japan’s use of biomass for power · delivered fuel cost per mwh produced fuel cost as % of...

34
Japan’s Use of Biomass for Power Presented by William Strauss, PhD, MBA President, FutureMetrics September 24, 2019

Upload: others

Post on 04-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Japan’s Use of Biomass for Power · Delivered Fuel Cost per MWh Produced Fuel Cost as % of Revenue (biomass from FiT, coal from day ahead rate) Pellets $84.13 38% PKS $51.75 24%

Japan’sUseofBiomassforPower

PresentedbyWilliamStrauss,PhD,MBAPresident,FutureMetricsSeptember24,2019

Page 2: Japan’s Use of Biomass for Power · Delivered Fuel Cost per MWh Produced Fuel Cost as % of Revenue (biomass from FiT, coal from day ahead rate) Pellets $84.13 38% PKS $51.75 24%
Page 3: Japan’s Use of Biomass for Power · Delivered Fuel Cost per MWh Produced Fuel Cost as % of Revenue (biomass from FiT, coal from day ahead rate) Pellets $84.13 38% PKS $51.75 24%

Dr.WilliamStrauss,President

NamedoneofthemostinfluenAalleadersinthe

biomasssectorin2016and2017byArgusMedia.Recipientofthe2012

InternaAonalExcellenceinBioenergyAward.

Aleaderintheindustryfortwodecades.

JohnSwaan,PelletPlantOperaBons

JohnisaleadingexpertonpelletplantoperaAons.Heis

thefounderofPacificBioEnergyandproducerofthefirstbulkshipmentofwoodpelletsfromNorthAmericatoEurope(1998).Recipientof

the2014InternaAonalFoundersAward.

KeyMembersoftheFutureMetricsTeam

AnneHeBossler,MarketIntelligenceExpert

AnneWeprovidesdetailedmarketintelligenceon

renewableenergypoliciesaroundtheworldwithastrongfocusonJapan.

AnneWespeaks,reads,andwritesfluentJapanese.Shewasthe2013recipientofthePresident’sAwardfromtheMaineInternaAonal

TradeCenter.

LaurenzSchmidt,TechnologySpecialist

Laurenzisagloballyrespectedexpertin

thermodynamicsandmassandenergyflowdynamicsintherenewableenergysector.Hereviewsandanalyzesalladvancedpellettechnologies.

YoshinobuKusano,JapanPolicyAdvisor

YoshiisoneofthemosthighlyrespectedparAcipantsinthe

Japanesebiomasssector.HewasakeymemberofSumitomo’spellettradingoperaAons.Heprovides

valuedinsightsintoJapanesepolicydevelopments.

Page 4: Japan’s Use of Biomass for Power · Delivered Fuel Cost per MWh Produced Fuel Cost as % of Revenue (biomass from FiT, coal from day ahead rate) Pellets $84.13 38% PKS $51.75 24%

FutureMetricsForthcomingComprehensiveReportonJapan’sBiomassPowerMarkets

AnneHeBosslerisperformingdetailedprimaryresearchforFutureMetrics’reportonJapan’sbiomasspowersector.

AnneWeisexaminingJapaneselanguagedocumentsanddatabasesfromprimarysourcesin

JapanthatarenotavailableinEnglish,andverifyingthedatawithmulAplesources.

HerworkhasdiscoverednumerousdifferencesbetweenthedatathatsheiscollecBngandthedatapresentedbysomeofthemainstreamprovidersoftradedataandinformaBononJapan’suseofbiomassfuels.

AcomprehensivereportontheJapanesebiomassmarkets,includingforecasts,willbepublishedbyFutureMetricsinOctober2019.

Page 5: Japan’s Use of Biomass for Power · Delivered Fuel Cost per MWh Produced Fuel Cost as % of Revenue (biomass from FiT, coal from day ahead rate) Pellets $84.13 38% PKS $51.75 24%

Thereasonthatthisindustryexists…

Page 6: Japan’s Use of Biomass for Power · Delivered Fuel Cost per MWh Produced Fuel Cost as % of Revenue (biomass from FiT, coal from day ahead rate) Pellets $84.13 38% PKS $51.75 24%

Ifthetrendinthechartbelowisfollowed,wewillreleasemostofthegeologiccarbonsequesteredoverhundredsofmillionsofyearsoveraspanofabout250years.

