Page 0 of 15 L Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference United Methodist Church) 8580 Wesley Lane North Webster, Indiana 46555 Lake and River Enhancement Program Indiana DNR Division of Fish and Wildlife 1353 Governors Drive Columbia City, Indiana 46725 Prepared By: S&L Environmental Group 15504 CR 42 Goshen, Indiana 46528 www.slenvirogroup.com January 2020 Webster Lake, Kosciusko County, Indiana S & Environmental Group “Restoring Natural Resources”

Upload: others

Post on 24-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference

Page 0 of 15  

 

                 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

L

Kline Island – Phase III Bank Stabilization 

Final Report 

 Prepared For: Epworth Forest Conference Center (Indiana Conference United Methodist Church) 8580 Wesley Lane North Webster, Indiana 46555 Lake and River Enhancement Program Indiana DNR Division of Fish and Wildlife 1353 Governors Drive Columbia City, Indiana 46725

Prepared By:

S&L Environmental Group

15504 CR 42 Goshen, Indiana 46528

www.slenvirogroup.com

January 2020

 

Webster Lake, Kosciusko County, 

Indiana 

S & Environmental Group “Restoring Natural Resources” 

Page 2: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference

Table of Contents 

1.0 Executive Summary ................................................................................................................................ 1 2.0 Project Purpose ...................................................................................................................................... 1 2.1 Objectives ........................................................................................................................................... 1 

2.2 Accomplishments ............................................................................................................................... 2 

3.0 Project Description ................................................................................................................................. 2 3.1 General Location ................................................................................................................................ 2 

3.2 Site Specific Location .......................................................................................................................... 3 

3.3 Project Interest ................................................................................................................................... 3 

4.0 Project Construction ............................................................................................................................... 3 4.1 Mobilization ........................................................................................................................................ 3 

4.2 Glacial Stone Installation ................................................................................................................... 4 

4.3 Island Access Stone Step Installation ................................................................................................ 4 

4.4 Native Plant Installation ..................................................................................................................... 4 

4.5 Restoration ......................................................................................................................................... 4 

5.0 Project Logistics ...................................................................................................................................... 4 5.1 Permit Requirements ......................................................................................................................... 4 

5.2 Construction Timing ........................................................................................................................... 4 

5.3 Project Contractor .............................................................................................................................. 4 

5.4 Construction Methods ....................................................................................................................... 4 

6.0 Future Project Inspection and Maintenance ......................................................................................... 5 6.1 Post‐construction Inspection ............................................................................................................. 5 

6.2 Vegetative Inspections and Maintenance ......................................................................................... 5 

6.3 Structural Inspections and Maintenance .......................................................................................... 5 

7.0 Estimated Load Reduction (Post‐construction) ..................................................................................... 5  

List of Figures 

Figure 1 ‐ General Location Map .................................................................................................. 2 

Figure 2 ‐ Site Specific Location Map............................................................................................ 3 

 

List of Appendices 

Appendix A – As‐built Engineering Plans  

Appendix B – Plant Materials 

Appendix C – Photographs 

Appendix D – Correspondence 

Appendix E – Permits and Engineers Assessment 

Appendix F – Estimated Load Reduction (Post‐construction) 

 

 

Page 3: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference

    Kline Island – Phase III Bank Stabilization 

Final Report 

Page 1 of 5  

1.0 Executive Summary 

The Kline Island shoreline banks have been under continual erosion for many years due to wave action caused by wind‐energy and recreational boating. The southwest and northwest banks are the most severely eroded banks on the island. The bank erosion has slowly reduced the surface area of the island, damaged fishery habitat, increased turbidity, and released nutrients into the water.  Department of Natural Resources (DNR) Fishery Biologist, Jed Pearson, originally identified the severity of the bank erosion and contacted Lyn Crighton at The Watershed Foundation (TWF) to discuss  potential  programs  and  funding  sources  to  address  the  problem.    In  2013  a  report prepared by Mr. Pearson was completed which  identified the problem and provided potential solutions, Webster  Lake  Island Protection Project.   TWF  and  the  Epworth  Forest Conference Center identified two potential funding programs for controlling shoreline erosion in 2014.  Grant applications were submitted and funding was obtained to proceed with construction of Phase I.   Construction consisting of 290 feet of bank protection on the south and southwest sides of the island was completed in fall of 2015.  Grant applications were submitted and funding approved to proceed with construction of Phase II for an additional 290 feet of bank protection on the west side of  the  island. Construction was completed on Phase  II  in  January 2018.  In 2018 Epworth Forest Conference Center applied to the DNR Lake and River Enhancement (LARE) Program for funding  to  complete  Phase  III  of  the  island  project.    The  application  was  for  design  and construction of approximately 300 feet of bank stabilization on the west and southeast sides of the island.  Following final approval of the LARE funding, Epworth Forest Conference Center contracted S&L Environmental Group to design and construct the required activities to stabilize approximately 300 feet of shoreline banks from further erosion.  The design was completed and submitted in October 2018 and included: (1) construction of a bio‐engineered seawall consisting of a glacial stone toe‐wall   spanning approximately 200  feet of the southeast shoreline, 95  feet of glacial stone toe‐wall on the west shoreline, (2) installation of stone steps on the southern edge of the island for access, and (3) planting of native live stakes into the glacial stone toe‐wall.   All contract tasks were completed in December 2019.  

2.0 Project Purpose 

2.1 Objectives 

The objective of the construction project was to eliminate bank erosion on the shoreline of Kline Island by installing approximately 200 feet of bio‐engineered seawall on the southeast side, as well as 95 feet of bio‐engineered seawall on the west side and  install  island access stone steps on the southeast edge of the island.     

Page 4: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference

    Kline Island – Phase III Bank Stabilization 

Final Report 

Page 2 of 5  

2.2 Accomplishments 

300  feet  of  the west,  east,  and  southeast  banks were  stabilized  from  further  erosion  by installing a glacial  stone  toe‐wall, planting  live  tree  stakes near  the  top of  the  stone, and installing  island  access  stone  steps.    The height of  the  stone  toe‐wall was determined by calculating wave height.  

3.0 Project Description 

3.1 General Location 

The Kline  Island Phase  III project  is  located on Webster Lake  in North Webster, Kosciusko County, Indiana. 

 Figure 1 ‐ General Location Map 

 

 

 

 

 

 

 

 

Page 5: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference

    Kline Island – Phase III Bank Stabilization 

Final Report 

Page 3 of 5  

3.2 Site Specific Location 

The project was located at the west, east, and southeast banks of Kline Island within Webster Lake. 

