STARTUP MANUAL VOLUME-2 Riyadh Power Plant # 10 Page 1

Upload: muhammad-gulzar

Post on 15-May-2015

2.144 views

Category:

Business


35 download

TRANSCRIPT

Page 1: PP10 startup manual (Unofficial as Requested)

STARTUP MANUAL

VOLUME-2

Riyadh Power Plant # 10

Page 1

Page 2: PP10 startup manual (Unofficial as Requested)

STARTUP MANUAL

VOLUME-2

Riyadh Power Plant # 10

Page 3: PP10 startup manual (Unofficial as Requested)

Client : SEC-COA Consultant : Contractor : BEMCO

Riyadh Power plant # 10

“10621166/00”

Doc. No.: PP10-BS-SU-001 STARTUP MANUAL Date:13 Feb,09

Revision: 0

Author: Asif Haneef

Annex B 1. Electrical Test Procedures

1.1. Over all Testing List (Excel Sheet)………………………………………......6 1.2. TP-HP01 High Voltage AC/DC Testing……………………………………….23 1.3. TP-CM01 MV Cable Testing.......................................................................32 1.4. TP-CM02 LV Cable Testing........................................................................44 1.5. TP-AT01 Auxiliary Transformers.................................................................51 1.6. TP-BD01 MV Bus Duct................................................................................70 1.7. TP-BD02 LV Bus Duct.................................................................................83 1.8. TP-CL01 Current limiting Reactor................................................................95 1.9. TP-CT01 Current Transformer....................................................................104 1.10. TP-PT01 Generator Transformer................................................................121 1.11. TP-AM01 Ammeter ....................................................................................160 1.12. TP-EM01 Energy Meter .............................................................................166 1.13. TP-FM01 Frequency Meter.........................................................................181 1.14. TP-PFM01 Power Factor Meter..................................................................187 1.15. TP-PM01 Power Meter...............................................................................193 1.16. TP-VM01 Voltmeter....................................................................................197 1.17. TP-BB01 MV Bus Bar.................................................................................203 1.18. TP-BB02 LV Bus Bar..................................................................................218 1.19. TP-MB01 MV Switchgear Breaker Feeder.................................................234 1.20. TP-DS01 MV Disconnect Switch................................................................282 1.21. TP-LB 01 LV Switch Gear Breaker Feeder................................................282 1.22. TP-AR01 Over current Relay.....................................................................304 1.23. TP-CR01 Trip Circuit Supervision Relay....................................................378 1.24. TP-DR01 Differential Relay........................................................................386 1.25. TP-HR01 Timing Relay..............................................................................496 1.26. TP-LR01 Tripping Relay.............................................................................503 1.27. TP-SR01 Synchronous Check Relay.........................................................510 1.28. TP-VR01 Voltage Relay.............................................................................523 1.29. TP-AX01 Current Transducer....................................................................538 1.30. TP-VX01 Voltage Transducer....................................................................545 1.31. TP-PX01 Power Transducer......................................................................552 1.32. TP-VT01 Voltage Transformer...................................................................559 1.33. TP-BT01 Battery testing and discharge test..............................................575 1.34. TP-BT02 Charger Testing (Later)..............................................................592 1.35. TP-BT03 UPS Testing (Later)....................................................................593 1.36. TP-MT01 Motors........................................................................................594 1.37. TP-GT01 Generators.................................................................................607 1.38. TP-MM01 Low Voltage Motor Control Center……………………………....618 1.39. TP-DB01 DC Switch Board …………………………………………………..635 1.40. TP-BE01 Procedure for Back Energization (Later) 1.41. TP-OS01 Procedure for Electrical Over Speed (Later) 1.42. TP-SY01 Procedure for Synchronization (Later) 1.43. TP-LG01 Procedure for Load Rejection (Later) 1.44. TP-IL01 Procedure for System Interlock Checks (later)

Page 4: PP10 startup manual (Unofficial as Requested)

Client : SEC-COA Consultant : Contractor : BEMCO

Riyadh Power plant # 10

“10621166/00”

Doc. No.: PP10-BS-SU-001 STARTUP MANUAL Date:13 Feb,09

Revision: 0

Author: Asif Haneef

1.45. TP-IT01 Procedure for System Inter trip Checks (later) 1.46. TP-IN01 Initial Energization of the Plant (Later) 1.47. TP-SS01 Procedure for System Stability (Later)

2. Attachment for Section–12 Testing and commissioning-Instrumentation (Later) .................................................................................................................651 2.1. CI-01 Calibration of Pressure Switches 2.2. CI-02 Calibration of Temperature gauges 2.3. CI-03 Calibration of Pressure gauges 2.4. CI-04 Exhaust over temperature alarm & trip 2.5. CI-05 Exhaust duct over pressure protection 2.6. CI-06 Compressor bleed Valves 2.7. CI 07 Emergency oil pump test & low lube oil pressure trip 2.8. CI-08 Exhaust frame blower (lead / lag test) 2.9. CI-09 Firing checks 2.10. CI-10 Flame detection test and loss of flame trip 2.11. CI-11 Cooling water lead lag test & cooling water fans vibration alarm trip 2.12. CI-12 Hydraulic oil System 2.13. CI-13 Compartment cooling Fans 2.14. CI-14 Hydraulic ratchet System 2.15. CI-15 Trip oil system checks 2.16. CI-16 Vibration protection system 2.17. CI-17 Vanadium inhibitor pip trip, lead lag and change

over distillate 2.18. CI-18 Manual emergency shutdown 2.19. CI-19 High lube oil header temperature alarm & trip 2.20. CI-20 Low and high lube oil alarm 2.21. CI-21 IGV position calibration 2.22. CI-22 Mark VI processor hard 2.23. CI-23 Inlet air-filter 2.24. Instrumentation Test Sheets(Attached)

2.24.1. Orifice Plate Verification Report ......................................................653 2.24.2. Thermo well Verification. .................................................................654 2.24.3. Instrument Calibration Report For Temperature Element

Transmitters……………………………………………………………...655 2.24.4. Instrument Calibration Report(Transmitters)....................................656 2.24.5. Switch Calibration Report (PS/TS/LS-DPS) ...................................657 2.24.6. Local Instrument Calibration Report (PG/TG/LG)............................658 2.24.7. Instrument Loop Test Sheet-Pressure/Level/Flow/Temperature

Transmitter/Other Transmitters........................................................659 2.24.8. Instrument Loop Test Sheet-RTD....................................................660 2.24.9. Instrument Loop Test Sheet-DCS Digital Input Signal(Switches) ...661 2.24.10. Instrument Loop Test Sheet- Motor Operated Valve. ………………662 2.24.11. Instrument Loop Test Sheet- Pneumatic Valves..............................663 2.24.12. Instrument Loop Test -Solenoid valve .............................................664 2.24.13. Switch Calibration report (PS/TS/LS-DPS)…………………………...665 2.24.14. Instrument Control Cable -Megger/Continuity………………………..666

Page 5: PP10 startup manual (Unofficial as Requested)

Client : SEC-COA Consultant : Contractor : BEMCO

Riyadh Power plant # 10

“10621166/00”

Doc. No.: PP10-BS-SU-001 STARTUP MANUAL Date:13 Feb,09

Revision: 0

Author: Asif Haneef

3. Attachment for Section –13 Testing and commissioning-Mechanical

(Later)....................................................................................................................667 3.1. CM-01 Commissioning of Fuel Oil System 3.2. CM-02 Commissioning of Fuel Treatment Plant (Vendor) 3.3. CM-01 Commissioning of Fuel Oil System 3.4. CM-04 Commissioning of Oily Water Drainage System 3.5. CM-05 Commissioning of GT Wash Water Supply System 3.6. CM-06 Commissioning of GT Wash Water Drain System 3.7. CM-07 Commissioning of Raw Water Transfer Pumps 3.8. CM-08 Commissioning of Water Treatment Plant (Vendor) 3.9. CM-09 Commissioning of Dimin Water Plant (Vendor) 3.10. CM-10 Commissioning of Dimin Water Supply Pumps

3.11. CM-11 Commissioning of Service Water Distribution Pumps 3.12. CM-12 Commissioning of Drinking Water Distribution Pumps 3.13. CM-13 Commissioning of Instrument Air Compressors and Air Dryers 3.14. CM-14 Commissioning of Service Air Compressors 3.15. CM-15 Commissioning of Fire Water System Pumps 3.16. CM-16 Commissioning of Foam System Equipments 3.17. CM-17 Commissioning of Fire Water and Fire Foam Deluge System 3.18. CM-18 Commissioning of HVAC Equipments 3.19. CM-19 Commissioning of Sewage Treatment Plant (Vendor) 3.20. CM-20 Commissioning of Irrigation System Pumps and Equipments 3.21. CM-21 Commissioning and Load Testing of Overhead Cranes and Hoists 3.22. CM-22 Commissioning of Black Start Diesel Generator (Vendor) 3.23. Gas Turbine and Associated Auxiliaries (By GE)

4. Attachment for Section –14 Velocity Flushing...............................................668

4.1. Lube Oil Flushing

Page 6: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

LI

: SEC-C : : BEMCO

10-BS-SU-

ST OF

COA

O

R

-001

F TEST

Riyadh Po“1062

STARTU

TING O

ower plant21166/00”

UP MANUA

OVER

t # 10

AL DF

ALL (E

Date:13 Feb,09

EXCEL

Revision0

L SHE

n:

EET)

Page 6

Page 7: PP10 startup manual (Unofficial as Requested)

Testing and commissioning (Electrical)Testing List Project : Riyadh Power plant # 10

1.General inspection and Name plate details Commissioning Test. 2.Winding Ratio Test 1.Internal wiring and control power measurement TS-PT033.Winding Resistance Test 2.Trips fromTranformer Protection Device to protection panel TS-PT044.Magnetism Current Measurement 3. Alarms and trips indication to Remote checks TS-PT045.Vector Group Test 4.CT Loops , Burden , and Single point Grounding test TS-PT066.Magnetic Balance Test 5.Secondary Injection to Verify Close circuit of the Cuts TS-PT067.Insulation and Polarization test 6.Stability and sensitivity test for the Transformer and system TS-SS018.Core Insulation test 7. interlock test for the system TS-IL019.Tan delta Measurement 8. inter trip test for the system TS-1T0110.Frequency Response Analysis (if vendor recommended) 9.Pre Energisation Tests 11.Winding Temperature Indicator Calibration Meggering 12.Oil Temperature Indicator Calibration Post Enegisation test13.Single Phase Impedance Measurement Measurement of In rush current14.Zero Sequence Impedance Measurement Measurement of noise level (if Vendor Recommends) TS-PT0815.Testing of protection devices and auxiliary circuits 10. Load Service Checks TS-PT0916.Testing and commissioning of cooler control system17.Testing and commissioning of OLTC18.Testing and commissioning of remote OLTC panel TP-PT02 TS-PT0219.Current transformer test Ratio test Polarity Test Winding Resistance Test Winding Insulation test Mag Curve test

1.General inspection and Name plate details Commissioning Test. 2.Winding Ratio Test 1. Internal wiring and control power measurement TS-AT023.Winding Resistance Test 2.Trips fromTranformer Protection Device to protection panel TS-AT024.Magnetism Current Measurment 3. Alrams and trips indication to Remote checks TS-AT025.Vector Group Test 4. CT Loops , Burden , and Single point Grounding test TS-AT026.Insulation and Polarization test 5. Secondary Injection to Verify Close circuit of the CTs TS-AT027.Winding Temperature Indicator Caliberation 6. Stability and sensitivity test for the Transformer TS-AT028.Oil Temperature Indicator Caliberation 7. Pre Energisation Tests TS-AT039.Testing of protection devices and auxilari circuits Meggering 10.Current transformer test Post Enegisation test Ratio test Polarity Test Winding Resistance Test Winding Insulation test Mag Curve test

1.General inspection and Name plate details 2.Conductor continuity and phasing test3.Cable Insulation Test befror hipot4.High Voltage Test5. Insulation resistance test after hipot

MV XLPE Cable

3

SL No. Equipment

1

2

Testing ActivitiesSystem Name

TP-CT01

TP-PT01

Test sheet No

Test Proc. No Proc. NoCommissioning ActivitiesTest sheet No

TS-PT07

CE-01

CE-02

MV SYSTEM

COMMISSIONING OF MV XLPE CABLE

COMMISSIONING OF GENERATOR STEP UP TRANSFORMER

380KV SYSTEM

MV/LV SYSTEM

COMMISSIONING OF AUXILIARY TRANSFORMER

TS-HC01TP-HC01

Auxiliary Transformer

GSU Transformer

TS-AT01TP-AT01

TP-CT01 TS-CT01

TS-CT01

TS-PT01

Page 8: PP10 startup manual (Unofficial as Requested)

Testing and commissioning (Electrical)Testing List Project : Riyadh Power plant # 10

SL No. Equipment Testing ActivitiesSystem

NameTest sheet

NoTest Proc.

No Proc. NoCommissioning ActivitiesTest sheet No

1.General inspection and Name plate details

2. Impedance and resistance test3.Insulation Resistance test

1.General inspection and Name plate details 2.Impedance test3.Insulation Resistance test before hipot4.High Volatge test5.Insulation resistance test after hipot

1.General inspection and Name plate details 2.Winding Resitance Test3.Insulation test before hipot4.High Voltage Test5.Insulation test after hipot

1. General inspection and Name plate details Commssioning Test. 2. Bus continuity and phasing test 1. Heater Circuit Commissioning3. Torque test 2. Dry Air Supply commissioning4. Contact Resitance test 3. Pre Energisation Tests 5. Main Circuit Contact Resitance test Meggering 6. Insulation resistance test before hipot7. High Voltage test8. Insulation resistance test after hipot9. Protective earthing check

COMMISSIONING OF MV SWITCHGEARCommssioning Test.

1. Test on Disconnect switch 1. Internal wiring and control power measurmenta. Contact Resitance test. 2. functional checks of feeders and ATSb. Insulation resistance test before hipot. 3. Protection checks c. High Voltage test. 3.1 CT Loops , Burden , and Single point Grounding testd. Insulation resistance test after hipot 3.2 Tripping of relays by secondary injection at final settinge. Switch operating time /motor current measurment 3.3 Primary Injection testf. Minimum voltage operation (open/close) at 90V dc. 3.4 Stability and sensitivity test for bus bar

2. Discoonect switch operation 3.5 VT Functional Check a. Disconect Switch operation at rated Voltage. 3.5 Arc Protection Checks b. Functional test of local controls, alarm and indication.

3.6 Tripping and itertripping checks c. Functional test of Remote controls, alarm and indication. 4. Interlock checks d. Correct settings of motor limit switches.e. Check correct operation of auxiliary switches. 6. Alarms and indication checksf. Automatic disconnection of supply to the motor on insertion of handle 7. Remote opertion and Alarm Checks (DCS)

3. Operation of Earth Switch. 8. Pre Energisation Tests 4. Correct Functioning of Interlocks Meggering of the bus bar5. Electrical control and protection/Measuring Devices Post Enegisation test

TS-RT01TP-RT01Current Limiting Reactor

Neutral Grounding ZIG ZAG

Transformer

TS-NT01

5

TP-NT02

7

4

6

COMMISSIONING OF CURRENT LIMITING REACTOR

COMMISSIONING OF NEUTRAL GROUNDING RESISTOR

CE-03

MV SYSTEM

TS-BD01MV bus duct

COMMISSIONING OF MV BUS DUCT

CE-04

8

Neutral Grounding

Resistor

MV Dis connect Switch

TS-BD03

TP-BD01

TS-NT02

COMMISSIONING OF GROUNDING ZIG ZAG TRANSFORMER

TP-NT01

Page 9: PP10 startup manual (Unofficial as Requested)

Testing and commissioning (Electrical)Testing List Project : Riyadh Power plant # 10

SL No. Equipment Testing ActivitiesSystem

NameTest sheet

NoTest Proc.

No Proc. NoCommissioning ActivitiesTest sheet No

a. Insulation resistance measurment for control circuit Measurment of Voltages

b. Control power and current measurment. Phase sequence check6. Commissioning of Heater Circuit Phasing between the line and bus

a. Visual Checks b. Measurment of insulation resistance of heater and lamp circuit c. Functional checks of thermostat , Heaters, d. Measurment of Current and voltage

7. Protective earthing check.

Testing of bus bar1. General inspection and Name plate details 2. Bus continuity and phasing test3. Torque test 4. Contact Resitance test5. Main Circuit Contact Resitance test6. Insulation resistance test before hipot7. High Voltage test8. Insulation resistance test after hipot9. Protective earthing checkTesting of Feeder Breaker1. Operation and alignment Checks of breakerliftingTrolley2. Tests on the CB

a. Breaker Manual closing/opening, and manual spring chargingb. Contact gap Measurment for main contact of the VCBc. Contact Resitance testd. Insulation resistance test before hipote. Vacuum Integrity test on VCBf. High Voltage test. g. Insulation resistance test after hipot.h. Minimum operating voltage for close and trip coil.

i. Breaker operating time.j. Spring charging motor current and time

tk. Stored energy and spring charge mechanism h kl. Functional check of C.B Operation counter

3. Breaker operationa. CB Racking IN and OUT Checksb. CB operation in service position mechanical and electricalc. CB operation in test position electricald. Anti pumping functional checke. Functional test of local controls, alarm and Indication

TS-BB01

MV SYSTEM9

MV Switch Gear

MV Dis connect Switch

TP-BB01

TP-MB01 TS-MB01

Page 10: PP10 startup manual (Unofficial as Requested)

Testing and commissioning (Electrical)Testing List Project : Riyadh Power plant # 10

SL No. Equipment Testing ActivitiesSystem

NameTest sheet

NoTest Proc.

No Proc. NoCommissioning ActivitiesTest sheet No

f. Functional Test of Remote control, alarm, and indication

4. Checks for operation of Auxiliary switches ,limitswitches for test, service and 5. Operation of Earth Switch6. Functional check of interlock and limit switches.7. Check for interchangeable of CB of same rating forInterference interlock8. Commissioning of Heater Circuit

a. Visual Checks b. Measurment of insulation resistance of heater and lamc. Functional checks of thermostat , Heaters, d. Measurment of Current and voltage

Testing of MV Contactor General Visual Inspection Contactor operational checks Contact Resistance test insulation Resistance test Timing Test Minimum pickup/drop out voltage for the coil Vacuum Integrity test for vacuum contactorsTesting of current transformer1. General inspection and Name plate details 2. CT Winding insulation Resistance test3. CT Ratio test by primary injection4. CT Winding Resitance Measurment5. CT Loop Resistance Measurment 6. CT Polarity Test7. CT Burden test8. CT Magnetizing Current Test (Knee Voltage test)9. Demagnetizing CT cores after above all test10. Inter Core Coupling Test for bus differential test11. High voltage test12. Verifying secondary circuits, terminals, shorting/isolating l13. single point earthing check14. phase identificationTesting of Voltage Transformers1. General inspection and Name plate details 2. Winding insulation Resistance test3. Voltage Ratio test by primary injection4. Phase Angle Error 5. Winding Resitance Measurment6. Polarity Test7. Loop Resistance Measurment 8. Burden test9. Phase Sequence test10. Fuse Failure checks 11. Protective earthing 12. Back Energization Test at rated Voltage for 15 minutes

TP-VT01

MV SYSTEM9

TS-MC01

MV Switch Gear

TP-MC01

TP-CT01

TS-VT01

TS-CT01

TP-MB01 TS-MB01

Page 11: PP10 startup manual (Unofficial as Requested)

Testing and commissioning (Electrical)Testing List Project : Riyadh Power plant # 10

SL No. Equipment Testing ActivitiesSystem

NameTest sheet

NoTest Proc.

No Proc. NoCommissioning ActivitiesTest sheet No

Testing of Components Phase Over current Relay

1. General inspection and Name plate details 1. Electrical Function test

1. Functional check of Test Plug 2. Shorting of links on relay case when relay is withdrawn

2. Secondary Injection1. Relay Power measurment2. Configuration of the relay3. Testing of LEDs4. Testing of out put relays5. Testing of input Devices6. Metering function7. Over current Pickup/Dropout test8. Time current characteristics i. IEC-Normal inverse

ii. IEC-Very inverse

iii. IEC- Extremely Inverse

iv. Long time Inverse

v. Definite Time

9. Testing of Instantaneous element 10. Reduced voltage (at 90 Volts ) trip test for all output relays 11. Testing at final setting

3.Checking the protective Earthing GE Relay ------MFII TS-AR01(MFII)ABB Relay-----SPAJ TS-AR01(SPAJ)SEL Relay------551 TS-AR01(SEL551) Ground Over Current Relay

1. General inspection and Name plate details 1. Electrical Function test

1. Functional check of Test Plug 2. Shorting of links on relay case when relay is withdrawn

2. Secondary Injection1. Relay Power measurment2. Configuration of the relay3. Testing of LEDs4. Testing of out put relays

TP-AR01

MV Switch Gear 9 MV SYSTEM

TP-AR01

Page 12: PP10 startup manual (Unofficial as Requested)

Testing and commissioning (Electrical)Testing List Project : Riyadh Power plant # 10

SL No. Equipment Testing ActivitiesSystem

NameTest sheet

NoTest Proc.

No Proc. NoCommissioning ActivitiesTest sheet No

5. Testing of input Devices6. Metering function7. Over current Pickup/Dropout test8. Time current characteristics i. IEC-Normal inverse

ii. IEC-Very inverse

iii. IEC- Extremely Inverse

iv. Long time Inverse

v. Definite Time

9. Testing of Instantaneous element 10. Reduced voltage (at 90 Volts ) trip test for all output relays 11. Testing at final setting

3.Checking the protective Earthing GE Relay ------MFII TS-AR01(MFI)ABB Relay-----SPAJ TS-AR01(SPAJ) Voltage Relay

1. General inspection and Name plate details 2. Electrical Function test

1. Functional check of Test Plug 2. Secondary Injection

1. Relay Power measurment2. Testing of LEDs3. Testing of out put relays4. Testing of input Devices5. Metering function6. Under Voltage Function

i. Pickup/dropout test ii. Timing test

7. Over voltage test i. Pickup/dropout ii. Timing test

GE Relay--MVII TS-VR01(MVII)ABB Relay-----610 TS-VR01(MVII) Differential Relay1. General inspection and Name plate details 2. Electrical Function test i. Functional check of Test Plug ii. Shorting of links on relay case when relay is with3. Secondary Injection i. Relay Power measurment ii. Testing of LEDs iii. Testing of out put relays

TP-AR01

TP-VR01

TP-DR01

MV SYSTEM MV Switch Gear 9

Page 13: PP10 startup manual (Unofficial as Requested)

Testing and commissioning (Electrical)Testing List Project : Riyadh Power plant # 10

SL No. Equipment Testing ActivitiesSystem

NameTest sheet

NoTest Proc.

No Proc. NoCommissioning ActivitiesTest sheet No

iv. Testing of input Devices v. Metering function vi. Differential Function

1. Differential current Function2. Differential restraint characteristic 3. Harmonic Function4. Instantaneous Differential current function5. Timing Test

vii. Backup over current 1. current Pickup/Dropout test2. Time current characteristics

a. IEC-Very inverseb. IEC- Extremely Inverse c. Long time Inversed. Definite Time

3.Testing of Instantaneous elemGE Relay ------G60 TS-DR01(G60)GE Relay-------T6O TS-DR02(T60)GE Relay -------DTP TS-DR02(DTP)AREVA-------MCAG TS-DR03(MCAG Motor Management Relay

1. General inspection and Name plate details 1. Electrical Function test

1. Functional check of Test Plug 2. Shorting of links on relay case when relay

2. Secondary Injection1. Relay Power measurment2. Configuration of the relay3. Testing of LEDs4. Testing of out put relays5. Testing of input Devices6. Metering function7. Group elements checks

1.Thermal over load checks 2. Ground current checks 3. unbalance current checks 4. short circuit current checks 5 RTD 'S Function checks

10. Reduced voltage (at 90 Volts ) trip test for all 11. Testing at final setting

3.Checking the protective Earthing GE Relay-------369 TS-AR02(369) Synchronous Relay1.General Inspection2. Electrical Function test

1. Functional check of Test Plug 2. Secondary Injection

1. Relay Power measurment2. Testing of LEDs

TP-DR01

TP-MR01

MV Switch Gear 9

TP-SR01

MV SYSTEM

Page 14: PP10 startup manual (Unofficial as Requested)

Testing and commissioning (Electrical)Testing List Project : Riyadh Power plant # 10

SL No. Equipment Testing ActivitiesSystem

NameTest sheet

NoTest Proc.

No Proc. NoCommissioning ActivitiesTest sheet No

3. Testing of out put relays4. Testing of input Devices5. Metering function6. Live line- Live bus (synchronous ) test

i. Difference in voltage test ii. Difference in frequency iii. Difference in phase angle iv. Under voltage blocking test

7. Dead line –Dead bus test8. Dead Bus-Live line test9. Dead Line – Dead Bus

ARGUS 8----VATECH TS-SR01(ARGUSSPUA --ABB TS-SR01(SPUA CT Supervision Relay TP-CR01 TS-CR011.General Inspection2. Electrical Function test

1. Functional check of Test Plug 2. Secondary Injection

1. Voltage Pick-Up Verification2. Voltage Drop-Out Verification3. Function Check

i. The CB Is In Open Position ii. The CB In Close Position

Timing Relay TP-CR03 TS-CR031. Secondary Injection

1. Minimum Voltage Pick-Up Verification2. Operating time Measurment

Ammeter TP-AM01 TS-AM011. Electrical Function test2. Secondary Injection Voltmeter TP-VM01 TS-VM011. Electrical Function test2. Secondary Injection power Meter TP-PM01 TS-PM011. Electrical Function test2. Secondary Injection Power Factor Meter TP-PM01 TS-PM011. Electrical Function test2. Secondary Injection VAR meter TP-PM01 TS-PM011. Electrical Function test2. Secondary Injection Energy Meter TP-EM01 TS-EM011. Electrical Function test2. Secondary Injection Multi function meter TP-PM01 TS-PM011. Electrical Function test2. Secondary Injection Current Transducer TP-AX01 TS-AX01

9 MV Switch Gear MV SYSTEM

Page 15: PP10 startup manual (Unofficial as Requested)

Testing and commissioning (Electrical)Testing List Project : Riyadh Power plant # 10

SL No. Equipment Testing ActivitiesSystem

NameTest sheet

NoTest Proc.

