NASA Earned Value Management (EVM) Capability Project evm.nasa.gov National Aeronautics and Space Administration NASA Earned Value Management (EVM) Update PM Challenge Jerald Kerby Feb., 2012

Post on 19-Oct-2014

25.513 views

Category:

Technology


5 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ct

evm.nasa.gov

National Aeronautics and Space Administration

NASA Earned Value Management (EVM) UpdatePM Challenge

Jerald KerbyFeb., 2012

Page 2: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ct

22

Outline

• EVM Requirements• NASA EVM Capability• Available EVM Resources

Page 3: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ct

3

• OMB Circular A-11 requires for total project EVM (in-house and contracted effort) to comply with the ANSI/EIA-748 guidelines– Details are in the Capital Planning Guide Supplement

• The OMB Circular A-11 requirement has been flowed down to the current version of NPR 7120.5

Overarching EVM Requirements

Page 4: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ct • EVM is applied in phases C and D to projects with an estimated life cycle cost >$20 million and to Phase E modifications, enhancements, or upgrades with an estimated cost > $20 million.

• EVM system complies with the guidelines in ANSI/EIA-748 and is described in the Project Plan.

• EVM system requirements are flowed down to applicable suppliers. (NFS 1834 is applied to contractors.)

• The project’s Performance Measurement Baseline (PMB) is established in Phase B in preparation for KDP C approval and is assessed during a review of the integrated baseline for the project.   • Project EVM reporting begins no later than 60 days after the start

of Phase C. Contract EVM reporting begins no later than 90 days after contract award.

• NPR 7120.5e expected to be finalized by summer of 2012• EVM requirements will not change from NID

NPR 7120.5 NID- EVM Requirements

Page 4

Page 5: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ctEVM Requirements - Excerpts of Interest

• 7120.5D:– (2) The Project's EVM approach is in-place by KDP C and implemented in Phase C through KDP E.– (4) As a minimum, EVM principles, as defined by ANSI/EIA-748, Earned Value Management Systems, apply from

KDP C through KDP E, if the project's life-cycle cost is at or greater than $20M.

• 7120.5E (draft):– 2.2.7 Programs, at the discretion of the MDAA, projects in phases C and D with a life cycle cost estimated to be

greater than $20 million and Phase E project modifications, enhancements, or upgrades with an estimated development cost greater than $20 million shall perform earned value management (EVM) with an EVM system that complies with the guidelines in ANSI/EIA-748, Standard for Earned Value Management Systems. Use of the NASA’s EVM capability and processes, will ensure compliance with the ANSI standard. This capability allows tailoring to match the individual needs of the program or project, while still meeting the ANSI-748 guidelines.

– 2.2.8 EVM system requirements shall be applied to applicable suppliers in accordance with the NASA Federal Acquisition Regulation (FAR) Supplement 1834.201 and to in-house elements.

– 2.2.9 In accordance with the NASA Federal Acquisition Regulation (FAR) Supplement 1834.201, EVM system requirements shall be applied to applicable suppliers and to in-house work elements. For contracts that require EVM, a Contract Performance Report (CPR), Integrated Master Schedule (IMS), and Work Breakdown Structure (WBS) are required deliverables and the appropriate data requirements descriptions (DRDs) included in the contract and/or agreement.

– 2.2.10    For projects requiring EVM, Mission Directorates shall conduct an pre-approval integrated baseline review as part of their preparations for KDP C to ensure that the project’s work is properly linked with its cost, schedule, and risk and that the systems are in place to conduct EVM.

Page 6: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ct

Page 6

EVM Requirements

> $50M $20M to $50M $0 to $20M

NASA Projects

Flow-Down to Contractors

32 GuidelinesNASA System

32 GuidelinesNASA System

Non-EVMPerformance Mgmt

> $50M $20M or More Less than $20M

32 GuidelinesValidated

Full EVMTerms andConditions of DRDs

32 GuidelinesCompliance

Full EVMTerms andConditions of DRDs

Non-EVMPerformance Mgmt

Performance MgmtTerms andConditions of DRD

All Supporting Contractors

Page 7: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ct EVM Assessment/Maturity Model

7

The Earned Value Management Maturity Model ® and the abbreviation EVM3® are trademarks of MMI

NPR 7120.5d

NPR 7120.5e

Page 8: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ct

8

What is the NASA EVM Capability?

• A common agency EVM capability/process that complies with the guidelines in ANSI/EIA-748 for in-house projects

• Documented with supporting handbooks, instructions, workarounds, etc.

• Tested through two pilot projects, Extra-vehicular Activities (EVA) and Ice, Clouds and Land Elevation Satellite (ICESat) II

• Approved by independent Peer Review Team with representation from each Mission Directorate and Center

• Reported to a senior level Agency Steering Committee represented by each Mission Directorate and Center

• Approved initial (phased) rollout by the Agency Project Management Council (APMC) in Dec. 2011– Space Launch System (SLS) - (MSFC)– ICESat II (GSFC)– Focus on EVM flow-down to contracts across the Agency

Overall Objective was to develop an Agency EVM capability that complies with the guidelines in ANSI/EIA-748 and test through two pilots, refine and finalize EVM process and documentation based on test results.

Page 9: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ct

9

Why develop a common process?

