Date 16-02-17 ………………………………………. KILANG KELAPA SAWIT BATU LINTANG Progress Report For the month of JANUARY 2017 (YEO BOON KEAT) Manager KUALA LUMPUR KEPONG BERHAD (No. Syarikat: 15043-V) KILANG KELAPA SAWIT BATU LINTANG

Upload: doliem

Post on 15-Apr-2018

306 views

Category:

Documents


13 download

TRANSCRIPT

  • Date 16-02-17

    .

    KILANG KELAPA SAWIT BATU LINTANG

    Progress Report

    For the month ofJANUARY 2017

    (YEO BOON KEAT)Manager

    KUALA LUMPUR KEPONG BERHAD(No. Syarikat: 15043-V)

    KILANG KELAPA SAWIT BATU LINTANG

  • 024 - KKS BATU LINTANG

    Task Item UsedQty

    Used UOM

    MAINTENANCE REPORT FOR THE MONTH OF JANUARY 2017

    Work Done By Outsider Problem Description

    STERILIZATION

    STERILIZER NO.1

    REPAIR UT8" S/STEEL B/FLY VALVE 1 NEXCONE ENGINEERING MAINTENANCE OF STERILISER VALVEREPAIR ST8" OKM ACTUATOR 1 1 NEXCONE ENGINEERING

    STERILIZER NO.2

    REPAIR UT10" S/STEEL B/FLY VALVE 1 NEXCONE ENGINEERING MAINTENANCE OF STERILISERREPAIR UT8" S/STEEL B/FLY VALVE 1 NEXCONE ENGINEERING

    Printed On: 14/02/2017 2:11:35 PM Page: 1 of 5

  • 024 - KKS BATU LINTANG

    Task Item UsedQty

    Used UOM

    MAINTENANCE REPORT FOR THE MONTH OF JANUARY 2017

    Work Done By Outsider Problem Description

    CLARIFICATION/FILTRATION

    SEPARATOR C7A

    REPLACE PCDISTRIBUTOR INSERT 1 MAINTENANCE OF SEPERATORREPLACE PCEROSION GUARD (UPPER) 1

    SEPARATOR C7B

    REPLACE PCMCCB 100A 16KA 1 MAINTENANCE OF SEPERATORREWIND UT3PHASE 25HP STATOR COIL 1 KANDAN ELECTRICAL SERVICE SEPERATOR MOTOR BURN

    SEPARATOR C7C

    REPLACE PCSKF BEARING 22514M 1 MAINTENANCE OF SEPERATOR

    SLUDGE TANKS

    FABRICATE SH4MMX5'X10' M.S. PLATE 2 MAINTENANCE OF TOP DISTRIBUTOR SLUDETANK

    FABRICATE SH3/8"X5'X8' M.S. PLATE 2

    VIBRATING SCREEN

    REPAIR UT16MMX120MMX8P H.T.S. COILSPRING

    4 MAINTENANCE OF VIBRATING SCREEN

    REPAIR ST4"X29"L3/4" HOOK ANGLE S/SCLAMP

    4

    REPAIR ST4"X29"LX3/4 S/STEEL HOOKANGLE

    4 MAINTENANCE OF SLUDGE VIBRATINGSCREEN

    WATER SUPPLY

    RAW WATER PIPING( RIVER TO HILLTOP/MILL/ESTATE)

    REPLACE LH180MMX20'(PN 12.5) POLY PIPE 2 MAINTENANCE OF WATER SUPPLY PIPING

    Printed On: 14/02/2017 2:11:35 PM Page: 2 of 5

  • 024 - KKS BATU LINTANG

    Task Item UsedQty

    Used UOM

    MAINTENANCE REPORT FOR THE MONTH OF JANUARY 2017

    Work Done By Outsider Problem Description

    DIGESTION/PRESSING

    DIGESTER NO.1

    REPLACE STP15 DIGESTER EXPELLER ARM 1 DIGESTER EXPELLER ARM WORN OUTRECONDITION UTGEAR BOX 1 NEXCONE ENGINEERING DIGESTER GEARBOX WORN OUT

    DIGESTER NO.2

    REPLACE PC6MM S/STEEL PERF. DRAINAGEPLATE

    1 MAINTENANCE OF DIGESTER

    REPLACE PC9MM M.S. BOTTOM DRAINAGEPLATE

    1

    REWIND UT40HP MOTOR STATOR COIL 1 KANDAN ELECTRICAL SERVICE DIGESTER MOTOR BURN

    PRESS NO.1

    REPLACE UTP15 PRESS CAGE 1 MAINTENANCE OF SCREW PRESSREPLACE STP15 CB/MSB WORM SCREW 1

    Printed On: 14/02/2017 2:11:35 PM Page: 3 of 5

  • 024 - KKS BATU LINTANG

    Task Item UsedQty

    Used UOM

    MAINTENANCE REPORT FOR THE MONTH OF JANUARY 2017

    Work Done By Outsider Problem Description

    RECEPTION

    BOGIES & CAGES

    REPAIR ST12 1/2" CAST STEEL BOOGIEWHEEL

    6 MAINTENANCE OF BOOGIES

    REPAIR UT2 1/2" MT FRAME HOOK BUMPER 2REPAIR UT2 1/2" MT FRAME TOWING

    BUMPER2

    REPAIR ST12 1/2" CAST STEEL WHEEL 6REPAIR SH4MMX5'X10' M.S. PLATE 3 MAINTENANCE OF FFB CAGESREPAIR SH1/4"X5'X10' M.S. PLATE 3REPAIR UT4'X6' FFB CAGE FRONT PLATE 2REPAIR UT4 1/2'X8 1/2' CURVATURE SIDE

    PLATE2

    REPAIR UT5'X8 1/2' PERF. BASE PLATE SIDEBEND

    1

    REPAIR UT2"X2" CURVATURE SIDE ANGLE 12

    OLD LINE CAPSTAN

    REPLACE RLWIRE ROPE 16MM X 250' 1 MAINTENANCE OF OLD LINE CAPSTANT

    EFFLUENT DISPOSAL

    EFFLUENT PUMP NO.1

    REPAIR PCVSP300U4DOB3SS304 IMPELLER 1 MAINTENANCE OF EFFLUENT PUMPREPAIR PCVSP300U4DOB3SS304 CASING 1

    POWER GENERATION

    VICKERS HOSKINS BOILER

    REPLACE PCHIGH PRESSURE GAUGE GLASS 2 MAINTENANCE OF BOILERREPLACE PCFURNACE FIRE BAR 5REWIND UT50HP MOTOR STATOR COIL 1 KANDAN ELECTRICAL SERVICE BOILER FEED WATER MOTOR BURN

    Printed On: 14/02/2017 2:11:35 PM Page: 4 of 5

  • 024 - KKS BATU LINTANG

    Task Item UsedQty

    Used UOM

    MAINTENANCE REPORT FOR THE MONTH OF JANUARY 2017

    Work Done By Outsider Problem Description

    VEHICLES

    SDLG (SHOVEL)

    REPLACE UTTCIM5ALG24V-70A ALTERNATOR 1 MAINTENANCE OF LOADERREPLACE PC17.5X25 NEW TUBE 1 KEAT HENG KEDAI TYRE & BATTERY MAINTENANCE OF WHEEL LOADER

    HOISTING & THRESHING

    FRUIT ELEVATOR

    REPLACE FT250 FT 6" RENOLD CHAIN 250 WELL ON ENGINEERING & TRADING FRUIT ELEVATOR CHAIN WORN OUT

    HOIST

    REPLACE PCBRAKE CAP PLASTIC 16K 1 MAINTENANCE OF HOISTREPLACE UTP625 ROTOR SHAFT (NEW) 1REPLACE PCBRAKE SPRING 1REPLACE PCDISHED WASHER PACK

    PN;6167151

    REWIND UT2 SPEED MOTOR COIL 1 KANDAN ELECTRICAL SERVICE HOIST MOTOR BURN

    DEPERICARPER

    NUT POLISHING DRUM

    REPLACE PCSNL517SKF HOUSING 2 WELL ON ENGINEERING & TRADING REPLACE NEW POLISHING DRUMREPLACE PC22217EK SKF BEARING 2 WELL ON ENGINEERING & TRADING

    Printed On: 14/02/2017 2:11:35 PM Page: 5 of 5

    Chan Kok Leong ([email protected])File AttachmentMaintenanceRpt Jan 2017.pdf

  • PAGE 1

    HIGHLIGHTSEstimated percentage of FFB pushed by shovelPercentage FFB pushed due to grading

    PRODUCTION

    RAINFALL RECORD (mm) Year 2017

    Fin Year Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug SepLast FY 312.00 520.00 364.00 133.00 58.00 42.00 60.00 319.00 141.00 212.00 246.00 342.00This FY 432.00 514.00 299.00 256.00

    OTHER HIGHLIGHTS

    DESCRIPTION OF PROBLEMS / ACHIEVEMENTS

    Comments :

    than the estimate of 4.70%.The month rainfall recorded at 256mm.

    ITEM

    4.54

    Current Financial Year This Month

    4.57

    PROGRESS REPORT ON

    (4TH MONTH OF FINANCIAL YEAR)FOR THE MONTH OF JANUARY 2017

    KILANG KELAPA SAWIT BATU LINTANG

    Same Period Last YearTodate

    21.4321.1921.23 O.E.R %

    4.374.84 4.09 K.E.R %

    The month OER increased by 0.04% as compared to last month and KER increased by 0.75%Todate OER for FY 2016/17 is 0.57% lower than the estimate of 22.00 and todate KER is 0.33% lower

    TodateThis Month

    21.76

    Last Month

    21.42

  • PAGE 2

    1 PRODUCTION REPORT

    1.1. FFB STATEMENT

    1.1.1. FFB CONTRIBUTION

    Estimate for Estimate +/- Estimate +/- EstimateThis Month Todate This Month Todate This Month Todate

    KLK Estates MT MT MT MT MT MT1,951.580 7,913.760 2,872.000 11,903.000 -32.05% -33.51%

    450.980 1,987.070 - -790.720 2,709.630 1,307.000 5,778.000 -39.50% -53.10%640.640 2,388.530 - -691.800 2,857.660 - -430.690 1,634.990 1,677.000 7,386.000 -74.32% -77.86%758.270 3,159.060 - -399.180 1,570.810 - -

    2,413.740 10,456.610 3,651.000 15,314.000 -33.89% -31.72%- - - -- - - -

    758.530 1,110.900 836.000 4,116.000 -9.27% -73.01%- -- -- -- -- -

    Sub Total 9,286.130 35,789.020 10,343.000 44,497.000 -10.22% -19.57%

    Non-KLK Estates- -

    436.220 887.820 - -1,017.360 3,488.210 - -

    - -- -- -- -- -- -- -- -

    Sub Total 1,453.580 4,376.030 - - - -

    Outsiders- -- -- -- -- -- -- -- -- -- -- -- -

    Sub Total - - - - - -

    Grand Total 10,739.710 40,165.050 10,343.000 44,497.000 3.84% -9.74%

    Comment :

    Total FFB received for the month of January 2017 is 10739.710 mt which is 3.84% higher than the estimate

    Sungai PulauPelam

    Serapoh

    Batu LintangKedah BuntarGhim KhoonNagalelaiSubur

    Kuala Kangsar

    Genting Selama (Home)Genting Chong Meng

    due to receive crop from genting and Selinsing Estate.