No Proc. NoCommissioning ActivitiesTest sheet No

1. Electrical Function test2. Secondary Injection Voltage Transducer TP-VX01 TS-VX011. Electrical Function test2. Secondary Injection Power Transducer TP-PX01 TS-PX011. Electrical Function test2. Secondary Injection

1.General inspection and Name plate details Commssioning Test. CP-MM01 TS-MM022. winding Resistance 1.No load current measurment3. Winding Insulation 2.Vibration measurment4. Di-electric absorption Ratio for Motor Less then 200HP 3. Bearing temperature measurment5. Polarization index for motor above 200HP 4. Full load current and voltage drop measurment

6. Vibration measurment after coupled7. Bearing temperature measurment after couple

1.General inspection and Name plate details Commssioning Test. 2.Winding Ratio Test 1. Pre Energisation Tests TS-DT023.Winding Resistance Test Meggering 4.Insulation Resistance Test Post Enegisation test-Measrument of voltages5.Magnetising current Measurment6.Phase Relation Checks

1.General inspection and Name plate details 2.Conductor continuity and phasing test3.Cable Insulation Test

1. General inspection and Name plate details TP-BD02 TS-BD02 Commssioning Test. 2. Bus continuity and phasing test 1. Pre Energisation Tests 3. Torque test Meggering 4. Contact Resitance test5. Main Circuit Contact Resitance test6. Insulation resistance test before hipot7. High Voltage test @ 1.6KV AC8. Insulation resistance test after hipot9. Protective earthing check

Testing of bus bar TP-BB01 TS-BB01 Commssioning Test. CP-MS011. General inspection and Name plate details 1. Internal wiring and control power measurment2. Bus continuity and phasing test 2. functional checks of feeders and ATS3. Torque test 3. Protection checks 4. Contact Resitance test 3.1 CT Loops , Burden , and Single point Grounding test5. Main Circuit Contact Resitance test 3.2 Tripping of relays by secondary injection at final setting CP-MS026. Insulation resistance test before hipot 3.3 Primary Injection test7. High Voltage test TP-MB01 TS-MB01 3.4 Stability and sensitivity test for bus bar8. Insulation resistance test after hipot 3.5 VT Functional Check 9. Protective earthing check 3.5 Arc Protection Checks CP-MS03

TP-AT01

TP-HC02

MV /LV Motors 10

9

TP-MM01

MV SYSTEM MV Switch Gear

Dry Type Transformer

LV Cable

COMMISSIONING OF DRY TYPE TRANSFORMER

LV SYSTEM

TS-MM01MV/LV

SYSTEM

13

12

11 TS-AT01

TS-HC01

COMMISSIONING OF MV /LV MOTORS

CE-07

CE-05

CE-06

COMMISSIONING OF LV XLPE CABLE

COMMISSIONING OF LV BUS DUCT

COMMISSIONING OF LV SWITCHGEAR

LV bus duct

LV Switch Gear

14

Page 16: PP10 startup manual (Unofficial as Requested)

Testing and commissioning (Electrical)Testing List Project : Riyadh Power plant # 10

SL No. Equipment Testing ActivitiesSystem

NameTest sheet

NoTest Proc.

No Proc. NoCommissioning ActivitiesTest sheet No

Testing of Feeder Breaker 3.6 Tripping and itertripping checks 12. Tests on the CB 4. Interlock checks

a. Breaker Manual closing/opening, and manual spring charging 6. Alarms and indication checksc. Contact Resitance test 7. Remote opertion and Alarm Checks (DCS)d. Insulation resistance test before hipot 8. Pre Energisation Tests

Meggering of the bus barf. High Voltage test. Post Enegisation testg. Insulation resistance test after hipot. Measurment of Voltages h. Minimum operating voltage for close and trip coil.

Phase sequence checki. Breaker operating time. Phasing between the line and busj. Spring charging motor current and time measurment. Phasing between the line and busk. Stored energy and spring charge mechanism checksl. Functional check of C.B Operation counter

3. Breaker operationa. CB Racking IN and OUT Checksb. CB operation in service position mechanical and electricalc. CB operation in test position electricald. Anti pumping functional checke. Functional test of local controls, alarm and Indicationf. Functional Test of Remote control, alarm, and indication

4. Checks for operation of Auxiliary switches ,limitswitches for test, service and 6. Functional check of interlock and limit switches.

8. Commissioning of Heater Circuita. Visual Checks b. Measurment of insulation resistance of heater and lamp circuit c. Functional checks of thermostat , Heaters, d. Measurment of Current and voltage

Testing of current transformer TP-CT01 TS-CT011. General inspection and Name plate details 2. CT Winding insulation Resistance test3. CT Ratio test by primary injection4. CT Winding Resitance Measurment5. CT Loop Resistance Measurment 6. CT Polarity Test7. CT Burden test TP-CT01 TS-CT018. CT Magnetizing Current Test (Knee Voltage test)9. Demagnetizing CT cores after above all test11. Verifying secondary circuits, terminals, shorting/isolatinglinks by primary injection

LV Switch Gear LV SYSTEM14

Page 17: PP10 startup manual (Unofficial as Requested)

Testing and commissioning (Electrical)Testing List Project : Riyadh Power plant # 10

SL No. Equipment Testing ActivitiesSystem

NameTest sheet

NoTest Proc.

No Proc. NoCommissioning ActivitiesTest sheet No

12. single point earthing check13. phase identificationTesting of Voltage Transformers TP-VT01 TS-VT011. General inspection and Name plate details 2. Winding insulation Resistance test3. Voltage Ratio test by primary injection4. Phase Angle Error 5. Winding Resitance Measurment6. Polarity Test7. Loop Resistance Measurment 8. Burden test9. Phase Sequence test10. Fuse Failure checks 11. Protective earthing 12. Back Energization Test at rated Voltage for 15 minutes

Testing of Components TP-AR01 Phase Over current Relay

1. General inspection and Name plate details 1. Electrical Function test

1. Functional check of Test Plug 2. Shorting of links on relay case when relay is withdrawn

2. Secondary Injection1. Relay Power measurment2. Configuration of the relay3. Testing of LEDs4. Testing of out put relays5. Testing of input Devices6. Metering function7. Over current Pickup/Dropout test8. Time current characteristics i. IEC-Normal inverse

ii. IEC-Very inverse

iii. IEC- Extremely Inverse

iv. Long time Inverse v. Definite Time 9. Testing of Instantaneous element 10. Reduced voltage (at 90 Volts ) trip test for all output relays 11. Testing at final setting

3.Checking the protective Earthing

14 LV SYSTEM LV Switch Gear

Page 18: PP10 startup manual (Unofficial as Requested)

Testing and commissioning (Electrical)Testing List Project : Riyadh Power plant # 10

SL No. Equipment Testing ActivitiesSystem

NameTest sheet

NoTest Proc.

No Proc. NoCommissioning ActivitiesTest sheet No

GE Relay ------MFII TS-AR01(MFI)ABB Relay-----SPAJ TS-AR01(SPAJ) Ground Over Current Relay TP-AR01

1. General inspection and Name plate details 1. Electrical Function test

1. Functional check of Test Plug 2. Shorting of links on relay case when relay is withdrawn

2. Secondary Injection1. Relay Power measurment2. Configuration of the relay3. Testing of LEDs4. Testing of out put relays5. Testing of input Devices6. Metering function7. Over current Pickup/Dropout test8. Time current characteristics i. IEC-Normal inverse

ii. IEC-Very inverse

iii. IEC- Extremely Inverse

iv. Long time Inverse

v. Definite Time

9. Testing of Instantaneous element 10. Reduced voltage (at 90 Volts ) trip test for all output relays 11. Testing at final setting

3.Checking the protective Earthing GE Relay ------MFII TS-AR02(MFI)ABB Relay-----SPAJ TS-AR02(SPAJ) Voltage Relay TP-VR01

1. General inspection and Name plate details 2. Electrical Function test

1. Functional check of Test Plug 2. Secondary Injection

1. Relay Power measurment2. Testing of LEDs3. Testing of out put relays4. Testing of input Devices5. Metering function6. Under Voltage Function

i. Pickup/dropout test ii. Timing test

LV SYSTEM14 LV Switch Gear

Page 19: PP10 startup manual (Unofficial as Requested)

Testing and commissioning (Electrical)Testing List Project : Riyadh Power plant # 10

SL No. Equipment Testing ActivitiesSystem

NameTest sheet

NoTest Proc.

No Proc. NoCommissioning ActivitiesTest sheet No

7. Over voltage test i. Pickup/dropout ii. Timing test

GE Relay--MVII TS-VR01(MVII)ABB Relay-----610 TS-VR01(MVII) Synchronous Relay1.General Inspection2. Electrical Function test

1. Functional check of Test Plug 2. Secondary Injection

1. Relay Power measurment2. Testing of LEDs3. Testing of out put relays4. Testing of input Devices5. Metering function6. Live line- Live bus (synchronous ) test

i. Difference in voltage test ii. Difference in frequency iii. Difference in phase angle iv. Under voltage blocking test

7. Dead line –Dead bus test8. Dead Bus-Live line test9. Dead Line – Dead Bus

3.Checking the protective Earthing ARGUS 8----VATECH TS-SR01(ARGUSSPUA --ABB TS-SR01(SPUA Timing Relay TP-CR03 TS-CR031. Secondary Injection

1. Minimum Voltage Pick-Up Verification2. Operating time Measurment

Ammeter TP-AM01 TS-AM011. Electrical Function test2. Secondary Injection Voltmeter TP-VM01 TS-VM011. Electrical Function test2. Secondary Injection power Meter TP-PM01 TS-PM011. Electrical Function test2. Secondary Injection Power Factor Meter TP-PM01 TS-PM011. Electrical Function test2. Secondary Injection VAR meter TP-PM01 TS-PM011. Electrical Function test2. Secondary Injection Energy Meter TP-EM01 TS-EM011. Electrical Function test2. Secondary Injection Multi function meter TP-PM01 TS-PM01

14 LV SYSTEM LV Switch Gear

Page 20: PP10 startup manual (Unofficial as Requested)

Testing and commissioning (Electrical)Testing List Project : Riyadh Power plant # 10

SL No. Equipment Testing ActivitiesSystem

NameTest sheet

NoTest Proc.

No Proc. NoCommissioning ActivitiesTest sheet No

1. Electrical Function test2. Secondary Injection Current Transducer TP-AX01 TS-AX011. Electrical Function test2. Secondary Injection Voltage Transducer TP-VX01 TS-VX011. Electrical Function test2. Secondary Injection Power Transducer TP-PX01 TS-PX011. Electrical Function test2. Secondary Injection

Battery General Inspection TP-BC01Componenet test (Metering Facitlities ) pre energization checks

post energization checksOperational CheckAlarms Ckecks Load Test

Torque testRefersher ChargingBattery discharge test TP-BA01

Testing of bus bar TP-DB01 TS-DB01 Commssioning Test. CP-FC03 General Visual inspection 1. Internal wiring and control power measurment CP-EN03 Torque test 2. functional checks of feeders and ATS Contact Resistance test for the joints 3. Protection checks Total conductor resistance test 3.1 Tripping of relays by secondary injection at final setting Insulation Resistance test 3.2 Primary Injection testTesting of Circuit Breaker 4. Interlock checks General Visual Inspection 5. Alarms and indication checks Breaker operational checks 6. Remote opertion and Alarm Checks (DCS) Contact Resistance test 7. Pre Energisation Tests

insulation Resistance test Meggering of the bus barTesting of Components TP-VR02 TS-VR02 Post Enegisation test Voltage Relay Measurment of Voltages General Inspection Phase sequence check Power Consumption Digital input/out put checks Metering function checks Pickup /dropout checks Time -Voltage characteristics checks Lockout or Trip Relay TP-CR02 TP-CR02 General Inspection Pickup/drop out checks

DC SYSTEM

Batteries

DC Switch board

COMMISSIONING OF DC SWITCHBOARD

14 LV SYSTEM LV Switch Gear

CE-09

CE-08COMMISSIONING OF BATTERY CHARGERS

15

16

17

COMMISSIONING OF BATTERIES

Page 21: PP10 startup manual (Unofficial as Requested)

Testing and commissioning (Electrical)Testing List Project : Riyadh Power plant # 10

SL No. Equipment Testing ActivitiesSystem

NameTest sheet

NoTest Proc.

No Proc. NoCommissioning ActivitiesTest sheet No

Timing test Timing Relay TP-CR03 TS-CR03 General Inspection Pickup/drop out checks Timing test Ammeter TP-AM02 TS-AM02 General Inspection Caliberation of the Meter Voltmeter TP-VM02 TS-VM02 General Inspection Caliberation of the Meter Current Transducer TP-AX02 TS-AX02 General Inspection Caliberation of the Meter Voltage Transducer TP-VX02 TS-VX02 General Inspection Caliberation of the Meter

General Inspection TP-UC01Componenet test (Metering Facitlities ) pre energization checks

post energization checksOperational CheckAlarms Ckecks Load Test

Generator differential RelayG60- GE TS-DR01) TS-DR01(G60)Breaker Failure RelayC60-GE TS-AR01(C60) TS-AR01(C60)Transformer Differetial RelayT60- GE TS-DR01 TS-DR01(T60)Lockout RelaysMultifunction Meter DMM

1.General inspection and Name plate details TP-MM01 TS-MM012. Polarization index of stator @ 5kv dc3. Polarization index of Rotor @ 4.Insulation Resistance Test of exciter stator5. Commissioning of Heaters 1. Insulation resistance measurement test for heaters and cable 2. Measurement of Current 3. measurement of voltages

Bus Bar 1. Internal wiring and control power measurment1.General inspection and Name plate details 2. functional checks of feeders and ATS2. Torque check 3. Primary Injection test3. conatct resistance test for joint 4. Interlock checks

TP-MM01 TS-MM01

Gerator Protection

Panel

GENERATOR PROTECTION

DC SYSTEM

DC Switch board

UPS

COMMISSIONING OF UPS

COMMISSIONING OF GENERATOR PROTECTION PANEL

CE-10

MCC & DISTRIBUTION

BAORD

CE-11

LV SYSTEM

COMMISSIONING OF MCC and Distrubution Board

Gerator MV SYSTEM

COMMISSIONING OF GENERATOR

21

22

18

20

19

Page 22: PP10 startup manual (Unofficial as Requested)

Testing and commissioning (Electrical)Testing List Project : Riyadh Power plant # 10

SL No. Equipment Testing ActivitiesSystem

NameTest sheet

NoTest Proc.

No Proc. NoCommissioning ActivitiesTest sheet No

4. Total circuit contact resistance test 5. Alarms and indication checks5. Insulation resistance test 6. Remote opertion and Alarm Checks (DCS)For Breakers 7. Pre Energisation Tests 1. Primary injection test for MCCB above 100 Amps Meggering of the bus bar2. Trip test for over load above 100 amps Post Enegisation test3. Functional Check of Starter Measurment of Voltages 4. Ratio and insulation resistance test for CTs above 100 Amp Phase sequence check

22 LV SYSTEMMCC &

DISTRIBUTION BAORD

TP-MM01 TP-MM01

Page 23: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

GE

V

Riyadh Po“1062

STARTU

NERA

FO

VOLTA

ower plant21166/00”

UP MANUA

AL INST

OR AC

AGE T

t # 10

AL DF

TRUC

C/DC

TESTIN

Date:13 Feb,09

TION

NG

Revision0

n:

Page 23

Page 24: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

ClientConsultantContractor

: : :

SEC-COA

BEMCO

Riyadh Power plant # 10“10621166/00”

Subject : High Voltage AC/DC Testing Doc. No: TP-HP01, Page 1 of 8Equipment : MV Cable and Switch Gear

Date:13 Feb,09 Revision: 0

1

TABLE OF CONTENTS

Page 1. PURPOSE 1

2. SCOPE 1

3. REFERENCES 1

4. NOTES .AND PRECAUTIONS 1

5. PROCEDURE 2

6. ACCEPTANCE CRITERIA 4

APPENDICES

A TEST TABLES

B HIGH POTENTIAL DATA RECORD

Page 24

Page 25: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

ClientConsultantContractor

: : :

SEC-COA

BEMCO

Riyadh Power plant # 10“10621166/00”

Subject : High Voltage AC/DC Testing Doc. No: TP-HP01, Page 2 of 8Equipment : MV Cable and Switch Gear

Date:13 Feb,09 Revision: 0

2

1. PURPOSE

The purpose of this procedure is to test and document the integrity of cables, metal enclosed bus duct, and switchgear assemblies of both 4.16kV and 13.8 kV levels using an ac/dc source.

2. SCOPE

This procedure applies to both ac and dc high-potential testing. DC high-potential testing is preferred for testing on a periodic basis since it is more than a "go" or "no-go" test, as is the ac test. The dc test can indicate that the tested object is all right at the present time but may fail in the future. The ac high-potential test is more accepted standard in practice.

3. REFERENCES

3.1. IEEE Standard 62-1958, IEEE Recommended Guide for Making Dielectric Measurements in the field.

3.2. The ac high-potentla1 test levels recommended by the national standards ANSI for switchgear assemblies and rigid bus.

3.3. The ac/dc high-potentla1 test levels recommended by IEC 60502 standards for 1kv to 15 kv cables

4. NOTES AND PRECAUTIONS

4.1. Due to high voltage being used, adequate safety precautions should be taken to avoid injury to personnel and damage to property.

4.2. Always use approved and tested safety rubber gloves when connecting and disconnecting test leads to and from the apparatus, and while operating the test equipment.

4.3. Test equipment operation shall be in accordance with the manufacturer's instructions.

4.4. In the case of unshielded cable, the non-uniform electric field between conductor and the metal enclosure (ground) may introduce excessive stresses in the insulation. In the case of unshielded cable it is therefore recommended that a dc test only be carried out.

4.5. Shielded power cables require electrical stress control when they are terminated. Cables shall be made up with either stress cones or with heat-shrinkable stress control material.

4.6. The cable route or the equipment should be walked down to establish safety boundaries as necessary for personnel and equipment protection.

4.7. Ensure that all voltage transformers are disconnected for the duration of the test and that all current transformers are short-circuited.

4.8. Continuity and phasing of all cables and switchgear bus-work should be checked, where

Page 25

Page 26: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

ClientConsultantContractor

: : :

SEC-COA

BEMCO

Riyadh Power plant # 10“10621166/00”

Subject : High Voltage AC/DC Testing Doc. No: TP-HP01, Page 3 of 8Equipment : MV Cable and Switch Gear

Date:13 Feb,09 Revision: 0

3

practical.

4.9. Provision should be made to ground equipment through a resistance by means of a hot stick after megger or high-potential testing.

4.10. Ensure that all cable shields and switchgear grounds have been made per the installation instructions.

4.11. Conductors of each like phase may be tested together, provided the source has adequate capacity to maintain the specified test voltage for the required period of time. Conductors not being tested shall be tied together, using a soft wire and grounded at the test end.

4.12. Phases should be properly identified and labeled

4.13. This test should be performed only by personnel who are properly trained on the test equipment. Safety rules, testing procedures and interpretation of the results.

5. PROCEDURE

5.1 Determine the test voltage, kVA and times and voltage steps to be used (refer to Appendix A).

5.2 De-energize, discharge and safety) tag the cable/equipment to be tested, as necessary. Record the scheme/cable/equipment number on the High-Potential Data Record form.

5.3 Disconnect the cable/equipment from the equipment/cables at each end and position it with maximum possible clearance from objects. The minimum clearance recommended to preclude flashover is 10 cm. Ensure that open cable ends are insulated.

5.4 Ground all equipment, cables and conductors not under test that are in contact with the cable under test or that can become energized by a flashover.

NOTE

Where high-potential testing of shielded cables with grounded shields is to be performed, the existing cables/equipment need not be grounded.

5.5 As a precautionary measure a 2,500 V megger reading shall be made between the test terminals to ensure that the equipment/cable is free from gross defects as a result of damage during installation and that no inadvertent grounds have been left. The megger readings should be recorded on the High-Potential Data Record form.

NOTE Megger resistance values will vary over a wide range depending on the type of equipment being tested and the test environment. As a result it is difficult to state precisely what constitutes an acceptable megger resistance value. However, as a general rule, tests should be terminated if the insulation resistance is less than 5 Mohms for 5 kV class equipment and 15 Mohms for 15 kV class equipment. Abnormally low values of insulation resistance should be

Page 26

Page 27: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

ClientConsultantContractor

: : :

SEC-COA

BEMCO

Riyadh Power plant # 10“10621166/00”

Subject : High Voltage AC/DC Testing Doc. No: TP-HP01, Page 4 of 8Equipment : MV Cable and Switch Gear

Date:13 Feb,09 Revision: 0

4

investigated before proceeding further with any test

5.6 Position the test instrument inside the test area keeping the high voltage lead between the test instrument and the cable/equipment being tested.

5.7 Connect the test set in accordance with the manufacturer's instructions.

5.8 Set the ammeter to its highest range.

5.9 Set the voltage to its lowest range.

CAUTION

Avoid overshooting the voltage. The initially applied direct-current voltage shall not be greater than three times the rated alternating-current voltage of the cable for high-potential dc testing.

5.10 Gradually increase the test voltage until the desired test level is reached. During the voltage buildup, the rate of increase of the applied voltage shall be approximately uniform so that the required time shall be no less than 10 seconds and no more than 60 seconds for dc high-potential testing and shall not exceed 10 seconds for ac high-potential testing.

NOTE If cable/equipment insulation failure should occur as indicated by the high ammeter reading, secure the test voltage immediately.

5.11 Measure leakage current at the end of each step, record data on the High-Potential Data

Record form.

5.12 Repeat steps 5.10 and 5.1 1 correcting any abnormalities, until the maximum test voltage is reached.

5.13 Maintain maximum test voltage as indicated in Table 3 of Appendix A. Measure leakage current every minute and record data on the High-Potential Data Record form.

5.14 Reduce test voltage continuously, but not abruptly

5.15 Turn off the test instrument and allow the voltage to decay for the minimum time in accordance with the test instrument instruction.

CAUTION

A dangerous charge may be stored by the apparatus unless it is grounded after the test.

5.16 Ground the cable/equipment (use a discharge rod) and allow the ground to remain in place for a period of at least 3 to 5 minutes.

5.17 Remove the test connections.

Page 27

Page 28: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

ClientConsultantContractor

: : :

SEC-COA

BEMCO

Riyadh Power plant # 10“10621166/00”

Subject : High Voltage AC/DC Testing Doc. No: TP-HP01, Page 5 of 8Equipment : MV Cable and Switch Gear

Date:13 Feb,09 Revision: 0

5

5.18 Restore the cable to its as-found condition.

5.19 Remove all grounds installed in Step 5.4. 6. ACCEPTANCE CRITERIA

The equipment tested shall withstand the imposed potentials for the prescribed periods of time without distress or failure.

NOTE

If the leakage current versus voltage are plotted as a curve, as long as this plotted curve is linear for each step. The insulation system is in good condition. At some value of step voltage if the leakage current begins to increase noticeably an increase in the slope of the curve will be noticed. as shown in the figure below. If the test is continued beyond this test voltage, the leakage current will increase even more rapidly and immediate breakdown may occur in the cable insulation.

When the final test voltage of leakage current versus voltage test is reached, it can be left on for the required time and the leakage current versus time can be plotted for fixed intervals of time as the leakage current during this step reduces from an initial high value to a steady-state value. A curve for good cables will generally indicate a continuous decrease in leakage current with respect to time or steady-state value without any increase of current during the test. This is shown in the figure below.

Page 28

Page 29: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

ClientConsultantContractor

: : :

SEC-COA

BEMCO

Riyadh Power plant # 10“10621166/00”

Subject : High Voltage AC/DC Testing Doc. No: TP-HP01, Page 6 of 8Equipment : MV Cable and Switch Gear

Date:13 Feb,09 Revision: 0

6

Page 29

Page 30: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

ClientConsultantContractor

: : :

SEC-COA

BEMCO

Riyadh Power plant # 10“10621166/00”

Subject : High Voltage AC/DC Testing Doc. No: TP-HP01, Page 7 of 8Equipment : MV Cable and Switch Gear

Date:13 Feb,09 Revision: 0

7

APPENDIX A TEST TABLES

Table I

Test Set kVA Required for High-Potential Testing of 5 kV Class Shielded Cable (100 m length at 10kV)

Cable Size, EPR Cable, XLPE Cable.MCM kVA kVA 250 2.5 2.0

350 2.9 2.3

500 3.4 2.6

750 4.3 3.3

1,000 5.0 4.0

Table 2

Test Set kVA Required for High-Potential Testing of 15 kV Class Shielded Cable (100 m length at 20 kV)

Cable Size, EPR Cable, XLPE Cable.MCM kVA kVA 250 5.7 4.5

350 6.6 5.2

500 7.5 5.9

750 9.5 7.4

1,000 10.8 8.4 NOTES:

1. The tables show' the values for both cross-linked polyethylene (XLPE) and ethylene-propylene rubber (EPR) type cables.

2. The values have been calculated based on standard cable dimensions and using a dielectric

Page 30

Page 31: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

ClientConsultantContractor

: : :

SEC-COA

BEMCO

Riyadh Power plant # 10“10621166/00”

Subject : High Voltage AC/DC Testing Doc. No: TP-HP01, Page 8 of 8Equipment : MV Cable and Switch Gear

Date:13 Feb,09 Revision: 0

8

constant of 3.7 for EPR and 2.5 for XLPE. as supplied by cable manufacturers.

APPENDIX A (Continued)

Table 3

Recommended Field Test Levels

AC Testing

High-potential Test(PF) Partial Discharge Test VLF @0.1HZ DC Testing

Equipment

Rated Voltage,

kV Test Level,

kV

Time, Min

Extinction Level, kV

Pulse Magnitude,

pC

Time, Min

Test level, kV

Time, Min

Test level, kV

Time, Min

Power Cable: 3XUo 4XU0 Unshielded 4.16 N/A N/A N/A N/A N/A 60 9.6 5 Shielded 4.16 9(13) 5 4.5(4.5) 3(3) 2 7.2 60 9.6 15 (including Cable Bus) 8 13(18) 5 7.5(7.5) 3(3) 2 13.85 60 19 15

13.8 19(27) 5 13(13) 3(3) 2 23.9 60 32 15 Bus Duct : Isolated phase Bus (IPB) 25 45(60) 1 19 100 2 N/A N/A 64 1

Metal-Enclosed Rigid Bus

13.8 27(36) 1 10.5(10.5) 100(100) 2 N/A N/A

37(50) 1

4.16 14(19) 1 3.5(3.5) 100(100) 2 N/A N/A N/A N/A

Switchgear 13.8 27(36) 1 10.5(10.5) 100(100) 2 N/A N/A N/A N/A

NOTES: 1. Factory tests are shown in brackets. 2. The values recommended for field ac high-potential tests are at 75 percent of the factory

levels, for switchgear assemblies 70 percent of factory levels. 3. The values recommended for field dc high-potential testing of cable as per IEC-60502 is

4times U0 Where as Uo is U/1.732. 4. The value recommended for field AC VLF testing is 3Uo for 60 minutes 5. above values to be used in case Vendor recommended values are not available

Page 31

Page 32: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

TES

COA

O

R

-001

STING

Riyadh Po“1062

STARTU

PROCVOLT

ower plant21166/00”

UP MANUA

CEDURTAGE

t # 10

AL DF

RE FOCABL

Date:13 Feb,09

OR MEE

Revision0

EDIUM

n:

Page 32

Page 33: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Form No: TP-CM01, Page 1 of 7 Equipment : MV Cable Up to 33kv Date:13 Feb,09 Revision: 0

:

TABLE OF CONTENT

1. Task a. Work Status-----------------------------------------------------------------------------------------------------------------2 b. Documentation-------------------------------------------------------------------------------------------------------------2 c. Personnel--------------------------------------------------------------------------------------------------------------------2 d. Measuring Instrumentation----------------------------------------------------------------------------------------------2

2. Preconditions--------------------------------------------------------------------------------------------------------------2 3. Precautions-----------------------------------------------------------------------------------------------------------------2 4. Scope-------------------------------------------------------------------------------------------------------------------------3 5. Execution--------------------------------------------------------------------------------------------------------------------3

a. Visual Inspection--------------------------------------------------------------------------------------------------------3 b. Testing of Motor

1. Cable Sheath Testing--------------------------------------------------------------------------------------------3 2. Conductor continuity and phasing test.----------------------------------------------------------------------3 3. Insulation Resistance test Before Hipot.--------------------------------------------------------------------4 4. High voltage AC test for XLPE cable.------------------------------------------------------------------------5 5. Insulation Resistance test After Hipot-----------------------------------------------------------------------7

6. Documents-----------------------------------------------------------------------------------------------------------------7 7. Reference-------------------------------------------------------------------------------------------------------------------7 8. Attachment-----------------------------------------------------------------------------------------------------------------7

Page 33

Page 34: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Form No: TP-CM01, Page 2 of 7 Equipment : MV Cable Up to 33kv Date:13 Feb,09 Revision: 0

1.0 Task All newly installed power cable (1-33kV) in the electrical system requires field testing.

2.0 Preconditions

2.1 Work Status

• Erection has been completed. • Labelling of the equipment is complete

2.2 Documentation

• Test Sheet TS-CM01

2.3 Personnel • 1 Testing engineer: Engineer or technician with experience in high voltage

testing of electrical equipment. • 1 Helper: skilled worker with adequate on-the-job training.

