jica · 2008. 10. 28. · step a (type-3) power system analysis for step a - power system analysis...

289
Power System Analysis - Ashanti 11kV -

Upload: others

Post on 16-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

  • Power System Analysis

    - Ashanti 11kV -

  • Step A (Type-3)

    Pow

    er S

    yste

    m A

    naly

    sis

    for S

    tep

    A -

    Pow

    er S

    yste

    m A

    naly

    sis

    for e

    xist

    ing

    syst

    em u

    sing

    Mac

    ro d

    eman

    d fo

    reca

    st -

    No.

    7N

    o.7

    No.

    7

    →I m

    axR

    T1

    =5.6Ω

    XT1

    =7.2Ω

    RT2

    =1.9Ω

    XT2

    =2.4Ω

    RB

    2=2

    .8Ω

    XB

    2=3

    .6Ω

    Trun

    k Li

    ne 1

    Trun

    k Li

    ne 2

    Bra

    nch

    Line

    2

    RB

    1=2

    .8Ω

    XB

    1=3

    .6Ω

    RB

    3=3

    .8Ω

    XB

    3=5

    .0Ω

    Bra

    nch

    Line

    1B

    ranc

    h Li

    ne 3

    No.

    7N

    o.7

    ====

    =Equ

    atio

    n===

    ==V

    i1 =

    Vs

    - 1.7

    32・(R

    T1co

    sθ +

    XT1

    sinθ

    )・(L

    T1・f T

    1 + L

    T2 +

    LB

    1 +

    L B2 +

    L B3)

    Vi2 =

    Vi1

    - 1.

    732・

    (RT2

    cosθ

    + X

    T2si

    nθ)・

    (LT2

    ・f T

    2 + L

    B2 +

    L B3)

    Vr1

    = V

    i1 -

    1.73

    2・L B

    1(R

    B1c

    osθ

    + X

    B1s

    inθ

    )・f B

    1

    Vr2

    = V

    i2 -

    1.73

    2・L B

    2(R

    B2c

    osθ

    + X

    B2s

    inθ

    )・f B

    2

    Vr3

    = V

    i2 -

    1.73

    2・L B

    3(R

    B3c

    osθ

    + X

    B3s

    inθ

    )・f B

    3

    LT1

    = I

    max

    ・C

    AP

    T1/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LT2

    = I

    max

    ・C

    AP

    T2/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LB

    1 =

    Im

    ax・C

    AP

    B1/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LB

    2 =

    Im

    ax・C

    AP

    B2/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LB

    3 =

    Im

    ax・C

    AP

    B3/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    I max

    = L

    T1

    + L

    T2

    + L

    B1 +

    LB

    2 +

    LB

    3

    Vs

    : Sup

    ply

    Vol

    tage

    I max

    : Max

    imum

    Cur

    rent

    : Res

    ista

    nce

    Vi1

    : Int

    erim

    Vol

    tage

    L T1

    : Loa

    d (T

    runk

    line

    1)

    : Rea

    ctan

    ceV

    i2: I

    nter

    im V

    olta

    geL T

    2: L

    oad

    (Tru

    nk li

    ne 2

    )f T

    1, f T

    2, f B

    1, f B

    2, f B

    3

    Vr1

    L B1

    : Loa

    d (B

    ranc

    h Li

    ne 1

    )V

    r2L B

    2: L

    oad

    (Bra

    nch

    Line

    2)

    Vr3

    L B3

    : Loa

    d (B

    ranc

    h Li

    ne 3

    )co

    sθ: P

    ower

    Fac

    tor

    : Dis

    pers

    al L

    oad

    Fact

    or

    : Tot

    al T

    rans

    form

    er C

    apac

    ity o

    f sec

    onda

    ry s

    ubst

    atio

    ns

    Type

    of D

    istri

    bute

    d Lo

    adE

    qual

    ityTo

    tal T

    rans

    form

    erC

    apac

    ity o

    f sec

    onda

    rysu

    bsta

    tions

    CA

    P T2

    1115

    kVA

    L B1 (D

    istri

    bute

    d or

    Con

    cent

    rate

    d Lo

    ad)

    5AA

    AC

    120m

    m2

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP B

    1

    300k

    VA

    AA

    C12

    0mm

    2

    Type

    of D

    istri

    bute

    d Lo

    adE

    qual

    ityLi

    ne L

    engt

    h Le

    n B1

    10.1

    km

    Vol

    tage

    Vr2

    9.3k

    V(1

    5%D

    rop)

    Load

    ing

    8%R

    ated

    Cur

    rent

    =455

    A

    Max

    imum

    L T1

    (Dis

    tribu

    ted

    Load

    )

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP T

    1

    1150

    kVA

    L B2 (D

    istri

    bute

    d or

    Con

    cent

    rate

    d Lo

    ad)

    Pow

    er fa

    ctor

    Loading

    Load

    LB

    1

    Sub

    stat

    ion

    Nam

    eK

    ON

    ON

    GO

    Feed

    er N

    ame

    AG

    OG

    O

    Load

    ing

    Type

    -3

    Cur

    rent

    I max

    95.0

    A

    Load

    LT1

    Type

    of D

    istri

    bute

    d Lo

    ad

    Line

    Typ

    e21

    AA

    AC

    120m

    m2

    Mid

    dle

    Larg

    erLi

    ne L

    egth

    Len

    T26.

    8km

    Line

    Typ

    e

    Vol

    tage

    Vi1

    9.7k

    VR

    ated

    Cur

    rent

    21%

    9.7k

    V(1

    2%D

    rop)

    Vol

    tage

    Vr1

    1%

    Line

    Typ

    eA

    AC

    120m

    m2

    0.85

    Line

    Leg

    th L

    enT1

    20.3

    km

    (cosθ)

    (11%

    Dro

    p)=4

    55A

    Vol

    tage

    VS

    11.0

    kV

    Mid

    dle

    Sm

    alle

    r

    Line

    Len

    gth

    Len B

    110

    .1km

    Line

    Typ

    e

    Type

    of D

    istri

    bute

    d Lo

    ad

    : Inp

    ut d

    ata

    in c

    olor

    ed c

    ells

    =455

    A

    Rat

    ed C

    urre

    nt=4

    55A

    Load

    LB

    237

    A

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP B

    2

    2050

    kVA

    Load

    LT2

    20A

    L T2

    (Dis

    tribu

    ted

    Load

    )

    Loading

    15%

    Rat

    ed C

    urre

    nt

    Vol

    tage

    Vi2

    9.5k

    V(1

    4%D

    rop)

    Load

    ing

    L B3 (D

    istri

    bute

    d or

    Con

    cent

    rate

    d Lo

    ad)

    AA

    C12

    0mm

    2

    Type

    of D

    istri

    bute

    d Lo

    adM

    iddl

    e La

    rger

    Load

    LB

    3

    Line

    Len

    gth

    Len B

    313

    .9km

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP B

    3

    600k

    VA

    Vol

    tage

    Vr3

    9.4k

    V(1

    5%D

    rop)

    2%R

    ated

    Cur

    rent

    =455

    A

    11A

    Line

    Typ

    e

    : Rec

    eive

    d V

    olta

    ge

    RT1

    , RT2

    , RB

    1, R

    B2,

    RB

    3

    X T1,

    X T2,

    X B1,

    X B2,

    X B3

    CA

    PB

    2, C

    AP

    B3

    CA

    P T1,

    CA

    PT2

    , CA

    PB

    1: R

    ecei

    ved

    Vol

    tage

    : Rec

    eive

    d V

    olta

    ge

    Prim

    ary

    Sub

    stat

    ion

    JICA

    Stu

    dy o

    n "P

    ower

    Dis

    trib

    utio

    n Sy

    stem

    MAs

    ter

    Plan

    Stu

    dy f

    or Gha

    na"

  • Step A (Type-3)

    Pow

    er S

    yste

    m A

    naly

    sis

    for S

    tep

    A -

    Pow

    er S

    yste

    m A

    naly

    sis

    for e

    xist

    ing

    syst

    em u

    sing

    Mac

    ro d

    eman

    d fo

    reca

    st -

    No.

    7N

    o.7

    No.

    7

    →I m

    axR

    T1

    =1.1Ω

    XT1

    =1.4Ω

    RT2

    =1.4Ω

    XT2

    =1.8Ω

    RB

    2=1

    .3Ω

    XB

    2=1

    .6Ω

    Trun

    k Li

    ne 1

    Trun

    k Li

    ne 2

    Bra

    nch

    Line

    2

    RB

    1=1

    .5Ω

    XB

    1=1

    .9Ω

    RB

    3=1

    .0Ω

    XB

    3=1

    .4Ω

    Bra

    nch

    Line

    1B

    ranc

    h Li

    ne 3

    No.

    7N

    o.7

    ====

    =Equ

    atio

    n===

    ==V

    i1 =

    Vs

    - 1.7

    32・(R

    T1co

    sθ +

    XT1

    sinθ

    )・(L

    T1・f T

    1 + L

    T2 +

    LB

    1 +

    L B2 +

    L B3)

    Vi2 =

    Vi1

    - 1.

