F-35 Program Information
Non Export Controlled Information – Releasable to Foreign Persons
1
Joint Strike Fighter Information Brief DoD Maintenance Symposium
15 November2010
Lightning II The next generation strike fighter
F-35 Program Information
Non Export Controlled Information – Releasable to Foreign Persons
PowerDOCS #####
Information Brief JSF/JPO Depot Activation
in a PBL Environment 15 November 2010
Charlie Brown
703 601 5476
F-35 Program Information
Non Export Controlled Information – Releasable to Foreign Persons
F-35 Program Information
Non Export Controlled Information – Releasable to Foreign Persons
Background
• During 2001, Memorandum of Agreement between JSFJPO and Services
for Depot Maintenance Core Capability Requirements Determination and
Workload Quantification Procedures is signed
• During 2006 in support of the JSF DSOR assignment process, Team JSF
subject matter experts from the Maintenance Support IPT developed a
notional representation detailing an ideal time-phased approach to Title 10
implementation.
• During 2007, Title 10 Implementation Plan developed and delivered. This
time-phased approach and the resulting 2007 Baseline Title 10
Implementation Timeline will be used as the baseline schedule for F-35
USG depot planning activities. A substantial part of this time-phased
approach is the establishment of a Partnering Agreement (PA) and
subsequent Implementation Agreements (IA), between the parties under a
performance-based logistics (PBL) concept.
• The JSF Depot Source of Repair (DSOR) MOA is currently in staffing. The
Joint JSF Depot Source of Repair Assignment Process is consistent with
the requirements of 10 US Code Sec 2464 and supplements DoD policy.
F-35 Program Information
Non Export Controlled Information – Releasable to Foreign Persons
Depot Activation Way Forward
• Current Depot Activation Plan will have full F-35 Depot capability
established no later than 2016, through the phased systemic
approach to standup of capabilities at DoD organic depots
• Dual assignment of all airframe variants to Ogden –Air Logistics
Center (OO-ALC) and Fleet Readiness Center (FRC) East. - OO-ALC is primary on F-35A, and may receive inter-service support from FRC East.
- FRC East is primary on F-35B/C and may receive inter-service support from OO-ALC.
• Dual Assignment of both Engine variants to OC-ALC and FRC
Southeast. - OC-ALC to stand up capability in 2012.
- FRC Southeast to stand up capability in 2014.
• STOVL Lift Fan, Business Case Analysis in currently in work to
ascertain where and when capability will be established for the
STOVL Lift Fan.
• Total of 50 systems will be activated by 2016 (IOC +4), in
accordance with the Depot Activation Plan.
F-35 Program Information
Non Export Controlled Information – Releasable to Foreign Persons
Propulsion DSOR-Assigned Hardware
• P&W F135 Propulsion System Hardware
- Unique Hardware Includes Fan/Power/Gearbox Modules
- F135/F136 Common Hardware Includes Aug/Nozzle Modules
• FET F136 Propulsion System Hardware
- Unique Hardware Includes Fan/Power/Gearbox Modules
• F135/F136 Common Lift System Hardware
- Includes Lift Fan/Clutch/Roll Post/Lift Fan Drive Shaft/VAVBN/3BSM Modules
and Associated LRCs
• All Hardware Except F135/F136 Main Engine LRCs DSOR-Assigned
- Approx 180 LRCs +/-
- Phased Over 4-6 years, Starting 2011/2012
F-35 Program Information
Non Export Controlled Information – Releasable to Foreign Persons
Propulsion DSOR Assignments
• F135 DSOR Assignments
Initial Capability Full Capability
OC-ALC 2012 2016
FRCSE 2014 2018
FRCE (Lift System) 2014 2016*
*Lift Fan Test Capability
• F136 DSOR Assignments
Initial Capability Full Capability
OC-ALC 2016 2018
FRCSE 2014 2016
Initial Capability: Engine/Modules-Assy, Dissy, Clean, Inspect, Test
Full Capability: Engine/Modules- Major Repair/Overhaul
F-35 Program Information
Non Export Controlled Information – Releasable to Foreign Persons
Depot Activation
• Multi-Year, Multi-Phase Approach to Meet Projected Workscope Needs
- Assy, Dissy, Clean, Inspect, Test
- NDI Capability
- Overhaul, Complex Repairs
- C&A Repairs
• Integration Between P&W and FET
- Common Solution-Test Cell Facility Requirements
- Common Solution-ECI Capability