    Norseman

    Senggang

  • PAGE 31.1.2. FFB COMPOSITION

    Composition of crop from various years of planting are :-

    MT % MT %1980 - - - - 1981 - - - - 1982 - - - - 1983 - - - - 1984 - - - - 1985 - - - - 1986 - - - - 1987 - - - - 1988 10.13 0.09 19.95 0.05 1989 - - - - 1990 87.05 0.81 289.14 0.72 1991 73.73 0.69 313.73 0.78 1992 72.43 0.67 189.68 0.47 1993 121.94 1.14 272.34 0.68 1994 414.41 3.86 1,076.49 2.68 1995 578.83 5.39 1,845.67 4.60 1996 230.76 2.15 885.61 2.20 1997 713.71 6.65 2,536.74 6.32 1998 1,130.20 10.52 4,253.45 10.59 1999 1,088.59 10.14 3,838.48 9.56 2000 710.17 6.61 2,897.53 7.21 2001 571.46 5.32 2,061.11 5.13 2002 574.47 5.35 1,908.66 4.75 2003 717.05 6.68 2,570.97 6.40 2004 814.58 7.58 3,391.97 8.45 2005 203.02 1.89 896.49 2.23 2006 273.30 2.54 1,122.66 2.80 2007 398.40 3.71 1,390.95 3.46 2008 493.98 4.60 2,025.94 5.04 2009 421.79 3.93 1,859.47 4.63 2010 457.07 4.26 2,239.38 5.58 2011 354.03 3.30 1,594.45 3.97 2012/13 228.61 2.13 684.19 1.70

    - - - - - - - - - - - - - -

    Total 10,739.710 100.00 40,165.05 100.00

    Append below the classification of Palms According to Age :-Category Palm Age (years) TM % TD %

    Immature 1st - 3rd 0% 0%Young 4th - 9th 16% 19%Prime 10th - 18th 50% 50%Old 19th and above 34% 31%Comments :

    coming from the year of 1998 & 1999.

    Year of Planting

    Remarks

    FFB composition vary from the year 1990 to 2012 with most of the crop

    This Month Todate

  • 1.1.3. FFB QUALITY

    CONTRIBUTING This Last This Last This Last This Last This Last This Last This Last This LastESTATES Month Month Month Month Month Month Month Month Month Month Month Month Month Month Month Month

    Total/Average 0 0

    1.1.4. % FFB ON FLOOR AND IN LOADING RAMP FOR GRADING

    FFB INTAKE (MT) % %- -

    Comments :

    PAGE 4

    No. of Grading % Black % Underripe % Long Stalk % Pest Damaged

    WEIGHT (MT)LOADING RAMP

    WEIGHT (MT)FFB GRADING

    10,739.710

    % Empty Bunch% Overnight % Rotten

    No grading is carried out by the mill.

    -

  • 1.1.5. LOOSE FRUIT & TRASH CONTENT

    This Last This Last This Last This LastNO ESTATES Month Month Month Month Month Month Month Month

    123456789

    101112

    Average 0 0

    NO Outsider Estate123

    Average 0 0

    1.1.6. LOOSE FRUITS TO FFB RATIO

    NO ESTATES1 Batu Lintang2 Pelam3 Kedah45678

    1.1.7. STONES & TRASH IN FFB

    NO ESTATES12345678

    Comments :

    Fruit in Load Loose Fruit (%) FFB %

    PAGE 4.1

    No. of Grading % Loose Trash Content in Trash Content in

    Last Month% to FFB

    This Month Last MonthTotal Tonnage

    This Month

    TrashTonnage (mt) % to FFBStones (kgs) per 100 tn FFB

    No Grading is carried out by the mill.

  • PAGE 5

    1.2. PRODUCTION QUALITY

    1.2.1. PRODUCTION OIL / DESPATCH OIL

    X S.D. X S.D. X S.D. X S.D.

    FFA %

    Moisture (VM) %

    Dirt %

    Peroxide Value %

    DOBI

    ANALYSIS RESULT BY (KDC/TQCC)

    TaikoSAMPLE Average StandardFFA 3.30 3.53 3.43 3.0 MaxVM 0.19 0.15 0.18 0.13 MaxDIRT 0.064 0.036 0.05 0.03 MaxPEROXIDE VALUE 0.06 0.70 0.49 0.60 MaxIODINE VALUE 51.80 51.90 51.83 50 - 54DOBI VALUE 2.83 2.73 2.81 3.0 MinCAROTENE 576.75 600 MinE233 (1% CORR.) 1.34 1.17 1.22 1.20 MaxE269 (1% CORR.) 0.24 0.28 0.26 0.20 MaxIRON 5.0 - 3.0PHOSPHORUS 8.0 - 5.0D.F. (Delta Y) 18.14 16.56 17.79 20.0 MinQUALITY RATING NIL

    Comments :

    3.51 0.27

    1.20

    0.01

    0.027

    0.190.041

    0.02

    0.011

    Specification

    < 5.0

    3rd Week 4th Week

    > 2.31

    0.018

    0.13

    This Month DESPATCH

    Last Month

    0.018

    0.12

    3.54

    0.011

    0.02

    3.370.19

    3.28 3.60

    51.802.75

    PRODUCTIONThis Month Last Month

    2.67 0.02

    1st Week

    0.170.0540.60

    Marketing

    1.180.26

    < 0.25

    2nd Week

    560.00

    0.60

    19.59

    623.00

    51.80

    The quality of production oil was satisfactory.

    541.00

    0.34

    0.02

    0.038

    0.113.40

    0.021

    0.11

    2.63 0.022.63 0.03

    0.26

    2.92

    The quality of despatched Oil within the Marketing specifications.

    0.11

    0.020

    2.68 0.02

    583.00

    16.87

  • PAGE 61.2.2. PRODUCTION / DESPATCH KERNEL

    MARKETINGX S.D. X S.D. X S.D. X S.D. SPECIFICATION

    5.40 0.23 5.32 0.33 5.64 0.09 5.13 0.15 6%4.98 1.41 4.65 0.41 4.62 0.11 4.69 0.15 7%0.20 0.03 0.20 0.03

    12.20 0.10 12.29 1.390.20 0.03 0.26 0.06 0.22 0.05 0.24 0.04

    1.2.3. CPO DESPATCHBUYER MILL BUYER'S + / -

    NET NET ON MILLWEIGHT WEIGHT NET WEIGHT

    tn tn tn1- 0.000 0.000 0.0002- 0.000 0.000 0.0003- 0.000 0.000 0.0004- 0.000 0.000 0.0005- 0.000 0.000 0.0006- 900.220 900.090 -0.1307- 268.570 269.330 0.7608- 828.210 829.580 1.3709- 0.000

    10- 0.000 1997.000 1999.000 2.000

    1.2.4. PK DESPATCHBUYER MILL

    NETWEIGHT

    tn1- 0.0002- 0.000 3- 4- 0.0005- 418.3706-7-

    Total : 418.370

    1.2.5. CXC REPORT

    Comments :

    Total number of CPO tankers dispatched (A+B+C)

    The kernel quality is within the Marketing Specification.

    46

    4656Total CPO tankers dispatched with no GPS installed (C)

    Month of Jan 17 - 100% of CPO-SG despatched from total despatch of 1999.000mt - 100% of PK SG despatched from total despatch of 418.370 mt

    The difference in weight for CPO despatch between the mill and the buyers was +2.000 mt

    FLEET PALM

    Total CPO tankers dispatched with active GPS (A) 56

    0

    Total CPO tankers dispatched with non-active GPS (B)

    No. of loads with the weight shortage of 80kg and above

    THIS MONTH

    3

    SINN HWAT HENG

    FELDA IFFCO SDN BHD (SG)

    LAST MONTH

    SANG KEE

    KL-KEPONG OLEOMAS

    CARGILL PALM (SG)

    UNITATA (SG)

    ISI SAWIT

    DIRT %FFA %TOTAL BROKEN KERNEL %STONE CONTENT %

    TAIKO BLEACHING

    KL-KEPONG OLEOMAS (ISCC)

    KL-KEPONG OLEOMAS (MB)UNITATA (SG)

    THIS MONTH

    MEWAH OIL - (SG)

    WILMAR (KLKC/00351-S)PALM-OLEO(KLANG)

    DESPATCHTHIS MONTH LAST MONTH

    PRODUCTIONLAST MONTH

    MOISTURE %

  • PAGE 6.1

    LOADS FROM MONTH: January 2017

    Ticket No Driver Vehicle Date Mill Buyer Loss (A) BuyerA100336 SUNTHARAJAN AJG1139 19-01-17 40.600 40.410 0.190 0.260A100595 ZULKIFLI BIN YUSOF PHT1444 24-01-17 29.840 29.740 0.100 0.050A100596 CHE HUSSAIN B.HARUNNAS448 24-01-17 35.530 35.440 0.090 0.010 0.000

    Total 0.380 0.320 0.000* Chargeable to transporters when (A) - (B) is above 80kg. Quantity chargeable is net after minus the limit of 80kg.

    Comments

    EXTRACTED FROM CXC REPORT

    Actual oil recovered (MT) at Mill

    (B)

    CPO Despatch Loads With Weight Shortage of 80kg and Above

    Charges to the

    transporters (MT) *

    The shortage is charged to the transporters.

    Tanker with GPS

    Weight Details (MT)

  • PAGE 6.2

    No. Tanker number Date Time Action Taken / RemarksNett Weight diff. with buyers (+/-) (MT)

    None of the tankers that doesn't follow the authorisedroute during delivery.

    Total 0.000

    GPS VIOLATION REPORT FOR KILANG KELAPA SAWIT BATU LINTANG ON January 2017On Exit the Zone Grid of Authorized Route during CPO delivery to Buyers Only

  • PAGE 71.3. COST OF PRODUCTION

    (Basis : Cost per tonne CPO)

    ThisMonth Todate Year ' s

    January 2017 4 mths EstimateRM / tn RM / tn RM / tn

    Indirect Cost 58.41 67.34 60.01

    Depreciation 14.67 15.55 11.31

    Manufacturing Cost 163.88 175.13 159.11

    Ex-Mill Cost 236.96 258.02 230.43

    Cooking Oil Cess 13.00 13.00 13.00

    Palm Oil Stabilisation Cess 0.00 0.00 0.00

    CPO (Sabah) Sales Tax

    Despatch & Selling 43.23 44.56 49.64

    TOTAL EXPENDITURE 293.19 315.58 293.07

    A/c This Month Estimate

    Code RM/ton CPO RM/ton CPO Diff. (%)2 15.64 13.92 12.4%3 12.54 7.13 75.9%

    14 5.00 3.68 35.9%19 5.11 3.90 31.0%41 4.00 2.65 50.9%42 41.15 37.82 8.8%43 37.47 23.06 62.5%48 2.50 1.65 51.5%

    55 13.28 10.17 30.6%

    Comments :

    Under estimate the additional executive salaryHigher cost due to 3 Indonesia Foreign Workers renewal work permit (RM2,520) and flight ticket for Suhin and Sri Anun( RM1,172) & vacation leave pay (Sultan Kedah & Chinese New Year)Purchase safety shoes of workers ( RM 4,085)Higher Ap wages and Ot levied by BLE

    Manufacturing cost was at RM 163.88/tonne oil against estimate of RM 159.11/tonne oil.

