Page 1: JINR Topical Plan for 2007 in line with the Provisions of the Road Map R. Lednicky JINR, Dubna Scientific Council 101 th meeting, 18-19 January 2007

JINR Topical Plan for 2007 JINR Topical Plan for 2007 in line with the Provisions of the Road Mapin line with the Provisions of the Road Map

R. R. LednickyLednicky

JINR, DubnaJINR, Dubna

Scientific Council101th meeting,

18-19 January 2007

Page 2: JINR Topical Plan for 2007 in line with the Provisions of the Road Map R. Lednicky JINR, Dubna Scientific Council 101 th meeting, 18-19 January 2007

The three foundations The three foundations of the of the

JINR road-map:JINR road-map:– basic research in frontier

particle, nuclear and condensed matter physics,

– development and application of high technologies, and

– university education in the relevant fields of knowledge.

Page 3: JINR Topical Plan for 2007 in line with the Provisions of the Road Map R. Lednicky JINR, Dubna Scientific Council 101 th meeting, 18-19 January 2007

Our resources in particle + Our resources in particle + relativistic nuclear physics:relativistic nuclear physics:

LaboratorLaboratoryy

Employed Employed StaffStaff

Financing Financing from JINR from JINR

budgetbudget

VBLHEVBLHE ≈≈ 680680 15.4%15.4%

LPPLPP ≈≈ 440440 9.8%9.8%

DLNPDLNP ≈≈ 200200 7.3%7.3%

BLTP+LIBLTP+LITT

1%1%

TOTALTOTAL:: ≈≈ 13201320 33.5 %33.5 % NP+CMP 1287 NP+CMP 1287 55.5% 55.5%Financial resources/staff in PP are Financial resources/staff in PP are

essentially worse than in NP or CMP → essentially worse than in NP or CMP → an increased funding will be required an increased funding will be required during Nuclotron modernizationduring Nuclotron modernization

Page 4: JINR Topical Plan for 2007 in line with the Provisions of the Road Map R. Lednicky JINR, Dubna Scientific Council 101 th meeting, 18-19 January 2007

0

5

10

15

20

25

30

35

20 30 40 50 60 70 >70

LHE

LNP

LPP

Age of staff

Page 5: JINR Topical Plan for 2007 in line with the Provisions of the Road Map R. Lednicky JINR, Dubna Scientific Council 101 th meeting, 18-19 January 2007

JINR’s basic facilitiesJINR’s basic facilities

Cyclotron U400has been operating since 1979

Cyclotron U400Mhas been operating since 1993

Nuclotron (superconducting synchrotron) has been operating since 1993

Neutron pulsed source IBR-2 has been operating since 1984

Phasotron (synchrocyclotron)has been operating since 14.12.1949

Page 6: JINR Topical Plan for 2007 in line with the Provisions of the Road Map R. Lednicky JINR, Dubna Scientific Council 101 th meeting, 18-19 January 2007

Round table discussion IIRound table discussion IIOctober 6-7, 2006October 6-7, 2006

NUCLOTRON can become competitive facility NUCLOTRON can become competitive facility at reasonable time scaleat reasonable time scale

Experiments with relativistic heavy ions can Experiments with relativistic heavy ions can attract the international community searching attract the international community searching for the creation of mixed phasefor the creation of mixed phase

Polarization experiments at modernized Polarization experiments at modernized Nuclotron with sufficient intensity are also Nuclotron with sufficient intensity are also highly competitivehighly competitive

JINR Directorate is taking organization JINR Directorate is taking organization measures to realize the Nuclotron measures to realize the Nuclotron modernization programmemodernization programme

Page 7: JINR Topical Plan for 2007 in line with the Provisions of the Road Map R. Lednicky JINR, Dubna Scientific Council 101 th meeting, 18-19 January 2007

International cooperation in HEPInternational cooperation in HEP

CERN is JINR’s main partner in HEP:Dubna physicists are widely involved in more

than 20 CERN projects including: ATLAS, CMS, ALICE, LHC/Damper, NA48/1/2, NA49, NA58, DIRAC, OPERA, CLIC and others.

