JOB SAFETY ANALYSIS SHEET Cometto trailer, 10 axle Drop deck Cometto Safety Shoes & Hand Gloves Sequence of Basic Potential Hazards Yes / No Precautions Job Steps PRE - WORK Collapse of the Crane & Load NO ● Verify the suitability of crane for the load to be ● Check the Lifting Tools; and crane certificates. ● Ensure the area is free f crane operations. ● Confirm the stability of ● Conduct safety check of t to start lifting. ● Ensure that the load is s lifting. Injury to Workers NO ● Check the slings, chain, are not damaged and safe ● Verify the workers are tr lifting operations and n leave the area before li starts. ● Confirm the signal betwee & signal man. Only train give signal. ● Ensure no one rides the l goes below the load. Damage to the Load NO ● Ensure the load before li overload more than the c shackle, sling, chain or ● Lift the load slowly & ch ropes or chain are not t the load in central posi ● Use the rope for guiding Falling Tools NO ● Barricade work area at gr prevent people entering for falling objects. Job : Heavy Lifting in Hazardous Area Job Site : On Semi SCG Industr Malaysia Sd Equipments : Demag 500t crane, Tadano 120t crane, 30m Skylift, 2 set Personel Protective Equipment & Tools needed for work activities : S LIFTING & ERECTION ADDITIONAL HAZARDS (other than stated above) JSA NO : JSA - AL - 00 JSA REV: 0 DATE : 16 JUNE 2011 PREPARED BY : SYKT. LOW KIM CH

Upload: vigines89

Post on 21-Feb-2016

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: JSA (Autosaved) STORE 4.xls

JOB SAFETY ANALYSIS SHEET

Cometto trailer, 10 axle Drop deck Cometto trailer and 10t lorry.

Safety Shoes & Hand GlovesSequence of Basic

Potential Hazards Yes / No PrecautionsJob Steps

PRE - WORK Collapse of the Crane & Load NO

● Verify the suitability of shackles, slings & crane for the load to be handled.

● Check the Lifting Tools; shackles, slings and crane certificates.

● Ensure the area is free from obstacles for crane operations.

● Confirm the stability of crane at work site.

● Conduct safety check of the crane prior to start lifting.

● Ensure that the load is secured for safe lifting.

Injury to Workers NO

● Check the slings, chain, ropes, shackles are not damaged and safe for lifting.

● Verify the workers are trained for heavy lifting operations and non essential person leave the area before lifting operations starts.

● Confirm the signal between crane operator & signal man. Only trained signal man to give signal.

● Ensure no one rides the load and nobody goes below the load.

Damage to the Load NO

● Ensure the load before lifting and never overload more than the capacity of crane, shackle, sling, chain or ropes etc.

● Lift the load slowly & check the slings / ropes or chain are not twisted keeping the load in central position.

● Use the rope for guiding the load if required.

Falling Tools NO● Barricade work area at ground level to prevent people entering in the danger zone for falling objects.

Job : Heavy Lifting in Hazardous Area Job Site : On Semi SCG Industries Malaysia Sdn. Bhd. (Senawang)

Equipments : Demag 500t crane, Tadano 120t crane, 30m Skylift, 2 sets of 10 axle 2 file

Personel Protective Equipment & Tools needed for work activities : Safety Hat,

LIFTING & ERECTION

ADDITIONAL HAZARDS (other than stated above)

JSA NO : JSA - AL - 00 JSA REV: 0DATE : 16 JUNE 2011 PREPARED BY : SYKT. LOW KIM CHUAN

Page 2: JSA (Autosaved) STORE 4.xls

JOB SAFETY ANALYSIS SHEET

Safety Shoes,Hand Gloves & Long Sleeve JacketSequence of Basic

Potential Hazards Yes / No PrecautionsJob Steps

PRE - WORK Collapse of the Crane & Load NO

● Verify the suitability of shackles, slings & crane for the load to be handled.

● Check the Lifting Tools; shackles, slings and crane certificates.

● Ensure the area is free from obstacles for crane operations.

● Confirm the stability of crane at work site.

● Conduct safety check of the crane prior to start lifting.

● Ensure that the load is secured for safe lifting.

Injury to Workers NO

● Check the slings, chain, ropes, shackles are not damaged and safe for lifting.

● Verify the workers are trained for heavy lifting operations and non essential person leave the area before lifting operations starts.

● Confirm the signal between crane operator & signal man. Only trained signal man to give signal.

● Ensure no one rides the load and nobody goes below the load.

Damage to the Load NO

● Ensure the load before lifting and never overload more than the capacity of crane, shackle, sling, chain or ropes etc.

● Lift the load slowly & check the slings / ropes or chain are not twisted keeping the load in central position.

● Use the rope for guiding the load if required.

Falling Tools NO● Barricade work area at ground level to prevent people entering in the danger zone for falling objects.

Job : Lifting of 5 units gas cylinder Job Site : Texas Instrument, Ulu Klang

Equipments : 1 UNIT OF KATO 35T MOBILE CRANE

Personel Protective Equipment & Tools needed for work activities : Safety Helmet,

LIFTING & ERECTION

ADDITIONAL HAZARDS (other than stated above)

JSA NO : JSA - AL - 06 JSA REV: 0DATE : 17 JULY 2015 PREPARED BY : CFW