kth presentation

Upload: abdullahnayyab

Post on 30-May-2018

224 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/14/2019 KTH Presentation

    1/53

    Mujeeb urahman portion

    Planning

    Back ground studies Defining components of the old system

  • 8/14/2019 KTH Presentation

    2/53

    1 - 2

    PROJECT PHASES

    Planning (Why build the system? Howshould the team go about building it?)

    Analysis(Who uses system, what willit do, where and when will the systembe used?)

    Design (How will the system work?)

    Implementation (System delivery)

  • 8/14/2019 KTH Presentation

    3/53

    TOPIC OF PRESENTATION K.T.H

  • 8/14/2019 KTH Presentation

    4/53

    BACK GROUND STUDIES OF

    K.T.H FOR OUR PROJECT

    KTH.doc

    http://c/Documents%20and%20Settings/Student/Desktop/KTH.dochttp://c/Documents%20and%20Settings/Student/Desktop/KTH.doc
  • 8/14/2019 KTH Presentation

    5/53

    COMPONENTS OF KHYBER

    TEACHING HOSPITAL

    SYSTEM

  • 8/14/2019 KTH Presentation

    6/53

    Sial muhammad portion

    Analysis

    Data collection Interviews

    System requirements

    Priority requirement

    Altrernative

    Review plan

  • 8/14/2019 KTH Presentation

    7/53

    ANALYSIS PHASE

  • 8/14/2019 KTH Presentation

    8/53

    GATHERING

    INFORMATION

    1. Interviews

    o Nurse

    o General public

    o Doctors

    o Administration

    o The name of the nurse is Hina Rehman and shakeela ali.

    o We visit the hospital and meet that nurse and ask somequestion from her. She said that it is difficult to find thespecific person in the hospital.

    o She also suggest that there should be an informationsystem in that hospital which will make easy for us to findthe right person.

  • 8/14/2019 KTH Presentation

    9/53

    DOCTORS

    We meet the Cardiologist and discussthe problem he said that some time

    doctor are facing the problem of findingthe right disease of person.

    Therefore we need that kind ofinformation system through which every

    doctor receive information in their ownplace. He further add that theinformation system should be online

  • 8/14/2019 KTH Presentation

    10/53

    OPD HEAD

    The another person we meet was thehead of OPB. He said that there should

    be an information system which willdecreased load of the people and wewill be able to manage the people inbetter and in effective way. We will feelrelax because the most burden is shift

    to the information system

  • 8/14/2019 KTH Presentation

    11/53

    AUDIT AND ACCOUNT

    SYSTEM

    We also visit the audit and account secton. Theywere facing the problem of entering the checkserial number for right person.

    They also give suggestion of information systemthat it should be connected to the SAP. Becauseif person shift to another hospital then only theID of that person will be shifted from thehospital therefore we do not need of searching

    of the file of the specific person.

  • 8/14/2019 KTH Presentation

    12/53

    PROBLEM OF THE

    HOSPITAL

    The full detail of the problem are as follows

    It is difficult to Keep records of admission ofpatient.

    It is difficult to Keep patient-care as utmostpriority.

    It is difficult to Scheduling the appointment ofPatient with Doctor. Information system willmake it convenient for both.

    It is difficult to Scheduling the services ofspecialized Doctor (Consultant) and emergencyproperly if information system is there thenfacilities provided by Hospital are fully utilizedin effective and efficient manner.

  • 8/14/2019 KTH Presentation

    13/53

    It is difficult to Keep explicit details about the patients diseases,diagnosis and management for comprehensive research.

    It is difficult to Keep the records of salary structure of the employeesof Hospital by billing approach.

  • 8/14/2019 KTH Presentation

    14/53

    SYSTEM REQUIREMENT

    Functional requirement

    It include the basic requirement of the

    system Computers

    Computer operator

    SQL server window

    Cate 5 wire

  • 8/14/2019 KTH Presentation

    15/53

    NON-FOUNTIONAL

    REQUIRMENT

    High price computer

    Expert of the computer

    Cate 6 wire

  • 8/14/2019 KTH Presentation

    16/53

    PRIORITY OF THE

    REQUIRMENT

    Most important requirements are Pentium4 computer

    Computer operator who are able to usethe system and operate easily.

