itica pp10 master data
DESCRIPTION
PP Master dataTRANSCRIPT
-
http://www.itica.cz
PP10 Master Data
Created by: Veronika Obstov
www.itica.cz [email protected]
-
http://www.itica.cz
PP10 Master data Material
Material
-
http://www.itica.cz
SAP PP Master Data
1) Product structure (BOM) 2) Product processes (Routing) 3) Available capacities (Work Center)
BOM and Routing can be combined into production versions.
Master Data consists of three parts
Master Data Overview
-
http://www.itica.cz
Material Master
Central element of basic data within production
When you create in MM01 the new material: Industry sector needs to be filled Industry sector influences the
A) screen sequence B) field selection
Which follow in the creation of material master Material Type is also neccessary to select. It influences: Internal or external number assignment Which views are available and in which sequence Whether the material can be configured Controls Inventory management requirements Accounts for goods movements
MM01/MM02
MM02 transaction
-
http://www.itica.cz
Customize material type
You can set in SPRO several material types or use the existing ones
SPRO setting
SPRO
-
http://www.itica.cz
MRP profile
When you are creating material master you can use MRP profile to make easier the data management of all materials.
MMD1 / MMD2
Create material with MRP profile
-
http://www.itica.cz
Reduce maintenance time
You can save your usually used views and your organizational data.
MM01
Save views and orgainizational data
-
http://www.itica.cz
PP10 Bill of Material
BOM
-
http://www.itica.cz
SAP BOM Master data
1) Single-level BOM 2) Multilevel BOM 3) Summarized BOM 4) Variant BOM
4 types of BOMs
BOM Overview
-
http://www.itica.cz
Create BOM
The BOM can be used in several types of usage.
CS01
Create Bill of Material
-
http://www.itica.cz
Change BOM
CS02 Change BOM
CS02 transaction
Customize in OS13
-
http://www.itica.cz
BOM Header
CS02 BOM Header
CS02 transaction
Customize in OS23
-
http://www.itica.cz
BOM Item
CS02 BOM Header
CS02 transaction
Phantom item iden5ca5on
-
http://www.itica.cz
SAP BOM Transactions
1) CS11 Multilevel BOM 2) CS15 Where used BOM 3) CS14 BOM comparison
Transaction to manage BOMs
BOM Overview
-
http://www.itica.cz
PP10 Work center master data
Work center
-
http://www.itica.cz
Work centers overview
Work center represents the central capacity quantity within production planning. It can represent: Machine Group of machines Person Group of persons
Main characteristics
Master data
-
http://www.itica.cz
Create Work center
By CR01 you create the work center. By CR02 you can change the work center.
CR01
Create the master data
Can be customized in OP40
-
http://www.itica.cz
Create Pooled capacity
Capacity can be shared with several work centers.
CR11
Create the master data
Can be customized in OP40
-
http://www.itica.cz
Work center hiearchy
You can subordinate one work center to another work center.
CR21
Create the master data
You can select which workcenters are
under this hiearchy.
-
http://www.itica.cz
PP10 Routings master data
Routings
-
http://www.itica.cz
Routings overview
3 types of time are used within routings:
1) Queque time This is the period of time in which the material is located at the production center until the execution of operation begins.
2) Move time Time to move from one production center to subsequent production center.
3) Wait time After the operation is done the material wait to be moved to another production center.
Main characteristics
Master data
-
http://www.itica.cz
Create Routing
By CA01 you create the routing. By CA02 you can change the Routing.
CA01
Create the master data