2.4 Measuring Instruments and Tools

• Fluke • High Voltage Tester Up to 100KV AC/DC or VLF • Insulation Tester 5KV

3.0 Precautions

• The work will only proceed when a Permit to Work (PTW) in work permit

area has been obtained. The PTW will be kept on site for consultation during the testing works.

• Closing of the work permit after completion of the work (if the test area is to be considered in work permit area) is necessary.

• The test site shall have sufficient protective barriers and warning signs to conduct the tests.

• All cable section ends under test shall be grounded from accidental contact. Also the minimum separation from all ends or elements not being subject to test shall be 25.4mm/10kV of test voltage.

• Before cable test operation started, conductor under test and all cable accessories shall be checked as being de-energized using reliable voltage indicator. The voltage indicator should be tested for proper operation with an independent voltage source prior to operation.

• While the voltage indicator is still in contact with each component and is showing de-energized, a hot line grounded device for the purpose shall be continuously attached to all conductors under examination except while test equipment is ready for energization.

• All adjacent conductors in cable circuit not on test should be de-energized and left grounded while testing the other conductor.

Page 34

Page 35: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Form No: TP-CM01, Page 3 of 7 Equipment : MV Cable Up to 33kv Date:13 Feb,09 Revision: 0

4.0 Scope • Checking termination, • Checking shield • Checking of correct earthing,

5.0 Execution

5.1 Visual Checks

• Checking of the cables for any damage • Inspection for termination. • Inspection for correct tightness for connection • Checking labels

5.2 Testing of Cable

Enter the rating plate data in check list TS-CM01. The following test shall be carried out

1. Cable Sheath Testing 2. Conductor continuity and phasing test. 3. Insulation Resistance test Before Hipot. 4. High voltage AC test for XLPE cable. 5. Insulation Resistance test After Hipot

5.2.1 Cable Sheath Testing

Cable sheath testing is carried out in order to detect damage to cable sheath. To do this DC test is carried out. Test voltage 3kv is applied between PVC sheath and ground provided shield is grounded and insulation resistance or leakage current is measured.

5.2.2 Conductor Continuity and Phasing Test

To ensure the continuity and phasing of the cable conductor from terminal to terminal, the cable conductor shall be tested by using a minimum 500VDC megger as per figure below; tests results shall be noted down in the test sheet.

Conductor continuity test

M

Page 35

Page 36: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Form No: TP-CM01, Page 4 of 7 Equipment : MV Cable Up to 33kv Date:13 Feb,09 Revision: 0

Phase verification

FIGURE-5-1

5.2.3 Insulation Resistance test Before High Voltage Test Prior to performing the high voltage test on the cable, insulation resistance test by mega ohmmeter at 5000VDC shall be performed for one minute on each cable, between the conductor and the metallic shield with the adjacent cable conductors and shield grounded as per figure below.

Grounding sheet Insulation Resistance Test FIGURE: 5-2

Minimum insulation resistance of conductor for new cables shall be determined by the following.

M

M

Page 36

Page 37: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Form No: TP-CM01, Page 5 of 7 Equipment : MV Cable Up to 33kv Date:13 Feb,09 Revision: 0

5.2.4 High Voltage Test High Voltage test for medium voltage cable can be accomplished either of the following method in agreement with the SEC/Consultant

5.2.4.1 AC High Voltage Testing The AC power frequency voltage shall be applied through the test set as per figure 5-3. While test, all cable conductors and shield not on test shall be grounded. The test voltage shall be pure sinusoidal wave shape. As per IEC 60840 the test voltages are as follows The maximum phase to phase voltage of the system shall be maintained for line to ground for five minutes, OR

2 X U0 for 60 Minutes

OR

A. C. test volts = .75(2 X equipment maximum voltage + 1kV) for one minute (as per ARMCO)

In all cases voltage at the rate of 1 kV per second shall be increased until the maximum recommended test voltage is reached and maintained for required time duration. The AC high potential test results are evaluated on a go, no-go basis by slowly raising the test voltage to the required value of final test voltage and maintaining for required durat

Grounding sheet AC High voltage Test FIGURE: 5-3

AC test set shall have adequate volt-ampere capacity to supply the required cable charging current. The KVA capacity of the test set shall be determined by the following

KVA= 2πfCE2X10-3

C= Cable capacitance in μf/km f= Supply frequency E=Test voltage

HV tester

Page 37

Page 38: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Form No: TP-CM01, Page 6 of 7 Equipment : MV Cable Up to 33kv Date:13 Feb,09 Revision: 0

5.2.4.2 DC High Voltage Testing

The high voltage DC shall be applied to each individual cable of a 3-phase circuit. All cable conductors and shield not on test shall be grounded. High voltage DC test shall be as per IEC 60502 that is 4XU0 for 15 minutes. OR 1.7[.75(2 X equipment maximum voltage + 1kV)] for 15 Minutes (ARMCO) The test connections are as shown in figure 5-3. A DC high potential test (controlled over voltage test) is one in which the increase of applied direct voltage is controlled. The measured current is continuously observed for abnormalities with the intention of stopping the test before breakdown occurs The initially applied voltage shall not exceed 1.8 times the rated AC phase to phase voltage of the cable. After that the rate of increase of the test voltage shall be approximately uniform and shall not more than the maximum test voltage in 10 seconds or less than the maximum test voltage in 60 seconds. The maximum test voltage shall be maintained for 15 minutes, leakage current shall be recorded in TS-CMO2. No breakdown of the insulation shall occur. Maximum allowable leakage current for new cables shall be determined by the following IL=E/RX10-3 Amps Where IL= Leakage current in Amps E= DC test voltage in Kv R= Insulation resistance in MΩ

OR 5.2.4.3 VLF High Voltage Testing

VLF is used for the cable testing where power requirement for the test is high; VLF uses very low frequency (0.01 to 0.1 HZ) that’s why power requirement for the cable under test is less. Test voltage equal to 3U0 is applied through the test set as shown in figure 5.3. While test, all cable conductors and shield not on test shall be grounded. Test voltage is applied at the rate 1KV/second till the maximum test voltage is reached and maintain for 60 Minutes. Leakage current is recorded.

Page 38

Page 39: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Form No: TP-CM01, Page 7 of 7 Equipment : MV Cable Up to 33kv Date:13 Feb,09 Revision: 0

5.2.5 Insulation Resistance Test After High Voltage Test Insulation resistance test by mega ohmmeter at 5000VDC shall be performed for one minute on each cable, between the conductor and the metallic shield with the adjacent cable conductors and shield grounded after the high voltage test.

Recommended Field Test Levels

AC Testing

High-potential Test(PF) Partial Discharge Test VLF @0.1HZ DC Testing

Equipment

Rated Voltage,

kV Test Level,

kV

Time, Min

Extinction Level, kV

Pulse Magnitude,

pC

Time, Min

Test level, kV

Time, Min

Test level, kV

Time, Min

Power Cable:

3XUo 4XU0

Unshielded 4.16 N/A N/A N/A N/A N/A 60 9.6 5 4.16 9(13) 5 4.5(4.5) 3(3) 2 7.2 60 9.6 15

8 13(18) 5 7.5(7.5) 3(3) 2 13.85 60 19 15 Shielded (including Cable Bus) 13.8 19(27) 5 13(13) 3(3) 2 23.9 60 32 15

NOTES: 1. Factory tests are shown in brackets. 2. The values recommended for field ac high-potential tests are at 75 percent of the factory

levels, for switchgear assemblies 70 percent of factory levels. 3. The values recommended for field dc high-potential testing of cable as per IEC-60502 is

4times U0 Where as Uo is U/1.732. 4. The value recommended for field AC VLF testing is 3Uo for 60 minutes 5. above values shall be used in case Vendor recommended values are not available

otherwise

5.2.6 Checking the protective Earthing Check the earthing for the armour and shield is properly connected

6.0 Documents

Test sheet TS-CM01 shall be completed. 7.0 References: 8.0 Attachment:

8.1 Test Sheet of Cable TS-CM01

*** End of the procedure ***

Page 39

Page 40: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

Riyadh Po“1062

STARTU

TES

ower plant21166/00”

UP MANUA

ST SH

t # 10

AL DF

EETS

Date:13 Feb,09

Revision0

n:

Page 40

Page 41: PP10 startup manual (Unofficial as Requested)

Cable Tag No : Type of cable: Location : Length : From Equipment: To equipment:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-CM01 Page 1 of 3

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Medium Voltage Cable

Date:13/02/09,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirms Remarks

1. Technical data

Manufacturer:...............................................................................................

Size:.........................................................................................

Rated voltage:..............................................................................................

2. Visual check i. Check for Physical damage/Defects and also check for any irregular form

of outer jackets caused by non-uniform shield wire distribution ii. Check for proper cable support, clamping and blocking etc iii. Verify Shields are grounded as specified iv. Check that phases are identified and colour coded

4. 4.1

4.2 4.3

Electrical test on Cable Cable Continuity and phasing test

Phases Continuity Phasing

Phase A Phase B Phase C

Cable Sheath Test. Test Voltage--------------- KV DC

Phase R-G Y-G B-G G-ohms

Test Voltage

Insulation Resistance Measurment. Before Hipot Test.

Phase R-G+Y+B B-G+Y+R Y-G+B+R Insulation Resistance in MΩ

Test Voltage

Page 41

Page 42: PP10 startup manual (Unofficial as Requested)

Cable Tag No : Type of cable: Location : Length : From Equipment: To equipment:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-CM01 Page 2 of 3

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Medium Voltage Cable

Date:13/02/09,Revision: 0

No

ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirms Remarks

4.4

4.5

AC High Pot test Hipot Test at ------------ KV AC for 60minute. VLF @ 0.1 HZ

Phase R-Y+B+G Y-R+B+G B-R+Y+G Leakage current Test Voltage

OR DC Hipot testing Hipot Test at ------------ KVDC for 15minute.

Leakage current Test voltage /Time R-Y+B+G Y-R+B+G B-R+Y+G ----KV -----KV -----KV -----KV -----KV 15 Sec 30 sec 45 sec 1 minutes 2 minutes 3 minutes 4 minutes 5 minutes 6 minutes 7 minutes 8 minutes 9 minutes 10 minutes 11 minutes 12 minutes 13 minutes 14 minutes 15 minutes

Page 42

Page 43: PP10 startup manual (Unofficial as Requested)

Cable Tag No : Type of cable: Location : Length : From Equipment: To equipment:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-CM01 Page 3 of 3

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Medium Voltage Cable

Date:13/02/09,Revision: 0

No

ACTIVITIES/CHECKS (All activities are part of field commissioning)

Confirms Remarks

4.6

Insulation Resistance Measurment. After Hipot Test.

Phase R-G+Y+B B-G+Y+R Y-G+B+R Insulation Resistance in MΩ

Test Voltage

5

Remarks

Test Equipment Model Cal due date Test Equipment Model Cal due date

Page 43

Page 44: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

TE

COA

O

R

-001

ESTIN

Riyadh Po“1062

STARTU

NG PRO VOLT

ower plant21166/00”

UP MANUA

OCEDTAGE

t # 10

AL DF

DURE FCABL

Date:13 Feb,09

FOR LLE

Revision0

LOW

n:

Page 44

Page 45: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Form No: TP-CM02, Page 1 of 4 Equipment : LV Cable Up to 1kv Date:13 Feb,09 Revision: 0

:

TABLE OF CONTENT

1. Task a. Work Status-----------------------------------------------------------------------------------------------------------------2 b. Documentation-------------------------------------------------------------------------------------------------------------2 c. Personnel--------------------------------------------------------------------------------------------------------------------2 d. Measuring Instrumentation----------------------------------------------------------------------------------------------2

2. Preconditions--------------------------------------------------------------------------------------------------------------2 3. Precautions-----------------------------------------------------------------------------------------------------------------2 4. Scope-------------------------------------------------------------------------------------------------------------------------3 5. Execution--------------------------------------------------------------------------------------------------------------------3

a. Visual Inspection--------------------------------------------------------------------------------------------------------3 b. Testing of Motor

1. Cable Sheath Testing--------------------------------------------------------------------------------------------3 2. Conductor continuity and phasing test.----------------------------------------------------------------------3 3. Insulation Resistance test Before Hipot.--------------------------------------------------------------------4 4. High voltage AC test for XLPE cable.------------------------------------------------------------------------5 5. Insulation Resistance test After Hipot-----------------------------------------------------------------------7

6. Documents-----------------------------------------------------------------------------------------------------------------7 7. Reference-------------------------------------------------------------------------------------------------------------------7 8. Attachment-----------------------------------------------------------------------------------------------------------------7

Page 45

Page 46: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Form No: TP-CM02, Page 2 of 4 Equipment : LV Cable Up to 1kv Date:13 Feb,09 Revision: 0

1.0 Task All newly installed power and control cable (1KV) in the electrical system requires field testing.

2.0 Preconditions

2.1 Work Status

• Erection has been completed. • Labelling of the equipment is complete

2.2 Documentation

• Test Sheet TS-CM01

2.3 Personnel • 1 Testing engineer: Engineer or technician with experience in high voltage

testing of electrical equipment. • 1 Helper: skilled worker with adequate on-the-job training.

2.4 Measuring Instruments and Tools

• Fluke • Insulation Tester 5KV

3.0 Precautions

• The work will only proceed when a Permit to Work (PTW) in work permit

area has been obtained. The PTW will be kept on site for consultation during the testing works.

• Closing of the work permit after completion of the work (if the test area is to be considered in work permit area) is necessary.

• The test site shall have sufficient protective barriers and warning signs to conduct the tests.

• All cable section ends under test shall be grounded from accidental contact. Also the minimum separation from all ends or elements not being subject to test shall be 25.4mm/10kV of test voltage.

• Before cable test operation started, conductor under test and all cable accessories shall be checked as being de-energized using reliable voltage indicator. The voltage indicator should be tested for proper operation with an independent voltage source prior to operation.

• While the voltage indicator is still in contact with each component and is showing de-energized, a hot line grounded device for the purpose shall be continuously attached to all conductors under examination except while test equipment is ready for energization.

• All adjacent conductors in cable circuit not on test should be de-energized and left grounded while testing the other conductor.

Page 46

Page 47: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Form No: TP-CM02, Page 3 of 4 Equipment : LV Cable Up to 1kv Date:13 Feb,09 Revision: 0

4.0 Scope • Checking termination, • Checking shield • Checking of correct earthing,

5.0 Execution

5.1 Visual Checks

• Checking of the cables for any damage • Inspection for termination. • Inspection for correct tightness for connection • Checking labels

5.2 Testing of Cable

Enter the rating plate data in check list TS-CM01. The following test shall be carried out

1. Conductor continuity and phasing test. 2. Insulation Resistance test Before Hipot.

5.2.1 Conductor Continuity and Phasing Test

To ensure the continuity and phasing of the cable conductor from terminal to terminal, the cable conductor shall be tested by using a 500VDC meeger or a fluke as per figure below; tests results shall be noted down.

Conductor continuity test

Phase verification

FIGURE-5-1

M

M

Page 47

Page 48: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Form No: TP-CM02, Page 4 of 4 Equipment : LV Cable Up to 1kv Date:13 Feb,09 Revision: 0

5.2.2 Insulation Resistance test Insulation resistance test by mega ohmmeter at 500VDC shall be performed for one minute on each cable, between the conductor and the metallic shield with the adjacent cable conductors and shield grounded as per figure below.

Grounding sheet Insulation Resistance Test FIGURE: 5-2

Minimum insulation resistance of conductor for new cables shall be determined by the following.

5.2.3 Checking the protective Earthing Check the earthing for the armour and shield is properly connected

6.0 Documents

Test sheet TS-CM02 shall be completed. 7.0 References: 8.0 Attachment:

8.1 Test Sheet of Cable TS-CM02

*** End of the procedure ***

M

Page 48

Page 49: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

Riyadh Po“1062

STARTU

TES

ower plant21166/00”

UP MANUA

ST SH

t # 10

AL DF

EETS

Date:13 Feb,09

Revision0

n:

Page 49

Page 50: PP10 startup manual (Unofficial as Requested)

Cable Tag No : Type of cable: Location : Length : From Equipment: To equipment:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-CM02 Page 1 of 1

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Low Voltage Cable

Date:13/02/09,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirms Remarks

1. Technical data

Manufacturer:...............................................................................................

Size:.........................................................................................

Rated voltage:..............................................................................................

2. Visual check i. Check for Physical damage/Defects and also check for any irregular form

of outer jackets caused by non-uniform shield wire distribution ii. Check for proper cable support, clamping and blocking etc iii. Verify Shields are grounded as specified iv. Check that phases are identified and colour coded

4. 4.1

4.2

Electrical test on Cable Cable Continuity and phasing test

Phases Continuity Phasing

Phase A Phase B Phase C

Insulation Resistance Measurment.

Phase R-G+Y+B B-G+Y+R Y-G+B+R Insulation Resistance in MΩ

Test Voltage

Test Equipment Model Cal due date Test Equipment Model Cal due date

Page 50

Page 51: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

TEST

COA

O

R

-001

TING P

Riyadh Po“1062

STARTU

PROCETRA

ower plant21166/00”

UP MANUA

EDURANSFO

t # 10

AL DF

RE FORORMER

Date:13 Feb,09

R AUXR

Revision0

XILIARY

n:

Y

Page 51

Page 52: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-AT01, Page 1 of 8 Equipment : Auxiliary Transformer(<10MVA) Date:13 Feb,09 Revision: 0

TABLE OF CONTENT

1. Task

a. Work Status----------------------------------------------------------------------------------------------------------2 b. Documentation------------------------------------------------------------------------------------------------------2 c. Personnel-------------------------------------------------------------------------------------------------------------2 d. Measuring Instrumentation---------------------------------------------------------------------------------------2

2. Preconditions-----------------------------------------------------------------------------------------------------------2 3. Precautions--------------------------------------------------------------------------------------------------------------2 4. Scope----------------------------------------------------------------------------------------------------------------------3 5. Execution-----------------------------------------------------------------------------------------------------------------3

a. Visual Checks------------------------------------------------------------------------------------------------------3 b. Testing of Transformer

1. insulation resistance / Polarization index test----------------------------------------------------------3 2. Voltage Ratio Measurement--------------------------------------------------------------------------------4 3. Vector Group/Phase Displacement-----------------------------------------------------------------------4 4. Winding Resistance Test------------------------------------------------------------------------------------5 5. Excitation current Measurement---------------------------------------------------------------------------6 6. Temperature indicator and sensor Calibration--------------------------------------------------------7 7. Bushing Current Transformer------------------------------------------------------------------------------7 8. Testing and commissioning of cooler control cabinet------------------------------------------------7 9. Transformer protection devices functional check-----------------------------------------------------7 10. Protective Earthing Checks---------------------------------------------------------------------------------7

6. Documents---------------------------------------------------------------------------------------------------------------8 7. Reference-----------------------------------------------------------------------------------------------------------------8 8. Attachment---------------------------------------------------------------------------------------------------------------8

Page 52

Page 53: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-AT01, Page 2 of 8 Equipment : Auxiliary Transformer(<10MVA) Date:13 Feb,09 Revision: 0

1. Task This instruction comprises a complete description of the testing of oil and dry type distribution or auxiliary transformers.

2. Preconditions 2.1. Work status

• Erection has been completed. • Labelling of the equipment and designation of live enclosed plant sections has

been carried out.

2.2. Documentation • The circuit diagram of Electrical equipment ,cabinets, etc are available • Test Sheet TS-AT01 is available • Product manual of the transformer is Available • Factory Test Results of the transformer is available

2.3. personnel • Commissioning engineer: - (1) engineer with experience in commissioning of

transformer and switch gear. • Technician or helper:- (2) skilled worker with adequate on -the-job training • Witness from the client‘s concern department

2.4. Measuring instrument

• Ratio meter (calibrated)---1 • Multi Meter (calibrated)—2 • Insulation resistance meter –megger(calibrated)—1 • CT tester-CPC100( calibrated)-1 • DC shunt 100 amps( calibrated)--1 • Mini clamp(calibrated)—2 • Tan delta measurement test equipment—1 • Current injection set(calibrated)—1 • 3 phase relay tester(calibrated)—1

3. Precautions The work will only proceed when a Permit to Work (PTW) in work permit area has been obtained. The PTW will be kept on site for consultation during the testing works. • Observe the rules for handling electronic components sensitive to electrostatic

discharge (ESD measures). • Special safety arrangements shall be made for all areas which are not explicitly

designated as” electrical operating areas” when performing tests at voltages in excess of 50V.

• Closing of the work permit after completion of the work (if the test area is to be considered in work permit area) is necessary.

• Before test voltages are applied a check shall be carried out to ensure that no unauthorized persons are working at the corresponding load-where ever necessary barriers should be provided.

Page 53

Page 54: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-AT01, Page 3 of 8 Equipment : Auxiliary Transformer(<10MVA) Date:13 Feb,09 Revision: 0

4. Scope

• Testing of Transformer • Checking Auxiliaries and cooling system • Checking that the mounting position is correct, • Testing of bushing CT • Checking of correct Earthing,

5. Execution 5.1. Visual Inspection.

Prior to carrying out electrical tests, a visual check of the transformer should be carried out paying particular attention to the following points • Correct labeling of devices and cables • Equipment and cables are undamaged • Correct execution of the cable gland/sealing end • Name plate data, match with drawing and ambient condition • Firm cable termination/terminal connection and ferruling

5.2. Testing of Transformer Following tests to be carried out

1. insulation resistance / Polarization index test 2. Voltage Ratio Measurement 3. Vector Group/Phase Displacement 4. Winding Resistance Test 5. Excitation current Mesurment 6. Temperature indicator and sensor Caliberation

a. Winding Temperature b. Oil Temperature

7. Bushing Current Transformer 8. Testing and commissioning of cooler control cabinet 9. Transformer protection devices functional check 10. Protective Earthing Checks

5.2.1. Insulation resistance/polarization index test Checking of the insulation resistance and polarization index should be carried out as under Apply the test voltage on following Connection and note down the readings Two Winding Transformers

HV – LV + Earth LV – HV + Earth

The insulation resistance Measurement is done from 15 seconds to 1 minute with 15 seconds interval and then for every minute up to ten minutes. Value obtained at 10 minute divided by value at 1 minute gives polarization index Please refer below for connection and test arrangement

Page 54

Page 55: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-AT01, Page 4 of 8 Equipment : Auxiliary Transformer(<10MVA) Date:13 Feb,09 Revision: 0

5.2.2. Voltage Ratio Measurement The voltage ratio measurement for two or three winding power transformer can be done either by conventional method by using Voltmeters or by using Turns ratio Meter

The test shall be done for each and every phase at all tap position as follows.

For Two winding Transformer

• Apply 3 phase Voltage more then 220V on HV Winding and measured the corresponding voltages at the LV winding

• Note down both HV and LV winding side voltages on all the three phases and all tap positions.

5.2.3. Vector group check

The vector group or phase relationship can be checked by injecting three phase supply and measuring the voltages as per the figure below. One of the phase say 1U and 2U between HV and LV should be shorted together and three phase low voltage is applied on HV terminals. Then the voltage between various pairs of line terminal should be measured and compared

Page 55

Page 56: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-AT01, Page 5 of 8 Equipment : Auxiliary Transformer(<10MVA) Date:13 Feb,09 Revision: 0

Example: condition for Dyn11 is, the voltage between 1W-2V> 1W-2W=1V-2W=1V-2V

5.2.4. Winding Resistance Measurement The Winding resistance measurement can be done by either conventional method using 2V DC battery with voltmeter and Ammeter or by Transformer resistance meter.

The winding resistance will be measured by a drop of potential method on all windings by injecting direct current through the phase winding as shown below.

Page 56

Page 57: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-AT01, Page 6 of 8 Equipment : Auxiliary Transformer(<10MVA) Date:13 Feb,09 Revision: 0

For the Y connected transformer the measurement should be made between each line bushing and single phase value is half of the measured value. For the delta connection, the measurement should be made between each pair of bushing and then single phase value is three half of the measured value. The measured values should be compared with factory value, for that, a conversion for the temperature correction should be done by following formula. R75 = Ra x 234.5+75 234.5+Ra Where as R75 = Corrected Resitance in ohms Ra = Measured Resistance at ambient temperature in ohms Ta = Ambient temperature in 0 C

5.2.5. Magnetization Current Measurement.

The test connection is done as shown in the following drawing. Apply 200 V to the transformer HV terminals and measure the current and corresponding voltage for all the tap position.

Page 57

Page 58: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-AT01, Page 7 of 8 Equipment : Auxiliary Transformer(<10MVA) Date:13 Feb,09 Revision: 0

5.2.6. Oil Testing

Oil sample should be taken from bottom, top of the main tank, OLTC chamber and also from the conservator tank, De-electric test for the oil should be performed as per IEC 156 using de-electric test machine

5.2.7. Temperature indicator and sensor.

5.2.7.1. Oil Temperature The oil and winding temperature indicators shall be calibrated by heat sink with thermometer.

5.2.7.2. Winding Temperature The winding temperature indicator shall be checked by current injection at the heater element.

5.2.8. Bushing current transformer

Following tests should be done on all the bushing transformers • Ratio test • Magnetization curve • Polarity test • Insulation test • Winding resistance test • Loop resistance test

All the test results shall be entered in the test form No.TS-CT01of the transformer. Refer TP-CT01 for the test procedure

5.2.9. Testing and commissioning of cooler control cabinet Prior to power up cooler control cabinet with auxiliary 3 phase/single phase/dc voltage, following check up shall be carried out.

Winding insulation resistance and winding resistance for the fan motors

should be carried out. Insulation resistance test for the control circuit should be carried out. After obtaining all the results and found satisfactory auxiliary power can be

switched on and voltage/phase sequence measurement should be carried out.

Manual/auto operation of the fans should be checked Heater and lighting circuit should be checked and made functional.

