latest innovations from esri’s · 2017. 3. 15. · latest innovations from esri’s applications...

20
Latest Innovations from Esri’s Applications Prototype Lab Al Pascual, Bob Gerlt, Carol Sousa, David Johnson, Hugh Keegan John Grayson, Mark Deaton, Mark Smith, Lenny Kneller Richie Carmichael, Thomas Emge, Witold Fraczek

Upload: others

Post on 07-Feb-2021

18 views

Category:

Documents


0 download

TRANSCRIPT

  • Latest Innovations from Esri’s

    Applications Prototype LabAl Pascual, Bob Gerlt, Carol Sousa, David Johnson, Hugh Keegan

    John Grayson, Mark Deaton, Mark Smith, Lenny Kneller

    Richie Carmichael, Thomas Emge, Witold Fraczek

  • Who are we?

    • 12 GIS pros

    • Located in Redlands, California

    • What we do

    • Competitive benchmarks

    • Strategic collaborations

    • Corporate assignments

    • Prototyping

    • New technology, new gadgets

  • Green Infrastructure Project

  • Filter the Cores – John Grayson

    Land Cover Analysis – Mark Deaton

    Betweenness Centrality – Mark Smith

    Rates Analysis Addin for ArcMap – Dave Johnson

    Green Infrastructure

  • “If future generations are to remember us with gratitude rather than contempt, we

    must leave them something more than the miracles of technology. We must leave

    them a glimpse of the world as it was in the beginning, not just after we got through

    with it.”

    -Lyndon Johnson

    “The nation behaves well if it treats the natural resources as assets which it must

    turn over to the next generation increased, and not impaired in value.”

    “We have become great because of the lavish use of our resources. But the time has

    come to inquire seriously what will happen when our forests are gone, when the coal,

    the iron, the oil, and the gas are exhausted, when the soils have still further

    impoverished and washed into the streams, polluting the rivers, denuding the fields

    and obstructing the navigation.”

    -Theodore Roosevelt

  • What is Green Infrastructure?

    • “Green infrastructure is defined as an interconnected network of green space that

    conserves natural ecosystem values and functions and provides associated

    benefits to human populations.”

    • “Green Infrastructure is the ecological framework needed for environmental, social

    and economic sustainability–in short it is our nation’s natural life sustaining

    system.”

    • Mark A. Benedict, Ph.D. and Edward T. McMahon, J.D., The Conservation Fund

  • Principles of Green Infrastructure

    • GI should be the framework for conservation and development

    • Design and plan GI before development

    • Linkage is key

    • GI functions across multiple jurisdictions and at different scales

    • GI is grounded in sound science and land use planning theories and practices

    • GI is a critical public investment

    • GI involves diverse stakeholders

  • What is a Core? How do you find a Core?

    • Undisturbed area

    - Minimum size: 100 acres

    200 meters wide

    • Methodology developed by GIC Inc., Charlottesville, VA

    • Model uses 8 data layers to identify cores

    - Primary layers:

    - NLCD 2011

    - NHD-Plus

    - TIGER

  • Green Infrastructure Quick Facts on USA Lower 48

    • Outputs (derived from vector and raster sources):

    - 554K cores (polygons)

    - 3.5M fragments (polygons)

    - 1.4M Least Cost Path Connectors

    - Cost Surface

    - Betweenness Centrality

    • 30m resolution ~ 15 billion cells

    • Distributed processing across 12 workstations

    • Enriched the cores with > 50 attributes

    Source data, products, apps and model available at

    http://www.esri.com/about-esri/greeninfrastructure

  • What is Betweenness Centrality (BC)?

    • Measures how often a core lies along the optimum path between other cores

    • High BC indicates a critical role in network structural connectivity

    Most popular core in the neighborhood

  • Computing BC requires a network of connected cores

    • Use Spatial Analyst: Cost Connectivity

    - Defines the Least Cost Paths from a core to each neighbor

    - Input:

    - Cost surface

    - Cores

    - Result:

    - 1.4M Least Cost Paths

    • Processing and post processing

    - 12 machines

    - 4 days

  • Finding BC means finding all of the optimal path between all cores in the

    network

    • Networkx python library from Los Alamos: Betweenness_Centrality function

    • Our network is 554K cores and 1.4M LCPs connecting the cores

    • 7 parallel instances on each of 12 machines takes about 26 hours

    • Computed 307 billion optimal paths between all pairs of cores

  • Rates Analysis Addin for ArcMapDave Johnson

  • Al Pascual

    Electric Vehicle Routing Mode

  • Fossil Fuel cars impact to the planetC02 levels since 2006

    Credit: https://climate.nasa.gov/vital-signs/carbon-dioxide/

  • Richie Carmichael

    Submarine Cables

    Solar Eclipse 3D

    Terrain Exporter

    Satellite Map 2

    Terrain Holographic Map

  • John Grayson

    Auckland Transportation

    Proximity Template

    Nearby Airports

    Terrain Visualizations

    Lake Reservoir

  • Please Take Our Survey! – No more memorizing Session ID numbers!!

    Get the Esri Events app

    Select session

    Scroll down to the

    Feedback sectionComplete Answers,

    Comment,

    SubmitGo to Dev Summit Schedule

  • Thank you!

    See our demos at

    https://maps.esri.com

    http://blogs.esri.com/esri/apl

    See our blogs at