landfill mining: an option to trigger resources?landfill mining: an option to trigger resources?...

54
Landfill Mining: An Option to Trigger Resources? Prof. Dr.-Ing. Peter Quicker RWTH Aachen University Unit of Technology of Fuels 8 th CEWEP Waste-to-Energy Congress 2016 Circular Economy Meets Energy Union 16-17 June 2016 Rotterdam

Upload: others

Post on 26-Jul-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Prof. Dr.-Ing. Peter Quicker

RWTH Aachen University – Unit of Technology of Fuels

8th CEWEP Waste-to-Energy Congress 2016

Circular Economy Meets Energy Union

16-17 June 2016 Rotterdam

Page 2: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

2 von 54

Quelle: www.propubs.com/industries/global-landfill-mining/conferences/introduction

Page 3: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Content

3 von 54

I. Introduction

i. Project structure

ii. Goals & Approach

II. RDF-Production

i. Landfill material excavation

ii. Mechanical treatment of landfill material

III. Trials for thermal recovery of RDF

i. Waste incineration plant EEW Hannover

ii. RDF power plant Bernburg

iii. Cement plant CEMEX Beckum

IV. Conclusion

Page 4: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Introduction

Page 5: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Introduction

Project structure

5 von 54

• Funding from Federal Ministry of Education and Research

• Program

„r³ – Innovative Technologies for Resource

Efficiency – Strategic Metals and Minerals“

• Project period: August 2012 – July 2015

• Project partners

Companies

Universities

Institutes

Page 6: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Introduction

Ambition & Approach

6 von 54

• Development of methods for recovery of selected resources from

municipal waste and slag landfills

• Excavation and treatment of 8,000 Mg old-deposit (80s to 2010s)

• Study on landfill reclamation and resource usage:

Technology

Ecology

Economy

• Preparation of guidelines for the implementation of landfill mining projects

• Our task

Thermal recycling of RDF-fractions generated from landfill material

Pyrolytic treatment of mechanically generated metal concentrates

(disintegration of composite material)

Page 7: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill material excavation

RDF-Production

Page 8: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Landfill Pohlsche Heide District Minden-Lübecke

8 von 54

1988-1991

1995-2002

1991-1995

Page 9: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Landfill material excavation

9 von 54

Page 10: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Landfill material excavation

10 von 54

Page 11: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Landfill material excavation

11 von 54

Page 12: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Mechanical treatment of landfill material

RDF-Production

Page 13: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Mechanical & thermal treatment of landfill material – Overview

13 von 54

Vor-konditionierung

Rohdeponat K1, 2 und 3

MBAPohlsche Heide LVP

Sortieranlage

HKW Minden

8000 t

Gewerbeabfall-sortieranlage

Zwischenlager

Deponat-EBS

ca. 180 t

ca. 25 t

FluffProduktion

EEW Hannover Zementwerk

ca. 100 t

Kunststoffe

ca. 75 t

Leichtfraktion Schwerfraktion

Folien

ca. 75 t

Frischmüll (Hannover)

Frisch-EBS (Minden)

Zumischung

ca. 80 t

Zumischung

EAB Bernburg

ca. 200 t

Leichtfraktion

Raw landfill material

K1, 2 and 3

Interim

storage

Pre-

conditioning

MBT Pohlsche

Heide

Landfill material RDFFresh RDF (Minden)

Admixture

Plastics Foils

Lightweight fraction Heavy fraction

CHP Minden

Admixture

Fluff

production

Cement

plant

Fresh waste

Lightweight fraction

Lightweight

packaging

sortingplant

Commercial

waste

sorting plant

Page 14: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

• Sampling according to LAGA PN 98: Several samples (320 liter)

Mechanical treatment of landfill material – Output

RDF material analysis (from mechanical-biological waste treatment plant in Pohlsche Heide)

14 von 54

Foil

Sorting

residue

Fines

Non-ferrous

Iron

Plastics 3D

Minerals

Wood

TextilesPaper and board

20 to 40 mm

40 to 60 mm

60 to 80 mm

< 20 mm

> 80 mm

Page 15: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Mechanical treatment of landfill material – Output

15 von 54

Plastics 3-D

Page 16: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Mechanical treatment of landfill material – Output

16 von 54

Foils

Page 17: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Mechanical treatment of landfill material – Output

High calorific material

17 von 54

Calorific value [kJ/kg] 9.800 – 17.300

Chlorine content [%] up to 2,5

Ash content [%] ca. 30 – 42

Water content [%] ca. 11 – 40

Page 18: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Mechanical treatment of landfill material – Output

Fines

18 von 54

Page 19: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Mechanical treatment of landfill material – Output

Sorting residue

19 von 54

Page 20: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Waste-to-energy plant EEW Hannover