5.2.10. Transformer protection devices functional check

Trip and alarm should be simulated from buchholz relay. tripping of protection relay and breakers should be observed, alarms on local and remote annunciation shall be observed

Trip and alarm should be simulated from pressure relay. tripping of protection relay and breakers should be observed, alarms on local and remote annunciation shall be observed

Page 58

Page 59: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-AT01, Page 8 of 8 Equipment : Auxiliary Transformer(<10MVA) Date:13 Feb,09 Revision: 0

Trip and alarm should be simulated from pressure relief relay. tripping of protection relay and breakers should be observed, alarms on local and remote annunciation shall be observed

Trip and alarm should be simulated from oil and winding temperature indicator. tripping of protection relay and breakers should be observed, alarms on local and remote annunciation shall be observed

Results for above tests shall be entered in the test form No.TS-AT01 of the power transformer.

5.2.11. Protective Earthing Check

Transformer protective earthing bond must be earthed in order to afford protection to human beings.

6. Documents Test sheet TS-AT01 shall be completed.

7. References

8. Attachment

8.1. Test Sheet for oil filled transformer 13.8/4.16KV: TS-AT01A

8.2. Test Sheet for oil filled transformer 13.8/0.480KV: TS-AT01B

8.3. Test Sheet for oil filled transformer 4.16/48KV: TS-AT01C

8.4. Test for Dry Type transformer: TS-AT01/D

***End of the procedure***

Page 59

Page 60: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

Riyadh Po“1062

STARTU

TES

ower plant21166/00”

UP MANUA

ST SH

t # 10

AL DF

EETS

Date:13 Feb,09

Revision0

n:

Page 60

Page 61: PP10 startup manual (Unofficial as Requested)

Form No: TS-AT01A

EQUIPMENT LOCATION

EQUIPMENT NAMEPLATE DATATYPE: MODEL: STYLE: SERIAL NO.:

RATINGS

STARTUP DATA A. TRANSFORMER RATIO TEST (TTR)

PHASE A PHASE B PHASE C

WINDING TAP VOLTS ACT.RATIO MR %ERROR MR %ERROR MR %ERROR

TAP #1 6.03TAP #2 5.89TAP #3 5.75TAP #4 5.60TAP #5 5.46

B. VECTOR GROUP TEST(CHECK OF VOLTAGE RELATIONSHIP)H1 X1

PHASE VOLTAGE PHASE VOLTAGE X2H1-H2 H3-X3 X3H2-H3 H3-X2H3-H1 H2-X3 H3 H2

H2-X2CONDITION FOR DYN11 H3-X2>H3-X3=H2-X3=H2-X2

C. MEASURMENT OF WINDING RESISTANCE : PRIMARY WINDING @ TAP 3

PHASE VOLTAGEH1-H2H2-H3H3-H1

SECONDARY WINDING :

PHASE VOLTAGEX1-X0X2-X0X3-X0

SINGLE LINE DIAGRAM NO.

VOLTAGE APPLIED VOLTAGE MEASUR

Client : SEC-COAContradtor: BEMCO

Riyadh Power Plant # 10 " 10721026/00'

Auxilairy TransformerTest 13.8/4.16kv

SYSTEM NO.

MANUFACTURER:

UNIT NO (BELONGS TO) VENDOR DRAWING NO.

TRNASFORMER NAME TAG No. FED FROM (BREAKER NFEEDING TO (BREAKER NO.)

14490.0014145.0013800.0013455.0013110.00

KVA: INS. CLASS: FREQUENCY: AMB. TEMP.: VECTOR GROUP:60 HZ 55 Dyn11

SHORT CKT CURRENT5 50KV 28 KVNO. OF TAPS HV BIL LV BIL % IMPEDENCE

NYNAS NYTRO 10GBNTYPE OF TAP CHANGER: TYPE OF COOLING: TEMP RISE OF OIL TEMP. RISE OF WINDINGOIL TYPE:

45 50

TAP #1:14490 TAP #2 :14145 TAP #3 :13800 TAP #4 :13455 TAP #5: 13110HIGH VOLTAGE SIDE CURRENT:

HIGH VOLTAGE SIDE VOLTAGE:

TAP #1: TAP #2 : TAP #3 : TAP #4: TAP #5:

LOW VOLT SIDE VOLTAG

LOW VOLT SIDE CURRE

CURRENT

CURRENT RESISTANCE IN OHMS

RESISTANCE IN OHMS

TS-AT01A13.8-4.16 Page 61

Page 62: PP10 startup manual (Unofficial as Requested)

Form No: TS-AT01A D. MAGNETISING CUURENT MEASURMENT :

D. INSULATION RESISTANCE TESTLV -- GND+HV HV ---GND+ LV HV -- LVTEST VOLT OHMS G TEST VOLT OHMS G TEST VOLT OHMS G

E.OIL DIELECTRIC TEST.

TEST NO.

BREAK DOWN

VOLTAGE

123456

AVERAGEF. TRANSFORMER PROTECTIVE DEVICES FUNCTIONAL TEST

1) WINDING TEMPERATURE INDICATORALARM TRIP FAN OPERATION

SET VALUEOPERATED VALUE

2) OIL TEMPERATURE INDICATORALARM TRIP FAN OPERATION

SET VALUEOPERATED VALUE

2) BUCCHOLZ RELAYTRIP CONTACTS OKALARM COTACTS OK

3) RAPID RISE RELAYTRIP CONTACTS OKALARM CONTACTS OK

MODEL CAL.DUE MODEL CAL.DUE

Riyadh Power Plant # 10 " 10721026/00'

Auxilairy TransformerTest

5000V2500V 5000V

Client : SEC-COA

Contradtor: BEMCO

TEST EQUIPMENT USED TEST EQUIPMENT USEDDTR

TAP-4

MAGNETISATION CURRENT IN MILLI AMPSPHASE A PHASE B PHASE C

TAP POSITION VOLTAGE FREQ

TAP-5

TAP-1TAP-2TAP-3

MULTI METER FLUKMEGGER

TEST PERFORMED BY:WITNESSED BY:WITNESSED BY:

SIGNATURE NAME COMPANY DATE

TS-AT01A13.8-4.16 Page 62

Page 63: PP10 startup manual (Unofficial as Requested)

Form No: TS-AT01A G.CALIBERATION OF WINDING AND OIL TEMPERATURE GAUGE

H.CALIBERATION OF WINDING GAUGE BY CURRENT INJECTION

WINDIN TEMPERATURE CT RATIOINJECTION CURRENT =

MODEL CAL.DUE MODEL CAL.DUE

Riyadh Power Plant # 10 " 10721026/00'

Auxilairy TransformerTest

WITNESSED BY:

DATETEST PERFORMED BY:

MULTI METER FLUK

SIGNATURE NAME COMPANY

MEGGER

TEST EQUIPMENT USED TEST EQUIPMENT USEDDTR

454035302520151050

TIME IN MINUTES OIL TEMP GAUGE WIND TEMP GAUGE DIFF IN TEMP

900C

600C

Client : SEC-COAContradtor: BEMCO

GAUGEOIL TEMPERATUE GAUGE WINDING TEMPERATURE GAUGE

THERMO METER GAUGE THERMO METER

400C500C

800C700C

1000C1100C

WITNESSED BY:

TS-AT01A13.8-4.16 Page 63

Page 64: PP10 startup manual (Unofficial as Requested)

Form No: TS-AT01B

EQUIPMENT LOCATION

EQUIPMENT NAMEPLATE DATATYPE: MODEL: STYLE: SERIAL NO.:

RATINGS

STARTUP DATA A. TRANSFORMER RATIO TEST (TTR)

PHASE A PHASE B PHASE C

WINDING TAP VOLTS ACT.RATIO MR %ERROR MR %ERROR MR %ERROR

TAP #1 52.28TAP #2 51.04TAP #3 49.80TAP #4 48.55TAP #5 47.31

B. VECTOR GROUP TEST(CHECK OF VOLTAGE RELATIONSHIP)H1 X1

PHASE VOLTAGE PHASE VOLTAGE X2H1-H2 H3-X3 X3H2-H3 H3-X2H3-H1 H2-X3 H3 H2

H2-X2CONDITION FOR DYN11 H3-X2>H3-X3=H2-X3=H2-X2

C. MEASURMENT OF WINDING RESISTANCE : PRIMARY WINDING @ TAP 3

PHASE VOLTAGEH1-H2H2-H3H3-H1

SECONDARY WINDING :

PHASE VOLTAGEX1-X0X2-X0X3-X0

SINGLE LINE DIAGRAM NO.

VOLTAGE APPLIED VOLTAGE MEASUR

Client : SEC-COAContradtor: BEMCO

Riyadh Power Plant # 10 " 10721026/00'

Auxilairy TransformerTest 13.8/.48kv

SYSTEM NO.

MANUFACTURER:

UNIT NO (BELONGS TO) VENDOR DRAWING NO.

TRNASFORMER NAME TAG No. FED FROM (BREAKER NFEEDING TO (BREAKER NO.)

14490.0014145.0013800.0013455.0013110.00

KVA: INS. CLASS: FREQUENCY: AMB. TEMP.: VECTOR GROUP:60 HZ 55 Dyn11

SHORT CKT CURRENT5 50KV 28 KV 9.36NO. OF TAPS HV BIL LV BIL % IMPEDENCE

NYNAS NYTRO 10GBNTYPE OF TAP CHANGER: TYPE OF COOLING: TEMP RISE OF OIL TEMP. RISE OF WINDINGOIL TYPE:

OFF LOAD ONAN 45 50

TAP #1:14490 TAP #2 :14145 TAP #3 :13800 TAP #4 :13455 TAP #5: 13110HIGH VOLTAGE SIDE CURRENT:

HIGH VOLTAGE SIDE VOLTAGE:

TAP #1: TAP #2 : TAP #3 : TAP #4: TAP #5:

LOW VOLT SIDE VOLTAG

LOW VOLT SIDE CURRE

CURRENT

CURRENT RESISTANCE IN OHMS

RESISTANCE IN OHMS

TS-AT01B13.8-480 Page 64

Page 65: PP10 startup manual (Unofficial as Requested)

Form No: TS-AT01C

EQUIPMENT LOCATION

EQUIPMENT NAMEPLATE DATATYPE: MODEL: STYLE: SERIAL NO.:

RATINGS

STARTUP DATA A. TRANSFORMER RATIO TEST (TTR)

PHASE A PHASE B PHASE C

WINDING TAP VOLTS ACT.RATIO MR %ERROR MR %ERROR MR %ERROR

TAP #1 15.76TAP #2 15.39TAP #3 15.01TAP #4 14.64TAP #5 14.26

B. VECTOR GROUP TEST(CHECK OF VOLTAGE RELATIONSHIP)H1 X1

PHASE VOLTAGE PHASE VOLTAGE X2H1-H2 H3-X3 X3H2-H3 H3-X2H3-H1 H2-X3 H3 H2

H2-X2H3-X2>H3-X3=H2-X3=H2-X2

C. MEASURMENT OF WINDING RESISTANCE : PRIMARY WINDING @ TAP 3

PHASE VOLTAGEH1-H2H2-H3H3-H1

SECONDARY WINDING :

PHASE VOLTAGEX1-X0X2-X0X3-X0

SINGLE LINE DIAGRAM NO.

VOLTAGE APPLIED VOLTAGE MEASUR

4368.004264.004160.00

Client : SEC-COAContradtor: BEMCO

Riyadh Power Plant # 10 " 10721026/00'

Auxilairy TransformerTest 4.16/-.48kv

SYSTEM NO.

MANUFACTURER:

UNIT NO (BELONGS TO) VENDOR DRAWING NO.

TRNASFORMER NAME TAG No. FED FROM (BREAKER NFEEDING TO (BREAKER NO.)

4056.003952.00

2007W08546G4WQFFCBAZ13893

KVA: INS. CLASS: FREQUENCY: AMB. TEMP.: VECTOR GROUP:60 HZ 55 Dyn11

SHORT CKT CURRENT5 50KV 28 KVNO. OF TAPS HV BIL LV BIL % IMPEDENCE

NYNAS NYTRO 10GBNTYPE OF TAP CHANGER: TYPE OF COOLING: TEMP RISE OF OIL TEMP. RISE OF WINDINGOIL TYPE:

OFF LOAD ONAN 45 50

TAP #1:4368 TAP #2 :4264 TAP #3 :4160 TAP #4 :4056 TAP #5: 3952HIGH VOLTAGE SIDE CURRENT:

HIGH VOLTAGE SIDE VOLTAGE:

TAP #1: TAP #2 : TAP #3 : TAP #4: TAP #5:

LOW VOLT SIDE VOLTAG

LOW VOLT SIDE CURRE

CURRENT

CURRENT RESISTANCE IN OHMS

RESISTANCE IN OHMS

TS-AT01C4.16-480 Page 65

Page 66: PP10 startup manual (Unofficial as Requested)

Form No: TS-AT01C D. MAGNETISING CUURENT MEASURMENT :

D. INSULATION RESISTANCE TESTLV -- GND+HV HV ---GND+ LV HV -- LVTEST VOLT OHMS G TEST VOLT OHMS G TEST VOLT OHMS G

E.OIL DIELECTRIC TEST.

TEST NO.

BREAK DOWN

VOLTAGE

123456

AVERAGEF. TRANSFORMER PROTECTIVE DEVICES FUNCTIONAL TEST

1) WINDING TEMPERATURE INDICATORALARM TRIP FAN OPERATION

SET VALUEOPERATED VALUE

2) OIL TEMPERATURE INDICATORALARM TRIP FAN OPERATION

SET VALUEOPERATED VALUE

2) BUCCHOLZ RELAYTRIP CONTACTS OKALARM COTACTS OK

3) RAPID RISE RELAYTRIP CONTACTS OKALARM CONTACTS OK

MODEL CAL.DUE MODEL CAL.DUE

Riyadh Power Plant # 10 " 10721026/00'

Auxilairy TransformerTest

N/A

N/AN/A

5000V

Client : SEC-COA

Contradtor: BEMCO

1000V 5000V

N/A

TEST EQUIPMENT USED TEST EQUIPMENT USEDDTR

TAP-4

PHASE A PHASE B PHASE CTAP POSITION VOLTAGE FREQ MAGNETISATION CURRENT IN MILLI AMPS

TAP-5

TAP-1TAP-2TAP-3

MULTI METER FLUKMEGGER

TEST PERFORMED BY:WITNESSED BY:WITNESSED BY:

SIGNATURE NAME COMPANY DATE

TS-AT01C4.16-480 Page 66

Page 67: PP10 startup manual (Unofficial as Requested)

Form No: TS-AT01B D. MAGNETISING CUURENT MEASURMENT :

D. INSULATION RESISTANCE TESTLV -- GND+HV HV ---GND+ LV HV -- LVTEST VOLT OHMS G TEST VOLT OHMS G TEST VOLT OHMS G

E.OIL DIELECTRIC TEST.

TEST NO.

BREAK DOWN

VOLTAGE

123456

AVERAGEF. TRANSFORMER PROTECTIVE DEVICES FUNCTIONAL TEST

1) WINDING TEMPERATURE INDICATORALARM TRIP FAN OPERATION

SET VALUEOPERATED VALUE

2) OIL TEMPERATURE INDICATORALARM TRIP FAN OPERATION

SET VALUEOPERATED VALUE

2) BUCCHOLZ RELAYTRIP CONTACTS OKALARM COTACTS OK

3) RAPID RISE RELAYTRIP CONTACTS OKALARM CONTACTS OK

MODEL CAL.DUE MODEL CAL.DUE

Riyadh Power Plant # 10 " 10721026/00'

Auxilairy TransformerTest

N/A

N/AN/A

5000V1000V 5000V

Client : SEC-COA

Contradtor: BEMCO

N/A

TEST EQUIPMENT USED TEST EQUIPMENT USEDDTR

TAP-4

MAGNETISATION CURRENT IN MILLI AMPSPHASE A PHASE B PHASE C

TAP POSITION VOLTAGE FREQ

TAP-5

TAP-1TAP-2TAP-3

MULTI METER FLUKMEGGER

TEST PERFORMED BY:WITNESSED BY:WITNESSED BY:

SIGNATURE NAME COMPANY DATE

TS-AT01B13.8-480 Page 67

Page 68: PP10 startup manual (Unofficial as Requested)

Form No: TS-AT01D

EQUIPMENT LOCATION

EQUIPMENT NAMEPLATE DATATYPE: MODEL: STYLE: SERIAL NO.:

RATINGS

STARTUP DATA A. TRANSFORMER RATIO TEST (TTR)

PHASE A PHASE B PHASE C

WINDING TAP VOLTS ACT.RATIO MR %ERROR MR %ERROR MR %ERROR

TAP #1

TAP #2

TAP #3

TAP #4

TAP #5

B. VECTOR GROUP TEST(CHECK OF VOLTAGE RELATIONSHIP)H1 X1

PHASE VOLTAGE PHASE VOLTAGE X2H1-H2 H3-X3 X3H2-H3 H3-X2H3-H1 H2-X3 H3 H2

H2-X2CONDITION FOR DYN11 H3-X2>H3-X3=H2-X3=H2-X2

C. MEASURMENT OF WINDING RESISTANCE : PRIMARY WINDING @ TAP 3

PHASE VOLTAGEH1-H2H2-H3H3-H1

SECONDARY WINDING :

PHASE VOLTAGEX1-X0X2-X0X3-X0

CURRENT

CURRENT RESISTANCE IN OHMS

RESISTANCE IN OHMS

LOW VOLT SIDE VOLTAG

LOW VOLT SIDE CURRETAP #1: TAP #2 : TAP #3 : TAP #4 : TAP #5: HIGH VOLTAGE SIDE CURRENT:

HIGH VOLTAGE SIDE VOLTAGE:

TAP #1: TAP #2 : TAP #3 : TAP #4: TAP #5:

TYPE OF TAP CHANGER: TYPE OF COOLING: TEMP RISE OF OIL TEMP. RISE OF WINDINGOIL TYPE:

SHORT CKT CURRENTNO. OF TAPS HV BIL LV BIL % IMPEDENCE

FREQUENCY: AMB. TEMP.: VECTOR GROUP:KVA: INS. CLASS:

TRNASFORMER NAME TAG No. FED FROM (BREAKER NFEEDING TO (BREAKER NO.)

SYSTEM NO.

MANUFACTURER:

UNIT NO (BELONGS TO) VENDOR DRAWING NO.

Client : SEC-COAContradtor: BEMCO

Riyadh Power Plant # 10 " 10721026/00'

Auxilairy TransformerTest Dry Type XFMR

SINGLE LINE DIAGRAM NO.

VOLTAGE APPLIED VOLTAGE MEASUR

TS-AT01DDry Typ Page 68

Page 69: PP10 startup manual (Unofficial as Requested)

Form No: TS-AT02D D. MAGNETISING CUURENT MEASURMENT :

D. INSULATION RESISTANCE TESTLV -- GND+HV HV ---GND+ LV HV -- LVTEST VOLT OHMS G TEST VOLT OHMS G TEST VOLT OHMS G

MODEL CAL.DUE MODEL CAL.DUE

SIGNATURE NAME COMPANY DATETEST PERFORMED BY:WITNESSED BY:WITNESSED BY:

MULTI METER FLUKMEGGER

TAP-5

TAP-1TAP-2TAP-3

PHASE B PHASE CTAP POSITION VOLTAGE FREQ

TAP-4

MAGNETISATION CURRENT IN MILLI AMPSPHASE A

TEST EQUIPMENT USED TEST EQUIPMENT USEDDTR

Client : SEC-COA

Contradtor: BEMCO

2500V 5000V

Riyadh Power Plant # 10 " 10721026/00'

Auxilairy TransformerTest

5000V

TS-AT01DDry Typ Page 69

Page 70: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

TES

COA

O

R

-001

STINGV

Riyadh Po“1062

STARTU

PROCVOLTA

ower plant21166/00”

UP MANUA

CEDURAGE BU

t # 10

AL DF

RE FOUS DU

Date:13 Feb,09

OR MEUCT

Revision0

EDIUM

n:

Page 70

Page 71: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc No: TP-BD01, Page 1 of 7 Equipment : Medium Voltage bus duct Date:13 Feb,09 Revision: 0

TABLE OF CONTENT

1. Task a. Work Status------------------------------------------------------------------------------------------------2 b. Documentation--------------------------------------------------------------------------------------------2 c. Personnel---------------------------------------------------------------------------------------------------2 d. Measuring Instrumentation-----------------------------------------------------------------------------2

2. Preconditions---------------------------------------------------------------------------------------------------2 3. Precautions------------------------------------------------------------------------------------------------------2 4. Scope--------------------------------------------------------------------------------------------------------------3 5. Execution---------------------------------------------------------------------------------------------------------3

a. Visual Checks---------------------------------------------------------------------------------------------3 b. Testing of MV Bus duct

1. Bus continuity and phasing test----------------------------------------------------------------3 2. Torque test-------------------------------------------------------------------------------------------4 3. Contact Resistance test--------------------------------------------------------------------------4 4. Main Circuit Contact Resistance test---------------------------------------------------------4 5. Insulation resistance test before hipot--------------------------------------------------------5 6. High Voltage test-----------------------------------------------------------------------------------5 7. Insulation resistance test after hipot-----------------------------------------------------------6 8. Commissioning of Heater Circuit --------------------------------------------------------------6 9. Protective earthing check------------------------------------------------------------------------7

6. Documents-------------------------------------------------------------------------------------------------------7 7. Reference---------------------------------------------------------------------------------------------------------7 8. Attachment-------------------------------------------------------------------------------------------------------7

Page 71

Page 72: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc No: TP-BD01, Page 2 of 7 Equipment : Medium Voltage bus duct Date:13 Feb,09 Revision: 0

1.0 Task

The purpose of this procedure is to test and document the integrity of metal enclosed medium voltage bus duct assemblies of 13.8 kV and 4.16kv level using an ac/dc source.

2.0 Preconditions

2.1 Work Status • Erection has been completed. • Labelling of the equipment and designation of live enclosed plant sections

has been carried out.

2.2 Documentation • The bus duct diagram is available • Commissioning checklists TS-BD01

2.3 Personnel • 1 Commissioning engineer: Engineer or technician with experience in

commissioning of all types of electrical equipments. • 1 Helper: skilled worker with adequate on-the-job training.

2.4 Measuring Instruments and Tools

• Torque wrench • Micro ohm meter 10A and 100A • Insulation Tester 5000V dc • High voltage tester AC (up to 50 KV or DC (up to 80 KV) • Discharge hot stick

3.0 Precautions The work will only proceed when a Permit to Work (PTW) in work permit area has been obtained. The PTW will be kept on site for consultation during the testing works.

Special attention will be given to: • Due to high voltage being used, adequate safety precautions should be taken to

avoid injury to personnel and damage to property. • Cordoning off specified working area and provision of applicable safety warning

sign board. • Ensure that all the necessary test equipment are made available at the test area

and with valid calibration stickers and certificate. • Hand insulating gloves and grounding sticks / wire jumpers shall be provided for

safe handling and draining of residual voltage. • Switch gear and transformer should be disconnected from flexible connection

with the bus duct. Switchgear and transformer should be connected to ground. • Ensure that all voltage transformers are disconnected for the duration of the test

and that all current transformers are short-circuited. • Immediately after testing of each phase, voltage residue shall be drain by using

grounding stick / wire which is directly connected to earth. • Test equipment operation shall be in accordance with the manufacturer's

instructions.

Page 72

Page 73: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc No: TP-BD01, Page 3 of 7 Equipment : Medium Voltage bus duct Date:13 Feb,09 Revision: 0

• Closing of the work permit after completion of the work (if the test area is to be considered in work permit area) is necessary.

4.0 Scope

• Testing of bus bar • High voltage test on complete Bus duct assembly • Circuit resistance for complete Bus duct assembly • Checking that the bus bar mounting position is correct, • Checking of the phase and continuity • Checking of correct earthing,

5.0 Execution

5.1 Visual Checks • Check that the bus bar is not damage and that they are bolted correctly, • Check that insulator does not have any cracks or damage. • Inspect for cleanliness, connections etc. • Check for water tight seals at all joints including expanding interface

points • Check for quality of paint work both inside and out side • Check that ventilation openings are not blocked and that they are

screened against ingress of insects and rain • Check that moisture drain holes are available at the bottom of enclosure • Check anti-condensation heaters are mounted at bottom

5.2 Testing of the MV Bus Duct Enter the rating plate data in check list TS-BD01 and compare the bus duct data with the data contained in the diagram. The following test shall be carried out

1. Bus continuity and phasing test 2. Torque test 3. Contact Resitance test 4. Main Circuit Contact Resitance test 5. Insulation resistance test before hipot 6. High Voltage test 7. Insulation resistance test after hipot 8. Commissioning of Heater Circuit

a. Visual Checks b. Measurement of insulation resistance of heater and lamp

circuit c. Functional checks of thermostat , Heaters, d. Measurement of Current and voltage

9. Protective earthing check 5.2.1 Continuity and Phasing Test

Continuity and phasing test can be done by simple ohm meter or fluk Connect the extreme end of the single phase of the bus with ground and check the resistance between phases and ground. All the phases should read infinity except the grounded phase. Thus the phase is identified and continuity is checked. Repeat the test on remaining two phases.

Page 73

Page 74: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc No: TP-BD01, Page 4 of 7 Equipment : Medium Voltage bus duct Date:13 Feb,09 Revision: 0

5.2.2 Torque Test

Torque shall be applied to all joints made at site. The bolts shall be tightened according to manufacturer instruction after the bus bar erection completion. Spot check shall be carried out using a calibrated torque wrench. Following is the reference Value in case data from manufacturer is not available Bolt tighten maximum value, Bolt Maximum Size value M 6 8 Nm M 8 20 Nm M 10 40 Nm M 12 70 Nm M 16 140 Nm Tolerance : ± 20 %

5.2.3 Contact Resistance Test The contact resistance test will be carried out after torque completion and will be applied to all bus bar joints. The test requires to measure very small fluctuations in resistance while simulating actual operating conditions. A DC power source will inject the test current up to 100 A and digital voltmeter will measure the voltage drop across the joints under test, Thus V/I gives Resistance Contact resistance can also be measured using micro ohm meter as shown in figure below.

• Check the resistance for all the bus bar joints using micro-ohm meter at 100 Amps.

• Check the over all resistance of the bus bar for each phase using micro-ohm meter at 100Amps.

M IC R O O H M M E T E R

C O N T A C T R E S IS T A N C E T E S T A R R A N G E M E N T F O R P R IM A R Y C IR C U IT S

Page 74

Page 75: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc No: TP-BD01, Page 5 of 7 Equipment : Medium Voltage bus duct Date:13 Feb,09 Revision: 0

5.2.4 Insulation Resistance Test Before High Voltage Test

Before performing high voltage test, perform the Insulation resistance test for one minute with 5000Vdc insulation tester as under

• Isolate the VTs and short the CTs secondary if installed on bus duct

• Connect the phases Y, B to ground and apply the test voltage between phase R and ground and note down the readings after I minute of application.

