l panel for... · o.sts/e/isa-vol- iii dated: 07.12.2015 sub: revised panel ofindependent safety...

1
Fax: +91-522-2452332, Tel:+91-522-2465748 Email: dsig6rdso@gmaiLcom 'IlffiT m<f}R--t>r ~ Government of India - Ministry of Railways ~ ~ 3lR lJRiI) ~ Research Designs & Standards Organisation ~-226011 LUCKNOW -226011 o. STS/E/ISA-Vol- III Dated: 07.12.2015 Sub: Revised Panel of Independent Safety Assessors (ISAs) for Signalling Projects and Products. Ref: This office letter of even no. dated 12/]6.12.2013. The earlier panel of Independent Safety Assessors (ISAs) for Signalling Projects and Products in three categories circulated vide above reference is superseded by the present panel with effect from 2/]2/2015. The terms and conditions for operation ofthe panel are given in the last. A: lSA Panel for Metro Signalling Projects/systems: 5 firms)* ---~. .---------------------_ .. _------------ .. _--- S.N. Name of the Firm on Panel 1 M/s Halcrow Rail Approvals Ltd., Quarnmill House, Stores Road, Derby DE21 4XF (UK), Tele:+44 (0) 1332222620, FAX: +44 (0) 1332222621, Email: mullinsd(a)halcrow.com, hral(a)halcrow.com 2 M/s TUV Rheinland lnertraffic GmbH, Am Grauen Stein 51105 Koln Email: infolalind.tuv.com i 3 M/s ATKlNS China Ltd., I 13/F WharfT&T Centre Harbour City Tsim Sha Tsui, Kowloon, Hongkong, I Tel: (852) 29721000, FAX: (852) 2890 6343, Email: acl[a).atkins.com.hk 4 M/s CERTIFER; I, Place de Boussu-B.P. 70141-F 59416, ANZTN, France Tele: +33(0)327283500; Fax: +33(0)3272835 09, Email:(i)o ierre.kadziolaesccrtifer.eu ( i i ) zabriel .decoomnanraicertifer. eu ,5 M/s Bureau Veritas ltalia S.p.A., [ Edificio "caffa" -Darsena di Genova Via paoloimperiale, 4 16126 Genova, I L_ Tele: (+39) 010.586564, Fax: (+39) 010.8604243, I Email : [email protected] - ....J .. *Notc: The terms and conditions for the operation of the panel IS given III the last. Terms and Conditions for Validity of above Panel: The above panel shall be valid with the following terms and conditions: i. lSA to be selected by Railway/Metro project organization and not by the signaling system supplier. 11. ISA selected for a project should not have been involved in other project activities like general consultancy, tendering, design, testing etc. of the same project. Ill. The panel will be valid for 2 years from the date of issue. iv. The work awarding organizations (Metro railway/ Zonal Railway/RDSO) shall ensure that the currency of accreditation of ISA as per ISO/IEC 17065 is valid on the date assignment given to them as well as on the date onSA's final report after completion of the assignment. v. Any adverse report the ISA may be considered suitable reason for deletion of firms name for the panel. vi. RDSO reserve the right to continue with the panel and add/delete, name of any/all firms partly and completely before assigning any reason. vii. The firms on above panel may authorize their Indian counterpart offices/ Representatives for ease in co-ordination, communication and bidding on behalf of the ISA firm. Such authorization may be communicated to the work awarding organization directly. However, it is made clear that the assessment, certification etc. for the project shall be done by the firm on the panel as above and not by the Indian representatives. DA:Nil. \~ \ ~\') (Hari OmvKu;shwaha) Director/Signal-VI For Director General/Signa! I -

Upload: phamkien

Post on 28-Apr-2018

220 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: L Panel for... · o.STS/E/ISA-Vol- III Dated: 07.12.2015 Sub: Revised Panel ofIndependent Safety Assessors (ISAs) for Signalling Projects and Products

Fax: +91-522-2452332, Tel:+91-522-2465748Email: dsig6rdso@gmaiLcom

'IlffiT m<f}R--t>r ~

Government of India - Ministry of Railways~ ~ 3lR lJRiI) ~

Research Designs & Standards Organisation~-226011

LUCKNOW -226011

o. STS/E/ISA-Vol- III Dated: 07.12.2015

Sub: Revised Panel of Independent Safety Assessors (ISAs) for SignallingProjects and Products.

Ref: This office letter of even no. dated 12/]6.12.2013.

The earlier panel of Independent Safety Assessors (ISAs) for Signalling Projects and Products inthree categories circulated vide above reference is superseded by the present panel with effect from2/]2/2015.

The terms and conditions for operation ofthe panel are given in the last.

A: lSA Panel for Metro Signalling Projects/systems: 5 firms)*

---~. .---------------------_ .._------------ .._---S.N. Name of the Firm on Panel1 M/s Halcrow Rail Approvals Ltd.,

Quarnmill House, Stores Road, Derby DE21 4XF (UK),Tele:+44 (0) 1332222620, FAX: +44 (0) 1332222621,Email: mullinsd(a)halcrow.com, hral(a)halcrow.com

2 M/s TUV Rheinland lnertraffic GmbH,Am Grauen Stein 51105 KolnEmail: infolalind.tuv.com i3 M/s ATKlNS China Ltd., I13/F WharfT&T Centre Harbour City Tsim Sha Tsui, Kowloon, Hongkong, I

Tel: (852) 29721000, FAX: (852) 2890 6343,Email: acl[a).atkins.com.hk

4 M/s CERTIFER;I, Place de Boussu-B.P. 70141-F 59416, ANZTN, FranceTele: +33(0)327283500; Fax: +33(0)3272835 09,Email:(i)o ierre.kadziolaesccrtifer.eu ( i i ) zabriel .decoomnanraicertifer. eu

,5 M/s Bureau Veritas ltalia S.p.A.,[ Edificio "caffa" -Darsena di Genova Via paoloimperiale, 4 16126 Genova, I

L_ Tele: (+39) 010.586564, Fax: (+39) 010.8604243,IEmail : [email protected]

- . ...J..*Notc: The terms and conditions for the operation of the panel IS given III the last.

Terms and Conditions for Validity of above Panel:

The above panel shall be valid with the following terms and conditions:

i. lSA to be selected by Railway/Metro project organization and not by the signaling systemsupplier.

11. ISA selected for a project should not have been involved in other project activities like generalconsultancy, tendering, design, testing etc. of the same project.

Ill. The panel will be valid for 2 years from the date of issue.

iv. The work awarding organizations (Metro railway/ Zonal Railway/RDSO) shall ensure that thecurrency of accreditation of ISA as per ISO/IEC 17065 is valid on the date assignment given tothem as well as on the date onSA's final report after completion of the assignment.

v. Any adverse report the ISA may be considered suitable reason for deletion of firms name for thepanel.

vi. RDSO reserve the right to continue with the panel and add/delete, name of any/all firms partlyand completely before assigning any reason.

vii. The firms on above panel may authorize their Indian counterpart offices/ Representatives for easein co-ordination, communication and bidding on behalf of the ISA firm. Such authorization maybe communicated to the work awarding organization directly. However, it is made clear that theassessment, certification etc. for the project shall be done by the firm on the panel as above andnot by the Indian representatives.

DA:Nil. \~\ ~\')

(Hari OmvKu;shwaha)Director/Signal-VI

For Director General/Signa!

I -