 Figure 2 ‐ Site Specific Location Map 

3.3 Project Interest  

A coordinated effort between Epworth Forest Conference Center, The Watershed Foundation, and Webster Lake Conservation Association allowed the project to become a reality.  These agencies were involved in the review of the design drawings and construction activities.  In‐kind services were provided by Epworth Forest in the form of acquiring construction staging area and access.  Funding contributions and project support were received through the LARE Program.   

 

4.0 Project Construction 

The following construction activities were completed according to the design plans.  Adjustments were made during  construction due  to  site  conditions,  as  shown  in  the As‐built Drawings  in Appendix A of this report.  The most notable change to the design plans was the location to install the stone toe‐wall.  Severe shoreline erosion occurred on the east side of the island subsequent to  the  completion  of  the  design  plans.    It was  agreed  upon  by  Colby  Stanger  of  S&L, Doug Nusbaum of LARE, and Lyn Crighton of TWF to shift 130 feet of shoreline stabilization from the southeast side of the island to the east side to prioritize the location of increased erosion.  

4.1 Mobilization 

The construction staging area and  lake access was provided by Epworth Forest Conference Center.  This site provided a location to load the barge with the glacial stone to be transported to the island and for general construction storage.   

  

Page 6: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference

    Kline Island – Phase III Bank Stabilization 

Final Report 

Page 4 of 5  

4.2 Glacial Stone Installation 

6‐inch to 12‐inch glacial stone was imported and installed on a total of 300 feet of shoreline bank as shown on the As‐built drawings.  The size, slope, and height of the stone toe‐wall was designed based on wave height calculations from wind energy and recreational boating.  4.3 Island Access Stone Step Installation 

A set of five stone steps constructed of Tennessee Stone were installed on the southeast side of the island to allow safe and easy public access.  The Tennessee Stone slabs used for steps were placed on a glacial stone base for support and to prevent wave action from undercutting and damaging the stability of the steps.  4.4 Native Plant Installation 

100 live tree stakes were planted near the top edge of the stone toe‐wall.  The live stakes were planted in late December on 3 foot spacing.  The plant materials used are shown in Appendix B.  4.5 Restoration 

All disturbed areas within  the access and  staging areas were  returned  to pre‐construction conditions. 

 

5.0 Project Logistics 

5.1 Permit Requirements 

The Indiana DNR Water Division, Lake Preservation Act Permit was acquired for the project.  Requirements of the approved permit was to provide a Public Notice to adjacent property owners to allow them the opportunity to review and comment on the proposed project.  A copy of the permit is included in Appendix E.  5.2 Construction Timing 

Construction activities began the first week of December 2019 and were completed in three weeks when the dormant live tree stakes were harvested and installed.  5.3 Project Contractor 

S&L Environmental Group (S&L) was awarded the bid for the design and construction of the project and was determined to be the preferred consultant to provide construction oversite.   5.4 Construction Methods 

A barge was used to transport the glacial stone for the stone toe‐wall from the lake access to the island.  Construction equipment used the same barge to construct the stone toe‐wall from the water which minimized the disturbance of the island. 

Page 7: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference

    Kline Island – Phase III Bank Stabilization 

Final Report 

Page 5 of 5  

6.0 Future Project Inspection and Maintenance 

6.1 Post‐construction Inspection 

Post‐construction inspection shall be performed at a minimum of twice a year, spring and fall.  During the first year following construction it is recommended to complete an inspection after each significant storm event.  If repairs are required, they should be made immediately.  6.2 Vegetative Inspections and Maintenance 

Vegetative practices will be  inspected following the first growing season, spring of 2020 to ensure  successful  germination.    If  the  vegetative  cover  is not  75%  established,  additional seeding may be required.  Live tree stakes will need to be inspected after ice thaw in the spring of 2020 and after heavy boat traffic in the fall to verify planting success and survival rate.  6.3 Structural Inspections and Maintenance 

Structural improvements, glacial stone toe‐wall including tie‐ins on both ends will need to be inspected after the ice on the lake thaws each spring.  Replace any stone that may have been displaced by  ice  forming or  thawing events.  Inspect  the  stone  toe‐wall after peak boating periods and after all major storm events to determine if the toe‐wall was adversely affected by the wave action.  Buoys should be moved a greater distance from the island if wave action from boats are adversely affecting the stone toe‐wall.  

7.0 Estimated Load Reduction (Post‐construction) 

The EPA Region 5 Load Reduction Program was used to estimate the load reductions of sediment, phosphorous,  and  nitrogen.    The  shoreline  Sediment  Load  Reduction  is  0.5  ton  per  year, Phosphorous Load Reduction is 0.4 pounds per year, and Nitrogen Load Reduction is 0.8 pounds per year.  See Appendix F for the detailed Worksheet.     

Page 8: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference

 

 

      

APPENDIX A 

As‐built Engineering Plans    

Page 9: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference

PROJECT NO.:

DATE:

HORIZONTAL SCALE:

VERTICAL SCALE:

REVISIONNUMBER

REVISIONDATEDESIGN BY:

DRAWN BY:

CHECKED BY:

APPROVED BY:

PAGENO.

WSS

WSS

JWS

JWS

.

.

01.20.2020

.

.

.

.

.

.

.

9OF

1KLINE ISLAND

WEBSTER LAKENORTH WEBSTER, IN.

AS-BUILT DRAWINGS

TITLE SHEET ANDPROJECT LOCATIONS15504 COUNTY ROAD 42

GOSHEN, INDIANA 46528

KLINE ISLAND BANK STABILIZATION - PHASE IIIAS-BUILT DRAWINGS

VICINITY LOCATION

SHEET1234

5-6789

DESCRIPTIONTITLE SHEET and PROJECT LOCATIONSPLAN VIEW MAPPROJECT SITE MAPDISTURBED AREA MAPCROSS SECTIONSISLAND ACCESS DETAIL DRAWINGCONSTRUCTION SPECIFICATIONSPLANTING AND EROSION CONTROL PLAN

For:Indiana Annual Conference of the UMC, Inc.8580 Wesley Lane, North Webster, IN. 46555

IDNRDivision of Fish and Wildlife Lake and River Enhancement1353 South Governors Drive, Columbia City, Indiana 46725c/o Doug Nusbaum

Project Location:Tippecanoe TownshipKosciusko County

Section 11, Township 33, Range 741°19'39.69" N 85°41'09.98" WHydrologic Unit Code - 051201060105

SHEET INDEX

PROJECT LOCATION

Environmental GroupS L&"Restoring Natural Resources"

