kim gram june 2013 the most important thing we …...the most important thing we build is trust...

19
The most important thing we build is trust DEFENCE SYSTEMS DIVISION Defence Electronics MISSION SYSTEMS DIVISION Aviation Services Life Support Mission Equipment AEROSPACE AND SECURITY DIVISION Aerospace Communications Antenna Systems Commercial Systems SATCOM Tactical Communications and Surveillance Inmarsat Aero Conference San Diego 2013 Invitation to Dialogue June 2013 Kim Gram

Upload: others

Post on 17-Mar-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Kim Gram June 2013 The most important thing we …...The most important thing we build is trust DEFENCE SYSTEMS DIVISIONSECURITY DIVISION • Defence Electronics MISSION SYSTEMS DIVISION

The most important thing we build is trust

DEFENCE SYSTEMS DIVISION • Defence Electronics

MISSION SYSTEMS DIVISION • Aviation Services

• Life Support

• Mission Equipment

AEROSPACE AND SECURITY DIVISION • Aerospace Communications

• Antenna Systems

• Commercial Systems

• SATCOM

• Tactical Communications and Surveillance

Inmarsat Aero Conference San Diego 2013 Invitation to Dialogue

June 2013

Kim Gram

Page 2: Kim Gram June 2013 The most important thing we …...The most important thing we build is trust DEFENCE SYSTEMS DIVISIONSECURITY DIVISION • Defence Electronics MISSION SYSTEMS DIVISION

Cobham plc 12 June 2013 1

Agenda

• The joining of capabilities

• Our Market Vision

• Introduction of the Combined Aeronautical Product Portfolio

• Current Aircraft Platform Status

• SBB Safety Flight Trials

• Highlights Aeronautical Product Development Roadmap

Page 3: Kim Gram June 2013 The most important thing we …...The most important thing we build is trust DEFENCE SYSTEMS DIVISIONSECURITY DIVISION • Defence Electronics MISSION SYSTEMS DIVISION

Cobham plc 12 June 2013 2

Agenda

• The joining of capabilities

• Our Market Vision

• Introduction of Combined Aeronautical Product Portfolio

• Current Aircraft Platform Status

• SBB Safety Flight Trials

• Highlights Aeronautical Product Development Roadmap

Page 4: Kim Gram June 2013 The most important thing we …...The most important thing we build is trust DEFENCE SYSTEMS DIVISIONSECURITY DIVISION • Defence Electronics MISSION SYSTEMS DIVISION

Cobham plc

The New House in Aeronautical Satcom Two progressive organisation has become one

• Cobham Cape Town – Unique capabilities in engineering and manufacturing

world class antennas

– Significant market position with Air Transport Airframe manufacturers

• Cobham Lyngby – Ability to develop unique modems based on the

common L band technology base

– A unique position in the Government and Business Aviation Markets

• Today:

– A Single Commercial Organization

– A Single Product Portfolio

– A Single Roadmap

– A Single Product Development Organization

12 June 2013 A Stronger Connection 3

!

Page 5: Kim Gram June 2013 The most important thing we …...The most important thing we build is trust DEFENCE SYSTEMS DIVISIONSECURITY DIVISION • Defence Electronics MISSION SYSTEMS DIVISION

Cobham plc 12 June 2013 4

Agenda

• The joining of capabilities

• Our Market Vision

• Introduction of the Combined Aeronautical Product Portfolio

• Current Aircraft Platform Status

• SBB Safety Flight Trials

• Highlights Aeronautical Product Development Roadmap

Page 6: Kim Gram June 2013 The most important thing we …...The most important thing we build is trust DEFENCE SYSTEMS DIVISIONSECURITY DIVISION • Defence Electronics MISSION SYSTEMS DIVISION

Cobham plc

Market and growth vision

A large and growing market for IP connectivity

12 June 2013 A Stronger Connection 5

Around 3000 aircrafts world wide are equipped with an IP Data Link.

It is the vision of Cobham Aero Satcom that all operators of aircrafts in the air transport,

government and business aviation verticals ultimately wish to have

their aircrafts connected with an IP data connection, to achieve navigation, operation and maintenance efficiencies

Page 7: Kim Gram June 2013 The most important thing we …...The most important thing we build is trust DEFENCE SYSTEMS DIVISIONSECURITY DIVISION • Defence Electronics MISSION SYSTEMS DIVISION

Cobham plc

Out Off On In

•Crew list

Init

•Loadinfo

•Maint. St.

