km c458-20180627143620discover.pbcgov.org/engineering/roadwayproduction/links... · 2021. 1....
TRANSCRIPT
-
PROFESSIONAL SERVICES EVALUATION FORM I t I I -- I l ~ I -- - -1- j f- -- +- .. l
ONE (1) FIRM FOR: All Engineering Services Required for: ... Lyons Rd., LWDD L-30 Canal to Boynton Beach Blvd., estimated 3.0 miles, 4 lane r
-I--~ -PROJECT NO: 2018503 -~--- -7 J I - - - - ~ +- I D,-.. .:'.J MEETING DATE: Thursday,June 14, 2018 ~
I - - -
MEETING TIME: 1:30p.m.
T j - ·-'--
I American
Arcadis U.S., EAC
HSQGroup, Last McMahon Propel
R.J. Behar & Scalar Stanley Stantec
Wantman Max Criteria Consulting DRMP, Inc. consulting, Devenport, Associates, Engineering, Consulting Consultants, Consulting
Score Inc. Inc. Co.,lnc. Group, Inc. Eng. of Fl., LLC. Inc, Inc. tnc. Inc. Group, Inc., Inc. Services, Inc.
Ability, knowledge of design criteria and I l past performace of firm and the designated so 46 46 40 38 46 43 38 40 39 44 50 46 45 project team to satisify the technical
requirements of the project. . .. I ... - ~ -Approach to the project, understanding of
the project and quality of presentation, 20 18
Including meeting time/budget 20 13 15 18 10 14 18 14 19 20 20 17
requirements.
Subtotal l 10 64 66 53 53 64 53 52 58 53 63 70 66 62 I
Location of the firm's offices and where
work will be accomplished 10 10 10 10 10 10 10 10 10 10 10 10 10 10
-+ - ~ -- - ~
SBE/MWBE Participation 10 9 8 10 9 10 10 8 10 10 10 6 8 9 - - ,- t r --
7 --
Volume of previous work awarded by the . County over the past four (4) years. (The
10 7 8 10 10 5 10 10 9 7 7 9 6 firm with the most work receives the
lowest score.) I
Subtotoll 30 26 26 30 29 25 30 27 30 29 27 23 27 25
Total 100 90 92 83 82 89 83 79 88 82 90 93 93 87
Ronk 4 3 9 11 6 9 13 7 11 4 1 1 8
" - Designated Representative I I - j Member's Title: Assistant County Engineer I l -- t 1 Member's Name: Steve Carrier I
-
~-- ~ --
Member's Signature: I (,... 1-z, I 1~) ~ - I - ~--'---' \,...____/
-
PROFESSIONAL SERVICES EVALUATION FORM 1-= I I I
1 J I ----i- I I - .... I ~ -ONE (1) FIRM FOR: All Engineering Services Required for:
-1- t ----- I _I Lyons Rd., LWDD L-30 canal to Boynton Beach Blvd., estimated 3.0 miles, 4 lane r
- --
t.
t
PROJECT NO: t . I 2018503 ' J I I -- .... - - -0 (< I GI tllrL MEETING DATE: Thursday, June 14, 2018 -- - - - r- F MEETING TIME; 1:30p.m. + l I I l
American Arcadis U.S.,
EAC HSQGroup,
Last McMahon Propel R.J. Behar&
Scalar Stanley Stantec Max Wantman
Criteria Consulting DRMP, tnc. Consulting, Devenport, Associates, Engineering, Consulting Consultants, Consulting Score Inc. Inc. Co., Inc. Group, Inc.
Eng. of Fl., LLC. Inc. Inc. Inc. Inc. Group,lnc. Inc. Services, Inc.
Ability, knowledge of design criteria and I I
past performace of firm and the designated 50 45 46 44 40 42 45 35 40 42 40 45 43 42
project team to satisify the technica I
requirements of the project. I r
--- -
Approach to the project, understanding of I
the project and quality of presentation, 20 18
in duding meeting time/budget 18 18 15 18 18 15 15 17 15 18 18 18
requirements.
Subtotal l 70 63 64 62 55 60 63 50 55 59 55 63 61. 60
Location of the firm's offices and where I I l I work will be accomplished 10 10 10 10 10 10 10 10 10 10 10 10 10 10 - -- I ... --SBE/MWBE Participation 10 9 8 10 9 10 10 8 10 10 10 6 J_ 8 I 9
I
~
Volume of previous work awarded by the i
County over the past four (4) years. (The
firm with the most work receives the 10 7 8 10 10 5 10 9 10 9 7 7 9 6
lowest score.)