• Connect the phases B, R to ground and apply the test voltage between phase Y and ground and note down the readings after I minute of application

• Connect the phases R, Y to ground and apply the test voltage between phase B and ground and note down the readings after I minute of application

• Insulation resistance measurement shall also be made of heater circuit by applying 500V dc for one minute

5.2.5 High Voltage Test

AC high- pot test shall be carried out in accordance with IEC standard at site. The test shall be carried out on MV Bus bar as under

• Bus duct is isolated from the transformer and switch gear • Voltage transformers primary is disconnected if it is installed

on the bus duct. • Current transformer secondary is shorted if it is installed on the

bus duct. • The test voltage to carry out the test is mention in table below

against different voltage levels • Connect the phases Y, B to ground and apply the test voltage

between phase R and ground by increasing gradually at the rate of 2kv/sec, Record the leakage current at 15 Sec, 30 sec , 45 sec and 60 sec

• Connect the phases B, R to ground and apply the test voltage between phase Y and ground by increasing gradually at the rate of 2kv/sec, Record the leakage current at 15 Sec, 30 sec , 45 sec and 60 sec

• Connect the phases R, Y to ground and apply the test voltage between phase B and ground by increasing gradually at the rate of 2kv/sec, Record the leakage current at 15 Sec, 30 sec , 45 sec and 60 sec

Page 75

Page 76: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc No: TP-BD01, Page 6 of 7 Equipment : Medium Voltage bus duct Date:13 Feb,09 Revision: 0

Table-1 AC Testing

High-potential Test Partial Discharge Test

DC Testing

Equipment Rated

Voltage, kV Test

Level, kV

Time, Min

Extinction Level, kV

Pulse Magnitude,

pC

Time, Min

Test level,

kV

Time, Min

Bus Duct : Isolated phase Bus (IPB) 25 45(60) 1 19 100 2 64 1

Metal-Enclosed Rigid Bus 13.8 27(36) 1 10.5(10.5) 100(100) 2 37(50) 1

4.16 14(19) 1 3.5(3.5) 100(100) 2 N/A N/A Switchgear 13.8 27(36) 1 10.5(10.5) 100(100) 2 N/A N/A

Voltages shown in parenthesis are factory test value

5.2.6 Insulation Resitance Test after High Voltage Test After performing high voltage test Perform the Insulation resistance test with 5000Vdc for MV switch gear as describe in 5.2.4

5.2.7 Commissioning of Heaters Space heater shall be commissioned as under. 5.2.7.1 Visual Checks of Heaters

• Check the rating of the heater match with the supply voltage.

• Check the KW rating of the heater match with drawing. • Check the breaker which supplying power to heater

circuit for correct rating with respect to total load of the heaters.

5.2.7.2 Measurement of Insulation Resistance Perform insulation resistance measurement on space heater circuit with 500 VDC megger

5.2.7.3 Measurement of Current and Voltage Switch on the breaker and measured the total current and individual heater load with mini clamp meter

5.2.7.4 Functional Checks of Thermostat

Check the operation of the thermostat and hygrometer for cut in and cut out operation

Page 76

Page 77: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc No: TP-BD01, Page 7 of 7 Equipment : Medium Voltage bus duct Date:13 Feb,09 Revision: 0

5.2.8 Checking the Protective Earthing

Bus duct protective earthing bond must be earthed in order to afford protection to human beings. Protective earthing bond should be checked for its continuity. Shorting plate between the bus duct enclosures at transformer end and switch gear end should be checked for firm connection and grounding. The shorting bar between bus duct enclosures carries the circulating current induced on the bus enclosures.

6.0 Documents Check list TS-BD01 shall be completed.

7.0 References 8.0 Attachment

8.1 Test Sheet for MV Bus duct TS-BD01

*** End of the procedure***

Page 77

Page 78: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

Riyadh Po“1062

STARTU

TES

ower plant21166/00”

UP MANUA

ST SH

t # 10

AL DF

EETS

Date:13 Feb,09

Revision0

n:

Page 78

Page 79: PP10 startup manual (Unofficial as Requested)

Bus duct Name Bus duct Tag No Location: Ambient Temp: Humidity:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-BD01, Page 1 of 4

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Testing of Medium Voltage bus duct

Date:13/02/09 Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

1. Technical data Bus duct:

Manufacturer:...............................................................................................

Type designation:.........................................................................................

Serial No / year of manufacturing:...............................................................

Rated voltage:..............................................................................................

Rated nominal current:.................................................................................

2. Visual check i. Check the bus bar for any damage and they are bolted correctly, ii. Check the insulator for any cracks or damage iii. Check insulation damage, cleanliness, connections etc. iv. Check for water tight seals at all joints including expanding interface points v. Check for quality of paint work both inside and out side vi. Check that ventilation openings are not blocked and that they are screened

against ingress of insects and rain vii. Check that moisture drain holes are available at the bottom of enclosure viii. Check anti-condensation heaters are mounted at bottom

3.

Mechanical check Torque Check Perform and Check the torque for all the interconnection joints of the bus bar which are made at site. Torque should be checked as per following values. Or as per Manuf Rec. For SS A270 Bolt Maximum

Size value M 6 8 Nm M 8 17 Nm M 10 40 Nm M 12 60 Nm M 16 91 Nm

Page 79

Page 80: PP10 startup manual (Unofficial as Requested)

Bus duct Name Bus duct Tag No Location: Ambient Temp: Humidity:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-BD01, Page 2 of 4

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Testing of Medium Voltage bus duct

Date:13/02/09 Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

4. 4.1

Electrical test on Bus Bar Bus Bar Continuity and phasing test

Continuity From End To end

Phases

Transformer Switchgear

Phasing

Phase R Phase Y Phase B Neutral Ground

4.2

Main Circuit Contact Resitance test. (Test Current 100Amps) As per attached diagram

Contact Resistance in µ Ohms Phases Joint-1 Joint-2 Joint-3 Joint-4 Joint-5 Joint-6 Phase R Phase Y Phase B Neutral Ground

Diagram showing joints and number to be attached

4.3

Insulation Resistance Measurment. Before Hipot Test. Minimum Value:

Phase R-G Y-G B-G R-Y Y-B B-R IR in G-ohms

Test Voltage

Page 80

Page 81: PP10 startup manual (Unofficial as Requested)

Bus duct Name Bus duct Tag No Location: Ambient Temp: Humidity:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-BD01, Page 3 of 4

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Testing of Medium Voltage bus duct

Date:13/02/09 Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

4.4

Hipot Test at ------------ KV AC for I minute. (Power Frequency)

Leakage Current in m A Duration R-Y+B+G Y-R+B+G B-R+Y+G

15 Sec

30 Sec

45 Sec

60 Sec

4.6.

Insulation Resistance Measurment. After Hipot Test. Minimum Value:

Phase R-G Y-G B-G R-Y Y-B B-R IR in G-ohms

Test Voltage

Page 81

Page 82: PP10 startup manual (Unofficial as Requested)

Bus duct Name Bus duct Tag No Location: Ambient Temp: Humidity:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-BD01, Page 4 of 4

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Testing of Medium Voltage bus duct

Date:13/02/09 Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

4.7

Space Heater Commissioning Rating: Heater Rated Voltage: ------------------- Heater Watts:-------------------- Total No Of Heater :------------------- Total Heater load:-------------- Electrical Test: Insulation Resistance in M ohms for 1 Minute:------------------------------------- Measurment

Heater No/Location Voltage in volts Current in Amps 1 2 3 4 5 6 7 8

Functional Check Thermostat:

Ambient Temp in o C Cut in Temp in o C Cut out Temp in o C

Test Equipment Model Cal due date Test Equipment Model Cal due date

Page 82

Page 83: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

TE

COA

O

R

-001

ESTIN V

Riyadh Po“1062

STARTU

NG PROVOLTA

ower plant21166/00”

UP MANUA

OCEDAGE BU

t # 10

AL DF

DURE FUS DU

Date:13 Feb,09

FOR LUCT

Revision0

LOW

n:

Page 83

Page 84: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc No: TP-BD02, Page 1 of 6 Equipment : Low Voltage bus duct Date:13 Feb,09 Revision: 0

TABLE OF CONTENT

1. Task

a. Work Status-------------------------------------------------------------------------------------------------------2 b. Documentation---------------------------------------------------------------------------------------------------2 c. Personnel----------------------------------------------------------------------------------------------------------2 d. Measuring Instrumentation-----------------------------------------------------------------------------------2

2. Preconditions---------------------------------------------------------------------------------------------------------2 3. Precautions------------------------------------------------------------------------------------------------------------2 4. Scope--------------------------------------------------------------------------------------------------------------------3 5. Execution---------------------------------------------------------------------------------------------------------------3

a. Visual Checks----------------------------------------------------------------------------------------------------3 b. Testing of LV Bus Duct

1. Bus continuity and phasing test---------------------------------------------------------------------3 2. Torque test------------------------------------------------------------------------------------------------4 3. Contact Resistance test-------------------------------------------------------------------------------4 4. Main Circuit Contact Resistance test--------------------------------------------------------------4 5. Insulation resistance test before hipot-------------------------------------------------------------5 6. High Voltage test----------------------------------------------------------------------------------------5 7. Insulation resistance test after hipot----------------------------------------------------------------5 8. Commissioning of Heater Circuit -------------------------------------------------------------------5 9. Protective earthing check-----------------------------------------------------------------------------6

6. Documents------------------------------------------------------------------------------------------------------------6 7. Reference--------------------------------------------------------------------------------------------------------------6 8. Attachment------------------------------------------------------------------------------------------------------------6

Page 84

Page 85: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc No: TP-BD02, Page 2 of 6 Equipment : Low Voltage bus duct Date:13 Feb,09 Revision: 0

1.0 Task The purpose of this procedure is to test and document the integrity of bus bar of metal enclosed assemblies of non segregated bus duct of 380V and 480V, levels using an ac/dc source.

2.0 Preconditions

2.1 Work Status • Erection has been completed. • Labelling of the equipment and designation of live enclosed plant sections has

been carried out.

2.2 Documentation • The bus duct diagram and single line diagram are available • Commissioning checklists TS-BD02

2.3 Personnel • 1 Commissioning engineer: Engineer or technician with experience in

commissioning of all types of electrical equipments. • 1 Helper: skilled worker with adequate on-the-job training.

2.4 Measuring Instruments and Tools

• Torque wrench • Micro ohm meter 10A and 100A • Insulation Tester 1000V dc • High voltage tester AC (up to 2 KV ) • Discharge hot stick

3.0 Precautions The work will only proceed when a Permit to Work (PTW) in work permit area has been obtained. The PTW will be kept on site for consultation during the testing works. Special attention will be given to:

• Due to high voltage being used, adequate safety precautions should be taken to avoid injury to personnel and damage to property.

• Cordoning off specified working area and provision of applicable safety warning sign board.

• Ensure that all the necessary test equipment are made available at the test area and with valid calibration stickers and certificate.

• Hand insulating gloves and grounding sticks / wire jumpers shall be provided for safe handling and draining of residual voltage.

• Switch gear and transfomer flexible brad should be disconnected from the bus duct. Switchgear end and transformer end should be shorted and grounded.

• Ensure that all voltage transformers are disconnected for the duration of the test and that all current transformers are short-circuited.

• Immediately after testing of each phase, voltage residue shall be drain by using grounding stick / wire which is directly connected to earth.

• Test equipment operation shall be in accordance with the manufacturer's instructions. • Closing of the work permit after completion of the work (if the test area is to be

considered in work permit area) is necessary.

Page 85

Page 86: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc No: TP-BD02, Page 3 of 6 Equipment : Low Voltage bus duct Date:13 Feb,09 Revision: 0

4.0 Scope

• Testing of bus bar • High voltage test on complete bus duct assembly • Circuit resistance for complete bus duct assembly • Checking that the bus bar mounting position is correct, • Checking of the phase and continuity • Checking of correct earthing,

5.0 Execution

5.1 Visual Checks • Check that the bus bar is not damage and that they are bolted correctly, • Check that insulator does not have any cracks or damage. • Inspect for cleanliness, connections etc. • Check for water tight seals at all joints including expanding interface points • Check for quality of paint work both inside and out side • Check that ventilation openings are not blocked and that they are screened

against ingress of insects and rain • Check that moisture drain holes are available at the bottom of enclosure • Check anti-condensation heaters are mounted at bottom

5.2 Testing the LV Bus Duct Enter the rating plate data in check list TS-BD02 and compare the bus duct data with the data contained in the circuit documentation. The following test shall be carried out

1. Bus continuity and phasing test. 2. Torque test. 3. Contact Resistance test 4. Main Circuit Contact Resitance test 5. Insulation resistance test before hipot 6. High Voltage test 7. Insulation resistance test after hipot 8. Commissioning of Heater Circuit

a. Visual Checks b. Measurement of insulation resistance of heater and lamp circuit c. Functional checks of thermostat , Heaters, d. Measurement of Current and voltage

9. Protective earthing check 5.2.1 Continuity and Phasing Test

Continuity and phasing test can be done by simple ohm meter or fluk Connect the extreme end of the single phase of the bus with ground and check the resistance between phases and ground. All the phases should read Infinity except the grounded phase. Thus the phase is identified and continuity is checked. Repeat the test on remaining two phases.

Page 86

Page 87: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc No: TP-BD02, Page 4 of 6 Equipment : Low Voltage bus duct Date:13 Feb,09 Revision: 0

5.2.2 Torque Test Torque test shall be applied to all joints made at site. The bolts shall be tightened according to manufacturer instruction after the bus duct erection completion. Spot check shall be carried out using a calibrated torque wrench. Following is the reference value in case data from manufacturer is not available Bolt tighten maximum value, Bolt Maximum Size value M 6 8 Nm M 8 20 Nm M 10 40 Nm M 12 70 Nm M 16 140 Nm Tolerance : ± 20 %

5.2.3 Contact Resistance Test

The contact resistance test will be carried out after torque completion and will be applied to all bus bar joints. The test requires to measure very small fluctuations in resistance while simulating actual operating conditions. A DC power source will inject the test current up to 100 A and digital voltmeter will measure the voltage drop across the joints under test, Thus V/I gives Resistance Contact resistance can also be measured using micro ohm meter as shown in figure below.

• Check the resistance for all the bus bar joints using micro-ohm meter at 100 Amps.

• Check the over all resistance of the bus bar for each phase using micro-ohm meter 100Amps.

M IC R O O H M M E T E R

C O N T A C T R E S IS T A N C E T E S T A R R A N G E M E N T F O R P R IM A R Y C IR C U IT S

Page 87

Page 88: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc No: TP-BD02, Page 5 of 6 Equipment : Low Voltage bus duct Date:13 Feb,09 Revision: 0

5.2.4 Insulation Resistance test Before High Voltage Test

Before performing high voltage test, perform the Insulation resistance test for one minute with 5000Vdc insulation tester as under

• Isolate the VTs and short the CTs secondary if installed on bus duct • Connect the phases Y, B to ground and apply the test voltage

between phase R and ground and note down the readings after I minute of application.

• Connect the phases B, R to ground and apply the test voltage between phase Y and ground and note down the readings after I minute of application Connect the phases R, Y to ground and apply the test voltage between phase B and ground and note down the readings after I minute of application

• Connect the phases R, Y to ground and apply the test voltage between phase B and ground and note down the readings.

• Insulation resistance measurement shall also be made of heater circuit by applying 500V dc for one minute

5.2.5 High Voltage Test

AC high- pot test shall be carried out in accordance with IEC standard at site. The test shall be carried out on LV Bus bar.

• Bus duct is isolated from the transformer and switch gear • Voltage transformers primary is disconnected if it is installed on the

bus duct. • Current transformer secondary is shorted if it is installed on the bus

duct. • The test voltage to carry out the test is mention in table below against

different voltage levels • Connect the phases Y, B to ground and apply the test voltage

between phase R and ground by increasing gradually to 2kv, Record the leakage current at 15 Sec, 30 sec , 45 sec and 60 sec

• Connect the phases B, R to ground and apply the test voltage between phase Y and ground by increasing gradually to 2kv, Record the leakage current at 15 Sec, 30 sec , 45 sec and 60 sec

• Connect the phases R, Y to ground and apply the test voltage between phase B and ground by increasing gradually to 2kv, Record the leakage current at 15 Sec, 30 sec , 45 sec and 60 sec

5.2.6 Insulation Resitance Test after High Voltage Test

After performing high voltage test, perform the Insulation resistance test with 1000Vdc for LV Bus as describe in 5.2.4

5.2.7 Commissioning of Heaters Space heater shall be commissioned as under. 5.2.7.1 Visual Checks of Heaters

• Check the rating of the heater match with the supply voltage. • Check the KW rating of the heater match with drawing.

Page 88

Page 89: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc No: TP-BD02, Page 6 of 6 Equipment : Low Voltage bus duct Date:13 Feb,09 Revision: 0

• Check the breaker which supplying power to heater circuit for correct rating with respect to total load of the heaters.

5.2.7.2 Measurement of Insulation Resistance Perform insulation resistance measurement on space heater circuit with 500 VDC megger

5.2.7.3 Measurement of Current and Voltage Switch on the breaker and measured the total current and individual heater load with mini clamp meter

5.2.7.4 Functional Checks of Thermostat

Check the operation of the thermostat and hygrometer for cut in and cut out operation

5.2.8 Checking the Protective Earthing

Bus duct protective earthing bond must be earthed in order to afford protection to human beings. Protective earthing bond should be checked for its continuity.

6.0 Documents

Check list TS-BD02 shall be completed.

7.0 References 8.0 Attachment

8.1 Test Sheet for LV Bus duct TS-BD02

***end of the procedure ***

Page 89

Page 90: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

Riyadh Po“1062

STARTU

TES

ower plant21166/00”

UP MANUA

ST SH

t # 10

AL DF

EETS

Date:13 Feb,09

Revision0

n:

Page 90

Page 91: PP10 startup manual (Unofficial as Requested)

Bus duct Name Bus duct Tag No Location: Ambient Temp: Humidity:

Subcontract/Tested by Arabian BEMCO SEC-EOA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-BD02, Page 1 of 4

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Testing of Low Voltage bus duct

Date: 13/02/09 Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Remarks Confirm

1. Technical data Bus duct:

Manufacturer:...............................................................................................

Type designation:.........................................................................................

Serial No / year of manufacturing:...............................................................

Rated voltage:..............................................................................................

Rated nominal current:.................................................................................

2. Visual check i. Check the bus bar for any damage and they are bolted correctly, ii. Check the insulator for any cracks or damage iii. Check insulation damage, cleanliness, connections etc. iv. Check for water tight seals at all joints including expanding interface points v. Check for quality of paint work both inside and out side vi. Check that ventilation openings are not blocked and that they are screened

against ingress of insects and rain vii. Check that moisture drain holes are available at the bottom of enclosure viii. Check anti-condensation heaters are mounted at bottom

3.

Mechanical check Torque Check Perform and Check the torque for all the interconnection joints of the bus bar which are made at site. Torque should be checked as per following values. Or as per Manuf Rec. For SS A270 Bolt Maximum

Size value M 6 8 Nm M 8 17 Nm M 10 40 Nm M 12 60 Nm M 16 91 Nm

Page 91

Page 92: PP10 startup manual (Unofficial as Requested)

Bus duct Name Bus duct Tag No Location: Ambient Temp: Humidity:

Subcontract/Tested by Arabian BEMCO SEC-EOA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-BD02, Page 2 of 4

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Testing of Low Voltage bus duct

Date: 13/02/09 Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Remarks Confirm

4. 4.1

Electrical test on Bus Bar Bus Bar Continuity and phasing test

Continuity From End To end

Phases

Transformer Switchgear

Phasing

Phase R Phase Y Phase B Neutral Ground

4.2

Main Circuit Contact Resitance test. (Test Current 100Amps) As per attached diagram

Contact Resistance in µ Ohms Phases Joint-1 Joint-2 Joint-3 Joint-4 Joint-5 Joint-6 Phase R Phase Y Phase B Neutral Ground

Diagram showing joints and number to be attached

4.3

Insulation Resistance Measurment. Before Hipot Test. Minimum Value:

Phase R-G Y-G B-G R-Y Y-B B-R IR in G-ohms

Test Voltage

Page 92

Page 93: PP10 startup manual (Unofficial as Requested)

Bus duct Name Bus duct Tag No Location: Ambient Temp: Humidity:

Subcontract/Tested by Arabian BEMCO SEC-EOA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-BD02, Page 3 of 4

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Testing of Low Voltage bus duct

Date: 13/02/09 Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirms Remarks

4.4

Hipot Test at ------------ KV AC for I minute(Power Frequency)

Leakage Current in m A Duration R-Y+B+G Y-R+B+G B-R+Y+G

15 Sec

30 Sec

45 Sec

60 Sec

4.6.

Insulation Resistance Measurment. After Hipot Test. Minimum Value:

Phase R-G Y-G B-G R-Y Y-B B-R IR in G-ohms

Test Voltage

Page 93

Page 94: PP10 startup manual (Unofficial as Requested)

Bus duct Name Bus duct Tag No Location: Ambient Temp: Humidity:

Subcontract/Tested by Arabian BEMCO SEC-EOA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-BD02, Page 4 of 4

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Testing of Low Voltage bus duct

Date: 13/02/09 Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Remarks Confirm

4.7

Space Heater Commissioning Rating: Heater Rated Voltage: ------------------- Heater Watts:-------------------- Total No Of Heater :------------------- Total Heater load:-------------- Electrical Test: Insulation Resistance in M ohms for 1 Minute:------------------------------------- Measurment

Heater No/Location Voltage in volts Current in Amps 1 2 3 4 5 6 7 8

Functional Check Thermostat:

Ambient Temp in o C Cut in Temp in o C Cut out Temp in o C

Test Equipment Model Cal due date Test Equipment Model Cal due date

Page 94

Page 95: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

TEST

COA

O

R

-001

TING PL

Riyadh Po“1062

STARTU

PROCLIMITI

ower plant21166/00”

UP MANUA

CEDURNG RE

t # 10

AL DF

RE FOREACTO

Date:13 Feb,09

R CUROR

Revision0

RRENT

n:

T

Page 95

Page 96: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-CL01, Page 1 of 5 Equipment : Current Limiting Reactor Date:13 Feb,09 Revision: 0

TABLE OF CONTENT

1. Task a. Work Status-------------------------------------------------------------------------2 b. Documentation---------------------------------------------------------------------2 c. Personnel----------------------------------------------------------------------------2 d. Measuring Instrumentation------------------------------------------------------2

2. Preconditions-------------------------------------------------------------------------------2 3. Precautions----------------------------------------------------------------------------------2 4. Scope------------------------------------------------------------------------------------------3 5. Execution-------------------------------------------------------------------------------------3

a. Visual Checks----------------------------------------------------------------------3 b. Testing of Current Limiting Reactor

1. Measurement of Insulation resistance-----------------------------4 2. Measurement of Winding Resistance------------------------------4 3. Measurement of Impedance.-----------------------------------------4 4. High Voltage Test for Dry or Air core Reactor-------------------5 5. Testing of protection devices for oil type reactor----------------5

6. Documents-----------------------------------------------------------------------------------5 7. Reference-------------------------------------------------------------------------------------5 8. Attachment-----------------------------------------------------------------------------------5

Page 96

Page 97: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-CL01, Page 2 of 5 Equipment : Current Limiting Reactor Date:13 Feb,09 Revision: 0

1. Task. This instruction comprises a complete description of the testing of the oil and dry type Current Limiting Reactor

2. Preconditions

2.1. Work Status • Erection has been completed. • Labelling of the equipment and designation of live enclosed plant sections has

been carried out.

2.2. Documentation • The circuit diagrams and Single line Drawings are available. • Commissioning checklists TS-CL01. • Product manual of the Current limiting Reactor is available.

2.3. personnel • Commissioning engineer: - (1) engineer with experience in commissioning of

transformer and switch gear. • Technician or helper:- (2) skilled worker with adequate on -the-job training • Witness from the client‘s concern department

2.4. Measuring Instrument

• Multi meter (calibrated)—2 • Insulation resistance meter 5KV –megger(calibrated)—1 • AC High Voltage tester up to 30 kv (calibrated)—1 • Variable Auto Transformer-----1 • Mini clamp(calibrated)—2 • Fluke

3. Precautions The work will only proceed when a Permit to Work (PTW) in work permit area has been obtained. The PTW will be kept on site for consultation during the testing works. • Observe the rules for handling electronic components sensitive to electrostatic

discharge (ESD measures). • Special safety arrangements shall be made for all areas which are not explicitly

designated as” electrical operating areas” when performing tests at voltages in excess of 50V.

• Closing of the work permit after completion of the work (if the test area is to be considered in work permit area) is necessary.

• Before test voltages are applied a check shall be carried out to ensure that no unauthorized persons are working at the corresponding load-where ever necessary barriers should be provided

4. Scope

• Testing of Current Limiting Reactor • Checking that the mounting position is correct, • Checking of correct earthing, • Checking of protection devices for oil type reactor

Page 97

Page 98: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-CL01, Page 3 of 5 Equipment : Current Limiting Reactor Date:13 Feb,09 Revision: 0

5. Execution 5.1. Visual Inspection.

Prior to carrying out electrical tests, a visual check of the CLR should be carried out paying particular attention to the following points • Correct labeling of devices and cables • Equipment and cables are undamaged • Correct execution of the cable gland/sealing end • Name plate data, match with drawing and ambient condition • Firm cable termination/terminal connection and ferruling

5.2. Testing of Current Limiting Rector Following tests to be carried out

1. Measurement of Insulation Resistance 2. Measurement of Winding Resistance. 3. Measurement of Impedance. 4. High Voltage Test for Dry or Air core Reactor 5. Testing of protection devices for oil type reactor

5.2.1. Insulation Resistance Before High Voltage Test

Checking of the insulation resistance should be carried out as under Apply the test voltage between winding and ground and note down the readings The insulation resistance measurement is done from 15 seconds to 1 minute with 15 seconds interval. Please refer below for connection and test arrangement

5.2.2. Winding Resistance Measurement The Winding resistance measurement can be done by either conventional method using 2V DC battery with voltmeter and Ammeter or by Micro ohmmeter.

The winding resistance will be measured by a drop of potential method by injecting direct current through the winding as shown below.

Page 98

Page 99: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-CL01, Page 4 of 5 Equipment : Current Limiting Reactor Date:13 Feb,09 Revision: 0

Measurement should be made between line to line bushing The measured values should be compared with factory value, for that a conversion for the temperature correction should be done by following formula. R75 = Ra x 234.5+75 234.5+Ra Where as R75 = Corrected Resitance in ohms Ra = Measured Resistance at ambient temperature in ohms Ta = Ambient temperature in 0 C

5.2.3. Impedance Measurement

The impedance should be measured as follows. Test connection is done as shown in figure below. Apply about 22 0 Vac between the line terminals and measured the current, voltage divided by current gives Impedance.

5.2.4. High Voltage Test

AC high- pot test shall be carried out in accordance with IEC standard at site. The test shall be carried out on dry type or air core reactor as under • Connect the phases Y, B to ground and apply the test voltage between

phase R and ground by increasing gradually at the rate of 2kv/sec, Record the leakage current at 15 Sec, 30 sec , 45 sec and 60 sec

• Connect the phases B, R to ground and apply the test voltage between phase Y and ground by increasing gradually at the rate of 2kv/sec, Record the leakage current at 15 Sec, 30 sec , 45 sec and 60 sec

• Connect the phases R, Y to ground and apply the test voltage between phase B and ground by increasing gradually at the rate of 2kv/sec, Record the leakage current at 15 Sec, 30 sec , 45 sec and 60 sec

Page 99

Page 100: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-CL01, Page 5 of 5 Equipment : Current Limiting Reactor Date:13 Feb,09 Revision: 0

5.2.5. Insulation Resistance After High Voltage Test Checking of the insulation resistance should be carried out as mention in 5.5.1

5.2.6. Oil Testing( for oil type Reactor) Oil sample should be taken from bottom, top of the main tank, also from the conservator tank, De-electric test for the oil should be performed as per IEC 156 using de-electric test machine

5.2.7. Temperature Indicator and Sensor.

5.2.7.1. Oil Temperature The oil and winding temperature indicators shall be calibrated by heat sink with thermometer.

5.2.7.2. Winding Temperature The winding temperature indicator shall be checked by current injection at the heater element.