CurveisfromasimulaBonbyFutureMetrics

Page 7: Japan’s Use of Biomass for Power · Delivered Fuel Cost per MWh Produced Fuel Cost as % of Revenue (biomass from FiT, coal from day ahead rate) Pellets $84.13 38% PKS $51.75 24%
Page 8: Japan’s Use of Biomass for Power · Delivered Fuel Cost per MWh Produced Fuel Cost as % of Revenue (biomass from FiT, coal from day ahead rate) Pellets $84.13 38% PKS $51.75 24%
Page 9: Japan’s Use of Biomass for Power · Delivered Fuel Cost per MWh Produced Fuel Cost as % of Revenue (biomass from FiT, coal from day ahead rate) Pellets $84.13 38% PKS $51.75 24%

AXer2020,undercurrentpolicy,growthinEuropeandUKisalmostover.JapanandSouthKoreaarethemajornewgrowthmarkets.

Page 10: Japan’s Use of Biomass for Power · Delivered Fuel Cost per MWh Produced Fuel Cost as % of Revenue (biomass from FiT, coal from day ahead rate) Pellets $84.13 38% PKS $51.75 24%

S.Korea

WhathappensinS.KoreaimpactsJapan

Page 11: Japan’s Use of Biomass for Power · Delivered Fuel Cost per MWh Produced Fuel Cost as % of Revenue (biomass from FiT, coal from day ahead rate) Pellets $84.13 38% PKS $51.75 24%

AsRECpricesdrop,S.KoreanuAliAesreduceco-firingraAos.

ThedramaAcdropinRECpriceshasrippleeffectsintotheJapanesepelletmarkets.

Page 12: Japan’s Use of Biomass for Power · Delivered Fuel Cost per MWh Produced Fuel Cost as % of Revenue (biomass from FiT, coal from day ahead rate) Pellets $84.13 38% PKS $51.75 24%
Page 13: Japan’s Use of Biomass for Power · Delivered Fuel Cost per MWh Produced Fuel Cost as % of Revenue (biomass from FiT, coal from day ahead rate) Pellets $84.13 38% PKS $51.75 24%
Page 14: Japan’s Use of Biomass for Power · Delivered Fuel Cost per MWh Produced Fuel Cost as % of Revenue (biomass from FiT, coal from day ahead rate) Pellets $84.13 38% PKS $51.75 24%
Page 15: Japan’s Use of Biomass for Power · Delivered Fuel Cost per MWh Produced Fuel Cost as % of Revenue (biomass from FiT, coal from day ahead rate) Pellets $84.13 38% PKS $51.75 24%

ExcesssupplyinVietnamiscreaAngpressureonCanadianexportstoJapan

Page 16: Japan’s Use of Biomass for Power · Delivered Fuel Cost per MWh Produced Fuel Cost as % of Revenue (biomass from FiT, coal from day ahead rate) Pellets $84.13 38% PKS $51.75 24%
Page 17: Japan’s Use of Biomass for Power · Delivered Fuel Cost per MWh Produced Fuel Cost as % of Revenue (biomass from FiT, coal from day ahead rate) Pellets $84.13 38% PKS $51.75 24%
Page 18: Japan’s Use of Biomass for Power · Delivered Fuel Cost per MWh Produced Fuel Cost as % of Revenue (biomass from FiT, coal from day ahead rate) Pellets $84.13 38% PKS $51.75 24%

Japan

Page 19: Japan’s Use of Biomass for Power · Delivered Fuel Cost per MWh Produced Fuel Cost as % of Revenue (biomass from FiT, coal from day ahead rate) Pellets $84.13 38% PKS $51.75 24%

JapaneseGovernment’sTargetEnergyMixin2030

Source:StrategicEnergyPlan,GovernmentofJapan,July2018

Page 20: Japan’s Use of Biomass for Power · Delivered Fuel Cost per MWh Produced Fuel Cost as % of Revenue (biomass from FiT, coal from day ahead rate) Pellets $84.13 38% PKS $51.75 24%

Ifnucleardoesnotreach20%-22%andcoalandNGreach2030targets,howwillthegridstayenergized?