SubtotaJ2 30 26 26 30 29 25 30 27 30 29 27 23 27 25
Total 100 89 90 92 84 85 93 77 85 88 82 86 88 85
Rank 4 3 2 1l 8 1 1.3 8 5 12 7 5 8
~ - Designated Representative ----Member's Title: · Oirecto~ Roadway Production
-Member's Name: Omello ~ernandez - -~
-
0)~ - -
(J
-
PROFESSIONAL SERVICES EVALUATION FORM I I t
I
-------L I
- +-
' - ONE (1) FIRM FOR: All Engineering Services Required for: I f Lyons Rd., LWDD l-30 Canal to Boynton Beach Blvd., estimated 3.0 miles, 4 lane r -- -PROJECT NO: 2018503 t I l -=--=E - - -
--
('.)ct \U--1 ,.> 'l-1-- MEETING DATE: Thursday, June 14, 2018 l - -MEETING TIME: 1:30p.m.
I l I j I -- - - -
American Arcadis U.S.,
EAC HSQ Group,
Last McMahon Propel R.J. Behar&
Scalar Stanley Stantec Max Wantman
Criteria Consulting DRMP, Inc. Consulting, Devenport, Associates, Engineering, Consulting Consultants, Consulting Score Inc. Inc. co., Inc. Group, Inc.
Eng. of Fl., LLC. Inc. Inc. Inc. Inc. Group, Inc. Inc. Services, Inc. I I
. l \ Ability, knowledge of design criteria and I
past performace of firm and the designated
project team to satisify the technical 50 45 48 40 42 47 45 40 43 44 45 48 48 48
requirements of the project. ~ - ._ • ~- ~ -
Approach to the project, understanding of
the project and quality of presentation, 20 16
including meeting time/budget 18 12 12 15 15 12 18 15 17 18 18 17
requirements.
Subtotaf 1 70 61 66 52 54 62 60 52 61 59 62 66 66 65
Location of the firm's offices and where 10 10 ~I 10 10 10 10 10 10 10 10 10 10 10 I 10 work will be accomplished l + ~
SBE/MWBE Participation 10 9 8 10 9 10 10 8 10 10 10 6 9 --
Volume of previous work awarded by the
County over the past four (4) years. (The 10 7 8 10 10 5 10 9 10 9 7 7 6
firm with the most work receives the
lowest score.) I I
Subtotaf2 30 26 26 30 29 25 30 27 30 29 27 23 27 25
Total 100 87 92 82 83 87 90 79 91 88 89 89 93 90
Rank 9 2 12 11 9 4 13 3 8 6 6 1 4
"' - De5ignated Representative - t Member's Title:IDirector Land Development ] • I - --Membe
-
PROFESSIONAL SERVICES EVALUATION FORM l I
ONE (1) FIRM FOR: All Engineering Services Required for: ______ 1
I Lyons Rd., LWDD L-30 Canal to Boynton Beach Blvd., estimated 3.0 miles, 4 lane r1 PROJECT NO: 2018503 --
-__ -_,-::-L I v • J ' '"'° MEETING DATE: Thursday,J~ 2018 _
1
___ M_E_ET_ I_NG TIME: 1:30~p_.m_._~----
American
Criteria Max
Score Consulting Eng. of Fl., LLC.
Ability, knowledge of design criteria and
past performace of firm and the designated 50
project team to satisify the technical
requirements of the project. I Approach to the project, understandin~
the project and quality of presentation,
including meeting time/budget
requirements.
20
Subtotal 1 70
Location of the firm's offices and where work will be accomplished
SBE/MWBE Participation
Volume of previous work awarded by the
County over the past four (4) years. {The firm with the most work receives the
lowest score.)
10
10
10
Subtotal 2 30 Total 100 Rank
• - Designated Representative
44
14
58
10
9
7
26
84 8
Arcadis U.S.,
Inc.
48
16
64
10
8
8
26
90 1
Member's Title: Contracts Manager ___ _
Member's Name: Basher Khan
Member's Signature:
DRMP, Inc.
30
12
42
10
10
10
30
72 10
I I
I
I
T
EAC
Consulting,
Inc.
30
12
42
10
9
10
29
71 11
l (
HSQGroup,
Inc.
45
17
62
10
10
5
25
87 4
I
Last
Devenport,
Inc.
42
14
56
10
10
10
30
86 6
I
- -----+
McMahon
Associates,
Inc.
30
12
42
10
8
9
27 69 13
I
I
Propel
Engineering,
Inc.