NASA utilizes EVM data on contracts but lacks the capability to: (1) readily apply EVM on in-house development effort; and (2) integrate in-house and contracted EVM data for total project performance assessment.– CxP was in the process of building EVM capability but consistent center

processes do not exist– Centers are also in process of building capability but none are ANSI

compliant except JPL– Consistent roles and responsibilities between programs, projects and

centers do not exist to streamline EVM– NASA lacks an approach to coordinate necessary business system,

policy, and process changes

Page 10: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ctAgency EVM Capability Implementation Schedule –

Phased Rollout

10

Processes Documentation/Products Pilot Testing Tools

Architecture Development

EVM Capability Implementation

SLS Survey, 10/20

MSFC Survey, 10/27

ICESat-2 Survey, 11/2

Other Center’s/Project’s Surveys & Visits

SLS Implementation PlanSLS Tool Set-up & Configuration

SLS EVM Processes & Tool TrainingSLS EVM Implementation

Surveillance

ICESAT-2 Tool Set-up & ConfigurationICESAT-2 EVM Processes & Tool Training

ICESat-2 EVM Implementation

ICESat-2 Implementation Plan

*Other Project Implementation Plan, etc. TBD

GSFC Survey, 11/2

Contracts

Page 11: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ctPhased Rollout - Contracts

• Contracts (1-2 yrs.) – Agency-wide1. Clarify NPR 7120 contract EVM requirements per NASA FAR Supplement (NFS) from

contract award2. Work with OP to refine/reinforce Agency process for flowing down EVM requirements to

development contracts that exceed $20M threshold 1. Strengthen Procurement Strategy Meetings (PSM)2. Implement a contracts checklist to include EVM requirements3. Utilize standard EVM DRDs4. Check for other control points to ensure consistent EVM flow-down of contractual

requirements and reporting cross Agency/Center/Projects3. House EVM data in centralized database for roll-up reporting capability, cost estimating,

software tools, etc. 4. Improve the data analysis used to make management decisions5. Implement EVM analysis training within APPEL for Agency implementation

• Improving and consistently flowing down the contractual EVM requirements corrects a number of the agency’s EVM issues

11

Page 12: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ct

12

• In-house Projects (1-5 yrs.) – Phased by selected projects1. NPR 7120 requirement to comply with ANSI/EIA-748 guidelines

1. Point to EVM Capability process in NPR as agency standard2. HEO and SMD Senior managers agreed to initial Rollout to SLS (MSFC) and ICESat

II (GSFC)– By following the process other Centers could get involved with flow-down

requirements from SLS or ICESat II3. Slowly rollout to others as new projects are identified by MDs4. Goal is to eventually rollout to a project at each Center

2. Conduct surveys at projects and Centers to scope the support/tools needed for agency implementation

3. Tool support/setup4. Implementation/Training/Surveillance Support5. Mitigate remaining Risks during project implementations6. Continuous improvement - modify process/documentation as needed7. Center should develop the capability/tools/infrastructure to support its project’s EVM

implementation8. During implementation, it’s the projects and Centers ultimate responsibility for success9. It is the Center’s responsibility to develop or acquire the skills to repeat the process and

maintain compliance with the overarching requirements within the agency process

Phased Roll-out Approach – Project/Centers

Page 13: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ct

13

Products Developed by EVM Capability EVM process flow diagrams (Storyboard) System Description (Detailed Process) Narratives (Summary Process) Project-Control Account Manager’s (P-CAM) Reference Guide

– Provides a quick reference for Technical Managers EVM Handbook

– Overall Agency and general EVM guidance Pilots results

– Lessons Learned/Issues/Workarounds/Recommendations EVM Acceptance/Surveillance Strategy

– Acceptance Strategy– Surveillance Overview

Software Acquisition Strategy– Hardware/Software access/acquisition

Training Modules by Process Area– Modularized training for each process area

Latest documents are on the www.nen.nasa.gov website under the EVM sub community folder

Page 14: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ct

14

Summarized Remaining Risks During Rollout• Support organizations add-on overheads not linked to performance• Support contractors cost reporting at appropriate level to support

EVM– Cost over obligations– Contracts not owned by projects

• SAP restricted to seven WBS levels for EVM reporting• Lack of skilled PP&C competencies to support EVM• Technical WBS driven by financial WBS• Increased scope without associated budget/schedule

– Lack of disciplined agency work authorization process• Management Reserve and UFE confusion• Change Management/Culture/Training• Lack of EVM considerations from day 1 of project

• There are workarounds for all risks and all can be mitigated over time

Page 15: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ct

15

Maintaining Integrity in the EVM Process

• Surveillance is a key function to ensure usefulness as a management tool and compliance with external mandates.

• Surveillance Frequency (programmatic/institutional)– Recurring assessment as part of the lifecycle reviews and– NPR 7120.5 Surveys

• Mature EVM Capability for improved support of multi-center programs and projects

Page 16: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ct

16

NASA’s EVM Capability ProcessEVM Capability

EVM in-house capability has been demonstrated by one or more pilots.

Results of the pilots are documented.

Integrated set of processes, tools, guidance and training products are finalized, incorporating the lessons learned gained from the pilots.

The system description, training and other EVM capability products are transitioned to the OCE and other responsible functional organizations for implementation.