COUNTY LOCATION

MAP PROJECT LOCATIONS SHOWN BY

AutoCAD SHX Text
DELKALB
AutoCAD SHX Text
STEUBEN
AutoCAD SHX Text
WAYNE
AutoCAD SHX Text
FORT
AutoCAD SHX Text
NOBLE
AutoCAD SHX Text
LAGRANGE
AutoCAD SHX Text
ELKHART
AutoCAD SHX Text
69
AutoCAD SHX Text
p
AutoCAD SHX Text
HUNTINGTON
AutoCAD SHX Text
WHITLEY
AutoCAD SHX Text
KOSCIUSKO
AutoCAD SHX Text
ALLEN
AutoCAD SHX Text
ADAMS
AutoCAD SHX Text
JAY
AutoCAD SHX Text
WAYNE
AutoCAD SHX Text
WELLS
AutoCAD SHX Text
BLACKFORD
AutoCAD SHX Text
MIAMI
AutoCAD SHX Text
HOWARD
AutoCAD SHX Text
MARION
AutoCAD SHX Text
GRANT
AutoCAD SHX Text
DELAWARE
AutoCAD SHX Text
HENRY
AutoCAD SHX Text
TIPTON
AutoCAD SHX Text
69
AutoCAD SHX Text
p
AutoCAD SHX Text
HAMILTON
AutoCAD SHX Text
o
AutoCAD SHX Text
31
AutoCAD SHX Text
ANDERSON
AutoCAD SHX Text
MADISON
AutoCAD SHX Text
MUNCIE
AutoCAD SHX Text
RANDOLPH
AutoCAD SHX Text
31
AutoCAD SHX Text
WABASH
AutoCAD SHX Text
80
AutoCAD SHX Text
p
AutoCAD SHX Text
94
AutoCAD SHX Text
p
AutoCAD SHX Text
PORTER
AutoCAD SHX Text
LAPORTE
AutoCAD SHX Text
JASPER
AutoCAD SHX Text
STARKE
AutoCAD SHX Text
PULASKI
AutoCAD SHX Text
NEWTON
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
GARY
AutoCAD SHX Text
CASS
AutoCAD SHX Text
CARROLL
AutoCAD SHX Text
WHITE
AutoCAD SHX Text
CLINTON
AutoCAD SHX Text
65
AutoCAD SHX Text
74
AutoCAD SHX Text
BOONE
AutoCAD SHX Text
p
AutoCAD SHX Text
TIPPECANOE
AutoCAD SHX Text
MONTGOMERY
AutoCAD SHX Text
LAFAYETTE
AutoCAD SHX Text
BENTON
AutoCAD SHX Text
WARREN
AutoCAD SHX Text
CRAWFORDSVILLE
AutoCAD SHX Text
FOUNTAIN
AutoCAD SHX Text
p
AutoCAD SHX Text
65
AutoCAD SHX Text
o
AutoCAD SHX Text
LOGANSPORT
AutoCAD SHX Text
KOKOMO
AutoCAD SHX Text
90
AutoCAD SHX Text
p
AutoCAD SHX Text
FULTON
AutoCAD SHX Text
MARSHALL
AutoCAD SHX Text
ST. JOSEPH
AutoCAD SHX Text
UNION
AutoCAD SHX Text
DEARBORN
AutoCAD SHX Text
OHIO
AutoCAD SHX Text
p
AutoCAD SHX Text
70
AutoCAD SHX Text
74
AutoCAD SHX Text
p
AutoCAD SHX Text
RUSH
AutoCAD SHX Text
HANCOCK
AutoCAD SHX Text
465
AutoCAD SHX Text
p
AutoCAD SHX Text
SHELBY
AutoCAD SHX Text
DECATUR
AutoCAD SHX Text
RIPLEY
AutoCAD SHX Text
65
AutoCAD SHX Text
p
AutoCAD SHX Text
BARTHOLOMEW
AutoCAD SHX Text
JENNINGS
AutoCAD SHX Text
FRANKLIN
AutoCAD SHX Text
FAYETTE
AutoCAD SHX Text
JEFFERSON
AutoCAD SHX Text
SCOTT
AutoCAD SHX Text
CLARKE
AutoCAD SHX Text
KENTUCKY
AutoCAD SHX Text
LOUISVILLE,
AutoCAD SHX Text
FLOYD
AutoCAD SHX Text
SWITZERLAND
AutoCAD SHX Text
HENDRICKS
AutoCAD SHX Text
MORGAN
AutoCAD SHX Text
PUTNAM
AutoCAD SHX Text
70
AutoCAD SHX Text
p
AutoCAD SHX Text
CLAY
AutoCAD SHX Text
BROWN
AutoCAD SHX Text
MONROE
AutoCAD SHX Text
OWEN
AutoCAD SHX Text
GREENE
AutoCAD SHX Text
TERRE
AutoCAD SHX Text
HAUTE
AutoCAD SHX Text
VIGO
AutoCAD SHX Text
SULLIVAN
AutoCAD SHX Text
PARKE
AutoCAD SHX Text
ORANGE
AutoCAD SHX Text
MARTIN
AutoCAD SHX Text
64
AutoCAD SHX Text
p
AutoCAD SHX Text
SPENCER
AutoCAD SHX Text
PERRY
AutoCAD SHX Text
CRAWFORD
AutoCAD SHX Text
DUBOIS
AutoCAD SHX Text
KNOX
AutoCAD SHX Text
PIKE
AutoCAD SHX Text
41
AutoCAD SHX Text
o
AutoCAD SHX Text
GIBSON
AutoCAD SHX Text
EVANSVILLE
AutoCAD SHX Text
WARRICK
AutoCAD SHX Text
POSEY
AutoCAD SHX Text
VANDER
AutoCAD SHX Text
BURGH
AutoCAD SHX Text
DAVIESS
AutoCAD SHX Text
LAWRENCE
AutoCAD SHX Text
BLOOMINGTON
AutoCAD SHX Text
GREENWOOD
AutoCAD SHX Text
HARRISON
AutoCAD SHX Text
JACKSON
AutoCAD SHX Text
JOHNSON
AutoCAD SHX Text
MARION
AutoCAD SHX Text
WASHINGTON
AutoCAD SHX Text
p
AutoCAD SHX Text
INDIANAPOLIS
AutoCAD SHX Text
RICHMOND
AutoCAD SHX Text
VERMILLION
AutoCAD SHX Text
HOBART
AutoCAD SHX Text
KOSCIUSKO
AutoCAD SHX Text
SOUTH BEND
Page 10: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference

PROJECT NO.:

DATE:

HORIZONTAL SCALE:

VERTICAL SCALE:

REVISIONNUMBER

REVISIONDATEDESIGN BY:

DRAWN BY:

CHECKED BY:

APPROVED BY:

PAGENO.

