DEVELOPMENT APPLICATION - SECTIONSJETTY ROAD CAUSEWAY REDEVELOPMENTTRANSFORMING BUNBURY'S WATERFRONT
0 5M
1603
5
D
DA.02
FUTURE VIEWING PLATFORM
SECTION C-C SCALE 1:200
NORTH/WEST
REFER DRAWING DA.01 FOR SECTION LOCATIONS
SOUTH/EAST
SECTION B-B SCALE 1:200
SECTION A-A SCALE 1:200
SWALE
PCB
90° CB
FUTURE VIEWING PLATFORM
MULTI PURPOSE BUILDING
GATE HOUSE
3.00 6.300.30 5.70 4.503.007.25
3.00 1.80
0.30
3.00 6.30
3.00
0.35
2.75 1.50
0.30
2.70 6.30 5.80 4.50
3.005.70
PARKING BAY
PARKING BAY
PARKING BAY
PATHSWALE
SWALE
3.00
Department of Transport
Jetty Road Causeway UpgradeWorks 2019 & Beyond
DoT 1484-53-06
CAR PARKING BAYS:
90° 148PARALLEL 39TOTAL 187 (subject to bus/coachbays) parking
ADEQUACY TO BE VERIFIED ANDASSUMES DIVERSE USE PATTENS
FUTUREDEVELOPMENT SITE
(BY OTHERS)
MULTI PURPOSEBUILDING
12.5M RAD ROUND-ABOUT. CENTREPROVIDES SITE OPPORTUNITY FORPUBLIC ART/INTERPRETIVE ELEMENT
OPTION FOR COACH/BUSLAYOFF BAYS
MAINTENANCE ACCESS
PREVAILINGOCEAN WINDS
RAMPS, STEPS & SEATING
OPTIONAL CROSSOVER
ASSUMEDSITE ENTRY POINT
PATH LEVELS / RAMPING RELATIVE TO ROADLEVEL TBC THROUGH THIS SECTION
LANDSCAPEDDRAINAGE SWALE
STEPS
RAMPS, STEPS & SEATING
STEPS
RAMPS, STEPS& SEATING
WIDE PEDESTRIAN ACCESS BOTHSIDES OF BREAKWATER
29
32
32
32
20
FUTURE VIEWING PLATFORMS
6
12
6
8
EXISTING CITY OF BUNBURY PUBLIC TOILETS
3
FUTURE WASTE OIL COLLECTION &RECYCLING FACILITY
CAUSEWAY HEAD AND SPUR GROYNEMASTERPLANNING SUBJECT TO FURTHERCONSULTATION WITH CITY OF BUNBURY &FINALISATION OF COASTAL ENGINEERINGDESIGN
JETT
Y RO
AD
CITY OF BUNBURY INTERPRETIVEAREA
EXISTING HERITAGE CRANE
GATE HOUSE
STAGE 3
A BOAT P
ENS (
FUTU
RE)
EXISTINGBOAT PENS
FUTURE CAUSEWAY FIRE FIGHTING EQUIPMENTPRECINCT & SERVICING STORAGE (REQUIREMENTS TBC)
REVETMENT TIE-IN TO EXISTING PATH ANDLANDSCAPING SUBJECT TO FURTHERCONSULTATION WITH CITY OF BUNBURY ANDFINALISATION OF COASTAL ENGINEERING DESIGN
DEVELOPMENT APPLICATION AREA
EXISTING WATER LINE
DEVELOPMENT APPLICATION - SITE PLANJETTY ROAD CAUSEWAY REDEVELOPMENTTRANSFORMING BUNBURY'S WATERFRONT
NORTH
1603
5
J
DA.01
SCALE
0 10 50M
DEVELOPMENT APPLICATION - FLOOR PLAN & ELEVATIONSJETTY ROAD CAUSEWAY REDEVELOPMENTTRANSFORMING BUNBURY'S WATERFRONT
0
1603
5
D
DA.05
1 2 5M3 4
PLAN SCALE 1:100 @ A3
GATE HOUSE
BINS
ELEC
FR & SK
ST
HS
WASTE OILSTORE
TANK
PLAN SCALE 1:100 @ A3
FIRE TANKS/PUMPS, MAINTENANCE & WASTE OIL STORES
TO PENS MAINTENANCESTORE
PUMPSPLANTRM
TANK
12
A
B
C
D
E
111098
F
G
H
REVN
12
150mm
APPROVED
AUTHORISED
APPROVED
APPROVED
CHECKED
CHECKED
DRAWN
DESIGNED
10050
PROJECT MANAGER
111098
Department of Transport
7654321
A
B
C
D
E
4030200
SCALE:
10
HORIZ:
VERT :DESIGN
GENERAL NOTES
76543
DRNAMENDMENT
FILE No
DATE
A1ORIG SIZE
REVN
F
G
H
21
APPROVAL
BAR MEASURE INDICATES IF SCALES HAVE BEEN VARIED
UNLESS OTHERWISE STATED DIMENSIONS IN METRES
DRAWING NUMBER
CASUARINA HARBOURJETTY ROAD CAUSEWAYREDEVELOPMENT
DEVELOPMENTAPPLICATIONAREA SOUTHERN PORTS
AUTHORITYSERVICE JETTY
DoT SERVICE JETTY
REFER DRG. No. BU0691-23-02FOR DETAILED VISUALISATION
C CROWN COPYRIGHT
WESTERN A U STR AL I A
TH
E
G O V E R N M E N
TO
F
OUTER HARBOUR
SOUTHERN PORTS AUTHORITY BERTHS 1 & 2
PUBLIC BOATLAUNCHINGFACILITY
Indicative Concepts
Revetment edge example
Project Deliverables 2019 and Beyond
• Multi-purpose building • Additional boat pens
• Viewing platforms (shade/shelter) • Fire fighting pumps, maintenance and waste oil storage shed