lansdale boro 2012_budget

Upload: sokildan

Post on 06-Apr-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/3/2019 Lansdale Boro 2012_Budget

    1/49

    LANSDALE BOROUGH2012 BUDGETGENERAL FUND

    SUMMARY

    2012 Budget 1 Preliminary Draft

    DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    2012

    BUDGET

    CURRENT REVENUE

    Real Property Taxes 2,503,500$ 2,482,248$ 2,505,000$

    Local Enabling Act Taxes 2,050,000 1,635,432 2,050,000

    Business Licenses and Permits 340,100 292,486 400,100

    Fines 110,000 94,384 110,000

    Interest Earnings 1,000 530 500

    State Operating & Capital Grant - 88,555 -

    State Shared Revenue 312,000 569,207 492,000Charges for Services 10,000 10,751 10,000

    Public Safety 168,500 173,327 165,500

    Highway and Streets 4,500 11,465 6,000

    Refunds 600,000 540,000 640,000

    Interfund Transfers 4,500,000 4,050,000 5,500,000

    Total Revenue 10,599,600$ 9,948,384$ 11,879,100$

    REVENUES

  • 8/3/2019 Lansdale Boro 2012_Budget

    2/49

    LANSDALE BOROUGH2012 BUDGETGENERAL FUND

    SUMMARY

    2012 Budget 2 Preliminary Draft

    DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    2012

    BUDGET

    EXPENDITURES

    Legislative Body 33,500$ 31,001$ 32,000$

    Executive 423,500 324,690 452,500

    Financial Administration 275,500 209,341 319,000

    Tax Collection 60,500 48,460 56,000

    Legal Services 135,000 116,305 205,000

    General Administration 98,500 56,044 79,500

    Information Technology 28,300 3,789 104,000

    Engineering 80,000 46,494 125,000

    Buildings and Grounds 335,000 248,913 379,000

    Police Services 3,401,500 2,544,113 3,593,000

    Fire Protection Services 189,000 187,340 189,000

    Code Enforcement & Zoning 383,500 269,562 535,500

    Planning Commission 11,500 12,005 16,000

    Zoning Hearing Board 5,500 5,342 7,000

    Public Works 1,103,500 842,558 1,196,000

    Fleet Maintenance Services 111,000 137,589 185,000

    Library 442,000 416,279 448,000

    Historical Society 39,000 40,872 39,000

    Community Development - - 150,000

    Employer Paid Benefits 1,546,000 1,529,226 1,582,700

    Insurance 91,250 79,361 70,500

    Other - - 180,000

    Total Operating Expenditures 8,793,550$ 7,149,283$ 9,943,700$

    Interfund Transfers 2,409,000 2,168,100 2,376,500

    Total Expenditures 11,202,550$ 9,317,383$ 12,320,200$

    EXPENDITURES

  • 8/3/2019 Lansdale Boro 2012_Budget

    3/49

    LANSDALE BOROUGH2012 BUDGETGENERAL FUND

    2012 Budget 3 Preliminary Draft

    ACCOUNT

    NUMBER DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    BUDGET

    BALANCE

    % OF

    BUDGET

    2012

    BUDGET

    01.301.100 Real Estate Taxes - Current 2,500,000$ 2,461,245$ 38,755$ 98.45% 2,500,000$01.301.500 Real Estate Taxes - Delinquent 3,500 21,003 (17,503) 600.09% 5,000

    2,503,500$ 2,482,248$ 21,252$ 99.15% 2,505,000$

    01.310.100 Real Estate Transfer Tax 200,000$ 169,505$ 30,495$ 84.75% 200,000$

    01.310.210 Earned Income Taxes 1,600,000 1,261,223 338,777 78.83% 1,600,000

    01.310.500 Local Services Tax 250,000 204,704 45,296 81.88% 250,000

    2,050,000$ 1,635,432$ 414,568$ 79.78% 2,050,000$

    01.321.320 Junk Yard License 100$ 100$ -$ 100.00% 100$

    01.321.340 Refuse Collector Licenses - - - 0.00% -

    01.321.400 Apartment License 140,000 94,810 45,190 67.72% 150,000

    01.321.800 Cable Television Franchise Fees 200,000 197,576 2,424 98.79% 250,000

    340,100$ 292,486$ 47,614$ 86.00% 400,100$

    01.331.110 Vehicle Code Violations 40,000$ 41,493$ (1,493)$ 103.73% 40,000$

    01.331.120 Ordinance Violations 70,000 52,890 17,110 75.56% 70,000

    110,000$ 94,384$ 15,616$ 85.80% 110,000$

    01.341.100 Interest on Investments 1,000$ 530$ 470$ 52.95% 500$

    01.354.010 State Grants -$ 88,555$ (88,555)$ 0.00% -$

    01.354.090 CDBG - - - 0.00% -

    01.354.160 DCED Grants - - - 0.00% -

    -$ 88,555$ (88,555)$ 0.00% -$

    LOCAL TAX ENABLING ACT 511 TAXES

    BUSINESS LICENSES & PERMITS

    STATE OPERATING & CAPITAL GRANTS

    REVENUES

    FINES

    REAL PROPERTY TAXES

    INTEREST EARNINGS

  • 8/3/2019 Lansdale Boro 2012_Budget

    4/49

    LANSDALE BOROUGH2012 BUDGETGENERAL FUND

    2012 Budget 4 Preliminary Draft

    ACCOUNT

    NUMBER DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    BUDGET

    BALANCE

    % OF

    BUDGET

    2012

    BUDGET

    01.355.010 Public Utility Realty Taxes 4,500$ 5,114$ (614)$ 113.65% 4,500$01.355.040 Beverage License 7,500 4,450 3,050 59.33% 7,500

    01.355.050 Pension System State Aid 300,000 559,643 (259,643) 186.55% 300,000

    01.355.070 Foreign Fire Insurance Premiums - - - 0.00% 180,000

    312,000$ 569,207$ (257,207)$ 182.44% 492,000$

    01.361.310 Land Development Fees $ 4,000 $ 3,600 $ 400 90.00% $ 3,000

    01.361.330 Conditional Use Fees 1,000 - 1,000 0.00% 1,000

    01.361.340 Zoning Hearing Board Fees 5,000 5,825 (825) 116.50% 5,000

    01.361.700 Document Reproduction Fees - 1,326 (1,326) 0.00% 1,000

    $ 10,000 $ 10,751 $ (751) 107.51% $ 10,000

    01.362.100 Special Police Services 35,000$ 50,702$ (15,702)$ 144.86% 35,000$

    01.362.140 Crossing Guards 35,000 - 35,000 0.00% 35,000

    01.362.410 Building Permits 45,000 9,874 35,126 21.94% 35,000

    01.362.420 Electrical Permits 7,500 38,300 (30,800) 510.66% 15,000

    01.362.430 Plumbing Permits 5,000 22,820 (17,820) 456.40% 7,500

    01.362.450 Use and Occupancy Permits 5,000 15,615 (10,615) 312.30% 5,000

    01.362.460 Mechanical System Permits 1,000 9,075 (8,075) 907.50% 500

    01.362.470 Zoning Permits 5,000 - 5,000 0.00% 500

    01.362.480 Sign Permits 1,000 - 1,000 0.00% 500

    01.362.490 Amusement Device License 1,000 3,100 (2,100) 310.00% 3,500

    01.362.500 Intergovernmental Agreements 18,000 - 18,000 0.00% 18,000

    01.362.600 Other Revenue 10,000 23,841 (13,841) 238.41% 10,000

    168,500$ 173,327$ (4,827)$ 102.86% 165,500$

    01.363.100 Street, Sidewalk and Curb Repairs 3,500$ 9,380$ (5,880)$ 268.00% 5,000$

    01.363.600 Other Revenue 1,000 2,085 (1,085) 208.50% 1,000

    4,500$ 11,465$ (6,965)$ 254.78% 6,000$

    REVENUES

    STATE SHARED REVENUE

    PUBLIC SAFETY

    CHARGES FOR SERVICES

    HIGHWAYS AND STREETS

  • 8/3/2019 Lansdale Boro 2012_Budget

    5/49

    LANSDALE BOROUGH2012 BUDGETGENERAL FUND

    2012 Budget 5 Preliminary Draft

    ACCOUNT

    NUMBER DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    BUDGET

    BALANCE

    % OF

    BUDGET

    2012

    BUDGET

    01.395.000 Refund of Prior Year Expenditures -$ -$ -$ 0.00% -$01.395.007 Electric Fund - Service and Facility 400,000 360,000 40,000 90.00% 420,000

    01.395.008 Sewer Fund - Service and Facility 200,000 180,000 20,000 90.00% 220,000

    01.392.500 Bond Proceeds - - - 0.00% -

    600,000$ 540,000$ 60,000$ 90.00% 640,000$

    6,099,600$ 5,898,384$ 201,216$ 96.70% 6,379,100$

    01.392.007 From Electric Fund 4,500,000$ 4,050,000$ 450,000$ 90.00% 5,000,000$

    01.392.008 From Sewer Fund - - - 0.00% 500,000

    01.392.023 From Debt Service Fund - - - 0.00% -

    01.392.030 From Capital Projects Fund - - - 0.00% -

    4,500,000$ 4,050,000$ 450,000$ 90.00% 5,500,000$

    10,599,600$ 9,948,384$ 651,216$ 93.86% 11,879,100$

    TOTAL OPERATIONAL REVENUES

    TOTAL REVENUES WITH TRANSFERS

    REFUNDS

    REVENUES

    INTERFUND TRANSFERS

  • 8/3/2019 Lansdale Boro 2012_Budget

    6/49

    LANSDALE BOROUGH2012 BUDGETGENERAL FUND

    2012 Budget 6 Preliminary Draft

    ACCOUNT

    NUMBER DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    BUDGET

    BALANCE

    % OF

    BUDGET

    2012

    BUDGET

    01.400.105 Salaries and Wages 24,000$ 19,286$ 4,714$ 80.36% 24,000$01.400.192 FICA/Medicare 2,000 1,530 470 76.50% 2,000

    01.400.210 Office Supplies 500 - 500 0.00% 500

    01.400.310 Professional Services 2,500 8,885 (6,385) 355.40% 2,500

    01.400.340 Advertising & Printing 1,000 275 725 27.50% 1,000

    01.400.420 Subscriptions & Memberships 2,500 245 2,255 9.80% 1,000

    01.400.460 Trainings & Meetings 1,000 780 220 78.00% 1,000

    33,500$ 31,001$ 2,499$ 92.54% 32,000$

    01.401.112 Salaries and Wages 277,000$ 206,077$ 70,923$ 74.40% 285,000$

    01.401.180 Overtime Salaries - 51 (51) 0.00% -

    01.401.192 FICA/Medicare 21,500 18,105 3,395 84.21% 22,000

    01.401.196 Medical Insurance 94,000 76,245 17,755 81.11% 112,00001.401.198 Disability Insurance 6,000 2,716 3,284 45.27% 8,000

    01.401.199 Group Life Insurance 3,000 (2,086) 5,086 -69.52% 5,500

    01.401.210 Office Supplies 2,500 349 2,151 13.97% 1,000

    01.401.220 Operating Supplies 5,000 8,129 (3,129) 162.59% 6,500

    01.401.260 Minor Equipment 2,500 243 2,257 9.71% 1,000

    01.401.310 Professional Services 5,000 7,297 (2,297) 145.94% 5,000

    01.401.320 Communications 3,000 1,909 1,091 63.62% 2,000

    01.401.420 Subscriptions & Memberships 1,500 3,567 (2,067) 237.77% 1,500

    01.401.460 Training & Meetings 2,500 2,089 411 83.54% 3,000

    423,500$ 324,690$ 98,810$ 76.67% 452,500$

    01.402.112 Salaries and Wages 184,000$ 133,032$ 50,968$ 72.30% 195,000$

    01.402.180 Overtime Salaries - 88 (88) 0.00% -

    01.402.192 FICA/Medicare 15,000 11,408 3,592 76.05% 15,000

    01.402.196 Medical Insurance 47,000 37,600 9,400 80.00% 50,000

    01.402.198 Disability Insurance 3,500 3,911 (411) 111.74% 4,000

    01.402.199 Group Life Insurance 1,500 1,050 450 69.99% 1,500

    01.402.210 Office Supplies 1,000 13 987 1.25% 1,000

    01.402.220 Operating Supplies 2,500 4,344 (1,844) 173.76% 3,000

    01.402.260 Minor Equipment 2,500 132 2,368 5.30% 1,000

    01.402.310 Professional Services 12,500 12,534 (34) 100.27% 42,500

    01.402.320 Communications 1,000 - 1,000 0.00% 500

    01.402.340 Advertising and Printing 1,000 769 231 76.90% 1,000

    01.402.420 Subscriptions & Memberships 1,500 1,210 290 80.67% 1,000

    01.402.460 Trainings & Meetings 2,500 3,251 (751) 130.05% 3,500

    275,500$ 209,341$ 66,159$ 75.99% 319,000$

    EXECUTIVE

    FINANCIAL ADMINISTRATION

    LEGISLATIVE BODY

    EXPENDITURES

  • 8/3/2019 Lansdale Boro 2012_Budget

    7/49

    LANSDALE BOROUGH2012 BUDGETGENERAL FUND

    2012 Budget 7 Preliminary Draft

    ACCOUNT

    NUMBER DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    BUDGET

    BALANCE

    % OF

    BUDGET

    2012

    BUDGET

    01.403.105 Salaries and Wages 26,000$ 20,732$ 5,268$ 79.74% 27,000$01.403.160 Commission 30,000 22,874 7,126 76.25% 25,000