43
14
51
10
10
10
30
87 4
I
I
+
R.J, Behar&
Co., Inc.
30
12
42
10
10
9
29
71 l1
l
I
scalar
Consulting
Group, Inc.
39
14
53
10
10
7
27 80 9
1 ---,-
l r- - -
Stanley
Consultants,
Inc.
I
I
..
Stantec
Consultlng
Services, Inc.
48 46
18 17
66
10
6
7
23
89 3
I
63
10
8
9
27 90 1
I
..
Wantman Group, Inc.
45
15
60
10
9
6
25
85 7
-
PROFESSIONAL SERVICES EVALUATION FORM l _J_ I -- - I I l ~ -ONE (1) FIRM FOR: ~ Engineering Services Required for:
r I Lyons Rd., LWDD L-30 Canal to Boynton Beach Blvd., estimated 3.0 miles, 4 lane r1 I >----- --
--
I -
PROJECT NO: 2018503
_l I -- --- l
--- -- -' - - - -
c::(L\c.,, .... ~'- MEETING DATE: j._Thursday, June 14, 2018 I -- 7 I -- I
-- -MEETING TIME: 1:30 p.m.
r r ! -~
Max American
Arcadis U.S., EAC Last McMahon Propel R.J. Behar&
Scalar Stanley Stantec
Criteria Consulting DRMP, Inc. Consulting, HSQGroup,
Devenport, Associates, Engineering, Consulting Consultants, Consulting wantman
Score Inc. Inc. Co., Inc. Group, lnc. Eng. of Fl., LLC. Inc. Inc. Inc. Inc. Group, Inc. Inc. Services, Inc,
Ability, knowledge of design criteria and I past performace of firm and the designated
project team to satisify the technical 50 45 46 44 43 46 43 43 44 44 44 46 45 45
requirements of the project. - -- - --~ I - - -- - -Approach to the project, understanding of
the project and quality of presentation, 20 17
including meeting time/budget 19 17 15 17 14 15 17 15 15 18 17 17
requirements.
Subtotal 1 70 62 65 61 58 63 57 58 61 S9 59 64 62 62
Location of the firm's offices and where I
I I
work will be accomplished 10 10 10 10 10 10 10 10 10 10 10 10 10 10
-~ . SBE/MWBE Participation 10 9 8 10 9 10 10 8 10 10 10 6 8 9
- ~ ~ -- -Volume of previous work awarded by the County over the past four (4) years. (The
10 7 firm with the most work receives the
8 10 10 5 10 9 10 9 7 7 9 6
lowest score.)
Subtotal2 30 26 26 30 29 25 30 27 30 29 27 23 27 25
Total 100 88 91 91 87 88 87 85 91 88 86 87 89 87
Rank 5 l l 8 5 8 13 1 s 12 8 4 8 * - Designated Representative l -t Member's Title: Director Com,t:ruction Coordination l l --- l ---Member's Name: Mark Tomlinson - - --- - -- J ---
~ ~ " - (.., l i--i l te. --t Member's Signature: ( ' s- r I ---.__,. I
-
PROFESSIONAL SERVICES EVALUATION FORM I -=i_ L=
I
f --
ONE (1) FIRM FOR: All Engineering Services Required for: - --Lyons Rd., LWDD L-3D Canal to Boynton Beach Blvd., estimated 3.0 miles, 4 Ian_!!_
f--- -- - ~ - ---- ---PROJECT NO: 2018503
I -- -
j ' ~ -- -
----'i'bucsda¥, hu~e ai11, ii!0:1,8
- --MEETING DATE: --- t - -MEETING TIME: l:30p.m.
~ - -- 7 -- l -1 I --
T t
American Arcadls U.S.,
EAC HSQ Group,
Last McMahon Propel RJ. Behar&
Scalar Stanley Stantec Wantman Max
Criteria Score
Consulting Inc.
DRMP, Inc. Consulting, Inc.
Devenport, Associates, Engineering, Co., Inc. Consulting Consultants, Consulting Group, Inc.
Eng. of Fl., LLC. Inc. Inc. Inc. Inc. Group, Inc. Inc. Services, Inc.