    Under estimate the supervisor salaries and overtimeHigher due to higher price bonusHigher due to higher price bonus

    Comments

    Higher expenditure due to purchased chemical for lab testing - (RM 3,003)

    Replaced s/steel digester perforated drainage plate (RM2,850) and labour charges to overhaul and reconditioning digester box (RM9,800)

  • PAGE 82 PROCESS PERFORMANCE

    2.1. STERILIZATION

    Summary of sterilisation cycle for the month is tabulated as follows :-

    Function X (min) S.D.Deaeration 21st. Peak (1.2 Bar / 17.4 psi) 101st. Peak exhaust 22nd. Peak (1.2 Bar / 17.4 psi) 62nd. Peak exhaust 23rd. Peak (1.2 Bar / 17.4 psi) 63rd. Peak exhaust 24th. Peak (2.9 Bar / 42 psi) 11Holding Time 45Final exhaust 5Steaming cycle 91 0Door Open to Door Shut Time 15

    X S.D. X S.D.USB after 1st Threshing (%)USB after 2nd Threshing (%) 1.37 0.02 1.38 0.02Threshing Efficiency (%)

    STERILIZER CONDENSATE

    This Month Last MonthX S.D. X S.D.

    0.90 0.09 0.91 0.08

    Condensate / FFB Ratio

    Absolute oil loss (kg/tn FFB)

    Comments :

    The percentage of USB is 1.37% .

    Last MonthThis Month

    Steriliser condensate (Oil Content in Wet Basis)

    OLWB in steriliser condensate at range of 1.00%.The condensate is recycled to system as press dilution.Sterilization using four peak sterilising.

  • PAGE 9.02.2. DIGESTING & PRESSING STATION

    2.2.1. DIGESTER TEMPERATURE OC

    This Month Last Month DIGESTER X S.D. X S.D. Digester No. 1 95.00 0.41 95.00 0.42 Digester No. 2 96.00 0.43 95.00 0.43 Digester No. 3 95.00 0.34 96.00 0.31 Digester No. 4 Digester No. 5 Digester No. 6 Digester No. 7 Digester No. 8 Digester No. 9

    2.2.2. PRESSING

    Press Press Press Press Press Press Press Press Press AverageNo. 1 No. 2 No. 3 No. 4 No. 5 No. 6 No. 7 No. 8 No. 9

    X 5.06 5.02 5.14 5.07S.D. 0.24 0.21 0.10 0.18

    X 5.17 5.12 5.23 5.17S.D. 0.18 0.18 0.13 0.16

    X 7.63 7.53 7.63 7.60S.D. 0.22 0.23 0.03 0.16

    X 7.63 7.58 7.71 7.64S.D. 0.17 0.19 0.14 0.17

    X 19.38 20.18 20.21 19.92S.D. 0.86 0.55 0.51 0.64

    X 19.35 19.53 19.47 19.45S.D. 1.20 1.93 0.84 1.32

    X 320.66 229.36 259.92 269.98S.D.

    X 221.27 332.47 123.23 225.66S.D.

    Comments :

    - Nut Breakage was recorded at 19.92% and will strive to control below 15%.- Digester temperature was >90 C

    - Average OLDB of Press Fibre was recorded at 7.60%

    OIL LOSS ON DRY BASIS (OLDB)

    NUT BREAKAGE (%)

    PRESS RUNNING HOURS

    This Month

    Last Month

    This Month

    Last Month

    OIL LOSS ON WET BASIS (OLWB)

    This Month

    Last Month

    This Month

    Last Month

  • PAGE 9.12.2.3.

    This Month

    Last Month

    This Month

    Last Month

    This Month

    Last Month

    This Month

    Last Month

    This Month

    Last Month

    This Month

    Last Month

    This Month

    Last Month

    This Month

    Last Month

    X 25.04 25.88 33.98 31.49 62.84 63.18 7.35 6.96 14.32 15.88 21.75 22.85 11.34 11.48S.D. 7.48 4.75 5.16 4.66 1.45 1.08 1.21 0.29 3.32 2.86 2.52 2.77 2.16 1.93N

    True Nut TrashTrue Mesocarp (ripe)

    True Mesocarp (unripe)

    Oil in Mesocarp OLWB Normal Parthenocarp

    Abnormal Partnenocarp

  • PAGE 9.2

    2.2.4. EFB PRESSING

    Press Press Press Press Super SuperNo. 1 No. 2 No. 3 No. 4 Press 1 Press 2

    PRESS RUNNING This Month HOURS Last Month DOWN TIME This Month

    Last Month

    2.2.5. OIL RECOVERED

    This Month F F A (%) DOBI

    VM (%)OLWB (%)

    Press 1 Press 2 Press 3 Press 4 Press 5 Press 6 Press 7 Press Fibre (OLDB) Ratio EFB Liquor to FFB (%)

    2.2.6. SPLITTER

    RUNNING HOURSThis Month Last Month

    No. 1 No. 2

    Comments : No EFB press installed in this mill.

    Last Month

  • PAGE 10

    2.3. CLARIFICATION STATION

    2.3.1. CLARIFICATION TANK

    This Month Last MonthTank 1 Tank 2 Tank 3 Tank 1 Tank 2 Tank 3

    X 95.00 95.00S.D 2.67 2.62

    % Oil in underflow X 5.49 5.42 (% OLWB) S.D 0.35 0.36

    2.3.2. SLUDGE SEPARATOR (S) / CENTRIFUGE (C)

    S1 S2 S3 C1 C2 C3 C4 C5 C6 C7 C8X 0.82 0.84 0.83

    S.D 0.09 0.09 0.09X 0.84 0.80 0.81

    S.D. 0.08 0.07 0.08T Mth X 325.48 233.09 222.06L Mth X 320.66 229.36 259.92T Mth X 1.60 1.60 1.60L Mth X 1.60 1.60 1.60T Mth X 2171.45 1555.07 1481.48L Mth X 1942.71 1389.57 1574.72T Mth X 1.68 1.22 1.15L Mth X 1.65 1.15 1.31

    Comments :

    Temperature OC

    This MonthLast

    Month

    % Oil loss on wet basis (x)

    Operating Hours (hrs)

    Nozzle size (mm)

    Separate Waste Basculator (mt)

    Oil losses on Absolute Terms (Kg/tn FFB)

    OLWB in underflow was recorded at 5.42%.Temperature of underflow was recorded at 95 C.

    Main Menu

  • PAGE 11

    2.3.2. DECANTER (D)

    Inlet

    D1 D2 D1 D2 D1 D2X

    S.DX

    S.D.X

    S.DX

    S.D.X

    S.DX

    S.D.T Mth XL Mth X

    Comments :

    Oil % (x)

    This MonthLast

    Month

    VM % (x)

    This MonthLast

    Month

    Heavy Phase

    This MonthLast

    Month

    This Month Solid Phase Light Phase

    Last Month

    No Decanters are installed in the mill.

    Temperature (oC)

    Operating Hours

    NOS % (x)

  • PAGE 12

    2.3.3. DILUTION RATE & ABSOLUTE OIL LOSS

    X S.D. X S.DDILUTION RATE % 26.00 26.00Separator Waste to FFB ratio 1.12Decanter cake to FFB ratioAbsolute Oil loss in Separator/Centrifuge kg/mt FFB 4.10 4.03Absolute Oil loss in Decanter Cake kg/mt FFBTotal Oil loss kg/MT FFB 4.10 0.00 4.03 0.00

    2.3.4. OIL LOSSES AFTER DEOILING TANK TO EFFLUENT

    DescriptionAfter Deoiling tank (OLWB)After Cooling pond

    Comments :

    No decanter cake is produced.

    This Month Last Month

    This Month Last Month

    Absolute oil loss in kg/mt FFB recorded at 4.10kg/FFB

    0.740.70

    0.760.69

    Oil losses after cooling pond recorded below 1%.

  • PAGE 13

    2.3.5. PURIFIER & VACUUM DRYER

    No: 1 No: 2 No: 1 No: 2 No: 3 No: 4 No: 5X

    S.DX

    S.D.X

    S.DX

    S.D.X

    S.DX

    S.D.X

    S.DX

    S.D.

    2.3.6. VACUUM DRYER

    X S.D X S.D X S.DThis Month 75.00 0.71 0.30 0.03 0.11 0.02 63.33Last Month 72.00 0.56 0.30 0.04 0.13 0.01 56.67This MonthLast MonthThis MonthLast Month

    Comments :

    Vacuum dryer efficiency was satisfactory.

    VM. Removal

    Eff.

    No: 1

    No: 2

    No: 3

    PURIFIER After PurifierBefore Purifier

    VACUUM DRYER Vacuum (-cm Hg) VM % After DryerVM % Before Dryer

    VM Rem. Eff

    This MonthLast

    Month

    Dirt Rem. Eff

    This MonthLast

    Month

    % VM

    This MonthLast

    Month

    % Dirt

    This MonthLast

    Month

  • 2.4. NUT & KERNEL STATION PAGE 13.1

    2.4.1. NUT SILO & KERNEL SILOS

    DESCRIPTION No: 1 No: 2 No: 3 No: 4X 19.19 19.01

    S.D 0.81 0.26X 19.26 19.14

    S.D. 0.78 0.02X 15.09 14.64

    S.D 1.16 0.61X 15.52 14.88

    S.D. 1.21 0.03X 21.37 22.99

    S.DX 19.42 22.26

    S.D.

    2.4.2. KERNEL SILO

    1 2 3 4 5 1 2 3 4 5Top

    Middle 40.00 40.00 49.00 46.00Bottom 60.00 66.00 61.00 64.00

    % VM Fresh Kernel X 20.33 20.22 20.00 20.55S.D 0.85 0.78 0.84 0.10X 5.34 5.50 5.28 5.47

    S.D 0.30 0.06 0.34 0.11% Drying Efficiency 73.73 72.80 73.60 73.38

    Comments :

    % VM Fresh Nut

    This MonthLast

    Month

    % Dried Nut

    This MonthLast

    Month

    % Dried Kernel

    Temperature oC

    This MonthLast

    Month

    Kernel drying efficiency was satisfactory.