Combustion trials

Page 21: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Combustion test EEW Hannover

21 von 54

Plant layout

Wa

ste

Bottom

ash

Lime

milk Dust

Boiler

Spray absorber

Fabric filter

Induced draft

Entrained flow

reactor

Filter dust

Rec

ircu

latio

n

Clean gas

ChimneyA

C

Page 22: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Combustion test EEW Hannover

Input

22 von 54

• Mono-combustion of landfill material RDF from MBT

• Combustion of crude landfill material in mixture with fresh waste

Ratio Landfill material : Fresh waste

1 : 10, 1 : 5, 1 : 3

Mixture 1:3Landfill material RDFFresh waste

Page 23: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Combustion test EEW Hannover

Input

23 von 54

Landfill material RDFFresh waste

Page 24: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Landfill material RDFFresh waste

Combustion test EEW Hannover

Flame image

24 von 54

Landfill material – Fresh

waste 1 : 3

Page 25: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Combustion test EEW Hannover

Bottom ash

25 von 54

Slag from landfill material

Slag from fresh waste

Page 26: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Combustion test EEW Hannover

Results

26 von 54

35

40

45

50

55

60

65

70

10:00 12:00 14:00 16:00 18:00 20:00

Ste

am

mass f

low

[Mg

/h]

Referenzzeitraum 1 Versuchszeitraum Referenzzeitraum 2

Crude landfill material/ Fresh waste mixtureRDF from landfill material

Steam

Reference period 1 Trial period Reference period 2

Page 27: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Combustion test EEW Hannover

Results

27 von 54

• HCl raw gas values (mean values over trial time)

0

500

1000

1500

2000

2500

3000

Referenzvorher

Mono-EBS 1:10 1:5 1:3 Referenznachher

HC

lconcentr

atio

n[m

g/m

³i.N

.]

Crude landfill material/ Fresh waste mixture

HClRaw gas

Reference

period 1Reference

period 2

Mono

RDF

Page 28: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Combustion test EEW Hannover

Results

28 von 54

• HCl clean gas values (mean values over trial time) HClClean gas

0

5

10

15

Referenzvorher

Mono-EBS 1:10 1:5 1:3 Referenznachher

HC

lconcentr

ation

[mg/m

³i.N

.]

Limit value

Reference

period 1Reference

period 2

Mono

RDF

Crude landfill material/ Fresh waste mixture

Page 29: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Combustion test EEW Hannover

Results

29 von 54

• SO2 raw gas values (mean values over trial time)

0

100

200

300

400

500

600

700

Referenzvorher

Mono-EBS 1:10 1:5 1:3 Referenznachher

SO

2concentr

atio

n[m

g/m

³i.N

.]

Crude landfill material/ Fresh waste mixture

SO2

Raw gas

Reference

period 1Reference

period 2

Mono

RDF

Page 30: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

0

20

40

60

80

100

Referenzvorher

Mono-EBS 1:10 1:5 1:3 Referenznachher

CO

concentr

atio

n[m

g/m

³ i.N

.]Combustion test EEW Hannover

Results

30 von 54

• CO values (mean values over trial time)

Crude landfill material/ Fresh waste mixture

CO

Reference

period 1Reference

period 2

Mono

RDF

Page 31: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Combustion test EEW Hannover

Results

31 von 54

• Moisture (mean values over trial time)

15

16

17

18

19

20

Referenzvorher

Mono-EBS 1:10 1:5 1:3 Referenznachher

Wasserg

ehalt im

RG

[V

ol.-%

]

Moisture

Reference

period 1Reference

period 2

Mono

RDF

Crude landfill material/ Fresh waste mixture

Page 32: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Combustion test EEW Hannover

Results

32 von 54

• RDF monocombustion possible

• Raw gas values of RDF mono-combustion

HCl: significant increase by a factor of 2-3 Exceedance of emission limit

SO2: moderate increase

• Increase of lime milk consumption (ca. factor 2)

• Flue gas moisture noticeably higher

• Target value in steam production not reached because of low calorific value

• Crude landfill material only applicable in very high dilution with fresh waste (>1:10)

• Opinion of operator:

Combustion of landfill material RDF in 1 : 1 mixture with fresh waste

should be no problem

Page 33: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Refuse-derived fuel power plant Bernburg

Combustion trials

Page 34: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Combustion test EAB Bernburg

Plant layout

34 von 54

Quelle: www.eew-energyfromwaste.com 2014

SNCR

BICAR

HOK

Page 35: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Combustion test EAB Bernburg

Input

35 von 54

• Mono-combustion of landfill material RDF from preconditioning

1 year storage (drying!) and post-screening (about 50 % mass loss!!!)