Ability, knowledge of design criteria and l I r past performace of firm and the designated 50 48 43 45 43
I 46 43 42 43 44 43 50 46 44
project team to satisify the technical
requirements of the project. ----t- I
Approach to the project, understanding of
the project and quality of presentation, 20 19 17 17 18 18 14 15 18 15 15 19 16 15
including meeting time/budget
I requirements. I Subtotal l 70 67 60 62 61 64 57 57 61. 59 58 69 62 59
Location of the firm's offices and where 10 10 10 10 10 10 10 10 10 10 I 10 10 10 10
work will be accomplished - ~ - . SBE/MWBE Participation 10 9 8 10 9 10 10 8 10 10 10 6 8 9
~ -~ .. - +- -- .. I Volume of previous work awarded by the
County over the past four (4) years. (The
firm with the most work receives the 10 7 8 10 10 5 10 9 10 9 7 7 9 6
lowest score.)
Subtota/2 30 26 26 30 29 25 30 27 30 29 27 23 27 ~.J) 25
Total 100 93 86 92 90 89 87 84 91 88 85 92 89 ,.,..., " 84
Rank 1. 10 z 5 6 9 l2 4 8 ll 2 6 12 • - Designated Representative J --- Member's Titlei User Dept Representative r - - -
Member's Name: Morton Rose -- -- ----
Member's Signature: l fl I~ a ~/47/ 1~ -- - ~ -
--~ -v-~
'-' I I
-
PROFESSIONAL SERVICES EVALUATION FORM
r I ~
ONE (1) FIRM FOR: All Engineering Services Required for: -'---- ~ Lyons Rd., LWDD l-30 canal to Boynton Beach Blvd., estimated 3.0 miles, 4 lane n
PROJECT NO: 2018503
MEETING DAlE: Th .,,~ - .. ~. , .ccu.i.8 .Jt.>J--L- ,:;t7 ~OL& ~ -_ MEETING ltME: id6'Jr.m. z•.OO f"""' ~ ------
1
Criteria
Ability, knowledge of design criteria and
past performace of firm and the designated
project team to satisify the technica I requirements of the project.
Approach to the project, understanding of
the project and quality of presentation,
including meeting time/budget
requirements.
American MaK
Consulting Score
Eng. of Fl., LLC.
50 46
20 18
SubtotQI 1 70 64
Location of the firm's offices and where
work will be accomplished
SBE/MWBE Participation
Volume of previous work awarded by the County over the past four (4) years. (The
firm with the most work receives the
lowest score.)
10
10
10
SubtotQf 2 30
Total 100 Rank
*, Designated Repre5entative
10
9
7
26
90 11
Arcadis U.S., Inc.
46
17
63
10
8
8
26
89 12
Member's Title: Director Office of Small Business Member's Name: Angela _Sm_ it_h___ _ __
Memb:,.,sgn,ruceG ~----
DRMP, Inc.
so
20
70
10
+
10 +
10
30
100 1
EAC Consulting,
Inc.
49
19
68
10
9
10
29
97 3
-~
HSQGroup,
Inc.
50
20
70
10
10
s
25
95 5
I
I
_______,_.[-
Last
Devenport, Inc:.
46
18
64
10
10
10
30
94 7
1 McMahon Associates,
Inc.
48
t-18
66
10
8
9
27
93 9
I I
'
l ----l---
--- ~
r t-· I ---- -f - -'-l =t=
Propel
Engineering, Inc.
R.J. Behar& Co,, Inc.
49 48
19 19
68
10
10
10
30
98 2
-1-
67
10
10
9
29
96 4
l
Scalar Consulting Group, Inc.
46
18
64
10
10
7
27
91 10
i I
Stanley Consultants,
Inc.
46
Stantec Consulting
Services, Inc.
49
18 r 19 64
10
6
7
23
87 13
I
j
68
10
8
9
27
95 5
I
Wantman Group, Inc.
