LABOR COMPLIANCE PROGRAM ANNUAL REPORT Format for Awarding Body that enforces its own Labor Compliance Program for some but not all projects
Report for the reporting period:
1. Name of Labor Compliance Program (LCP): OXNARD UNIFIED HIGH SCHOOL DISTRICT
2. LCP 1.0. Number (assigned by DIR): 2003.00155
3. Date of Initial Approval: April 25, 2003
4. Contact Person Name: Penelope Deleon I Superintendent Address: 309 SOUTH K STREET, OXNARD, CA 93030 Phone: (805) 385-2500 Fax: (805) 483-3069 Email: [email protected]
07/01/15 06/30/16 ~~~~~~~~
5. Did LCP perform any LC§ 1771 .5 enforcement activities during the 12 months in the reporting period?
Yes _X_ If yes, proceed to item 6 on the next page
No _ If No, complete the information below, sign the form and submit to:
Reports must be emailed in .PDF form to [email protected] or mailed to: Department of Industrial Relations Office of the Director- Attn: Special Assistant to the Director 1515 Clay Street, 17th Floor Oakland, CA 94612 What suggestions do you have for the Department of Industrial Relations to better assist you with your program in the coming year (attach additional sheets if necessary)?
~#'l?/ll1!A7/()/ IV'Prl~ n /1-~/M /JnJ/ti!: 1,.4/e/ ~n,e~tes #/IH!r >~.meku_y h/~ ~ .
Date
LCP ANNUAL REPORT 8 CCR 16431 --AB limited
Page 1 of4
LABOR COMPLIANCE PROGRAM ANNUAL REPORT
6. LC § 1771 .5 enforcement activities (provide all information requested, attaching as many sheets as necessary)
A. List projects handled by LCP within the past 12 months.
Total: $ 58,285, 794.00 Bia Aavertisement u
- Project Name Date (tl#./##f##) Prime Contractor Contract Amount RANCHO CAMPANA HIGH SCHOOL- PSA 12/30/13 1 PRIME CONTRACTOR & 96 SUBCONTRACTORS $58,285,794.00
LCP ANNUAL REPORT 8 CCR 16431 -- AB limited
Page 2 of 4
LABOR COMPLIANCE PROGRAM ANNUAL REPORT
B. Summary of all wages and penalties assessed and/or recovered.
Total: $ 17,672.50 $ 18,562.72
' '·' ' J:
Approval of Forfeib.we Project Name Affected Contractor Amount Amount Requested from Labor
" (who dlrecUy employed Ille worker) Assessed Recovered Commisstoner? Description of Violation RANCHO CAMPANA HIGH SCHOOL-PSA AMERICAN LANDSCAPE $2,589.16 $2,589.16 Oves 0No CLC 1775
RANCHO CAMPANA HIGH SCHOOL-PSA PLATINUM CONSTRUCTION INC $379.76 $379.76 Oves 0No CLC 1775 & 1777.5
RANCHO CAMPANA HIGH SCHOOL-PSA HUGHES GENERAL ENGINEERING INC $770.65 $770.65 0Yes 0No CLC 1775 RANCHO CAMPANA HIGH SCHOOL- PSA TWINING LABORATORIES OF SOUTHERN 0Yes 0No
CALIFORNIA, INC. $1 ,012.31 $1 ,900.53 CLC 1775 RANCHO CAMPANA HIGH SCHOOL-PSA PERFORMANCE CONTRACTING $316.08 $318.08 0Yes 0No CLC 1775 & 1777 .5 RANCHO CAMPANA HIGH SCHOOL-PSA T&T TRUCK & CRANE SERVICE $5.60 $5.60 Oves 0No CLC 1775 RANCHO CAMPANA HIGH SCHOOL- PSA SELECT STEEL ERECTROS, INC. $1 ,996.54 $1 ,996.54 Oves 0No CLC 1775 RANCHO CAMPANA HIGH SCHOOL- PSA DOBITZ CONSTRUCTION INC. $28.25 $28.25 Oves 0No CLC 1775 RANCHO CAMPANA HIGH SCHOOL-PSA WILROY HEATING & AIR $91 .22 $91 .22 Oves QNo CLC 1775 RANCHO CAMPANA HIGH SCHOOL-PSA DJ INSULATION, INC. $27.54 $27.54 0Yes 0No CLC 1775
RANCHO CAMPANA HIGH SCHOOL- PSA BNC CONTRACTORS $3,328.78 $3,328.78 Oves 0No CLC 1775 & 1776 RANCHO CAMPANA HIGH SCHOOL- PSA GONSALVES & SANTUCCI INC DBA CONGO LJYes [;dNo
PUMPING INC $3,136.21 $3,136.21 CLC 1775, 1776 & 1777.5 RANCHO CAMPANA HIGH SCHOOL- PSA PRO PACIFIC SWEEP $3,990.40 $3,990.40 Oves 0No CLC 1775, 1776 & 1777.5
0Yes 0No
0Yes 0No
Oves 0No
Oves 0No
LJYes LJNo
LJYes LJNo
Oves 0No
Oves 0No
0Yes 0No
0Yes 0No
Oves 0No
0Yes 0No
Oves 0No
Oves 0No
0Yes 0No
LCP ANNUAL REPORT 8 CCR 1643 1 -- AB limited Page 3 of 4
LABOR COMPLIANCE PROGRAM ANNUAL REPORT
c . For anv Amount identified in item B for which aooroval of forfeiture not reauested from the Labor Commissioner, olease exolain below. I Amount Amount
Project Name Assessed Recovered Explanation RANCHO CAMPANA HIGH SCHOOL- PSA s 17,672.50 $ 18,562.72 CONTRACTORS IMMEDIATELY & VOLUNTARILY MADE RESTITUTION TO AFFECTED WORKERS & PLANS
Total: $17,672.50 $18,562.72
D . For anv amount identified in item B for which aooroval of forfeiture was reauested from the Labor Commissioner, olease orovide the followinA: Amount Assessed Amount Recovered
Proiect Name LC IS 1776 LC§ 1775 LC§ 1813 Wages Total LC§ 1776(!:ij LC§ 1775 LC§ 1813 Wages Total N/A
$ - $ -$ - $ -$ - $ -
E . ldentifv cases that are or were the subiect of LC 6 1742 oroceedini:is. Project Name Contractors Nature of Violation ODL Case# Current Status
N/A
F. Did you refer any contractor to the Labor Commissioner for debarment per LC§ 1777.1? Please check one: Des ~ If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral :
G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standard (DAS)? Please check one: Des 0,lo If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:
LCP ANNUAL REPORT 8 CCR 1643 1 -· AB Umitcd Page 4 of 4