    01.403.192 FICA/Medicare 2,000 1,645 355 82.24% 3,000

    01.403.196 Medical Insurance 1,500 - 1,500 0.00% -

    01.403.215 Postage - - - 0.00% -

    01.403.220 Operating Supplies 1,000 3,209 (2,209) 320.86% 1,000

    01.403.310 Professional Services - - - 0.00% -

    01.403.340 Advertising & Printing - - - 0.00% -

    60,500$ 48,460$ 12,040$ 80.10% 56,000$

    01.404.301 General Legal Services 125,000$ 102,075$ 22,925$ 81.66% 200,000$

    01.404.314 Special Legal Services 10,000 14,230 (4,230) 142.30% 5,000

    135,000$ 116,305$ 18,695$ 86.15% 205,000$

    01.406.215 Postage 2,500$ 21$ 2,479$ 0.84% 2,500$

    01.406.220 Operating Supplies 10,000 3,497 6,503 34.97% 5,000

    01.406.260 Minor Equipment 1,000 334 666 33.40% 1,000

    01.406.320 Communications 50,000 9,522 40,478 19.04% 25,000

    01.406.340 Advertising and Printing 15,000 17,744 (2,744) 118.29% 20,000

    01.406.374 Equipment Maintenance 2,000 98 1,903 4.88% 1,000

    01.406.384 Equipment Leasing 5,000 - 5,000 0.00% 1,000

    01.406.390 Professional Services 1,000 - 1,000 0.00% 1,000

    01.406.420 Subscriptions and Memberships 2,000 4,788 (2,788) 239.38% 3,000

    01.406.450 Contracted Services 10,000 20,040 (10,040) 200.40% 20,000

    98,500$ 56,044$ 84,956$ 56.90% 79,500$

    01.407.112 Salaries and Wages -$ -$ -$ 0.00% 66,000$

    01.407.192 FICA/Medicare - - - 0.00% 6,000

    01.407.196 Medical Insurance - - - 0.00% 15,000

    01.407.198 Disability Insurance - - - 0.00% 1,000

    01.407.199 Group Life Insurance - - - 0.00% 500

    01.407.252 Equipment Parts - - - 0.00% -

    01.407.310 Professional Services 8,300 - 8,300 0.00% 4,000

    01.407.318 Software License Fees 10,000 3,370 6,630 33.70% 6,500

    01.407.450 Contracted Services 10,000 420 9,580 4.20% 5,000

    01.407.460 Training & Meetings - - - 0.00% -

    28,300$ 3,789$ 24,511$ 13.39% 104,000$

    01.408.313 General Engineering 30,000$ 27,135$ 2,865$ 90.45% 75,000$

    01.408.317 Traffic Engineering 50,000 19,359 30,641 38.72% 50,000

    01.408.318 Storm Water Engineering - - - 0.00% -

    01.408.319 Street Lighting Engineering - - - 0.00% -

    80,000$ 46,494$ 33,506$ 58.12% 125,000$

    INFORMATION TECHNOLOGY

    GENERAL ADMINISTRATION

    LEGAL SERVICES

    ENGINEERING

    EXPENDITURES

    TAX COLLECTION

  • 8/3/2019 Lansdale Boro 2012_Budget

    8/49

    LANSDALE BOROUGH2012 BUDGETGENERAL FUND

    2012 Budget 8 Preliminary Draft

    ACCOUNT

    NUMBER DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    BUDGET

    BALANCE

    % OF

    BUDGET

    2012

    BUDGET

    01.409.112 Salaries and Wages 75,000$ 53,057$ 21,943$ 70.74% 115,000$01.409.192 FICA/Medicare 6,000 4,616 1,384 76.93% 9,000

    01.409.196 Medical Insurance 22,000 15,514 6,486 70.52% 52,000

    01.409.198 Disability Insurance 1,500 1,135 365 75.70% 2,000

    01.409.199 Group Life Insurance 500 406 94 81.13% 1,000

    01.409.220 Operating Supplies 20,000 4,163 15,837 20.81% 10,000

    01.409.236 Building Supplies 20,000 48 19,952 0.24% 20,000

    01.409.360 Utilities 135,000 88,243 46,757 65.37% 115,000

    01.409.373 Repairs and Maintenance 25,000 24,526 474 98.10% 25,000

    01.409.450 Contracted Services 30,000 57,205 (27,205) 190.68% 30,000

    335,000$ 248,913$ 86,087$ 74.30% 379,000$

    01.410.112 Salaries and Wages 2,108,000$ 1,604,062$ 503,938$ 76.09% 2,235,000$01.410.146 Crossing Guards Salaries 70,000 35,259 34,741 50.37% 75,000

    01.410.149 Holiday Pay 80,000 43,649 36,352 54.56% 90,000

    01.410.179 Longevity Pay 80,000 77,006 2,994 96.26% 102,000

    01.410.180 Overtime Salaries 165,000 152,015 12,985 92.13% 170,000

    01.410.181 Court Overtime Pay 13,000 11,673 1,327 89.80% 14,000

    01.410.182 Shift Differential 25,000 17,952 7,048 71.81% 25,000

    01.410.186 Clothing Allowance 5,000 150 4,850 3.00% 5,000

    01.410.192 FICA/Medicare 65,500 50,160 15,340 76.58% 67,000

    01.410.196 Medical Insurance 604,000 414,365 189,635 68.60% 616,000

    01.410.198 Disability Insurance 15,000 12,385 2,615 82.57% 15,500

    01.410.199 Group Life Insurance 7,500 5,325 2,175 71.00% 7,500

    01.410.210 Office Supplies 11,000 3,535 7,465 32.14% 12,000

    01.410.215 Postage 2,000 1,618 382 80.91% 2,00001.410.220 Operating Supplies 10,000 16,143 (6,143) 161.43% 12,000

    01.410.238 Clothing and Uniforms 20,500 14,790 5,710 72.15% 20,500

    01.410.239 Munitions Supplies 12,000 8,090 3,910 67.42% 13,500

    01.410.260 Minor Equipment 1,500 5,431 (3,931) 362.04% 2,000

    01.410.310 Professional Services 1,000 4,100 (3,100) 410.00% 1,000

    01.410.317 Civil Service 15,000 13,652 1,348 91.01% 15,000

    01.410.320 Communications 27,000 13,067 13,933 48.40% 27,000

    01.410.340 Advertising and Printing 2,000 2,892 (892) 144.59% 4,000

    01.410.370 Repairs and Maintenance 11,000 4,194 6,806 38.13% 12,000

    01.410.374 Equipment Maintenance 4,500 2,859 1,641 63.53% 6,000

    01.410.384 Equipment Leasing 6,000 5,910 90 98.50% 6,500

    01.410.420 Subscriptions and Memberships 4,000 2,880 1,120 72.01% 5,000

    01.410.450 Contracted Services 7,000 8,103 (1,103) 115.75% 1,500

    01.410.460 Training and Meetings 18,000 7,648 10,352 42.49% 20,000

    01.410.530 Mutual Aid Cost 11,000 5,200 5,800 47.27% 11,000

    3,401,500$ 2,544,113$ 857,387$ 74.79% 3,593,000$

    POLICE SERVICES

    BUILDINGS AND GROUNDS

    EXPENDITURES

  • 8/3/2019 Lansdale Boro 2012_Budget

    9/49

    LANSDALE BOROUGH2012 BUDGETGENERAL FUND

    2012 Budget 9 Preliminary Draft

    ACCOUNT

    NUMBER DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    BUDGET

    BALANCE

    % OF

    BUDGET

    2012

    BUDGET

    01.411.112 Salaries and Wages 6,000$ 4,584$ 1,416$ 76.40% 6,000$01.411.192 FICA/Medicare 500 364 136 72.72% 500

    01.411.220 Operating Supplies - - - 0.00% -

    01.411.320 Communications 500 392 108 78.48% 500

    01.411.540 Contribution To Fire Company 182,000 182,000 - 100.00% 182,000

    189,000$ 187,340$ 1,660$ 99.12% 189,000$

    01.413.112 Salaries and Wages 227,000$ 176,418$ 50,582$ 77.72% 330,000$

    01.413.180 Overtime Salaries 5,000 4,039 961 80.78% 5,000

    01.413.192 FICA/Medicare 18,000 14,158 3,842 78.66% 26,000

    01.413.196 Medical Insurance 90,000 50,410 39,590 56.01% 125,000

    01.413.198 Disability Insurance 4,000 4,362 (362) 109.05% 6,000

    01.413.199 Group Life Insurance 1,500 754 746 50.27% 2,00001.413.210 Office Supplies 1,500 706 794 47.06% 1,500

    01.413.220 Operating Supplies 8,000 4,470 3,530 55.88% 5,000

    01.413.260 Minor Equipment 1,000 745 255 74.50% 1,000

    01.413.310 Professional Services - - - 0.00% -

    01.413.320 Communications 1,500 2,309 (809) 153.90% 3,000

    01.413.340 Advertising and Printing 2,500 2,865 (365) 114.60% 3,500

    01.413.370 Repairs and Maintenance 1,000 - 1,000 0.00% 500

    01.413.374 Equipment Maintenance 500 - 500 0.00% 500

    01.413.384 Equipment Leasing 3,000 1,907 1,093 63.57% 4,000

    01.413.420 Subscriptions and Memberships 3,000 747 2,253 24.91% 2,500

    01.413.450 Contracted Services 10,000 2,058 7,942 20.58% 10,000

    01.413.460 Training and Meetings 6,000 3,614 2,386 60.23% 10,000

    383,500$ 269,562$ 113,939$ 70.29% 535,500$

    01.414.220 Operating Supplies 500$ -$ 500$ 0.00% 500$

    01.414.310 Professional Services 500 1,342 (842) 268.49% 5,000

    01.414.340 Advertising and Printing 500 - 500 0.00% 500

    01.414.450 Contracted Services 10,000 10,663 (663) 106.63% 10,000

    11,500$ 12,005$ (505)$ 104.40% 16,000$

    01.418.220 Operating Supplies 500$ -$ 500$ 0.00% 500$

    01.418.310 Professional Services 3,000 3,859 (859) 128.63% 3,000

    01.418.340 Advertising & Printing 1,000 1,183 (183) 118.33% 2,500

    01.418.450 Contracted Services 1,000 300 700 30.00% 1,000

    5,500$ 5,342$ 158$ 97.13% 7,000$

    CODE ENFORCEMENT & ZONING

    EXPENDITURES

    PLANNING COMMISSION

    FIRE PROTECTION SERVICES

    ZONING HEARING BOARD

  • 8/3/2019 Lansdale Boro 2012_Budget

    10/49

    LANSDALE BOROUGH2012 BUDGETGENERAL FUND

    2012 Budget 10 Preliminary Draft

    ACCOUNT

    NUMBER DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    BUDGET

    BALANCE

    % OF

    BUDGET

    2012

    BUDGET

    01.430.112 Salaries and Wages 220,000$ 156,065$ 63,935$ 70.94% 206,000$01.430.115 Salaries and Wages Seasonal 4,000 - 4,000 0.00% 4,000

    01.430.180 Overtime Salaries - 9,444 (9,444) 0.00% 5,000

    01.430.192 FICA/Medicare 17,000 14,544 28,956 85.56% 26,500

    01.430.196 Medical Insurance 230,000 147,609 42,391 64.18% 265,000

    01.430.198 Disability Insurance 13,000 8,541 2,959 65.70% 13,500

    01.430.199 Group Life Insurance 5,500 2,964 1,036 53.89% 5,500

    01.430.210 Office Supplies 1,000 110 890 11.04% 1,000

    01.430.220 Operating Supplies 10,000 13,133 (7,933) 131.33% 10,000

    01.430.238 Uniforms 8,000 5,505 4,495 68.82% 8,000

    01.430.260 Minor Equipment 5,000 4,904 14,096 98.09% 5,000

    01.430.320 Communications 5,000 10,860 (7,860) 217.20% 13,000

    01.430.340 Advertising and Printing 4,000 2,108 (608) 52.69% 4,000

    01.430.370 Maintenance and Repair 2,500 - 5,000 0.00% 2,50001.430.374 Equipment Maintenance 3,000 417 38,583 13.90% 2,500

