State of Florida, GEO Blackwater River Correctional Facility, Milton, FL This campus holds 2,000 inmates, and consists of two dormitory housing buildings, four cell housing buildings, a segregation housing support building, and an administration building. Fast-track schedule. LEED Gold. Portland State University, Academic and Student Recreation Center, Portland, OR This 175,000-sf complex houses an indoor swimming pool, gym, indoor soccer, a track, basketball courts, climbing walls, training rooms, classrooms, and offices. Fast-track schedule. LEED Gold. City of Hillsboro, Hillsboro Stadium, Hillsboro, OR 4,000-seat stadium. Fast-track schedule. National Council of Structural Engineering Association’s Outstanding Project Award. U.S. Department of State, New Embassy Compound, Quito, Ecuador The compound includes six structures, each designed to highest seismic requirements of the IBC. The project’s total area is approximately 170,000-sf. Environmental Protection Agency (EPA), Region 8 Headquarters, Denver, CO The nine-story, mid-rise structure has 292,000-sf of office and retail space, and 103,000-sf of parking. The structure is designed to resist specified blast forces originating at specified distances from the primary structural frame elements and therefore to prevent progressive collapse. LEED Gold. At KPFF, we strive to be more than consultants. Here, we are partners with our project teams, collaboratively pushing the boundaries and elevating the work we do in a constant pursuit of excellence. We are comprised of structural & civil engineers, who thrive on designing innovative solutions for projects of all scales. Our Portland office, established in 1974, has 130+ engineers that are collectively licensed in all 50 states. Our award-winning portfolio spans six continents and over 250,000 projects.

Upload: kpff-portland-structural

Post on 23-Jul-2016

215 views

Category:

Documents


0 download

DESCRIPTION

KPFF values the inherent opportunity to integrate constructability with great design in a design-build project. This project delivery method enables us to work directly with the contractor from project onset. In this context, we are able to collaborate with the contractor to determine the most appropriate structural system that will meet the project’s budget; allow for construction costs to be determined up front; provide design services for project elements that are the contractor’s responsibility; and help to solve construction challenges. Nearly twenty percent of our workload utilizes the design-build method.

TRANSCRIPT

Page 1: KPFF + Design/Build

State of Florida, GEO Blackwater River Correctional Facility, Milton, FLThis campus holds 2,000 inmates, and consists of two dormitory housing buildings, four cell housing buildings, a segregation housing support building, and an administration building. Fast-track schedule. LEED Gold.

Portland State University, Academic and Student Recreation Center, Portland, ORThis 175,000-sf complex houses an indoor swimming pool, gym, indoor soccer, a track, basketball courts, climbing walls, training rooms, classrooms, and offices. Fast-track schedule. LEED Gold.

City of Hillsboro, Hillsboro Stadium, Hillsboro, OR4,000-seat stadium. Fast-track schedule. National Council of Structural Engineering Association’s Outstanding Project Award.

U.S. Department of State, New Embassy Compound, Quito, EcuadorThe compound includes six structures, each designed to highest seismic requirements of the IBC. The project’s total area is approximately 170,000-sf.

Environmental Protection Agency (EPA), Region 8 Headquarters, Denver, COThe nine-story, mid-rise structure has 292,000-sf of office and retail space, and 103,000-sf of parking. The structure is designed to resist specified blast forces originating at specified distances from the primary structural frame elements and therefore to prevent progressive collapse. LEED Gold.

At KPFF, we strive to be more than consultants. Here, we are partners with our project teams, collaboratively pushing the boundaries and elevating the work we do in a constant pursuit of excellence. We are comprised of structural & civil engineers, who thrive on designing innovative solutions for projects of all scales. Our Portland office, established in 1974, has 130+ engineers that are collectively licensed in all 50 states.

Our award-winning portfolio spans six continents and over 250,000 projects.

Page 2: KPFF + Design/Build

Oregon Military Department, Armed Forces Reserve Center (AFRC), Camp Withycombe, Clackamas, ORThe project consists of a 250,000 sf AFRC, in several one- and two-story steel framed buildings. The AFRC provides administrative, training, kitchen, family welfare, recruiting and retention, physical fitness, and vehicle maintenance space for 9 Oregon Army National Guard units and 8 Army Reserve units.

DESIGN-BUILD EXPERIENCEKPFF values the inherent opportunity to integrate constructability with great design in a design-build project. This project delivery method enables us to work directly with the contractor from project onset. In this context, we are able to collaborate with the contractor to determine the most appropriate structural system that will meet the project’s budget; allow for construction costs to be determined up front; provide design services for project elements that are the contractor’s responsibility; and help to solve construction challenges. Nearly twenty percent of our workload utilizes the design-build method.

» CORE Campus, Hub on Campus, 515 East Broadway, Eugene, OR

» Ronler Acres, Fabrication and Office Building (Confidential Client), Hillsboro, OR

» Riker Data Center, Quincy, WA

» Oregon Military Department, Oregon Military Department/Columbia Gorge Community College, Fort Dalles Readiness Center, The Dalles, OR

» Oregon Military Department, 41 Infantry Division, Armed Forces Reserve Center, Camp Wythecombe, Clackamas, OR

» Oregon Military Department, Flight Operations Facility, Salem, OR

» U.S. Department of State, Office of Overseas Buildings Operations, New Mini Annex, Willemstad, Curacao

» Evergreen ASB Data Center, Hillsboro, OR

» U.S. Department of State, Office of Overseas Buildings Operations, New Embassy Compound, Rabat, Morocco

» Mountain View Hospital, Madras, OR

» Coquille Valley Hospital, Coquille, OR

» The Vancouver Clinic, Battle Ground, WA

» TriMet, Merlo Fuel and Wash Facility and LIFT Administration Building, Beaverton, OR

» Humboldt State University, Schatz Energy Research Center, Arcata, CA

» Humboldt State University, Forbes Sports Complex Renovation and Addition (Kinesiology & Athletic Building), Arcata, CA

» Kaiser Permanente, Sunnyside Medical Center Parking Structure #3, Clackamas, OR

» Lewis-Clark State College, Nursing and Health Sciences Building, Lewiston, ID

» TriMet, Clackamas Town Center Parking Garage, South Corridor Light Rail, Clackamas, OR

» Portland State University, Academic and Student Recreation Center, Portland, OR

» Clackamas Town Center Parking Garage, Clackamas, OR

» U.S. Department of State, Office of Overseas Buildings Operations, Numerous Embassy Projects, Worldwide

TriMet, Clackamas Town Center Parking Garage, Clackamas, OR This 4-story, 792-space park & ride facility for the I-205 light rail line is linked to the rail station by three pedestrian bridges and a freestanding elevator/stair structure.

Humboldt State University, Forbes Sports Complex, Arcata, CAThis 90,000-sf, steel and concrete structure was constructed on three levels due to the steep site topography.