LMRP Cap Oil collection

73,300Cumulative

6,100Cumulative

16,600Cumulative

27,700Cumulative

42,500Cumulative

57,500Cumulative

15,800per day

6,100per day

10,500per day

11,100per day

14,800per day

15,000per day

-

10,000

20,000

30,000

40,000

50,000

60,000

70,000

June 4th June 5th June 6th June 7th June 8th June 9th

Bar

rels

per

day

-

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

Cum

ulat

ive

Bar

rels

Cumulative barrels Barrels/day

Page 3: Kent wells technical update 10June10

Lightering – Transferring Oil from Enterprise to Massachusetts (and Ultimately to Shore)

Discoverer Enterprise

Massachusetts Tanker

Q4000

Page 4: Kent wells technical update 10June10

LMRP Cap with Q4000 Direct Connect(up to 28,000 BOPD combined capacity)

Page 5: Kent wells technical update 10June10

Q4000 Direct Connect

• Q4000 reconfigured for Direct Connect:

Top Kill equipment replaced with production equipment

5,000 – 10,000 barrels of oil per day capacity

• Flare both oil & gas via ‘EverGreen’ burner – used globally but new to GoM

Page 6: Kent wells technical update 10June10

Dual Long Term Containment

#2 Floating Riser

#2 Floating Riser

Helix Producer and Evi Knutsen or Juanita Tanker

Helix Producer and Evi Knutsen or Juanita TankerToisa Pisces and Loch

Rannoch TankerToisa Pisces and Loch

Rannoch Tanker

#1 Floating Riser

#1 Floating Riser

Subsea Dispersant and

Hydrate Inhibition Capability

Subsea Dispersant and

Hydrate Inhibition Capability

Page 7: Kent wells technical update 10June10

Surface: Key Vessels

Plus 2 Additional Tankers:

Evi Knutsen and Juanita

Toisa Pisces

Loch Rannoch

Helix Producer

Production Vessels Storage Tanker Support

Page 8: Kent wells technical update 10June10

Subsea Equipment Fabrication Underway

Overshot Tool58” Diameter

34’ Tall, 75 Tons

Overshot Tool58” Diameter

34’ Tall, 75 Tons

Air Can #126’ Diameter

45’ Long

Air Can #126’ Diameter

45’ Long

New Manifold49’ x 25’ x 11’

45 Tons

New Manifold49’ x 25’ x 11’

45 Tons

Suction Piles14’ Diameter

90’ Long

Suction Piles14’ Diameter

90’ Long

Page 9: Kent wells technical update 10June10

Creating Redundancy & Optionality

• Discoverer Clear Leader

• Enterprise-Class Drillship

• Up to 20,000 barrels per day capacity

• 124,000 barrels oil storage capacity

Page 10: Kent wells technical update 10June10

Timeline and Associated Vessels

June July

LMRP Cap: Discoverer Enterprise

w/ Tanker Support (Massachusetts and Overseas Cascade)

Near Term Containment #1:

Q4000 Direct Connect

Discoverer Clear LeaderMultiple Options

- Kill Line Connection (5 -10)- Replacement Vessel (up to 20)

Long Term Containment #1:

Toisa Picses FPSO w/ Loch Rannoch Tanker

Long Term Containment #2:

Helix Producer w/ EviKnutsen or Juanita Tanker

Creating Redundancy

(15 - 18) (15 - 18) = Oil Capacity per Day(5 - 10)

(20 - 25) (20 - 25)

1st 15th 1st 15th