    732・

    (RT2

    cosθ

    + X

    T2si

    nθ)・

    (LT2

    ・f T

    2 + L

    B2 +

    L B3)

    Vr1

    = V

    i1 -

    1.73

    2・L B

    1(R

    B1c

    osθ

    + X

    B1s

    inθ

    )・f B

    1

    Vr2

    = V

    i2 -

    1.73

    2・L B

    2(R

    B2c

    osθ

    + X

    B2s

    inθ

    )・f B

    2

    Vr3

    = V

    i2 -

    1.73

    2・L B

    3(R

    B3c

    osθ

    + X

    B3s

    inθ

    )・f B

    3

    LT1

    = I

    max

    ・C

    AP

    T1/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LT2

    = I

    max

    ・C

    AP

    T2/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LB

    1 =

    Im

    ax・C

    AP

    B1/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LB

    2 =

    Im

    ax・C

    AP

    B2/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LB

    3 =

    Im

    ax・C

    AP

    B3/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    I max

    = L

    T1

    + L

    T2

    + L

    B1 +

    LB

    2 +

    LB

    3

    Vs

    : Sup

    ply

    Vol

    tage

    I max

    : Max

    imum

    Cur

    rent

    : Res

    ista

    nce

    Vi1

    : Int

    erim

    Vol

    tage

    L T1

    : Loa

    d (T

    runk

    line

    1)

    : Rea

    ctan

    ceV

    i2: I

    nter

    im V

    olta

    geL T

    2: L

    oad

    (Tru

    nk li

    ne 2

    )f T

    1, f T

    2, f B

    1, f B

    2, f B

    3

    Vr1

    L B1

    : Loa

    d (B

    ranc

    h Li

    ne 1

    )V

    r2L B

    2: L

    oad

    (Bra

    nch

    Line

    2)

    Vr3

    L B3

    : Loa

    d (B

    ranc

    h Li

    ne 3

    )co

    sθ: P

    ower

    Fac

    tor

    : Dis

    pers

    al L

    oad

    Fact

    or

    : Tot

    al T

    rans

    form

    er C

    apac

    ity o

    f sec

    onda

    ry s

    ubst

    atio

    ns

    Type

    of D

    istri

    bute

    d Lo

    adE

    qual

    ityTo

    tal T

    rans

    form

    erC

    apac

    ity o

    f sec

    onda

    rysu

    bsta

    tions

    CA

    P T2

    5330

    kVA

    L B1 (D

    istri

    bute

    d or

    Con

    cent

    rate

    d Lo

    ad)

    113A

    AA

    C12

    0mm

    2

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP B

    1

    3740

    kVA

    AA

    C12

    0mm

    2

    Type

    of D

    istri

    bute

    d Lo

    adS

    endi

    ng L

    arge

    r

    Line

    Len

    gth

    Len B

    14.

    6km

    Vol

    tage

    Vr2

    9.6k

    V(1

    3%D

    rop)

    Load

    ing

    3%R

    ated

    Cur

    rent

    =455

    A

    Max

    imum

    L T1

    (Dis

    tribu

    ted

    Load

    )

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP T

    1

    2030

    kVA

    L B2 (D

    istri

    bute

    d or

    Con

    cent

    rate

    d Lo

    ad)

    Pow

    er fa

    ctor

    Loading

    Load

    LB

    1

    Sub

    stat

    ion

    Nam

    eM

    AIN

    CFe

    eder

    Nam

    eA

    IRP

    OR

    T 1

    Load

    ing

    Type

    -3

    Cur

    rent

    I max

    365.

    0A

    Load

    LT1

    Type

    of D

    istri

    bute

    d Lo

    ad

    Line

    Typ

    e61

    AA

    AC

    120m

    m2

    Equ

    ality

    Line

    Leg

    th L

    enT2

    5.1k

    mLi

    ne T

    ype

    Vol

    tage

    Vi1

    10.0

    kVR

    ated

    Cur

    rent

    80%

    9.8k

    V(1

    1%D

    rop)

    Vol

    tage

    Vr1

    25%

    Line

    Typ

    eA

    AC

    120m

    m2

    0.82

    Line

    Leg

    th L

    enT1

    4.0k

    m

    (cosθ)

    (9%

    Dro

    p)=4

    55A

    Vol

    tage

    VS

    11.0

    kV

    Mid

    dle

    Larg

    er

    Line

    Len

    gth

    Len B

    15.

    4km

    Line

    Typ

    e

    Type

    of D

    istri

    bute

    d Lo

    ad

    : Inp

    ut d

    ata

    in c

    olor

    ed c

    ells

    =455

    A

    Rat

    ed C

    urre

    nt=4

    55A

    Load

    LB

    214

    A

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP B

    2

    450k

    VA

    Load

    LT2

    161A

    L T2

    (Dis

    tribu

    ted

    Load

    )

    Loading

    42%

    Rat

    ed C

    urre

    nt

    Vol

    tage

    Vi2

    9.6k

    V(1

    3%D

    rop)

    Load

    ing

    L B3 (D

    istri

    bute

    d or

    Con

    cent

    rate

    d Lo

    ad)

    AA

    C12

    0mm

    2

    Type

    of D

    istri

    bute

    d Lo

    adE

    qual

    ity

    Load

    LB

    3

    Line

    Len

    gth

    Len B

    33.

    8km

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP B

    3

    500k

    VA

    Vol

    tage

    Vr3

    9.6k

    V(1

    3%D

    rop)

    3%R

    ated

    Cur

    rent

    =455

    A

    15A

    Line

    Typ

    e

    : Rec

    eive

    d V

    olta

    ge

    RT1

    , RT2

    , RB

    1, R

    B2,

    RB

    3

    X T1,

    X T2,

    X B1,

    X B2,

    X B3

    CA

    PB

    2, C

    AP

    B3

    CA

    P T1,

    CA

    PT2

    , CA

    PB

    1: R

    ecei

    ved

    Vol

    tage

    : Rec

    eive

    d V

    olta

    ge

    Prim

    ary

    Sub

    stat

    ion

    JICA

    Stu

    dy o

    n "P

    ower

    Dis

    trib

    utio

    n Sy

    stem

    MAs

    ter

    Plan

    Stu

    dy f

    or Gha

    na"

  • Step A (Type-3)

    Pow

    er S

    yste

    m A

    naly

    sis

    for S

    tep

    A -

    Pow

    er S

    yste

    m A

    naly

    sis

    for e

    xist

    ing

    syst

    em u

    sing

    Mac

    ro d

    eman

    d fo

    reca

    st -

    No.

    7N

    o.7

    No.

    7

    →I m

    axR

    T1

    =1.0Ω

    XT1

    =1.2Ω

    RT2

    =1.8Ω

    XT2

    =2.3Ω

    RB

    2=1

    .0Ω

    XB

    2=1

    .4Ω

    Trun

    k Li

    ne 1

    Trun

    k Li

    ne 2

    Bra

    nch

    Line

    2

    RB

    1=.

    6ΩX

    B1

    =.8Ω

    RB

    3=.

    4ΩX

    B3

    =.5Ω

    Bra

    nch

    Line

    1B

    ranc

    h Li

    ne 3

    No.

    7N

    o.7

    ====

    =Equ

    atio

    n===

    ==V

    i1 =

    Vs

    - 1.7

    32・(R

    T1co

    sθ +

    XT1

    sinθ

    )・(L

    T1・f T

    1 + L

    T2 +

    LB

    1 +

    L B2 +

    L B3)

    Vi2 =

    Vi1

    - 1.

    732・

    (RT2

    cosθ

    + X

    T2si

    nθ)・

    (LT2

    ・f T

    2 + L

    B2 +

    L B3)

    Vr1

    = V

    i1 -

    1.73

    2・L B

    1(R

    B1c

    osθ

    + X

    B1s

    inθ

    )・f B

    1

    Vr2

    = V

    i2 -

    1.73

    2・L B

    2(R

    B2c

    osθ

    + X

    B2s

    inθ

    )・f B

    2

    Vr3

    = V

    i2 -

    1.73

    2・L B

    3(R

    B3c

    osθ

    + X

    B3s

    inθ

    )・f B

    3

    LT1

    = I

    max

    ・C

    AP

    T1/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LT2

    = I

    max

    ・C

    AP

    T2/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LB

    1 =

    Im

    ax・C

    AP

    B1/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LB

    2 =

    Im

    ax・C

    AP

    B2/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LB

    3 =

    Im

    ax・C

    AP

    B3/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    I max

    = L

    T1

    + L

    T2

    + L

    B1 +

    LB

    2 +

    LB

    3

    Vs

    : Sup

    ply

    Vol

    tage

    I max

    : Max

    imum

    Cur

    rent

    : Res

    ista

    nce

    Vi1

    : Int

    erim

    Vol

    tage

    L T1

    : Loa

    d (T

    runk

    line

    1)

    : Rea

    ctan

    ceV

    i2: I

    nter

    im V

    olta

    geL T

    2: L

    oad

    (Tru

    nk li

    ne 2

    )f T

    1, f T

    2, f B

    1, f B

    2, f B

    3

    Vr1

    L B1

    : Loa

    d (B

    ranc

    h Li

    ne 1

    )V

    r2L B

    2: L

    oad

    (Bra

    nch

    Line

    2)

    Vr3

    L B3

    : Loa

    d (B

    ranc

    h Li

    ne 3

    )co

    sθ: P

    ower

    Fac

    tor

    : Dis

    pers

    al L

    oad

    Fact

    or

    : Tot

    al T

    rans

    form

    er C

    apac

    ity o

    f sec

    onda

    ry s

    ubst

    atio

    ns

    Type

    of D

    istri

    bute

    d Lo

    adR

    ecei

    ved

    Larg

    er

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP T

    2

    6425

    kVA

    L B1 (D

    istri

    bute

    d or

    Con

    cent

    rate

    d Lo

    ad)

    44A

    AA

    C12

    0mm

    2

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP B

    1

    1365

    kVA

    AA

    C12

    0mm

    2

    Type

    of D

    istri

    bute

    d Lo

    adE

    qual

    ityLi

    ne L

    engt

    h Le

    n B1

    3.8k

    m

    Vol

    tage

    Vr2

    9.0k

    V(1

    8%D

    rop)

    Load

    ing

    9%R

    ated

    Cur

    rent

    =455

    A

    Max

    imum

    L T1

    (Dis

    tribu

    ted

    Load

    )

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP T

    1

    2600

    kVA

    L B2 (D

    istri

    bute

    d or

    Con

    cent

    rate

    d Lo

    ad)

    Pow

    er fa

    ctor

    Loading

    Load

    LB

    1

    Sub

    stat

    ion

    Nam

    eM

    AIN

    CFe

    eder

    Nam

    eA

    IRP

    OR

    T 2

    Load

    ing

    Type

    -3

    Cur

    rent

    I max

    405.

    0A

    Load

    LT1

    Type

    of D

    istri

    bute

    d Lo

    ad

    Line

    Typ

    e84

    AA

    AC

    120m

    m2

    Equ

    ality

    Line

    Leg

    th L

    enT2

    6.5k

    mLi

    ne T

    ype

    Vol

    tage

    Vi1

    10.1

    kVR

    ated

    Cur

    rent

    89%

    10.0

    kV(9

    %D

    rop)

    Vol

    tage

    Vr1

    10%

    Line

    Typ

    eA

    AC

    120m

    m2

    0.82

    Line

    Leg

    th L

    enT1

    3.5k

    m

    (cosθ)

    (9%

    Dro

    p)=4

    55A

    Vol

    tage

    VS

    11.0

    kV

    Equ

    ality

    Line

    Len

    gth

    Len B

    12.