Final Peer Review results in no show stoppers

Next Steps

Rollout on 1st two projects – SLS (MSFC) and ICESat II (GSFC) Remaining Items that still need to be addressed through Implementation

Cost Issues/Business Rules – OCFO working long-term solutions (Interim Workarounds developed) Mitigate Remaining Risks during rollout Continuous Improvement of the Process through Implementation Lessons Learned

Page 17: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ctEVM Capability Toolbox

Process Flow(Storyboard)

Documented Procedures\ Instructions

Training Materials

(Classroom)

Pilots Lessons Learned

Center EVM Focal Points

Surveillance Tools

EVM Capability

Components

Storyboard System Description APPEL (JIT) EVA Implementation Institutional wInsightNarratives Handbooks ICESat II Support Projects Cobra Guides

Page 18: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ct

Mission Directorate& Center

EVM Focal Point

POLICY , HANDBOOKS, GUIDANCE• NPR 7120.5• EVM Handbook • Scheduling Handbook • IBR Toolkit • WBS Handbook• Project Control Account Manager (CAM) Guide (draft)• Standardized WBS (7120.5)• EVM Capability Products

• Process/Storyboard• System Description• DRDs

MISSION

PROGRAM / PROJECT

REQUEST

PRODUCTS & SERVICES

• Center EVM Implementation Plans and

Support• Support for Agency and Centers EVM

Policy & Procedures• Training• RFP Development• SEB EVM Evaluation• IBR Support• Data Analysis/Tools• Surveillance• In-house EVM Support

RESOURCES, SYSTEMS, TOOLS• Automated Tools

• wInsight/Cobra • Access to Training Materials and

• online EVM/Scheduling/CAM/IBR training available through SATERN

• Websites • evm.nasa.gov• Internal material/Knowledge Now• nen.nasa.gov

• EVM Working Group Meetings and Peer Support

NASA EVM Resources

Page 19: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ctOrganizational EVM Focal Points

ORGANIZATION NAME EMAIL ADDRESS TELHeadquarters - Focal PointsIPCE Charles Hunt [email protected] 202.358.0803Procurement Carl Weber [email protected] 202.358.1784OCIO John Bosco [email protected] 202.358.1352OCFO Richard Savitsky [email protected] 202.358.2329Mission Directorates - Focal PointsSMD Claude Freaner [email protected] 202.358.2522HEOMD Cris Guidi [email protected] 202.358.1777Centers - Focal PointsAmes Alan Wong [email protected] 650.604.4952Dryden Patty Daws [email protected] 661.276.2964Glenn Bob Sefcik [email protected] 216.433.8445

GoddardStephen Shinn [email protected] 301.286.5894Julie Baker [email protected] 301.286.8096

Jet Propulsion Lab Cal Chambers [email protected] 818.354.0092Johnson Charlie Stegemoeller [email protected] 281.483.0576Kennedy - Deputy Chair Kristen Kehrer [email protected] 321.867.3691Langley Dr. Barry Lazos [email protected] 757.864.5731Marshall - Chair Jerald Kerby [email protected] 256.544.3243

StennisDeborah Norton [email protected] 228.688.1168Robert Ross [email protected] 228.688.2320

Page 20: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ctNASA EVM Website (Homepage)

Page 21: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ctNASA Engineering Network

https://nen.nasa.gov

Page 22: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ctNEN - NASA Community of Practice

Page 23: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ctNEN - NASA EVM Community of Practice

Page 24: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ct

24

EVM Support During the Project Life Cycle

Project Pre-Formulation Project Formulation Project ImplementationPre-Phase A Phase A Phase B Phase C Phase D Phase E Phase F

Approval

Project Evaluation

EVM Focal Points

• Up-front Project Planning• WBS Development • Schedule Development & Evaluation• Schedule Risk Assessment (SRA)• Program Planning & Control (PP&C) Training Initiative• Integrated Baseline Review (IBR) Preparation &

Support• Earned Value Management (EVM) Data Analysis

Processes/Practices

• wInsight© Support (EVM Data Analysis Tool)• Monthly Analysis

Page 25: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ctKey Components of EVM Process

Requirement (7120)Roll Out SupportSurveillance

Program

ProcessesDocumentation

ToolsCustomer

Support

Curriculum Training Materials

TargetAudiences

Edu c

atio

n &

Tra

i nin

g

Imp l

emen

tat i

on

Arc h

ite c

ture

25Everything is in place to begin implementation

Page 26: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ct

26

Backups

Page 27: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ct7120 EVM Language - Comparison

7120.5d 7120.5 NID Proposed 7120.5EDescribe the program's EVMS if EVM requirements are levied at the program level

2.2.7 Programs, at the discretion of the MDAA, and projects in phases C and D (and project modifications, enhancements, or upgrades during Phase E) with a life cycle cost estimated to be greater than $20 million shall perform earned value management (EVM) with an EVM system that complies with the guidelines in ANSI/EIA-748, Standard for Earned Value Management Systems. This includes flowing down EVM system requirements to applicable suppliers.

2.2.7 Programs, at the discretion of the MDAA, projects in phases C and D with a life cycle cost estimated to be greater than $20 million and Phase E project modifications, enhancements, or upgrades with an estimated development cost greater than $20 million shall perform earned value management (EVM) with an EVM system that complies with the guidelines in ANSI/EIA-748, Standard for Earned Value Management Systems. Use of the NASA’s EVM capability and processes, will ensure compliance with the ANSI standard. This capability allows tailoring to match the individual needs of the program or project, while still meeting the ANSI-748 guidelines.

Describe the project's implementation of Earned Value Management (EVM). The following requirements apply: (1) The project's EVM approach is consistent with the participating Center's best practices.

2.2.8 Projects will conduct an integrated review of project baselines as part of their preparations for KDP C to ensure that the project‘s work is properly linked with its cost, schedule, and risk and that the systems are in place to conduct EVM.

2.2.8 EVM system requirements shall be applied to applicable suppliers in accordance with the NASA Federal Acquisition Regulation (FAR) Supplement 1834.201 and to in-house work elements.

(2) The Project's EVM approach is in-place by KDP C and implemented in Phase C through KDP E.

