Joint CIWEM Engineers Ireland Presentation

12TH November 2014

Page 2: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

PRESENTERS / PRESENTATION CONTENTS

Thomas Cooney

Supervisor

Part 1

Scheme Overview

Part 4

Conclusion

Paul McSparran

Contracts Manager

Part 2

Construction

Alan McWatters

CEEQUAL Assessor

Part 3

CEEQUAL Process

Page 3: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Part 1 Catchment

Flooding History

Scheme Overview

Page 4: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Catchment

Catchment Size – 55km²

Main Stream length – 22km

Q100 – 63m³/s

Page 5: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

History of Flooding October 1987 –

highest on record

December 2000

August 2008

October 2011

Page 6: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Q100 Flooded Area

St Ciaran’s School

Ballygawley Village

Page 7: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Scheme Objectives Provide Q100 protection to

St. Ciaran’s High School (Site 1)

No.’s 8, 9 and 11 Tullybryan Rd (Site 1)

No. 28 Tullybryan Rd (Site 2)

Residential & Commercial Properties within Ballygawley Village (Site 3)

Enhance the river environment

Undertake the works in a sustainable manner

Page 8: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Scheme Overview

Site 3 Site 1

Site 2

Page 9: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Site 1 – St.Ciarans School • 700m of sheet

piled & reinforced

concrete wall

• 60m of flood

embankment

• 600m of back

drainage

• Installation of

fishery enhancement

measures

Page 10: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Site 1

Page 11: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Site 1

Page 12: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Site 2 – Tullybyran Rd • 160m of reinforced

concrete wall

• 150m of culvert

upgrade

• 115m of back

drainage

• Reinstatement of garden area

Page 13: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Site 2

Page 14: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Site 3 – Ballygawley Village • Removal of

existing

embankment

• 240m of kingpost

concrete floodwall

• 50m of

landscaped flood

embankment

• 250m of back drainage

Page 15: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Site 3

Page 16: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Bridge Replacement • Upgrade of

Tullybyran Rd

Bridge

• Partnership with

Roads Service

• Works completed

prior to flood

alleviation scheme

Page 17: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Culvert Upgrade • Upgrade of

Feddan Drain

Culvert

• Partnership with

Roads Service

• 1200mm Ø pipe to

twin 900mm Ø pipe

Page 18: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Part 2 - Construction

Management

Options

PAUL MCSPARRAN – CONTRACTS MANAGER BSG

Page 19: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Value Engineering

Savings Delivered:

• Use of vacant

offices

• Sheet pile trials

and redesign

• Use of precast

walls

Page 20: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Value Engineering

Savings Delivered:

• Use of 100 pour liner and review

of layout to

maximise shutter

use

• Rationalisation of

rebar design to

minimise

wastage

• Alternative coping detail

Page 21: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Programme

Time Savings:

• Good relationship

with adjacent

landowners

• Flexible

subcontractors

• Early engagement

with utilies, DCAL,

client etc.

• Programming to

provide a fall back

option

• Completion

achieved 4 months

ahead of schedule

Page 22: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Challenges

• King Post Piling

• Maintaining existing

flood protection

• Existing Services

• Reducing noise and

vibration from sheet

piling

Page 23: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Challenges

• Working close to a

school and nursery

• Maintaining access

for people and

animals

• Poor weather

conditions during

reinstatement

Page 24: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Sustainability

Reuse of excavated

material

Reuse of temporary

roads

All works completed

from the river banks

Page 25: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Sustainability Channel

Improvements

Fishery Measures

Project submitted

for Considerate

Constructors &

CEEQUAL Scheme

Page 26: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Health & Safety Works completed

successfully in

sensitive location

10749 man hours

completed with no

accidents

Regular contact

with school, nursery

and locals reduced

risks to all

Page 27: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Part 3 - CEEQUAL

Management

Options

ALAN McWATTERS – CEEQUAL ASSESSOR RIVERS AGENCY

Page 28: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

CEEQUAL – a Brief Introduction Sustainability assessment and

awards scheme for civil engineering projects.

Celebrates the achievement of high environmental and social performance.

Aims to deliver improved project specification, design and construction of civil engineering works.

Encourages performance above legal, environmental and social minima.