Page 21: Japan’s Use of Biomass for Power · Delivered Fuel Cost per MWh Produced Fuel Cost as % of Revenue (biomass from FiT, coal from day ahead rate) Pellets $84.13 38% PKS $51.75 24%

AsJapanistransiBoning,itscoalpoweredfleetwillbechallenged

Status NumberofPlants MWcancelled 15 8,318

construction 17 9,743operating 135 44,483permitted 4 2,600pre-permit 4 1,812retired 7 746shelved 2 1,135

184 68,837source:GlobalCoalTracker,September8,2019;AnalysisbyFutureMetrics

Japan Coal Power Stations (greater than 30MW)

WoodpelletswillbealargepartofthesoluBon.Severalmajorpowerplantconversionsarelikelyinthefuture.

Andwoodpelletsalreadyarepartof

thesoluBonforIPP’s.Source:GlobalCoalPlantTracker,PublishedbyGlobalEnergyMonitor

Page 22: Japan’s Use of Biomass for Power · Delivered Fuel Cost per MWh Produced Fuel Cost as % of Revenue (biomass from FiT, coal from day ahead rate) Pellets $84.13 38% PKS $51.75 24%

Evolution of the Feed-in-Tariff (FiT) The FiT was revised downwards from 24 yen to 21 yen

and now it is determined by public tender.

The FiT is fixed for 20 years (no adjustment for inflation) FiT money comes from the ratepayers, therefore it is designed to have a ceiling in

order to avoid too much burden on the ratepayers.

Current approved FiT projects support substantial quantities of renewable power.

There are hundreds of small (avg. 21 MW, median 6.25 MW) biomass fueled independent power projects operating or in the pipeline*.

*source:hHp://www.mori-energy.jp/hatsuden1.html;translatedfromJapanesebyFutureMetrics

Page 23: Japan’s Use of Biomass for Power · Delivered Fuel Cost per MWh Produced Fuel Cost as % of Revenue (biomass from FiT, coal from day ahead rate) Pellets $84.13 38% PKS $51.75 24%

Source:hHp://www.mori-energy.jp/hatsuden1.html;translatedfromJapaneseandverificaBonandanalysisbyFutureMetrics

MW’s

Largerplantsnotongraph

IncludesbothoperaAngandinthepipeline

Page 24: Japan’s Use of Biomass for Power · Delivered Fuel Cost per MWh Produced Fuel Cost as % of Revenue (biomass from FiT, coal from day ahead rate) Pellets $84.13 38% PKS $51.75 24%

FiTapprovedprojectsunderconstrucAonorinpipelinetendtobelargerthanthosealreadyoperaAng.

Thereare70projectsstarAngin2020orlatertotaling3,104MWwithanaveragesizeof44.3MW

MW’s

Source:hHp://www.mori-energy.jp/hatsuden1.html;translatedfromJapaneseandverificaBonandanalysisbyFutureMetrics

3,104 MWofnewcapacity80% Assumedcapacityfactor

21,751,851 AnnualMWh'sgenerated38% Assumedefficiency2.63 MWhfuelperMWhofpowerat38%

57,241,713 TotalMWh'soffuelneeded40% Proportionoffuelthatispellets

22,896,685 TotalMWhfrompellets17.5 GJpertonneofpellets4.9 MWhinonetonneofpellets

4,673,000 Totaltonnesperyearofpellets

Page 25: Japan’s Use of Biomass for Power · Delivered Fuel Cost per MWh Produced Fuel Cost as % of Revenue (biomass from FiT, coal from day ahead rate) Pellets $84.13 38% PKS $51.75 24%

TheIPPpowerstaAonsusefluidbedboilersandcanuseawidevarietyoffuels.

Page 26: Japan’s Use of Biomass for Power · Delivered Fuel Cost per MWh Produced Fuel Cost as % of Revenue (biomass from FiT, coal from day ahead rate) Pellets $84.13 38% PKS $51.75 24%

Pelletsarehighercostpertonne.

38% power plant efficiency

Delivered Fuel Cost per MWh

Produced

Fuel Cost as % of Revenue (biomass from FiT, coal from

day ahead rate)Pellets $84.13 38%PKS $51.75 24%Difference $32.38 15%Coal $40.49 61%

2.63 MWhs of Fuel to Make One MWh Power

However,ajeradjusAngformoisturecontent,thedifferenceissignificantlyless.

Page 27: Japan’s Use of Biomass for Power · Delivered Fuel Cost per MWh Produced Fuel Cost as % of Revenue (biomass from FiT, coal from day ahead rate) Pellets $84.13 38% PKS $51.75 24%

PelletsarepartofthefuelmixforJapaneseIPPsbecausepelletsareavailableatacostthatallowsprofitable

generaBonunderFiT.