5.2.8. Protection Devices Functional Check (for oil type CLR)

Trip and alarm should be simulated from buchholz relay. tripping of protection relay and breakers should be observed, alarms on local and remote annunciation shall be observed

Trip and alarm should be simulated from pressure relay. tripping of protection relay and breakers should be observed, alarms on local and remote annunciation shall be observed

Trip and alarm should be simulated from pressure relief relay. tripping of protection relay and breakers should be observed, alarms on local and remote annunciation shall be observed

Trip and alarm should be simulated from oil and winding temperature indicator. tripping of protection relay and breakers should be observed, alarms on local and remote annunciation shall be observed

Results for above tests shall be entered in the test form No.TS-PT01 of the power transformer.

5.3. Checking the Protective Earthing

Bus duct protective earthing bond must be earthed in order to afford protection to human beings. Protective earthing bond should be checked for continuity.

6. Documents Check list TS-CL01 shall be completed.

7. References

8. Attachment

8.1. Test Sheet for Current Limiting Reactor TS-CL01

***End of the procedure***

Page 100

Page 101: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

Riyadh Po“1062

STARTU

TES

ower plant21166/00”

UP MANUA

ST SH

t # 10

AL DF

EETS

Date:13 Feb,09

Revision0

n:

Page 101

Page 102: PP10 startup manual (Unofficial as Requested)

Reactor Name Reactor Tag No Location: Ambient Temp: Humidity:

Tested by/Company Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No:TS-CL01 Page 1 of 2

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Testing of Dry type Reactor

Date:13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

1.

Technical data Manufacturer:........................................................... Type:...........................................................

Serial No............................................................

KVA Rating: .............................., Current Rating……………

Resistance Value…………………..Ohms @...................... o C

Impedance Value……………………Ohms

2.

Visual check ITEM DESCRIPTION

1 Inspect for physical damage / defects.

2 Verify nameplate information for correctness

3 Check tightness of all bolted connections.

4 Check all grounding connections are securely connected

5 Check apparatus lists

3

3.1

Electrical Tests Impedance and Winding Resistance(DC) Measurment:

Phase Injected current in AC amps

Injected voltage in AC Volts

Calculated Impedance in Ω

Measured resistance(DC) in Ω

R Y B

Page 102

Page 103: PP10 startup manual (Unofficial as Requested)

Reactor Name Reactor Tag No Location: Ambient Temp: Humidity:

Tested by/Company Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No:TS-CL01 Page 2 of 2

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Testing of Dry type Reactor

Date:13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

3.2

Insulation Resistance Measurment. Before Hipot Test. Minimum Value:

Phase R-G Y-G B-G R-Y Y-B B-R IR in G-ohms

Test Voltage

3.3

Hipot Test at ------------ KV AC for I minute. (Power Frequency)

Leakage Current in m A Duration R-Y+B+G Y-R+B+G B-R+Y+G

15 Sec

30 Sec

45 Sec

60 Sec

3.4

Insulation Resistance Measurment. Before Hipot Test. Minimum Value:

Phase R-G Y-G B-G R-Y Y-B B-R IR in G-ohms

Test Voltage

Test Equipment Model Cal due date Test Equipment Model Cal due date

Page 103

Page 104: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

TEST

COA

O

R

-001

TING P

Riyadh Po“1062

STARTU

PROCTRA

ower plant21166/00”

UP MANUA

CEDURANSFO

t # 10

AL DF

RE FORORMER

Date:13 Feb,09

R CURR

Revision0

RRENT

n:

T

Page 104

Page 105: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-CT01, Page 1 of 9 Equipment : Current Transformer Date:13 Feb,09 Revision: 0

TABLE OF CONTENT

1. Task a. Work Status-------------------------------------------------------------------------2 b. Documentation---------------------------------------------------------------------2 c. Personnel----------------------------------------------------------------------------2 d. Measuring Instrumentation------------------------------------------------------2

2. Preconditions-------------------------------------------------------------------------------2 3. Precautions----------------------------------------------------------------------------------2 4. Scope------------------------------------------------------------------------------------------3 5. Execution-------------------------------------------------------------------------------------3

a. Visual Checks-----------------------------------------------------------------------3 b. Testing of Current Transformer

1. CT Winding insulation Resistance test--------------------------------3 2. CT Ratio test by primary injection--------------------------------------4 3. CT Winding Resistance Measurement--------------------------------4 4. CT Loop Resistance Measurements----------------------------------5 5. CT Polarity Test------------------------------------------------------------6 6. CT Burden test--------------------------------------------------------------6 7. CT Magnetizing Current Test (Knee Voltage test)-----------------7 8. Demagnetizing CT cores after above all test------------------------8 9. Inter Core Coupling Test for bus differential test------------------8 10. High voltage test------------------------------------------------------------8 11. Verifying secondary circuits, terminals, shorting/isolating links-9 by primary injection--------------------------------------------------------9 12. single point earthing check----------------------------------------------9 13. phase identification--------------------------------------------------------9

6. Documents-----------------------------------------------------------------------------------9 7. Reference-------------------------------------------------------------------------------------9 8. Attachment-----------------------------------------------------------------------------------9

Page 105

Page 106: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-CT01, Page 2 of 9 Equipment : Current Transformer Date:13 Feb,09 Revision: 0

1.0 Task

This instruction comprises a complete description of the testing of the Current transformers, the measuring circuits for protection, and closed-loop for instrumentation.

2.0 Preconditions 2.1 Work Status

• Erection has been completed. • Labelling of the equipment and designation of live enclosed plant sections

has been carried out.

2.2 Documentation • The Schematic and single line diagrams are available • Commissioning checklists TS-CT01. • Factory test results are available.

2.3 Personnel • 1 Commissioning engineer: Engineer or technician with experience in

commissioning of all the electrical equipments. • 1 Helper: skilled worker with adequate on-the-job training.

2.4 Measuring Instruments and Tools

• Single-phase variable-voltage transformer (approx. 0 -1200 V secondary voltage),

• 1 Ammeter (AC), or Fluk • 1 Voltmeter (AC), or Fluk • Multi-meter (A, V, Ohms) or Wheatstone bridge • Primary Injection test set • Insulation Tester 500V dc • Instead of above all CPC100

3.0 Precautions The work will only proceed when a Permit to Work (PTW) in work permit area has been obtained. The PTW will be kept on site for consultation during the testing works.

• Observe the rules for handling electronic components sensitive to electrostatic discharge (ESD measures).

• Special safety arrangements shall be made for all areas which are not explicitly designated as” electrical operating areas” when performing tests at voltages in excess of 50V.

• Closing of the work permit after completion of the work (if the test area is to be considered in work permit area) is necessary.

4.0 Scope • Testing cable connections, • Testing of CT’s • Checking that the mounting position is correct, • Checking of the phase and core assignment, • Checking of correct earthing, • Checking of the function.

Page 106

Page 107: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-CT01, Page 3 of 9 Equipment : Current Transformer Date:13 Feb,09 Revision: 0

5.0 Execution

5.1 Visual Checks • Checking of the cables for damage and that they are connected correctly, • Checking of the mounting position of the current transformers (polarity), • Checking of the labelling of the individual cores, checking of the

phase/core assignment • Inspection for cleanliness of current transformers, connections and

associated cable connections • Inspection of isolating terminals and earthing connections

5.2 Testing the Current Transformers Enter the rating plate data in check list TS-CT01 and compare the current transformer data with the data contained in the circuit documentation. The following test shall be carried out

1. CT Winding insulation Resistance test 2. CT Ratio test by primary injection

a. CT Ratio b. Phase Angle Error

3. CT Winding Resitance Measurement 4. CT Loop Resistance Measurement 5. CT Polarity Test 6. CT Burden test 7. CT Magnetizing Current Test (Knee Voltage test) 8. Demagnetizing CT cores after above all test 9. Inter Core Coupling Test for bus differential test 10. High voltage test 11. Verifying secondary circuits, terminals, shorting/isolating links by

primary injection 12. single point earthing check 13. phase identification

In case of multi core type current transformers each winding must be tested individually. 5.2.1 CT Winding Insulation Resistance Test

• Insulation resistance for the CT Winding is done by using 500V dc insulation resistance tester as per following schematic

• Insulation resistance shall be checked at terminal of secondary winding with respect to ground with 500V dc insulation tester.

Page 107

Page 108: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-CT01, Page 4 of 9 Equipment : Current Transformer Date:13 Feb,09 Revision: 0

A A M M E T E R

P 1

P 2

S 1

C T R A T I O T E S T A R R A N G E M E N T

S 2P R I M A R Y I N J E C T I O N T E S T S E T

Insulation test by CPC100

5.2.2 CT Ratio Test By Primary Injection/ Phase Angle Error

5.2.2.1 CT Ratio • Current ratio test can be done by injecting current in primary circuit

and measuring the current at secondary by Primary injection test set as per following schematic diagram

• Check the CT ratio by injecting current as much as near to normal current of the CT primary and measure the corresponding secondary current.

• The test is to be carried out individually for each core and phase. Use precision clamp meter and Ammeter to measure the primary and secondary current respectively Ratio test CPC100

Page 108

Page 109: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-CT01, Page 5 of 9 Equipment : Current Transformer Date:13 Feb,09 Revision: 0

5.2.2.2 Phase Angle Error

• Phase angle can be measured by using CPC100 as shown in above figure, phase angle is the angle measured between primary current through CT and the secondary current through the relay

• This test can also be performed by injecting current in primary of the CT and angle is measured between primary and secondary current flowing in to the relay.

5.2.3 CT Winding Resistance Test

CT Winding Resistance can be measured either by FLUK or Wheatstone bridge as per fallowing schematic diagram • Connect the Wheatstone bridge as shown below and measured the

CT secondary resistance and compare with name plate data • While measuring the winding resistance note down the Ambient

temperature in order to correct the value to factory test results

Winding Resistance by CPC100

5.2.4 CT Loop Resistance test CT Loop Resistance can be measured either by FLUK or Wheatstone bridge as per fallowing schematic diagram • Connect the Wheatstone bridge as shown below and measured the

loop resistance.

Page 109

Page 110: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-CT01, Page 6 of 9 Equipment : Current Transformer Date:13 Feb,09 Revision: 0

A-

+S E N S IT IV E A M M E T E R

P 1

P 2

S 1

S 2

+

-B A T T E R Y

S W IT C H

C T P O L A R IT Y T E S T A R R A N G E M E N T

5.2.5 CT Polarity Test.

CT polarities can be checked by using 9 volts battery and a zero center galvanometer as per the following Schematic Drawing

On pressing the switch momentarily in above circuit, the needle on center zero galvanometer or sensitive ammeter reads positive deflection thus polarity of the transformer is subtractive. Subtractive polarity exists when current going into the primary polarity terminal causes to go out of the secondary polarity at the same instant in time Polarity Test by CPC 100.

5.2.6 CT Burden Test

CT Burden test can be done by a variable voltage source with voltmeter and ammeter as per schematic diagram • The burden in each core of each phase is determined by injection

of a current of 1 A (or 5 A as appropriate) in the direction of the load and measurement of the voltage with respect to earth. The

Page 110

Page 111: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-CT01, Page 7 of 9 Equipment : Current Transformer Date:13 Feb,09 Revision: 0

voltage across the burden must decrease on moving from burden to burden along the current path. The measured burden should be compared with the rated data of the current transformer.

Burden measurement by CPC100

5.2.7 CT Magnetization Current test

CT Magnetization test can be done by a variable voltage source with voltmeter and ammeter as per schematic diagram

Page 111

Page 112: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-CT01, Page 8 of 9 Equipment : Current Transformer Date:13 Feb,09 Revision: 0

• Apply the voltage gradually in 10% increment of the knee voltage and note down the secondary excitation current

• Current values are obtained for every 10% voltage increment till the knee point. Knee point is the condition where 10% increase in voltage results in 50% increase in current

• Minimum two points over the knee point and five points below the knee point shall be taken.

• Readings are tabulated on a excel from where a graph is generated automatically Magnetization curve By CPC100

5.2.8 Demagnetising the CT Core

After performing the above tests, a voltage greater than knee voltage shall be applied gradually to CT secondary and reduced slowly back to zero. CPC 100 can also be used for demagnetising the CT core

5.2.9 Inter Core Coupling Test for Bus Differential CT’s

In many instances several secondary windings are mounted in close proximity on the same primary lead. It is possible, through failure of grading shields or support structures, to have coupling between cores which is not detectible by excitation tests, but it is still substantial enough to improperly operate bus differential relays. The presence of abnormal coupling can be detected by reading open circuit voltage on CT's adjacent to a CT being excitation tested. By measuring the voltage across the secondary of differential CT’s when adjacent core is excited during magnetisation current test.

5.2.10 High Voltage Test

• CT’s are subject to high voltage tests during High voltage test of switch gear.

• While performing high voltage test CT secondary should be isolated from load and kept shorted/grounded

Page 112

Page 113: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-CT01, Page 9 of 9 Equipment : Current Transformer Date:13 Feb,09 Revision: 0

5.2.11 Verification of Secondary Circuits , Terminals shorting /Isolating Links by Primary Injection During primary injection check secondary circuit terminal shorting/isolation is working properly by closing the shorting slid link and opening the slid link, there should not be any current in direction of load.

5.2.12 Phase Identification Test Check phase identification by injecting primary current in single phase Check the current in all the three phase. Two phases should read zero current and third phase whose primary has a current should read a secondary current

5.2.13 Checking the Protective Earthing and Single Point Earthing Current transformers must be earthed on the secondary side in order to afford protection to human beings. In order to avoid circulating currents such earthing is permissible at one point only of a metallically connected system. (In case of physical separation of the phases the three earthing points should be regarded as being one earthing point.) Meeting of both requirements is verified in a simple manner by opening of the earthing point link and connection thereof to a secondary testing device while simultaneously measuring the current I=0. Subsequently the earth connection is to be restored.

6.0 Documents Test Sheet TS-CT01 shall be completed for each set of instrumentation transformers.

7.0 References 8.0 Attachment

8.1 Test Sheet For Current Transformer TS-CT01

***End of the procedure ***

Page 113

Page 114: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

Riyadh Po“1062

STARTU

TES

ower plant21166/00”

UP MANUA

ST SH

t # 10

AL DF

EETS

Date:13 Feb,09

Revision0

n:

Page 114

Page 115: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: Ambient Temp:

Tested by/Company Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No:TS-CT01 Page 1 of 6

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Current Transformer

Date:13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

1.

Technical data Manufacturer: ............................................................... Type: ...............................................................

CT No Phase Serial No Ratio Rated burden Accuracy Resistance Application

R Y

B R Y

B R Y

B R Y

B N

2.

Visual check Cable connections Labelling Mounting position (polarity) Earthing connections

Page 115

Page 116: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: Ambient Temp:

Tested by/Company Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No:TS-CT01 Page 2 of 6

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Current Transformer

Date:13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

3.

Insulation test of Current transformer DC Test voltage: .................V

Insulation Resistance in M ohms

CT No. R Y B N

5.

Ratio check of current transformer:

Current in Amps CT No. Phase

Primary Secondary Calculated Ratio

% Error

Nominal Ratio

R Y B R Y B R Y B R Y B N

Page 116

Page 117: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: Ambient Temp:

Tested by/Company Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No:TS-CT01 Page 3 of 6

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Current Transformer

Date:13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

6.

Winding and loop Resistance Measurment: By Fluke or Wheatstone bridge

Measured Resistance in Ω CT No. Phase Loop with CT Rct Lead+Load Cal. Burden

R CT- Y

B R

CT- Y B R

CT- Y B R

CT- Y B N

7.

Polarity checks of Current transformer: By Battery and Galvanometer

P1: P2:

Phase R Y B CT No. S1 S2 S1 S2 S1 S2

Page 117

Page 118: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: Ambient Temp:

Tested by/Company Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No:TS-CT01 Page 4 of 6

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Current Transformer

Date:13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

8.

Magnetization Curve.

Magnetization test can be done from CPC and results can be print out Note: Print out to be attached

9 Burden Measurment :

Phase R Y B CT No. U(v) I(ma) VA U(v) I(ma) VA U(v) I(ma) VA

Rated burden

CT- CT- CT- CT-

phase Neutral CT No. U(V) I(A) VA Rated Burden

CT- CT-

10

Inter Core coupling check for bus bar differential CT’s

Injected Voltage Measured Voltage CT No Core No Phase Terminal

No Volts Freq Core No Volts

R Y B

Page 118

Page 119: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: Ambient Temp:

Tested by/Company Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No:TS-CT01 Page 5 of 6

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Current Transformer

Date:13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

11 Testing for correct phasing, ground connections, Core Function and Single point Grounding a. Core Function

CT No Core identification

Function Phase Terminal No

Obtained Knee Voltage

Actual Knee Voltage

R Y B R Y B R Y B R Y B

b. Grounding Connection /Single point Grounding

Grounding Connection CT No Phases CT Side Relay Side Single point Grounding Location

R, Y, B R, Y, B R, Y, B N

Page 119

Page 120: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: Ambient Temp:

Tested by/Company Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No:TS-CT01 Page 6 of 6

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Current Transformer

Date:13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

c. Correct Phasing Checks Current Measured at Relay

CT No Function/Relay No.

Phase Terminal No

Injected Current in Amps Term No Current

R 1 Y 0.75

B 0.5 R 1 Y 0.75

B 0.5 R 1 Y 0.75

B 0.5 R 1 Y 0.75

B 0.5 Information

CT Core No Relay No Relay Location Function

12.

Normalize the links. Check terminal screws are tightened correctly. Check the single point grounding

Test Equipment Model Cal due date Test Equipment Model Cal due date

Page 120

Page 121: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

T

: SEC-C : : BEMCO

10-BS-SU-

TESTI

COA

O

R

-001

NG PRSTE

Riyadh Po“1062

STARTU

ROCEEP UP

ower plant21166/00”

UP MANUA

DURETRAN

t # 10

AL DF

E FOR NSFOR

Date:13 Feb,09

GENERMER

Revision0

ERATO

n:

OR

Page 121

Page 122: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Form No: TP-PT01, Page 1 of 16 Equipment : Generator step up Transformer Date:13 Feb,09 Revision: 0

TABLE OF CONTENT

1. Task

a. Work Status----------------------------------------------------------------------------------------------2 b. Documentation------------------------------------------------------------------------------------------2 c. Personnel-------------------------------------------------------------------------------------------------2 d. Measuring Instrumentation---------------------------------------------------------------------------2

2. Preconditions---------------------------------------------------------------------------------------------------2 3. Precautions------------------------------------------------------------------------------------------------------2 4. Scope--------------------------------------------------------------------------------------------------------------3 5. Execution---------------------------------------------------------------------------------------------------------3

a. Visual Checks-----------------------------------------------------------------------------------------------4 b. Testing of Generator Transformer---------------------------------------------------------------------4

1. Pressure or leak test for the transformer tank--------------------------------------------------5 2. Core insulation test------------------------------------------------------------------------------------5 3. insulation resistance / Polarization index test--------------------------------------------------5 4. Voltage Ratio Measurement------------------------------------------------------------------------6 5. Vector Group/Phase Displacement---------------------------------------------------------------7 6. Magnetic Balance test--------------------------------------------------------------------------------8 7. Winding Resistance Test----------------------------------------------------------------------------8 8. impedance measurement--------------------------------------------------------------------------10 a. Single phase impedance measurement-------------------------------------------------------10 b. Zero sequence impendence measurement---------------------------------------------------11 9. Excitation current Measurement ----------------------------------------------------------------12 10. Insulation Power factor or Tan delta measurement-----------------------------------------12 11. Measurement of capacitance and tan delta of transformer bushing--------------------12 12. Measurement of breakdown voltage, moisture content of transformer----------------13 13. Temperature indicator and sensor Calibration----------------------------------------------14 14. Bushing Current Transformer--------------------------------------------------------------------14 15. Sweep Frequency Response Analysis---------------------------------------------------------14 16. Testing and commissioning of cooler control cabinet--------------------------------------14 17. Functional checks------------------------------------------------------------------------------------15 18. Testing and commissioning of Remote tap changer control panel----------------------15 19. Measurement of inrush Current and inrush current withstand test----------------------16 20. Measurement of Neutral current in no load and load condition--------------------------16 21. Particulate content of transformer oil ----------------------------------------------------------16 22. DGA-----------------------------------------------------------------------------------------------------16

6. Documents-----------------------------------------------------------------------------------------------------16 7. Reference-------------------------------------------------------------------------------------------------------16 8. Attachment-----------------------------------------------------------------------------------------------------16

Page 122

Page 123: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Form No: TP-PT01, Page 2 of 16 Equipment : Generator step up Transformer Date:13 Feb,09 Revision: 0

1. Task This instruction comprises a complete description of the testing of the generator step up transformer GSU

2. Preconditions

2.1. Work Status • Erection has been completed. • Labelling of the equipment and designation of live enclosed plant sections has

been carried out.

2.2. Documentation • The Schematic diagrams of the electrical equipment cabinets are available • Commissioning checklists TS-PT01 • Product manual of the transformer • Drawing number shall be specified along with electrical diagram • Factory acceptance report (FAT) shall be in hand during testing in order to refer

reference value • SEC approved manufactured drawings shall be available at site during field

testing • Valid Caliberation Certificates for the test equipment to be used shall be

available at site before starting the tests.

2.3. personnel • Commissioning engineer: - (1) engineer with experience in commissioning of

transformer and switch gear. • Technician or helper:- (2) skilled worker with adequate on -the-job training • Witness from the client‘s concern department

2.4. Measuring Instruments

• Ratio meter (calibrated)---1 • Multi meter(calibrated)—2 • Insulation resistance meter –megger(calibrated)—1 • CT tester( calibrated)-1 • DC shunt 100 amps( calibrated)--1 • Mini clamp(calibrated)—2 • Tan delta measurement test equipment—1 • Current injection set(calibrated)—1 • 3 phase relay tester(calibrated)—1 • Voltmeter • Transformer resistance meter • Sweep frequency Response Analyzer (SFRA) • Power Analyzer which can also record the in rush current

Page 123

Page 124: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Form No: TP-PT01, Page 3 of 16 Equipment : Generator step up Transformer Date:13 Feb,09 Revision: 0

3. Precautions

The work will only proceed when a Permit to Work (PTW) in work permit area has been obtained. The PTW will be kept on site for consultation during the testing works. • Observe the rules for handling electronic components sensitive to electrostatic

discharge (ESD measures). • Special safety arrangements shall be made for all areas which are not explicitly

designated as” electrical operating areas” when performing tests at voltages in excess of 50V.

• Closing of the work permit after completion of the work (if the test area is to be considered in work permit area) is necessary.

• Before test voltages are applied a check shall be carried out to ensure that no unauthorized persons are working at the corresponding load-where ever necessary barriers should be provided

4. Scope

• Testing of Transformer • Checking Auxiliaries and cooling system • Checking that the mounting position is correct, • Testing of bushing CT • Checking of correct earthing, • Testing of Protective devices • Adjustment of OLTC AVR for final operation

5. Execution 5.1. Visual Inspection.

Prior to carrying out electrical tests, a visual check of the transformer should be carried out paying particular attention to the following points • Equipment and cables are undamaged • Correct execution of the cable gland/sealing end • Firm cable termination/terminal connection and ferruling • Check name Plate data for correctness in accordance with approved drawings • Check all components are installed • Check for any damages, oil leakage, defectives • Check all groundings are securely connected “at least two points • Check that piping for Buchholz relay has proper slope and direction towards the

conservator • Check that Inlet &Outlet valves of Buchholz relay are OPEN • Check that the valves for Protective relay of OLTC are OPEN • Check all valves between main tank and radiator are OPEN • Check the color and quantity of Silica gel in the breather and oil pot level • Check labeling of both High & Low Voltage Bushings • Check labeling of all Aux. Devices and cables in accordance with drawings • Check proper Installation of all Aux. Devices • Check Oil level in the conservator and Bushings. • Check tightness of all wiring • Check installation of Gas Monitoring Unit “CALISTO” , sample valves are open • Check installation of On Load Tap Changer

Page 124

Page 125: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Form No: TP-PT01, Page 4 of 16 Equipment : Generator step up Transformer Date:13 Feb,09 Revision: 0

• Records from the impact recorder shall be checked once the transformer is in position for any abnormalities caused during transportation, if recorder is electronic then stored data shall be sent to vendor for analyzing (this is part of the erection activity)

• Tightness of all bolted connection to be checked and torque according to the manufacture recommendation (this is part of the erection activity)

• Horizontal and vertical clearance of live parts to adjacent ground part to shall be checked and confirm to the standard (this is part of the erection activity)

• Bushing and Neutral CT’s shall be checked for damages on connections

5.2. Commissioning of OLTC Commissioning of OLTC will ease the testing of transformer as tap changer can be operated electrically. Prior to power up OLTC control panel with auxiliary 3 phase/single phase/dc voltage, following check up shall be carried out. • Winding insulation resistance and winding resistance for the motor should be

carried out. • Insulation resistance test for the control circuit should be carried out. • After obtaining all the results and found satisfactory auxiliary power can be

switched on • voltage/phase sequence measurement shall be entered in test form • Complete operational check including interlock and alarm shall be checked

5.3. Testing of Transformer

Following tests to be carried out 1. Pressure or leak test for the transformer tank.(this is part of erection

activity) a. Vacuum with stand test b. Pressure test

2. Core insulation test 3. insulation resistance / Polarization index test 4. Voltage Ratio Measurement 5. Vector Group/Phase Displacement 6. Magnetic Balance test 7. Winding Resistance Test 8. impedance measurement

a. Single phase impedance measurement b. Zero sequence impendence measurement

9. Excitation current Measurement 10. Insulation Power factor or Tan delta measurement 11. Measurement of capacitance and tan delta of transformer bushing at

voltage of 2kv to 12kv in steps of 2kv 12. Measurement of breakdown voltage , moisture content of transformer

insulating oil 13. Temperature indicator and sensor Caliberation

a. Winding Temperature b. Oil Temperature

14. Bushing Current Transformer 15. Sweep Frequency Response Analysis 16. Testing and commissioning of cooler control cabinet 17. Functional checks

a. Functional checks of protection devices

Page 125

Page 126: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Form No: TP-PT01, Page 5 of 16 Equipment : Generator step up Transformer Date:13 Feb,09 Revision: 0

b. Functional checks of alarms c. Functional check of measuring devices

18. Testing and commissioning of Remote tap changer control panel 19. Measurement of inrush Current and inrush current withstand test 20. Measurement of Neutral current in no load and load condition 21. Particulate content of transformer oil after completion of testing and three

days of enrgization 22. DGA shall be carried out transformer insulating oil after three days and

after month of energization.