49
20
69
10
9
6
25
94 7
-
-
N:\ROADWAY\CCNA\2018\2018503 - Lyons Rd - N of LWDD L-30 Canal to Boynton Beach Blvd\Short List\2018503 Short List Consultant Summary.xlsx Page 1 of 5 6/27/2018 2:35 PM
One Firm to Provide:
Project No:
Meeting Date: Meeting Time:
(Non-black) (Black)
American Consulting Engineers of Florida, LLC. 3.02 62% 1 62% $653,626 $401,980Brown & Phillips, Inc. 5.02 14% 14% 13.5 13.5 $646,951 $87,338GCME, Inc. 6.01 7% 7% 7.0 7.0 $32,994 $2,310Scalar Consulting Group, Inc. 1.07, 3.02 8% 1 8% 8.0 $744,450 $59,556Stantec Consulting Services, Inc. 3.02 10% 1 10% $545,291 $54,529
28.5% 7% 13.5%1 3
Arcadis U.S., Inc. 3.02 74% 1 74% $398,666 $293,020Brown & Phillips, Inc. 5.02 14% 14% 13.5 13.5 $646,951 $87,338EW Consultants, Inc. 1.07 2% 2% 2.0 $8,731 $175McMahon Associates, Inc. 3.02 5% 1 5% $66,987 $3,349Tierra South Florida, Inc. 6.01 6% 6% 6.0 $779,211 $46,753
15.5% 6% 13.5%1 3
DRMP, Inc. 3.02 68% 63% $0 $0Baron Worth Advisors, Inc. 1.07 3% 3% 3.0 3.0 $0 $0Brown & Phillips, Inc. 5.02 15% 15% 15.0 15.0 $646,951 $97,043K-F Group, Inc. 3.02 10% 10% 10.0 10.0 $275,375 $27,538RADISE International, LC. 6.01 4% 4% 4.0 4.0 $536,729 $21,469
32% 17% 15%2 3
10 10 10
100% 95% 65
PointsServices Provided
10 8 8
100% 100% 44
100%100%
10 9
45
SBE
$605,713
$430,635
$146,050
SHORTLIST CONSULTANT SUMMARY
Professional Engineering Consulting Services forLyons Rd., N. of LWDD L-30 Canal to Boynton Beach Blvd.estimated 3.0 miles, 4 lane roadway
2018503
Wednesday June 27, 20182:00 p.m.
7
% Work on Project Notes
% Work in PBC PointsTeam Members
LOCATIONTEAM SBE & M/WBE VOLUME OF PREVIOUS WORK ($)M/WBE
Points Fee ConsideredPro-Rated
Fee
-
N:\ROADWAY\CCNA\2018\2018503 - Lyons Rd - N of LWDD L-30 Canal to Boynton Beach Blvd\Short List\2018503 Short List Consultant Summary.xlsx Page 2 of 5 6/27/2018 2:35 PM
One Firm to Provide:
Project No:
Meeting Date: Meeting Time:
(Non-black) (Black)
PointsServices Provided SBE
SHORTLIST CONSULTANT SUMMARY
Professional Engineering Consulting Services forLyons Rd., N. of LWDD L-30 Canal to Boynton Beach Blvd.estimated 3.0 miles, 4 lane roadway
2018503
Wednesday June 27, 20182:00 p.m.
% Work on Project Notes
% Work in PBC PointsTeam Members
LOCATIONTEAM SBE & M/WBE VOLUME OF PREVIOUS WORK ($)M/WBE
Points Fee ConsideredPro-Rated
Fee
EAC Consulting, Inc. 3.02 80% 80% 80.0 $0 $0Brown & Phillips, Inc. 5.02 10% 10% 10.0 10.0 $646,951 $64,695Cyriacks Envrionmental Consulting Services, Inc. 1.07 2% 0% 2.0 $5,467 $109RADISE International, LC. 6.01 5% 5% 5.0 5.0 $536,729 $26,836Simmons & White, Inc. 3.06 - unrequested service 3% 2 3% 3.0 $235,202 $7,056
18% 7% 90%1 5
HSQ Group, Inc. 3.02, 5.02 85% 1 85% 85.0 85.0 $1,273,044 $1,082,087Kimley-Horn & Associates, Inc. 3.02, 1.07 10% 10% $1,820,725 $182,073RADISE International, LC. 6.01 5% 5% 5.0 5.0 $536,729 $26,836
90% 90% 0%5 0
Last Devenport, Inc. 3.02 82% 82% 82.0 $37,570 $30,807Brown & Phillips, Inc. 5.02 12% 12% 12.0 12.0 $646,951 $77,634Tierra South Florida, Inc. 6.01 4% 4% 4.0 $779,211 $31,168EW Consultants, Inc. 1.07 2% 2% 2.0 $8,731 $175
96% 4% 12%0 2
10 10 5100% 100% 10
5
10 9 10
100% 98% 45
10 10 10
100% 100% 102
$139,784
$98,696
$1,290,996
-
N:\ROADWAY\CCNA\2018\2018503 - Lyons Rd - N of LWDD L-30 Canal to Boynton Beach Blvd\Short List\2018503 Short List Consultant Summary.xlsx Page 3 of 5 6/27/2018 2:35 PM
One Firm to Provide:
Project No:
Meeting Date: Meeting Time:
(Non-black) (Black)
PointsServices Provided SBE
SHORTLIST CONSULTANT SUMMARY
Professional Engineering Consulting Services forLyons Rd., N. of LWDD L-30 Canal to Boynton Beach Blvd.estimated 3.0 miles, 4 lane roadway
2018503
Wednesday June 27, 20182:00 p.m.