Other long-term and fruitful cooperation activities with:Russia: IHEP, INR RAS, BINP SB RAS, …Germany: GSI, DESY, IFF FZJ, FZR, …USA: FNAL, BNL, MIT, LLNL, …France: IN2P3/CNRS, …Italy: INFN, …Japan: KEK, …China: IHEP CAS, CIAE, ……

ILC: started participation in accelerator part

Page 8: JINR Topical Plan for 2007 in line with the Provisions of the Road Map R. Lednicky JINR, Dubna Scientific Council 101 th meeting, 18-19 January 2007

ATLAS (JINR’s participation)ATLAS (JINR’s participation)

The Hadron Barrel Calorimeter waspositioned at its final destination,

with significant contribution from the JINR ATLAS team.

The main tasks of the JINR muon group connected with chambers assembling, testing and installation in ATLAS BMF/BMS

were successfully completed.

Installation of barrel muon stationThe mechanical installation is complete, electrical and cryogenic connections and

testing is being made now.

Accounted JINR’s contribution to ATLAS by the end of 2006 is ~100% of JINR’s commitment of 8.2 MCHF

Page 9: JINR Topical Plan for 2007 in line with the Provisions of the Road Map R. Lednicky JINR, Dubna Scientific Council 101 th meeting, 18-19 January 2007

Assembly of hadron endcap calorimetersAssembly of hadron endcap calorimeters

Test of readout system Test of readout system before installation on before installation on detectordetector

Installation of readout Installation of readout systems on detectorsystems on detector

Test of installed Test of installed readout systemreadout system

Radioactive source Radioactive source calibrationcalibration Hadron endcap calorimeter with

installed readout system

CMS CMS (JINR’s participation)(JINR’s participation)Accounted JINR’s contribution to CMS by the end of 2006 is ~100% of JINR’s commitment of 13.3 MCHF

The main interest of JINR and RDMS physicists is focusing on physics beyond the Standard Model at dimuon masses in TeV-range

Page 10: JINR Topical Plan for 2007 in line with the Provisions of the Road Map R. Lednicky JINR, Dubna Scientific Council 101 th meeting, 18-19 January 2007

Dipole Magnet was disassembled and then successfully assembled in the operational position. It was tested & mapped at full current.

ALICE (JINR’s participation)

Accounted JINR’s contribution to ALICE by the end of 2006 is ~90% of JINR’s commitment of 2.5 MCHF

Delivery of 330 of PbWO crystals (200 in Delivery of 330 of PbWO crystals (200 in 2006);2006);

Test of 1000 crystals using the Test of 1000 crystals using the spectrophotometer;spectrophotometer;

Construction of 40 drift chambers for Construction of 40 drift chambers for TRD;TRD;

Preparation of Physics Performance Preparation of Physics Performance Report vol. II;Report vol. II;

Further development and tests of GRID Further development and tests of GRID computing.computing.

Commissioning of the ALICE detector;Commissioning of the ALICE detector; Beginning of data taking;Beginning of data taking; Start of the data analysis.Start of the data analysis.

plans for 2007-2008

Page 11: JINR Topical Plan for 2007 in line with the Provisions of the Road Map R. Lednicky JINR, Dubna Scientific Council 101 th meeting, 18-19 January 2007

Network for PhysicsNetwork for Physics2.5 → 10 Gbps in 2007

Page 12: JINR Topical Plan for 2007 in line with the Provisions of the Road Map R. Lednicky JINR, Dubna Scientific Council 101 th meeting, 18-19 January 2007

Funding in k$ (materials, equipments, visits) Funding in k$ (materials, equipments, visits) 07/07-09 07/07-09