2.2.9    For projects requiring EVM, Mission Directorates shall conduct an pre-approval integrated baseline review as part of their preparations for KDP C to ensure that the project’s work is properly linked with its cost, schedule, and risk and that the systems are in place to conduct EVM.

(3) Project EVM reporting begins within 60 days after the start of Phase C. 3.1 Describe the program‘s Earned Value Management System (EVMS), if EVM requirements are to be levied at the program level.

(4) As a minimum, EVM principles, as defined by ANSI/EIA-748, Earned Value Management Systems, apply from KDP C through KDP E, if the project's life-cycle cost is at or greater than $20M.

Describe the project‘s implementation of Earned Value Management (EVM) including:

(5) If the project's primary NASA Center has a fully validated Earned Value Management System (EVMS), the project uses that system rather than EVM principles.

(1) How the PMB will be developed and maintained for the project and how UFE will be established and controlled.

(6) For contracts and subcontracts, application of an EVMS is required as follows:

(2) The methods the project will use to authorize the work and to communicate changes for the scope, schedule, and budget of all suppliers. This plan is updated as make-buy decisions and agreements are made.

(i) For development or production (including flight and ground support) contracts and subcontracts valued at $20M or more, the contractor EVMS must comply with the guidelines in ANSI/EIA-748.

(3) The process to be used by the project to communicate the time-phased levels of funding that have been forecast to be made available to each supplier.

(ii) For development or production (including flight and ground support) contracts and subcontracts valued at $50M or more, the contractor EVMS has been formally determined compliant with ANSI/EIA-748 by the cognizant Federal contract management agency.

(4) For the class of suppliers not required to use EVM, the schedule and resource information required of the suppliers to establish and maintain a baseline and to quantify schedule and cost variances.

(iii) EVM is not required for grants, non-developmental level-of-effort engineering support services, steady-state operations, basic and applied research, and routine services such as janitorial services or grounds maintenance services; however, application is at the discretion of the Program/Project Manager.

(5) How the cost and schedule data from all partners/suppliers will be integrated to form a total project-level assessment of cost and schedule performance.

(iv) A Contract Performance Report (CPR), Integrated Master Schedule (IMS), WBS, and WBS dictionary are required whenever EVM is required on contracts and subcontracts. (v) In accordance with NFS Part 1834, require IBRs through Phase D for contracts requiring EVM. Schedule such reviews not later than 180 calendar days after contract award or the exercise of significant contract options, or not later than 60 calendar days after a significant funding or work scope realignment.

Page 28: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ctTop 5 Lessons Learned (linked to remaining risks)

28

1. Projects have to consider EVM Implementation from Day 1 of project1. Each time a charge code is created it effectively changes the

technical WBS for the life of the project2. Where will the work be controlled and performance taken?

EVM construct must be considered for control accounts and work packages.

2. Support Contractor costs will continue to be a constraint unless proper cost reporting requirements are flowed down to contracts• Support Contracts are often owned by other organizations

outside of the projects with no EVM requirements.3. Work Authorization agreements that document an agreement of

scope, schedule and budget by both sponsor and performing orgs. are fundamental to the implementation of EVM

4. PP&C skills must be strengthened to support EVM and project management

5. Senior Level Management support is needed across the agency with the change management process

Page 29: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ct • NASA Earned Value Management (EVM) System Description 1.Purpose: This document describes the NASA management system that will integrate the scope, schedule, and budget of a program or project for optimal planning and control of prime contracts and in-house work that can be used to ensure compliance with NASA’s EVM requirements (e.g., complies with the ANSI/EIA-748 guidelines). It is intended to establish a common project management process across all centers and Mission Directorates to facilitate adoption of best business practices, the application of timely and predictive analysis, and ultimately provide all stakeholders with greater insight into project performance.

• NASA Earned Value Management (EVM) Implementation Guide • Purpose: This handbook provides Earned Value Management (EVM) guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts in a consolidated reference document. This handbook was developed to serve as the central EVM guidance document for NASA personnel.• Content: Key components of NASA’s EVM policy addressed in this handbook include: Roles and Responsibilities, EVM Implementation on NASA Contracts (pre-award contract requirements (e.g., Data Requirement Descriptions, Statement of Work (SOW), contract type/incentives, etc.); EVM Implementation on NASA in-house Programs/Projects and EVM System (EVMS) Acceptance and Surveillance Processes. NASA EVM best practices and lessons learned are also included.

• NASA Project Control Account Manager (P-CAM) Handbook 1.Purpose: This handbook is intended to be a quick reference for a P‑CAM or technical manager empowered with a project’s cost, schedule, and technical responsibilities where EVM is required. The overall objective is to support the P‑CAMs in performing their responsibilities as they relate to EVM.

• NASA Integrated Baseline Review (IBR) Handbook (NASA/SP-2010-3406)1.Purpose: This handbook is intended to be a how-to guide to prepare for, conduct, and close-out an IBR. 2.Content: The guide describes the steps that should be considered for the IBR, offers tips for tailoring the IBR based on risk, cost, and need for management insight. Appendices to the guide contain samples of documentation typically used in connection with the IBR.

• NASA Schedule Management Handbook (NASA/SP-2010-3403)1.Purpose: The purpose of this handbook is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and industry. 2.Content: Describe the schedule management approach and best practices for developing and maintaining an integrated master schedule. Includes schedule tool considerations, pre-schedule development activities, development of the IMS, status updates and maintenance, schedule assessment and analysis, schedule control and lessons learned.

• NASA Work Breakdown Structure (WBS) Handbook (NASA/SP-2010-3404)1.Purpose: Provide WBS development guidance for the Agency to include government partners, international partners and contractors to extent required by their contracts.