    256 Mb or Higher,1500 or higherProcessor

    Less important are export users of thecomputer

    Dual core computer

  • 8/14/2019 KTH Presentation

    17/53

    ALTERNATIVE FOR THE

    SYSTEM

    . Batch System:-

    Another alternative solution can be used of computerbased batch system. A batch system refers to a system in

    which data is processed in a periodical basis. 3. Online System:-

    This system (HMS) willprovides online storage/updations

    system promises very less or no paper work and alsoprovides help to Doctor and operational staff.

    You can easily find the information without searching hereand there into registers

    REVIEW AND

  • 8/14/2019 KTH Presentation

    18/53

    We have discussed with management aboutthe new computer and operator of the

    computer system

    They suggest that this system should beimplemented in hospital

    that will help not only doctors, patient, nursebut also general public and staff of thehospital.

    REVIEW ANDRECOMMENDATION WITH

    MANAGEMENT

  • 8/14/2019 KTH Presentation

    19/53

    Qaiser Hayat portion

    Feasibility

    Types of feasibility

    Technical feasibility

    Economic feasibility

    Operational feasibility Management feasibility

  • 8/14/2019 KTH Presentation

    20/53

    FEASIBILITY

  • 8/14/2019 KTH Presentation

    21/53

    OPERATIONAL

    FEASIBILITY

    Computer operators costs Rs:12000per operator

    Utility costs: Rs:20000

  • 8/14/2019 KTH Presentation

    22/53

    ECONOMIC FEASIBILITY

  • 8/14/2019 KTH Presentation

    23/53

    TECHNICAL FEASIBILITY

    Computers

    Software maintenance

    Wires and cables

    Computer operators

  • 8/14/2019 KTH Presentation

    24/53

    In this project, I can say that this project will betechnical feasible. This is successfully

    satisfying the users of the basis requirement. The toolsand application software are used in this

    project are very popular and easily available acrossthe world.

    My project is demo project completely applicable theground level of department

    desktop computer this can easily enhanced by a teamof experts on the basis of my project and

    its data collection report.

    For the setup of the project minimum software andhardware requirements are given

  • 8/14/2019 KTH Presentation

    25/53

    LEGAL FEASIBILITY

    All the documentation

    Approval from the finance deptt of govt

    Approval from the health deptt of govt

    Approval from the ms of the hopital

  • 8/14/2019 KTH Presentation

    26/53

    MANAGEMENT

    FEASIBILITY

    The senior level officers are supportivein implement this project for motivation

    of clerical or no-technical employee.

    Objects Costs

  • 8/14/2019 KTH Presentation

    27/53

    TOTAL COSTS OF THE PATIENTINFORMATION SYSTEM

    Objects Costs

    computers 96000

    wires &cables 7000

    creceptions 15000

    comp operators 36000

    maintanance 5000

    software cost 40000

    utility costs 3000

    Total costs 202000

  • 8/14/2019 KTH Presentation

    28/53

    Abdullah portion

    Design phase of the project

    Preliminary design

    methodology

    Detailed design

    Architecture design

    Data flow diagram

  • 8/14/2019 KTH Presentation

    29/53

    SYSTEM DESIGN

  • 8/14/2019 KTH Presentation

    30/53

    PRELIMINARY DESIGN

    At preliminary stage we have studiedthe feasibility of the new system and

    found that it is feasible. Then weproceed to the detailed design system

  • 8/14/2019 KTH Presentation

    31/53

    DETAILED DESIGN STAGE

    Designselection

    Architecture design

    Interfacedesign

    Datastoragedesign

    Programdesign

  • 8/14/2019 KTH Presentation

    32/53

    DESIGN SELECTION

  • 8/14/2019 KTH Presentation

    33/53

    DESIGN SELECTION

    METHODOLOGY

  • 8/14/2019 KTH Presentation

    34/53

  • 8/14/2019 KTH Presentation

    35/53

    ARCHITECTURE DESIGN

  • 8/14/2019 KTH Presentation

    36/53

    INTERFACE DESIGN

    K.T.H.