•Final LS

•Fuel rel.

•NoToc

•Dep CLX

•CTOT •Re-RTG

•Atis

•MEL msg

•INIT

•IRR Info

•OUT •Rpt

•OFF Rpt + ETA

•DEP Delay

•TKOF Delay

Crew Palco AH ATS

Appl. FLOW RODOS

Aura/

MOPS

•Winds

•Atis

•Oceanic •CLX

OPUS FLIDRAS

•ACMS

•ENRT •Delay

•Gate Delay

•ON •Rpt

•IN •Rpt

•Crew NxtDuty

•FltSum •Ldg Pilot

•ETA •InRange

•Flight •Plan

•WX

•Free •Text

TRIN REDI

•CNX •Info

•SNAG

TASIR PFR

monitor

•CMC

TODC

•LDC

•LS CFM

•LMC

SMHI LFV

CIES

•MET

•STAR •FMS DLs

•TODC

•Sigmet

Data communication to and from the aircraft increasing and diversifying

6 12 June 2013

Page 8: Kim Gram June 2013 The most important thing we …...The most important thing we build is trust DEFENCE SYSTEMS DIVISIONSECURITY DIVISION • Defence Electronics MISSION SYSTEMS DIVISION

Cobham plc

Aircraft communication and segregation

1. Aircraft Control / Air Traffic Control

– high reliability and security

– compliance with standards & mandates

2. Operational efficiency via applications with real-time communication

3. Cabin Connectivity - Crew and Passengers

How can we satisfy the different domain requirements?

Cockpit Cabin

Operational (AIS/AOC):

Airline Info Services Aircraft Control:

(AC / ATC)

IFE & Comms (PIES):

Pax Info & Entertainment

7 12 June 2013

Page 9: Kim Gram June 2013 The most important thing we …...The most important thing we build is trust DEFENCE SYSTEMS DIVISIONSECURITY DIVISION • Defence Electronics MISSION SYSTEMS DIVISION

Cobham plc 12 June 2013 8

Agenda

• The joining of capabilities

• Our Market Vision

• Introduction of the Combined Aeronautical Product Portfolio

• Current Aircraft Platform Status

• SBB Safety Flight Trials

• Highlights Aeronautical Product Development Roadmap

Page 10: Kim Gram June 2013 The most important thing we …...The most important thing we build is trust DEFENCE SYSTEMS DIVISIONSECURITY DIVISION • Defence Electronics MISSION SYSTEMS DIVISION

Cobham plc

The Single Channel Product Line Aviator 200, 300, 350 and 700 E/D

9 12 June 2013

Page 11: Kim Gram June 2013 The most important thing we …...The most important thing we build is trust DEFENCE SYSTEMS DIVISIONSECURITY DIVISION • Defence Electronics MISSION SYSTEMS DIVISION

Cobham plc

Aviator SP (Ex Cape Town) SB200, 300, 400, 600, 800 and 1600

12 June 2013

• Aviator SP

– Extended environmental specification

– Multi channel systems

– Flange mounted configuration

Page 12: Kim Gram June 2013 The most important thing we …...The most important thing we build is trust DEFENCE SYSTEMS DIVISIONSECURITY DIVISION • Defence Electronics MISSION SYSTEMS DIVISION

Cobham plc

The Antennas

Slide

11

• The comprehensive series of antennas from Cobham

– LGA ?

– IGA 5006

– IGA 5001

– HGA 6000 (and variants)

– HGA 7001 (and variants)

– It obviously does not stop here !