% Work on Project Notes
% Work in PBC PointsTeam Members
LOCATIONTEAM SBE & M/WBE VOLUME OF PREVIOUS WORK ($)M/WBE
Points Fee ConsideredPro-Rated
Fee
McMahon Associates, Inc. 3.02 50% 1 50% $66,987 $33,494Arcadis U.S., Inc. 3.02 28% 1 28% $398,666 $111,626Brown & Phillips, Inc. 5.02 15% 15% 15.0 15.0 $646,951 $97,043Cyriacks Environmental Consulting Services, Inc. 1.07 2% 0% 2.0 $5,467 $109GCME, Inc. 6.01 5% 5% 5.0 5.0 $32,994 $1,650
20% 7% 15%1 3
Propel Engineering, Inc. 3.02 80% 1 80% 80.0 80.0 $0 $0Stantec Consulting Services, Inc. 3.02, 5.02 13% 1 13% $545,291 $70,888GCME, Inc. 6.01 5% 5% 5.0 5.0 $32,994 $1,650Baron Worth Advisors, Inc. 1.07 2% 2% 2.0 2.0 $0 $0
87% 87% 0%5 0
R.J. Behar & Company, Inc. 3.02 74% 74% 74.0 $419,646 $310,538Baron Worth Advisors, Inc. 1.07 1% 1% 1.0 1.0 $0 $0Biscayne Engineering Company, Inc. 5.02 15% 15% 15.0 $0 $0RADISE International, LC. 6.01 10% 10% 10.0 10.0 $536,729 $53,673
26% 85% 0%5 0
$243,922
10 10 9
100% 100% 55
$364,211
10 10
100% 100% 105
$72,538
10
10 8 9
100% 98% 44
-
N:\ROADWAY\CCNA\2018\2018503 - Lyons Rd - N of LWDD L-30 Canal to Boynton Beach Blvd\Short List\2018503 Short List Consultant Summary.xlsx Page 4 of 5 6/27/2018 2:35 PM
One Firm to Provide:
Project No:
Meeting Date: Meeting Time:
(Non-black) (Black)
PointsServices Provided SBE
SHORTLIST CONSULTANT SUMMARY
Professional Engineering Consulting Services forLyons Rd., N. of LWDD L-30 Canal to Boynton Beach Blvd.estimated 3.0 miles, 4 lane roadway
2018503
Wednesday June 27, 20182:00 p.m.
% Work on Project Notes
% Work in PBC PointsTeam Members
LOCATIONTEAM SBE & M/WBE VOLUME OF PREVIOUS WORK ($)M/WBE
Points Fee ConsideredPro-Rated
Fee
Scalar Consulting Group, Inc. 3.02, 1.07 62% 1 59% 62.0 $744,450 $461,559Stantec Consulting Services, Inc. 5.02 15% 1 15% $545,291 $81,794Wantman Group, Inc. 3.02 15% 1 15% $1,150,308 $172,546RADISE International, LC. 6.01 8% 8% 8.0 8.0 $536,729 $42,938
70% 8% 0%1 0
Stanley Consultants, Inc. 3.02, 1.07 75% 75% $462,393 $346,795Tierra South Florida, Inc. 6.01 10% 10% 10.0 $779,211 $77,921HSQ Group, Inc. 3.02, 5.02 15% 1 15% 15.0 15.0 $1,273,044 $190,957
15% 25% 0%2 0
Stantec Consulting Services, Inc. 3.02, 3.06 60% 1 60% $545,291 $327,175American Consulting Engineers of Florida, LLC. 3.02 10% 1 10% $653,626 $65,363GCME, Inc. 6.01 5% 5% 5.0 5.0 $32,994 $1,650Manuel G. Vera & Associates, Inc. 5.02 10% 10% 10.0 10.0 $0 $0Propel Engineering, Inc. 3.06 - unrequested service 10% 1, 2 10% 10.0 10.0 $0 $0Baron Worth Advisors, Inc. 1.07 5% 5% 5.0 5.0 $0 $0
30% 30% 0%3 0
10 6 7100% 100% 4
2$615,673
10 10 7
100% 97% 91
$758,837
10 8 9
100% 100% 53
$394,188
-
N:\ROADWAY\CCNA\2018\2018503 - Lyons Rd - N of LWDD L-30 Canal to Boynton Beach Blvd\Short List\2018503 Short List Consultant Summary.xlsx Page 5 of 5 6/27/2018 2:35 PM
One Firm to Provide:
Project No:
Meeting Date: Meeting Time:
(Non-black) (Black)
PointsServices Provided SBE
SHORTLIST CONSULTANT SUMMARY
Professional Engineering Consulting Services forLyons Rd., N. of LWDD L-30 Canal to Boynton Beach Blvd.estimated 3.0 miles, 4 lane roadway
2018503
Wednesday June 27, 20182:00 p.m.