- Pursuing Other Opportunities
• F135/F136 Depot Activation Timeline
- Detailed POA&Ms in Place
- F135/Lift System Activation Major Activities Start LRIP 4 & 5
- F136 Major Activities Planned for LRIP 5 or 6
F-35 Program Information
Non Export Controlled Information – Releasable to Foreign Persons
Depot Activation Challenges
• LRIP Funding
– LRIP 4 Slip Leads to Late Start on F135
– LRIP 5 Work Scope Late-to-need in Many Areas
– LRIP 5/6 Impact to F136 TBD
• Depot Funding
– Need Agreement of What Gets Funded by Whom, Then Execute
• Repair Qualifications
• Dem/Vals
• Depot Capacity
– Satisfying Core Minimum Guaranteed Workload @ IOC+4
• 57% DLH Navy
• 66% DLH USAF
– Funding Approach to Build Long-Term Capacity for All Workload
(Core, Above-Core/Non-Core) Uncertain
USG Depot Stand Up Schedule
2012 2013 2014 2015
OO-ALC Air Vehicle – LM AERO
Doors, Panels & Covers – LM
AERO/NGC/BAE
Radome – LM AERO
Landing Gear – Goodrich
Control Surfaces & Edges – LM
AERO
Canopy System – LM AERO
FRIU – GE Aviation
MRIU – GE Aviation
HMDS – VSI
PCD – L3 EDI
S&RES – ITT (EDO)
Canopy Actuator – MPC
AME – Marvin
Gun – General Dynamics
SFDS – GE Aviation
WR-ALC RIO – GE Aviation
VMC – BAE
GPS – Raytheon
EW CM – BAE
AMS – GE Aviation
Cockpit Equip & Layout – Sirio
Panel
Lighting – LSI
CNI – NG CNDMS
ICP – LM MS2
EODAS – NG ES
Common Components – Harris
TNS – Honeywell
INS – Honeywell
OC-ALC F-135 –P&W
F-136 - FET
Life Support System – Honeywell
Yeovil
FRCE Air Vehicle – LM AERO
Doors, Panels & Covers – LM
AERO/NGC/BAE
Radome – LM AERO
Control Surfaces & Edges – LM
AERO
Canopy System – LM AERO
PTMS – Honeywell
Engine Lift System Rudder Pedal – Pacific Scientific
HPGS – Eaton
UA&CV – Eaton
WBDDS – Goodrich Actuation
Ejection Seat – Martin Baker
ADS – Goodrich Sensors
In-flight Ice Detection – Goodrich
Sensor Systems
FRCSE Radar – NG ES EOTS – LM M&FC Fuel – Parker Hannifin
F-135- P&W
F-136- FET
AIS – BAE
CSMU – L3
Arresting Gear – Stork
FRCSW LEFAS – Moog
LEFDS – Curtiss Wright
EPG&C – Hamilton Sundstrand
EPMS – GE Aviation
EHAS – Moog/Parker
WFAS – Moog
Note: All Red entries are awaiting final approval Depot Implementation Plan Rev 3b
F-35 Program Information
Non Export Controlled Information – Releasable to Foreign Persons
AS
P
F-35 Operational Footprint
-35 Bases
-22 Ships
Iwakuni
Williamtown
Tindal
Amberly
Lossiemouth
Rota
Grottaglie Konya
Leeuwarden Amendola
Juan Carlos
CVF
CVN LHD
Pax Beaufort
Eglin
Ft. Worth Nellis
Luk
e Yuma
Edwards
Lemoore
Bodo
Orland
Decimomannu
Skrydstrup
PACAF
(Kadena)
Volkel
Eskisehir
USAFE (Germany)
Bagotville
Cold Lake Hill
Fallon Mirimar
Shaw
Cherry Point
Oceana St. Istrana
(Italy) St. Ghedi (Italy)
CONUS OPS 5 (location: TBD)
Global MRO&U Capability Will be Sized and Located to
Support the Fleet
ITS Cavour
F-35 Program Information
Non Export Controlled Information – Releasable to Foreign Persons
Sustainment
IA Template
Development
Sustainment Implementation Agreement
Development and Execution
2010
Sustainment
IA
Development
LM ALGS
Service Depot
PBL Supplier (as required)
2011 - 2015
Sustainment
IA
Execution
2012+
Source Data Depot Partnering
Agreement (PA)
&
Site Activation
IA’s
Development
of IA template
to follow same
path as PA,
collaboration
between all
stakeholders
F-35 Program Information
Non Export Controlled Information – Releasable to Foreign Persons
JSF Public – Private Partnerships
Challenges
• Common Language / Processes
- Partnering Agreement
- Implementing Agreements
• Business Arrangement
- Direct Sales
- Workshare
- IA Tempo
- Cost Accounting
- Depot Incentives
• Legacy Mindset
- Existing Processes
- Amount of Work
- Title X Perceptions
- Roles and Responsibilities
Opportunities
• Leverage of Best from Partners
- Depot Technician Skills
- Contractor System Knowledge
• Payments
- Pay as you Perform
- Depot Pre-Payment
• Contract Type & Length
- Prime Period of Performance
- OEM/Depot Period of
Performance
• Depot Labor Adjustments
- Annual versus Contract Period
F-35 Program Information
Non Export Controlled Information – Releasable to Foreign Persons
WORKING TO AFFORDABLY MEET THE
REQUIREMENTS OF THE WARFIGHTER
F-35 Program Information
Non Export Controlled Information – Releasable to Foreign Persons