jv agreement
DESCRIPTION
SampleTRANSCRIPT
8 APRIL 2016To:Managing DirectorEralab Sdn BhdAttention: Pn Noraini Shair
APEXS SYNERGY RESOURCESmember of apexsgroup
unit a12b-1, jalan selaman 1/1, dataran palma, 68000 ampang, selangor, malaysia, t: +603.4278.4779 , e: [email protected] , w: www.apexs.my
QUOTATIONDear Sir,
SUBJECT: OFFICE RENOVATION, MOVERS AND SUPPLY/INSTALL STANDARD WORKBENCH FOR LAB USE :: Q1221-321 (REV.0)
We are pleased to submit our price quotation, scope of work and commercial & business terms as below:
These pricing is worked based on the limited information we received from the client and might be adjusted it incorporate whatever items or works need to be done to complete the final lab equipment / interior decoration or environment.
All other variation order shall be charged accordingly, if any.
All payments are in Ringgit Malaysia and must be made payable to our designated company for this purpose. i.e. APEXS SYNERGY RESOURCES
All payment(s) made / received are not refundable due to any reason or whatsoever.
This Quotation is valid for 14 working days from the date stipulated herein.
PART A: SCHEDULE OF PRICE
SCOPE DESCRIPTION QUANTITI PRICE (RM)
A1 Removal of existing partitions / workbench and wall cabinet INCLUDING electrical appliances and cables dismantling
1 lot at 1 location 3,500
A2 OPTIONAL MOVER : All of the above items to a new location
Depending on location
Each 5KM = RM1800
A3 Relocation of Office File Racks, tables and others from Middle Office location to front location
1 Lot 800
A4 Supply Of Workbench For ‘U’ Shape – See Appendix A (Sketches)
Default top Surface :: Mica surface table
Alloy steel / aluminum leg Normal wooden cabinet with small
1 Lot 21,725
partitions for sample holder
A5 Installation of the above 1 Lot 2,800
A6 OPTIONAL:
Anti-corrosive / Anti acid surface 3M Film – installation and supply
Per Sqft.: USD 37.00
A7 Supply & Install of extension of workbench – G Floor
Default top surface :: Mica surface table
Alloy steel / aluminum leg Normal wooden cabinet with small
partitions for sample holder
1 Lot 5,500
A8 Glass door supply, replacement and installation
1 Lot 920
A9 3 X 3 GANG Electric plug socket – supply and install
1 Lot 280
GRAND TOTAL 35,525
Goodwill – onetime discount 6% (2,132)
FINAL OFFER PRICE RM 33,393.00
PART B: SCHEDULE OF PAYMENT / PAYMENT TERMS
SCOPE DESCRIPTION PERCENTUM VALUE (RM)
B1 Upon Purchase Order : prior to start work 50% 16,696.50
B2 Upon Completion of Installation and Delivery of EACH Item in Schedule A
45% 15,026.85
B3 Upon Satisfaction and Approval of the overall Project and Handing Over meeting / session (Retention)
5% 1,669,65
We shall mobilize only after we receive FULL payment of the first milestone before 6th of April 2016 for all of the above or else, you are NOT entitled for the Goodwill discount.
Regards,
fM Shahzar M Idris, CEO
Apex Symphony Sdn Bhd
APPENDIX A :: Sketches – For Reviewing Purpose Only
The full drawings shall be produce upon PO.