St Alban’s 24 kW Solar
Saint Alban’s 24 kW Solar Installation, August of 2009
![Page 2: Jim Muhlenbruch - St Alban’s 24 k w solar](https://reader030.vdocuments.us/reader030/viewer/2022032619/55c35289bb61eb52378b4697/html5/thumbnails/2.jpg)
Proposal received;
24,000 watt solar PV system
Total installed cost: $135,100 ($5.63/w)
Austin Energy Estimated Rebate: $100,000 (cap)
Net cost to St. Alban’s: $35,100 ($1.46/w)
Payment plan: 117 solar panels at $300 each purchased by parishioners as church donation.
![Page 3: Jim Muhlenbruch - St Alban’s 24 k w solar](https://reader030.vdocuments.us/reader030/viewer/2022032619/55c35289bb61eb52378b4697/html5/thumbnails/3.jpg)
The application for the proposed $100,000 rebate from Austin Energy became a reality in August 2009.
![Page 4: Jim Muhlenbruch - St Alban’s 24 k w solar](https://reader030.vdocuments.us/reader030/viewer/2022032619/55c35289bb61eb52378b4697/html5/thumbnails/4.jpg)
Our solar interconnection equipment line up…includes inverters, combiner panel, solar production meter, and A/C disconnect switch. All back feeding into existing building distribution panel.
Inverters Existing PLC Sub-Panel
![Page 5: Jim Muhlenbruch - St Alban’s 24 k w solar](https://reader030.vdocuments.us/reader030/viewer/2022032619/55c35289bb61eb52378b4697/html5/thumbnails/5.jpg)
Site challenge:Metering as required by Austin Energy.
Main electrical service is on another building from our solar interconnection.
(Requires coordination with Austin Energy and variances for metering)
![Page 6: Jim Muhlenbruch - St Alban’s 24 k w solar](https://reader030.vdocuments.us/reader030/viewer/2022032619/55c35289bb61eb52378b4697/html5/thumbnails/6.jpg)
Included with our solar installation was a “real time” production/consumption flat panel monitor in our Parish Life Center lobby.
![Page 7: Jim Muhlenbruch - St Alban’s 24 k w solar](https://reader030.vdocuments.us/reader030/viewer/2022032619/55c35289bb61eb52378b4697/html5/thumbnails/7.jpg)
Production has been shown to exceed proposal projections.
![Page 8: Jim Muhlenbruch - St Alban’s 24 k w solar](https://reader030.vdocuments.us/reader030/viewer/2022032619/55c35289bb61eb52378b4697/html5/thumbnails/8.jpg)
Note:
This is not representative of total production since PV system was installed.
At a point in the past we converted monitoring over to a new system and was unable to carry forward production up to that point.
We are quite pleased with our solar production with absolutely zero system maintenance costs.