    This Month Last Month

    % Drying Efficiency

  • 2.4.3. NUT CRACKING EFFICIENCY PAGE 13.2

    X SD X SD X SD X SD X SD X SD X SD X SD X SDWhole Nut (%) 83.21 2.23 83.84 3.51Broken Nut (%) 10.01 3.09 9.02 2.44Whole Kernel (%) 0.73 0.53 0.72 0.15Brokern Kernel (%) 0.32 0.26 0.75 0.36

    X SD X SD X SD X SD X SD X SD X SD X SD X SDWhole Kernel (%) 35.23 1.18 33.80 3.87Broken Kernel (%) 11.64 0.81 11.63 0.94Uncracked Nut (%) 0.40 0.17 0.38 0.08Half cracked Nut (%) 0.56 0.18 0.56 0.15

    X SD X SDRipple Mill No: 1 97.88 0.51 98.62 0.57Ripple Mill No: 2 97.84 0.38 98.57 0.20Ripple Mill No: 3Ripple Mill No: 4Ripple Mill No: 5Ripple Mill No: 6Ripple Mill No: 7Ripple Mill No: 8Ripple Mill No: 9

    Comments :

    Nut Composition before Cracker (INPUT)

    No: 4 No: 5 No: 6

    No: 8 No: 9No: 2 No: 3 No: 6 No: 7

    R I P P L E M I L L

    R I P P L E M I L L

    No: 1 No: 2 No: 3 No: 7 No: 8 No: 9

    No: 4 No: 5

    Nut Cracking Eff.

    Kernel Recovery Eff.

    Mixture Composition after Cracker

    No: 1

    Nut cracking eff. & kernel recovery eff. was satisfactory.

  • PAGE 142.4.4. KERNEL LOSSES / COST

    X SD X SD X SD X SD X SD X SD

    0.54 0.07 0.60 0.13

    1st Stage

    2nd Stage

    1st Stage

    2nd Stage

    1st Stage

    2nd Stage

    1st Stage

    2nd Stage

    1st Stage

    2nd Stage

    1st Stage

    2nd Stage

    0.84 0.08 0.83 0.11

    Claybath 0.69 0.14 0.73 0.13

    2.4.5. RUNNING COST

    Comments :

    0.233 0.245 0.246

    All kernel losses was within the in-house target.

    Cost / MT of PK (RM)

    Cost / MT of FFB (RM)

    4.805 5.980 5.624

    Other Cost e.g Sodium Silicate (RM)

    2439.500 9877.000

    Cyclone Fibre

    LTDSHydrocyclone (PK in wet shell)

    This Month

    Last MonthThis Month

    Kernel Produced (mt)Total Kaolin or Calcium Carbonate Cost (RM)

    520.116 407.948

    Last Month Todate

    1756.278

    2499.000

    Line 3Line 1 Line 2 Line 3 Line 1 Line 2

  • PAGE 152.5. BOILER / POWER HOUSE

    2.5.1. BOILER HOUSE

    Description This Month Last Month TodateBoiler Chemical Cost (RM) 1610.95 1495.05 6024.74 Cost / MT FFB (RM) 0.15 0.15 0.15

    2.5.2. POWER HOUSE

    DescriptionThis Month Last Month This Month Last Month This Month Last Month This Month Last Month This Month Last Month

    Turbines > Dresser RandNo. 1 (700 KW) 400.1 354.4 162400 136130 405.90 384.11No. 2 (400 KW)No. 3 (0 KW)No. 4 (0 KW)Diesel Gen Set > CumminsNo. 1 (300 KW) 8.9 72.1 564.0 10257.00 0.0 200.0 63.37 142.26 0.00 51.29No. 2 (640 KW)No. 3 (640 KW)KwHr / mt FFB (Turbine + Genset)

    2.5.3. TNB POWER SUPPLY

    KwHr RM KwHr RM KwHr RMPalm Oil Mill 31404.00 14382.59 48114.00 23106.18 44418.00 92088.18Rubber FactoryEcomat PlantTotal 31404.00 14382.59 48114.00 23106.18 44418.00 92088.18

    Comments :

    Operating Hours Total KwH Generated Kw KwHr / LitDiesel Consumption

    (Litres)

    Steam Consumption per KwHr (Turbine)

    Diesel genset warmed up to maintain its condition.TNB supply is used to start the mill operation by using change over switch.

    Last Month TodateThis Month

  • PAGE 16

    2.6. WATER TREATMENT PLANT

    2.6.1. WATER CONSUMPTION

    Description This Month Last Month This Month Last Month m3/mt FFBOwnEstate

    Mill 12280.00 11970.00 1.14 FCTOTAL 12280.00 11970.00 0.00 0.00 1.14

    2.6.2. WATER TREATMENT COST

    This Month Last Month TodateChemical Cost (RM) 2104.59 2495.37 9281.66Cost /m3 water (cts / m3) 0.17 0.21 0.18Cost /mt FFB (cts / mt FFB) 0.20 0.25 0.23Water Consumption (m3 / mt FFB) 1.14 1.20 1.26

    2.6.3. MONTHLY LICENCE COSTPUMPING RAW WATER FROM RIVER

    This Month Last Month TodateTotal Volume of water (m3) consumed 12280.00 11970.00 50560.00Total Cost (RM)

    Comments :

    Domestic

    Water consumed%

    Water treatment cost is 0.20cts/m3 of water.Belt press production : 2.40 mt/hrCost of cake Production : 8.70 Rm/mt of cake

  • PAGE 17

    2.7. General (Visitors / Security / Training Programme / Details of Breakdown, etc)

    2.7.1. Visitation

    Date01-01-17

    2.7.2. Training

    Date12-13/01/17

    2.7.3. Security

    Date

    2.7.4. OSH Matter

    Date

    2.7.5. RSPO Matter

    Date

    2.7.6. Amenities

    Date

    2.7.7. Water Supply

    Date

    2.7.8. EFB DISPOSAL

    2.7.9. DECANTER CAKE DISPOSAL

    Remarks

    RemarksMR.YEO ATTEND NIOSH BANGI AGTES REFRESHER

    RemarksPersonMPOB VISIT

    Remarks

    Remarks

    Remarks

    Remarks

    2,170.800 105.809 Balance b/f (mt) Production (mt) Collected (mt) Balance c/f (mt)

    21.270 2,255.339

    Balance b/f (mt) Production (mt) Collected (mt) Balance c/f (mt)

  • PAGE 17.1

    2.8.0. Effluent Treatment

    Date

    2.8.1 Mill Downtime

    Date Hours Date Hours12-01-17 3 3/4 First stage threshing drum plate broken25-01-17 330-01-17 4 1/2

    Total 11.25 0

    2.8.2 Housekeeping / Beautification / Linesite / Compound

    Date

    2.8.3. Others

    Date

    Comments

    Remarks

    Crane coupling worn outWire rope roller old line shaft broken

    Remarks

    Remarks

    Details DetailsLine 1 Line 2

  • PAGE 17.2

    2.8.4. Effluent Result For January 2017

    abcdefgh

    2.8.5 Trailing Report

    132

    Suspended Solids (mg / l)N/A

    533

    Ammonical Nitrogen (mg / l) N/A

    30

    4307Total Solids (mg / l)

    Oil & Grease (mg / l) N/AN/A

    653161

    COD (mg / l) N/ATotal Nitrogen (mg / l) N/A

    5000 MAX

    DOE LimitpH N/A

    TQCC Result871BOD (mg / l)

  • PAGE 183.0 MANPOWER

    3.1. EMPLOYEES

    MALAYS CHINESE INDIANS OTHERS TOTAL Executives 2 1 2 0 5 Subordinate Staff 5 0 13 0 18 TOTAL 7 1 15 0 23

    3.2. SUBORDINATE STAFF LEAVE STATUS

    Leave Leave Leave B/F from Earned Todate TakenYear '16 for Year '17 (A+B) This Bal

    No. Position (Days)-A (Days)-B Total Month (A+B-C)1 C/CLERK 17 2 19 3 3 162 2ND CLERK 8 2 10 1 1 93 CHARGEMAN 1 2 3 1 1 24 SUPERVISOR 4 2 6 1 1 55 SUPERVISOR 9 4 13 2 13 06 E/DRIVER 0 2 2 0 0 27 BOILERMAN -9 1 -8 0 0 -88 BOILERMAN 15 2 17 4 4 139 LAB OPER -10 2 -8 2 2 -1010 MECHANIC 15 2 17 2 2 1511 MECHANIC 13 2 15 0 0 1512 MECHANIC 8 18 26 11 26 01314 FOREMAN 15 2 17 2 2 1515 E/DRIVER 1 2 3 1 1 216 MECHANIC 2 1 3 0 0 317 S/KEEPER 15 2 17 3 3 1418 W/B OPER -3 1 -2 0 0 -219 BOILERMAN 0 1 1 0 0 120 SUPERVISOR 7 2 9 0 0 92122232425262728

    Comments :

    NAME

    SAMSUDDIN BIN ISHAK

    G. KRISHNASAMY

    SARAVANANGV. THANARASUMANJULA A/P PERUMALUMOHD KHAIRIL ABDULLAHS. JAMESON

    Leave Taken Todate

    (C)ALIZA BINTI MAT ISA

    G.LOGANATHANA.PUGALENTHY

    S.SUBRAMANIAM

    MAHD HANIFFAH

    A.MOHANATHASSYED MOHAMAD ADNAN

    P.SANKARANAVR.MOGANAKRISHNANR.RAJOOS.MUNIANDYR.BALAN

  • PAGE 18.13.3 EMPLOYEE (MILL WORKERS)

    (A) CHECKROLL

    (1) MALAYSIAN Male Female Sub Total Male Female Sub Total Bumiputera 21 3 24 - 24 Chinese - - - - Indian 25 3 28 - 28 Grand Total 46 6 52 - - - 52

    (2) NON-MALAYSIAN Sri Lanka - - - India 8 - 8 - 8 Indonesia 10 - 10 - 10 Bangladeshi - - - Thai - - - Filipino - - - Grand Total 18 - 18 - - - 18 Total Checkroll 64 6 70 - - - 70

    (B) CONTRACT / TEMPORARY

    (1) MALAYSIAN Male Female Sub Total Male Female Sub Total Bumiputera 2 - 2 - 2 Chinese - - - Indian 1 1 - 1 Grand Total 3 - 3 - - - 3

    Employees Dependants (Resident)Total

    Employees Dependants (Resident)Total

  • PAGE 19Appendix 1

    Unit This Month Last Month Todate1.0 FFB

    1.1.1 Weight of FFB processed MT 10,739.710 9,967.040 40,165.050 1.1.2 Estimate MT 10,343.000 10,421.000 44,497.000 1.1.3 Shift Hours Hrs -