*Scientific leader**Including funding under the JINR-BMBF Agreement

Info+Comp+NetworkInfo+Comp+Network (V.Ivanov, V.Korenkov, P.Zrelov) (V.Ivanov, V.Korenkov, P.Zrelov) 240/ 901240/ 901 ATLASATLAS (N.Russakovich)(N.Russakovich) 414/ 1479414/ 1479 CMSCMS (A.Zarubin, I.Golutvin*)(A.Zarubin, I.Golutvin*) 320/ 955320/ 955 NA58/HERMESNA58/HERMES (A.Nagaitsev, I.Savin*) (A.Nagaitsev, I.Savin*) 145/ 420145/ 420 GIBS+GIBS+2+NA49+LNS+pHe3+PHENIX+2+NA49+LNS+pHe3+PHENIX+Nucl+BECQNucl+BECQ (A.Malakhov) (A.Malakhov) 135/ 465135/ 465 NA48/H1/OKAPINA48/H1/OKAPI (V.Kekelidze) (V.Kekelidze) 115/ 375115/ 375 OPERAOPERA (Yu.Gornushkin) (Yu.Gornushkin) 110/ 330110/ 330 STARSTAR (R.Lednicky, Yu.Panebratsev) (R.Lednicky, Yu.Panebratsev) 72/ 26972/ 269 CDF+D0CDF+D0 (G.Alekseev, J.Budagov*, V.Glagolev)(G.Alekseev, J.Budagov*, V.Glagolev) 72/ 21672/ 216 ALICEALICE (A.Vodopianov) (A.Vodopianov) 60/ 18060/ 180 DIRACDIRAC (L.Afanasyev, L.Nemenov*)(L.Afanasyev, L.Nemenov*) 58/ 17458/ 174 Rare ProcessesRare Processes (A.Kurilin)(A.Kurilin) 53/ 15953/ 159 HADESHADES (A.Malakhov) (A.Malakhov) 35/ 11535/ 115 STRELA+STRELA++ALPOM+PPM+ALPOM+PPM (N.Piskunov, G.Martinska) (N.Piskunov, G.Martinska) 34/ 10734/ 107 NISNIS (E.Strokovsky, A.Litvinenko) (E.Strokovsky, A.Litvinenko) 27/ 12427/ 124 MARUSYAMARUSYA (A.Baldin) (A.Baldin) 21/ 10121/ 101 FAIR-GSIFAIR-GSI (A.Sissakian) (A.Sissakian) 217/ 644**217/ 644** NUCLOTRONNUCLOTRON (A.Sissakian, A.Sorin, A.Kovalenko ) (A.Sissakian, A.Sorin, A.Kovalenko ) 1140/ 50761140/ 5076 MED-NUCLOTRONMED-NUCLOTRON (N.Agapov, N.Krasavin, G.Mytsin, J.Ruzicka) (N.Agapov, N.Krasavin, G.Mytsin, J.Ruzicka) 30/ 9030/ 90 LHC DampLHC Damp (V.Zhabitsky) (V.Zhabitsky) 30/ 11030/ 110 ILCILC Phys+Det Phys+Det (A.Olshevsky)(A.Olshevsky) 110/ 349110/ 349 ILCILC: Accelerator Physics and Engineering : Accelerator Physics and Engineering (A.Sissakian, G.Shirkov) (A.Sissakian, G.Shirkov) 145145/ / 459**459**

+352+352/ / 2512 n-b2512 n-b

Page 13: JINR Topical Plan for 2007 in line with the Provisions of the Road Map R. Lednicky JINR, Dubna Scientific Council 101 th meeting, 18-19 January 2007

University Education + DIAS-University Education + DIAS-THTH

Lectures Training

University Centre of JINRUniversity Centre of JINR University “DUBNA”

1.10.1994 г.

Page 14: JINR Topical Plan for 2007 in line with the Provisions of the Road Map R. Lednicky JINR, Dubna Scientific Council 101 th meeting, 18-19 January 2007

JINR

European School on High-Energy PhysicsEuropean School on High-Energy PhysicsCERN-JINR schools since 1970CERN-JINR schools since 1970

Aronsborg near Stockholm, Sweden18 June – 1 July 2006Tsakhkadzor, Armenia

24 August – 6 September 2003

Trest, Czech Republic19 August – 1 September 2007

Page 15: JINR Topical Plan for 2007 in line with the Provisions of the Road Map R. Lednicky JINR, Dubna Scientific Council 101 th meeting, 18-19 January 2007

