Page 1: Jetty Road Causeway Upgrade...• Viewing platforms (shade/shelter) • Fire fighting pumps, maintenance and waste oil storage shed • Pen jetty gatehouses Title Jetty Road Causeway

3.63.5

3.1

2.4

3.23

2.5 2.4

3.5

3.052.5

3.80

3.16 3.233.50

3.1

DEVELOPMENT APPLICATION - SECTIONSJETTY ROAD CAUSEWAY REDEVELOPMENTTRANSFORMING BUNBURY'S WATERFRONT

0 5M

1603

5

D

DA.02

FUTURE VIEWING PLATFORM

SECTION C-C SCALE 1:200

NORTH/WEST

REFER DRAWING DA.01 FOR SECTION LOCATIONS

SOUTH/EAST

SECTION B-B SCALE 1:200

SECTION A-A SCALE 1:200

SWALE

PCB

90° CB

FUTURE VIEWING PLATFORM

MULTI PURPOSE BUILDING

GATE HOUSE

3.00 6.300.30 5.70 4.503.007.25

3.00 1.80

0.30

3.00 6.30

3.00

0.35

2.75 1.50

0.30

2.70 6.30 5.80 4.50

3.005.70

PARKING BAY

PARKING BAY

PARKING BAY

PATHSWALE

SWALE

3.00

Department of Transport

Jetty Road Causeway UpgradeWorks 2019 & Beyond

DoT 1484-53-06

CAR PARKING BAYS:

90° 148PARALLEL 39TOTAL 187 (subject to bus/coachbays) parking

ADEQUACY TO BE VERIFIED ANDASSUMES DIVERSE USE PATTENS

FUTUREDEVELOPMENT SITE

(BY OTHERS)

MULTI PURPOSEBUILDING

12.5M RAD ROUND-ABOUT. CENTREPROVIDES SITE OPPORTUNITY FORPUBLIC ART/INTERPRETIVE ELEMENT

OPTION FOR COACH/BUSLAYOFF BAYS

MAINTENANCE ACCESS

PREVAILINGOCEAN WINDS

RAMPS, STEPS & SEATING

OPTIONAL CROSSOVER

ASSUMEDSITE ENTRY POINT

PATH LEVELS / RAMPING RELATIVE TO ROADLEVEL TBC THROUGH THIS SECTION

LANDSCAPEDDRAINAGE SWALE

STEPS

RAMPS, STEPS & SEATING

STEPS

RAMPS, STEPS& SEATING

WIDE PEDESTRIAN ACCESS BOTHSIDES OF BREAKWATER

29

32

32

32

20

FUTURE VIEWING PLATFORMS

6

12

6

8

EXISTING CITY OF BUNBURY PUBLIC TOILETS

3

FUTURE WASTE OIL COLLECTION &RECYCLING FACILITY

CAUSEWAY HEAD AND SPUR GROYNEMASTERPLANNING SUBJECT TO FURTHERCONSULTATION WITH CITY OF BUNBURY &FINALISATION OF COASTAL ENGINEERINGDESIGN

JETT

Y RO

AD

CITY OF BUNBURY INTERPRETIVEAREA

EXISTING HERITAGE CRANE

GATE HOUSE

STAGE 3

A BOAT P

ENS (

FUTU

RE)

EXISTINGBOAT PENS

FUTURE CAUSEWAY FIRE FIGHTING EQUIPMENTPRECINCT & SERVICING STORAGE (REQUIREMENTS TBC)

REVETMENT TIE-IN TO EXISTING PATH ANDLANDSCAPING SUBJECT TO FURTHERCONSULTATION WITH CITY OF BUNBURY ANDFINALISATION OF COASTAL ENGINEERING DESIGN

DEVELOPMENT APPLICATION AREA

EXISTING WATER LINE

DEVELOPMENT APPLICATION - SITE PLANJETTY ROAD CAUSEWAY REDEVELOPMENTTRANSFORMING BUNBURY'S WATERFRONT

NORTH

1603

5

J

DA.01

SCALE

0 10 50M

DEVELOPMENT APPLICATION - FLOOR PLAN & ELEVATIONSJETTY ROAD CAUSEWAY REDEVELOPMENTTRANSFORMING BUNBURY'S WATERFRONT

0

1603

5

D

DA.05

1 2 5M3 4

PLAN SCALE 1:100 @ A3

GATE HOUSE

BINS

ELEC

FR & SK

ST

HS

WASTE OILSTORE

TANK

PLAN SCALE 1:100 @ A3

FIRE TANKS/PUMPS, MAINTENANCE & WASTE OIL STORES

TO PENS MAINTENANCESTORE

PUMPSPLANTRM

TANK

12

A

B

C

D

E

111098

F

G

H

REVN

12

150mm

APPROVED

AUTHORISED

APPROVED

APPROVED

CHECKED

CHECKED

DRAWN

DESIGNED

10050

PROJECT MANAGER

111098

Department of Transport

7654321

A

B

C

D

E

4030200

SCALE:

10

HORIZ:

VERT :DESIGN

GENERAL NOTES

76543

DRNAMENDMENT

FILE No

DATE

A1ORIG SIZE

REVN

F

G

H

21

APPROVAL

BAR MEASURE INDICATES IF SCALES HAVE BEEN VARIED

UNLESS OTHERWISE STATED DIMENSIONS IN METRES

DRAWING NUMBER

CASUARINA HARBOURJETTY ROAD CAUSEWAYREDEVELOPMENT

DEVELOPMENTAPPLICATIONAREA SOUTHERN PORTS

AUTHORITYSERVICE JETTY

DoT SERVICE JETTY

REFER DRG. No. BU0691-23-02FOR DETAILED VISUALISATION

C CROWN COPYRIGHT

WESTERN A U STR AL I A

TH

E

G O V E R N M E N

TO

F

OUTER HARBOUR

SOUTHERN PORTS AUTHORITY BERTHS 1 & 2

PUBLIC BOATLAUNCHINGFACILITY

Indicative Concepts

Revetment edge example

Project Deliverables 2019 and Beyond

• Multi-purpose building • Additional boat pens

• Viewing platforms (shade/shelter) • Fire fighting pumps, maintenance and waste oil storage shed

• Pen jetty gatehouses