    2km

    Line

    Typ

    e

    Type

    of D

    istri

    bute

    d Lo

    ad

    : Inp

    ut d

    ata

    in c

    olor

    ed c

    ells

    =455

    A

    Rat

    ed C

    urre

    nt=4

    55A

    Load

    LB

    239

    A

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP B

    2

    1215

    kVA

    Load

    LT2

    206A

    L T2

    (Dis

    tribu

    ted

    Load

    )

    Loading

    61%

    Rat

    ed C

    urre

    nt

    Vol

    tage

    Vi2

    9.0k

    V(1

    8%D

    rop)

    Load

    ing

    L B3 (D

    istri

    bute

    d or

    Con

    cent

    rate

    d Lo

    ad)

    AA

    C12

    0mm

    2

    Type

    of D

    istri

    bute

    d Lo

    adE

    qual

    ity

    Load

    LB

    3

    Line

    Len

    gth

    Len B

    31.

    3km

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP B

    3

    1000

    kVA

    Vol

    tage

    Vr3

    9.0k

    V(1

    8%D

    rop)

    7%R

    ated

    Cur

    rent

    =455

    A

    32A

    Line

    Typ

    e

    : Rec

    eive

    d V

    olta

    ge

    RT1

    , RT2

    , RB

    1, R

    B2,

    RB

    3

    X T1,

    X T2,

    X B1,

    X B2,

    X B3

    CA

    PB

    2, C

    AP

    B3

    CA

    P T1,

    CA

    PT2

    , CA

    PB

    1: R

    ecei

    ved

    Vol

    tage

    : Rec

    eive

    d V

    olta

    ge

    Prim

    ary

    Sub

    stat

    ion

    JICA

    Stu

    dy o

    n "P

    ower

    Dis

    trib

    utio

    n Sy

    stem

    MAs

    ter

    Plan

    Stu

    dy f

    or Gha

    na"

  • Step A (Type-3)

    Pow

    er S

    yste

    m A

    naly

    sis

    for S

    tep

    A -

    Pow

    er S

    yste

    m A

    naly

    sis

    for e

    xist

    ing

    syst

    em u

    sing

    Mac

    ro d

    eman

    d fo

    reca

    st -

    No.

    24N

    o.7

    No.

    7

    →I m

    axR

    T1

    =.2Ω

    XT1

    =.1Ω

    RT2

    =.7Ω

    XT2

    =.9Ω

    RB

    2=.

    9ΩX

    B2

    =1.1Ω

    Trun

    k Li

    ne 1

    Trun

    k Li

    ne 2

    Bra

    nch

    Line

    2

    RB

    1=.

    4ΩX

    B1

    =.5Ω

    RB

    3=.

    8ΩX

    B3

    =1.0Ω

    Bra

    nch

    Line

    1B

    ranc

    h Li

    ne 3

    No.

    7N

    o.7

    ====

    =Equ

    atio

    n===

    ==V

    i1 =

    Vs

    - 1.7

    32・(R

    T1co

    sθ +

    XT1

    sinθ

    )・(L

    T1・f T

    1 + L

    T2 +

    LB

    1 +

    L B2 +

    L B3)

    Vi2 =

    Vi1

    - 1.

    732・

    (RT2

    cosθ

    + X

    T2si

    nθ)・

    (LT2

    ・f T

    2 + L

    B2 +

    L B3)

    Vr1

    = V

    i1 -

    1.73

    2・L B

    1(R

    B1c

    osθ

    + X

    B1s

    inθ

    )・f B

    1

    Vr2

    = V

    i2 -

    1.73

    2・L B

    2(R

    B2c

    osθ

    + X

    B2s

    inθ

    )・f B

    2

    Vr3

    = V

    i2 -

    1.73

    2・L B

    3(R

    B3c

    osθ

    + X

    B3s

    inθ

    )・f B

    3

    LT1

    = I

    max

    ・C

    AP

    T1/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LT2

    = I

    max

    ・C

    AP

    T2/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LB

    1 =

    Im

    ax・C

    AP

    B1/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LB

    2 =

    Im

    ax・C

    AP

    B2/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LB

    3 =

    Im

    ax・C

    AP

    B3/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    I max

    = L

    T1

    + L

    T2

    + L

    B1 +

    LB

    2 +

    LB

    3

    Vs

    : Sup

    ply

    Vol

    tage

    I max

    : Max

    imum

    Cur

    rent

    : Res

    ista

    nce

    Vi1

    : Int

    erim

    Vol

    tage

    L T1

    : Loa

    d (T

    runk

    line

    1)

    : Rea

    ctan

    ceV

    i2: I

    nter

    im V

    olta

    geL T

    2: L

    oad

    (Tru

    nk li

    ne 2

    )f T

    1, f T

    2, f B

    1, f B

    2, f B

    3

    Vr1

    L B1

    : Loa

    d (B

    ranc

    h Li

    ne 1

    )V

    r2L B

    2: L

    oad

    (Bra

    nch

    Line

    2)

    Vr3

    L B3

    : Loa

    d (B

    ranc

    h Li

    ne 3

    )co

    sθ: P

    ower

    Fac

    tor

    : Rec

    eive

    d V

    olta

    ge

    RT1

    , RT2

    , RB

    1, R

    B2,

    RB

    3

    X T1,

    X T2,

    X B1,

    X B2,

    X B3

    CA

    PB

    2, C

    AP

    B3

    CA

    P T1,

    CA

    PT2

    , CA

    PB

    1: R

    ecei

    ved

    Vol

    tage

    : Rec

    eive

    d V

    olta

    ge

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP B

    3

    1350

    kVA

    Vol

    tage

    Vr3

    10.5

    kV(4

    %D

    rop)

    13%

    Rat

    ed C

    urre

    nt=4

    55A

    61A

    Line

    Typ

    eA

    AC

    120m

    m2

    Type

    of D

    istri

    bute

    d Lo

    adR

    ecei

    ved

    Larg

    er

    Load

    LB

    3

    Line

    Len

    gth

    Len B

    32.

    8km

    Vol

    tage

    Vi2

    10.6

    kV(4

    %D

    rop)

    Load

    ing

    L B3 (D

    istri

    bute

    d or

    Con

    cent

    rate

    d Lo

    ad)

    L T2

    (Dis

    tribu

    ted

    Load

    )

    Loading

    74%

    Rat

    ed C

    urre

    nt

    : Inp

    ut d

    ata

    in c

    olor

    ed c

    ells

    =335

    A

    Rat

    ed C

    urre

    nt=4

    55A

    Load

    LB

    255

    A

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP B

    2

    1230

    kVA

    Load

    LT2

    132A

    Rec

    eive

    d La

    rger

    Line

    Len

    gth

    Len B

    11.

    4km

    Line

    Typ

    e

    Type

    of D

    istri

    bute

    d Lo

    ad

    Line

    Typ

    eA

    AC

    120m

    m2

    0.97

    Line

    Leg

    th L

    enT1

    1.1k

    m

    (cosθ)

    (1%

    Dro

    p)=4

    55A

    Vol

    tage

    VS

    11.0

    kV

    10.9

    kV(1

    %D

    rop)

    Vol

    tage

    Vr1

    13%

    Vol

    tage

    Vi1

    10.9

    kVR

    ated

    Cur

    rent

    100%

    Load

    LT1

    Type

    of D

    istri

    bute

    d Lo

    ad

    Line

    Typ

    e28

    A18

    5ALX

    PLE

    (11k

    V)

    Equ

    ality

    Line

    Leg

    th L

    enT2

    2.6k

    mLi

    ne T

    ype

    Loading

    Load

    LB

    1

    Sub

    stat

    ion

    Nam

    eM

    AIN

    B

    Feed

    er N

    ame

    B 1

    1

    Load

    ing

    Type

    -3

    Cur

    rent

    I max

    335.

    0A

    L B2 (D

    istri

    bute

    d or

    Con

    cent

    rate

    d Lo

    ad)

    Pow

    er fa

    ctor

    Max

    imum

    L T1

    (Dis

    tribu

    ted

    Load

    )

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP T

    1

    630k

    VA

    Vol

    tage

    Vr2

    10.6

    kV(4

    %D

    rop)

    Load

    ing

    12%

    Rat

    ed C

    urre

    nt=4

    55A

    AA

    C12

    0mm

    2

    Type

    of D

    istri

    bute

    d Lo

    adE

    qual

    ityLi

    ne L

    engt

    h Le

    n B1

    3.1k

    m

    : Tot

    al T

    rans

    form

    er C

    apac

    ity o

    f sec

    onda

    ry s

    ubst

    atio

    ns

    Type

    of D

    istri

    bute

    d Lo

    adE

    qual

    ityTo

    tal T

    rans

    form

    erC

    apac

    ity o

    f sec

    onda

    rysu

    bsta

    tions

    CA

    P T2

    2945

    kVA

    L B1 (D

    istri

    bute

    d or

    Con

    cent

    rate

    d Lo

    ad)

    59A

    AA

    C12

    0mm

    2

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP B

    1

    1315

    kVA

    : Dis

    pers

    al L

    oad

    Fact

    or

    Prim

    ary

    Sub

    stat

    ion

    JICA

    Stu

    dy o

    n "P

    ower

    Dis

    trib

    utio

    n Sy

    stem

    MAs

    ter

    Plan

    Stu

    dy f

    or Gha

    na"

  • Step A (Type-3)

    Pow

    er S

    yste

    m A

    naly

    sis

    for S

    tep

    A -

    Pow

    er S

    yste

    m A

    naly

    sis

    for e

    xist

    ing

    syst

    em u

    sing

    Mac

    ro d

    eman

    d fo

    reca

    st -

    No.

    24N

    o.24

    No.

    7

    →I m

    axR

    T1

    =.3Ω

    XT1

    =.3Ω

    RT2

    =.1Ω

    XT2

    =.1Ω

    RB

    2=.

    5ΩX

    B2

    =.6Ω

    Trun

    k Li

    ne 1

    Trun

    k Li

    ne 2

    Bra

    nch

    Line

    2

    RB

    1=.

    0ΩX

    B1

    =.0Ω

    RB

    3=.

    0ΩX

    B3

    =.0Ω

    Bra

    nch

    Line

    1B

    ranc

    h Li

    ne 3

    No.

    24N

    o.33

    ====

    =Equ

    atio

    n===

    ==V

    i1 =

    Vs

    - 1.7

    32・(R

    T1co

    sθ +

    XT1

    sinθ

    )・(L

    T1・f T

    1 + L

    T2 +

    LB

    1 +

    L B2 +

    L B3)

    Vi2 =

    Vi1

    - 1.