JINR – 0ne of the organizers

A. Sissakian – vice-chairman

G. Kozlov – secretary

V. Kekelidze, I. Meshkov,

A. Olshevsky, O. Teriaev

– co-leaders of parallel sessions

17 talks at parallel sessions

1 plenary talk (D. Kazakov)

Page 16: JINR Topical Plan for 2007 in line with the Provisions of the Road Map R. Lednicky JINR, Dubna Scientific Council 101 th meeting, 18-19 January 2007

XXXIII INTERNATIONAL CONFERENCEXXXIII INTERNATIONAL CONFERENCEON HIGH ENERGY PHYSICSON HIGH ENERGY PHYSICS

ICHEP’06ICHEP’06Moscow, 26.07-02.08.2006Moscow, 26.07-02.08.2006

D.Kazakov (BLTP) “Plenary talk: Beyond the Standard Model (Theory)”D.Kazakov (BLTP) “Plenary talk: Beyond the Standard Model (Theory)”I.Anikin (BLTP) “Recent and future experimental evidence for exotic mesons”I.Anikin (BLTP) “Recent and future experimental evidence for exotic mesons”D.Arkhipkin (LPP) “Suppression of high pt non-photonic electrons at RHIC”D.Arkhipkin (LPP) “Suppression of high pt non-photonic electrons at RHIC”S.Balev (LPP) “Search for CPV in KS.Balev (LPP) “Search for CPV in K±decays, NA48/2”±decays, NA48/2”Ju.Belikov (VBLHE/CERN) “The first year of LHC physics analysis using the GRID: Ju.Belikov (VBLHE/CERN) “The first year of LHC physics analysis using the GRID: Prospects from ALICE”Prospects from ALICE”A.Dorokhov (BLTP) “Hadronic corrections to muon g-2 within instanton model”A.Dorokhov (BLTP) “Hadronic corrections to muon g-2 within instanton model”M.Doroshenko (DLNP) “Search for K_L → pi nu nubar, E391”M.Doroshenko (DLNP) “Search for K_L → pi nu nubar, E391”Yu.Gornushkin (DLNP) “OPERA-status of the experiment”Yu.Gornushkin (DLNP) “OPERA-status of the experiment”A.Guskov (DLNP) “Pion polarisability at COMPASS”A.Guskov (DLNP) “Pion polarisability at COMPASS”M.Kapichine (LPP) “Diffractive final states (HI/ZEUS)”M.Kapichine (LPP) “Diffractive final states (HI/ZEUS)”A.Kotikov (BLTP) “Anomalous dimensions of Wilson operators in QCD and N=4 SYM model”A.Kotikov (BLTP) “Anomalous dimensions of Wilson operators in QCD and N=4 SYM model”O.Kouznetsov (LPP) “Gluon polarization measurement at COMPASS”O.Kouznetsov (LPP) “Gluon polarization measurement at COMPASS”V.Krasnov (VBLHE) “Experimental study of resonant-like structure in the pion V.Krasnov (VBLHE) “Experimental study of resonant-like structure in the pion production reaction on the Nuclotron”production reaction on the Nuclotron”R.Lednicky (LPP/Directorate) “Particle correlations in heavy ion collisions”R.Lednicky (LPP/Directorate) “Particle correlations in heavy ion collisions”O.Rogachevsky (VBLHE) “Scale dependent analysis approach for STAR events”O.Rogachevsky (VBLHE) “Scale dependent analysis approach for STAR events”S.Shmatov (LPP) “Search for extra dimensions with ATLAS and CMS detectors at the LHC”S.Shmatov (LPP) “Search for extra dimensions with ATLAS and CMS detectors at the LHC”A.Sorin (BLTP) “QCD Matter: search for mixed phase”A.Sorin (BLTP) “QCD Matter: search for mixed phase”V.Zykunov (LPP) “Weak radiative corrections to the Drell-Yan process”V.Zykunov (LPP) “Weak radiative corrections to the Drell-Yan process”

Page 17: JINR Topical Plan for 2007 in line with the Provisions of the Road Map R. Lednicky JINR, Dubna Scientific Council 101 th meeting, 18-19 January 2007

Thank you for your Thank you for your attention!attention!