    01.430.384 Equipment Rentals 1,000 59 941 5.90% 1,000

    01.430.420 Subscriptions and Memberships 2,000 393 2,307 19.63% 2,000

    01.430.450 Contracted Services 1,000 2,791 (1,791) 279.05% 1,000

    01.430.460 Trainings and Meetings 2,000 552 1,448 27.61% 2,000

    534,000$ 379,999$ 183,401$ 71.16% 577,500$

    01.431.112 Salaries and Wages 30,000$ 16,997$ 13,003$ 56.66% 35,000$

    01.431.180 Overtime Salaries - - - 0.00% -

    01.431.192 FICA/Medicare 2,500 1,300 1,200 52.01% 3,000

    01.431.220 Operating Supplies 5,000 3,372 1,628 67.44% 5,000

    01.431.245 Highway Supplies 2,000 - 2,000 0.00% 2,00001.431.374 Equipment Maintenance 13,000 - 13,000 0.00% 7,000

    01.431.450 Contracted Services 38,000 38,714 (714) 101.88% 40,000

    90,500$ 60,384$ 30,116$ 66.72% 92,000$

    01.432.112 Salaries and Wages 10,000$ 352$ 9,648$ 3.52% 11,000$

    01.432.180 Overtime Salaries 1,000 - 1,000 0.00% 1,000

    01.432.192 FICA/Medicare 1,000 42 958 4.19% 1,000

    01.432.220 Operating Supplies 3,000 3,607 (607) 120.22% 3,000

    01.432.260 Minor Equipment 500 - 500 0.00% 500

    01.432.374 Equipment Maintenance 500 3,332 (2,832) 666.45% 500

    01.432.384 Equipment Rentals 500 - 500 0.00% 500

    01.432.450 Contracted Services - - - 0.00% -

    16,500$ 7,333$ 9,167$ 44.44% 17,500$

    STREET CLEANING

    EXPENDITURES

    SNOW AND ICE REMOVAL

    PUBLIC WORKS

  • 8/3/2019 Lansdale Boro 2012_Budget

    11/49

    LANSDALE BOROUGH2012 BUDGETGENERAL FUND

    2012 Budget 11 Preliminary Draft

    ACCOUNT

    NUMBER DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    BUDGET

    BALANCE

    % OF

    BUDGET

    2012

    BUDGET

    01.435.112 Salaries and Wages 10,000$ 2,873$ 7,127$ 28.73% 10,000$01.435.180 Overtime Salaries - - - 0.00% -

    01.435.192 FICA/Medicare 1,000 220 780 21.98% 1,000

    01.435.220 Operating Supplies 8,000 23,269 (15,269) 290.87% 8,000

    01.435.450 Contracted Services - 6,894 (6,894) 0.00% -

    19,000$ 33,256$ (14,256)$ 175.03% 19,000$

    01.436.112 Salaries and Wages 50,000$ 29,045$ 20,955$ 58.09% 57,000$

    01.436.180 Overtime Salaries - 390 (390) 0.00% -

    01.436.192 FICA/Medicare 4,000 2,252 1,748 56.30% 5,000

    01.436.220 Operating Supplies 5,000 5,113 (113) 102.27% 5,000

    01.436.450 Contracted Services 10,000 528 9,472 5.28% 10,000

    69,000$ 37,328$ 31,672$ 54.10% 77,000$

    01.437.220 Operating Supplies 3,000$ 4,742$ (1,742)$ 158.08% 35,000$

    01.437.231 Motor Fuels - Gasoline 3,000 28,888 (25,888) 962.94% 30,000

    01.437.232 Motor Fuels - Diesel 20,000 28,257 (8,257) 141.29% 32,000

    01.437.235 Oils and Lubricants 5,000 3,211 1,789 64.21% 5,000

    01.437.253 Administration 2,500 - 2,500 0.00% 1,000

    01.437.254 Police Services 30,000 26,987 3,013 89.96% 30,000

    01.437.255 Code Enforcement 2,500 3,698 (1,198) 147.93% 5,000

    01.437.256 Public Works 39,000 21,668 17,332 55.56% 33,000

    01.437.259 Heavy Equipment 6,000 19,974 (13,974) 332.90% 13,000

    01.437.260 Minor Equipment - 133 (133) 0.00% 500

    01.437.450 Contracted Services - 30 (30) 0.00% 500

    111,000$ 137,589$ (26,589)$ 123.95% 185,000$

    01.438.112 Salaries and Wages 228,000$ 204,345$ 23,655$ 89.62% 267,000$

    01.438.180 Overtime Salaries 50,000 41,974 8,026 83.95% 51,000

    01.438.192 FICA/Medicare 25,000 19,085 5,915 76.34% 22,000

    01.438.220 Operating Supplies 55,000 50,825 4,175 92.41% 60,000

    01.438.260 Minor Equipment 4,000 - 4,000 0.00% 4,000

    01.438.374 Equipment Maintenance - 275 (275) 0.00% -

    01.438.384 Equipment Rentals 5,000 7,755 (2,755) 155.09% 5,000

    01.438.450 Contracted Services 7,500 - 7,500 0.00% 4,000

    374,500$ 324,258$ 50,242$ 86.58% 413,000$

    EXPENDITURES

    SIDEWALKS AND CROSSWALKS

    ROAD AND BRIDGE MAINTENANCE

    STORM SEWERS AND DRAINS

    FLEET MAINTENANCE SERVICES

  • 8/3/2019 Lansdale Boro 2012_Budget

    12/49

    LANSDALE BOROUGH2012 BUDGETGENERAL FUND

    2012 Budget 12 Preliminary Draft

    ACCOUNT

    NUMBER DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    BUDGET

    BALANCE

    % OF

    BUDGET

    2012

    BUDGET

    01.456.196 Medical Insurance 90,000$ 66,279$ 23,721$ 73.64% 96,000$01.456.198 Disability Insurance 1,500 - 1,500 0.00% 1,500

    01.456.199 Group Life Insurance 500 - 500 0.00% 500

    01.456.220 Operating Supplies - - - 0.00% -

    01.456.373 Repairs and Maintenance - Buildings - - - 0.00% -

    01.456.500 Contribution to Library 350,000 350,000 - 100.00% 350,000

    442,000$ 416,279$ 25,721$ 94.18% 448,000$

    01.459.220 Operating Supplies 500$ -$ 500$ 0.00% 500$

    01.459.260 Minor Equipment - - - 0.00% -

    01.459.360 Utilities 10,000 7,909 2,091 79.09% 10,000

    01.459.373 Repairs and Maintenance - Buildings 1,000 5,463 (4,463) 546.30% 1,000

    01.459.500 Contribution from Borough 27,500 27,500 - 100.00% 27,500

    39,000$ 40,872$ (1,872)$ 104.80% 39,000$

    01.463.500 Contribution from Borough -$ -$ -$ 0.00% 150,000$

    01.483.190 Other Personal Services -$ -$ -$ 0.00% -$

    01.483.191 Police - Post Retirement Medical 300,000 300,000 - 100.00% 300,000

    01.483.194 Unemployment Compensation - 21,527 (21,527) 0.00% -

    01.483.195 Workers' Compensation 152,000 131,406 20,594 86.45% 149,700

    01.483.197 Police Pension Plan 930,000 939,672 (9,672) 101.04% 932,000

    01.483.198 Non-Uniformed Pension Plan 159,000 130,174 28,826 81.87% 195,000

    01.483.199 Educational Incentive Benefits 5,000 5,183 (183) 103.67% 5,000

    01.483.310 Professional Services - 79 (79) 0.00% -

    01.483.500 Human Resource Programs - 1,186 (1,186) 0.00% 1,000

    1,546,000$ 1,529,226$ 16,774$ 98.92% 1,582,700$

    01.486.100 Property and Liability 90,750$ 79,361$ 11,389$ 87.45% 70,000$

    01.486.600 Professional Bonds 500 - 500 0.00% 500

    91,250$ 79,361$ 11,889$ 86.97% 70,500$

    01.488.320 Refunds -$ -$ -$ 0.00% -$

    01.489.100 Fireman's Relief Association -$ -$ -$ 0.00% 180,000$

    8,793,550$ 7,149,283$ 1,716,167$ 81.30% 9,943,700$

    LIBRARY

    EXPENDITURES

    TOTAL OPERATIONAL EXPENDITURES

    REFUNDS

    INSURANCE

    HISTORICAL SOCIETY

    UNCLASSIFIED EXPENDITURES

    EMPLOYER PAID BENEFITS

    COMMUNITY DEVELOPMENT

  • 8/3/2019 Lansdale Boro 2012_Budget

    13/49

    LANSDALE BOROUGH2012 BUDGETGENERAL FUND

    2012 Budget 13 Preliminary Draft

    ACCOUNT

    NUMBER DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    BUDGET

    BALANCE

    % OF

    BUDGET

    2012

    BUDGET

    01.492.009 To Park & Rec Fund 1,207,000$ 1,086,300$ 120,700$ 90.00% 1,218,000$01.492.018 To 311 West Main Street Fund 50,000 45,000 5,000 90.00% 32,000