Page 29: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

CEEQUAL – How it works

Page 30: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Rivers Agency CEEQUAL History Moneymore Flood

Protection Scheme

Construction Only Award

Excellent (93%)

Lodge Burn Flood Alleviation Scheme

Whole Team Award

Excellent (76.4%)

Page 31: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Ballygawley Water Flood Alleviation Scheme

SUSTAINABILITY PERFORMANCE ASSESSMENT

Whole Team Award

Client – DARD Rivers Agency

Designer – DARD Rivers Agency

Constructor – BSG Civil Engineering

Assessor – Alan McWatters, DARD Rivers Agency

Verifier – David Fisher, The Design Environment

Page 32: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Ballygawley Water FAS Sustainable planning from the start

Environmental Enhancement

Fishery Enhancement

Electro Fishing Survey

Otter Holt

Environmental Protection

Green Barrier

Invasive Species

Neighbour Interactions

Community Amenity

Opportunities for the Unemployed

Minimal Construction Waste

Value Engineering

Page 33: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Sustainable thinking from the start Feasibility Study and Economic Appraisal considered Social, Economic

and Environmental impacts and benefits of the proposed project

Flood protection delivered to residential, commercial and social properties

Climate change fully incorporated within the design process

Overall delivering this flood alleviation scheme will provide more sustainable living to the community it serves

Page 34: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Fishery Enhancement Measures

• Water environment enhancement considered within all capital works schemes

• Liaison and site investigation with DCAL Inland Fisheries and RA Environment Section

• Fishery habitat units included in scheme to improve environment for UKBAP significant species

Page 35: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Fishery Enhancement Measures

Pool

Nursery D-Groyne

Page 36: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Electro Fishing Monitoring Survey

Fish are stunned with an electric current

Safely collected from a 10 metre length of channel

Species and size recorded to calculate density

Safely released back into the watercourse

Undertaken at both a control and the enhancement site

Page 37: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

2013 – Pre Enhancement Works

Page 38: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

2014 – Post Enhancement Works

Page 39: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Total Salmonid Biomass

Page 40: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Otter Holt Construction

Otter footprints identified

Loss of vegetation in this area

Agreed best area for artificial holt with RA Environment Section

Included Otter Holt construction with project

Page 41: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Environmental Protection

Green Barrier

Page 42: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Environmental Protection

Temporary Upstream Barrier

Mature Tree Retention

Page 43: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Invasive Species – Japanese Knotweed

•Followed Environment Agency JKW remediation flow chart •7 metre radius supervised excavation zone •Buried contaminated soil over 2 metres depth in root membrane •Plant tracks washed before leaving site

Page 44: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Neighbour Interactions

•Promoting Civil Engineering in St. Ciarans College

•Existing culvert pipes retained for reuse by landowner

•Existing fence around St. Ciarans retained for reuse

•Back drainage amended after concerns raised by local resident

Page 45: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Community Amenity

•Created new public amenity footway over flood wall tie in to high ground •Reckli patterned formwork finish to all exposed surfaces for reduced visual impact •Both the above points were well received from community feedback questionaire

Page 46: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Opportunities for the Unemployed Contract documents specified the need for provision

of work experience through the DEL Steps to Work (StW)Programme

BSG carried out 2 periods of interviews with possible StW candidates

Sam Managh was employed on a 13 week training experience placement

Sam is now a full time

employee of BSG Civil

Engineering

Page 47: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Minimal Construction Waste

KPI’s to monitor waste reduction and recycling

99.9% of non hazardous waste was reused on site

All excavation material re-profiled onsite

Waste segregation and recycling implemented

Materials ordered and stored appropriately

Haul road stone reused throughout project

Page 48: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Value Engineering

NEC3 Option C incentivises value engineering

Reduced material usage through reduction in sheet pile section – saving of 270T of steel.

Re-design of coping equated to 60m3 concrete saving

Precast embankment wall

Page 49: Joint CIWEM Engineers Ireland Presentation 12TH November 2014
Page 50: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Benefits of using CEEQUAL

Delivery of a more sustainable project

Improved public relations and perception

Environment protected and enhanced

Enhanced Team Spirit - Provided a target for the project team to deliver high performance and developed a positive attitude

Increased interest within construction workforce about environmental issues

Cost Savings through Value Engineering and reduced material wastage

Page 51: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

Part 4 - Conclusion

Management

Options

Page 52: Joint CIWEM Engineers Ireland Presentation 12TH November 2014

CONCLUSIONS

• Flood protection up to 1% AEP provided

for Ballygawley

• Improvement to fisheries habitat and river environment

• Project completed ahead of schedule

• Awarded CEEQUAL Excellent award