WSS

WSS

JWS

JWS

.

.

.

.

.

.

.

.

.

9OF

215504 COUNTY ROAD 42GOSHEN, INDIANA 46528

KLINE ISLANDWEBSTER LAKE

NORTH WEBSTER, IN.

AS-BUILT DRAWINGS

PLAN VIEW MAP

PROJECT ACCESS ANDMATERIAL STAGING AREA

Environmental GroupS L&"Restoring Natural Resources"

N

PROJECT SITE

01.20.2020

ADDITIONALPROJECT SITE

Page 11: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference

PROJECT NO.:

DATE:

HORIZONTAL SCALE:

VERTICAL SCALE:

REVISIONNUMBER

REVISIONDATEDESIGN BY:

DRAWN BY:

CHECKED BY:

APPROVED BY:

PAGENO.

WSS

WSS

JWS

JWS

.

.

.

.

.

.

.

.

.

9OF

315504 COUNTY ROAD 42GOSHEN, INDIANA 46528

KLINE ISLANDWEBSTER LAKE

NORTH WEBSTER, IN.

AS-BUILT DRAWINGS

PROJECT SITE MAP

LEGEND

GLACIAL STONE TOEWALL WITH NATIVELIVESTAKES, 3 FT C/C

GLACIAL STONE TOENATIVE LIVESTAKES,3 FT C/C

ISLAND ACCESSSTONE STEPS

BENCH MARK DESCRIPTION

USGS GEOLOGICAL SURVEYGAGING STATION TABLE,STAMPED SET IN THE TOP OF ACONCRETE LAKE LEVELMONUMENT ON THE TOP OFTHE NORTH END OF THE WESTABUTMENT OF THE LAKE DAMACROSS THE TIPPECANOE RIVER.

ELEVATION: 855.870

LAKE ELEVATIONS

LEGAL LAKE ELEV.: 852.75

BANK PROTECTION95 FT

N

Environmental GroupS L&"Restoring Natural Resources"

BANK PROTECTION200 FT 75 FT

ISLAND ACCESS

01.20.2020

BANK PROTECTION200 FT 130 FT

Page 12: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference

PROJECT NO.:

DATE:

HORIZONTAL SCALE:

VERTICAL SCALE:

REVISIONNUMBER

REVISIONDATEDESIGN BY:

DRAWN BY:

CHECKED BY:

APPROVED BY:

PAGENO.

WSS

WSS

JWS

JWS

.

.

.

.

.

.

.

.

.

9OF

415504 COUNTY ROAD 42GOSHEN, INDIANA 46528

KLINE ISLANDWEBSTER LAKE

NORTH WEBSTER, IN.

AS-BUILT DRAWINGS

DISTURBED AREA MAP

LEGEND

INCIDENTAL ACCESS0.033 ACRES

INCIDENTAL STAGINGAREA0.112 ACRES

INCIDENTAL ACCESS

N

Environmental GroupS L&"Restoring Natural Resources"

INCIDENTAL STAGINGAREA

01.20.2020

Page 13: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference

PROJECT NO.:

DATE:

HORIZONTAL SCALE:

VERTICAL SCALE:

REVISIONNUMBER

REVISIONDATEDESIGN BY:

DRAWN BY:

CHECKED BY:

APPROVED BY:

PAGENO.

WSS

WSS

JWS

JWS

.

.

.

.

.

.

.

.

.

9OF

515504 COUNTY ROAD 42GOSHEN, INDIANA 46528

KLINE ISLANDWEBSTER LAKE

NORTH WEBSTER, IN.

AS-BUILT DRAWINGS

CROSS SECTIONWEST AND EAST BANK - 95 225 FT

852

854

856

858

850

-2 0 2 4 6 8 10 12 14-4-6-8-10848

EXISTING GRADE0.5:1 SLOPE

EXISTING GRADEELEV - 851.8 FT

D50-6" GLACIALSTONE (MINIMUM)

PROPOSED GRADE2:1 SLOPEOHWM

ELEV - 852.8 FT

16 18 20 22

860

862

864

866

TOP OF BANKELEV - 862.5 FT

TOP OF STONEELEV - 855.3 FT

NATIVE LIVESTAKES3.0 FT - C/C

Environmental GroupS L&"Restoring Natural Resources"

-12

GEOTEXTILEFABRIC

01.20.2020

AS-BUILT DRAWING NOTES:

1. TOTAL LENGTH WAS INCREASED FROM 95 FT TO 225 FT TO INCLUDEADDITIONAL BANK STABILIZATION ON THE EAST SIDE OF THE ISLAND WHERESEVERE EROSION HAD OCCURRED SUBSEQUENT TO THE DESIGN DRAWINGS.

Page 14: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference

PROJECT NO.:

DATE:

HORIZONTAL SCALE:

VERTICAL SCALE:

REVISIONNUMBER

REVISIONDATEDESIGN BY:

DRAWN BY:

CHECKED BY:

APPROVED BY:

PAGENO.

WSS

WSS

JWS

JWS

.

.

.

.

.

.

.

.

.

9OF

615504 COUNTY ROAD 42GOSHEN, INDIANA 46528

KLINE ISLANDWEBSTER LAKE

NORTH WEBSTER, IN.

AS-BUILT DRAWINGS

CROSS SECTIONSOUTH BANK - 200 75 FT

852

854

856

858

850

-2 0 2 4 6-10-12-14 -4-6-8-26-28848

TOE OF SLOPEELEV - 851.6 FT

PROPOSED GRADE2:1 SLOPE

OHWMELEV - 852.8 FT

-16-18-20-22

860

862

864

866

TOP OF BANKELEV - 854.2 FT

NATIVE LIVESTAKES3.0 FT - C/C

Environmental GroupS L&"Restoring Natural Resources"

-30

EXISTING GRADEELEV - 850.4 FT

-24

EXISTING GRADEELEV - 851.0 FT

EXISTING GRADE1.2:1 SLOPE

KEY INTO LAKE BOTTOM1.0 FT DEPTH x 2.0 FT WIDTH GEOTEXTILE

FABRIC

01.20.2020

AS-BUILT DRAWING NOTES:

1. TOTAL LENGTH WAS DECREASED FROM 200 FT TO 75 FT TO INCLUDEADDITIONAL BANK STABILIZATION ON THE EAST SIDE OF THE ISLAND WHERESEVERE EROSION HAD OCCURRED SUBSEQUENT TO THE DESIGN DRAWINGS.