Page 36: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Combustion test EAB Bernburg

Input

36 von 54

RDF from fresh waste RDF from landfill material

Page 37: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Combustion test EAB Bernburg

Input

37 von 54

RDF from landfill materialRDF from fresh waste

Page 38: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Combustion test EAB Bernburg

Flame image

38 von 54

RDF from landfill materialRDF from fresh waste

Page 39: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Combustion test EAB Bernburg

Results

39 von 54

• Steam production

Combustion of RDF from

landfill material

Page 40: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Combustion test EAB Bernburg

Results

40 von 54

• Emissions

HClHCl

Bicarbonate consumption

SO2

Combustion of RDF from

landfill material

Page 41: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Combustion test EAB Bernburg

Results

41 von 54

• Mono-combustion possible: No difference to normal operation

• No problems with material logistics

Reason: Material was comparatively dry (1 year storage)

• Raw gas values RDF mono-combustion

HCl: significant increase by a factor of 2-3 to 2.400 – 4.700 mg/m³i.N.

SO2: unremarkable

• Consumption increase of sodium bicarbonate (ca. factor 2-3)

• Stable steam generation

• Operating staff:

„Combustion behavior of landfill material RDF better than some fresh RDF“

Page 42: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Cement plant CEMEX Beckum

Combustion trials

Page 43: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Combustion test cement plant CEMEX Beckum

Plant layout

43 von 54

Quelle: CEMEX Deutschland 2014

Page 44: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Combustion test cement plant CEMEX Beckum

Input

44 von 54

• High-calorific material with 13 - 15 MJ/kg

• 2 Mg/h (= ca. 5 % of total FWL)

Page 45: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Combustion test cement plant CEMEX Beckum

Input

45 von 54

RDF from fresh waste RDF from landfill material

Page 46: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Combustion test cement plant CEMEX Beckum

Results

46 von 54

• Troubles in conveying

Significant tendency to agglomeration

Bridging over screw conveyors

Blocking beyond rotary valve

Page 47: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Combustion test cement plant CEMEX Beckum

Ergebnisse

47 von 54

Page 48: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Combustion test cement plant CEMEX Beckum

Results

48 von 54

• Troubles in conveying

Significant tendency to agglomeration

Bridging by discharge screw conveyors (isolated)

Frequent damer to reduce impact on rotary valve

• Too high chlorine values

Values from analysis of CEMEX sampling: Average value: 2,45 %!

Too high chlorine content in hot meal

Too much chlorine in bypass dust

Cl values in clinker (still) okay

• Massive incrustations in preheater tower

Higher pressure drop and personnel effort

Page 49: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Combustion test cement plant CEMEX Beckum

Results

49 von 54

• Due to difficult material handling reduction in throughput from 2 to 1,5 Mg/h

• Conveying problems and chlorine concentration led to test termination

• Conclusion

Troubles in conveying

Chlorine is biggest problem

Heavy metal content often above acceptance criterion

Drying necessary

• Operator: „Material is not applicable“

Complex treatment

Page 50: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Conclusion

Page 51: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Conclusion

Landfill material

51 von 54

• Very heterogeneous with different compositions

Much inert material due to soil cover (ash content, fines)

High moisture content

High content of chlorine (from „0“ to 2,5 %) and sulfur possible

Dull and brittle plastic consistency (lack of plasticizer?)

• Untreated landfill material is only applicable in very high mixture

• Treatment to RDF necessary

Crushing

Fractioning (fine and heavy product separation)

Metal separation

(Storage for) Drying?

• (Very) low RDF production

Page 52: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Landfill Mining: An Option to Trigger Resources?

Peter Quicker

8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam

Interim conclusion

Thermal treatment

52 von 54

• Incineration in WtE plant possible

• Recommended conditions

Treatment with separation of fines and metals

Drying (perhaps by storage) appears to be advantageous

Incinerator

- Classical WtE technology with variable grate

- With great effort (and in mixture) also for simpler systems applicable

Increase in raw gas values and consumptions of adsorbents expected

• Combustion of untreated material seems not to be reasonable

But what can be done with the separated fines?

• Application in cement plants not possible

• Landfill Mining only for material and energy recovery is unrealistic

Economical not feasible

Page 53: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Many thanks to

EEW Energy from Waste GmbH

CEMEX Deutschland AG

Pader Entsorgung GmbH & Co. KG

and Energie Anlage Bernburg GmbH

for the support with the trials

and

the authorities granting aid PTJ and BMBF

for the funding.

Page 54: Landfill Mining: An Option to Trigger Resources?Landfill Mining: An Option to Trigger Resources? Peter Quicker 8th CEWEP Waste-to-Energy Congress | 16-17 June 2016 Rotterdam Content

Thank youfor your attention

Prof. Dr.-Ing. Peter Quicker

RWTH Aachen University

52056 Aachen

www.teer.rwth-aachen.de