    01.492.023 To Debt Service Fund 712,000 640,800 71,200 90.00% 960,000

    01.492.030 To Capital Project Fund 440,000 396,000 44,000 90.00% 166,500

    2,409,000$ 2,168,100$ 240,900$ 90.00% 2,376,500$

    11,202,550$ 9,317,383$ 1,885,167$ 83.17% 12,320,200$TOTAL EXPENDITURES WITH TRANSFERS

    INTERFUND TRANSFERS

    EXPENDITURES

  • 8/3/2019 Lansdale Boro 2012_Budget

    14/49

    LANSDALE BOROUGH2012 BUDGETPARKING FUND

    SUMMARY

    2012 Budget 14 Preliminary Draft

    DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    2012

    BUDGET

    CURRENT REVENUE

    Fines 20,000$ 12,581$ 15,000$

    Interest Earnings 500 252 500

    Rents and Royalties 200 781 200

    Highways and Streets 50,000 48,628 50,000

    Refunds 67,250 29,663 30,000

    Interfund Transfers - - -

    Total Revenue 137,950$ 91,905$ 95,700$

    DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    2012

    BUDGET

    EXPENDITURES

    Legal Services 5,000$ 43,203$ 10,000$

    Engineering - -

    Parking Facilities 58,500 34,134 47,500

    Debt Principle - - -

    Debt Interest - - -

    Employer Paid Benefits 2,000 1,981 1,500

    Insurance 1,750 1,261 1,500

    Total Operating Expenditures 67,250$ 80,580$ 60,500$

    REVENUES

    EXPENDITURES

  • 8/3/2019 Lansdale Boro 2012_Budget

    15/49

    LANSDALE BOROUGH2012 BUDGET

    PARKING FUND

    2012 Budget 15 Preliminary Draft

    ACCOUNT

    NUMBER DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    BUDGET

    BALANCE

    % OF

    BUDGET

    2012

    BUDGET

    04.331.140 Parking Violation Fines 20,000$ 12,581$ 7,419$ 62.91% 15,000$

    04.341.100 Interest on Investments 500$ 252$ 248$ 50.32% 500$

    04.342.200 Rent of Buildings 100$ -$ 100$ 0.00% 100$

    04.365.400 Other Revenue 100 781 (681) 781.00% 100

    200$ 781$ (581)$ 390.50% 200$

    04.363.210 Parking Meter Use 50,000$ 48,628$ 1,372$ 97.26% 50,000$

    04.395.000 Refund of Prior Year Expenditures 67,250$ 29,663$ 37,587$ 44.11% 30,000$

    137,950$ 91,905$ 46,045$ 66.62% 95,700$

    04.391.001 From General Fund -$ -$ -$ 0.00% -$

    137,950$ 91,905$ 46,045$ 66.62% 95,700$

    INTERFUND TRANSFERS

    TOTAL OPERATIONAL REVENUES

    RENTS AND ROYALTIES

    TOTAL REVENUES WITH TRANSFERS

    REVENUES

    INTEREST EARNINGS

    HIGHWAYS AND STREETS

    FINES

    REFUNDS

  • 8/3/2019 Lansdale Boro 2012_Budget

    16/49

    LANSDALE BOROUGH2012 BUDGET

    PARKING FUND

    2012 Budget 16 Preliminary Draft

    ACCOUNT

    NUMBER DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    BUDGET

    BALANCE

    % OF

    BUDGET

    2012

    BUDGET

    04.404.301 Legal Expenses 5,000$ 43,203$ (38,203)$ 864.06% 10,000$

    04.404.314 Special Legal Services - - - 0.00% -

    5,000$ 43,203$ (38,203)$ 864.06% 10,000$

    04.408.313 General Engineering -$ -$ -$ 0.00% -$

    04.445.112 Salaries and Wages 27,000$ 18,891$ 8,109$ 69.96% 28,500$

    04.445.192 FICA/Medicare 2,500 1,469 1,031 58.75% 2,500

    04.445.220 Operating Supplies 15,000 2,183 12,817 14.55% 5,000

    04.445.320 Communications 1,000 705 295 70.52% 1,000

    04.445.330 Automobile Expense 500 1,785 (1,285) 356.94% 1,000

    04.445.360 Utilities 5,000 3,324 1,676 66.48% 5,000

    04.445.374 Equipment Repair 5,000 1,628 3,372 32.57% 3,000

    04.445.450 Contracted Services 2,500 4,150 (1,650) 166.00% 1,500

    58,500$ 34,134$ 24,366$ 58.35% 47,500$

    04.483.195 Worker's Compensation 2,000$ 1,981$ 19$ 99.07% 1,500$

    04.486.100 Property and Liability 1,750$ 1,261$ 489$ 72.06% 1,500$

    67,250$ 80,580$ (13,330)$ 119.82% 60,500$

    INSURANCE

    EXPENDITURES

    EMPLOYER PAID BENEFITS

    ENGINEERING

    TOTAL OPERATIONAL EXPENDITURES

    LEGAL SERVICES

    PARKING FACILITIES

  • 8/3/2019 Lansdale Boro 2012_Budget

    17/49

    LANSDALE BOROUGH2012 BUDGET

    421 WEST MAIN STREET FUND

    SUMMARY

    2012 Budget 17 Preliminary Draft

    DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    2012

    BUDGET

    CURRENT REVENUE

    Interest Earnings 500$ 138$ 500$

    Rents and Royalties 110,000 92,284 110,000

    Interfund Transfers - - -

    Total Revenue 110,500$ 92,423$ 110,500$

    DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    2012

    BUDGET

    EXPENDITURES

    Buildings and Grounds 40,500$ 21,596$ 33,000$

    Insurance 2,500 1,925 2,000

    Total Operating Expenditures 43,000$ 23,521$ 35,000$

    Interfund Transfers - -

    Total Expenditures 43,000$ 23,521$ 35,000$

    EXPENDITURES

    REVENUES

  • 8/3/2019 Lansdale Boro 2012_Budget

    18/49

    LANSDALE BOROUGH2012 BUDGET

    421 WEST MAIN STREET FUND

    2012 Budget 18 Preliminary Draf

    ACCOUNT

    NUMBER DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    BUDGET

    BALANCE

    % OF

    BUDGET

    2012

    BUDGET

    05.341.100 Interest on Investments 500$ 138$ 362$ 27.69% 500$

    05.342.200 Rent of Build ings 110,000$ 92,284$ 17,716$ 83.89% 110,000$

    110,500$ 92,423$ 18,077$ 83.64% 110,500$

    05.392.001From General Fund -$ -$ -$ 0.00% -$

    110,500$ 92,423$ 18,077$ 83.64% 110,500$

    INTERFUND TRANSFERS

    TOTAL OPERATIONAL REVENUES

    REVENUES

    INTEREST EARNINGS

    RENTS AND ROYALTIES

    TOTAL REVENUES WITH TRANSFERS

  • 8/3/2019 Lansdale Boro 2012_Budget

    19/49

    LANSDALE BOROUGH2012 BUDGET

    421 WEST MAIN STREET FUND

    2012 Budget 19 Preliminary Draf

    ACCOUNT

    NUMBER DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    BUDGET

    BALANCE

    % OF

    BUDGET

    2012

    BUDGET

    05.409.220 Operating Supplies 500$ 15$ 485$ 3.09% 500$

    05.409.236 Building Supplies - - - 0.00% -

    05.409.360 Utilities 20,000 5,816 14,184 29.08% 15,000

    05.409.373 Repairs and Maintenance - Buildings 5,000 678 4,322 13.56% 2,500

    05.409.450 Contracted Services 15,000 15,087 (87) 100.58% 15,000

    05.409.700 Capital Purchases - - - 0.00% -

    05.409.830 Depreciation Expense - - - 0.00% -

    40,500$ 21,596$ 18,904$ 53.32% 33,000$

    05.486.100 Property and Liability 2,500$ 1,925$ 575$ 76.98% 2,000$

    43,000$ 23,521$ 19,479$ 54.70% 35,000$

    05.492.001 To General Fund -$ -$ -$ 0.00% -$

    43,000$ 23,521$ 19,479$ 54.70% 35,000$

    INSURANCE

    TOTAL OPERATIONAL EXPENDITURES

    EXPENDITURES

    BUILDINGS AND GROUNDS

    INTERFUND TRANSFERS

    TOTAL EXPENDITURES WITH TRANSFERS

  • 8/3/2019 Lansdale Boro 2012_Budget

    20/49

    LANSDALE BOROUGH2012 BUDGETELECTRIC FUND

    SUMMARY

    2012 Budget 20 Preliminary Draft

    DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    2012

    BUDGET

    CURRENT REVENUE

    Interest Earnings 34,500$ 57,779$ 45,000$

    Rents and Royalties 10,000 8,591 10,000

    Electric System 19,380,000 16,022,554 19,690,000

    Proceeds of Fixed Asset Disposition - - -

    Total Revenue 19,424,500$ 16,088,924$ 19,745,000$

    DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    2012

    BUDGET

    EXPENDITURES

    Legal Services 21,000$ (13,100)$ 25,000$

    Information Technology 76,100 51,656 88,000

    Engineering 75,000 22,717 60,000

    Buildings and Grounds 11,653 29,000

    Administration 1,248,000 1,055,626 1,379,500

    Traffic Control Devices 43,500 13,193 20,000

    Street Lighting 113,000 79,042 110,000

    Fleet Maintenance Services 43,000 41,922 43,000

    Electric System 12,208,500 11,085,495 12,414,500

    Employer Paid Benefits 110,000 115,505 114,000

    Insurance 83,750 63,035 65,000

    Total Operating Expenditures 14,021,850$ 12,526,744$ 14,348,000$

    Interfund Transfers 4,665,500 4,198,950 5,235,500

    Total Expenditures 18,687,350$ 16,725,694$ 19,583,500$

    REVENUES

    EXPENDITURES

  • 8/3/2019 Lansdale Boro 2012_Budget

    21/49

    LANSDALE BOROUGH2012 BUDGETELECTRIC FUND

    2012 Budget 21 Preliminary Draf

    ACCOUNT

    NUMBER DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    BUDGET

    BALANCE

    % OF

    BUDGET

    2012

    BUDGET

    07.341.100 Interest on Investments 30,000$ 53,940$ (23,940)$ 179.80% 40,000$

    07.341.200 Commission on Sales Tax 2,000 2,611 (611) 130.56% 2,500

    07.341.300 Investment Income 2,500 1,228 1,272 49.13% 2,500

    34,500$ 57,779$ (23,279)$ 167.48% 45,000$

    07.342.400 Rent of Equipment 10,000$ 8,591$ 1,409$ 85.91% 10,000$

    07.372.342 Primary Electric 4,700,000$ 3,781,139$ 918,861$ 80.45% 4,700,000$

    07.372.400 General Service Electric 6,670,000 5,227,625 1,442,375 78.38% 6,670,000

    07.372.410 Residential Sales 7,750,000 6,727,825 1,022,175 86.81% 8,000,000

    07.372.500 Other Operating Revenue 50,000 2,620 47,380 5.24% 5,000

    07.372.510 Electric Incentive Ordinance - (18,628) 18,628 0.00% (5,000)

    07.372.600 Other Revenue 10,000 69,845 (59,845) 698.45% 70,000

    07.372.650 Penalties Electric 200,000 232,127 (32,127) 116.06% 250,000

    19,380,000$ 16,022,554$ 3,357,446$ 82.68% 19,690,000$

    07.391.100 Sale of Property and Equipment -$ -$ -$ 0.00% -$

    07.391.200 Miscellaneous - - - 0.00% -

    -$ -$ -$ 0.00% -$

    19,424,500$ 16,088,924$ 3,335,576$ 82.83% 19,745,000$

    INTEREST EARNINGS

    ELECTRIC SYSTEM

    REVENUES

    TOTAL OPERATIONAL REVENUES

    RENTS AND ROYALTIES

    PROCEEDS OF FIXED ASSET DISPOSITION

  • 8/3/2019 Lansdale Boro 2012_Budget

    22/49

    LANSDALE BOROUGH2012 BUDGETELECTRIC FUND

    2012 Budget 22 Preliminary Draf

    ACCOUNT

    NUMBER DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    BUDGET

    BALANCE

    % OF

    BUDGET

    2012

    BUDGET

    07.404.301 General Legal Services 20,000$ 15,385$ 4,615$ 76.93% 20,000$

    07.404.314 Special Legal Services 1,000 (28,485) 29,485 -2848.51% 5,000

    21,000$ (13,100)$ 34,100$ -62.38% 25,000$

    07.407.252 Equipment Parts 1,000$ 400$ 600$ 40.00% 1,000$

    07.407.310 Professional Services 10,000 17,104 (7,104) 171.04% 20,000

    07.407.318 Software License Fees 60,000 33,185 26,815 55.31% 60,000

    07.407.374 Equipment Maintenance - 304 (304) 0.00% 1,000

    07.407.384 Equipment Leasing 5,000 - 5,000 0.00% 5,000

    07.407.460 Training & Meetings 100 663 (563) 663.47% 1,000

    76,100$ 51,656$ 24,444$ 67.88% 88,000$

    07.408.313 General Engineering 25,000$ 21,677$ 3,323$ 86.71% 25,000$

    07.408.317 Traffic Engineering 50,000 1,040 48,960 2.08% 35,000

    75,000$ 22,717$ 52,283$ 30.29% 60,000$

    07.409.112 Salaries and Wages -$ -$ -$ 0.00% -$

    07.409.220 Operating Supplies 15,000 1,366 13,634 9.10% 7,000

    07.409.360 Utilities 7,000 10,287 (3,287) 146.96% 15,000

    07.409.373 Repairs and Maintenance - - - 0.00% -