    2.0 OIL MANUFACTURE2.1.1 Weight of Oil Produced MT 2,280.154 2,111.933 8,607.472 2.1.2 Estimate MT 2,275.000 2,293.000 9,790.000 2.1.3 Oil Extraction Rate % 21.23 21.19 21.43 2.1.4 Estimate % 22.00 22.00 22.00 2.1.5 Press Running Hours Hrs. 749.24 676.97 2,723.54 2.1.6 Production Hours Hrs. 432.25 402.25 1,620.00 2.1.7 Downtime (Line 1) Hrs. 11.25 7.50 28.75 2.1.8 Downtime (Line 2) Hrs. - 2.1.9 Press Capacity per unit MT / hr 14.33 14.72 14.75 2.2.0 F.F.B. Manufactured / Hours MT / hr 24.85 24.78 24.79 2.2.1 Oil Recovered / Hours MT / hr 5.28 5.25 21.27

    3.0 KERNEL MANUFACTURE3.1.1 Weight of kernel Produced MT 520.116 407.948 1,756.278 3.1.2 Estimate MT 486.000 490.000 2,091.000 3.1.3 Kernel Extraction Rate % 4.84 4.09 4.37

    ;3.1.4 Estimate % 4.70 4.70 4.70 3.1.5 Production Hours Hrs. 432.25 402.25 1,620.00 3.1.6 Kernel Recovered / Hr MT / hr 1.20 1.01 1.08

    4.0 DESPATCH AND STOCK4.1.1 Oil Despatched MT 1,999.000 1,675.380 7,944.320 4.1.2 Oil in Stock MT 1,039.481 758.327 2,570.195 4.1.3 Kernels Despatched MT 418.370 419.630 1,629.220 4.1.4 Kernels in stock MT 217.484 115.738 582.621

    - Packed / Bulk Silo MT 217.484 115.738 582.621 - Kernel in Bag MT -

    Remarks :

    PROGRESS REPORT FOR THE MONTHOF JANUARY 2017

  • PAGE 20

    MAJOR MAINTENANCE REPORT FOR THE MONTH OF JANUARY 2017

    (1) RECEPTION STATION / (2) LOADING PUMP / (3) STERILISER STATION(4) HOISTING / TIPPER AND THRESHING STATION

  • PAGE 21

    MAJOR MAINTENANCE REPORT FOR THE MONTH OF JANUARY 2017

    (5) PRESS AND DIGESTER STATION / (6) EFB PRESSING STATION / (7) KERNEL PLANT STATION(8) CLARIFICATION STATION

  • PAGE 22

    MAJOR MAINTENANCE REPORT FOR THE MONTH OF JANUARY 2017

    (9) RAW WATER HOUSE AND WATER TREATMENT PLANT STATION / (10) POWER STATION / (11) BOILER STATION(12) EFFLUENT STATION

  • PAGE 23

    MAJOR MAINTENANCE REPORT FOR THE MONTH OF JANUARY 2017

    (13) MILL BUILDING UPKEEP / (14) VEHICLE / (15) WORKSHOP / (16) GENERAL

    CoverPageHighlightsProductionReportFFBCompositionFFBQualityLF_TrashContentProductionQualityProdDesKernelCPODesGPSRepCOPProcPerfDigPressStationDigPressStation2EFBPressingClarificationStationDecanterDilutionPurifierNutKernelStationNutCrackingEffKernelLossesBoilerPowerHouseWaterTreatmentGeneralGeneral2General3ManPowerEmployeeAppendix1MajorMaintRep1MajorMaintRep2MajorMaintRep3MajorMaintRep4

    Main

    KKS Progress Report version 1.44 for January 2017

    Please select your desire section by a mouse click

    Section ASection B

    Print

    3

    Save

    Information for the Progress Report

    Co NameKUALA LUMPUR KEPONG BERHAD

    Co Reg No.15043-VSetup

    OC Code024

    OC NameKILANG KELAPA SAWIT BATU LINTANG

    Co Start of Fin Mth10

    Current Year2017Reset

    Current Month1January

    Current Month, YrJanuary 2017

    Current Fin Mth #4th

    Current Fin Mth4th

    Current Fin Yr2017

    Current Period2016/17

    Asst/Manager NameYEO BOON KEATTitleManager

    Wt Shortage Limit80Kg

    By: Chan Kok LeongInstalled to:C:\eProgressRep\version 1.44

    Sys last updated:25-Oct-2013Set:16-Jun-2015

    Title ListYearMonthYesNo

    Assistant20111No

    Senior Assistant20122Yes

    Acting Manager20133

    Manager20144

    Senior Manager20155

    20166

    20177

    20188

    20199

    202010

    202111

    202212

    Brief Instructions1. Change the Current Year / Month2. Click to get to desire Worksheet Page3. Enter the necessary data - Use Tab key to move to different fields4. Click Save icon to save your work5. Click Print to preview print out

    Notes:1. Click Setup to change system defaults2. Click Reset for default zoom or A4 size

    ++ means click tab for more pages

    11. Process Performance

    1. Highlights

    2. Production Report

    4. FFB Quality

    5. LF and Trash Content

    6. Production Quality

    7. Production and Despatch Kernel

    8. CPO Despatch Loads with wt shortage

    9. GPS Violation Report

    10. Cost of Production

    12. Digesting & Pressing Station ++

    13. EFB Pressing

    1. Clarification Station

    2. Decanter

    3. Dilution Rate & Absolute Oil Loss

    4. Purifier & Vacuum Dryer

    5. Nut & Kernel Station

    6. Nut Cracking Efficiency

    7. Kernel Losses / Cost

    8. Boiler / Power House

    9. Water Treatment Plant

    10. General (Visitors/Security/Breakdown, etc.) ++

    11. Man Power

    12. Appendix 1

    3. FFB Composition

    13. Major Maintenance Report ++

    CoverPage

    KILANG KELAPA SAWIT BATU LINTANG

    Progress Report

    For the month of

    JANUARY 2017

    Date2/16/17KUALA LUMPUR KEPONG BERHAD

    (No. Syarikat: 15043-V)

    KILANG KELAPA SAWIT BATU LINTANG

    .

    (YEO BOON KEAT)

    Manager

    Highlights

    PROGRESS REPORT ONPAGE 1

    KILANG KELAPA SAWIT BATU LINTANG

    FOR THE MONTH OF JANUARY 2017

    (4TH MONTH OF FINANCIAL YEAR)

    HIGHLIGHTS

    Estimated percentage of FFB pushed by shovel

    Percentage FFB pushed due to grading

    PRODUCTION

    Current Financial YearSame Period Last Year

    This MonthLast MonthTodateThis MonthTodate

    O.E.R %21.2321.1921.4321.7621.42

    K.E.R %4.844.094.374.574.54

    RAINFALL RECORD (mm)Year2017

    Fin YearOctNovDecJanFebMarAprMayJunJulAugSep

    Last FY312.00520.00364.00133.0058.0042.0060.00319.00141.00212.00246.00342.00

    This FY432.00514.00299.00256.00

    OTHER HIGHLIGHTS

    ITEMDESCRIPTION OF PROBLEMS / ACHIEVEMENTS

    Comments :

    The month OER increased by 0.04% as compared to last month and KER increased by 0.75%

    Todate OER for FY 2016/17 is 0.57% lower than the estimate of 22.00 and todate KER is 0.33% lower

    than the estimate of 4.70%.

    The month rainfall recorded at 256mm.

    Main Menu

    ProductionReport

    PAGE 2

    1PRODUCTION REPORT

    1.1.FFB STATEMENT

    1.1.1.FFB CONTRIBUTION

    Estimate forEstimate+/- Estimate+/- Estimate

    This MonthTodateThis MonthTodateThis MonthTodate

    KLK EstatesMTMTMTMTMTMT

    Batu Lintang1,951.5807,913.7602,872.00011,903.000-32.05%-33.51%

    Kedah450.9801,987.070

    Buntar790.7202,709.6301,307.0005,778.000-39.50%-53.10%

    Ghim Khoon640.6402,388.530--

    Nagalelai691.8002,857.660--

    Subur430.6901,634.9901,677.0007,386.000-74.32%-77.86%

    Norseman758.2703,159.060--

    Sungai Pulau399.1801,570.810--

    Pelam2,413.74010,456.6103,651.00015,314.000-33.89%-31.72%

    Senggang- 0- 0--

    Serapoh- 0- 0--

    Kuala Kangsar758.5301,110.900836.0004,116.000-9.27%-73.01%

    --

    --

    --

    --

    --

    Sub Total9,286.13035,789.02010,343.00044,497.000-10.22%-19.57%

    Non-KLK Estates

    --

    Genting Chong Meng436.220887.820

    Genting Selama (Home)1,017.3603,488.210--

    --

    --

    --

    --

    --

    --

    --

    --

    Sub Total1,453.5804,376.030- 0- 0--

    Outsiders

    --

    --

    --

    --

    --

    --

    --

    --

    --

    --

    Sub Total- 0- 0- 0- 0--

    Grand Total10,739.71040,165.05010,343.00044,497.0003.84%-9.74%

    Comment :

    Total FFB received for the month of January 2017 is 10739.710 mt which is 3.84% higher than the estimate

    due to receive crop from genting and Selinsing Estate.

    Main Menu

    FFBComposition

    PAGE 3

    1.1.2.FFB COMPOSITION

    Composition of crop from various years of planting are :-

    Year of PlantingThis MonthTodate

    MT%MT%Palm Age1st-3rd4th-9th10th-18th19th&above

    1980- 0- 0- 0- 03701726.875351.043661.8

    1981- 0- 0- 0- 03607719.2420078.8212366.99

    1982- 0- 0- 0- 035

    1983- 0- 0- 0- 034

    1984- 0- 0- 0- 033

    1985- 0- 0- 0- 032

    1986- 0- 0- 0- 031

    1987- 0- 0- 0- 030

    198810.130.0919.950.0529

    1989- 0- 0- 0- 028

    199087.050.81289.140.7227

    199173.730.69313.730.7826

    199272.430.67189.680.4725

    1993121.941.14272.340.6824

    1994414.413.861,076.492.6823

    1995578.835.391,845.674.6022

    1996230.762.15885.612.2021

    1997713.716.652,536.746.3220

    19981,130.2010.524,253.4510.5919

    19991,088.5910.143,838.489.5618

    2000710.176.612,897.537.2117

    2001571.465.322,061.115.1316

    2002574.475.351,908.664.7515

    2003717.056.682,570.976.4014

    2004814.587.583,391.978.4513

    2005203.021.89896.492.2312

    2006273.302.541,122.662.8011

    2007398.403.711,390.953.4610

    2008493.984.602,025.945.049

    2009421.793.931,859.474.638

    2010457.074.262,239.385.587

    2011354.033.301,594.453.976

    2012/13228.612.13684.191.7099

    - 0- 00

    - 0- 00

    - 0- 00

    - 0- 00

    - 0- 00

    - 0- 00

    - 0- 00

    Total10,739.710100.0040,165.05100.00

    Append below the classification of Palms According to Age :-

    CategoryPalm Age (years)TM %RemarksTD %

    Immature1st - 3rd0%0%

    Young4th - 9th16%19%

    Prime10th - 18th50%50%

    Old19th and above34%31%

    Comments :

    FFB composition vary from the year 1990 to 2012 with most of the crop

    coming from the year of 1998 & 1999.