Page 15: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference

847.0

849.0

851.0

853.0

857.0

859.0

861.0

847.0

849.0

851.0

853.0

857.0

859.0

861.0

100-10

WATERLEVEL

EXISTINGGRADE

EXISTINGTREES

PROJECT NO.:

DATE:

HORIZONTAL SCALE:

VERTICAL SCALE:

REVISIONNUMBER

REVISIONDATEDESIGN BY:

DRAWN BY:

CHECKED BY:

APPROVED BY:

PAGENO.

CLS

WSS

JWS

JWS

.

.

01.20.2020

.

.

.

.

.

.

. 7

15504 COUNTY ROAD 42GOSHEN, INDIANA 46528 9

of

KLINE ISLANDWEBSTER LAKE

NORTH WEBSTER, IN.

AS-BUILT DRAWINGS

ISLAND ACCESSDETAIL DRAWING

855.0855.0

2 FT

TENNESSEE STONE5 LAYERS OF SINGLE STONE

STEPS @ 5.5 FT x 3.5 FT(SEE AS-BUILT NOTE 1)

GLACIAL STONETOE WALL3"-6" AND 8"-12"

GLACIAL STONETOE WALL3"-6" AND 8"-12"WATER

LEVEL

3 FT

AS-BUILT DRAWING NOTES:

1. FIVE LAYERS OF TENNESSEE STONE, EACH MEASURING APPROXIMATELY 5.5 FT WIDE BY 3.5 FT DEEP AND 8

IN THICK. TREAD PORTION OF THE STONE WAS 1.5 FT DEEP. THE BOTTOM LAYER TO BE IMBEDDED INTO

THE LAKE BED ON TOP OF A 2 FT DEEP STABILIZATION LAYER OF 5C GLACIAL STONE. THE TREAD PORTION

OF THE TOP LAYER OF STONE WAS THE FULL 3.5 FT DEEP.

2. THE ADDITIONAL TWO STEPS WERE ADDED DUE TO A GREATER SHORELINE BANK SLOPE THAN WAS

CONSIDERED IN THE ORIGINAL DESIGN.

3. GEOTEXTILE FABRIC WAS INSTALLED UNDER THE 5C GLACIAL STONE STABILIZATION LAYER.

AS-BUILT - ISLAND ACCESS - CROSS SECTION AS-BUILT - ISLAND ACCESS - PLAN VIEW

Environmental GroupS L&"Restoring Natural Resources"

5C GLACIALSTONE

GEOTEXTILEFABRIC

Page 16: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference

PROJECT NO.:

DATE:

HORIZONTAL SCALE:

VERTICAL SCALE:

REVISIONNUMBER

REVISIONDATEDESIGN BY:

DRAWN BY:

CHECKED BY:

APPROVED BY:

PAGENO.

WSS

WSS

JWS

JWS

.

.

.

.

.

.

.

.

.

9OF

815504 COUNTY ROAD 42GOSHEN, INDIANA 46528

KLINE ISLANDWEBSTER LAKE

NORTH WEBSTER, IN.

AS-BUILT DRAWINGS

CONSTRUCTIONSPECFICIATIONS

Environmental GroupS L&"Restoring Natural Resources"

SEEDING SPECIFICATIONS:

1. SCOPEThe work shall consist of furnishing all labor, equipment and materials for seeding a permanent mixture of grasses(Native and Cool Season) on the areas shown on the drawings and/or all disturbed areas.

2. GENERALPermanent fertilizing, seeding, mulching and blanketing shall be performed within 15 days of disturbance. If apermanent seeding cannot be completed within the 15 days a temporary seeding can be used during the summermonths.

Preferred Seeding DatesCool Season Grasses March 1 to May 20 or August 1 to September 20Warm Season Grasses April 15 to May 30 or After October 1

(Late summer seeding if water provided)

3. FERTILIZERThe fertilizer (cool season grasses only) shall be a regular commercial fertilizer and shall be in such physical conditionto insure uniform application. Apply 12-12-12 or equivalent at the rate of 350 lbs/acre.

4. SEEDThe seed shall be good quality and conform to the latest Indiana seed laws. Species and rate of seeding shall be asspecified in the “Erosion Control and Planting Plan”. Seed shall be applied at a pure live seed (PLS) rate.

5. PREPARATION OF SEEDBEDThe entire area to be seeded shall be reasonably smooth prior to beginning seedbed preparation. Fertilizer, ifrequired, shall be applied uniformly and incorporated into the top 3” of the soil. The seedbed preparation should besuspended when the soil is too wet or too dry. On side slopes steeper than 2.5:1, the 3” minimum depth of seedbedpreparation is not required, but the soil shall be worked enough to insure sufficient loose soil to provide seed cover.

6. SOWING THE SEEDUnless otherwise specified, the seeding operation shall be performed immediately after preparation of the seedbed.The seed will be broadcast uniformly over the area to be seeded. Immediately after seeding, the soil shall be firmedto give the seed a cover of not more than 0.5” for cool season grasses and 0.25” for warm season grasses andforbs. On slopes greater than 2.5:1, the seed may be covered by hand.

7. MULCHINGThe required mulching shall be performed as soon as possible after seeding. The mulch shall be applied uniformlyover the area. The type and rate of mulch can be found in the “Erosion Control and Planting Plan”.

When mulching is required, all areas seeded during any one day shall be mulched within 24 hours. The mulch shallbe anchored unless otherwise approved. Anchoring of the mulch may be performed by a commercially availabletackifier, a mulch anchoring tool, by installation of mulch netting or by other approved methods.

GEOTEXTILE SPECIFICATIONS:

1. SCOPEThis work shall consist of furnishing all materials, equipment and labor necessary for the installation of geotextilesfor slope protection.

2. MATERIALSGeotextiles shall be manufactured from synthetic long chain or continous polymeric filaments or yarns, having acomposition of at lease 95 percent, by weight, of polypropylene, polester or polyvinylidene-chloride. The geotextilewill be inert to commonly encountered chemicals. The geotextile shall be free of any chemical treatment or coatingthat might significantly reduce its permeability and shall have no flaws or defects that significantly alter its physicalproperties.

Nonwoven GeotextileThe class and type of geotextile and requirements of material for slope protection are:

Class 1 NonwovenTensile Strength 180 lbs minBursting Strength 320 psi minElongation 50% maxPuncture 80 lbs minUltraviolet Light Resistance 70% min tensile strength retainedPermittivity 0.7 second min

3. SURFACE PREPARATIONThe surface on which the geotextile is to be placed shall be graded as shown on the sign plans. The surface shall bereasonably smooth and free of holes, sharp objects and projections.