    732・

    (RT2

    cosθ

    + X

    T2si

    nθ)・

    (LT2

    ・f T

    2 + L

    B2 +

    L B3)

    Vr1

    = V

    i1 -

    1.73

    2・L B

    1(R

    B1c

    osθ

    + X

    B1s

    inθ

    )・f B

    1

    Vr2

    = V

    i2 -

    1.73

    2・L B

    2(R

    B2c

    osθ

    + X

    B2s

    inθ

    )・f B

    2

    Vr3

    = V

    i2 -

    1.73

    2・L B

    3(R

    B3c

    osθ

    + X

    B3s

    inθ

    )・f B

    3

    LT1

    = I

    max

    ・C

    AP

    T1/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LT2

    = I

    max

    ・C

    AP

    T2/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LB

    1 =

    Im

    ax・C

    AP

    B1/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LB

    2 =

    Im

    ax・C

    AP

    B2/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LB

    3 =

    Im

    ax・C

    AP

    B3/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    I max

    = L

    T1

    + L

    T2

    + L

    B1 +

    LB

    2 +

    LB

    3

    Vs

    : Sup

    ply

    Vol

    tage

    I max

    : Max

    imum

    Cur

    rent

    : Res

    ista

    nce

    Vi1

    : Int

    erim

    Vol

    tage

    L T1

    : Loa

    d (T

    runk

    line

    1)

    : Rea

    ctan

    ceV

    i2: I

    nter

    im V

    olta

    geL T

    2: L

    oad

    (Tru

    nk li

    ne 2

    )f T

    1, f T

    2, f B

    1, f B

    2, f B

    3

    Vr1

    L B1

    : Loa

    d (B

    ranc

    h Li

    ne 1

    )V

    r2L B

    2: L

    oad

    (Bra

    nch

    Line

    2)

    Vr3

    L B3

    : Loa

    d (B

    ranc

    h Li

    ne 3

    )co

    sθ: P

    ower

    Fac

    tor

    : Dis

    pers

    al L

    oad

    Fact

    or

    : Tot

    al T

    rans

    form

    er C

    apac

    ity o

    f sec

    onda

    ry s

    ubst

    atio

    ns

    Type

    of D

    istri

    bute

    d Lo

    adE

    qual

    ityTo

    tal T

    rans

    form

    erC

    apac

    ity o

    f sec

    onda

    rysu

    bsta

    tions

    CA

    P T2

    1000

    kVA

    L B1 (D

    istri

    bute

    d or

    Con

    cent

    rate

    d Lo

    ad)

    21A

    185A

    LXP

    LE(1

    1kV

    )

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP B

    1

    315k

    VA

    AA

    C12

    0mm

    2

    Type

    of D

    istri

    bute

    d Lo

    adS

    endi

    ng L

    arge

    r

    Line

    Len

    gth

    Len B

    11.

    8km

    Vol

    tage

    Vr2

    10.8

    kV(1

    %D

    rop)

    Load

    ing

    15%

    Rat

    ed C

    urre

    nt=4

    55A

    Max

    imum

    L T1

    (Dis

    tribu

    ted

    Load

    )

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP T

    1

    500k

    VA

    L B2 (D

    istri

    bute

    d or

    Con

    cent

    rate

    d Lo

    ad)

    Pow

    er fa

    ctor

    Loading

    Load

    LB

    1

    Sub

    stat

    ion

    Nam

    eM

    AIN

    BFe

    eder

    Nam

    eB

    21

    Load

    ing

    Type

    -3

    Cur

    rent

    I max

    190.

    0A

    Load

    LT1

    Type

    of D

    istri

    bute

    d Lo

    ad

    Line

    Typ

    e34

    A18

    5ALX

    PLE

    (11k

    V)

    Mid

    dle

    Larg

    erLi

    ne L

    egth

    Len

    T2.4

    kmLi

    ne T

    ype

    Vol

    tage

    Vi1

    10.9

    kVR

    ated

    Cur

    rent

    57%

    10.9

    kV(1

    %D

    rop)

    Vol

    tage

    Vr1

    6%

    Line

    Typ

    e18

    5ALX

    PLE

    (11k

    V)

    0.97

    Line

    Leg

    th L

    enT1

    2.2k

    m

    (cosθ)

    (1%

    Dro

    p)=3

    35A

    Vol

    tage

    VS

    11.0

    kV

    Con

    cent

    rate

    d

    Line

    Len

    gth

    Len B

    1.2

    kmLi

    ne T

    ype

    Type

    of D

    istri

    bute

    d Lo

    ad

    : Inp

    ut d

    ata

    in c

    olor

    ed c

    ells

    =335

    A

    Rat

    ed C

    urre

    nt=3

    35A

    Load

    LB

    268

    A

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP B

    2

    1015

    kVA

    Load

    LT2

    67A

    L T2

    (Dis

    tribu

    ted

    Load

    )

    Loading

    40%

    Rat

    ed C

    urre

    nt

    Vol

    tage

    Vi2

    10.9

    kV(1

    %D

    rop)

    Load

    ing

    L B3 (D

    istri

    bute

    d or

    Con

    cent

    rate

    d Lo

    ad)

    Non

    e

    Type

    of D

    istri

    bute

    d Lo

    adE

    qual

    ity

    Load

    LB

    3

    Line

    Len

    gth

    Len B

    3.0

    km

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP B

    3

    kVA

    Vol

    tage

    Vr3

    10.9

    kV(1

    %D

    rop)

    #DIV

    /0!

    Rat

    ed C

    urre

    nt=A

    ALi

    ne T

    ype

    : Rec

    eive

    d V

    olta

    ge

    RT1

    , RT2

    , RB

    1, R

    B2,

    RB

    3

    X T1,

    X T2,

    X B1,

    X B2,

    X B3

    CA

    PB

    2, C

    AP

    B3

    CA

    P T1,

    CA

    PT2

    , CA

    PB

    1: R

    ecei

    ved

    Vol

    tage

    : Rec

    eive

    d V

    olta

    ge

    Prim

    ary

    Sub

    stat

    ion

    JICA

    Stu

    dy o

    n "P

    ower

    Dis

    trib

    utio

    n Sy

    stem

    MAs

    ter

    Plan

    Stu

    dy f

    or Gha

    na"

  • Step A (Type-2)

    Pow

    er S

    yste

    m A

    naly

    sis

    for S

    tep

    A -

    Pow

    er S

    yste

    m A

    naly

    sis

    for e

    xist

    ing

    syst

    em u

    sing

    Mac

    ro d

    eman

    d fo

    reca

    st -

    No.

    24N

    o.24

    →I m

    axR

    T=.

    1ΩX

    T=.

    1ΩR

    B1

    =.3Ω

    XB

    1=.

    3ΩTr

    unk

    Line

    Bra

    nch

    Line

    1

    RB

    2=.

    4ΩX

    B2

    =.2Ω

    ====

    =Equ

    atio

    n===

    ==B

    ranc

    h Li

    ne 2

    V i =

    Vs

    - 1.7

    32・(R

    Tcos

    θ +

    XTs

    inθ

    )(L T

    ・f T

    + (L

    B1+

    L B2)

    )V r

    1 = V

    i - 1

    .732

    ・L B

    1(R

    B1c

    osθ

    + X

    B1s

    inθ

    )・f B

    1

    V r2 =

    Vi -

    1.7

    32・L B

    2(R

    B2c

    osθ

    + X

    B2s

    inθ

    )・f B

    2

    L

    T =

    Im

    ax・C

    AP

    T/

    (CA

    PT+C

    AP

    B1+C

    AP

    B2)

    LB

    1 =

    Im

    ax・C

    AP

    B1/

    (CA

    PT+C

    AP

    B1+C

    AP

    B2)

    No.

    11L

    B2 =

    Im

    ax・C

    AP

    B2/

    (CA

    PT+C

    AP

    B1+C

    AP

    B2)

    I max

    = L

    T +

    LB

    1 +

    LB

    2

    V s: S

    uppl

    y V

    olta

    geI m

    ax: M

    axim

    um C

    urre

    nt: R

    esis

    tanc

    eV i

    : Int

    erim

    Vol

    tage

    L T: L

    oad

    (Tru

    nk li

    ne)

    : Rea

    ctan

    ceV r

    1L B

    1: L

    oad

    (Bra

    nch

    Line

    1)

    cosθ

    : Pow

    er F

    acto

    rV r

    2L B

    2: L

    oad

    (Bra

    nch

    Line

    2)

    f T, f

    B1,

    f B2

    : Inp

    ut d

    ata

    in c

    olor

    ed c

    ells

    =335

    A

    Rat

    ed C

    urre

    nt=3

    35A

    Line

    Len

    gth

    Len B

    12.

    3km

    Line

    Typ

    e

    Type

    of D

    istri

    bute

    d Lo

    ad

    60A

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP B

    1

    1600

    kVA

    Load

    LB

    218

    A

    Load

    ing

    L B1 (D

    istri

    bute

    d or

    Con

    cent

    rate

    d Lo

    ad)

    L B2 (D

    istri

    bute

    d or

    Con

    cent

    rate

    d Lo

    ad)

    .8km

    (cosθ)

    Vol

    tage

    VS

    11.0

    kVR

    ated

    Cur

    rent

    32%

    Loading

    L T (D

    istri

    bute

    d Lo

    ad)

    Load

    LT

    Type

    of D

    istri

    bute

    d Lo

    ad

    Line

    Typ

    e30

    A18

    5ALX

    PLE

    (11k

    V)

    Sen

    ding

    Lar

    ger

    Equ

    ality

    Load

    LB

    1

    185A

    LXP

    LE(1

    1kV

    )

    Pow

    er fa

    ctor

    Max

    imum

    Sub

    stat

    ion

    Nam

    eM

    AIN

    BFe

    eder

    Nam

    eB

    31

    0.97

    Line

    Leg

    th L

    enT

    Type

    -2

    Cur

    rent

    I max

    107.