    07.409.450 Contracted Services - - - 0.00% 7,000

    22,000$ 11,653$ 10,347$ 52.97% 29,000$

    07.430.112 Salaries and Wages 325,000$ 244,182$ 80,818$ 75.13% 350,000$

    07.430.180 Overtime Salaries 5,000 8,239 (3,239) 164.78% 5,000

    07.430.192 FICA/Medicare 30,000 20,779 9,221 69.26% 30,000

    07.430.196 Medical Insurance 324,000 222,708 101,292 68.74% 354,500

    07.430.198 Disability Insurance 20,000 17,016 2,984 85.08% 20,000

    07.430.199 Group Life Insurance 6,500 4,974 1,526 76.52% 6,500

    07.430.210 Office Supplies 2,500 2,354 146 94.16% 2,500

    07.430.215 Postage 15,000 32,650 (17,650) 217.67% 33,000

    07.430.220 Operating Supplies 55,000 26,439 28,561 48.07% 55,000

    07.430.238 Uniforms 10,500 7,515 2,985 71.57% 10,500

    07.430.310 Professional Services 12,500 12,500 - 100.00% 12,500

    07.430.317 Other Services and Charges 400,000 360,000 40,000 90.00% 420,000

    07.430.320 Communications 10,000 22,275 (12,275) 222.75% 18,000

    07.430.374 Equipment Maintenance 1,000 489 511 48.89% 1,000

    07.430.384 Equipment Leasing 15,000 10,629 4,371 70.86% 15,000

    07.430.390 Bank Services Charges/Fees - 37,693 (37,693) 0.00% 30,000

    07.430.420 Subscriptions and Memberships 6,000 9,989 (3,989) 166.48% 6,000

    07.430.450 Contracted Services 10,000 15,197 (5,197) 151.97% 10,000

    07.430.710 Cost of General Property - - - 0.00% -

    1,248,000$ 1,055,626$ 192,374$ 84.59% 1,379,500$

    LEGAL SERVICES

    ENGINEERING

    BUILDINGS AND GROUNDS

    ADMINISTRATION

    EXPENDITURES

    INFORMATION TECHNOLOGY

  • 8/3/2019 Lansdale Boro 2012_Budget

    23/49

    LANSDALE BOROUGH2012 BUDGETELECTRIC FUND

    2012 Budget 23 Preliminary Draf

    ACCOUNT

    NUMBER DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    BUDGET

    BALANCE

    % OF

    BUDGET

    2012

    BUDGET

    07.433.112 Salaries and Wages 7,500$ 4,866$ 2,634$ 64.88% 7,500$

    07.433.192 FICA/Medicare 1,000 377 623 37.69% 1,000

    07.433.220 Operating Supplies 25,000 3,314 21,686 13.26% 1,500

    07.433.450 Contracted Services 10,000 4,635 5,365 46.35% 10,000

    43,500$ 13,193$ 30,307$ 30.33% 20,000$

    07.434.112 Salaries and Wages 75,000$ 60,828$ 14,172$ 81.10% 75,000$

    07.434.220 Operating Supplies 38,000 18,214 19,786 47.93% 35,000

    113,000$ 79,042$ 33,958$ 69.95% 110,000$

    07.437.220 Operating Supplies 3,000$ 2,014$ 986$ 67.12% 3,000$

    07.437.231 Motor Fuels - Gasoline 6,000 8,485 (2,485) 141.42% 10,000

    07.437.232 Motor Fuels - Diesel 8,000 7,022 978 87.78% 1,000

    07.437.235 Oils and Lubricants 1,000 815 185 81.48% 1,000

    07.437.257 Electric Department - 4,340 (4,340) 0.00% 5,000

    07.437.259 Heavy Equipment - - - 0.00% -

    07.437.260 Minor Equipment - - - 0.00% -

    07.437.370 Repairs and Maintenance 25,000 16,204 8,796 64.81% 23,000

    07.437.450 Contracted Services - 3,042 (3,042) 0.00% -

    43,000$ 41,922$ 1,078$ 97.49% 43,000$

    07.442.112 Salaries and Wages 632,500$ 447,475$ 185,025$ 70.75% 657,500$

    07.442.180 Overtime Salaries 145,000 223,872 (78,872) 154.39% 155,000

    07.442.192 FICA/Medicare 70,000 60,409 9,591 86.30% 69,000

    07.442.220 Operating Supplies 55,000 52,958 2,042 96.29% 65,000

    07.442.361 Electricity 11,250,000 10,246,553 1,003,447 91.08% 11,400,000

    07.442.370 Repairs and Maintenance 44,000 23,033 20,967 52.35% 45,000

    07.442.374 Equipment Maintenance 1,000 7,173 (6,173) 717.25% 8,000

    07.442.384 Equipment Leasing 1,000 - 1,000 0.00% -

    07.442.450 Contracted Services 10,000 24,022 (14,022) 240.22% 15,000

    12,208,500$ 11,085,495$ 1,123,005$ 90.80% 12,414,500$

    EXPENDITURES

    ELECTRIC SYSTEM

    TRAFFIC CONTROL DEVICES

    STREET LIGHTING

    FLEET MAINTENANCE SERVICES

  • 8/3/2019 Lansdale Boro 2012_Budget

    24/49

    LANSDALE BOROUGH2012 BUDGETELECTRIC FUND

    2012 Budget 24 Preliminary Draf

    ACCOUNT

    NUMBER DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    BUDGET

    BALANCE

    % OF

    BUDGET

    2012

    BUDGET

    07.483.190 Other Personal Services -$ -$ -$ 0.00% -$

    07.483.194 Unemployment Compensation - 5,005 (5,005) 0.00% -

    07.483.195 Workers' Compensation 50,000 49,314 686 98.63% 47,000

    07.483.198 Non-Uniformed Pension Plan 60,000 60,010 (10) 100.02% 66,000

    07.483.310 Professional Services - - - 0.00% -

    07.483.500 Human Resource Programs - 1,176 (1,176) 0.00% 1,000

    110,000$ 115,505$ (5,505)$ 105.00% 114,000$

    07.486.100 Property and Liability 83,750$ 63,035$ 20,715$ 75.27% 65,000$

    14,043,850$ 12,526,744$ 1,517,106$ 89.20% 14,348,000$

    07.492.001 To General Fund 4,500,000$ 4,050,000$ 450,000$ 90.00% 5,000,000$

    07.492.018 To Downtown Revitalization Fund - - - 0.00% -

    07.492.023 To Debt Service Fund 147,000 132,300 14,700 90.00% 225,000

    07.492.030 To Capital Fund 18,500 16,650 1,850 90.00% 10,500

    4,665,500$ 4,198,950$ 466,550$ 90.00% 5,235,500$

    18,709,350$ 16,725,694$ 1,983,656$ 89.40% 19,583,500$

    INSURANCE

    EXPENDITURES

    TOTAL EXPENDITURES WITH TRANSFERS

    EMPLOYER PAID BENEFITS

    TOTAL OPERATIONAL EXPENDITURES

    INTERFUND TRANSFERS

  • 8/3/2019 Lansdale Boro 2012_Budget

    25/49

    LANSDALE BOROUGH2012 BUDGETSEWER FUND

    SUMMARY

    2012 Budget 25 Preliminary Draft

    DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    2012

    BUDGET

    CURRENT REVENUE

    Interest Earnings 15,000$ 23,427$ 20,000$

    State Operating & Capital Grants - - -

    Sanitation 3,120,000 2,452,275 3,620,000

    Interfund Transfers - - -

    Total Revenue 3,135,000$ 2,475,702$ 3,640,000$

    DESCRIPTION 2011BUDGET AS OF10/31/11 2012BUDGET

    EXPENDITURES

    Legal Services 26,000$ 91,401$ 26,000$

    Information Technology 7,000 2,140 8,000

    Engineering 25,000 25,765 25,000

    Wastewater Collection and Treatment 1,312,054 1,730,500

    Administration 752,000 535,659 802,500

    Fleet Maintenance Services 18,000 21,250 23,000

    Employer Paid Benefits 108,000 108,519 107,500

    Insurance 56,250 35,661 50,000

    Total Operating Expenditures 992,250$ 2,132,448$ 2,772,500$

    Interfund Transfers 266,500 239,850 762,000

    Total Expenditures 1,258,750$ 2,372,298$ 3,534,500$

    EXPENDITURES

    REVENUES

  • 8/3/2019 Lansdale Boro 2012_Budget

    26/49

    LANSDALE BOROUGH2012 BUDGETSEWER FUND

    2012 Budget 26 Preliminary Draf

    ACCOUNT

    NUMBER DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    BUDGET

    BALANCE

    % OF

    BUDGET

    2012

    BUDGET

    08.341.100 Interest on Investments 15,000$ 23,427$ (8,427)$ 156.18% 20,000$

    08.354.070 State Capital Grant -$ -$ -$ 0.00% -$

    08.354.090 CDBG - - - 0.00% -

    -$ -$ -$ 0.00% -$

    08.364.101 Residential Sewer 2,600,000$ 1,999,831$ 600,169$ 76.92% 2,600,000$08.364.102 Commercial Sewer 460,000 355,636 104,364 77.31% 960,000

    03.364.103 Penalties Sewer 40,000 42,651 (2,651) 106.63% 40,000

    08.364.600 Other Revenue 20,000 54,157 (34,157) 270.79% 20,000

    3,120,000$ 2,452,275$ 667,725$ 78.60% 3,620,000$

    3,135,000$ 2,475,702$ 659,298$ 78.97% 3,640,000$

    08.392.001 From General Fund -$ -$ -$ 0.00% -$

    3,135,000$ 2,475,702$ 659,298$ 78.97% 3,640,000$TOTAL REVENUES WITH TRANSFERS

    REVENUES

    INTEREST EARNINGS

    SANITATION

    INTERFUND TRANSFERS

    TOTAL OPERATIONAL REVENUES

    STATE OPERATING & CAPITAL GRANTS

  • 8/3/2019 Lansdale Boro 2012_Budget

    27/49

    LANSDALE BOROUGH2012 BUDGETSEWER FUND

    2012 Budget 27 Preliminary Draf

    ACCOUNT

    NUMBER DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    BUDGET

    BALANCE

    % OF

    BUDGET

    2012

    BUDGET

    08.404.301 General Legal Services 25,000$ 91,401$ (66,401)$ 365.61% 25,000$

    08.404.314 Special Legal Services 1,000 - 1,000 0.00% 1,000

    26,000$ 91,401$ (65,401)$ 351.54% 26,000$

    08.407.252 Equipment Parts -$ -$ -$ 0.00% -$

    08.407.310 Professional Services 4,000 - 4,000 0.00% 2,000

    08.407.318 Software License Fees 1,000 - 1,000 0.00% 4,000

    08.407.374 Equipment Maintenance - - - 0.00% -

    08.407.384 Equipment Leasing - - - 0.00% -

    08.407.450 Contracted Services 2,000 2,140 (140) 106.98% 2,000

    08.407.460 Training & Meetings - - - 0.00% -

    7,000$ 2,140$ 4,860$ 30.57% 8,000$

    08.408.313 General Engineering 25,000$ 25,765$ (765)$ 103.06% 25,000$

    08.429.112 Salaries and Wages 655,000$ 486,608$ 168,392$ 74.29% 662,000$

    08.429.180 Overtime Salaries 115,000 106,303 8,697 92.44% 118,000

    08.429.192 FICA/Medicare 60,000 47,936 12,064 79.89% 60,00008.429.220 Operating Supplies 159,000 36,534 122,466 22.98% 100,000

    08.429.222 Chemicals 73,000 71,594 1,406 98.07% 73,000

    08.429.238 Uniforms 9,000 7,799 1,201 86.65% 9,000

    08.429.260 Minor Equipment 4,000 5,716 (1,716) 142.89% 4,000

    08.429.310 Professional Services 10,000 190 9,810 1.90% 10,000

    08.429.319 Permitting and Fees 6,500 5,750 - 88.46% 6,500

    08.429.360 Utilities 410,000 341,487 68,513 83.29% 430,000

    08.429.370 Repairs and Maintenance 56,000 29,967 26,033 53.51% 56,000

    08.429.374 Equipment Maintenance 65,000 53,368 11,632 82.11% 65,000

    08.429.380 Rental Expense 2,000 157 1,843 7.84% 2,000

    08.429.384 Equipment Leasing 5,000 - 5,000 0.00% 5,000

    08.429.450 Contracted Services 127,000 118,644 8,356 93.42% 130,000

    1,756,500$ 1,312,054$ 443,696$ 74.70% 1,730,500$

    EXPENDITURES

    WASTEWATER COLLECTION AND TREATMENT

    LEGAL SERVICES

    INFORMATION TECHNOLOGY

    ENGINEERING

  • 8/3/2019 Lansdale Boro 2012_Budget

    28/49

    LANSDALE BOROUGH2012 BUDGETSEWER FUND

    2012 Budget 28 Preliminary Draf

    ACCOUNT

    NUMBER DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    BUDGET

    BALANCE

    % OF

    BUDGET

    2012

    BUDGET

    08.430.112 Salaries and Wages 156,000$ 95,563$ 60,437$ 61.26% 165,000$

    08.430.180 Overtime Salaries - 338 (338) 0.00% -

    08.430.192 FICA/Medicare 12,000 7,647 4,353 63.73% 13,000

    08.430.196 Medical Insurance 339,000 203,104 135,896 59.91% 351,000

    08.430.198 Disability Insurance 16,000 12,137 3,863 75.86% 15,500

    08.430.199 Group Life Insurance 6,500 4,242 2,258 65.27% 6,500

    08.430.210 Office Supplies 2,000 654 1,346 32.70% 2,000

    08.430.215 Postage 5,000 4,960 40 99.20% 7,000

    08.430.220 Operating Supplies 1,000 4,681 (3,681) 468.06% 1,000

    08.430.317 Other Services and Charges 200,000 180,000 20,000 90.00% 220,00008.430.320 Communications 6,000 6,495 (495) 108.24% 8,000