4. PLACEMENTa. General

The geotextile shall be placed on the prepared surface at the locations and in accordance with the details shownon the design plans. The geotextile shall be unrolled along the placement area and loosely laid (not stretched) insuch a manner that it will conform to the surface irregularities when the glacial stone is placed against it. No cutsor punctures will be permitted. The geotextile may be folded and overlapped to permit proper placement in thedesignated area.

b. Slope ProtectionThe roll or panel length shall be placed parallel to the direction of water flow. The minimum overlap shallbe 18”, in any direction. The geotextile shall not be placed until it can be anchored and protected with theintended covering within 48 hours. If the geotextile will not be covered within 48 hours, a temporary coveringwill be used for protection from ultraviolet light.

Securing pins shall be placed along the edge of the panel to adequately secure itduring placement. At vertical laps, securing pins shall be inserted through both layers along a line through theapproximate midpoint of the overlap. At horizontal laps and laps across slopes, securing pins shall be insertedthrough the bottom layer only. Securing pins shall be placed along a line approximately 2 inches in from the edgeof the outer limits of the placed geotextile at intervals not greater than 12 feet.Additional pins shall be installed as necessary to prevent any slippage of the fabric,regardless of locations.

01.20.2020

Page 17: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference

PROJECT NO.:

DATE:

HORIZONTAL SCALE:

VERTICAL SCALE:

REVISIONNUMBER

REVISIONDATEDESIGN BY:

DRAWN BY:

CHECKED BY:

APPROVED BY:

PAGENO.

WSS

WSS

JWS

JWS

.

.

.

.

.

.

.

.

.

9OF

915504 COUNTY ROAD 42GOSHEN, INDIANA 46528

KLINE ISLANDWEBSTER LAKE

NORTH WEBSTER, IN.

AS-BUILT DRAWINGS

EROSION CONTROLAND PLANTING PLAN

Environmental GroupS L&"Restoring Natural Resources"

PLANTING PLAN:

Native Wetland Live Stakes (295 FT)

Approximately 100 live stakes will be installed at or slightly above the ordinary highwater mark within the glacial stoneseawall. The live stakes will be installed on a 3-foot spacing. A minimum of three of the following species will be planted:

Button BushNinebarkSilky DogwoodRed-osier DogwoodSandbar WillowBlack Willow

EROSION CONTROL PLAN:

Temporary Seeding

A temporary seeding shall be applied if disturbed areas are exposed for more than 15 days. Winter wheat will beseeded at the rate of 150 lbs/acre.

Permanent Seeding

Establishment of Lawn Turf - Disturbed Areas at Staging Site

The disturbed areas at the staging site will be established with a high-quality seed which provides a high tolerancefor heavy traffic. The new seeding will be fertilized and straw mulched to assist in the establishment of thevegetation. Cisco's Execu-Turf Playmaker, or equivalent, seed mix will be planted at 8-10 lbs per 1000 sqft.

01.20.2020

Page 18: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference

 

 

      

APPENDIX B 

Plant Materials 

   

Page 19: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference
Page 20: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference

 

 

      

APPENDIX C 

Photographs    

Page 21: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference

 

 

 Photograph 1 – Shoreline looking north on the northeast side of the island 

 

 Photograph 2 – Shoreline looking south on the northeast side of the island 

    

Page 22: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference

 

 

 Photograph 3 – Shoreline and access steps on south side of the island 

 

 Photograph 4 – Stone toe‐wall shoreline on the west side of the island 

   

Page 23: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference

 

 

 Photograph 5 – Live stakes planted along the top of the stone toe‐wall on northeast side of island 

 

 Photograph 6 – Live stakes planted along the top of the stone toe‐wall on northeast side of island 

 

Page 24: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference

 

 

     

APPENDIX D 

Correspondence 

   

Page 25: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference
Page 26: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference
Page 27: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference
Page 28: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference
Page 29: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference
Page 30: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference
Page 31: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference

 

 

     

APPENDIX E 

Permits and Engineers Assessment    

Page 32: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference

LAKEPL-23614

North Indiana Conference of UMCNick Yarde301 Pennsylvania PkwyIndianapolis, IN 46280-1397S&L Environmental Group IncColby Stanger15504 County Road 42Goshen, IN 46528IC 14-26-2 with 312 IAC 11A new bioengineered seawall will be constructed along the frontage of KlineIsland to deter shoreline erosion. The wall will be composed of minimum 6"diameter glacial stone and will be approximately 295' long. Glacial stone will beinstalled up to 1' above the calculated wave height. Native livestake plants will beplanted within or above the stone to help stabilize the bank. This is Phase IIIconstruction of the bank restoration project. Details of the project are contained ininformation received electronically at the Division of Water on September 20,2018 and in plans and information received at the Division of Water on October18, 2018.The island is located within Webster Lake near North Webster, TippecanoeTownship, Kosciusko CountySection 11, T 33N, R 7E, North Webster QuadrangleUTM Coordinates: Downstream 4575967 North, 610026 East

James J. Hebenstreit, PE, Assistant DirectorDivision of WaterDecember 14, 2018

Webster Lake

Included: Notice Of Right To Administrative Review - General Conditions - Special Conditions - Service List

APPLICATION #

APPLICANT

AGENT

AUTHORITYDESCRIPTION

LOCATION

APPROVED BY

APPROVED ON

: : :

:

: :

:

:

:

MAILED: December 14, 2018

Attachments: Federal General Conditions.pdf

CERTIFICATE OF APPROVALPUBLIC FRESHWATER LAKE

DEPARTMENT OF NATURAL RESOURCESSTATE OF INDIANA

Page 33: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference

This signed document constitutes the issuance of a permit by the Department of Natural Resources,subject to the conditions and limitations stated on the pages entitled "General Conditions" and "SpecialConditions".The permit or any of the conditions or limitations which it contains may be appealed by applying foradministrative review. Such review is governed by the Administrative Orders and Procedures Act, IC4-21.5, and the Department's rules pertaining to adjudicative proceedings, 312 IAC 3-1.In order to obtain a review, a written petition must be filed with the Division of Hearings within 18 days ofthe mailing date of this notice. The petition should be addressed to:

Natural Resources CommissionDivision of Hearings

Indiana Government Center North, Room N103100 North Senate Avenue

Indianapolis, Indiana 46204-2200The petition must contain specific reasons for the appeal and indicate the portion or portions of the permitto which the appeal pertains.If an appeal is filed, the final agency determination will be made by the Natural Resources Commissionfollowing a legal proceeding conducted before an Administrative Law Judge. The Department of NaturalResources will be represented by legal counsel.