% Work on Project Notes
% Work in PBC PointsTeam Members
LOCATIONTEAM SBE & M/WBE VOLUME OF PREVIOUS WORK ($)M/WBE
Points Fee ConsideredPro-Rated
Fee
Wantman Group, Inc. (WGI) 3.02, 1.07, 5.02 60% 1 60% $1,150,308 $690,185Brown & Phillips, Inc. 5.02 11% 11% 11.0 11.0 $646,951 $71,165RADISE International, LC. 6.01 8% 8% 8.0 8.0 $536,729 $42,938Scalar Consulting Group, Inc. 3.02 21% 1 21% 21.0 $744,450 $156,335
40% 8% 11%1 2
3.02 (General Hwy. Design w/Curb & Gutter, Access & Drainage)
2 - Unrequested Service
1.07 (Environmental Studies)5.02 (Engineering Surveying)6.01 (Gelogical & Geographic Studies)
Subcategories
10 9 6
100%
Notes
* - Pro Rated Fee = Previous Work Amount multiplied by the % of work on the project1- Prime and Sub on different teams
Prime Categories
100% 63
$960,623
-
N:\ROADWAY\CCNA\2018\2018503 - Lyons Rd - N of LWDD L-30 Canal to Boynton Beach Blvd\Short List\Reconvened Short List 6_27_18\Short List Minutes.doc.docx
MINUTES OF RECONVENED SHORT LIST COMMITTEE MEETING June 27, 2018, Commencing: 2:04 p.m., Ending:2:25 p.m.
Vista Center 3W-12 Conference Room
MEMBERS PRESENT: Steve Carrier, P.E. - Assistant County Engineer Omelio Fernandez, P.E. - Director, Roadway Production Scott Cantor, P.E **. - Assistant Director, Land Development Basher Khan, P.E.* - Project Engineer, Roadway Production Mark Tomlinson - Director, Construction Coordination Morton Rose, P.E. - Assistant Director, Roadway Production Angela Smith *** - Office of Small Business Assistance
* voting for Contracts Manger ** voting for Director of Land Development *** voting for Director of Office of Small Business Assistance
DISCUSSION: The reconvened Short List Committee was called to order by Steve Carrier, P.E., Assistant County Engineer. It was stated that the committee would be discussing the firms for Professional Engineering Consulting Services for:
Lyons Road: North of LWDD L-30 Canal to Boynton Beach Blvd. 3.0 miles, 4 lane roadway
Project No. 2018503
The meeting was opened up the meeting for Public Comments, public was present but none had questions or comments. The question was posed to the committee as to whether or not EAC and Stantec should have their 3.06 firms labeled as unrequestsed services since they are providing signing and marking even though they were erroneously labeled 3.06 which was not requested. The committee voted to all those firms to receive the points as if they had been labeled correctly as 3.02. It was noted that 3.06 is to solve traffic problems using signing and marking as one of the potential tools. Standard signing and marking for a new design is part of the roadway design category, in this case, 3.02. RESULTS: Submitting Firms Shortlisted Firms American Consulting Engineers of Florida, LLC 1. Stantec Consulting Services, Inc Arcadis U.S., Inc. 2. Propel Engineering, Inc. DRMP, Inc. 3. Arcadis U.S., Inc. EAC Consulting, Inc. HSQ Group, Inc. Last Devenport, Inc. McMahon Associates, Inc. Propel Engineering, Inc. R.J. Behar & Company, Inc. Scalar Consulting Group, Inc. Stanley Consultants, Inc. Stantec Consulting Services, Inc. Wantman Group, Inc.