    Main Menu

    FFBQuality

    PAGE 4

    1.1.3.FFB QUALITY

    No. of Grading% Black% Underripe% Overnight% Rotten% Long Stalk% Pest Damaged% Empty Bunch

    CONTRIBUTINGThisLastThisLastThisLastThisLastThisLastThisLastThisLastThisLast

    ESTATESMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonth

    Total/Average00- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0

    1.1.4.% FFB ON FLOOR AND IN LOADING RAMP FOR GRADING

    LOADING RAMPFFB GRADING

    FFB INTAKE (MT)WEIGHT (MT)%WEIGHT (MT)%

    10,739.710- 0- 0- 0

    Comments :

    No grading is carried out by the mill.

    Main Menu

    LF_TrashContent

    PAGE 4.1

    1.1.5.LOOSE FRUIT & TRASH CONTENT

    No. of Grading% LooseTrash Content inTrash Content in

    Fruit in LoadLoose Fruit (%)FFB %

    ThisLastThisLastThisLastThisLast

    NOESTATESMonthMonthMonthMonthMonthMonthMonthMonth

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    Average00- 0- 0- 0- 0- 0- 0

    NOOutsider Estate

    1

    2

    3

    Average00- 0- 0- 0- 0- 0- 0

    1.1.6.LOOSE FRUITS TO FFB RATIO

    Total Tonnage% to FFB

    NOESTATESThis MonthLast MonthThis MonthLast Month

    1Batu Lintang

    2Pelam

    3Kedah

    4

    5

    6

    7

    8

    1.1.7.STONES & TRASH IN FFB

    Trash

    NOESTATESStones (kgs) per 100 tn FFBTonnage (mt)% to FFB

    1

    2

    3

    4

    5

    6

    7

    8

    Comments :

    No Grading is carried out by the mill.

    Main Menu

    ProductionQuality

    PAGE 5

    1.2.PRODUCTION QUALITY

    1.2.1.PRODUCTION OIL / DESPATCH OIL

    PRODUCTIONDESPATCHMarketing

    This MonthLast MonthThis MonthLast MonthSpecification

    XS.D.XS.D.XS.D.XS.D.

    3.510.343.400.273.540.193.370.11

    FFA %< 5.0

    0.110.020.110.010.120.020.130.02< 0.25

    Moisture (VM) %

    0.0200.0380.0210.0270.0180.0110.0180.011

    Dirt %

    Peroxide Value %

    2.680.022.670.022.630.032.630.02

    DOBI> 2.31

    ANALYSIS RESULT BY (KDC/TQCC)

    1st Week2nd Week3rd Week4th WeekTaiko

    SAMPLEAverageStandard

    FFA3.283.603.303.533.433.0 Max

    VM0.170.190.190.150.180.13 Max

    DIRT0.0540.0410.0640.0360.050.03 Max

    PEROXIDE VALUE0.600.600.060.700.490.60 Max

    IODINE VALUE51.8051.8051.8051.9051.8350 - 54

    DOBI VALUE2.752.922.832.732.813.0 Min

    CAROTENE560.00623.00541.00583.00576.75600 Min

    E233 (1% CORR.)1.181.201.341.171.221.20 Max

    E269 (1% CORR.)0.260.260.240.280.260.20 Max

    IRON0.005.0 - 3.0

    PHOSPHORUS0.008.0 - 5.0

    D.F. (Delta Y)16.8719.5918.1416.5617.7920.0 Min

    QUALITY RATING0.00NIL

    Comments :

    The quality of despatched Oil within the Marketing specifications.

    The quality of production oil was satisfactory.

    Main Menu

    ProdDesKernel

    PAGE 6

    1.2.2.PRODUCTION / DESPATCH KERNEL

    PRODUCTIONDESPATCH

    THIS MONTHLAST MONTHTHIS MONTHLAST MONTHMARKETING

    XS.D.XS.D.XS.D.XS.D.SPECIFICATION

    MOISTURE %5.400.235.320.335.640.095.130.156%

    DIRT %4.981.414.650.414.620.114.690.157%

    FFA %0.200.030.200.03

    TOTAL BROKEN KERNEL %12.200.1012.291.39

    STONE CONTENT %0.200.030.260.060.220.050.240.04

    1.2.3.CPO DESPATCH

    BUYERMILLBUYER'S+ / -

    NETNETON MILL

    WEIGHTWEIGHTNET WEIGHT

    tntntn

    1-WILMAR (KLKC/00351-S)0.0000.0000.000

    2-PALM-OLEO(KLANG)0.0000.0000.000

    3-MEWAH OIL - (SG)0.0000.0000.000

    4-TAIKO BLEACHING0.0000.0000.000

    5-KL-KEPONG OLEOMAS (MB)0.0000.0000.000

    6-UNITATA (SG)900.220900.090-0.130

    7-FELDA IFFCO SDN BHD (SG)268.570269.3300.760

    8-CARGILL PALM (SG)828.210829.5801.370

    9-KL-KEPONG OLEOMAS (ISCC)0.000

    10-KL-KEPONG OLEOMAS0.000

    1997.0001999.0002.000

    1.2.4.PK DESPATCH

    BUYERMILL

    NET

    WEIGHT

    tn

    1-SANG KEE0.000

    2-SINN HWAT HENG0.000

    3-ISI SAWIT

    4-FLEET PALM0.000

    5-UNITATA (SG)418.370

    6-

    7-

    Total :418.370

    1.2.5.CXC REPORT

    THIS MONTHLAST MONTH

    Total CPO tankers dispatched with active GPS (A)5646

    Total CPO tankers dispatched with non-active GPS (B)

    Total CPO tankers dispatched with no GPS installed (C)

    Total number of CPO tankers dispatched (A+B+C)5646

    No. of loads with the weight shortage of 80kg and above30

    Comments :

    The kernel quality is within the Marketing Specification.

    The difference in weight for CPO despatch between the mill and the buyers was +2.000 mt

    Month of Jan 17 - 100% of CPO-SG despatched from total despatch of 1999.000mt

    - 100% of PK SG despatched from total despatch of 418.370 mt

    Main Menu

    CPODes

    PAGE 6.1

    EXTRACTED FROM CXC REPORT

    CPO Despatch Loads With Weight Shortage of 80kg and Above

    LOADS FROM MONTH: January 2017

    Weight Details (MT)Actual oil recovered (MT) at Mill (B)Charges to the transporters (MT) *Tanker with GPS

    Ticket NoDriverVehicleDateMillBuyerLoss (A)Buyer

    A100336SUNTHARAJANAJG11391/19/1740.60040.4100.1900.2600.000

    A100595ZULKIFLI BIN YUSOFPHT14441/24/1729.84029.7400.1000.0500.000

    A100596CHE HUSSAIN B.HARUNNAS4481/24/1735.53035.4400.0900.0100.000

    0.0000.000

    0.0000.000

    0.0000.000

    0.0000.000

    0.0000.000

    0.0000.000

    0.0000.000

    0.0000.000

    0.0000.000

    0.0000.000

    0.0000.000

    0.0000.000

    Total0.3800.3200.000

    * Chargeable to transporters when (A) - (B) is above 80kg. Quantity chargeable is net after minus the limit of 80kg.

    Comments

    The shortage is charged to the transporters.

    Main Menu

    GPSRep

    PAGE 6.2

    GPS VIOLATION REPORT FOR KILANG KELAPA SAWIT BATU LINTANG ON January 2017

    On Exit the Zone Grid of Authorized Route during CPO delivery to Buyers Only

    No.Tanker numberDateTimeAction Taken / RemarksNett Weight diff. with buyers (+/-) (MT)

    None of the tankers that doesn't follow the authorised

    route during delivery.

    Total0.000

    Main Menu

    COP

    PAGE 7

    1.3.COST OF PRODUCTION

    (Basis : Cost per tonne CPO)

    This

    MonthTodateYear ' s

    January 20174 mthsEstimate

    RM / tnRM / tnRM / tn

    Indirect Cost58.4167.3460.01

    Depreciation14.6715.5511.31

    Manufacturing Cost163.88175.13159.11

    Ex-Mill Cost236.96258.02230.43

    Cooking Oil Cess13.0013.0013.00

    Palm Oil Stabilisation Cess0.000.000.00

    CPO (Sabah) Sales Tax

    Despatch & Selling43.2344.5649.64

    TOTAL EXPENDITURE293.19315.58293.07

    A/cThis MonthEstimateComments

    CodeRM/ton CPORM/ton CPODiff. (%)

    215.6413.9212.4%Under estimate the additional executive salary

    312.547.1375.9%Higher cost due to 3 Indonesia Foreign Workers renewal work permit (RM2,520) and flight ticket for Suhin and Sri Anun( RM1,172) & vacation leave pay (Sultan Kedah & Chinese New Year)

    145.003.6835.9%Purchase safety shoes of workers ( RM 4,085)

    195.113.9031.0%Higher Ap wages and Ot levied by BLE

    414.002.6550.9%Under estimate the supervisor salaries and overtime

    4241.1537.828.8%Higher due to higher price bonus

    4337.4723.0662.5%Higher due to higher price bonus

    482.501.6551.5%Higher expenditure due to purchased chemical for lab testing - (RM 3,003)

    0.0%

    0.0%

    5513.2810.1730.6%Replaced s/steel digester perforated drainage plate (RM2,850) and labour charges to overhaul and reconditioning digester box (RM9,800)

    0.0%

    0.0%

    0.0%

    0.0%

    0.0%

    0.0%

    0.0%

    Comments :

    Manufacturing cost was at RM 163.88/tonne oil against estimate of RM 159.11/tonne oil.

    Main Menu

    ProcPerf

    PAGE 8

    2PROCESS PERFORMANCE

    2.1.STERILIZATION

    Summary of sterilisation cycle for the month is tabulated as follows :-

    FunctionX (min)S.D.

    Deaeration2BarPsi

    1st. Peak(1.2 Bar / 17.4 psi)101.217.4

    1st. Peak exhaust2

    2nd. Peak(1.2 Bar / 17.4 psi)61.217.4

    2nd. Peak exhaust2

    3rd. Peak(1.2 Bar / 17.4 psi)61.217.4

    3rd. Peak exhaust2

    4th. Peak(2.9 Bar / 42 psi)112.942

    Holding Time45

    Final exhaust5

    Steaming cycle910

    Door Open to Door Shut Time15

    This MonthLast Month

    XS.D.XS.D.

    USB after 1st Threshing (%)

    USB after 2nd Threshing (%)1.370.021.380.02

    Threshing Efficiency (%)

    STERILIZER CONDENSATE

    This MonthLast Month

    XS.D.XS.D.