Overview of EVM Documents

Page 30: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ct

1.0 Organization

Inst

itutio

nal/

Func

tiona

lP

-CA

M

Sub

proj

ect /

E

lem

ent M

gr /

Team

Pro

ject

M

anag

er /

Pro

ject

Offi

ce

Pro

gram

Mgr

/ P

rogr

am M

gt

Offi

ceM

DA

A /

HQ

1.04 Extend &

Refine Project WBS

1.06 Extend &

Refine Organizational

Breakdown Structure (OBS)

1.07 Extend &

Refine Responsibility Assignment

Matrix (RAM) & Identify Control

Accounts

1.05Prepare WBS

Dictionary

1.02Finalize Project Plan for Phase C (EVM

Approach)

1.01KDP B

3.03Prepare & Issue

Preliminary Planning

Guidance / WAD / Dollarized RAM

2.01Extend and Refine Master Schedule

(Draft)

8.01Estimate Material Needs and Cost

Agency EVM Capability Storyboard

1.03Approve

Project Plan

Yes

No

Document(s)(If blue, linked

documents attached)Decision

Off-Page Connector(s)(May not be in

proper swim lane)

LEGEND

Process(If blue, illustration

attached)

Page 31: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ct

2.0 Scheduling

Inst

itutio

nal/

Func

tiona

lP

-CA

M

Sub

proj

ect/

Ele

men

t Mgr

Pro

ject

Man

ager

/ P

roje

ct O

ffice

2.01Extend and

Refine Master

Schedule(Draft)

(Includes on-going Status & Updates

2.13Input P-CAM updates into the detailed

schedule and or cost tool

2.10Baseline &

PublishIMS

(Includes Master,

Intermediate & Detail Levels)

2.06Create Roll-

up Intermediate

Level Schedule

using Task Coding

2.12Provide status including AS/

AF, forecasted dates,

Milestones, & EV

3.07Reconcile Schedule

with Budget

data until fully integrated

2.15Review

results of status.

Develop workaround

plansas needed to

correctforecasted schedule

slips

2.05Extend &

Refine Logic-Linked

Detailed CAP Schedules (Drafts),

Define WPs, & assign EV

Measure- ment

Techniques (Includes on-going Status & Updates

2.11 Generate

status gathering

mechanism to collect IMS updates &

EVM status from P-CAMs

2.16Input

workaroundplans.

Health Check and Analysis

Iterateas needed.

2.14Calculate a new critical

path and new forecast dates

2.08Conduct Schedule

Health Check

Verify Vertical & Horizontal

Traceability

Verify Significant

Project Milestones

Validate Critical Path

Conduct Schedule

Risk Assessment

Verify Intermediate-Level Rollup

2.17Publish and Distribute

finalschedules

1.07 Extend &

Refine Responsibility Assignment

Matrix (RAM) & Identify Control

Accounts

IMS Status & UpdateDeveloping IMS

2.18Export data to cost tool

6-1.01Distributing

Monthly Schedule Analysis

3.12 Establish the PMB

3.05P-CAMs Develop

CAPs(Budget

only)

8.19 Claim

BCWP/Status Schedule

10.08Integrate Supplier

Cost/ Schedule Data into Cost &

Schedule Tools and Reports

9.14Integrate

Contractor Cost/

Schedule Data into Cost &

Schedule Tools and Reports

Agency EVM Capability Storyboard

6-1.02Monthly

Performance Analysis

Document(s)(If blue, linked

documents attached)Decision

Off-Page Connector(s)(May not be in

proper swim lane)

LEGEND

Process(If blue, illustration

attached)

7-1.11Input CAPs/update IMS, WBS, RAM, WAD, etc.

Update budget logs (PBB,

AUW, Contingency/

MR, UB)

7-2.08Input CAPs/update IMS, WBS, RAM, WAD, etc.

Update budget logs (PBB,

AUW, Contingency/

MR, UB)

2.09Approve

IMS?

Yes

2.07Integrate

Detail Schedules from CAPs forming a single IMS (Includes on-going status & updates)

10.08Integrate

Supplier Cost/ Schedule

Data into Cost & Schedule Tools and Reports

No

2.04Extend &

Refine Detailed CAP

Schedules (Drafts),

Define WPs, & assign EV

Measure- ment

Techniques (Includes on-going Status & Updates

2.03Extend &

Refine Logic-Linked

Intermediate Level

Schedule (Draft)

(Includes on-going Status & Updates

2.02 Schedule logic at Inter-

mediate Level?

No

Yes

Page 32: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ct

3.0 Work/Budget Authorization

Inst

itutio

nal/

Func

tiona

lP

-CA

M

Sub

proj

ect /

E

lem

ent M

gr /

Team

Pro

ject

Man

ager

/ P

roje

ct O

ffice

Pro

gram

Mgr

/ P

rogr

am M

gt

Offi

ceM

DA

A /

HQ

3.02Establish Project

Budget Log

3.05P-CAMs Develop

CAPs(Budget only)

3.07Reconcile

schedule with budget data

until fully integrated

3.08Negotiate

CAPs

3.09Finalize & Issue CA

WAD

3.12 Establish the PMB

Yes

3.13 Perform IBR (Verify SOW,

WBS Dictionary, PMB, IMS, Risk, etc.)