DEPARTMENT OF NATURAL RESOURCESSTATE OF INDIANA

NOTICE OF RIGHT TO ADMINISTRATIVE REVIEWAPPLICATION #: PL- 23614

Page 34: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference

If any archaeological artifacts or human remains are uncovered during construction, federal law and regulations (16 USC 470, et seq.; 36 CFR 800.11, etal) and State Law (IC 14-21-1) require that work must stop and that the discovery must be reported to the Division of Historic Preservation andArchaeology within 2 business days.

This permit must be posted and maintained at the project site until the project is completed.This permit does not relieve the permittee of the responsibility for obtaining additional permits, approvals, easements, etc. as required by other federal,state, or local regulatory agencies. These agencies include, but are not limited to:

This permit must not be construed as a waiver of any local ordinance or other state or federal law.This permit does not relieve the permittee of any liability for the effects which the project may have upon the safety of the life or property of others.This permit may be revoked by the Department of Natural Resources for violation of any condition, limitation or applicable statute or rule.This permit shall not be assignable or transferable without the prior written approval of the Department of Natural Resources. To initiate a transfer contact:

The Department of Natural Resources shall have the right to enter upon the site of the permitted activity for the purpose of inspecting the authorized work.The receipt and acceptance of this permit by the applicant or authorized agent shall be considered as acceptance of the conditions and limitations statedon the pages entitled "General Conditions" and "Special Conditions".

Agency Telephone NumberKosciusko County Drainage BoardIndiana Department of Environmental ManagementLocal city or county planning or zoning commission

DirectorDivision of Water

Room W264402 West Washington Street

Indianapolis, IN 46204Telephone: (317) 232-4160, Toll Free: (877) 928-3755

FAX: (317) 233-4579

Division of Historic Preservation and ArchaeologyRoom W274

402 West Washington StreetIndianapolis, IN 46204

Telephone: (317) 232-1646, FAX: (317) 232-8036

(574) 372-2367(317) 233-8488 or (800) 451-6027

( 1 )

( 2 ) ( 3 )

( 4 ) ( 5 ) ( 6 ) ( 7 )

( 8 ) ( 9 )

GENERAL CONDITIONSAPPLICATION #: PL- 23614

DEPARTMENT OF NATURAL RESOURCESSTATE OF INDIANA

Page 35: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference

This permit is valid for 24 months from the "Approved On" date shown on the first page. If work has not been completed by December 14, 2020 the permit will become void anda new permit will be required in order to continue work on the project.This permit becomes effective 18 days after the "MAILED" date shown on the first page.If both a petition for review and a petition for a stay of effectiveness are filed before thispermit becomes effective, any part of the permit that is within the scope of the petition forstay is stayed for an additional 15 days.Other than those measures necessary to satisfy the "General Conditions" and "SpecialConditions", the project must conform to the information received by the Department ofNatural Resources on: September 20, 2018 and October 18, 2018. Any deviation fromthe information must receive the prior written approval of the Department.

PERMIT VALIDITY

CONFORMANCE

:

:

Number Special Condition( 1) minimize the movement of resuspended bottom sediment from the immediate project

area( 2) revegetate all bare and disturbed areas landward of the shoreline with a mixture of

grasses (excluding all varieties of tall fescue) and legumes as soon as possible uponcompletion

( 3) all excavated material must be properly spread landward of the shoreline on the propertydescribed on page 1 under "DESCRIPTION" or completely removed from the project sitesuch that erosion and off-site sedimentation of the material is prevented

( 4) to prevent the spread of aquatic invasive species, any equipment used for the projectshall be cleaned of any plants, mud, and debris prior to project initiation and aftercompletion of the work

( 5) the vegetative component of a bioengineered wall is critical to the function of the walland must be maintained throughout the life of the wall; replace dead or lost plants withthe same species or other approved species within one growing season

( 6) pursuant to 312 IAC 11-4-2 (h), do not place an impermeable material or structure(including but not limited to concrete, steel, or vinyl walls) directly behind the new seawallapproved by this permit

( 7) the placement of the bioengineered seawall along this shoreline does not constitute analteration that would change the shoreline classification on this project or nearby siteswhere shoreline classifications would be necessary for future permit application review

( 8) send photos, digital, or hard copy, of the bioengineered seawall no later than 14 daysafter completion to Nate Thomas, Lakes Permitting Biologist, Division of Fish andWildlife, 1353 S Governors Dr., Columbia City, IN 46725; [email protected]

DEPARTMENT OF NATURAL RESOURCESSTATE OF INDIANA

SPECIAL CONDITIONSAPPLICATION #: PL- 23614

Page 36: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference

( 9) NOTE: This Certificate of Approval serves as Federal authorization under the IndianaProgrammatic General Permit (PG), LRE-1998-1000100-S17, issued on March 2, 2018under authority of Section 404 of the Clean Water Act as administered by the U.S. ArmyCorps of Engineers. This authorization requires that the permittee comply with theattached Federal General Conditions. Commencement of work authorized in thisCertificate of Approval is considered acceptance of the Federal General Conditions. Ifyou have questions about the Federal General Conditions, contact the U.S. Army Corpsof Engineers, Detroit District Michiana Branch, at 574-232-1952, or the Louisville DistrictOffice, at 502-315-6686, or the Chicago District Office, at 312-846-5539. Refer to theService List page of this Certificate of Approval for the appropriate U.S. Army Corps ofEngineers District Office.

( 10) NOTE: The conditions stated on the pages entitled Federal General Conditions are noteligible for appeal through the procedures described on page 2 of this Certificate ofApproval. If you object to any one or more of the Federal General Conditions, thisCertificate of Approval is not considered valid for your Federal permit under the IndianaProgrammatic General Permit, LRE-1998-1000100-S17, and you must contact the U.S.Army Corps of Engineers to request a case-specific review of your project.