    Steriliser condensate (Oil Content in Wet Basis)0.900.090.910.08

    Condensate / FFB Ratio

    Absolute oil loss (kg/tn FFB)

    Comments :

    The percentage of USB is 1.37% .

    OLWB in steriliser condensate at range of 1.00%.

    The condensate is recycled to system as press dilution.

    Sterilization using four peak sterilising.

    Main Menu

    DigPressStation

    PAGE 9.0

    2.2.DIGESTING & PRESSING STATION

    2.2.1.DIGESTER TEMPERATURE OC

    ThisMonthLastMonth

    DIGESTERXS.D.XS.D.

    Digester No. 195.000.4195.000.42

    Digester No. 296.000.4395.000.43

    Digester No. 395.000.3496.000.31

    Digester No. 4

    Digester No. 5

    Digester No. 6

    Digester No. 7

    Digester No. 8

    Digester No. 9

    2.2.2.PRESSING

    PressPressPressPressPressPressPressPressPressAverage

    No. 1No. 2No. 3No. 4No. 5No. 6No. 7No. 8No. 9

    OIL LOSS ON WET BASIS (OLWB)This MonthX5.065.025.145.07

    S.D.0.240.210.100.18

    Last MonthX5.175.125.235.17

    S.D.0.180.180.130.16

    OIL LOSS ON DRY BASIS (OLDB)This MonthX7.637.537.637.60

    S.D.0.220.230.030.16

    Last MonthX7.637.587.717.64

    S.D.0.170.190.140.17

    NUT BREAKAGE (%)This MonthX19.3820.1820.2119.92

    S.D.0.860.550.510.64

    Last MonthX19.3519.5319.4719.45

    S.D.1.201.930.841.32

    PRESS RUNNING HOURSThis MonthX320.66229.36259.92269.98

    S.D.0.00

    Last MonthX221.27332.47123.23225.66

    S.D.0.00

    Comments :

    - Digester temperature was >90 C

    - Nut Breakage was recorded at 19.92% and will strive to control below 15%.

    - Average OLDB of Press Fibre was recorded at 7.60%

    Main Menu

    DigPressStation2

    PAGE 9.1

    2.2.3.

    True Mesocarp (ripe)True Mesocarp (unripe)Oil in MesocarpOLWBNormal ParthenocarpAbnormal PartnenocarpTrue NutTrash

    This MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast Month

    X25.0425.8833.9831.4962.8463.187.356.9614.3215.8821.7522.8511.3411.48

    S.D.7.484.755.164.661.451.081.210.293.322.862.522.772.161.93

    N

    Main Menu

    EFBPressing

    PAGE 9.2

    2.2.4.EFB PRESSING

    PressPressPressPressSuperSuper

    No. 1No. 2No. 3No. 4Press 1Press 2

    PRESS RUNNINGThis Month

    HOURSLast Month

    DOWN TIMEThis Month

    Last Month

    2.2.5.

    OIL RECOVERED

    This MonthLast Month

    F F A(%)

    DOBI

    VM(%)

    OLWB(%)

    Press 1Press 2Press 3Press 4Press 5Press 6Press 7

    Press Fibre (OLDB)

    Ratio EFB Liquor to FFB (%)

    2.2.6.SPLITTER

    Running HoursRUNNING HOURS

    This MonthLast Month

    No. 1

    No. 2

    Comments :

    No EFB press installed in this mill.

    Main Menu

    ClarificationStation

    PAGE 10

    2.3.CLARIFICATION STATION

    2.3.1.CLARIFICATION TANK

    This MonthLast Month

    Tank 1Tank 2Tank 3Tank 1Tank 2Tank 3

    Temperature OCX95.0095.00

    S.D2.672.62

    % Oil in underflowX5.495.42

    (% OLWB)S.D0.350.36

    2.3.2.SLUDGE SEPARATOR (S) / CENTRIFUGE (C)

    S1S2S3C1C2C3C4C5C6C7C8

    % Oil loss on wet basis (x)This MonthX0.820.840.83

    S.D0.090.090.09

    Last MonthX0.840.800.81

    S.D.0.080.070.08

    Operating Hours (hrs)T MthX325.48233.09222.06

    L MthX320.66229.36259.92

    Nozzle size (mm)T MthX1.601.601.60

    L MthX1.601.601.60

    Separate Waste Basculator (mt)T MthX2171.451555.071481.48

    L MthX1942.711389.571574.72

    Oil losses on Absolute Terms (Kg/tn FFB)T MthX1.681.221.15

    L MthX1.651.151.31

    Comments :

    OLWB in underflow was recorded at 5.42%.

    Temperature of underflow was recorded at 95 C.

    Main Menu

    Decanter

    PAGE 11

    2.3.2.DECANTER (D)

    InletSolid PhaseLight PhaseHeavy Phase

    Temperature (oC)This Month

    Last MonthD1D2D1D2D1D2

    Oil % (x)This MonthX

    S.D

    Last MonthX

    S.D.

    VM % (x)This MonthX

    S.D

    Last MonthX

    S.D.

    NOS % (x)This MonthX

    S.D

    Last MonthX

    S.D.

    Operating HoursT MthX

    L MthX

    Comments :

    No Decanters are installed in the mill.

    Main Menu

    Dilution

    PAGE 12

    2.3.3.DILUTION RATE & ABSOLUTE OIL LOSS

    This MonthLast Month

    XS.D.XS.D

    DILUTION RATE %26.0026.00

    Separator Waste to FFB ratio1.12

    Decanter cake to FFB ratio

    Absolute Oil loss in Separator/Centrifuge kg/mt FFB4.104.03

    Absolute Oil loss in Decanter Cake kg/mt FFB

    Total Oil loss kg/MT FFB4.100.004.030.00

    2.3.4.OIL LOSSES AFTER DEOILING TANK TO EFFLUENT

    DescriptionThis MonthLast Month

    After Deoiling tank (OLWB)0.740.76

    After Cooling pond0.700.69

    Comments :

    Absolute oil loss in kg/mt FFB recorded at 4.10kg/FFB

    No decanter cake is produced.

    Oil losses after cooling pond recorded below 1%.

    Main Menu

    Purifier

    PAGE 13

    2.3.5.PURIFIER & VACUUM DRYER

    PURIFIERBefore PurifierAfter Purifier

    No: 1No: 2No: 1No: 2No: 3No: 4No: 5

    % VMThis MonthX

    S.D

    Last MonthX

    S.D.

    % DirtThis MonthX

    S.D

    Last MonthX

    S.D.

    VM Rem. EffThis MonthX

    S.D

    Last MonthX

    S.D.

    Dirt Rem. EffThis MonthX

    S.D

    Last MonthX

    S.D.

    2.3.6.VACUUM DRYER

    VACUUM DRYERVacuum (-cm Hg)VM % Before DryerVM % After DryerVM. Removal Eff.

    XS.DXS.DXS.D

    No: 1This Month75.000.710.300.030.110.0263.33

    Last Month72.000.560.300.040.130.0156.67

    No: 2This Month

    Last Month

    No: 3This Month

    Last Month

    Comments :

    Vacuum dryer efficiency was satisfactory.

    Main Menu

    NutKernelStation

    2.4.NUT & KERNEL STATIONPAGE 13.1

    2.4.1.NUT SILO & KERNEL SILOS

    DESCRIPTIONNo: 1No: 2No: 3No: 4

    % VM Fresh NutThis MonthX19.1919.01

    S.D0.810.26

    Last MonthX19.2619.14

    S.D.0.780.02

    % Dried NutThis MonthX15.0914.64

    S.D1.160.61

    Last MonthX15.5214.88

    S.D.1.210.03

    % Drying EfficiencyThis MonthX21.3722.99

    S.D

    Last MonthX19.4222.26

    S.D.

    2.4.2.KERNEL SILO

    This MonthLast Month

    1234512345

    Temperature oCTop

    Middle40.0040.0049.0046.00

    Bottom60.0066.0061.0064.00

    % VM Fresh KernelX20.3320.2220.0020.55

    S.D0.850.780.840.10

    % Dried KernelX5.345.505.285.47

    S.D0.300.060.340.11

    % Drying Efficiency73.7372.8073.6073.38

    Comments :

    Kernel drying efficiency was satisfactory.

    Main Menu

    NutCrackingEff

    2.4.3.NUT CRACKING EFFICIENCYPAGE 13.2

    R I P P L E M I L L

    Nut Composition before Cracker (INPUT)No: 1No: 2No: 3No: 4No: 5No: 6No: 7No: 8No: 9

    XSDXSDXSDXSDXSDXSDXSDXSDXSD

    Whole Nut (%)83.212.2383.843.51

    Broken Nut (%)10.013.099.022.44

    Whole Kernel (%)0.730.530.720.15

    Brokern Kernel (%)0.320.260.750.36

    R I P P L E M I L L

    Mixture Composition after CrackerNo: 1No: 2No: 3No: 4No: 5No: 6No: 7No: 8No: 9

    XSDXSDXSDXSDXSDXSDXSDXSDXSD

    Whole Kernel (%)35.231.1833.803.87

    Broken Kernel (%)11.640.8111.630.94

    Uncracked Nut (%)0.400.170.380.08

    Half cracked Nut (%)0.560.180.560.15

    Nut Cracking Eff.Kernel Recovery Eff.

    XSDXSD

    Ripple Mill No: 197.880.5198.620.57

    Ripple Mill No: 297.840.3898.570.20

    Ripple Mill No: 3

    Ripple Mill No: 4

    Ripple Mill No: 5

    Ripple Mill No: 6

    Ripple Mill No: 7

    Ripple Mill No: 8

    Ripple Mill No: 9

    Comments :

    Nut cracking eff. & kernel recovery eff. was satisfactory.

    Main Menu

    KernelLosses

    PAGE 14

    2.4.4.KERNEL LOSSES / COST

    This MonthLast Month

    Line 1Line 2Line 3Line 1Line 2Line 3

    XSDXSDXSDXSDXSDXSD

    Cyclone Fibre0.540.070.600.13

    LTDS1st Stage2nd Stage1st Stage2nd Stage1st Stage2nd Stage1st Stage2nd Stage1st Stage2nd Stage1st Stage2nd Stage

    0.840.080.830.11

    Hydrocyclone (PK in wet shell)

    Claybath0.690.140.730.13

    2.4.5.RUNNING COST

    This MonthLast MonthTodate

    Kernel Produced (mt)520.116407.9481756.278

    Total Kaolin or Calcium Carbonate Cost (RM)2499.0002439.5009877.000

    Other Cost e.g Sodium Silicate (RM)

    Cost / MT of PK (RM)4.8055.9805.624

    Cost / MT of FFB (RM)0.2330.2450.246

    Comments :

    All kernel losses was within the in-house target.

