landfill layout and operation - ncsu coe peopletitle microsoft powerpoint - 17_lfoprns...

18
Copyright Morton A. Barlaz, NC State University, 1 Site layout Access roads permanent main roads temporary haul roads good access in all weather – 22' wide, crowned for drainage – slopes 7% for full truck 10% for empty truck Landfill Layout and Operation

Upload: others

Post on 17-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Landfill Layout and Operation - NCSU COE PeopleTitle Microsoft PowerPoint - 17_lfoprns [Compatibility Mode] Author SONY USER Created Date 3/11/2013 10:07:16 PM

Copyright Morton A. Barlaz, NC State University, 1

Site layout

Access roads– permanent main roads

– temporary haul roads

– good access in all weather

– 22' wide, crowned for drainage

– slopes7% for full truck

10% for empty truck

Landfill Layout and Operation

Page 2: Landfill Layout and Operation - NCSU COE PeopleTitle Microsoft PowerPoint - 17_lfoprns [Compatibility Mode] Author SONY USER Created Date 3/11/2013 10:07:16 PM

Copyright Morton A. Barlaz, NC State University, 2

Landfill Layout and Operation

• Equipment shelters

• Office/scale house or trailer– weight is required

– waste screening (2-4% of vehicles)

• Soil stockpile area

• Site buffer/visual screen

• Leachate treatment

• Sediment pond

Page 3: Landfill Layout and Operation - NCSU COE PeopleTitle Microsoft PowerPoint - 17_lfoprns [Compatibility Mode] Author SONY USER Created Date 3/11/2013 10:07:16 PM

Copyright Morton A. Barlaz, NC State University, 3

Landfill Layout and Operation• Truck washing area

– water accumulation in a depression

– an actual rinse

• Drop-off areas– recyclables, HHW, white goods, tires, oil, car batteries

– yard waste - possibly composting

• Construction and demolition debris– unlined section??

Page 4: Landfill Layout and Operation - NCSU COE PeopleTitle Microsoft PowerPoint - 17_lfoprns [Compatibility Mode] Author SONY USER Created Date 3/11/2013 10:07:16 PM

Copyright Morton A. Barlaz, NC State University, 4

Fill Plan

• Daily cell - typically the amount of refuse received in one day and covered– Not to be confused with a larger cell

– 4’-20’ high, 8’-12’ typical

• Orient working face to minimize wind– Placement of temporary litter control fence

Page 5: Landfill Layout and Operation - NCSU COE PeopleTitle Microsoft PowerPoint - 17_lfoprns [Compatibility Mode] Author SONY USER Created Date 3/11/2013 10:07:16 PM

Copyright Morton A. Barlaz, NC State University, 5

Page 6: Landfill Layout and Operation - NCSU COE PeopleTitle Microsoft PowerPoint - 17_lfoprns [Compatibility Mode] Author SONY USER Created Date 3/11/2013 10:07:16 PM

Copyright Morton A. Barlaz, NC State University, 6

Fill Plan

• Size working face to minimize at-site time to extent practical– ~20’ per vehicle

• Normal vs. wet vs. windy weather disposal areas

Page 7: Landfill Layout and Operation - NCSU COE PeopleTitle Microsoft PowerPoint - 17_lfoprns [Compatibility Mode] Author SONY USER Created Date 3/11/2013 10:07:16 PM

Copyright Morton A. Barlaz, NC State University, 7

Daily Cover• Protects Against:

• wind blown debris• odor• animals

• Minimize the amount of cover needed• historically soil at a ratio of:

• 4 yd3 refuse/ 1 yd3 soil

• now 9:1 is more typical, includes scraping some off in the morning

• Stockpile cover for wet and freezing periods• excavate in areas of southern exposure

Page 8: Landfill Layout and Operation - NCSU COE PeopleTitle Microsoft PowerPoint - 17_lfoprns [Compatibility Mode] Author SONY USER Created Date 3/11/2013 10:07:16 PM

Copyright Morton A. Barlaz, NC State University, 8

Alternative Daily Cover

• Foams which are sprayed on and last overnight• Posi-shell

• Compost• Mixed waste residual from a MRF• Yard waste

• Plastic sheet• one use• multiple use

• C&D fines (without wallboard)

Page 9: Landfill Layout and Operation - NCSU COE PeopleTitle Microsoft PowerPoint - 17_lfoprns [Compatibility Mode] Author SONY USER Created Date 3/11/2013 10:07:16 PM