    08.430.390 Bank Services Charges/Fees - 8,218 (8,218) 0.00% 5,000

    08.430.420 Subscriptions & Memberships 2,500 582 1,918 23.28% 2,500

    08.430.460 Trainings & Meetings 6,000 4,688 1,312 78.13% 6,000

    08.430.700 Capital Purchases - 2,350 (2,350) 0.00% -

    752,000$ 535,659$ 216,341$ 71.23% 802,500$

    08.437.220 Operating Supplies -$ 101$ (101)$ 0.00% -$

    08.437.231 Motor Fuels - Gasoline 4,000 5,112 (1,112) 127.80% 6,000

    08.437.232 Motor Fuels - Diesel 4,000 9,696 (5,696) 242.40% 7,00008.437.235 Oils and Lubricants - 330 (330) 0.00% 1,000

    08.437.258 Sewer Department 5,000 1,862 3,138 37.24% 4,000

    08.437.259 Heavy Equipment - 28 (28) 0.00% -

    08.437.260 Minor Equipment - - - 0.00% -

    08.437.370 Repairs and Maintenance 5,000 2,864 2,136 57.27% 5,000

    08.437.450 Contracted Services - 1,257 (1,257) 0.00% -

    18,000$ 21,250$ (3,250)$ 118.06% 23,000$

    08.483.190 Other Personal Services -$ -$ -$ 0.00% -$

    08.483.194 Unemployment Compensation - 7,033 (7,033) 0.00% -

    08.483.195 Workers' Compensation 40,000 39,462 538 98.66% 37,500

    08.483.198 Non-Uniformed Pension Plan 68,000 60,085 7,915 88.36% 69,000

    08.483.310 Professional Services - - - 0.00% -

    08.483.500 Human Resource Programs - 1,939 (1,939) 0.00% 1,000

    108,000$ 108,519$ (519)$ 100.48% 107,500$

    ADMINISTRATION

    FLEET MAINTENANCE SERVICES

    EMPLOYER PAID BENEFITS

    EXPENDITURES

  • 8/3/2019 Lansdale Boro 2012_Budget

    29/49

    LANSDALE BOROUGH2012 BUDGETSEWER FUND

    2012 Budget 29 Preliminary Draf

    ACCOUNT

    NUMBER DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    BUDGET

    BALANCE

    % OF

    BUDGET

    2012

    BUDGET

    08.486.100 Property and Liability 56,250$ 35,661$ 20,589$ 63.40% 50,000$

    2,748,750$ 2,132,448$ 615,552$ 77.58% 2,772,500$

    08.492.001 To General Fund -$ -$ -$ 0.00% 500,000$

    08.492.023 To Debt Service Fund 220,000 198,000 22,000 90.00% 230,000

    08.492.030 To Capital Fund 46,500 41,850 4,650 90.00% 32,000266,500$ 239,850$ 26,650$ 90.00% 762,000$

    3,015,250$ 2,372,298$ 642,952$ 78.68% 3,534,500$

    INTERFUND TRANSFERS

    TOTAL EXPENDITURES WITH TRANSFERS

    TOTAL OPERATIONAL EXPENDITURES

    INSURANCE

    EXPENDITURES

  • 8/3/2019 Lansdale Boro 2012_Budget

    30/49

    LANSDALE BOROUGH2012 BUDGET

    PARK AND RECREATION FUND

    SUMMARY

    2012 Budget 30 Preliminary Draft

    DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    2012

    BUDGET

    CURRENT REVENUE

    Interest Earnings 500$ 10$ 500$

    Rents and Royalties 7,500 5,600 8,400

    Charges for Services 314,500 277,325 298,500

    Miscellaneous Revenue 100 50 100

    Contributions and Donations - - -

    Interfund Transfers 1,207,000 1,086,300 1,218,000

    Total Revenue 1,529,600$ 1,369,285$ 1,525,500$

    DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    2012

    BUDGET

    EXPENDITURES

    Legal Services 2,000$ -$ 2,000$

    Engineering 300 1,000

    Fleet Maintenance 13,500 15,912 18,500

    Recreation Administration 308,500 235,732 417,500

    Participant Recreation 385,500 347,270 385,500

    Parks Maintenance 448,500 357,614 490,500

    Employer Paid Benefits 65,000 60,526 65,000

    Insurance 24,750 15,938 20,000

    Total Operating Expenditures 1,247,750$ 1,033,290$ 1,400,000$

    Interfund Transfers 277,000 249,300 125,500

    Total Expenditures 1,524,750$ 1,282,590$ 1,525,500$

    REVENUES

    EXPENDITURES

  • 8/3/2019 Lansdale Boro 2012_Budget

    31/49

    LANSDALE BOROUGH2012 BUDGET

    PARK AND RECREATION FUND

    2012 Budget 31 Preliminary Draft

    ACCOUNT

    NUMBER DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    BUDGET

    BALANCE

    % OF

    BUDGET

    2012

    BUDGET

    09.341.100 Interest on Investments 500$ 10$ 490$ 2.05% 500$

    09.342.200 Rent of Buildings 7,500$ 5,600$ 1,900$ 74.67% 8,400$

    09.367.110 Registration - Pools 220,000$ 191,230$ 28,770$ 86.92% 200,000$

    09.367.130 Concessions - Pools 6,500 6,400 100 98.46% 6,500

    09.367.140 Facility Rental 8,000 7,475 525 93.43% 8,000

    09.367.200 Summer Recreation Program 7,500 5,751 1,749 76.68% 7,000

    09.367.210 Guest Admission - Pools 30,000 27,030 2,970 90.10% 30,000

    09.367.220 Instructions - Pools 20,000 17,499 2,501 87.50% 19,000

    09.367.230 Other - Pools 8,000 10,035 (2,035) 125.44% 9,500

    09.367.240 Arts Festival 8,000 (40) 8,040 -0.50% 8,000

    09.367.250 Art Instruction 1,500 716 784 47.73% 1,000

    09.367.260 Concert Series - 5,811 (5,811) 0.00% 4,000

    09.367.270 Discount Ticket Sales 500 927 (427) 185.43% 1,000

    09.367.280 T-Ball Program 2,500 2,425 75 97.00% 2,500

    09.367.290 Tennis Program 1,500 1,040 460 69.33% 1,500

    09.367.300 Miscellaneous Other 500 1,026 (526) 205.20% 500

    314,500$ 277,325$ 37,175$ 88.18% 298,500$

    09.380.010 Miscellaneous Revenue 100$ 50$ 50$ 50.00% 100$

    09.387.100 Donations from Private Sources -$ -$ -$ 0.00% -$

    322,600$ 282,985$ 39,615$ 87.72% 307,500$

    09.392.001 From General Fund 1,207,000$ 1,086,300$ 120,700$ 90.00% 1,218,000$

    1,529,600$ 1,369,285$ 160,315$ 89.52% 1,525,500$

    RENTS AND ROYALTIES

    MISCELLANEOUS REVENUE

    CONTRIBUTIONS AND DONATIONS

    CHARGES FOR SERVICES

    REVENUES

    TOTAL OPERATIONAL REVENUES

    INTERFUND TRANSFERS

    TOTAL REVENUES WITH TRANSFERS

    INTEREST EARNINGS

  • 8/3/2019 Lansdale Boro 2012_Budget

    32/49

    LANSDALE BOROUGH2012 BUDGET

    PARK AND RECREATION FUND

    2012 Budget 32 Preliminary Draft

    ACCOUNT

    NUMBER DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    BUDGET

    BALANCE

    % OF

    BUDGET

    2012

    BUDGET

    09.404.301 General Legal Services 1,000$ -$ 1,000$ 0.00% 1,000$

    09.404.314 Special Legal Services 1,000 - 1,000 0.00% 1,000

    2,000$ -$ 2,000$ 0.00% 2,000$

    09.408.313 General Engineering 500$ 300$ 200$ 60.00% 1,000$

    09.437.220 Operating Supplies -$ -$ -$ 0.00% -$

    09.437.231 Motor Fuels - Gasoline 8,000 10,122 (2,122) 126.53% 12,000

    09.437.232 Motor Fuels - Diesel 1,000 1,274 (274) 127.36% 1,000

    09.437.235 Oils and Lubricants - - - 0.00% -

    09.437.258 Park and Recreation Department 500 41 459 8.25% 500

    09.437.259 Heavy Equipment - - - 0.00% -

    09.437.260 Minor Equipment - - - 0.00% -

    09.437.370 Repairs and Maintenance 4,000 4,474 (474) 111.86% 5,000

    09.437.450 Contracted Services - - - 0.00% -

    13,500$ 15,912$ (2,412)$ 117.86% 18,500$

    09.451.112 Salaries and Wages 129,500$ 92,928$ 36,572$ 71.76% 141,000$09.451.115 Salaries and Wages Seasonal 3,000 30 2,970 1.00% 3,000