3.10Approved?No

3.15KDP C

3.06Extend and

Refine Charge

Numbers(If needed)

2.10Baseline &

PublishIMS

(Includes Master,

Intermediate & Detail Levels)

2.04Extend & Refine

Detailed CAP Schedules

(Drafts), Define WPs, & assign EV

Measure- ment Techniques

(Includes on-going Status & Updates

3.14 Incorporate Changes if Required

3.03Prepare & Issue

Preliminary Planning Guidance / WAD /

Preliminary Dollarized RAM

5.03Time-phase

indirect budget

1.07 Extend & Refine

Responsibility Assignment

Matrix (RAM) & Identify Control

Accounts

2.08Conduct Schedule

Health Check

Verify Vertical & Horizontal

Traceability

Verify SignificantProject Milestones

Validate Critical Path

Conduct Schedule Risk Assessment

Verify Intermediate-Level Rollup

2.07Integrate

Detail Schedules from CAPs forming a

single IMS (Includes on-going status &

updates)

Agency EVM Capability Storyboard

3.01Update/Issue Project Level

WAD or Equivalent

Document(s)(If blue, linked

documents attached)Decision

Off-Page Connector(s)(May not be in

proper swim lane)

LEGEND

Process(If blue, illustration

attached)

3.04Update Tech, Cost,

& Schedule Risk Assessment

3.11 Determine Reserves Rqmnts

8.01Estimate Material Needs and Cost

Page 33: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ct

4.0 Accounting

Sub

proj

ect /

E

lem

ent M

gr /

Team

Inst

itutio

nal/

Func

tiona

lP

-CA

M

Pro

ject

Man

ager

/ P

roje

ct O

ffice

Pro

gram

Mgr

/ P

rogr

am M

gt

Offi

ce

4.01Record Cost in Core Financial

System

4.02Month end closing

4.03 Download data from

Core Financial System into

spreadsheets

4.04 Verify/Distribute ACWP data to P-

CAMs

4.06Correct errors as

applicable

4.05Verify labor charges and other charges as

applicable

4.07Incorporate verified

ACWP into Cost tool

4.08 Verify Load into

Cost Tool

4.09Reconcile to

general book of accounts

No

Yes

6-1.02Monthly

Performance Analysis

8.11Enter acceptance into SAP (Actuals

Recorded)

Agency EVM Capability StoryboardDocument(s)(If blue, linked

documents attached)Decision

Off-Page Connector(s)(May not be in

proper swim lane)

LEGEND

Process(If blue, illustration

attached)

Page 34: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ct

5.0 Indirect Management

Inst

itutio

nal/

Func

tiona

lP

-CA

M

Sub

proj

ect /

E

lem

ent M

gr /

Team

Pro

ject

M

anag

er /

Pro

ject

Offi

ce

Pro

gram

Mgr

/ P

rogr

am M

gt

Offi

ceM

DA

A /

HQ

5.02 Establish budgets

for indirect cost

5.06Analyze and

evaluate base and rate variances

5.03Time-phase

indirect budget

5.07Develop EAC &

ETC rates

5.04Collect and record

indirect cost

5.05Analyze and

evaluate variances caused by indirect

costs

5.08Establish EAC with

ETC rates for indirect cost at CA/

WP level

3.05P-CAMs Develop

CAPs(Budget only)

5.01IM Center CFO provide indirect

Guidance

6-2.02Develop ETC Plan

for the Control Account and BoE

Agency EVM Capability StoryboardDocument(s)(If blue, linked

documents attached)Decision

Off-Page Connector(s)(May not be in

proper swim lane)

LEGEND

Process(If blue, illustration

attached)

Page 35: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ct

6-1.0 Managerial Analysis

Inst

itutio

nal/

Func

tiona

lP

-CA

M

Sub

proj

ect /

E

lem

ent M

gr /

Team

Pro

ject

M

anag

er /

Pro

ject

Offi

ce

Pro

gram

Mgr

/ P

rogr

am M

gt

Offi

ceM

DA

A /

HQ

6-1.02Monthly

Performance Analysis

6-1.03Run preliminary

CPR and Variance

Analysis Report forms

6-1.04Analyze Data Metrics and

Trends

6-1.06Analysis and

response to VARs

6-1.05Identify accounts

that exceed established thresholds

6-1.08Review Metrics,

Variance Analysis, Corrective Actions

6-1.07Routine ETC / EAC Revision

Required?

No

6-1.11Prepare and Issue

Monthly Performance

Reports

6-1.12Review

Performance Data Assess Impact on Reserves (UFE)

6-1.10Review and

Approve Changes and incorporate revised ETC, if

necessary

6-1.09Review and

Submit Change Request Doc, If

Required

Yes

6-1.01Distributing

Monthly Schedule Analysis

6-2.01Issue

Comprehensive project EAC

planning guidelines

4.08 Verify Load into

Cost tool

7-2.01Identify Internal

Change

2.17Publish and Distribute

finalschedules

Agency EVM Capability Storyboard

10.08Integrate Supplier

Cost/Schedule data into Cost &

Schedule Tools and Reports

9.14Integrate

ContractorCost/Schedule

Data into Cost & Schedule Tools

and Reports

Optional

Document(s)(If blue, linked

documents attached)Decision

Off-Page Connector(s)(May not be in

proper swim lane)

LEGEND

Process(If blue, illustration

attached)

Page 36: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ct

6-2.0 Comprehensive Estimate-at-Completion (EAC)

Inst

itutio

nal/

Func

tiona

lP

-CA

M

Sub

proj

ect /

E

lem

ent M

gr /

Team

Pro

ject

M

anag

er /

Pro

ject

Offi

ce

Pro

gram

Mgr

/ P

rogr

am M

gt

Offi

ceM

DA

A /

HQ

6-2.03Analyze EACs and

BoEs

6-2.04Review Project

ETC / EAC

6-2.05Approve EAC?

