3/26/2003 Project Wireless Vietnam 1
Project Wireless VietnamMidterm Presentation Spring 2003
Royal Institute of Technology, KTH Stockholm, Sweden
3/26/2003 Project Wireless Vietnam 2
Project Team
Joanna Kühn Christine Simon Tung Thanh Nguyen Nhien To Ngo Hanh Van Nguyen
KTH KTH MoST MoST MoST
[email protected] [email protected] [email protected] [email protected] [email protected]
3/26/2003 Project Wireless Vietnam 3
Project Team (cont)
Principal: Coach: Co-coach:
Lars Gimbert Alberto Escudero-Pascual Van Nguyen Hong
DSV/Sida KTH/IT MoST
3/26/2003 Project Wireless Vietnam 4
OverviewIntroduction
Background
Project goals
Project methodology
Project structure
Work doneWireless technology survey
Equipment
Testing methods
Scenarios
Remaining tasks
ConclusionsProblemsRisks BenefitsSummary
Questions and Answers
3/26/2003 Project Wireless Vietnam 5
Background
The Wireless Vietnam project is a subproject of the ongoing STE-NET project
The STE-NET project aims to build a network infrastructure
The infrastructure will provide Internet connectivity and information services to the different educational sectors in Vietnam
3/26/2003 Project Wireless Vietnam 6
Background (cont)
Sida – Swedish International Development co-operation Agency
MoST – Ministry of Science and Technology in Vietnam
IT – University in Kista, Sweden
The STE-NET project is a co-operation between
3/26/2003 Project Wireless Vietnam 7
Project organisation
STE-NET PROJECT
Infrastructure ICT Services HRD M&O
ProjectWireless Vietnam
3/26/2003 Project Wireless Vietnam 8
Project goals
Provide a showcase of wireless broadband access by building two pilot sites that are connected to the STE-NET POP (Point of Presence) in Hanoi
The two selected pilot sites Hanoi Medical College Hanoi University of Civil Engineering
3/26/2003 Project Wireless Vietnam 9
Project methodologyLearn Propose Implement Document Evaluate
How to fulfil the goals Learn about wireless technologies Select one appropriate wireless technology Make an implementation plan
a wireless technology survey a list of needed equipment a description of how to implement it budget
Purchase equipment and make tests in Stockholm Implement and test the technology in Hanoi Document the implementation procedure Provide training for stakeholders and staff at MoST
3/26/2003 Project Wireless Vietnam 10
Project structure
Phase I Working in Stockholm January – March 2003
Phase II Working in Hanoi April – May 2003
3/26/2003 Project Wireless Vietnam 11
Wireless technology survey
Comparing the wireless technologies IEEE 802.11a IEEE 802.11b IEEE 802.11g IEEE 802.16 (MMDS)
Decision based on the following criteria Availability Capacity Costs of equipment Knowledge Market trends Open standards
3/26/2003 Project Wireless Vietnam 12
Point-to-Multipoint scenario
Leased line
Internet
Router
Switch
Switch
OR
COR
Switch
Switch
OR
F1 F2 F3
Laptop
Computer
Laptop
Laptop
Computer
Computer
Highest Building
MoST
Stakeholder 2Stakeholder 1
COR
F4
ROR
3/26/2003 Project Wireless Vietnam 13
Point-to-Point scenario
Leased lin
e
Internet
Router
Switch
OR
Switch
OR OR
Switch
OR
Laptop
Computer
Laptop
MoST
Stakeholder 2
Stakeholder 1
Firewall Server
1,1 km
2,3 km
Firewall Server
Laptop
3/26/2003 Project Wireless Vietnam 14
Equipment
COR-1100
OR-500
Antenna VP870/24
Antenna VP470/24
AntennaCA27/24
Antenna Cable
Pigtails
PC Card Gold S375 Cable
IEEE 802.11b Radio equipment Low loss microwaves cables 2.4 GHz Antennas
3/26/2003 Project Wireless Vietnam 15
Testing Methods
Perform radio link testSignal Noise Ratio StabilityMeasure effective radio capacityMeasure IP throughputMeasure Quality of Service
3/26/2003 Project Wireless Vietnam 16
Remaining tasks
ImplementationVerificationDocumentationTrainingHandover
3/26/2003 Project Wireless Vietnam 17
ProblemsInternal
Different goals for different team members • Individual performance rather then teamwork
Culture differences • Different way of working
Communication problems • Misunderstanding
3/26/2003 Project Wireless Vietnam 18
Problems (cont)
External Hierachical level at MoST
• bureaucracy• decisions are made beyond our influence and
knowledge Lack of trust and believe in us
• loosing motivation Budget approved too late
• lack of time for testing equipment
3/26/2003 Project Wireless Vietnam 19
RisksNo access to highest point or stakeholder’s building and
infrastructure
Radio design has to be redone
Project delay and goals may not be achieved
Plan B: implementation only in test environment
3/26/2003 Project Wireless Vietnam 20
Benefits
Learn about new wireless technologiesTheoretical and practical, hand-on
experiencesInvolved in an international project that
goes beyond countries’ bordersUnderstanding different culture and way of
working
3/26/2003 Project Wireless Vietnam 21
SummaryWhat are we doing? Provide wireless broadband access in Hanoi
Where are we now? Wireless technologies survey Implementation plan Ordered equipment
Where are we going? Implementation of the two pilot sites Documentation and Training for stakeholders and staff at MoST
What are we expecting? Learn about wireless technologies Gaining international experience Discover other cultures
3/26/2003 Project Wireless Vietnam 22
Questions and Answers
Feel free to ask questions!
More info at:
Webpage: http://csd.ssvl.kth.se/~csd2003-team3/
Email: [email protected]