    0ATo

    tal T

    rans

    form

    erC

    apac

    ity o

    f sec

    onda

    rysu

    bsta

    tions

    CA

    P T80

    0kV

    A

    : Rec

    eive

    d V

    olta

    ge: R

    ecei

    ved

    Vol

    tage

    RT,

    RB

    1, R

    B2

    XT,

    XB

    1, X

    B2

    11.0

    kV(0

    %D

    rop)

    Line

    Typ

    eA

    AC

    50m

    m2

    (0%

    Dro

    p)11

    .0kV : D

    ispe

    rsal

    Loa

    d Fa

    ctor

    Vol

    tage

    Vr1

    18%

    Vol

    tage

    Vi

    (0%

    Dro

    p)

    Load

    ing

    7%R

    ated

    Cur

    rent

    =260

    AV

    olta

    ge V

    r2

    11.0

    kV

    : Tot

    al T

    rans

    form

    er C

    apac

    ity o

    f sec

    onda

    ry s

    ubst

    atio

    ns

    Line

    Len

    gth

    Len B

    1.6

    km

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP B

    2

    475k

    VA

    CA

    PT,

    CA

    P B1,

    CA

    P B2

    Type

    of D

    istri

    bute

    d Lo

    adS

    endi

    ng L

    arge

    r

    Prim

    ary

    Sub

    stat

    ion

    JICA Study on "Power Distribution System Master Plan Study for G

    hana"

  • Step A (Type-3)

    Pow

    er S

    yste

    m A

    naly

    sis

    for S

    tep

    A -

    Pow

    er S

    yste

    m A

    naly

    sis

    for e

    xist

    ing

    syst

    em u

    sing

    Mac

    ro d

    eman

    d fo

    reca

    st -

    No.

    24N

    o.24

    No.

    24

    →I m

    axR

    T1

    =.1Ω

    XT1

    =.1Ω

    RT2

    =.0Ω

    XT2

    =.0Ω

    RB

    2=.

    3ΩX

    B2

    =.2Ω

    Trun

    k Li

    ne 1

    Trun

    k Li

    ne 2

    Bra

    nch

    Line

    2

    RB

    1=.

    1ΩX

    B1

    =.1Ω

    RB

    3=.

    1ΩX

    B3

    =.1Ω

    Bra

    nch

    Line

    1B

    ranc

    h Li

    ne 3

    No.

    24N

    o.7

    ====

    =Equ

    atio

    n===

    ==V

    i1 =

    Vs

    - 1.7

    32・(R

    T1co

    sθ +

    XT1

    sinθ

    )・(L

    T1・f T

    1 + L

    T2 +

    LB

    1 +

    L B2 +

    L B3)

    Vi2 =

    Vi1

    - 1.

    732・

    (RT2

    cosθ

    + X

    T2si

    nθ)・

    (LT2

    ・f T

    2 + L

    B2 +

    L B3)

    Vr1

    = V

    i1 -

    1.73

    2・L B

    1(R

    B1c

    osθ

    + X

    B1s

    inθ

    )・f B

    1

    Vr2

    = V

    i2 -

    1.73

    2・L B

    2(R

    B2c

    osθ

    + X

    B2s

    inθ

    )・f B

    2

    Vr3

    = V

    i2 -

    1.73

    2・L B

    3(R

    B3c

    osθ

    + X

    B3s

    inθ

    )・f B

    3

    LT1

    = I

    max

    ・C

    AP

    T1/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LT2

    = I

    max

    ・C

    AP

    T2/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LB

    1 =

    Im

    ax・C

    AP

    B1/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LB

    2 =

    Im

    ax・C

    AP

    B2/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LB

    3 =

    Im

    ax・C

    AP

    B3/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    I max

    = L

    T1

    + L

    T2

    + L

    B1 +

    LB

    2 +

    LB

    3

    Vs

    : Sup

    ply

    Vol

    tage

    I max

    : Max

    imum

    Cur

    rent

    : Res

    ista

    nce

    Vi1

    : Int

    erim

    Vol

    tage

    L T1

    : Loa

    d (T

    runk

    line

    1)

    : Rea

    ctan

    ceV

    i2: I

    nter

    im V

    olta

    geL T

    2: L

    oad

    (Tru

    nk li

    ne 2

    )f T

    1, f T

    2, f B

    1, f B

    2, f B

    3

    Vr1

    L B1

    : Loa

    d (B

    ranc

    h Li

    ne 1

    )V

    r2L B

    2: L

    oad

    (Bra

    nch

    Line

    2)

    Vr3

    L B3

    : Loa

    d (B

    ranc

    h Li

    ne 3

    )co

    sθ: P

    ower

    Fac

    tor

    : Dis

    pers

    al L

    oad

    Fact

    or

    : Tot

    al T

    rans

    form

    er C

    apac

    ity o

    f sec

    onda

    ry s

    ubst

    atio

    ns

    Type

    of D

    istri

    bute

    d Lo

    adE

    qual

    ityTo

    tal T

    rans

    form

    erC

    apac

    ity o

    f sec

    onda

    rysu

    bsta

    tions

    CA

    P T2

    kVA

    L B1 (D

    istri

    bute

    d or

    Con

    cent

    rate

    d Lo

    ad)

    13A

    185A

    LXP

    LE(1

    1kV

    )

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP B

    1

    500k

    VA

    185A

    LXP

    LE(1

    1kV

    )

    Type

    of D

    istri

    bute

    d Lo

    adR

    ecei

    ved

    Larg

    er

    Line

    Len

    gth

    Len B

    11.

    7km

    Vol

    tage

    Vr2

    10.9

    kV(1

    %D

    rop)

    Load

    ing

    24%

    Rat

    ed C

    urre

    nt=3

    35A

    Max

    imum

    L T1

    (Dis

    tribu

    ted

    Load

    )

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP T

    1

    300k

    VA

    L B2 (D

    istri

    bute

    d or

    Con

    cent

    rate

    d Lo

    ad)

    Pow

    er fa

    ctor

    Loading

    Load

    LB

    1

    Sub

    stat

    ion

    Nam

    eM

    AIN

    BFe

    eder

    Nam

    eB

    41

    Load

    ing

    Type

    -3

    Cur

    rent

    I max

    110.

    0A

    Load

    LT1

    Type

    of D

    istri

    bute

    d Lo

    ad

    Line

    Typ

    e8 A

    185A

    LXP

    LE(1

    1kV

    )

    Con

    cent

    rate

    dLi

    ne L

    egth

    Len

    T2.3

    kmLi

    ne T

    ype

    Vol

    tage

    Vi1

    11.0

    kVR

    ated

    Cur

    rent

    33%

    11.0

    kV(0

    %D

    rop)

    Vol

    tage

    Vr1

    4%

    Line

    Typ

    e18

    5ALX

    PLE

    (11k

    V)

    0.97

    Line

    Leg

    th L

    enT1

    .6km

    (cosθ)

    (0%

    Dro

    p)=3

    35A

    Vol

    tage

    VS

    11.0

    kV

    Con

    cent

    rate

    d

    Line

    Len

    gth

    Len B

    1.5

    kmLi

    ne T

    ype

    Type

    of D

    istri

    bute

    d Lo

    ad

    : Inp

    ut d

    ata

    in c

    olor

    ed c

    ells

    =335

    A

    Rat

    ed C

    urre

    nt=3

    35A

    Load

    LB

    281

    A

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP B

    2

    3065

    kVA

    Load

    LT2

    A

    L T2

    (Dis

    tribu

    ted

    Load

    )

    Loading

    27%

    Rat

    ed C

    urre

    nt

    Vol

    tage

    Vi2

    11.0

    kV(0

    %D

    rop)

    Load

    ing

    L B3 (D

    istri

    bute

    d or

    Con

    cent

    rate

    d Lo

    ad)

    AA

    C12

    0mm

    2

    Type

    of D

    istri

    bute

    d Lo

    adC

    once

    ntra

    ted

    Load

    LB

    3

    Line

    Len

    gth

    Len B

    3.4

    km

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP B

    3

    315k

    VA

    Vol

    tage

    Vr3

    11.0

    kV(0

    %D

    rop)

    2%R

    ated

    Cur

    rent

    =455

    A

    8ALi

    ne T

    ype

    : Rec

    eive

    d V

    olta

    ge

    RT1

    , RT2

    , RB

    1, R

    B2,

    RB

    3

    X T1,

    X T2,

    X B1,

    X B2,

    X B3

    CA

    PB

    2, C

    AP

    B3

    CA

    P T1,

    CA

    PT2

    , CA

    PB

    1: R

    ecei

    ved

    Vol

    tage

    : Rec

    eive

    d V

    olta

    ge

    Prim

    ary

    Sub

    stat

    ion

    JICA

    Stu

    dy o

    n "P

    ower

    Dis

    trib

    utio

    n Sy

    stem

    MAs

    ter

    Plan

    Stu

    dy f

    or Gha

    na"

  • Step A (Type-3)

    Pow

    er S

    yste

    m A

    naly

    sis

    for S

    tep

    A -

    Pow

    er S

    yste

    m A

    naly

    sis

    for e

    xist

    ing

    syst

    em u

    sing

    Mac

    ro d

    eman

    d fo

    reca

    st -

    No.

    7N

    o.7

    No.

    7

    →I m

    axR

    T1

    =.9Ω

    XT1

    =1.2Ω

    RT2

    =.1Ω

    XT2

    =.1Ω

    RB

    2=1

    .9Ω

    XB

    2=2

    .5Ω

    Trun

    k Li

    ne 1

    Trun

    k Li

    ne 2

    Bra

    nch

    Line

    2

    RB

    1=.

    1ΩX

    B1

    =.1Ω

    RB

    3=.

    1ΩX

    B3

    =.1Ω

    Bra

    nch

    Line

    1B

    ranc

    h Li

    ne 3

    No.

    24N

    o.24

    ====

    =Equ

    atio

    n===

    ==V

    i1 =

    Vs

    - 1.7

    32・(R

    T1co

    sθ +

    XT1

    sinθ

    )・(L

    T1・f T

    1 + L

    T2 +

    LB

    1 +

    L B2 +

    L B3)

    Vi2 =

    Vi1

    - 1.