  • 8/14/2019 KTH Presentation

    37/53

    DATA STORAGE DESIGN

  • 8/14/2019 KTH Presentation

    38/53

    PROGRAM DESIGN

    For program designing we areavailing the services of it software

    decision corporation

    They will develop and code all thesoftware according to ourrequirements we have identified

  • 8/14/2019 KTH Presentation

    39/53

    PROGRAM DESIGN

  • 8/14/2019 KTH Presentation

    40/53

    PROGRAM CODING

    In this stage we do program coding

    And data dictionary

  • 8/14/2019 KTH Presentation

    41/53

    SECURITY DESIGN

  • 8/14/2019 KTH Presentation

    42/53

    PROGRAM TESTING

    We will take a trail of the software if itis good then ok if it is not working or

    need any changes will go to thesoftware house and they will fix it .

  • 8/14/2019 KTH Presentation

    43/53

    Bilal Younus portion

    Implementation

    Support plan

    Trainning plan

    Conversion methods

    Post implementation review

    Review palan Mainatanace palan

    Help plan

  • 8/14/2019 KTH Presentation

    44/53

    We install the program on thecomputer and start working with the

    environment If the system function correctly its all

    right if any thing wrong we report tothe software house

    IMPLEMENTATION STAGE

  • 8/14/2019 KTH Presentation

    45/53

    TRAINING PLAN

    There are two types of training.

    Vendor and inservice training

    in house training.We use inservice

    training.we will hire new people whichare actually computer experts having

    qualification like MIT,MCS..Our trainingprogramme will be of 15 days.

  • 8/14/2019 KTH Presentation

    46/53

    SUPPORT PLAN

    (a)EVALUATION

    (b)PROBLEM REPORTING(c)CHANGE REQUESTAfter sometime we will evaluate the project andafter evaluation if any problem is found we willreport the problem and try our best to solve theproblem in a betterway and request for change

  • 8/14/2019 KTH Presentation

    47/53

    CONVERSION METHODS

    Conversion is the process of changingfrom old system to new one.It must be

    pro planned and executed. We will use the parallel method

    Along with the new we run the oldsystem

  • 8/14/2019 KTH Presentation

    48/53

    POST IMPLEMENTATION

    REVIEW

    After one year we will have a post auditreport.it will be the complete evaluation of theproject and we will report it to the MS OFKTH.A review should be conducted todetermine whether the system is meeting theexpectations and where improvements areneeded.A post review measures the systemperformance against predefinedrequiremnents.Once request is field the useris asked how well the measured benefits havebeen realized.Suggestions regarding changesand improvements are also asked.

  • 8/14/2019 KTH Presentation

    49/53

    REVTEW PLAN

    The review team prepares a formal review planaround the objectives of the review,the type ofevaluation to be carried out and the time

    schedule required.An overall plan covers thefollowing areas

    ADMINISTRATIVE PLAN

    PERSONEL REQUIREMENT PLAN

    HARDWARE PLAN DOCUMENTS REVIEW PLAN

  • 8/14/2019 KTH Presentation

    50/53

    MAINTENANCE

    Maintence is actually theimplementation of the post

    implementation reviewplan.Anyvariation from the prepaidpackage desired any improvementwould now be suggested by actualusers.As installation and actual use has

    taken place the feature change desiredwould actually be called mainterance ofpackage.

  • 8/14/2019 KTH Presentation

    51/53

    PROGRAMMS ANALYST

    The programm analyst spend sufficenttime for maintaining programms.thestudy on the maintenancerequirements for the information

    system revealed that 60-90% of the overall cost of software

    during the life of system is onmaintenance.

    In documented cases,the cost ofmaintenance when measured on the

    basis of writing each instruction incoding form is more than 50 times thecost of developing a system

    The software demand is increasing atfaster rate than demand

  • 8/14/2019 KTH Presentation

    52/53

    REPORT

    The output and report generation for hospital management system will include thefollowing details

    DOCTORS DETAIL

    VISITING DOCTORS DETAIL

    PATIENT DETAIL

    STAFF DETAIL

    NURSE DETAIL

    WARD BOY DETAIL

    EMPLOYEES WORK TIME DETAIL

    ATTENDENCE DETAIL

    MEDICINE DETAIL

    HOLIDAYS DETAIL

    ACCOUNTS DETAIL

  • 8/14/2019 KTH Presentation

    53/53

    Help plan

    Help to operators

    Help to operate the system