    09.451.180 Overtime Salaries 6,500 7,326 (826) 112.71% 1,000

    09.451.192 FICA/Medicare 11,000 8,548 2,452 77.71% 11,500

    09.451.196 Medical Insurance 120,000 79,703 40,297 66.42% 155,000

    09.451.198 Disability Insurance 7,000 6,581 419 94.01% 8,000

    09.451.199 Group Life Insurance 3,000 1,581 1,419 52.69% 3,000

    09.451.215 Postage 3,500 3,483 17 99.51% 4,000

    09.451.220 Operating Supplies 2,000 1,370 630 68.51% 12,000

    09.451.260 Minor Equipment 500 - 500 0.00% 500

    09.451.310 Professional Services - - - 0.00% 50,000

    09.451.320 Communications 8,500 7,597 903 89.37% 8,500

    09.451.340 Advertising & Printing 11,000 12,769 (1,769) 116.08% 12,50009.451.384 Equipment Leasing - - - 0.00% 2,500

    09.451.420 Subscriptions and Memberships 1,000 1,172 (172) 117.19% 1,500

    09.451.450 Contracted Services 2,000 12,644 (10,644) 632.22% 2,500

    09.451.460 Trainings and Meetings - - - 0.00% 1,000

    308,500$ 235,732$ 72,768$ 76.41% 417,500$

    RECREATION ADMINISTRATION

    LEGAL SERVICES

    ENGINEERING

    FLEET MAINTENANCE SERVICES

    EXPENDITURES

  • 8/3/2019 Lansdale Boro 2012_Budget

    33/49

    LANSDALE BOROUGH2012 BUDGET

    PARK AND RECREATION FUND

    2012 Budget 33 Preliminary Draft

    ACCOUNT

    NUMBER DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    BUDGET

    BALANCE

    % OF

    BUDGET

    2012

    BUDGET

    09.452.115 Salaries and Wages Seasonal 235,000$ 221,003$ 13,997$ 94.04% 241,000$

    09.452.192 FICA/Medicare 17,000 16,907 93 99.45% 19,000

    09.452.220 Operating Supplies 16,000 12,846 3,154 80.29% 16,000

    09.452.222 Chemicals 40,000 22,049 17,951 55.12% 34,000

    09.452.238 Uniforms 2,500 2,204 296 88.14% 2,500

    09.452.260 Minor Equipment 6,000 2,755 3,245 45.92% 5,000

    09.452.340 Advertising & Printing 5,000 14,153 (9,153) 283.05% 4,500

    09.452.360 Utilities 25,000 24,531 469 98.13% 25,000

    09.452.370 Repairs and Maintenance 7,000 6,768 232 96.69% 7,500

    09.452.450 Contracted Services 32,000 24,054 7,946 75.17% 31,000385,500$ 347,270$ 38,230$ 90.08% 385,500$

    09.454.112 Salaries and Wages 213,000$ 157,313$ 55,687$ 73.86% 249,000$

    09.454.115 Salaries and Wages Seasonal 22,000 13,223 8,777 60.10% 19,000

    09.454.180 Overtime Salaries 20,000 19,597 403 97.99% 21,000

    09.454.192 FICA/Medicare 20,500 15,574 4,926 75.97% 22,000

    09.454.220 Operating Supplies 8,500 6,668 1,832 78.45% 8,500

    09.454.238 Uniforms 2,500 1,099 1,401 43.97% 2,500

    09.454.260 Minor Equipment 5,000 1,873 3,127 37.46% 5,000

    09.454.360 Utilities 70,500 52,381 18,119 74.30% 70,000

    09.454.370 Repairs and Maintenance 45,000 26,751 18,249 59.45% 45,000

    09.454.374 Equipment Maintenance - 140 (140) 0.00% -

    09.454.384 Equipment Leasing 1,000 1,643 (643) 164.27% 1,500

    09.454.420 Training and Meetings 500 160 340 32.00% 1,000

    09.454.450 Contracted Services 40,000 61,190 (21,190) 152.97% 46,000

    448,500$ 357,614$ 90,886$ 79.74% 490,500$

    09.483.190 Other Personal Services -$ -$ -$ 0.00% -$

    09.483.194 Unemployment Compensation - - - 0.00% -

    09.483.195 Workers' Compensation 35,000 34,509 491 98.60% 32,000

    09.483.198 Non-Uniformed Pension Plan 30,000 25,056 4,944 83.52% 32,00009.483.310 Professional Services - - - 0.00% -

    09.483.500 Human Resource Programs - 961 (961) 0.00% 1,000

    65,000$ 60,526$ 4,474$ 93.12% 65,000$

    EXPENDITURES

    PARTICIPANT RECREATION

    BUILDINGS AND FACILITY MAINTENANCE

    EMPLOYER PAID BENEFITS

  • 8/3/2019 Lansdale Boro 2012_Budget

    34/49

    LANSDALE BOROUGH2012 BUDGET

    PARK AND RECREATION FUND

    2012 Budget 34 Preliminary Draft

    ACCOUNT

    NUMBER DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    BUDGET

    BALANCE

    % OF

    BUDGET

    2012

    BUDGET

    09.486.100 Property and Liability 24,750$ 15,938$ 8,812$ 64.39% 20,000$

    1,248,250$ 1,033,290$ 214,960$ 82.78% 1,400,000$

    09.492.023 To Debt Service Fund 244,000$ 219,600$ 24,400$ 90.00% 85,000$

    09.492.030 To Capital Fund 33,000 29,700 3,300 90.00% 40,500

    277,000$ 249,300$ 27,700$ 90.00% 125,500$

    1,525,250$ 1,282,590$ 242,660$ 84.09% 1,525,500$

    INTERFUND TRANSFERS

    TOTAL EXPENDITURES WITH TRANSFERS

    TOTAL OPERATIONAL EXPENDITURES

    INSURANCE

    EXPENDITURES

  • 8/3/2019 Lansdale Boro 2012_Budget

    35/49

    LANSDALE BOROUGH2012 BUDGET

    311 WEST MAIN STREET FUND

    SUMMARY

    2012 Budget 35 Preliminary Draft

    DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    2012

    BUDGET

    CURRENT REVENUE

    Interest Earnings -$ -$ -$

    Rents and Royalties - - -

    State Operating & Capital Grants - - -

    Interfund Transfers 50,000 45,000 32,000

    Total Revenue 50,000$ 45,000$ 32,000$

    DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    2012

    BUDGET

    EXPENDITURES

    Legal Services 5,000$ 19,591$ 10,000$

    Engineering 10,000 - 5,000

    Economic Development 20,500 10,610 17,000

    Insurance - - -

    Total Operating Expenditures 35,500$ 30,200$ 32,000$

    Interfund Transfers - - -

    Total Expenditures 35,500$ 30,200$ 32,000$

    REVENUES

    EXPENDITURES

  • 8/3/2019 Lansdale Boro 2012_Budget

    36/49

    LANSDALE BOROUGH2012 BUDGET

    311 WEST MAIN STREET FUND

    2012 Budget 36 Preliminary Draft

    ACCOUNT

    NUMBER DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    BUDGET

    BALANCE

    % OF

    BUDGET

    2012

    BUDGET

    18.341.100 Interest on Investments -$ -$ -$ 0.00% -$

    18.342.200 Rent of Buildings -$ -$ -$ 0.00% -$

    18.354.070 State Capital Grant -$ -$ -$ 0.00% -$

    18.354.090 CDBG - - - 0.00% -

    -$ -$ -$ 0.00% -$

    -$ -$ -$ 0.00% -$

    18.392.001 From General Fund 50,000$ 45,000$ 5,000$ 90.00% 32,000$

    50,000$ 45,000$ 5,000$ 90.00% 32,000$

    STATE OPERATING & CAPITAL GRANTS

    REVENUES

    INTEREST EARNINGS

    RENTS AND ROYALTIES

    TOTAL OPERATIONAL REVENUES

    INTERFUND TRANSFERS

    TOTAL REVENUES WITH TRANSFERS

  • 8/3/2019 Lansdale Boro 2012_Budget

    37/49

    LANSDALE BOROUGH2012 BUDGET

    311 WEST MAIN STREET FUND

    2012 Budget 37 Preliminary Draft

    ACCOUNT

    NUMBER DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    BUDGET

    BALANCE

    % OF

    BUDGET

    2012

    BUDGET

    18.404.301 General Legal Services 5,000$ 19,591$ (14,591)$ 391.81% 10,000$

    18.404.314 Special Legal Services - - - 0.00% -

    5,000$ 19,591$ (14,591)$ 391.81% 10,000$

    18.408.313 General Engineering 10,000$ -$ 10,000$ 0.00% 5,000$

    18.463.300 Other Services and Charges 1,500$ 664$ 836$ 44.28% 1,000$

    18.463.320 Communications 5,000 4,696 304 93.92% 5,000

    18.463.340 Advertising & Printing 1,000 505 495 50.49% -

    18.463.360 Utilities 2,500 2,829 (329) 113.17% 5,000

    18.463.370 Repairs and Maintenance 500 - 500 0.00% 1,000

    18.463.450 Contracted Services 10,000 1,915 8,085 19.15% 5,000

    18.463.540 Contributions to NGO - - - 0.00% -

    18.463.700 Capital Purchases - - - 0.00% -

    20,500$ 10,610$ 9,890$ 51.76% 17,000$

    18.486.100 Property and Liability -$ -$ -$ 0.00% -$

    35,500$ 30,200$ 5,300$ 85.07% 32,000$

    18.492.001 To General Fund -$ -$ -$ 0.00% -$

    18.492.007 To Electric Fund - - - 0.00% -

    18.492.023 To Debt Service Fund - - - 0.00% -

    18.492.030 To Capital Fund - - - 0.00% -

    -$ -$ -$ 0.00% -$

    35,500$ 30,200$ 5,300$ 85.07% 32,000$

    INTERFUND TRANSFERS

    TOTAL EXPENDITURES WITH TRANSFERS

    INSURANCE

    TOTAL OPERATING EXPENDITURES

    LEGAL SERVICES

    ENGINEERING

    ECONOMIC DEVELOPMENT

    EXPENDITURES

  • 8/3/2019 Lansdale Boro 2012_Budget

    38/49

    LANSDALE BOROUGH2012 BUDGET

    DEBT SERVICE FUND

    SUMMARY

    2012 Budget 38 Preliminary Draft

    DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    2012

    BUDGET

    CURRENT REVENUE

    Interest Earnings 500$ 130$ 500$

    Interfund Transfers 1,323,000 1,190,700 1,500,000

    Total Operational Revenue 1,323,500$ 1,190,830$ 1,500,500$

    DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    2012

    BUDGET

    EXPENDITURES

    Debt Principal 730,000$ 729,542$ 1,035,000$

    Debt Interest 580,000 576,591 565,000

    Fees and Charges - 1,050 2,500

    Total Operating Expenditures 1,310,000$ 1,307,183$ 1,602,500$

    REVENUES

    EXPENDITURES

  • 8/3/2019 Lansdale Boro 2012_Budget

    39/49

    LANSDALE BOROUGH2012 BUDGET

    DEBT SERVICE FUND

    2012 Budget 39 Preliminary Draf

    ACCOUNT

    NUMBER DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    BUDGET

    BALANCE

    % OF

    BUDGET

    2012

    BUDGET

    23.341.100 Interest on Investments 500$ 130$ 370$ 25.93% 500$

    500$ 130$ 370$ 25.93% 500$

    23.392.001 From General Fund 712,000$ 640,800$ 71,200$ 90.00% 960,000$

    23.392.007 From Electric Fund 147,000 132,300 14,700 90.00% 225,000

    23.392.008 From Sewer Fund 220,000 198,000 22,000 90.00% 230,000

    23.392.009 From Park & Recreation Fund 244,000 219,600 24,400 90.00% 85,000

    1,323,000$ 1,190,700$ 132,300$ 90.00% 1,500,000$

    1,323,500$ 1,190,830$ 132,670$ 89.98% 1,500,500$

    ACCOUNT

    NUMBER DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    BUDGET

    BALANCE

    % OF

    BUDGET

    2012

    BUDGET

    23.471.100 General Obligation Bond 645,000$ 645,000$ -$ 100.00% 950,000$23.471.400 General Obligation Notes 85,000 84,542 458 99.46% 85,000