Copyright Morton A. Barlaz, NC State University, 9

• Revenue generating material

– contaminated soil

– foundry sand

– ash

– auto shredder fluff

– C&D fines

• Lime stabilized sludge

• Use soil as a fire break weekly

Alternative Daily Cover

Page 10: Landfill Layout and Operation - NCSU COE PeopleTitle Microsoft PowerPoint - 17_lfoprns [Compatibility Mode] Author SONY USER Created Date 3/11/2013 10:07:16 PM

Copyright Morton A. Barlaz, NC State University, 10

Plastic Sheets Pulled Over Refuse• Sani-cover: vendor literature

• Lifecycle - 30 applications per panel

• claim 30 minute installation

• Must be held in place with soil, sandbags, tires

• One time use:

– 4 mil film, punch holes in morning

Page 11: Landfill Layout and Operation - NCSU COE PeopleTitle Microsoft PowerPoint - 17_lfoprns [Compatibility Mode] Author SONY USER Created Date 3/11/2013 10:07:16 PM

Copyright Morton A. Barlaz, NC State University, 11

Page 12: Landfill Layout and Operation - NCSU COE PeopleTitle Microsoft PowerPoint - 17_lfoprns [Compatibility Mode] Author SONY USER Created Date 3/11/2013 10:07:16 PM

Copyright Morton A. Barlaz, NC State University, 12

Site Hydrology• Run-on must be minimized through the use of

diversion ditches• Design for 25 year storm• Manage water so minimum amount is contaminated

– Temporary berms

• Phased construction to avoid stormwater accumulation

• Valving/berm to segregate clean and contaminated water

• Sediment ponds to treat clean runoff• Test impounded water before release

Page 13: Landfill Layout and Operation - NCSU COE PeopleTitle Microsoft PowerPoint - 17_lfoprns [Compatibility Mode] Author SONY USER Created Date 3/11/2013 10:07:16 PM

Copyright Morton A. Barlaz, NC State University, 13

• scale attendant /record keeper• equipment operators

• compact refuse• Push refuse• haul cover ?

• litter control• traffic control• manager• mechanic/handyman

• site engineer - monitor fill plan

• miscellaneous

Personnel

Page 14: Landfill Layout and Operation - NCSU COE PeopleTitle Microsoft PowerPoint - 17_lfoprns [Compatibility Mode] Author SONY USER Created Date 3/11/2013 10:07:16 PM

Copyright Morton A. Barlaz, NC State University, 14

2500 TPD Site:

- 1-traffic control

- 2-compactors

- 2-laborers

- 1-gate attendant

Personnel

Page 15: Landfill Layout and Operation - NCSU COE PeopleTitle Microsoft PowerPoint - 17_lfoprns [Compatibility Mode] Author SONY USER Created Date 3/11/2013 10:07:16 PM

Copyright Morton A. Barlaz, NC State University, 15

Refuse Density

• AUF – airspace utilization factor• Allow 1200 - 1500 lb/yd3 initially• This values allows for:

– cover soil– settlement

Page 16: Landfill Layout and Operation - NCSU COE PeopleTitle Microsoft PowerPoint - 17_lfoprns [Compatibility Mode] Author SONY USER Created Date 3/11/2013 10:07:16 PM

Copyright Morton A. Barlaz, NC State University, 16

Refuse Density• Variables in Compaction

– Lift thickness– Number of passes– Compactor weight

• Field test done under controlled conditions with 2000 tons of refuse– No C&D waste, sludge, soil covers

Heavy vehicles generally achieved better compaction but not always

4 passes 8 passes

1' lift - 1500 lb/yd3 1' lift - 1550 lb/yd3

2.5' lift - 1200 lb/yd3 2.5' lift - 1300 lb/yd3

Waste Age - Aug., 1994

Page 17: Landfill Layout and Operation - NCSU COE PeopleTitle Microsoft PowerPoint - 17_lfoprns [Compatibility Mode] Author SONY USER Created Date 3/11/2013 10:07:16 PM

Copyright Morton A. Barlaz, NC State University, 17

Landfill Fires

Causes

• hot loads

• lightening

• cigarette butts

• hot equipment

• aeration due to wind

• spontaneous combustion?

Page 18: Landfill Layout and Operation - NCSU COE PeopleTitle Microsoft PowerPoint - 17_lfoprns [Compatibility Mode] Author SONY USER Created Date 3/11/2013 10:07:16 PM

Copyright Morton A. Barlaz, NC State University, 18

Landfill Fires

• Most occur on windward side slopes

• Spreading from burning grass

• Practices to minimize potential for fire:

• good compaction

• soil cover daily

• load screening