DEPARTMENT OF NATURAL RESOURCESSTATE OF INDIANA

SPECIAL CONDITIONSAPPLICATION #: PL- 23614

Page 37: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference

North Indiana Conference of UMCNick Yarde301 Pennsylvania PkwyIndianapolis, IN 46280-1397

S&L Environmental Group IncColby Stanger15504 County Road 42Goshen, IN 46528

Randall Atkins8560 South Wheeling ParkwayFairmount, IN 46928

Bradley and Julie Bath6122 Woods Knoll DriveNewburgh, IN 46730-3430

Bradley Bogue2775 North 850 EastGreentown, IN 46936

JoAnn Tunes Boyer8393 East Wade LaneNorth Webster, IN 46555

Linda B and Roy G Chapman5775 Persimmon WayNaples, FL 34110

Jeffrey D and Cecily J Clifton2809 Bridlewood CircleCarmel, IN 46033

Devoe and Carol Cobbs9885 Brielle CourtFishers, IN 46037

Department of Natural ResourcesDivision of Law EnforcementDistrict 1 Headquarters9822 North Turkey Creek RoadSyracuse, IN 46567

James and Kelly Doles850 North Butler AvenueIndianapolis, IN 46219

Robert Fenstermacher1905 Farnsworth DriveSouth Bend, IN 46614

Myron E and Jo Anne Harmon3804 Redbud LaneKokomo, IN 46902

Kosciusko County Area Plan CommissionMatthew M SandyCourt House, 3rd floor100 West Center StreetWarsaw, IN 46580-2873

Kosciusko County Drainage BoardCounty SurveyorCourthouse, Room 103100 West Center StreetWarsaw, IN 46580-2872

Kosciusko County SWCD217 East Bell DriveWarsaw, IN 46582

Jeffrey and Kathryn Miller4040 Solitude CourtWestfield, IN 46062

Leonard and Debra Nielson8319 East Wade LaneNorth Webster, IN 46555

Richard and Rachel Presser6710 Sweetwood CourtFort Wayne, IN 46814-8127

Ramsey Remington113 Pinehurst AvenueFishers, IN 46034

John and Carolyn Shinn4680 South 300 WestMarion, IN 46953

Smith Family FarmsHarold and Peggy Smith17500 North 700 EastDunkirk, IN 47336

Steven P and Sandra J ErwinTrustSteven and Sandra Erwin8343 East Wade LaneNorth Webster, IN 46555

Robert and Molly Stine1542 West George Street BChicago, IL 60657

Taylor Family Living TrustCarol Dreska211 Farmwood PlaceGahanna, OH 43230

Robert Turner110 Pine Tree LaneNoblesville, IN 46060

US Army Corps of EngineersDetroit District, Michiana Branch2422 Viridian Drive, Suite 200South Bend, IN 46628

: Nicholas Males: Nicholas Males: J. Matthew Buffington: Nathan D. Thomas

Staff Assignment:AdministrativeTechnicalEnvironmentalFish and Wildlife

DEPARTMENT OF NATURAL RESOURCESSTATE OF INDIANA

SERVICE LISTAPPLICATION #: PL- 23614

Page 38: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference

15504 C.R. 42 Phone: (574) 536-5835 www.slenvirogroup.com Goshen, IN. 46528 Fax: (574) 642-3390 [email protected]

Kline Island Phase III – Webster Lake Bank Stabilization – Engineeer Assessment

September 2018

1. Composition of existing shoreline terrain – The northwest side of the Island consist of 10-16 ft. nearly vertical and non-vegetated banks. The East side of the island consists of 3-4 ft. non-vegetated banks. The soil structure at the Ordinary High Water Mark (OHWM) consist of stratified gravelly course sand to course sand, which is very easily eroded. Shrubs and trees exist at the top edge of the vertical banks. Water depth along the shoreline is shallow (1-2 ft.) 20-25 ft. lakeward due to the bank sloughing into the lake as a result of being undercut from wave action.

2. Impacts due to wind and wave action – The calculated wave height from wind is 1.8 ft. The wave action is undercutting the easily erodible soils of the bank allowing the soil above to slide into the lake along with trees and shrubs located at the top edge of the bank. The wave action and resulting bank erosion damages fish habitat and recreation activities by increasing turbidity, up-rooting trees and shrubs and decreasing aquatic and wetland plants.

3. Severity of erosion and need for bank stabilization – The on-going erosion process is severe and will continue at an accelerated rate if not stabilized. The severity of the erosion is evident from the number of trees and shrubs which have been up-rooted or have exposed roots. It is estimated the banks may be receding at 3-6 inches per year in areas.

4. Suitability of materials to armor and provide bank protection – A bio-engineered seawall is recommended, including planting native live stake shrubs within a glacial stone toe wall. D50-8” glacial stone is recommended based on the 2H:1V runner-up slope and the significant wave height of 1.8 ft. The stone will prevent further undercutting and sloughing of the banks, while presenting a natural appearance. Native plant materials placed within the glacial stone will help provide additional stability and provide a natural shoreline appearance. Sloping of the bank above the glacial stone is not recommended due to the significant loss of trees, shrubs and associated upland habitat.

Jeffrey W. Stanger, P.E. Indiana License No. PE11011539

Page 39: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference

 

 

     

APPENDIX F 

Estimated Load Reductions (Post‐construction) 

 

Page 40: Kline Island Phase III Bank Stabilization Final Report · Kline Island – Phase III Bank Stabilization Final Report Prepared For: Epworth Forest Conference Center (Indiana Conference

1/21/2020

If estimating for just one bank, put "0" in areas for Bank #2.

Please select a soil textural class:

FALSE Sands, loamy sands FALSE Silty clay loam, silty clayTRUE Sandy loam FALSE Clay loamFALSE Fine sandy loam FALSE ClayFALSE Loams, sandy clay loams, sandy clay FALSE OrganicFALSE Silt loam

Please fill in the gray areas below:

Parameter Bank #1 Bank #2 ExampleLength (ft) 300 0 500Height (ft) 3 0 15Lateral Recession Rate (ft/yr)* 0.01 0 0.5Soil Weight (tons/ft3) 0.0525 0.0525 0.04

Soil P Conc (lb/lb soil)** 0.0005 0.0005 0.0005 **

Soil N Conc (lb/lb soil)** 0.001 0.001 0.001 **** If not using the default values, users must provide input (in red) for Total P and Total N soil concentrations*Lateral Recession Rate (LRR) is the rate at which bank deterioration has taken place and is measured in feet per year. This rate may not be easily determined by direct measurement. Therefore best professional judgement may be required to estimate the LRR. Please refer to the narrative descriptions in Table 1.

BMP Efficiency*

Bank #1

BMP Efficiency*

Bank #2 Bank #1 Bank #2 Example

Sediment Load Reduction (ton/year) 1.0 0.0 0.5 0.0 150Phosphorus Load Reduction (lb/year) 0.4 0.0 150Nitrogen Load Reduction (lb/yr) 0.8 0.0 300

Estimated Load Reductions

Bank Stabilization

O

O

O

O

O

O

O

O

O

DEFAULT

DEFAULT