6-2.06Document

Disagreement (re-negotiate/iterate

as needed)

6-2.09Update Project

Lien List

6-2.07Update EAC on

WAD

Yes

Yes

No

6-2.08Revised EAC:

Approved WAD

6-2.11Update Reported

EAC(If Necessary)

6-2.12Performance

Reports

6-2.10Contingency/MR

Analysis6-2.01Issue

Comprehensive project EAC

planning guidelines

6-2.02Develop ETC Plan

for the Control Account and BoE

5.08Establish EAC with

ETC rates for indirect cost at CA/

WP level

6-1.04Analyze Data Metrics and

Trends

Agency EVM Capability StoryboardDocument(s)(If blue, linked

documents attached)Decision

Off-Page Connector(s)(May not be in

proper swim lane)

LEGEND

Process(If blue, illustration

attached)

Page 37: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ct

7-1.0 Change Management (External Changes)

Inst

itutio

nal/

Func

tiona

lP

-CA

M

Sub

proj

ect /

E

lem

ent M

gr /

Team

Pro

ject

M

anag

er /

Pro

ject

Offi

ce

Pro

gram

Mgr

/ P

rogr

am M

gt

Offi

ceM

DA

A /

HQ

7-1.01Identify External

Changes

7-1.03Assess change,

develop technical, cost &

schedule impacts

7-1.06Approved?No

7-1.07Publish Guidance

for Authorized Change

7-1.08Develop new and/or revise existing Control Account Plans (CAPs) &

EAC

7-1.13Receive approved

WAD, CAPs & EAC

7-1.11Input CAPs/update IMS, WBS, RAM, WAD, etc. Update budget logs (PBB,

AUW, Contingency/MR, UB)

7-1.12Issue approved WADs/CAPS/

IMS/WBS/Publish Project Budget

Logs

7-1.04Revise Program/

ProjectPlan?

Yes

Yes

No

7-1.05Revise Program/

Project Plan

7-1.10Review &

Approve CAPs & EACs?

Yes

No

7-1.09Review CAPs

& EACs

Agency EVM Capability Storyboard

7-1.02PrepareChange Request

Documentation

Document(s)(If blue, linked

documents attached)Decision

Off-Page Connector(s)(May not be in

proper swim lane)

LEGEND

Process(If blue, illustration

attached)

Page 38: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ct

7-2.0 Change Management (Internal Changes)

Inst

itutio

nal/

Func

tiona

lP

-CA

M

Sub

proj

ect /

E

lem

ent M

gr /

Team

Pro

ject

M

anag

er /

Pro

ject

Offi

ce

Pro

gram

Mgr

/ P

rogr

am M

gt

Offi

ceM

DA

A /

HQ

7-2.10Receive

approved WAD, CAPs & EAC

7-2.06Develop new and/or revise Control Account Plans (CAPs) & EAC

7-2.09Issue Approved & Revised WADs/

CAPS/IMS/WBS/Publish

Project Budget Log

7-2.03Assess change,

develop cost & schedule

impacts

7-2.05Update/Approve

Project Plan(If applicable)

7-2.02PrepareChange Request

Documentation

7-2.04Approved by

CCB, if required?

7-2.01Identify Internal Change

Yes

No

No

Yes7-2.07

Approve Changes?

Yes

7-2.08Input CAPs/update IMS, WBS, RAM, WAD, etc. Update budget logs (PBB,

AUW, Contingency/MR, UB)

Agency EVM Capability Storyboard

NOTE: Not all changes require a CCB or Program Office approval.

Document(s)(If blue, linked

documents attached)Decision

Off-Page Connector(s)(May not be in

proper swim lane)

LEGEND

Process(If blue, illustration

attached)

6-1.09Review and

Submit Change Request Doc, If

Required

Page 39: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ct

8.0 Material Management

Inst

itutio

nal/F

unct

iona

lP

-CA

M

Sub

proj

ect /

E

lem

ent

Man

ager

/ Te

am

Pro

ject

M

anag

er /

Pro

ject

Offi

ce

8.02Plan Material into

WPs/PPs

8.03Establish Material EV measurement

techniques

8.04Approve WAD

and CAP?Yes

8.07Monitor PO

8.10Work with Vendor

for Resolution

8.09Acceptance?

No

8.11Enter acceptance into SAP (Actuals

recorded)

8.19Claim BCWP/

Status Schedule

Project

Yes8.12

Project or Inventory?

8.13Move Material to

Inventory

8.14Withdraw

Material from inventory to

project

Inventory

4.01Record Cost in Core Financial

System

1.07Create

Responsibility Assignment Matrix (RAM) & Identify Control Accounts

Agency EVM Capability Storyboard

8.15Costs allocated to

Project?

Yes

8.17Enter Estimated ACWP into Cost

Tool

No

8.18 Update and Maintain Reconciliation with the Core Financial

System

8.16Transfer cost to

project

8.01Estimate Material Needs and Cost

8.06Create PO in

SAP

8.05Create PR in

SAP

8.08Receive and

Inspect

Document(s)(If blue, linked

documents attached)Decision

Off-Page Connector(s)(May not be in

proper swim lane)

LEGEND

Process(If blue, illustration

attached)