-
COMMITTEE MEMBERS RECONVENED SHORT LIST COl\™ITTEE MEETING
Palm Beach County Engineering Department
One (1) Firm - to provide all engineering services required for the preparation of plans and specifications complete for fonna1 advertising and receipt of bids for:
Lyons Rd., N. ofLWDD L-30 Canal to Boynton Beach Blvd. Estimated 3.0 miles, 4 lane roadway
Project No. 2018503 Wednesday, June 27, 2018
Name Organization Phone
/S-0
6 B 1-- f- I S-\J ,~tf- Lf-l4 I
F:\ROADWAY\CCNA\2018\2018503 - Lyons Rd - N of LWDD L-30 Canal to Boynton Beach Blvd\Short List\Reconvened Short List 6_27_18\ShortListMeetingSignlnSheeet_Committee.docx
Email
-
PUBLIC
RECONVENED SHORT LIST COMMITTEE MEETING
Palm Beach County Engineering Department
One (1) Firm - to provide all engineering services required for the preparation of plans and specifications complete for formal advertising and receipt of bids for:
Wednesday, June 27, 2018
Name
Lyons Rd., N. ofLWDD L-30 Canal to'Boynton Beach Blvd. Estimated 3.0 miles, 4 lane roadway
Project No. 2018503
Organization Phone
f/ZO PEL
F:\ROADWAY\CCNA\2018\2018503 - Lyons Rd - N of LWDD L-30 Caual to Boynton Beach Blvd\Short List\Reconvened Short List 6_27_18\ShortListMeetingSigninSheeet_Public.docx
Email
-
N:\ROADWAY\CCNA\2018\2018503 - Lyons Rd - N of LWDD L-30 Canal to Boynton Beach Blvd\Short List\Short List Minutes.doc.docx
MINUTES OF SHORT LIST COMMITTEE MEETING June 14, 2018, Commencing:1:40 p.m., Ending: 3:30 p.m.
Vista Center 3W-12 Conference Room
MEMBERS PRESENT: Steve Carrier, P.E. - Assistant County Engineer Omelio Fernandez, P.E. - Director, Roadway Production Scott Cantor, P.E. ** - Assistant Director, Land Development Basher Khan, P.E.* - Project Engineer, Roadway Production Mark Tomlinson - Director, Construction Coordination Morton Rose, P.E. - Assistant Director, Roadway Production Angela Smith *** - Office of Small Business Assistance
* voting for Contracts Manger ** voting for Director of Land Development *** voting for Director of Office of Small Business Assistance
DISCUSSION: The Short List Committee was called to order by Steve Carrier, P.E., Assistant County Engineer. It was stated that the committee would be discussing the firms for Professional Engineering Consulting Services for:
Lyons Road: North of LWDD L-30 Canal to Boynton Beach Blvd. 3.0 miles, 4 lane roadway
Project No. 2018503
The meeting was opened up the meeting for Public Comments, public was present but none had questions or comments. The outline of the project was discussed by Basher Khan, P.E., Project Engineer. RESULTS: Submitting Firms Shortlisted Firms American Consulting Engineers of Florida, LLC PENDING RECONVENED Arcadis U.S., Inc. SHORTLIST MEETING DRMP, Inc. ON JUNE 27, 2018 EAC Consulting, Inc. HSQ Group, Inc. Last Devenport, Inc. McMahon Associates, Inc. Propel Engineering, Inc. R.J. Behar & Company, Inc. Scalar Consulting Group, Inc. Stanley Consultants, Inc. Stantec Consulting Services, Inc. Wantman Group, Inc.
-
Co/lJ."JlTEE MEMBERS
SHORT LIST COMMITTEE MEETING
Palm Beach County Engineering Department
One (1) Firm - to provide all engineering services required for the preparation of plans and specifications complete for formal advertising and receipt of bids for:
Lyons Rd., N. of LWDD L-30 Canal to Boynton Beach Blvd. Estimated 3.0 miles, 4 lane roadway
Project No. 2018503 Thursday, June 14, 2018
Name Organization Phone
, .
Al-T~t-,
•( · -v
. '
Email
N: \ROADWAY\CCNA\2018\201 8503 - Lyons Rd - N of LWDD L-30 Canal to Boynton Beach Blvd\Short List\ ShortLi stMeetingSigninSheeet_ Commi ttee.docx
-
PUBLIC
SHORT LIST COMMITTEE MEETING
Palm Beach County Engineering Department
One ( 1) Firm - to provide all engineering services required for the preparation of plans and specifications complete for formal advertising and receipt of bids for:
Lyons Rd., N. of LWDD L-30 Canal to Boynton Beach Blvd. Estimated 3.0 miles, 4 lane roadway
Project No. 2018503
Thursday,June14,2018
Name Organization Phone Email
56 I f (Jl
I\
N:\ROADWAY\CCNA\2018\2018503 - Lyons Rd - N of LWDD L- 30 Canal to Boynton Beach Blvd\Short List\ShortListMeetingSigninSheeet_ Public . docx
2018503 Final Shortlist Tally.pdfSummary
2018503 Final Short List Consultant Summary.pdfSummary Sheet