    Main Menu

    BoilerPowerHouse

    PAGE 15

    2.5.BOILER / POWER HOUSE

    2.5.1.BOILER HOUSE

    DescriptionThis MonthLast MonthTodate

    Boiler Chemical Cost (RM)1610.951495.056024.74

    Cost / MT FFB (RM)0.150.150.15

    2.5.2.POWER HOUSE

    DescriptionOperating HoursTotal KwH GeneratedDiesel Consumption (Litres)KwKwHr / LitTurbine / Dieset Gen Set Kw

    This MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast Month

    Turbines>Dresser RandAllan KKKDresser RandElliotShinkoTurbodyneNadrowskiOthers

    No. 1 (700 KW)400.1354.4162400136130405.90384.11700

    No. 2 (400 KW)400

    No. 3 (0 KW)0

    No. 4 (0 KW)0

    Diesel Gen Set >CumminsCaterpillarCumminsListerOthers

    No. 1 (300 KW)8.972.1564.010257.000.0200.063.37142.260.0051.29300

    No. 2 (640 KW)640

    No. 3 (640 KW)640

    KwHr / mt FFB (Turbine + Genset)Steam Consumption per KwHr (Turbine)

    2.5.3.TNB POWER SUPPLY

    This MonthLast MonthTodate

    KwHrRMKwHrRMKwHrRM

    Palm Oil Mill31404.0014382.5948114.0023106.1844418.0092088.18

    Rubber Factory

    Ecomat Plant

    Total31404.0014382.5948114.0023106.1844418.0092088.18

    Comments :

    TNB supply is used to start the mill operation by using change over switch.

    Diesel genset warmed up to maintain its condition.

    Main Menu

    WaterTreatment

    PAGE 16

    2.6.WATER TREATMENT PLANT

    2.6.1.WATER CONSUMPTION

    Water consumed

    %

    DescriptionThis MonthLast MonthThis MonthLast Monthm3/mt FFB

    DomesticOwn

    Estate

    Mill12280.0011970.001.14

    FC

    TOTAL12280.0011970.000.000.001.14

    2.6.2.WATER TREATMENT COST

    This MonthLast MonthTodate

    Chemical Cost (RM)2104.592495.379281.66

    Cost /m3 water (cts / m3)0.170.210.18

    Cost /mt FFB (cts / mt FFB)0.200.250.23

    Water Consumption (m3 / mt FFB)1.141.201.26

    2.6.3.MONTHLY LICENCE COST

    PUMPING RAW WATER FROM RIVER

    This MonthLast MonthTodate

    Total Volume of water (m3) consumed12280.0011970.0050560.00

    Total Cost (RM)

    Comments :

    Water treatment cost is 0.20cts/m3 of water.

    Belt press production : 2.40 mt/hr

    Cost of cake Production : 8.70 Rm/mt of cake

    Main Menu

    General

    PAGE 17

    2.7.General (Visitors / Security / Training Programme / Details of Breakdown, etc)

    2.7.1.Visitation

    DatePersonRemarks

    1/1/17MPOB VISIT

    2.7.2.Training

    DateRemarks

    12-13/01/17MR.YEO ATTEND NIOSH BANGI AGTES REFRESHER

    2.7.3.Security

    DateRemarks

    2.7.4.OSH Matter

    DateRemarks

    2.7.5.RSPO Matter

    DateRemarks

    2.7.6.Amenities

    DateRemarks

    2.7.7.Water Supply

    DateRemarks

    2.7.8.EFB DISPOSAL

    Balance b/f (mt)Production (mt)Collected (mt)Balance c/f (mt)

    21.2702,255.3392,170.800105.809

    2.7.9.DECANTER CAKE DISPOSAL

    Balance b/f (mt)Production (mt)Collected (mt)Balance c/f (mt)

    Main Menu

    General2

    PAGE 17.1

    2.8.0.Effluent Treatment

    DateRemarks

    2.8.1Mill Downtime

    Line 1Line 2

    DateHoursDetailsDateHoursDetails

    1/12/173 3/4First stage threshing drum plate broken

    1/25/173Crane coupling worn out

    1/30/174 1/2Wire rope roller old line shaft broken

    Total11.250

    2.8.2Housekeeping / Beautification / Linesite / Compound

    DateRemarks

    2.8.3.Others

    DateRemarks

    Comments

    Main Menu

    General3

    PAGE 17.2

    2.8.4.Effluent Result For January 2017

    DOE LimitTQCC Result

    apHN/A8

    bBOD (mg / l)5000 MAX71

    cCOD (mg / l)N/A653

    dTotal Nitrogen (mg / l)N/A161

    eAmmonical Nitrogen (mg / l)N/A132

    fTotal Solids (mg / l)N/A4307

    gSuspended Solids (mg / l)N/A533

    hOil & Grease (mg / l)N/A30

    2.8.5Trailing Report

    Main Menu

    ManPower

    PAGE 18

    3.0MANPOWER

    3.1.EMPLOYEES

    MALAYSCHINESEINDIANSOTHERSTOTAL

    Executives21205

    Subordinate Staff5013018

    TOTAL7115023

    3.2.SUBORDINATE STAFF LEAVE STATUS

    LeaveLeaveLeaveLeave Taken Todate (C)

    B/F fromEarned TodateTaken

    Year '16for Year '17(A+B)ThisBal

    No.NAMEPosition(Days)-A(Days)-BTotalMonth(A+B-C)

    1ALIZA BINTI MAT ISAC/CLERK172193316

    2SYED MOHAMAD ADNAN2ND CLERK8210119

    3A.MOHANATHASCHARGEMAN123112

    4G.LOGANATHANSUPERVISOR426115

    5A.PUGALENTHYSUPERVISOR94132130

    6R.BALANE/DRIVER022002

    7S.MUNIANDYBOILERMAN-91-800-8

    8R.RAJOOBOILERMAN152174413

    9AVR.MOGANAKRISHNANLAB OPER-102-822-10

    10P.SANKARANMECHANIC152172215

    11S.SUBRAMANIAMMECHANIC132150015

    12SAMSUDDIN BIN ISHAKMECHANIC8182611260

    1300

    14MAHD HANIFFAHFOREMAN152172215

    15G. KRISHNASAMYE/DRIVER123112

    16S. JAMESONMECHANIC213003

    17MOHD KHAIRIL ABDULLAHS/KEEPER152173314

    18MANJULA A/P PERUMALUW/B OPER-31-200-2

    19GV. THANARASUBOILERMAN011001

    20SARAVANANSUPERVISOR729009

    2100

    2200

    2300

    2400

    2500

    2600

    2700

    2800

    Comments :

    Main Menu

    Employee

    PAGE 18.1

    3.3EMPLOYEE (MILL WORKERS)

    (A)CHECKROLL

    EmployeesDependants (Resident)Total

    (1) MALAYSIANMaleFemaleSub TotalMaleFemaleSub Total

    Bumiputera21324- 024

    Chinese- 0- 0- 0- 0

    Indian25328- 028

    Grand Total46652- 0- 0- 052

    (2) NON-MALAYSIAN

    Sri Lanka- 0- 0- 0

    India8- 08- 08

    Indonesia10- 010- 010

    Bangladeshi- 0- 0- 0

    Thai- 0- 0- 0

    Filipino- 0- 0- 0

    Grand Total18- 018- 0- 0- 018

    Total Checkroll64670- 0- 0- 070

    (B)CONTRACT / TEMPORARY

    EmployeesDependants (Resident)Total

    (1) MALAYSIANMaleFemaleSub TotalMaleFemaleSub Total

    Bumiputera2- 02- 02

    Chinese- 0- 0- 0

    Indian11- 01

    Grand Total3- 03- 0- 0- 03

    Main Menu

    Appendix1

    PAGE 19

    Appendix 1

    PROGRESS REPORT FOR THE MONTH

    OF JANUARY 2017

    UnitThis MonthLast MonthTodatePrevious Todate

    1.0FFB

    1.1.1Weight of FFB processedMT10,739.7109,967.04040,165.05029,425.340

    1.1.2EstimateMT10,343.00010,421.00044,497.00034,154.000

    1.1.3Shift HoursHrs- 0- 0

    2.0OIL MANUFACTURE

    2.1.1Weight of Oil ProducedMT2,280.1542,111.9338,607.4726,327.318

    2.1.2EstimateMT2,275.0002,293.0009,790.0007,515.000

    2.1.3Oil Extraction Rate%21.2321.1921.43

    2.1.4Estimate%22.0022.0022.00

    2.1.5Press Running HoursHrs.749.24676.972,723.541,974.30

    2.1.6Production HoursHrs.432.25402.251,620.001,187.75

    2.1.7Downtime (Line 1)Hrs.11.257.5028.7517.50

    2.1.8Downtime (Line 2)Hrs.- 0- 0

    2.1.9Press Capacity per unitMT / hr14.3314.7214.75

    2.2.0F.F.B. Manufactured / HoursMT / hr24.8524.7824.79

    2.2.1Oil Recovered / HoursMT / hr5.285.2521.2715.99

    3.0KERNEL MANUFACTURE

    3.1.1Weight of kernel ProducedMT520.116407.9481,756.2781,236.162

    3.1.2EstimateMT486.000490.0002,091.0001,605.000

    3.1.3Kernel Extraction Rate%4.844.094.37

    ;3.1.4Estimate%4.704.704.70

    3.1.5Production HoursHrs.432.25402.251,620.001,187.75

    3.1.6Kernel Recovered / HrMT / hr1.201.011.08

    4.0DESPATCH AND STOCK

    4.1.1Oil DespatchedMT1,999.0001,675.3807,944.3205,945.320

    4.1.2Oil in StockMT1,039.481758.3272,570.1951,530.714

    4.1.3Kernels DespatchedMT418.370419.6301,629.2201,210.850

    4.1.4Kernels in stockMT217.484115.738582.621365.137

    - Packed / Bulk SiloMT217.484115.738582.621365.137

    - Kernel in BagMT- 0- 0

    Remarks :

    Main Menu

    MajorMaintRep1

    PAGE 20

    MAJOR MAINTENANCE REPORT FOR THE MONTH OF JANUARY 2017

    (1) RECEPTION STATION / (2) LOADING PUMP / (3) STERILISER STATION

    (4) HOISTING / TIPPER AND THRESHING STATION

    Main Menu

    MajorMaintRep2

    PAGE 21

    MAJOR MAINTENANCE REPORT FOR THE MONTH OF JANUARY 2017

    (5) PRESS AND DIGESTER STATION / (6) EFB PRESSING STATION / (7) KERNEL PLANT STATION

    (8) CLARIFICATION STATION

    Main Menu

    MajorMaintRep3

    PAGE 22

    MAJOR MAINTENANCE REPORT FOR THE MONTH OF JANUARY 2017

    (9) RAW WATER HOUSE AND WATER TREATMENT PLANT STATION / (10) POWER STATION / (11) BOILER STATION

    (12) EFFLUENT STATION

    Main Menu

    MajorMaintRep4

    PAGE 23

    MAJOR MAINTENANCE REPORT FOR THE MONTH OF JANUARY 2017

    (13) MILL BUILDING UPKEEP / (14) VEHICLE / (15) WORKSHOP / (16) GENERAL

    Main Menu

    Sheet1