jsa (autosaved) store 4.xls
TRANSCRIPT
JOB SAFETY ANALYSIS SHEET
Cometto trailer, 10 axle Drop deck Cometto trailer and 10t lorry.
Safety Shoes & Hand GlovesSequence of Basic
Potential Hazards Yes / No PrecautionsJob Steps
PRE - WORK Collapse of the Crane & Load NO
● Verify the suitability of shackles, slings & crane for the load to be handled.
● Check the Lifting Tools; shackles, slings and crane certificates.
● Ensure the area is free from obstacles for crane operations.
● Confirm the stability of crane at work site.
● Conduct safety check of the crane prior to start lifting.
● Ensure that the load is secured for safe lifting.
Injury to Workers NO
● Check the slings, chain, ropes, shackles are not damaged and safe for lifting.
● Verify the workers are trained for heavy lifting operations and non essential person leave the area before lifting operations starts.
● Confirm the signal between crane operator & signal man. Only trained signal man to give signal.
● Ensure no one rides the load and nobody goes below the load.
Damage to the Load NO
● Ensure the load before lifting and never overload more than the capacity of crane, shackle, sling, chain or ropes etc.
● Lift the load slowly & check the slings / ropes or chain are not twisted keeping the load in central position.
● Use the rope for guiding the load if required.
Falling Tools NO● Barricade work area at ground level to prevent people entering in the danger zone for falling objects.
Job : Heavy Lifting in Hazardous Area Job Site : On Semi SCG Industries Malaysia Sdn. Bhd. (Senawang)
Equipments : Demag 500t crane, Tadano 120t crane, 30m Skylift, 2 sets of 10 axle 2 file
Personel Protective Equipment & Tools needed for work activities : Safety Hat,
LIFTING & ERECTION
ADDITIONAL HAZARDS (other than stated above)
JSA NO : JSA - AL - 00 JSA REV: 0DATE : 16 JUNE 2011 PREPARED BY : SYKT. LOW KIM CHUAN
JOB SAFETY ANALYSIS SHEET
Safety Shoes,Hand Gloves & Long Sleeve JacketSequence of Basic
Potential Hazards Yes / No PrecautionsJob Steps
PRE - WORK Collapse of the Crane & Load NO
● Verify the suitability of shackles, slings & crane for the load to be handled.
● Check the Lifting Tools; shackles, slings and crane certificates.
● Ensure the area is free from obstacles for crane operations.
● Confirm the stability of crane at work site.
● Conduct safety check of the crane prior to start lifting.
● Ensure that the load is secured for safe lifting.
Injury to Workers NO
● Check the slings, chain, ropes, shackles are not damaged and safe for lifting.
● Verify the workers are trained for heavy lifting operations and non essential person leave the area before lifting operations starts.
● Confirm the signal between crane operator & signal man. Only trained signal man to give signal.
● Ensure no one rides the load and nobody goes below the load.
Damage to the Load NO
● Ensure the load before lifting and never overload more than the capacity of crane, shackle, sling, chain or ropes etc.
● Lift the load slowly & check the slings / ropes or chain are not twisted keeping the load in central position.
● Use the rope for guiding the load if required.
Falling Tools NO● Barricade work area at ground level to prevent people entering in the danger zone for falling objects.
Job : Lifting of 5 units gas cylinder Job Site : Texas Instrument, Ulu Klang
Equipments : 1 UNIT OF KATO 35T MOBILE CRANE
Personel Protective Equipment & Tools needed for work activities : Safety Helmet,
LIFTING & ERECTION
ADDITIONAL HAZARDS (other than stated above)
JSA NO : JSA - AL - 06 JSA REV: 0DATE : 17 JULY 2015 PREPARED BY : CFW