    732・

    (RT2

    cosθ

    + X

    T2si

    nθ)・

    (LT2

    ・f T

    2 + L

    B2 +

    L B3)

    Vr1

    = V

    i1 -

    1.73

    2・L B

    1(R

    B1c

    osθ

    + X

    B1s

    inθ

    )・f B

    1

    Vr2

    = V

    i2 -

    1.73

    2・L B

    2(R

    B2c

    osθ

    + X

    B2s

    inθ

    )・f B

    2

    Vr3

    = V

    i2 -

    1.73

    2・L B

    3(R

    B3c

    osθ

    + X

    B3s

    inθ

    )・f B

    3

    LT1

    = I

    max

    ・C

    AP

    T1/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LT2

    = I

    max

    ・C

    AP

    T2/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LB

    1 =

    Im

    ax・C

    AP

    B1/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LB

    2 =

    Im

    ax・C

    AP

    B2/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LB

    3 =

    Im

    ax・C

    AP

    B3/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    I max

    = L

    T1

    + L

    T2

    + L

    B1 +

    LB

    2 +

    LB

    3

    Vs

    : Sup

    ply

    Vol

    tage

    I max

    : Max

    imum

    Cur

    rent

    : Res

    ista

    nce

    Vi1

    : Int

    erim

    Vol

    tage

    L T1

    : Loa

    d (T

    runk

    line

    1)

    : Rea

    ctan

    ceV

    i2: I

    nter

    im V

    olta

    geL T

    2: L

    oad

    (Tru

    nk li

    ne 2

    )f T

    1, f T

    2, f B

    1, f B

    2, f B

    3

    Vr1

    L B1

    : Loa

    d (B

    ranc

    h Li

    ne 1

    )V

    r2L B

    2: L

    oad

    (Bra

    nch

    Line

    2)

    Vr3

    L B3

    : Loa

    d (B

    ranc

    h Li

    ne 3

    )co

    sθ: P

    ower

    Fac

    tor

    : Dis

    pers

    al L

    oad

    Fact

    or

    : Tot

    al T

    rans

    form

    er C

    apac

    ity o

    f sec

    onda

    ry s

    ubst

    atio

    ns

    Type

    of D

    istri

    bute

    d Lo

    ad

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP T

    2

    kVA

    L B1 (D

    istri

    bute

    d or

    Con

    cent

    rate

    d Lo

    ad)

    27A

    185A

    LXP

    LE(1

    1kV

    )

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP B

    1

    630k

    VA

    AA

    C12

    0mm

    2

    Type

    of D

    istri

    bute

    d Lo

    adE

    qual

    ityLi

    ne L

    engt

    h Le

    n B1

    7.1k

    m

    Vol

    tage

    Vr2

    9.8k

    V(1

    1%D

    rop)

    Load

    ing

    47%

    Rat

    ed C

    urre

    nt=4

    55A

    Max

    imum

    L T1

    (Dis

    tribu

    ted

    Load

    )

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP T

    1

    3160

    kVA

    L B2 (D

    istri

    bute

    d or

    Con

    cent

    rate

    d Lo

    ad)

    Pow

    er fa

    ctor

    Loading

    Load

    LB

    1

    Sub

    stat

    ion

    Nam

    eM

    AIN

    BFe

    eder

    Nam

    eB

    71

    Load

    ing

    Type

    -3

    Cur

    rent

    I max

    400.

    0A

    Load

    LT1

    Type

    of D

    istri

    bute

    d Lo

    ad

    Line

    Typ

    e13

    4 AA

    AC

    120m

    m2

    Mid

    dle

    Larg

    erLi

    ne L

    egth

    Len

    T2.4

    kmLi

    ne T

    ype

    Vol

    tage

    Vi1

    10.3

    kVR

    ated

    Cur

    rent

    88%

    10.3

    kV(6

    %D

    rop)

    Vol

    tage

    Vr1

    8%

    Line

    Typ

    eA

    AC

    120m

    m2

    0.97

    Line

    Leg

    th L

    enT1

    3.3k

    m

    (cosθ)

    (6%

    Dro

    p)=4

    55A

    Vol

    tage

    VS

    11.0

    kV

    Equ

    ality

    Line

    Len

    gth

    Len B

    1.8

    kmLi

    ne T

    ype

    Type

    of D

    istri

    bute

    d Lo

    ad

    : Inp

    ut d

    ata

    in c

    olor

    ed c

    ells

    =455

    A

    Rat

    ed C

    urre

    nt=3

    35A

    Load

    LB

    221

    2A

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP B

    2

    4985

    kVA

    Load

    LT2

    A

    L T2

    (Dis

    tribu

    ted

    Load

    )

    Loading

    52%

    Rat

    ed C

    urre

    nt

    Vol

    tage

    Vi2

    10.3

    kV(7

    %D

    rop)

    Load

    ing

    L B3 (D

    istri

    bute

    d or

    Con

    cent

    rate

    d Lo

    ad)

    185A

    LXP

    LE(1

    1kV

    )

    Type

    of D

    istri

    bute

    d Lo

    adE

    qual

    ity

    Load

    LB

    3

    Line

    Len

    gth

    Len B

    3.7

    km

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP B

    3

    630k

    VA

    Vol

    tage

    Vr3

    10.3

    kV(7

    %D

    rop)

    8%R

    ated

    Cur

    rent

    =335

    A

    27A

    Line

    Typ

    e

    : Rec

    eive

    d V

    olta

    ge

    RT1

    , RT2

    , RB

    1, R

    B2,

    RB

    3

    X T1,

    X T2,

    X B1,

    X B2,

    X B3

    CA

    PB

    2, C

    AP

    B3

    CA

    P T1,

    CA

    PT2

    , CA

    PB

    1: R

    ecei

    ved

    Vol

    tage

    : Rec

    eive

    d V

    olta

    ge

    Prim

    ary

    Sub

    stat

    ion

    JICA

    Stu

    dy o

    n "P

    ower

    Dis

    trib

    utio

    n Sy

    stem

    MAs

    ter

    Plan

    Stu

    dy f

    or Gha

    na"

  • Step A (Type-3)

    Pow

    er S

    yste

    m A

    naly

    sis

    for S

    tep

    A -

    Pow

    er S

    yste

    m A

    naly

    sis

    for e

    xist

    ing

    syst

    em u

    sing

    Mac

    ro d

    eman

    d fo

    reca

    st -

    No.

    7N

    o.7

    No.

    7

    →I m

    axR

    T1

    =1.1Ω

    XT1

    =1.4Ω

    RT2

    =.2Ω

    XT2

    =.2Ω

    RB

    2=5

    .2Ω

    XB

    2=6

    .7Ω

    Trun

    k Li

    ne 1

    Trun

    k Li

    ne 2

    Bra

    nch

    Line

    2

    RB

    1=.

    7ΩX

    B1

    =.9Ω

    RB

    3=4

    .1Ω

    XB

    3=5

    .3Ω

    Bra

    nch

    Line

    1B

    ranc

    h Li

    ne 3

    No.

    7N

    o.7

    ====

    =Equ

    atio

    n===

    ==V

    i1 =

    Vs

    - 1.7

    32・(R

    T1co

    sθ +

    XT1

    sinθ

    )・(L

    T1・f T

    1 + L

    T2 +

    LB

    1 +

    L B2 +

    L B3)

    Vi2 =

    Vi1

    - 1.

    732・

    (RT2

    cosθ

    + X

    T2si

    nθ)・

    (LT2

    ・f T

    2 + L

    B2 +

    L B3)

    Vr1

    = V

    i1 -

    1.73

    2・L B

    1(R

    B1c

    osθ

    + X

    B1s

    inθ

    )・f B

    1

    Vr2

    = V

    i2 -

    1.73

    2・L B

    2(R

    B2c

    osθ

    + X

    B2s

    inθ

    )・f B

    2

    Vr3

    = V

    i2 -

    1.73

    2・L B

    3(R

    B3c

    osθ

    + X

    B3s

    inθ

    )・f B

    3

    LT1

    = I

    max

    ・C

    AP

    T1/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LT2

    = I

    max

    ・C

    AP

    T2/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LB

    1 =

    Im

    ax・C

    AP

    B1/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LB

    2 =

    Im

    ax・C

    AP

    B2/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LB

    3 =

    Im

    ax・C

    AP

    B3/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    I max

    = L

    T1

    + L

    T2

    + L

    B1 +

    LB

    2 +

    LB

    3

    Vs

    : Sup

    ply

    Vol

    tage

    I max

    : Max

    imum

    Cur

    rent

    : Res

    ista

    nce

    Vi1

    : Int

    erim

    Vol

    tage

    L T1

    : Loa

    d (T

    runk

    line

    1)

    : Rea

    ctan

    ceV

    i2: I

    nter

    im V

    olta

    geL T

    2: L

    oad

    (Tru

    nk li

    ne 2

    )f T

    1, f T

    2, f B

    1, f B

    2, f B

    3

    Vr1

    L B1

    : Loa

    d (B

    ranc

    h Li

    ne 1

    )V

    r2L B

    2: L

    oad

    (Bra

    nch

    Line

    2)

    Vr3

    L B3

    : Loa

    d (B

    ranc

    h Li

    ne 3

    )co

    sθ: P

    ower

    Fac

    tor

    : Dis

    pers

    al L

    oad

    Fact

    or

    : Tot

    al T

    rans

    form

    er C

    apac

    ity o

    f sec

    onda

    ry s

    ubst

    atio

    ns

    Type

    of D

    istri

    bute

    d Lo

    adC

    once

    ntra

    ted

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP T

    2

    880k

    VA

    L B1 (D

    istri

    bute

    d or

    Con

    cent

    rate

    d Lo

    ad)

    53A

    AA

    C12

    0mm

    2

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP B

    1

    1500

    kVA

    AA

    C12

    0mm

    2

    Type

    of D

    istri

    bute

    d Lo

    adS

    endi

    ng L

    arge

    r

    Line

    Len

    gth

    Len B

    118

    .8km

    Vol

    tage

    Vr2

    10.0

    kV(9

    %D

    rop)

    Load

    ing

    18%

    Rat

    ed C

    urre

    nt=4

    55A

    Max

    imum

    L T1

    (Dis

    tribu

    ted

    Load

    )

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP T

    1

    4010

    kVA

    L B2 (D

    istri

    bute

    d or

    Con

    cent

    rate

    d Lo

    ad)

    Pow

    er fa

    ctor

    Loading

    Load

    LB

    1

    Sub

    stat

    ion

    Nam

    eM

    AIN

    BFe

    eder

    Nam

    eB

    61

    Load

    ing

    Type

    -3

    Cur

    rent

    I max

    344.

    0A

    Load

    LT1

    Type

    of D

    istri

    bute

    d Lo

    ad

    Line

    Typ

    e14

    3 AA

    AC

    120m

    m2

    Equ

    ality

    Line

    Leg

    th L

    enT2

    .7km

    Line

    Typ

    e

    Vol

    tage

    Vi1

    10.4

    kVR

    ated

    Cur

    rent

    76%

    10.3

    kV(6

    %D

    rop)

    Vol

    tage

    Vr1

    12%

    Line

    Typ

    eA

    AC

    120m

    m2

    0.97

    Line

    Leg

    th L

    enT1

    3.9k

    m

    (cosθ)

    (6%

    Dro

    p)=4

    55A

    Vol

    tage

    VS

    11.0

    kV

    Equ

    ality

    Line

    Len

    gth

    Len B

    12.