3.03 Prepare and Issue

Preliminary Planning

Guidance/WAD/Preliminary

Dollarized RAM

2.11 Generate status

gathering mechanism to

collect IMS updates & EVM status from

P-CAMs

No

Page 40: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ct

9.0 Contract Management

Inst

itutio

nal/

Func

tiona

lP

-CA

M

Sub

proj

ect /

E

lem

ent M

gr /

Team

Pro

ject

M

anag

er /

Pro

ject

Offi

ce

Pro

gram

Mgr

/ P

rogr

am M

gt

Offi

ceM

DA

A /

HQ

Yes

Yes

9.01Program

Plan

9.07Evaluate

Contractors’ EVMS

Capability

9.05Issue

Solicitations

9.06EvaluateProposals

9.15Conduct Reviews

(IBR, Validation

review, etc.)(If Required)

9.09 Finalize & Execute Contract

9.14Integrate

ContractorCost/

Schedule Data into

Cost& Schedule Tools and Reports

9.03PSM/SEB

BoardEstablished

9.02ASM Make-buy Decision Identify contracted effort

(Scope, Schedule, Budget)

9.08Decide

ContractAwardee

9.10Does Contract

ContainEV Rqmnts? 9.11

Review Contractor’sEVM System Description

No

Yes

2.12Provide status

including AS/AF, forecasted dates,Milestones, & EV

9.04Determine EVM Rpt, System,& Review

Reqmnts

Agency EVM Capability Storyboard

No

No

6-1.02Monthly

Performance Analysis

9.12Receive Monthly

Performance Data

9.13Receive

CPRs/IMS, etc.

Document(s)(If blue, linked

documents attached)Decision

Off-Page Connector(s)(May not be in

proper swim lane)

LEGEND

Process(If blue, illustration

attached)

Page 41: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ct

10.0 Intra-Agency Work Agreements

Inst

itutio

nal/

Func

tiona

lP

-CA

M

Sub

proj

ect /

E

lem

ent M

gr /

Team

Pro

ject

M

anag

er /

Pro

ject

Offi

ce

Pro

gram

Mgr

/ P

rogr

am M

gt

Offi

ceM

DA

A /

HQ

No

Yes 10.08Integrate

Supplier Cost/Schedule data

into Cost & Schedule Tools

and Reports

10.04Does Agreement

ContainEV Rqmnts?

10.05Review

Performing Center/ProjectEVM Approach 10.09

Conduct IBR

(If required)

10.01Project Plan

10.02

Identify and collaborate support required from other

center (Scope,Schedule, Budget/

EVM Reqmnts, etc..)

2.11 Generate status

gathering mechanism to collect IMS

updates & EVM status from P-CAMs

10.03Intra-Agency Work

Agreement10.07

ReceiveCPRs/IMS, etc.

Agency EVM Capability Storyboard

6-1.02Monthly

Performance Analysis

10.06Receive Monthly

Performance Data

Document(s)(If blue, linked

documents attached)Decision

Off-Page Connector(s)(May not be in

proper swim lane)

LEGEND

Process(If blue, illustration

attached)

Page 42: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ct

42

Steering Committee Members

Steering Committee Email TelephoneOCE Mike Ryschkewitsch [email protected] 202.358.1823OCFO Beth Robinson (Chair) [email protected] 202.358.0978SMD Mike Luther [email protected] 202.358.0260 Roy Maizel (alternate for SMD) [email protected] 202.358.2630ESMD HEOMD Michele Gates [email protected] 202-358-1048OCIO Gary Cox [email protected] 202-358-0413 Michael Medsker (alternate for OCIO) [email protected] 202-358-0637OP Jim Balinskas [email protected] 202.358.0445PA&E Tom Coonce [email protected] 202.358.4905MSFC Pam Hanes [email protected] 256.544.0092JSC Cynthia Neal [email protected] 281.483.2202GSFC George Barth [email protected] 301.286.5894GRC James Free [email protected] 216.433.3339JPL Dale Johnson [email protected] 818.354.5453ARC Carol Carroll [email protected] 650.604.0267SSC Jim Bevis [email protected] 228.688.3374 Keith Brock (alternate for SSC) [email protected] 228.688.1311DRFC LaRC Dr. David Gilman [email protected] 757.864.4428KSC Janet Petro [email protected] 321.867.2355Others

Page 43: Jerald kerby

NA

SA E

arne

d Va

lue

Man

agem

ent (

EVM

) Cap

abili

ty P

roje

ct

43

Peer Review Team Members

Peer Review Team Email TelephoneOCE Sandra Smalley [email protected] 202.358.4731OCFO Kevin Buford [email protected] 202.358.0405SMD Chuck Miller [email protected] 202.358.0715 Claude Freaner (alternate for SMD) [email protected] 202.358.2522ESMD HEOMD OCIO Gerald Smith [email protected] 202-358-1372 Kai Moericke (alternate for OCIO) [email protected] 202-358-4733OP Carl Weber [email protected] 202.358.1784PA&E John Fitch [email protected] 202.358.1228MSFC Stacy Counts [email protected] 256.544.6004JSC Doug Sander [email protected] 281.244.7391JSC Justin Mathurin [email protected] 281.483.6333GSFC William Sluder [email protected] 301.286.8976GRC Bob Sefcik [email protected] 216.433.8445 Vince Bilardo (alternate for GRC) [email protected] 216.433.3931JPL Kevin Rice [email protected] 818.354.3622ARC SSC Robert Ross [email protected] 228.688.2320 Deborah Norton (alternate for SSC) [email protected] 228.688.1168DRFC LaRC Dan Tenney (Chair) [email protected] 757.864.6095LaRC Dr. Barry Lazos [email protected] 757.864.5731KSC Franci Brice [email protected] 321.867.2381KSC Richard Dobbs [email protected] 321.867.7402KSC Susan Waterman [email protected] 321.867.6688Others Richie Law [email protected] 757-864-2184Others Roy Savage [email protected] 757-864-4886