Page 13: Kim Gram June 2013 The most important thing we …...The most important thing we build is trust DEFENCE SYSTEMS DIVISIONSECURITY DIVISION • Defence Electronics MISSION SYSTEMS DIVISION

Cobham plc

Cobham Antennas Satcom Antennas for Cockpit and Cabin Communications

– Cobham antennas are currently certified on (sample)

• Boeing 737 (Forward fit)

• Boeing 767 (Forward fit)

• Boeing 777 (Forward fit)

• Boeing 787 (standard fit)

• Boeing 747-8 (standard fit)

• Boing 747-400 Retrofit

• Boeing 777 Retrofit

• Boeing 737 Retrofit

• Airbus SA (318,219,320,321) (forward fit)

• Airbus LR (330,340) (forward fit)

• A350

• A380 (standard fit June 2013)

• A400M

• C295

Page 14: Kim Gram June 2013 The most important thing we …...The most important thing we build is trust DEFENCE SYSTEMS DIVISIONSECURITY DIVISION • Defence Electronics MISSION SYSTEMS DIVISION

Cobham plc 12 June 2013 13

Agenda

• The joining of capabilities

• Our Market Vision

• Introduction of the Combined Aeronautical Product Portfolio

• Current Aircraft Platform Status

• SBB Safety Flight Trials

• Highlights Aeronautical Product Development Roadmap

Page 15: Kim Gram June 2013 The most important thing we …...The most important thing we build is trust DEFENCE SYSTEMS DIVISIONSECURITY DIVISION • Defence Electronics MISSION SYSTEMS DIVISION

Cobham plc

The Interim Solution for FANS Trials

SBU TT-5040A-THD (SwiftBroadband Unit = Satellite Data Unit)

• AAGW included, ACARS over SBB

• Level D software

• 1 x CMU interface

• No Aircraft Network Domain Segregation

• ARINC 404 tray interface

• Two possible system configurations:

1. Aviator 700D/S

• Includes Classic/S64 SDU + DLNA +HGA

• Allows Classic Voice + ACARS over SBB (with Classic ACARS fall-back)

2. Aviator 300D

• Includes single channel HLD + IGA (IGA-5001)

Aviator 700D/S

Aviator 300D

14

Page 16: Kim Gram June 2013 The most important thing we …...The most important thing we build is trust DEFENCE SYSTEMS DIVISIONSECURITY DIVISION • Defence Electronics MISSION SYSTEMS DIVISION

Cobham plc 12 June 2013 15

Agenda

• The joining of capabilities

• Our Market Vision

• Introduction of the Combined Aeronautical Product Portfolio

• Current Aircraft Platform Status

• SBB Safety Flight Trials

• Highlights Aeronautical Product Development Roadmap

Page 17: Kim Gram June 2013 The most important thing we …...The most important thing we build is trust DEFENCE SYSTEMS DIVISIONSECURITY DIVISION • Defence Electronics MISSION SYSTEMS DIVISION

Cobham plc

Aviator S Series The New Product Family

• Next Generation Safety Service Systems:

• Fulfils newest ARINC 781 att. 7 (Two Box)

• Unique CSDU allows most secure aircraft network domain separation ARINC 781 att. 8

• Smal, light and cost effective

• Uniquely built to address the space and weight constraints on modern aircrafts, regional, single aisle, dual aisle and large.

• Combines IP data together with safety services voice and datalink

• Secure IP data pipe allows a range of applications including EFB and future safety services

• The family of boxes shall support LGA, ELGA, IGA and HGA antennas

• New waveforms will support higher data rates and SBB use in helicopters

• Based on new BGAN Radio Module (Maritime, Vehicle, Portable)

• Re-use experience of Aviator 700D DO-178 Level D software certification

Slide

16

Page 18: Kim Gram June 2013 The most important thing we …...The most important thing we build is trust DEFENCE SYSTEMS DIVISIONSECURITY DIVISION • Defence Electronics MISSION SYSTEMS DIVISION

Cobham plc

Zoomning in on the HELGA (HLD & Enhanced Low Gain Antenna)

HELGA: LGA-5005A

• Antenna includes HPA and DLNA

• Allows minimal 2 component installation

• Complies with ARINC 741 LGA mounting footprint

• The dimensions of the antenna are:

– 376 x 139 x 50 mm (14.8” x 5.5” x 2.0”)

– similar to a TCAS antenna

– The weight is 1.8 kg (4.0 lb.)

17

Page 19: Kim Gram June 2013 The most important thing we …...The most important thing we build is trust DEFENCE SYSTEMS DIVISIONSECURITY DIVISION • Defence Electronics MISSION SYSTEMS DIVISION

Cobham plc 12 June 2013 18

Questions – We are here to answer them !

• Updates:

• Q2

• Air Asia

• Hawaii Flight Trials

• Boeing

• LMCO

• China

• RTM