    4km

    Line

    Typ

    e

    Type

    of D

    istri

    bute

    d Lo

    ad

    : Inp

    ut d

    ata

    in c

    olor

    ed c

    ells

    =455

    A

    Rat

    ed C

    urre

    nt=4

    55A

    Load

    LB

    281

    A

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP B

    2

    2270

    kVA

    Load

    LT2

    31A

    L T2

    (Dis

    tribu

    ted

    Load

    )

    Loading

    32%

    Rat

    ed C

    urre

    nt

    Vol

    tage

    Vi2

    10.3

    kV(6

    %D

    rop)

    Load

    ing

    L B3 (D

    istri

    bute

    d or

    Con

    cent

    rate

    d Lo

    ad)

    AA

    C12

    0mm

    2

    Type

    of D

    istri

    bute

    d Lo

    adE

    qual

    ity

    Load

    LB

    3

    Line

    Len

    gth

    Len B

    314

    .9km

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP B

    3

    1000

    kVA

    Vol

    tage

    Vr3

    10.1

    kV(8

    %D

    rop)

    8%R

    ated

    Cur

    rent

    =455

    A

    36A

    Line

    Typ

    e

    : Rec

    eive

    d V

    olta

    ge

    RT1

    , RT2

    , RB

    1, R

    B2,

    RB

    3

    X T1,

    X T2,

    X B1,

    X B2,

    X B3

    CA

    PB

    2, C

    AP

    B3

    CA

    P T1,

    CA

    PT2

    , CA

    PB

    1: R

    ecei

    ved

    Vol

    tage

    : Rec

    eive

    d V

    olta

    ge

    Prim

    ary

    Sub

    stat

    ion

    JICA

    Stu

    dy o

    n "P

    ower

    Dis

    trib

    utio

    n Sy

    stem

    MAs

    ter

    Plan

    Stu

    dy f

    or Gha

    na"

  • Step A (Type-3)

    Pow

    er S

    yste

    m A

    naly

    sis

    for S

    tep

    A -

    Pow

    er S

    yste

    m A

    naly

    sis

    for e

    xist

    ing

    syst

    em u

    sing

    Mac

    ro d

    eman

    d fo

    reca

    st -

    No.

    7N

    o.7

    No.

    7

    →I m

    axR

    T1

    =3.5Ω

    XT1

    =4.6Ω

    RT2

    =1.8Ω

    XT2

    =2.4Ω

    RB

    2=4

    .1Ω

    XB

    2=5

    .3Ω

    Trun

    k Li

    ne 1

    Trun

    k Li

    ne 2

    Bra

    nch

    Line

    2

    RB

    1=2

    .8Ω

    XB

    1=3

    .7Ω

    RB

    3=.

    5ΩX

    B3

    =.6Ω

    Bra

    nch

    Line

    1B

    ranc

    h Li

    ne 3

    No.

    7N

    o.7

    ====

    =Equ

    atio

    n===

    ==V

    i1 =

    Vs

    - 1.7

    32・(R

    T1co

    sθ +

    XT1

    sinθ

    )・(L

    T1・f T

    1 + L

    T2 +

    LB

    1 +

    L B2 +

    L B3)

    Vi2 =

    Vi1

    - 1.

    732・

    (RT2

    cosθ

    + X

    T2si

    nθ)・

    (LT2

    ・f T

    2 + L

    B2 +

    L B3)

    Vr1

    = V

    i1 -

    1.73

    2・L B

    1(R

    B1c

    osθ

    + X

    B1s

    inθ

    )・f B

    1

    Vr2

    = V

    i2 -

    1.73

    2・L B

    2(R

    B2c

    osθ

    + X

    B2s

    inθ

    )・f B

    2

    Vr3

    = V

    i2 -

    1.73

    2・L B

    3(R

    B3c

    osθ

    + X

    B3s

    inθ

    )・f B

    3

    LT1

    = I

    max

    ・C

    AP

    T1/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LT2

    = I

    max

    ・C

    AP

    T2/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LB

    1 =

    Im

    ax・C

    AP

    B1/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LB

    2 =

    Im

    ax・C

    AP

    B2/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LB

    3 =

    Im

    ax・C

    AP

    B3/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    I max

    = L

    T1

    + L

    T2

    + L

    B1 +

    LB

    2 +

    LB

    3

    Vs

    : Sup

    ply

    Vol

    tage

    I max

    : Max

    imum

    Cur

    rent

    : Res

    ista

    nce

    Vi1

    : Int

    erim

    Vol

    tage

    L T1

    : Loa

    d (T

    runk

    line

    1)

    : Rea

    ctan

    ceV

    i2: I

    nter

    im V

    olta

    geL T

    2: L

    oad

    (Tru

    nk li

    ne 2

    )f T

    1, f T

    2, f B

    1, f B

    2, f B

    3

    Vr1

    L B1

    : Loa

    d (B

    ranc

    h Li

    ne 1

    )V

    r2L B

    2: L

    oad

    (Bra

    nch

    Line

    2)

    Vr3

    L B3

    : Loa

    d (B

    ranc

    h Li

    ne 3

    )co

    sθ: P

    ower

    Fac

    tor

    : Dis

    pers

    al L

    oad

    Fact

    or

    : Tot

    al T

    rans

    form

    er C

    apac

    ity o

    f sec

    onda

    ry s

    ubst

    atio

    ns

    Type

    of D

    istri

    bute

    d Lo

    adE

    qual

    ityTo

    tal T

    rans

    form

    erC

    apac

    ity o

    f sec

    onda

    rysu

    bsta

    tions

    CA

    P T2

    1340

    kVA

    L B1 (D

    istri

    bute

    d or

    Con

    cent

    rate

    d Lo

    ad)

    44A

    AA

    C12

    0mm

    2

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP B

    1

    2755

    kVA

    AA

    C12

    0mm

    2

    Type

    of D

    istri

    bute

    d Lo

    adE

    qual

    ityLi

    ne L

    engt

    h Le

    n B1

    14.9

    km

    Vol

    tage

    Vr2

    7.5k

    V(3

    2%D

    rop)

    Load

    ing

    30%

    Rat

    ed C

    urre

    nt=4

    55A

    Max

    imum

    L T1

    (Dis

    tribu

    ted

    Load

    )

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP T

    1

    8045

    kVA

    L B2 (D

    istri

    bute

    d or

    Con

    cent

    rate

    d Lo

    ad)

    Pow

    er fa

    ctor

    Loading

    Load

    LB

    1

    Sub

    stat

    ion

    Nam

    eM

    AIN

    BFe

    eder

    Nam

    eB

    81

    Load

    ing

    Type

    -3

    Cur

    rent

    I max

    350.

    0A

    Load

    LT1

    Type

    of D

    istri

    bute

    d Lo

    ad

    Line

    Typ

    e12

    9 AA

    AC

    120m

    m2

    Equ

    ality

    Line

    Leg

    th L

    enT2

    6.6k

    mLi

    ne T

    ype

    Vol

    tage

    Vi1

    8.8k

    VR

    ated

    Cur

    rent

    77%

    8.6k

    V(2

    2%D

    rop)

    Vol

    tage

    Vr1

    10%

    Line

    Typ

    eA

    AC

    120m

    m2

    0.97

    Line

    Leg

    th L

    enT1

    12.8

    km

    (cosθ)

    (20%

    Dro

    p)=4

    55A

    Vol

    tage

    VS

    11.0

    kV

    Equ

    ality

    Line

    Len

    gth

    Len B

    110

    .3km

    Line

    Typ

    e

    Type

    of D

    istri

    bute

    d Lo

    ad

    : Inp

    ut d

    ata

    in c

    olor

    ed c

    ells

    =455

    A

    Rat

    ed C

    urre

    nt=4

    55A

    Load

    LB

    213

    6A

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP B

    2

    8495

    kVA

    Load

    LT2

    21A

    L T2

    (Dis

    tribu

    ted

    Load

    )

    Loading

    39%

    Rat

    ed C

    urre

    nt

    Vol

    tage

    Vi2

    8.1k

    V(2

    6%D

    rop)

    Load

    ing

    L B3 (D

    istri

    bute

    d or

    Con

    cent

    rate

    d Lo

    ad)

    AA

    C12

    0mm

    2

    Type

    of D

    istri

    bute

    d Lo

    adR

    ecei

    ved

    Larg

    er

    Load

    LB

    3

    Line

    Len

    gth

    Len B

    31.

    7km

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP B

    3

    1200

    kVA

    Vol

    tage

    Vr3

    8.1k

    V(2

    7%D

    rop)

    4%R

    ated

    Cur

    rent

    =455

    A

    19A

    Line

    Typ

    e

    : Rec

    eive

    d V

    olta

    ge

    RT1

    , RT2

    , RB

    1, R

    B2,

    RB

    3

    X T1,

    X T2,

    X B1,

    X B2,

    X B3

    CA

    PB

    2, C

    AP

    B3

    CA

    P T1,

    CA

    PT2

    , CA

    PB

    1: R

    ecei

    ved

    Vol

    tage

    : Rec

    eive

    d V

    olta

    ge

    Prim

    ary

    Sub

    stat

    ion

    JICA

    Stu

    dy o

    n "P

    ower

    Dis

    trib

    utio

    n Sy

    stem

    MAs

    ter

    Plan

    Stu

    dy f

    or Gha

    na"

  • Step A (Type-3)

    Pow

    er S

    yste

    m A

    naly

    sis

    for S

    tep

    A -

    Pow

    er S

    yste

    m A

    naly

    sis

    for e

    xist

    ing

    syst

    em u

    sing

    Mac

    ro d

    eman

    d fo

    reca

    st -

    No.

    11N

    o.11

    No.

    11

    →I m

    axR

    T1

    =.3Ω

    XT1

    =.2Ω

    RT2

    =1.3Ω

    XT2

    =.8Ω

    RB

    2=1

    .6Ω

    XB

    2=1

    .0Ω

    Trun

    k Li

    ne 1

    Trun

    k Li

    ne 2

    Bra

    nch

    Line

    2

    RB

    1=2

    .6Ω

    XB

    1=1

    .6Ω

    RB

    3=3

    .0Ω

    XB

    3=1

    .9Ω

    Bra

    nch

    Line

    1B

    ranc

    h Li

    ne 3

    No.