AND

Thesuppliersofpelletfuelare“bankable”

[forthcomingsustainabilityrequirementswillchallengemanyPKSsuppliers]

Page 28: Japan’s Use of Biomass for Power · Delivered Fuel Cost per MWh Produced Fuel Cost as % of Revenue (biomass from FiT, coal from day ahead rate) Pellets $84.13 38% PKS $51.75 24%

ExampleofoneIPP’sBiomassPowerStaAonPipeline-RENOVA

Page 29: Japan’s Use of Biomass for Power · Delivered Fuel Cost per MWh Produced Fuel Cost as % of Revenue (biomass from FiT, coal from day ahead rate) Pellets $84.13 38% PKS $51.75 24%

COD=commercialoperaBondate

Page 30: Japan’s Use of Biomass for Power · Delivered Fuel Cost per MWh Produced Fuel Cost as % of Revenue (biomass from FiT, coal from day ahead rate) Pellets $84.13 38% PKS $51.75 24%
Page 31: Japan’s Use of Biomass for Power · Delivered Fuel Cost per MWh Produced Fuel Cost as % of Revenue (biomass from FiT, coal from day ahead rate) Pellets $84.13 38% PKS $51.75 24%
Page 32: Japan’s Use of Biomass for Power · Delivered Fuel Cost per MWh Produced Fuel Cost as % of Revenue (biomass from FiT, coal from day ahead rate) Pellets $84.13 38% PKS $51.75 24%

NotJusttheIPPs

ForthemajoruBliBes,carbonemissionslimitsandminimumefficiencyrequirementsarefoundaBonsforthedemandforwoodpellets.

ItisquitepossiblethatafewofthelargecoalpowerstaBonswillfullyconverttowoodpellets.

Ifthathappens,eachwilldemandmillionsoftonnesperyearofpellets!

Page 33: Japan’s Use of Biomass for Power · Delivered Fuel Cost per MWh Produced Fuel Cost as % of Revenue (biomass from FiT, coal from day ahead rate) Pellets $84.13 38% PKS $51.75 24%

Thankyou

BillStrauss–[email protected]

BillenjoyingBCpowder–March2,2019

Page 34: Japan’s Use of Biomass for Power · Delivered Fuel Cost per MWh Produced Fuel Cost as % of Revenue (biomass from FiT, coal from day ahead rate) Pellets $84.13 38% PKS $51.75 24%

In 2018, the government launched the first tender for 180MW biomass generation for projects of 10MW or more capacity. The undisclosed ceiling price was JPY 20.60 /kWh. 7 bidders submitted proposals and 1 proposal got an award: Soma Kyodo Power for the 2,000MW Shinchi power plant co-fired by biomass and coal at JPY 19.60/kWh for 35MW of biomass capacity or 1.75pc of its 2GW power plant co-fired with coal1.

Bid fees were the same as for the solar tenders, i.e. JPY 127,000 general submission fee, primary deposit of JPY 500/kW and secondary deposit of JPY 5,000 /kW for the winning bid project.

However, Soma canceled its winning bid and is going to bid into the upcoming capacity market system which is likely to be more lucrative. The Japanese capacity market will formally launch in 2021.

The 2019/2020 biomass power tender that was announced will exclude co-firing projects. The currently ongoing tender for 2019/2020 which requires bids by December 6th, 2019 and seeks 120MW capacity, excludes any projects co-fired with biomass and coal, palm kernel shell, palm oil and palm trunk.

METI had discussed adding new biomass feedstocks for power generation under the FIT scheme, such as empty fruit bunches, plant shells such as coconut, cashew nut, walnut, almond, pistachio and sunflower seed, along with napier grass, sorghum, jatropha seeds and plant oils such as canola, soy, peanut, sunflower and palm acid.

However, no decision has been reached yet, due to the question re. how to ensure sustainability of these feedstocks. A newly launched working group along with the committee has taken over the discussions to establish how to confirm sustainability, aiming to finalize it by autumn 20192.1PressReleaseDecember18th,2018ofJapanLowCarbonInvestmentPromoBonOrganizaBon(⼀一般社団法⼈人低炭素投資促進機構)2ArgusNews&AnalysisMay27th,2019

FromForthcomingFutureMetricsJapanReport