kerala ground water

19
HYDROLOGY PROJECT II GROUND WATER DEPARTMENT KERALA STATE Final Review meeting May 7, 2014, New Delhi

Upload: hydrologywebsite1

Post on 24-May-2015

140 views

Category:

Technology


6 download

TRANSCRIPT

Page 1: Kerala ground water

HYDROLOGY PROJECT II

GROUND WATER DEPARTMENT

KERALA STATE

Final Review meetingMay 7, 2014, New Delhi

Page 2: Kerala ground water

HYDROLOGY PROJECT I

HYDROLOGY PROJECT II

HYDROLOGY PROJECT

Project Period

1996 to 2004

Total Outlay

12.5 Crores

Project Period

2006 June to May 2014

Total Outlay

16.7 Crores

Page 3: Kerala ground water

Financial Details

Total Project outlay as per Original PIP Rs.10.80 CR

Revised Cost Table-2013 Rs.16.70 CR

Total Expenditure from June 2006 to March 2014 Rs.13.73 CR

Likely Expenditure for the FY 2014-15 (upto May 2014) Rs. 16.00 CR

Hydrology Project II

Page 4: Kerala ground water

Reimbursement Status

Year Expenditure Eligible Claim Reimbursed Amount Remarks

2006-07 72.7 67.63 67.63 2007-08 106.97 79.02 79.02 2008-09 120.97 95.44 95.44 2009-10 166.66 139.35 139.35 2010-11 149.29 116.32 116.32 2011-12 141.32 111.17 111.17 2012-13 254.95 212.41 212.41

2013-14 359.91 306.11 193.52submitted claim

for Rs.112.59 lakhs

Total 1372.77 1127.45 1014.86

Page 5: Kerala ground water

PHYSICAL PROGRESS

CONSOLIDATION OF HPI ACTIVITIES

Monitoring of

Groundwater

level Quality

FCS

Periodic interagency

validation

(CGWB, IMD)

Upgraded computer hardware

Maintenance of Website

Page 6: Kerala ground water

PHYSICAL PROGRESS Contd…

INSTITUTIONAL STRENGTHENING

Posts created

5 Nos

Retained Posts created during HP I

14 NosParticipated in almost all the trainings /Workshops

Conducted by DHI (International &

National), NIH, CGWB, NWA

Conducted various inhouse trainings /workshops

Page 7: Kerala ground water

PHYSICAL PROGRESS Contd…

PROCUREMENT

Computer Hardware

Arc Gis Software

Vehicles

Laboratory Equipments

AAS, UV-VIS Spectrophotometer, Flame Photometer,

Ion Meter etc

Page 8: Kerala ground water

PHYSICAL PROGRESS Contd…

BUILDING CONSTRUCTION

Building at Ernakulam, Kerala

To house

Regional Data

Processing Centre

Analytical Laboratory

Level II

District Office,

Ernakulam

Page 9: Kerala ground water

PHYSICAL PROGRESS Contd…

ESTABLISHED…..

State data dissemination

Centre

State Centre for DSS

Page 10: Kerala ground water

Decision Support System (Planning)

Bharathapuzha as pilot basin…..

DSS activities are being done jointly by both surface water and ground water Departments.

Page 11: Kerala ground water

1

Applications Developed (In Pilot Basin)

2

5

4

2

3

8

7

6

Conjunctive Use

Artificial Recharge Viability Analysis

Inter Sub Basin Transfer

Inter basin transfer with Hydropower module

Water Quality module

Water Availability of Bharathapuzha Basin

Inter Basin transfer

Inter sub basin transfer- Silent Valley to Malampuzha

reservoir

10

Reservoir Operation

Irrigation module

9

Page 12: Kerala ground water

1

Applications Developed (Other Basins)

5

4

2

3

7

6

Dam release study for meeting the domestic water supply in Trivandrum

Viability analysis of proposed Pattissery Dam in Pambar basin

Feasibility of 7 check dam locations - Meenachil Basin

Reconnaissance study for storage locations -

Chalakudy Basin Feasibility of check dam locations in Pampar Basin

Analysing the feasibility of a dam at Murinjapuzha – Manimala Basin

Integrated operation of proposed reservoirs in Vamanapuram Basin

Page 13: Kerala ground water

Purpose Driven Studies (PDS)

A Comprehensive Assessment of Water Quality Status of Kerala State

Investigators:- Kerala GW, Kerala SW and NIH Belgaum

Draft report prepared

Final report will be published by May 15th 2014

Regional Seminar conducted

Page 14: Kerala ground water

Lessons learnt

Scientific approach to resolve water sector issues

Acquainted with modern techniques for effective and rapid decision

making

Integrated approach of Surface and Groundwater for sustainable

management

Adopting feasible methods and practices from other agencies through

interaction.

Exposure to latest technologies in water sector for problem solving

Evolution of methods for project management in a cost and time effective

manner

Page 15: Kerala ground water

Application of HIS

GEC Report W Quality maps Specific

Reports

Groundwater prospect maps

Water Level Fluctuation maps

Page 16: Kerala ground water

Data dissemination and awareness raising

HDUG Meeting convened at Idukki District, Kerala

Data disseminated to

Disaster Management (HVRA Cell) which has been formulated in the state for drought prediction and management is a permanent user of HIS Data

Page 17: Kerala ground water

Post Project Plan

Sustainability of the achievement of Hydrology Project activities

Water budgeting on water shed basis

Up gradation of Hydrological Network stations throughout the state

especially in coastal terrains of understanding different aquifer

parameters in the basin for groundwater developmental activities

Modeling of 43 river basins

Knowledge sharing and awareness rising.

Page 18: Kerala ground water

Ground Water Department was transformed to a new organization with the advent of Hydrology Project. Modernization of data collection, validation, analysis and dissemination strategies increased the acceptance of the department tremendously in various water related issues. We extend our sincere gratitude to

World BankMinistry of Water Resources, Govṭ of IndiaDHI, NIH Roorkee, Belgaum, CGWB, NWA, other implementing states……..

As mentioned earlier we also expect a continuance of the HP activities

through HPIII

Gratitude and Hope

Page 19: Kerala ground water