    11N

    o.11

    ====

    =Equ

    atio

    n===

    ==V

    i1 =

    Vs

    - 1.7

    32・(R

    T1co

    sθ +

    XT1

    sinθ

    )・(L

    T1・f T

    1 + L

    T2 +

    LB

    1 +

    L B2 +

    L B3)

    Vi2 =

    Vi1

    - 1.

    732・

    (RT2

    cosθ

    + X

    T2si

    nθ)・

    (LT2

    ・f T

    2 + L

    B2 +

    L B3)

    Vr1

    = V

    i1 -

    1.73

    2・L B

    1(R

    B1c

    osθ

    + X

    B1s

    inθ

    )・f B

    1

    Vr2

    = V

    i2 -

    1.73

    2・L B

    2(R

    B2c

    osθ

    + X

    B2s

    inθ

    )・f B

    2

    Vr3

    = V

    i2 -

    1.73

    2・L B

    3(R

    B3c

    osθ

    + X

    B3s

    inθ

    )・f B

    3

    LT1

    = I

    max

    ・C

    AP

    T1/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LT2

    = I

    max

    ・C

    AP

    T2/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LB

    1 =

    Im

    ax・C

    AP

    B1/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LB

    2 =

    Im

    ax・C

    AP

    B2/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LB

    3 =

    Im

    ax・C

    AP

    B3/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    I max

    = L

    T1

    + L

    T2

    + L

    B1 +

    LB

    2 +

    LB

    3

    Vs

    : Sup

    ply

    Vol

    tage

    I max

    : Max

    imum

    Cur

    rent

    : Res

    ista

    nce

    Vi1

    : Int

    erim

    Vol

    tage

    L T1

    : Loa

    d (T

    runk

    line

    1)

    : Rea

    ctan

    ceV

    i2: I

    nter

    im V

    olta

    geL T

    2: L

    oad

    (Tru

    nk li

    ne 2

    )f T

    1, f T

    2, f B

    1, f B

    2, f B

    3

    Vr1

    L B1

    : Loa

    d (B

    ranc

    h Li

    ne 1

    )V

    r2L B

    2: L

    oad

    (Bra

    nch

    Line

    2)

    Vr3

    L B3

    : Loa

    d (B

    ranc

    h Li

    ne 3

    )co

    sθ: P

    ower

    Fac

    tor

    : Dis

    pers

    al L

    oad

    Fact

    or

    : Tot

    al T

    rans

    form

    er C

    apac

    ity o

    f sec

    onda

    ry s

    ubst

    atio

    ns

    Type

    of D

    istri

    bute

    d Lo

    adC

    once

    ntra

    ted

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP T

    2

    200k

    VA

    L B1 (D

    istri

    bute

    d or

    Con

    cent

    rate

    d Lo

    ad)

    4AA

    AC

    50m

    m2

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP B

    1

    150k

    VA

    AA

    C50

    mm

    2

    Type

    of D

    istri

    bute

    d Lo

    adR

    ecei

    ved

    Larg

    er

    Line

    Len

    gth

    Len B

    12.

    7km

    Vol

    tage

    Vr2

    10.9

    kV(1

    %D

    rop)

    Load

    ing

    2%R

    ated

    Cur

    rent

    =260

    A

    Max

    imum

    L T1

    (Dis

    tribu

    ted

    Load

    )

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP T

    1

    kVA

    L B2 (D

    istri

    bute

    d or

    Con

    cent

    rate

    d Lo

    ad)

    Pow

    er fa

    ctor

    Loading

    Load

    LB

    1

    Sub

    stat

    ion

    Nam

    eK

    UM

    AW

    UFe

    eder

    Nam

    eB

    OD

    OM

    AS

    E

    Load

    ing

    Type

    -3

    Cur

    rent

    I max

    19.0

    A

    Load

    LT1

    Type

    of D

    istri

    bute

    d Lo

    ad

    Line

    Typ

    eA

    AA

    C50

    mm

    2Li

    ne L

    egth

    Len

    T22.

    1km

    Line

    Typ

    e

    Vol

    tage

    Vi1

    11.0

    kVR

    ated

    Cur

    rent

    7%

    11.0

    kV(0

    %D

    rop)

    Vol

    tage

    Vr1

    2%

    Line

    Typ

    eA

    AC

    50m

    m2

    0.82

    Line

    Leg

    th L

    enT1

    .5km

    (cosθ)

    (0%

    Dro

    p)=2

    60A

    Vol

    tage

    VS

    11.0

    kV

    Rec

    eive

    d La

    rger

    Line

    Len

    gth

    Len B

    14.

    2km

    Line

    Typ

    e

    Type

    of D

    istri

    bute

    d Lo

    ad

    : Inp

    ut d

    ata

    in c

    olor

    ed c

    ells

    =260

    A

    Rat

    ed C

    urre

    nt=2

    60A

    Load

    LB

    24A

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP B

    2

    150k

    VA

    Load

    LT2

    6A

    L T2

    (Dis

    tribu

    ted

    Load

    )

    Loading

    6%R

    ated

    Cur

    rent

    Vol

    tage

    Vi2

    11.0

    kV(0

    %D

    rop)

    Load

    ing

    L B3 (D

    istri

    bute

    d or

    Con

    cent

    rate

    d Lo

    ad)

    AA

    C50

    mm

    2

    Type

    of D

    istri

    bute

    d Lo

    adR

    ecei

    ved

    Larg

    er

    Load

    LB

    3

    Line

    Len

    gth

    Len B

    35.

    0km

    Tota

    l Tra

    nsfo

    rmer

    Cap

    acity

    of s

    econ

    dary

    subs

    tatio

    ns C

    AP B

    3

    150k

    VA

    Vol

    tage

    Vr3

    10.9

    kV(1

    %D

    rop)

    2%R

    ated

    Cur

    rent

    =260

    A

    4ALi

    ne T

    ype

    : Rec

    eive

    d V

    olta

    ge

    RT1

    , RT2

    , RB

    1, R

    B2,

    RB

    3

    X T1,

    X T2,

    X B1,

    X B2,

    X B3

    CA

    PB

    2, C

    AP

    B3

    CA

    P T1,

    CA

    PT2

    , CA

    PB

    1: R

    ecei

    ved

    Vol

    tage

    : Rec

    eive

    d V

    olta

    ge

    Prim

    ary

    Sub

    stat

    ion

    JICA

    Stu

    dy o

    n "P

    ower

    Dis

    trib

    utio

    n Sy

    stem

    MAs

    ter

    Plan

    Stu

    dy f

    or Gha

    na"

  • Step A (Type-3)

    Pow

    er S

    yste

    m A

    naly

    sis

    for S

    tep

    A -

    Pow

    er S

    yste

    m A

    naly

    sis

    for e

    xist

    ing

    syst

    em u

    sing

    Mac

    ro d

    eman

    d fo

    reca

    st -

    No.

    7N

    o.7

    No.

    7

    →I m

    axR

    T1

    =1.9Ω

    XT1

    =2.5Ω

    RT2

    =.5Ω

    XT2

    =.7Ω

    RB

    2=.

    7ΩX

    B2

    =1.0Ω

    Trun

    k Li

    ne 1

    Trun

    k Li

    ne 2

    Bra

    nch

    Line

    2

    RB

    1=.

    7ΩX

    B1

    =.9Ω

    RB

    3=.

    5ΩX

    B3

    =.6Ω

    Bra

    nch

    Line

    1B

    ranc

    h Li

    ne 3

    No.

    7N

    o.7

    ====

    =Equ

    atio

    n===

    ==V

    i1 =

    Vs

    - 1.7

    32・(R

    T1co

    sθ +

    XT1

    sinθ

    )・(L

    T1・f T

    1 + L

    T2 +

    LB

    1 +

    L B2 +

    L B3)

    Vi2 =

    Vi1

    - 1.

    732・

    (RT2

    cosθ

    + X

    T2si

    nθ)・

    (LT2

    ・f T

    2 + L

    B2 +

    L B3)

    Vr1

    = V

    i1 -

    1.73

    2・L B

    1(R

    B1c

    osθ

    + X

    B1s

    inθ

    )・f B

    1

    Vr2

    = V

    i2 -

    1.73

    2・L B

    2(R

    B2c

    osθ

    + X

    B2s

    inθ

    )・f B

    2

    Vr3

    = V

    i2 -

    1.73

    2・L B

    3(R

    B3c

    osθ

    + X

    B3s

    inθ

    )・f B

    3

    LT1

    = I

    max

    ・C

    AP

    T1/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LT2

    = I

    max

    ・C

    AP

    T2/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LB

    1 =

    Im

    ax・C

    AP

    B1/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LB

    2 =

    Im

    ax・C

    AP

    B2/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    LB

    3 =

    Im

    ax・C

    AP

    B3/

    (CA

    PT1+

    CA

    PT2+

    CA

    PB

    1+C

    AP

    B2+C

    AP

    B3)

    I max

    = L

    T1

    + L

    T2

    + L

    B1 +

    LB

    2 +

    LB

    3

    Vs

    : Sup

    ply

    Vol

    tage

    I max

    : Max

    imum

    Cur

    rent

    : Res

    ista

    nce

    Vi1

    : Int

    erim

    Vol

    tage

    L T1

    : Loa

    d (T

    runk

    line

    1)

    : Rea

    ctan

    ceV

    i2: I

    nter

    im V

    olta

    geL T

    2: L

    oad

    (Tru

    nk li

    ne 2

    )f T

    1, f T

    2, f B

    1, f B

    2, f B

    3

    Vr1

    L B1

    : Loa

    d (B

    ranc

    h Li

    ne 1

    )V

    r2L B

    2: L

    oad

    (Bra

    nch

    Line

    2)

    Vr3

    L B3

    : Loa

    d (B

    ranc

    h Li

    ne 3

    )co

    sθ: P

    ower

    Fac

    tor

    : Dis

    pers

    al L

    oad

    Fact

    or

    : Tot

    al T

    rans

    form

    er C

    apac

    ity o

    f sec

    onda

    ry s

    ubst

    atio

    ns

    Type

    of D

    istri

    bute

    d Lo

    adR

    ecei

    ved

    Larg

    er

    Tota

    l Tra