    730,000$ 729,542$ 458$ 99.94% 1,035,000$

    23.472.100 General Obligation Bond 563,000$ 562,939$ 61$ 99.99% 551,000$

    23.472.400 General Obligation Notes 17,000 13,652 3,348 80.31% 14,000

    580,000$ 576,591$ 3,409$ 99.41% 565,000$

    23.475.000 Fiscal Agent Fees -$ 1,050$ (1,050)$ 0.00% 2,500$

    1,310,000$ 1,307,183$ 2,817$ 99.78% 1,602,500$

    TOTAL REVENUES WITH TRANSFERS

    REVENUES

    INTEREST EARNINGS

    INTERFUND TRANSFERS

    TOTAL OPERATIONAL REVENUES

    DEBT INTEREST

    FEES AND CHARGES

    EXPENDITURES

    DEBT PRINCIPLE

    TOTAL OPERATIONAL EXPENDITURES

  • 8/3/2019 Lansdale Boro 2012_Budget

    40/49

    LANSDALE BOROUGH2012 BUDGETCAPITAL FUND

    SUMMARY

    2012 Budget 40 Preliminary Draft

    DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    2012

    BUDGET

    CURRENT REVENUE

    Interest Earnings -$ 581$ 500$

    State Operating & Capital Grants - 239,470 -

    Sanitation - 123,500 -

    Fee-In-Lieu-of Improvements - 3,951 -

    Interfund Transfers 538,000 484,200 249,500

    Total Operational Revenue 538,000$ 851,703$ 250,000$

    DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    2012

    BUDGET

    EXPENDITURES

    Executive 100,000$ 58,070$ -$

    Financial Administration - 25,775 -

    Legal Services 7,200 10,000

    Information Technology 25,000 6,592 36,500

    Engineering 100,000 405,454 10,000

    Buildings and Grounds 35,000 261,760 -

    Police Services 109,500 85,311 84,500

    Code Enforcement & Zoning 50,000 18,426 25,000

    Wastewater Collection and Treatment 43,500 542,770 32,000

    Public Works 3,000 2,288,041 3,000

    Electric System 16,000 398,322 8,000

    Parking Facilities - - -

    Culture/Recreation 31,000 637,456 40,500

    Library - - -

    Total Operating Expenditures 513,000$ 4,735,178$ 249,500$

    REVENUES

    EXPENDITURES

  • 8/3/2019 Lansdale Boro 2012_Budget

    41/49

    LANSDALE BOROUGH2012 BUDGETCAPITAL FUND

    2012 Budget 41 Preliminary Draft

    ACCOUNT

    NUMBER DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    BUDGET

    BALANCE

    % OF

    BUDGET

    2012

    BUDGET

    30.341.100 Interest on Investments -$ 581$ (581)$ 0.00% 500$

    30.351.030 2010 - Streetscape -$ 1,719,312$ (1,719,312)$ 0.00% -$

    30.351.031 PCTI - 17,749 (17,749) 0.00% -

    30.354.070 State Capital Grant - 171,475 (171,475) 0.00% -

    30.354.090 CDBG - 239,470 (239,470) 0.00% -

    30.354.160 DCED Grants - - - 0.00% -

    30.354.600 Other - 29,400 (29,400) 0.00% -

    -$ 2,177,406$ (2,177,406)$ 0.00% -$

    30.364.110 EDU Fees -$ 123,500$ (123,500)$ 0.00% -$

    30.387.600 Other -$ 3,951$ (3,951)$ 0.00% -$

    -$ 2,305,438$ (2,305,438)$ 0.00% 500$

    30.392.001 From General Fund 440,000$ 396,000$ 44,000$ 90.00% 166,500$

    30.392.007 From Electric Fund 18,500 16,650 1,850 90.00% 10,500

    30.392.008 From Sewer Fund 46,500 41,850 4,650 90.00% 32,000

    30.392.009 From Park & Rec Fund 33,000 29,700 3,300 90.00% 40,500

    538,000$ 484,200$ 53,800$ 90.00% 249,500$

    538,000$ 2,789,638$ (2,251,638)$ 518.52% 250,000$

    REVENUES

    INTEREST EARNINGS

    INTERFUND TRANSFERS

    TOTAL OPERATIONAL REVENUES

    TOTAL REVENUES WITH TRANSFERS

    SANITATION

    STATE OPERATING & CAPITAL GRANTS

    FEE-IN-LIEU-OF IMPROVEMENTS

  • 8/3/2019 Lansdale Boro 2012_Budget

    42/49

    LANSDALE BOROUGH2012 BUDGETCAPITAL FUND

    2012 Budget 42 Preliminary Draft

    ACCOUNT

    NUMBER DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    BUDGET

    BALANCE

    % OF

    BUDGET

    2012

    BUDGET

    30.401.700 Improvements Other Than Buildings 100,000$ 58,070$ 41,930$ 58.07% -$

    30.402.600 Capital Equipment -$ 25,775$ (25,775)$ 0.00% -$

    30.404.310 Professional Services 25,000$ 7,200$ 17,800$ 28.80% 10,000$

    30.407.600 Capital Equipment 25,000$ 6,592$ 18,408$ 26.37% 36,500$

    30.408.310 Professional Services 100,000$ 405,454$ (305,454)$ 405.45% 10,000$

    30.409.373 Facilities Maintenance 35,000$ 261,039$ (226,039)$ 745.83% -$

    30.409.710 Land Acquisition - - - 0.00% -

    30.409.730 Buildings - 721 (721) 0.00% -

    35,000$ 261,760$ (226,760)$ 747.89% -$

    30.410.600 Capital Equipment 109,500$ 85,311$ 24,189$ 77.91% 84,500$

    30.414.600 Capital Equipment 50,000$ 18,426$ 31,574$ 36.85% 25,000$

    INFORMATION TECHNOLOGY

    POLICE SERVICES

    CODE ENFORCEMENT & ZONING

    BUILDINGS AND GROUNDS

    EXECUTIVE

    EXPENDITURES

    FINANCIAL ADMINISTRATION

    LEGAL SERVICES

    ENGINEERING

  • 8/3/2019 Lansdale Boro 2012_Budget

    43/49

    LANSDALE BOROUGH2012 BUDGETCAPITAL FUND

    2012 Budget 43 Preliminary Draft

    ACCOUNT

    NUMBER DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    BUDGET

    BALANCE

    % OF

    BUDGET

    2012

    BUDGET

    30.429.600 Capital Equipment 43,500$ 542,770$ (499,270)$ 1247.75% 32,000$

    30.430.600 Capital Equipment 3,000$ 150,580$ (147,580)$ 5019.33% 3,000$

    30.439.610 Roadway Improvements - 422,848 (422,848) 0.00% -

    30.439.670 2010 - Streetscape - Grant - 1,618,487 (1,618,487) 0.00% -

    30.439.675 2010 - Streetscape - Borough - 94,681 (94,681) 0.00% -

    30.439.680 PCTI - Grant - - - 0.00% -

    30.439.685 PCTI - Borough - 1,445 (1,445) 0.00% -

    3,000$ 2,288,041$ (2,285,041)$ 76268.02% 3,000$

    30.442.600 Capital Equipment 16,000$ 398,322$ (382,322)$ 2489.51% 8,000$

    30.445.600 Capital Equipment -$ -$ -$ 0.00% -$

    30.450.373 Facilities Maintenance -$ 388,685$ (388,685)$ 0.00% -$

    30.450.600 Capital Equipment 31,000 248,771 (217,771) 802.49% 40,500

    30.450.710 Land Acquisition - - - 0.00% -30.450.730 Buildings - - - 0.00% -

    31,000$ 637,456$ (606,456)$ 2056.31% 40,500$

    30.456.600 Capital Equipment - - - 0.00% -

    538,000$ 4,735,178$ (4,197,178)$ 880.14% 249,500$

    PARKING FACILITIES

    LIBRARY

    EXPENDITURES

    WASTEWATER COLLECTION AND TREATMENT

    PUBLIC WORKS

    ELECTRIC SYSTEM

    CULTURE/RECREATION

    TOTAL OPERATIONAL EXPENDITURES

  • 8/3/2019 Lansdale Boro 2012_Budget

    44/49

    LANSDALE BOROUGH2012 BUDGET

    HIGWAY AID FUND

    SUMMARY

    2012 Budget 44 Preliminary Draft

    DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    2012

    BUDGET

    CURRENT REVENUE

    Interest Earnings 500$ 103$ 500$

    Intergovernmental Revenues 290,000 313,073 310,000

    Refunds - - -

    Total Operational Revenue 290,500$ 313,175$ 310,500$

    DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    2012

    BUDGET

    EXPENDITURES

    Public Works 5,000$ 1,118$ 5,000$

    Snow and Ice Removal 67,000 134,018 129,000

    Roadway Construction 149,000 374 62,000

    Highway Construction - - 100,000

    Total Operational Expenditures 135,509$ 296,000$

    REVENUES

    EXPENDITURES

  • 8/3/2019 Lansdale Boro 2012_Budget

    45/49

    LANSDALE BOROUGH2012 BUDGET

    HIGHWAY AID FUND

    2012 Budget 45 Preliminary Draf

    ACCOUNT

    NUMBER DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    BUDGET

    BALANCE

    % OF

    BUDGET

    2012

    BUDGET

    35.341.100 Interest on Investments 500$ 103$ 397$ 20.55% 500$

    35.350.050 Motor Vehicle Fuel Taxes 290,000$ 313,073$ (23,073)$ 107.96% 310,000$

    35.395.100 Reimbursement -$ -$ -$ 0.00% -$

    290,500$ 313,175$ (22,675)$ 107.81% 310,500$

    REVENUES

    INTEREST EARNINGS

    REFUNDS

    INTERGOVERNMENTAL REVENUES

    TOTAL OPERATIONAL REVENUES

  • 8/3/2019 Lansdale Boro 2012_Budget

    46/49

    LANSDALE BOROUGH2012 BUDGET

    HIGHWAY AID FUND

    2012 Budget 46 Preliminary Draf

    ACCOUNT

    NUMBER DESCRIPTION

    2011

    BUDGET

    AS OF

    10/31/11

    BUDGET

    BALANCE

    % OF

    BUDGET

    2012

    BUDGET

    35.430.740 Capital Purchases 5,000$ 1,118$ 3,882$ 22.36% 5,000$

    35.432.112 Salaries and Wages -$ 19,905$ (19,905)$ 0.00% 55,000$

    35.432.180 Overtime Salaries 25,000 28,168 (3,168) 112.67% 28,000

    35.432.192 FICA/Medicare 2,000 3,969 (1,969) 198.47% -

    35.432.220 Operating Supplies 40,000 43,427 (3,427) 108.57% 46,000

    35.432.374 Equipment Maintenance - - - 0.00% -

    35.432.384 Equipment Leasing - - - 0.00% -

    35.432.450 Contracted Services - 38,548 (38,548) 0.00% -

    67,000$ 134,018$ (67,018)$ 200.03% 129,000$

    35.438.112 Salaries and Wages 42,000$ 124$ 41,876$ 0.30% 20,000$

    35.438.180 Overtime Salaries - 214 (214) 0.00% -

    35.438.192 FICA/Medicare - 35 (35) 0.00% -

    35.438.220 Operating Supplies 42,000 - 42,000 0.00% 42,000

    35.438.450 Contracted Services 65,000 - 65,000 0.00% -

    149,000$ 374$ 148,626$ 0.25% 62,000$

    35.439.112 Salaries and Wages -$ -$ -$ 0.00% -$

    35.439.180 Overtime Salaries - - - 0.00% -

    35.439.220 Operating Supplies - - - 0.00% -

    35.439.450 Contracted Services - - - 0.00% 100,000

    -$ -$ -$ 0.00% 100,000$

    221,000$ 135,509$ 85,491$ 61.32% 296,000$TOTAL EXPENDITURES

    ROADWAY CONSTRUCTION

    EXPENDITURES

    SNOW & ICE REMOVAL

    PUBLIC WORKS

    HIGHWAY CONSTRUCTION

  • 8/3/2019 Lansdale Boro 2012_Budget

    47/49

    BOROUGH OF LANSDALE

    CAPITAL IMPROVEMENT PROGRAM

    Capital Reserve Fund

    2012 Budget 1 Schedule J

    Description 2011 2012 2013 2014 2015

    EXECUTIVE

    Human Resource Evaulation and Implementation 100,000$ -$ -$ -$ -$

    - - - - -

    TOTAL EXECUTIVE: 100,000$ -$ -$ -$ -$

    FINANCIAL ADMINISTRATION

    -$ -$ -$ -$ -$

    - - - - -

    TOTAL FINANCIAL ADMINISTRATION: -$ -$ -$ -$ -$

    LEGAL SERVICES

    Professional Services 25,000$ 10,000$ 10,000$ 10,000$ 10,000$

    - - - - -

    TOTAL LEGAL SERVICES: 25,000$ 10,000$ 10,000$ 10,000$ 10,000$

    GENERAL ADMINISTRATION

    Repair & Maintenance of Borough Hall Windows -$ -$ -$ -$ -$

    - - - - -

    TOTAL GENERAL ADMINISTRATION: -$ -$ -$ -$ -$

    INFORMATION TECHNOLOGY

    Communications Portal -$ -$ -$ -$ -$

    Server - Borough Wide - 10,000 - 20,000 -

    Server - Police Services - - - 13,000 -

    Software Upgrades - Borough Wide 5,000 5,000 5,000 5,000 5,000

    Software Upgrades - Police Services 3,000 3,000 3,000 - 4,000

    Computers - Legislative - 5,000 - - 5,000

    Computers - Executive 2,500 2,500 2,500 2,500 2,500Computers - Financial Administration 1,500 3,000 1,500 1,500 1,500

    Computers - Police Services 3,500 3,500 3,500 3,500 4,000

    Computers - Code Enforcement & Zoning 2,000 2,000 2,000 2,000 2,000

    Computers - Public Works - - 1,000 - -

    Computers - Electric 2,500 2,500 2,500 2,500 2,500

    Computers - WWTP 3,000 - 3,000 - 3,000

    Computers - Parks and Recreation 2,000 - 2,000 - -

    TOTAL INFORMATION TECHNOLOGY: 25,000$ 36,500$ 26,000$ 50,000$ 29,500$

    ENGINEERING

    Professional Services 100,000$ 10,000$ 10,000$ 10,000$ 10,000$

    - - - - -TOTAL ENGINEERING: 100,000$ 10,000$ 10,000$ 10,000$ 10,000$

  • 8/3/2019 Lansdale Boro 2012_Budget

    48/49

    BOROUGH OF LANSDALE

    CAPITAL IMPROVEMENT PROGRAM

    Capital Reserve Fund

    2012 Budget 2 Schedule J

    Description 2011 2012 2013 2014 2015

    BUILDINGS & GROUNDS

    Surveillance Cameras 5,000$ -$ -$ -$ -$

    Repair & Maintenance of Borough Hall W indows 20,000 - - - -

    Mold Study - Borough Hall 10,000 - - - -

    TOTAL BUILDINGS & GROUNDS: 35,000$ -$ -$ -$ -$

    POLICE SERVICES

    Police Vehicles - Cars 68,000$ 30,000$ 70,000$ 70,000$ 72,000$

    Voice Logger Computer 3,500 3,500 - - -

    Video Server 5,500 - - - -

    Replace Gutters 12,000 - - - -

    Exterior Upgrades

    Lighting 11,000 - - - -

    Painting 4,500 - - - -

    Landscaping - 3,000 - - -

    Radio Upgrades 5,000 - - - -Building Improvements

    Cell Refurbishing - 6,000 - - -

    Furniture - - 3,000 3,000 -

    Wireless Camera Network - 30,000 30,000 3,000 30,000

    High Band Radios - 12,000 - - -

    Patrol Car Computers - - 6,000 6,000 6,000

    Weapons Upgrade - - 9,000 3,000 -

    TOTAL POLICE SERVICES: 109,500$ 84,500$ 118,000$ 85,000$ 108,000$

    CODE ENFORCEMENT & ZONING

    Tax Map Parcel Filing System and Impementation 50,000$ -$ -$ -$ -$

    Vehicle - 20,000 - - -

    Technology Upgrades - 5,000 - - -

    TOTAL CODE ENFORCEMENT & ZONING: 50,000$ 25,000$ -$ -$ -$

    WWTP

    Vehicle Lease 3,500$ -$ -$ -$ -$

    Chemical Pumps 8,000 - - - -

    Lab Equipment (Oven, Autoclave, Sampler) 20,000 12,000 - - -

    John Deere Gator Utility Vehicle 7,000 - - - -

    Miscellaneous WWTP Equipment 5,000 5,000 15,000 20,000 25,000

    Flow Meters - 15,000 - - -

    Switchgear Repairs - - 20,000 - 20,000

    TOTAL WWTP: 43,500$ 32,000$ 35,000$ 20,000$ 45,000$

  • 8/3/2019 Lansdale Boro 2012_Budget

    49/49

    BOROUGH OF LANSDALE

    CAPITAL IMPROVEMENT PROGRAM

    Capital Reserve Fund

    Description 2011 2012 2013 2014 2015

    PUBLIC WORKS

    Mig-welder 3,000$ -$ -$ -$ -$

    Asphalt Sealer - 5 year lease - 3,000 3,000 3,000 3,000

    TOTAL PUBLIC WORKS: 3,000$ 3,000$ 3,000$ 3,000$ 3,000$

    ELECTRIC SYSTEM

    Chipper - 5 year lease 8,000$ 8,000$ 8,000$ 8,000$ 8,000$

    - - - - -

    TOTAL ELECTRIC SYSTEM 8,000$ 8,000$ 8,000$ 8,000$ 8,000$

    PARKS & RECREATION

    Pool Slides - 5 year Lease, year one - 2008 2,500$ 2,500$ -$ -$ -$

    Starting Blocks (6) 16,800 - 2,000 - -

    Portable Lifeguard Stand 3,500 - - - -

    Lane Lines 4,600 - - - -

    2Bay Swing Frame 3,600 - - - -ADA Compliant Lifts for Pools - Mandate - 16,000 - - -

    Pool Buildings Ventilation System - 22,000 - - -

    Photo ID System - - 10,000 - -

    Portable Grand Stand - - 14,000 14,000 15,000

    Zero Radius Mower - - - - 9,000

    TOTAL PARKS & RECREATION: 31,000$ 40,500$ 26,000$ 14,000$ 24,000$

    Total Capital Projects - Borough Reserves 530,000$ 249,500$ 236,000$ 200,000$ 237,500$

    LIBRARY

    Books, DVDs, & CDs 45,000$ 45,000$ -$ -$ -$

    Computer Equipment 19,500 19,000 - - -Furniture 5,000 5,000 - - -

    TOTAL LIBRARY: 69,500$ 69,000$ -$ -$ -$