5.3.1. Pressure or Leak Test for the Transformer Tank.(this is part of erection activity)

5.3.1.1. Vacuum with Stand Test After complete assembly including coolers, bushings, conservator and other accessories, transformer tank has to be vacuumed to <1 mbar or 750 tar and maintain for minimum six hours

5.3.1.2. Pressure Test /Leak Test After complete assembly including coolers, bushings, conservator and other accessories and oil filled, the transformer tank has to be filled with nitrogen or dry air and maintain pressure to 0.3kgf/cm2 for 12 hours

5.3.2. Core Insulation Test

The insulation resistance between core and earth shall be done for one minute with 3500 V dc megger, as per following connection Core – Earth

5.3.3. Insulation Resistance/Polarization Index Test Testing of insulation resistance and polarization index shall be carried out as under Apply the test voltage (5KV DC) on following Connection and note down the readings Two Winding Transformer

HV – Earth LV – Earth HV-LV

Three Winding Transformer HV – Earth LV1 –Earth LV2 –Earth HV -LV1 HV -LV2 LV1 -LV2

The insulation resistance measurement is done from 15 seconds to 1 minute with 15 seconds interval and then for every minute up to ten minutes. Value obtained at 10 minute divided by value at 1 minute gives polarization index Please refer below figures for connection and test arrangement

Page 126

Page 127: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Form No: TP-PT01, Page 6 of 16 Equipment : Generator step up Transformer Date:13 Feb,09 Revision: 0

Figure-1

Figure-2

Figure-3

5.3.4. Voltage Ratio Measurement The voltage ratio measurement for two or three winding power transformer can be done either by conventional method using Voltmeters or by using Turns ratio Meter

The test will be mad for each and every phase at all tap position as follows.

Page 127

Page 128: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Form No: TP-PT01, Page 7 of 16 Equipment : Generator step up Transformer Date:13 Feb,09 Revision: 0

Figure -4 For Two winding Transformer

• Apply 3 phase Voltage more then 220V on HV Winding and measure the corresponding voltages at the LV winding

• Note down both HV and LV winding side voltages for all the three phase and at all tap position

For Three winding Transformer

• Apply 3 phase Voltage more then 220V on HV Winding and measured the corresponding voltages at the LV1 and LV2 windings.

• Noted HV ,LV1and LV2 winding side voltages on all the three phase

and at all tap positions

5.3.5. Vector Group Check The vector group or phase relationship can be checked by injecting three phase supply and measuring the voltages as per the figure below One of the phase say 1U and 2U between HV and LV should be shorted together and three phase low voltage is applied on HV terminals. Then the voltage between various pairs of line terminal should be measured and compared

Figure-5 Example: condition for Yn1d1d1 is, the voltage between 1V-2W> 1W-2W=1W-2V=1V-2W

Page 128

Page 129: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Form No: TP-PT01, Page 8 of 16 Equipment : Generator step up Transformer Date:13 Feb,09 Revision: 0

Figure-6

5.3.6. Magnetic Balance Test This test can be done by applying 380 volts 60 Hz single phase supply across phase and neutral of HV winding and voltage induced on other two phases are measured Test shall be carried out at lowest, middle and highest tap

Figure-7

5.3.7. Winding Resistance Measurement The Winding resistance measurement can be done by either conventional method using 2V /50A DC battery with voltmeter and Ammeter or by Transformer resistance meter.

The winding resistance for HV winding will be measured by a drop of potential method on all windings by injecting 50A DC through the winding as shown below.

Page 129

Page 130: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Form No: TP-PT01, Page 9 of 16 Equipment : Generator step up Transformer Date:13 Feb,09 Revision: 0

Figure-8

Figure-9 The winding resistance for LV winding shall be measured by a drop of potential method on all the three windings by injecting 100A DC through the winding as shown Figure-10 to 12.

Figure-10

Page 130

Page 131: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Form No: TP-PT01, Page 10 of 16 Equipment : Generator step up Transformer Date:13 Feb,09 Revision: 0

Figure-11

Figure-12 For the Y connected transformer the measurement should be made between each line and neutral bushing and for the delta connection, the measurement shall be made between each pair of bushing and then single phase value is equal to three half of the measured value. The measured values should be compared with factory value, for that a conversion for the temperature correction should be done by using following formula. R75 = Ra x 234.5+75 234.5+Ra Where as R75 = Corrected Resitance in ohms Ra = Measured Resistance at ambient temperature in ohms Ta = Ambient temperature in 0 C

5.3.8. Impedance Measurement 5.3.8.1. Single Phase Impedance Measurement

The impedance should be measured at lowest, nominal, and highest tap position as follows. Connection will be made as shown in below figure. Apply about three phase 220 Vac to the transformer HV terminals and measure the current and voltages. Single phase Impedance can be calculated as follows Zu =1/2(Zuv+Zwu-Zvw) Zv =1/2(Zvw+Zuv-Zwu) Zw = 1/2(Zwu+Zvw-Zuv)

Page 131

Page 132: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Form No: TP-PT01, Page 11 of 16 Equipment : Generator step up Transformer Date:13 Feb,09 Revision: 0

Figure-13 In case, exclusively single phase measurement is required, where some experts do not agree with above test, follow the figure given below

Impedance voltage will be calculated to the rated current.

Figure-14

5.3.8.2. Zero Sequence Impedance Measurement The Zero sequence impedance is usually measured for all star or zigzag winding connected transformers Open Circuit zero sequence impedance is measured by applying single phase 220V 60 Hz between neutral and all the three phases shorted with other windings open circuited Connection shall be made as shown in figure-15. Zzq = 3V/I

Figure-15 Short Circuit zero sequence impedance is measured by applying single phase 220V 60 Hz between neutral and all the three phases shorted with other windings short circuited

Page 132

Page 133: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Form No: TP-PT01, Page 12 of 16 Equipment : Generator step up Transformer Date:13 Feb,09 Revision: 0

Measurement connection shall be made as shown in figure-16. Zzq = 3V/I

Figure-16

5.3.9. Magnetization Current Measurement.

Test connection will be done as shown in the following drawing. Apply 380V, 60 HZ to the transformer HV terminals and measure the current and corresponding voltage for all the tap position

Figure-17

5.3.10. Insulation Power Factor or Tan Delta and Excitation current at 2 to 12KV

Measurement

• The test shall be made on each winding to ground and between the windings with Doble or Megger tan delta equipment. Please refer the tan delta measurement equipment guide to perform the test

• Reading shall be obtained from 2KV to 12KV in every 2 kv step. • Same time Excitation current for all the windings are noted down. Note: SEC-ERB standard SEC-GMSS01 ask for 2-20KV but most of the equipment available in the market is only up to 12 KV even DOBLE 2H is up to 12 KV only.

5.3.11. Measurement of Capacitance and Tan Delta of Transformer Bushing at Voltage 2kv to 12kv in steps of 2kv Usually bushings above 23kv will have a power factor or a capacitance

tap which can be used to perform capacitance and dissipation factor measurement with out disconnecting the bushing from the winding.

The test is done under UST (ungrounded specimen test) mode as shown in figure below.

Page 133

Page 134: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Form No: TP-PT01, Page 13 of 16 Equipment : Generator step up Transformer Date:13 Feb,09 Revision: 0

the readings of capacitance and dissipation factor for the bushings shall be obtained for the test voltage of 2kv to 12kv in steps of 2kv

Figure-17 Above figure Measures main bushing insulation C 1 C HG , C HL , and C 3 shunt power supply, therefore no influence on measurement C 2 shunts bridge winding, therefore negligible influence if less than 5000 pF

5.3.12. Measurement of Breakdown Voltage, Moisture Content and DGA of Transformer Insulating Oil. Oil sample shall be taken from bottom, top of the main tank, OLTC

chamber and also from the conservator tank, De-electric test for the oil should be performed as per IEC 156 using de-

electric machine Except for the dielectric breakdown and power factor tests all other tests must be performed at a SEC approved laboratory and the results are to be submitted to SEC-COA for review and approval. a) Dielectric strength:

Page 134

Page 135: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Form No: TP-PT01, Page 14 of 16 Equipment : Generator step up Transformer Date:13 Feb,09 Revision: 0

i) ASTM D 877 (with 2.5 mm gap) for unprocessed oil & for oil in OLTC

ii) ASTM D 1816 (with 1.0 mm gap) for oil in Transformer Main Tank b) Neutralization Number (ASTM D 974) c) Interfacial tension (ASTM D 971) d) Color (ASTM D 1500) e) Moisture content (ASTM D 1533A) f) Power factor test (ASTM D 924) g) Dissolved gas in oil analysis (ASTM D 3612)

5.3.13. Temperature indicator and sensor. 5.3.13.1. Oil Temperature

The oil and winding temperature indicators shall be calibrated by heat sink with thermometer.

5.3.13.2. Winding Temperature

The winding temperature indicator shall be checked by current injection at the heater element.

5.3.14. Bushing Current Transformer

Following tests should be done on all the bushing transformers • Ratio test • Magnetization curve (measurement shall be for minimum 5 points

below and 2 points after the knee point) • Polarity test • Insulation test • Winding resistance test • Loop resistance test

All the test results shall be entered in the test form No.TS-CT01of the transformer. Refer TP-CT01 for the test procedure

5.3.15. Sweep Frequency Response Analysis Sweep frequency response analysis is tool which gives an indication of winding or core movement, deformation of winding axial or radial, spiraling short or open turns etc. The test can be performed by using DOBLE M5100 test equipment (please refer M5100 manual for test procedure). Test results are stored as a baseline reference and can be verified with results obtained during factory testing or can also be verified with the results of sister transformer in case factory results are not available. The test can also be performed once the transformer arrives and bushings are connected with no oil, provided no combustible gas in. This gives confidence in the mechanical integrity of the unit prior to further work and commissioning.

5.3.16. Testing and Commissioning of Cooler Control Cabinet Prior to power up cooler control cabinet with auxiliary 3 phase/single phase/dc voltage, following check s shall be carried out.

Page 135

Page 136: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Form No: TP-PT01, Page 15 of 16 Equipment : Generator step up Transformer Date:13 Feb,09 Revision: 0

Winding insulation resistance and winding resistance for the fan motors should be carried out.

Insulation resistance test for the control circuit should be carried out. After obtaining all the results and found satisfactory auxiliary power can

be switched on and voltage/phase sequence measurement should be carried out.

Manual/auto operation of the fans should be checked Heater and lighting circuit should be checked and made functional. 2KV, 60HZ, Power frequency withstand test on all control/auxiliary and

CT secondary circuit shall be performed Measurement of power, current/inrush current for the individual fan and

group shall be carried out

5.3.17. Functional Check 5.3.17.1. Functional Checks of Protective Devices

Trip shall be simulated from buchholz relay. tripping of protection relay and breakers should be observed,

Trip shall be simulated from pressure relay. tripping of protection relay and breakers should be observed,

Trip shall be simulated from pressure relief relay. tripping of protection relay and breakers should be observed,

Trip shall be simulated from oil and winding temperature indicator. Tripping of protection relay and breakers should be observed.

Results for above tests shall be entered in the test form No.TS-PT01 of the power transformer.

5.3.17.2. Functional Checks of Alarms

Alarm Shall be simulated from buchholz relay and observe at local and remote annunciator

Alarm shall be simulated from pressure relay and observe at local and remote annunciator

Alarm shall be simulated from pressure relief relay. and observe at local and remote annunciator

Alarm shall be simulated from oil and winding temperature and observe at local and remote annunciator

Results for above tests shall be entered in the test form No.TS-PT01 of the power transformer

5.3.17.3. Functional Checks of Measuring Devices

Measuring devices like temperature transducer shall be checked for its functionality by using multi loop calibrators

5.3.18. Testing and Commissioning of Remote tap Changer Control

panel(RTCC) Prior to power up RTCC with auxiliary Single phase/dc voltage, following check up shall be carried out. Insulation resistance test for the control circuit should be carried out. After obtaining all the results and found satisfactory auxiliary power can

be switched on and voltage/phase sequence measurement shall be entered in test form No TS-TP01.

AVR should be calibrated

Page 136

Page 137: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Form No: TP-PT01, Page 16 of 16 Equipment : Generator step up Transformer Date:13 Feb,09 Revision: 0

Manual/auto operation of the tap changer should be checked Alarm on annunciation shall be checked Remote operation that is from DCS and SCADA should be checked Tap position indication should be checked both on local panel and

DCS/SCADA. Heater and lighting circuit should be checked and made functional.

5.3.19. Measurement of Inrush Current.

Inrush current measurement shall be carried out by chart recorder or inrush current measurement instruments

As inrush current depends on switching instant, minimum three readings shall be taken at different occasion.

Inrush current can also be noted down from the Transformer management relay by programming the relay to trigger the oscillography for the pickup current

5.3.20. Measurement of Neutral Current in No Load and Load Condition

Neutral current under no load and load condition shall be measured once the transformer is energized, this can be measured directly on the neutral of the transformer with clamp meter Values for no load current may be more then that of under load condition; this is due to unbalanced magnetization current.

5.3.21. Particulate Content of Transformer Oil after Completion of Testing and

after three days of Energization Please refer 5.3.12 of this procedure

5.3.22. DGA of Transformer Insulating Oil.

DGA prior to energization, three days and one month after the energization must be performed at a SEC-COA approved laboratory and the results shall o be submitted to SEC-COA review and approval.

6. Documents Test sheet TS-PT01 shall be completed

7. References 1. SEC-ERB Standards SCS-P-105, SEC-GMSS-01 2. IEC 60076 3. Manual of DOBLE-M5100

8. Attachment

8.1. Test Sheet for Three Winding Transformer TS-PT01

***End of the procedure***

Page 137

Page 138: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

Riyadh Po“1062

STARTU

TES

ower plant21166/00”

UP MANUA

ST SH

t # 10

AL DF

EETS

Date:13 Feb,09

Revision0

n:

Page 138

Page 139: PP10 startup manual (Unofficial as Requested)

Client : SEC-COAContractor: BEMCO

XFMR TAG: Location:

Tests Page No1. NAME PLATE DETAILS 2

2. MECHANICAL CHECKS AND VISUAL INSPECTION 23. MEASUREMENT OF VOLTAGE RATIO 34. MEASUREMENT OF WINDING RESISTANCE 55. MEASUREMENT OF MAGNETIZING CURRENT 66. CHECK OF PHASE DISPLACEMENT 77. MAGNETIC BALANCE TEST 78. INSULATION RESISTANCE TEST: 89. SHORT CIRCUIT IMPEDANCE MEASURMENT@ 180MVA BASE 910. ZERO SEQUENCE IMPEDANCE MEASURMENT 1211.INSULATION POWER FACTOR/TAN DELTA MEASURMENT 1312.CALIBERATION OF WINDING TEMPERATUR INDCATORS BY CURRENT INJECTION 1413.CALIBERATION OF WINDING AND OIL TEMPERATUR INDCATORS 1514. TEST OF PROTECTION AND AUXILARY CIRCUITS: 1615. CHECKS ON COOLER CONTROL SYSTEM 1716. CHECK LIST FOR COOLER CONTROL SYSTEM OPERATION CHECK 1817. PROTECTION DEVICES FUNCTIONAL CHECK 1918.OLTC CONTROL PANL CHECKS 20

19. TAP POSITION ON INDICATION CONTACTS CHECK 21

SECTested By BEMCONameCompany

DateSignature

Index

Date: 13/02/09 Rev:0Serial No.:

SITE TEST REPORT

Riyadh Power Plant #10 "10621166/00"

Testing of 380/13.8/13.8 KV, 220MVA GSU XFMR

Form No. TS-PT01Page 1 of 21

Page 139

Page 140: PP10 startup manual (Unofficial as Requested)

Client : SEC-COAConsultant:Contractor: BEMCO

XFMR TAG: Location:

1. NAME PLATE DETAILS

2. MECHANICAL CHECKS AND VISUAL INSPECTIONa Check name Plate data for correctness in accordance with approved drawingsb Check all components are installedc Check for any damages, oil leakage, defectivesd Check all groundings are securely connected “at least two points e Check that piping for Buchholz relay has proper slope and direction towards the conservatorf Check that Inlet &Outlet valves of Buchholz relay are OPEN g Check that the valves for Protective relay of OLTC are OPENh Check all valves between main tank and radiator are OPENi Check the colour and quantity of Silica gel in the breather and oil pot levelj Check labelling of both High & Low Voltage Bushingsk Check labelling of all Aux. Devices in accordance with drawingsl Check proper Installation of all Aux. Devices m Check Oil level in the conservator and Bushings.n Check tightness of all wiringo Check installation of Gas Monitoring Unit “CALISTO” , sample valves are openp Check installation of On Load Tap Changerq Check installation of Hydraulic Plate (showing valve status : filling & vacuum)

146/183/220 MVA

Riyadh Power Plant #10 "10621166/00"

Testing of 380/13.8/13.8 KV, 220MVA GSU XFMR

Form No. TS-PT01Page 2 of 21

Cooling MethodYNd1d1

ManufactureVector Group Rated Capacity

Rated Voltage

Date: 13/02/09 Rev:0Serial No.:

SITE TEST REPORT

Rated Frequency

ONAN/ONAF1/ONAF2

380/13.8/13.8 KV60 Hz

NAOn Load Tap Changer NA NA

NA

Current Transformer Data

Description

Type : RIII 1200Y-123/D - 14 27 3GP

Ratio Class

NA

Date

HV/LV1+LV2LV1-LV2

NA

Signature

Burden VA Terminal

246.5POS.15/HV POS.25/HV

HV/LV1Winding Temp Rise

Oil Temp RisePOS.25/HVPOS.1/HV POS.15/HV

371.4ONAF1 183 380ONAF2 220

308.9

Rated Power MVA

Pos

293.2 334.3

194.6243.9 278

Max Ambient Temp.Short Circuit Impedence % base 110MVA

18

LV1/LV2HV LV1Current (A)

POS.1/HV

NAHV/LV2 Hot spot Temperatur RiseNA

Tested By BEMCOName

MR

Company

NA

4602.06

63 K

ONAN 146

45 K

221.8

55C50 K

3828.083054.09

SEC

Page 140

Page 141: PP10 startup manual (Unofficial as Requested)

Client : SEC-COAConsultant:Contractor: BEMCO

XFMR TAG: Location:

Ambient Temp: Humidity Oil Temperature:

3. MEASUREMENT OF VOLTAGE RATIOA. HV to LV1

2U1U Note : Transformation ratio error =

kn-k x 100k

1V 2W 3U 2V Where, kn : Name plate transformation Power Source 1N ratio. ( Calculated ratio)60 HZ 380 V k : Actual measured

1W 3V transformation ratio3W

11.94511.823

11.335

100.0011.70111.579

100.00100.00100.00

100.00100.00

100.00100.00 12.189100.00

12.31

12.067

100.00

100.00100.00

12.9212.798

13.042

13.285

100.00100.00 12.432

100.00

12.676

Date: 13/02/09 Rev:0

100.00

100.00100.00

421.8 18

414.2

13.651

2223

100.00100.00

361 18

13.52913.407

13.164

100.0012.554

345.8

100.0018353.4349.6

1818

357.2

100.00

100.00100.00

100.00100.00100.00

100.00

100.00

24 18100.00

100.00 100.00

100.00100.00

25 18342 100.00

100.00

100.00

100.00

100.00

100.00100.00

100.00100.00100.00100.00

100.00

100.00100.00100.00100.00

100.00

100.00

364.818

1818

18

18

380376.2

18

100.00

100.00100.00

100.00100.00

1818

13

18181818

18

45

368.6

399395.2391.4

383.8

372.4

387.6

11

RatedRatio

3100.00

6

1

18

18100.00 13.773

100.00 100.00 13.895100.00

Error %

MEASURED RATIO

100.00

425.6 18429.4 18433.2

TapNo

Tap Voltage (kV)

LV1HV

78

418

402.8

410.4406.6

12

9

2

21

1920

1415161718

10

Tested By

11.09210.97

100.00

11.457

100.00 100.0011.213

100.00100.00

RatioError %

R-Phase1U-1N / 2U-2V

Ratio

B-Phase1W-1N / 2W-2U

Y-Phase1V-1N / 2V-2W

100.00

100.00

100.00

100.00100.00

SEC

18

100.00

Ratio

Riyadh Power Plant #10 "10621166/00"

Testing of 380/13.8/13.8 KV, 220MVA GSU XFMR

Form No. TS-PT01Page 3 of 21

Date

BEMCOCompanyNameSignature

Test Equipment Model Cal Due Date Test Equipment Model Cal Due Date

SITE TEST REPORT

Error %

Serial No.:

v1 ~

v3

v2

Page 141

Page 142: PP10 startup manual (Unofficial as Requested)

Client : SEC-COAConsultant:Contractor: BEMCO

XFMR TAG: Location:

Ambient Temp: Humidity Oil Temperature:

3. MEASUREMENT OF VOLTAGE RATIOB. HV to LV2

1U 2U Note : Transformation ratio error =kn-k x 100

k

1V 2W 3U 2V Where, kn : Name plate transformation Power Source 1N ratio. ( Calculated ratio)60 HZ 380 V k : Actual measured

1W 3V transformation ratio3W

Model Cal Due Date

18

395.2

100.00

Test Equipment Model Cal Due Date Test Equipment

353.4349.6

18 100.00100.00

100.0018

364.8

23

18

1836121 357.2

18

1818181818

402.8399

376.2372.4368.6

383.8

18

380

Date: 13/02/09 Rev:0

8910

421.8418

414.2

406.6

18433.2

25 1834224 18345.8

22 11.33511.213

100.00100.00100.00100.00 100.00

100.00

11.70111.579

11.823

10.9711.092

100.00 11.457100.00100.00

100.00100.00

12.9212.798

11.945

12.55412.676

100.00100.00

13.65113.529

13.28513.164

12.43212.31

100.00100.00

12.18912.067

100.00100.00100.00

13.042

100.00

100.00100.00

100.00100.00

100.00

100.00100.00

100.00

100.00

100.00

100.00

100.00

100.00100.00

100.00100.00

100.00

100.00

100.00100.00100.00

100.00100.00100.00100.00

100.00

100.00100.00100.00

13.773100.00 100.00 13.895

13.407100.00

100.00100.00100.00

100.00100.00100.00100.00100.00100.00

100.00100.00100.00100.00100.00

18 100.00

1112

387.6391.4

1818

18181818

18

1818

18

6

Name

1920

13141516

410.4

17

TapNo

Tap Voltage (kV)

LV2HV

23

1

425.6429.4

Serial No.:

SECBEMCO

SignatureDate

45

Tested ByCompany

7

Ratio

MEASURED RATIO

Ratio

B-Phase1W-1N / 3W-3U

Error %

100.00100.00

100.00

Riyadh Power Plant #10 "10621166/00"

Testing of 380/13.8/13.8 KV, 220MVA GSU XFMR

Form No. TS-PT01Page 4 of 21

100.00100.00

SITE TEST REPORT

Error %

RatedRatio

R-Phase1U-1N / 3U-3VRatio Error %

Y-Phase1V-1N / 3V-3W

v1 ~

v3

v2

Page 142

Page 143: PP10 startup manual (Unofficial as Requested)

Client : SEC-COAConsul : Saud ConsultContractor: BEMCO

XFMR TAG: Location:Ambient Temp: Humidity Oil Temperature:4. MEASUREMENT OF WINDING RESISTANCEA. HV WINDING

B. LV 1 WINDING

C. LV 2 WINDING

Company Tested By BEMCO SECNameSignatureDate

75 0C ResistanceResistance TempMeasured OIL

Temp

Measured

OIL Temp

Temp

75 0C

Cal ResistResistance Temp 75 0C

B - Phase ( 3W - 3U ) ΩCal Resist

75 0CResistance

R - Phase ( 2U - 2V ) Ω B - Phase ( 2W - 2U ) ΩY - Phase ( 2V - 2W ) Ω

ResistanceMeasured OIL Cal Resist Measured OIL Cal Resist OIL

Cal ResistResistance Temp 75 0CMeasured OIL Measured

TempOIL

Resistance 75 0C Resistance Temp 75 0C

B - Phase ( 1W - 1N ) Ω

12

TapNo

R - Phase ( 1U - 1N ) Ω Y - Phase ( 1V - 1N) ΩMeasured OIL Cal ResistCal Resist

3456789

1011121314

1615

Resistance Temp 75 0C

Page 5 of 21Form No. TS-PT01

2524

17181920

22

TapNo

21

13

Riyadh Power Plant # 10 "10621166/00"

Testing of 380/13.8/13.8 KV,220KVA GSU XFMRDate: 13/02/09 Rev:0

23

75 0C

Y - Phase ( 3V - 3W ) ΩMeasured OIL Cal Resist Measured Cal Resist

Serial No.:

Test Equipment Model Cal Due Date Test Equipment Model Cal Due Date

13

TapNo

R - Phase ( 3U - 3V ) Ω

Page 143

Page 144: PP10 startup manual (Unofficial as Requested)

Client : SEC-COAConsultant:Contractor: BEMCO

XFMR TAG: Location:Ambient Temp: Humidity Oil Temperature:5. MEASUREMENT OF MAGNETIZING CURRENTA. AT HIGH VOLATGE SIDE

mA

1U 2u

2w1N

Power Source 2v60 HZ 380 V

1W 1V

Test Equipment Model Cal Due Date

B-PhaseMAGNATIZING CURRENT

18

12

24

20

2223

21

25

1716

19

151413

11

60 Hz

1098

67

45

TapNo

12

Voltage Frequency

(Hz)R-Phase

3

Riyadh Power Plant #10 "10621166/00"

Testing of 380/13.8/13.8 KV, 220MVA GSU XFMR

Form No. TS-PT01

Y-PhaseVoltage

Date: 13/02/09 Rev:0 Page 6 of 21

mA Voltage mARemarks

Voltage

Serial No.:

Signature

Model Cal Due DateTest Equipment

Company Tested By BEMCO SECName

Date

V ~A

Page 144

Page 145: PP10 startup manual (Unofficial as Requested)

Client : SEC-COAConsultant:Contractor: BEMCO

XFMR TAG: Location:

6. CHECK OF PHASE DISPLACEMENT

1V 1V

2V 3V1U 1U

1W 1W2U 2W 3U 3W

7. MAGNETIC BALANCE TESTSINGLE PHASE INJECTION

Taped Single phase voltage Measured Voltage 1U-1N 1V-1N 1W-1N 2U-2V 2V-2W 2W-2V

1U

1V 2W 2VPower Source 1N60 HZ 380 V

SECCompany Tested By BEMCO

Cal Due DateTest Equipment Model Cal Due Date Test Equipment Model

25

Date

1 1V - 2W > 1V - 2V =1W - 2V = 1W - 2W

1

15

Sl no

NameSignature

Vector Relation (Subtractive)

YNd1

Result

HV 1U-1V= 466.8

1U - 3U

Riyadh Power Plant #10 "10621166/00"

Testing of 380/13.8/13.8 KV, 220MVA GSU XFMR

Form No. TS-PT01Page 7 of 21Date: 13/02/09 Rev:0

Serial No.:

SITE TEST REPORT

Tap Voltage(kV)

AppliedWinding Voltage Connection Measured Voltage (V)

1V-3W 1V-3V 1W-3V

1V-2V 1W-2V 1W-2W

Result

1V-2WHV 1U-1V= 467.8

1U - 2 U

Result

1V - 3 > 1V - 3V =1W - 3V = 1W - 3W

1W-3W

YNd1

Vector Relation (Subtractive)

V1 ~v2

V2V2

Page 145

Page 146: PP10 startup manual (Unofficial as Requested)

Client : SEC-COAConsultant:Contractor: BEMCO

XFMR TAG: Location:Ambient Temp: Humidity Oil Temperature:

8. INSULATION RESISTANCE TEST:

LV1-LV2 5KV

CORE-TANK 1KV

LV1-TANK 5KV

LV2-TANK 5KV

60 Sec 600 Sec

HV-TANK 5KV

IR @20 OC

Serial No.:

SITE TEST REPORT

Insutation Resistance in …….. GΩ

HV-LV2 5KV

Date: 13/02/09 Rev:0

15 Sec

HV-LV1 5KV

Riyadh Power Plant #10 "10621166/00"

Testing of 380/13.8/13.8 KV, 220MVA GSU XFMR

Form No. TS-PT01Page 8 of 21

Company Tested By BEMCO SEC

IR

DateSignatureName

IR @20 OC

Measurment Test Voltage Oil

Temp IR @20

OCIR Oil

Temp IR Oil Temp

Test Equipment Model Cal Due Date Test Equipment Model Cal Due Date

CORE CLAMP-TANK 1KV

Page 146

Page 147: PP10 startup manual (Unofficial as Requested)

Client : SEC-COAConsultant:Contractor: BEMCO

XFMR TAG: Location:Ambient Temp: Humidity Oil Temperature:

9. SHORT CIRCUIT IMPEDANCE MEASURMENT @ 180MVA BASEa. HV -LV1 Winding at Tap 1

b. HV -LV1 Winding at Tap 15

c. HV -LV1 Winding at Tap 25

1U 2U

1V

2W 2VPower Souce60 Hz 380 V 1W

1U 2U

1V

2W 2V

Power Souce 1W60 Hz 380 V

1V

2W 2V

Power Souce 1W60 Hz 380 V

Model Cal Due DateTest Equipment Model Cal Due Date Test Equipment

2V,2W2W,2U

ImpedanceLV1 Winding

shorted

2W,2U

2U,2VImpedance

LV1 Winding shorted

Tap. 25

Tap. 15

342 KV

R-NPhase Injected Voltage

Y-N

current (A)

B-N

Phase

Y-N

B-N185.7 A

433.2 KV146.6 A

380 KV167.15 A

R-N

Y-NB-N

Factory tested Impedance @

Factory tested Impedance @

2U,2V2V,2W2W,2U

Injected Voltage current (A)

Signature

SECBEMCO

Date

Company Tested ByName

Date: 13/02/09 Rev:0 Page 9 of 21

Serial No.:

Tap. 1LV1 Winding

shortedPhase ImpedanceR-N

Injected Voltage

Riyadh Power Plant #10 "10621166/00"

Testing of 380/13.8/13.8 KV, 220MVA GSU XFMR

Form No. TS-PT01

SITE TEST REPORT

Factory tested Impedance @ current (A)

2U,2V2V,2W

A1

V1

A3V3

A3

V2

Page 147

Page 148: PP10 startup manual (Unofficial as Requested)

Client : SEC-COAConsultant:Contractor: BEMCO

XFMR TAG: Location:Ambient Temp: Humidity Oil Temperature:

9. SHORT CIRCUIT IMPEDANCE MEASURMENT @ 180MVA BASEa. HV -LV2 Winding at Tap 1

b. HV -LV2 Winding at Tap 15

c. HV -LV2 Winding at Tap 25

1U 3U

1V

3W 3VPower Souce60 Hz 380 V 1W

1U 3U

1V

3W 3V

Power Souce 1W60 Hz 380 V 3U

1V

3W 3V

Power Souce 1W60 Hz 380 V

SITE TEST REPORT

Factory tested Impedance @ current (A)

2U,2V2V,2W

Riyadh Power Plant #10 "10621166/00"

Testing of 380/13.8/13.8 KV, 220MVA GSU XFMR

Form No. TS-PT01Date: 13/02/09 Rev:0 Page 10 of 21

Serial No.:

Tap. 1LV1 Winding

shortedPhase ImpedanceR-N

Injected Voltage

Company Tested ByName

Date

SECBEMCO

Signature

2U,2V2V,2W2W,2U

Injected Voltage current (A)Factory tested Impedance @

Factory tested Impedance @

Y-NB-N

B-N185.7 A

433.2 KV146.6 A

380 KV167.15 A

R-NY-N

current (A)

B-N

Phase

Y-N

Tap. 25

Tap. 15

342 KV

R-NPhase Injected Voltage

2W,2U

2U,2VImpedance

LV1 Winding shorted

Cal Due Date Test Equipment

2V,2W2W,2U

ImpedanceLV1 Winding

shorted

Model Cal Due DateTest Equipment Model

A1

V1

A3V3

A3

V2

Page 148

Page 149: PP10 startup manual (Unofficial as Requested)

Client : SEC-COAConsultant:Contractor: BEMCO

XFMR TAG: Location:

9. SHORT CIRCUIT IMPEDANCE MEASURMENT @ 180MVA BASEg. HV -LV1& LV2 Winding at Tap 1

h. HV -LV1& LV2 Winding at Tap 15

i. HV -LV1& LV2 Winding at Tap 25

j. LV1-LV2 Winding at Tap 13

Impedance Voltage = ( H.V Rated Tap. Current x Average Voltage) ÷ Average Current

= VPercentage Impedance = ( Impedance Voltage ÷ H.V Rated Tap. Voltage ) x 100

Z = %

Test Equipment Model Cal Due Date Test Equipment Model Cal Due Date

2W,2U

ImpedanceLV Winding

shorted380 KV

167.15 A

Tap. 15 Phase

Y-NR-N

B-N

Injected Voltage

2W,2U

SITE TEST REPORT

2U,2VTap. 1

Factory tested Impedance @

433.2 KV146.6 A

current (A) Impedance

Y-N

Date: 13/02/09 Rev:0 Page 11 of 21Serial No.:

Factory tested Impedance @

342 KV185.7 A

2U,2V2V,2W2W,2U

R-NY-N

PhaseR-N

Injected Voltage

Riyadh Power Plant #10 "10621166/00"

Testing of 380/13.8/13.8 KV, 220MVA GSU XFMR

Form No. TS-PT01

Tap. 25 Phase Injected Voltage current (A)

B-N

Factory tested Impedance @

2V,2W

2V,2W2U,2V

LV Winding shorted

current (A)

B-N

DateSignature

Company Tested ByName

LV Winding shortedImpedance

SEC

2U,2V

BEMCO

LV Winding shorted

Factory tested Impedance @ ImpedanceTap. 13 Phase Injected Voltage current (A)

R-N

2W,2UY-N 2V,2WB-N

Page 149

Page 150: PP10 startup manual (Unofficial as Requested)

Client : SEC-COAConsultant:Contractor: BEMCO

XFMR TAG: Location:Ambient Temp: Humidity Oil Temperature:

10. ZERO SEQUENCE IMPDANCE MEASURMENT 10. 1. Open circuit Zero Sequence impedance

1U 2U

1V

2W 2VPower Souce 1W60 HZ 220 V 3U

3W 3V

10. 1. Short circuit Zero Sequence impedance

1U 2U

1V

2W 2VPower Souce 1W60 HZ 220 V

3U1 Correction Zero Sequence Impedance Voltage(V)

= (Measured Voltage X Rated Current X )/ Suuply Currrent3W

2 Zero Sequence Impdance% 3V= 300 X [Measured Voltagae X 1.732/Rated Volatge] X (Rated Current/supply current)

3 Ohm/Phase=3 X Measured Voltage/ Supply Cuurent

Model Cal Due Date

Serial No.:

LV Winding Shorted

Factory tested Impedance @

LV Winding Open Factory tested Impedance @ Impedance

Phase

BEMCO

Date

SEC

Phase Injected Voltage current (A)

Signature

Company Tested ByName

Riyadh Power Plant #10 "10621166/00"

Testing of 380/13.8/13.8 KV, 220MVA GSU XFMR

Form No. TS-PT01Date: 13/02/09 Rev:0 Page 12 of 21

SITE TEST REPORT

Injected Voltage current (A) Impedance

1

Test Equipment Model Cal Due Date Test Equipment

2U,2V,2W2513

25

113 2U,2V,2W

A1

V1

A1

V1

Page 150

Page 151: PP10 startup manual (Unofficial as Requested)

Client : SEC-COAConsultant:Contractor: BEMCO

XFMR TAG: Location:Ambient Temp: Humidity Oil Temperature:

11.INSULATION POERFACTOR/TAN DELTA MEASURMENT

A. Tandelta and capacitance Measurment for winding Ambient Temp:

B. Tandelta and capacitance Measurment for Bushing Ambient Temp:

Test Equipment Model Cal Due DateTest Equipment

1 C(H-G)+C(HV-LV1) GST

connection Sl. No. Capacitance Test

Mode

LV2H.V LV1

ENG Cap (Pf) D.F%Ma

Test Volts

MeasurmentWatt

10KV

Riyadh Power Plant #10 "10621166/00"

Testing of 380/13.8/13.8 KV, 220MVA GSU XFMR

Form No. TS-PT01

D.F % @ 200C

GND GAR

SITE TEST REPORT

Date: 13/02/09 Rev:0 Page 13 of 21

Serial No.:

4 C(LV1-G)+C(LV1-LV2) GST LV1

SEC

6 C(LV1-LV2)

DateSignature

10KV

NameCompany Tested By

UST

LV1,LV2

BEMCO

HV,LV2 10KV

10KV

2

C(H-LV1)

GST H.V

3

C(H-G)

UST H.V

LV2 HV 10KV

10KV

5 C(LV1-G) GST LV1

10KVUST LV1

7 C(LV2-G)+C(LV2-H) GST LV2 HV LV1 10KV

8 C(LV2-G) GST LV2 HV,LV1 10KV

Sl. No. Bushing Test

Mode Test Volts

LV2UST

UST

10KV

10KV

UST 10KV

10KV

1 1U

4 1N

2 1V

3 1W

9 C(LV2-H)

UST

MeasurmentMa Watt

Model Cal Due Date

Cap (Pf) D.F%

D.F % @ 200C

Page 151

Page 152: PP10 startup manual (Unofficial as Requested)

Client : SEC-COAConsultant:Contractor: BEMCO

XFMR TAG: Location:Ambient Temp: Humidity Oil Temperature:

12.CALIBERATION OF WINDING TEMPERATUR INDCATORS BY CURRENT INJECTION

Winding temp. IndicatorManufacture : MRType

Test procedure Adjust the variable resistance according to manufacture settingsMake sure that the oil bulb is partially filled with oil Inject full-load secondary current Record the temp. As indicated in WTI every 5 min. For 45 min.

Serial No.:

Model Cal Due Date

Current 1.67A

N.A Current

Ref Grad

Test Equipment Model Cal Due Date Test Equipment

Wind Temp

45 Min

35 Min

Heating Current

20 Min

25 Min

HV

HV Winding IndicatorTime Inter

LV1 Winding IndicatorOil

Temp

CT Ratio 400/2

CT Ratio 5000/2

Oil Temp

Company Tested By BEMCO

Date

NameSignature

N.A

SEC

Deviation

Wind Temp

Deviation

0 Min

5 Min

15 Min

10 Min

40 Min

30 Min

LV1Ref Grad 9.67 ºCLV2 1.84A

CT Ratio 5000/2 Resistance N.A Current

Deviation

Heating Current

Ref Grad

LV2 Winding IndicatorHeating Current

Oil Temp

15.23 ºCResistance

1.84A

Wind Temp

14.2 ºC

Riyadh Power Plant #10 "10621166/00"

Testing of 380/13.8/13.8 KV, 220MVA GSU XFMR

Form No. TS-PT01

MT-ST 160 WR

Date: 13/02/09 Rev:0 Page 14 of 21

SITE TEST REPORT

Resistance

Page 152

Page 153: PP10 startup manual (Unofficial as Requested)

Client : SEC-COAConsultant:Contractor: BEMCO

XFMR TAG: Location:Ambient Temp: Humidity Oil Temperature:

13.CALIBERATION OF WINDING AND OIL TEMPERATUR INDCATORS

Serial No.:

Model Cal Due DateTest Equipment Model Cal Due Date Test Equipment

Riyadh Power Plant #10 "10621166/00"

Measurement 0C

Testing of 380/13.8/13.8 KV, 220MVA GSU XFMR

Form No. TS-PT01Date: 13/02/09 Rev:0 Page 15 of 21

Ref Temp

0C

SITE TEST REPORT

120

40

50

60

OIL Temp

Tolerance

HV temp

SECCompany Tested By BEMCOName

Tolerance

LV1 temp

Tolerance

LV2 temp

Tolerance

SignatureDate

70

110

80

90

100

Page 153

Page 154: PP10 startup manual (Unofficial as Requested)

Client : SEC-COAConsultant:Contractor: BEMCO

XFMR TAG: Location:Ambient Temp: Humidity Oil Temperature:

14. TEST OF PROTECTION DEVICES AND AUXILARY CIRCUITS:A. INSULATION AND CONTINUITY CHECK

Riyadh Power Plant #10 "10621166/00"

Testing of 380/13.8/13.8 KV, 220MVA GSU XFMR

Form No. TS-PT01

Tested By

Alarm to DCS

Date: 13/02/09 Rev:0 Page 16 of 21

Serial No.:

Trip (1150C)

Trip indication (Alarm to DCS)

Pressure Relief for Transformer (82)

Trip

SEC

SignatureDate

NameBEMCO

15 Buchholz Relay for H.V Turrets (H2)

Alarm to DCS

17 Buchholz Relay for L.V.2 Turrets

Alarm to DCS

13 OLTC Protective device

Trip

14 Buchholz Relay for H.V Turrets (H3) Trip

Company

12 Signal Relay for rubber bag

Alarm to DCS

11

10

Buchholz Relay Alarm to DCS Trip

9 Pressure Relief for Transformer (83)

TripTrip indication (Alarm to DCS)

Pressure Relief device-1 for OLTC

Trip

Trip indication (Alarm to DCS)

7 Pressure Relief for Transformer (81)

Trip

8

Trip indication (Alarm to DCS)

6 Oil level indicatorfor OLTC

Min. (Alarm to DCS)Max

5 Oil level indicatorfor TR

Min. (Alarm to DCS)

4

Max

Temprature Relayfor LV2 Wdg.(CT035)

Fan control (700C)

Trip (1150C)Alarm to DCS (1050C)Fan control (750C)

3

Trip (1150C)

Fan control (700C)Fan control (750C)Alarm to DCS (1050C)

Temprature Relayfor LV1 Wdg.(CT034)

No. Subject

1 Temprature Relayfor oil(CT031)

Fan control (600C)

Alarm to DCS (900C)Fan control (650C)

2 Temprature Relayfor HV Wdg. (CT 033)

Fan control (700C)

Alarm to DCS (1050C)Fan control (750C)

16 Buchholz Relay for H.V Turrets (H1)

Alarm to DCS

Trip (506.7) (1000C)

Trip

Trip

Check Result

Trip

Device & Equipment Terminal Continuity Insulation

18 Buchholz Relay for L.V.1 Turrets

Alarm to DCS Trip

SITE TEST REPORT

Remarks

Page 154

Page 155: PP10 startup manual (Unofficial as Requested)

Client : SEC-COAConsultant:Contractor: BEMCO

XFMR TAG: Location:Ambient Temp: Humidity Oil Temperature:

15. CHECKS ON COOLER CONTROL SYSTEMA.INSULATION AND CONTINUITY TEST FOR MOTOR CIRCUIT

B. MEASUREMENT OF INSULATION RESISTANCE FOR CONTROL PANEL

C. CHECK OF SUPPLY VOLATGE FOR CONTROL PANEL

D.COOLER SYSTEM POWER MEASURMENT

Running starting Running starting Running

R-Y-BR-Y-B

starting

o.ko.k

Page 17 of 21Serial No.:

o.ko.ko.k

RemarkContinuity

o.k

o.k

CoolingFan

Group- 1&2

o.ko.ko.k

No. 2o.k

o.k

Date: 13/02/09 Rev:0

Terminal No. Rotation (or)

o.k

Subject Check ResultDevice or Equipmen

SITE TEST REPORT

No. 1

No. 5

o.k o.k

No. 6o.ko.ko.ko.k

o.k

MΩRemarks

o.ko.k

Insulation Resistance

Testing of 380/13.8/13.8 KV, 220MVA GSU XFMR

Form No. TS-PT01

Riyadh Power Plant #10 "10621166/00"

Insulation

Ambient Temp. °C

No. 11

No. 3o.kNo. 4

No. 7No. 8

No. 12

AC control

Circuit

AC power supplyCooler Control

Panel

No. 9

Device or Equipmen

Cooler Control AC control

Control Panel Circuit

o.kNo. 10

No. 5

No. 3No. 4

No. 2

O.K

Supply Voltage Polarity or Remarks(V)

IcTerminal No. VabVab Vab Ia Ib

No. 11

Subject

DC control

Subject Measurment

Phase RotationAC Power supply 1AC Power supply 2

CoolingFan

Group- 1&2

No. 1

Company Tested By

Group-1

No. 6

No. 9No. 10

No. 7

No. 12

Group 1 & 2

No. 8

SEC

Group-2

BEMCOName Mohamed GalalSignatureDate

Page 155

Page 156: PP10 startup manual (Unofficial as Requested)

Client : SEC-COAConsultant:Contractor: BEMCO

XFMR TAG: Location:Ambient Temp: Humidity Oil Temperature:

16. CHECK LIST FOR COOLER CONTROL SYSTEM OPERATION CHECK

A. Cooler control fan operation check1. Manual operation All cooling fans operationl.

Group 1 and Group 22. Automatic operationStart Fan Group 1 - Operation

Oil temp. 60 0C Odd Number Fans 1-11HV wdg temp. 70 0C Odd Number Fans 1-11LV1 wdg temp. 70 0C Odd Number Fans 1-11LV2 wdg temp. 70 0C Odd Number Fans 1-11

Start Fan Group 2- Operation Oil temp. 65 0C Even Number Fans 2-12HV wdg temp. 75 0C Even Number Fans 2-12LV wdg temp. 75 0C Even Number Fans 2-12LV wdg temp. 75 0C Even Number Fans 2-12

B. Lamp & Heater operation check1. Lamp

Door switch bothON Lamp - ONOFF Lamp - OFF

C. HeaterThermostat Setting value change more than ambient Temp. Heater - ONThermostat Setting value change less than ambient Temp. Heater - OFFD. Alarm circuit check

1 Fan Group 1 Running (K1) 2 Fan Group 2 Running (K2) 3 Fan Group 1Fault (K05) 4 Fan Group 2Fault (K06) 5 Fan Group 1 MCB Trip(F1)5 Fan Group 2 MCB Trip(F2)6 Control Volatge MCB Ttip(F01)7 Heater MCB trip (F02)8 Socket outlet MCB Trip(F03)9 Calisto MCB Trip(F04)10 Source-1 distrubed(K101)11 Source-2 distrubed (K201)E. Gas Monitoring Unit "CALISTO"1 Water Transducer output (4-20 mA) 2 Hydrogen Transducer output (4-20 mA)3 Hydrogen Alarm #1 (250 ppm)4 Hydrogen Alarm #2 (500 ppm)5 Water Alarm (30 )ppm

Date: 13/02/09 Rev:0 Page 18 of 21Serial No.:

ResualtOperation Confirmed

SITE TEST REPORT

Riyadh Power Plant #10 "10621166/00"

Testing of 380/13.8/13.8 KV, 220MVA GSU XFMR

Form No. TS-PT01

Company Tested By SEC

Signature

BEMCO

Date

Name

Page 156

Page 157: PP10 startup manual (Unofficial as Requested)

Client : SEC-COAConsultant:Contractor: BEMCO

XFMR TAG: Location:Ambient Temp: Humidity Oil Temperature:

17. PROTECTION DEVICES FUNCTIONAL CHECK

23,24

18 Buchholz Relay for L.V.1 Turrets

Alarm to DCS 13,14Trip 23,24

16 Buchholz Relay for H.V Turrets (H1)

Alarm to DCS 13,14Trip 23,24

17 Buchholz Relay for L.V.2 Turrets

Alarm to DCS 13,14Trip 23,24

21,24

11,1421,24

13,14(2)

11,14

21,24

13,14

Alarm to DCS (900C)

Fan control (750C) 21,24

Alarm to DCS 13,14

14 Buchholz Relay for H.V Turrets (H3)

Alarm to DCS Trip

15 Buchholz Relay for H.V Turrets (H2)

23,24

Trip

7 Pressure Relief for Transformer (81)

8 Pressure Relief for Transformer (82)

9 Pressure Relief for Transformer (83)

11 Buchholz Relay

10 Pressure Relief device-1 for OLTC

Date: 13/02/09 Rev:0Serial No.:

Sl NoSubject

RemarksDevice & Equipment

SITE TEST REPORT

Riyadh Power Plant #10 "10621166/00"

Testing of 380/13.8/13.8 KV, 220MVA GSU XFMR

Form No. TS-PT01Page 19 of 21

Terminal Fan control (600C)

1 Temprature Relayfor oil(CT031)

11,14

31,34Trip (506.7) (1000C)

Fan control (650C)

41,44

11,14

31,3441,44

Alarm to DCS (1050C)Trip (1150C)

Fan control (750C)

3 Temprature Relayfor LV1 Wdg.(CT034)

Fan control (700C)

2

Trip 13,14(1)

Temprature Relayfor HV Wdg. (CT 033) 31,34

41,44Alarm to DCS (1050C)

21,24

Trip (1150C)

Fan control (700C) 11,14

11,14

31,34Alarm to DCS (1050C)4 Temprature Relay

for LV2 Wdg.(CT035)Fan control (750C)Fan control (700C)

Trip (1150C)

21,24

41,44

5 Oil level indicatorfor TR

Min. (Alarm to DCS)

6 Oil level indicatorfor OLTC

Min. (Alarm to DCS)Max

Max

Trip indication (Alarm to DCS) 13,14(2)

Trip 13,14(1)

Trip 13,14(1)Trip indication (Alarm to DCS)

11,14Alarm to DCS

Trip indication (Alarm to DCS) 13,14(2)

21,24Trip

Trip 13,14Trip indication (Alarm to DCS) 21,22

13 OLTC Protective device

Trip 1,2

12 Signal Relay for rubber bag

Alarm to DCS 1,4

Company Tested By BEMCONameSignatureDate

SEC

Page 157

Page 158: PP10 startup manual (Unofficial as Requested)

Client : SEC-COAConsultant:Contractor: BEMCO

XFMR TAG: Location:Ambient Temp: Humidity Oil Temperature:

18.OLTC CONTROL PANL CHECKS

A. Measurement of insulation resistance for ON-LOAD TAP CHANGER

B. Check of supply voltage for ON-LOAD TAP CHANGER CONTROL PANEL

o.k

C. Operation check

Remote operation

LOWERRISE

LOWERRISE

SignatureDate

SECNameCompany Tested By BEMCO

AC controlR Phase R-Y:

RYBY Phase Y-B: B Phase B-R:

Date: 13/02/09 Rev:0 Page 20 of 21

Serial No.:

Supply of voltage (V)

AC control and motor o.k

Subject Insulation resistance (M OHM ) Remarks

Remarks

Riyadh Power Plant #10 "10621166/00"

Testing of 380/13.8/13.8 KV, 220MVA GSU XFMR

Form No. TS-PT01

Control panel CircuitON-LOAD TAP CHANGER CONTROL

Phase rotation Remarks

ON-LOAD TAP CHANGER CONTROL

DC control 125 v dc

Check all tap position

Operation Check result

Alarm indication

Interlock with handle operation

Tap position indicator

Electrical Operation(Local)

Subject

Electrical Operation(Remote)

SITE TEST REPORT

Subject

Manual Operation With handle

ON-LOAD TAP CHANGER CONTROL

Manual operation

Control panel Circuit

Page 158

Page 159: PP10 startup manual (Unofficial as Requested)

Client : SEC-COAConsultant:Contractor: BEMCO

XFMR TAG: Location:Ambient Temp: Humidity Oil Temperature:

19. TAP POSITION ON INDICATION CONTACTS CHECK

1,201,211,221,23

211-212X1

Serial No.:

U5 (mA)S40M

Contact Term

SITE TEST REPORT

Actual

Form No. TS-PT01Page 21 of 21

Riyadh Power Plant #10 "10621166/00"

Testing of 380/13.8/13.8 KV, 220MVA GSU XFMR

40 Ω

1,21,21,2

1,2

0 Ω

Company Tested By

1,101,111,121,13

1,61,7

BEMCOName

1,81,9

240 Ω

190 Ω200 Ω210 Ω220 Ω230 Ω

170 Ω

140 Ω150 Ω160 Ω

100 Ω

120 Ω

80 Ω

110 Ω

1,21,21,21,2

0 Ω10 Ω20 Ω30 Ω

60 Ω

90 Ω

1,21,2

180 Ω

230 Ω

210 Ω

10 Ω20 Ω30 Ω

200 Ω

240 Ω

130 Ω140 Ω150 Ω160 Ω170 Ω

190 Ω

220 Ω

40 Ω50 Ω60 Ω70 Ω

120 Ω

1,2

80 Ω90 Ω

100 Ω110 Ω

1,21,21,21,2

1,21,21,21,2

0Ω0Ω0Ω

0Ω0Ω

1,2 180 Ω

0Ω0Ω1,16

1,171,181,191,2

130 Ω

1,2

1,2

70 Ω

50 Ω

S38M

Term Actual MeasuredResistance

Date: 13/02/09 Rev:0

Tap position Resistance

6

1,2

45

Measured

S39M

Term

71,21,2

Date

1,21,2

1,21,2

Signature

1,2

123 1,2

1,21,2

1,2

1,21,2

1,21,21,2

1,2

1,27

SEC

1,28

0Ω0Ω1,24

1,251,26

89

10111213

1,2

2524

141516

20

1819

17

212223

1,21,2

1,2

1,21,21,2

1,21,2

1,2

0Ω0Ω0Ω

1,31,41,5

0Ω0Ω0Ω

0Ω0Ω0Ω0Ω0Ω0Ω

Page 159

Page 160: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

TEST

COA

O

R

-001

TING P

Riyadh Po“1062

STARTU

PROC

ower plant21166/00”

UP MANUA

EDUR

t # 10

AL DF

RE FOR

Date:13 Feb,09

R AMM

Revision0

METER

n:

R

Page 160

Page 161: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consult Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-AM01, Page 1 of 3 Equipment : Ammeter Date:13 Feb,09 Revision: 0

TABLE OF CONTENT

1. Task a. Work Status----------------------------------------------------------------------------------------------------------2 b. Documentation------------------------------------------------------------------------------------------------------2 c. Personnel-------------------------------------------------------------------------------------------------------------2 d. Measuring Instrumentation---------------------------------------------------------------------------------------2

2. Preconditions-----------------------------------------------------------------------------------------------------------2 3. Precautions--------------------------------------------------------------------------------------------------------------2 4. Scope----------------------------------------------------------------------------------------------------------------------2 5. Execution-----------------------------------------------------------------------------------------------------------------2

a. Visual Inspection--------------------------------------------------------------------------------------------------2 b. Testing of Ammeter

1. Electrical Function test----------------------------------------------------------------------------------3 2. Secondary Injection--------------------------------------------------------------------------------------3

6. Documents---------------------------------------------------------------------------------------------------------------3 7. Reference-----------------------------------------------------------------------------------------------------------------3 8. Attachment---------------------------------------------------------------------------------------------------------------3

Page 161

Page 162: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consult Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-AM01, Page 2 of 3 Equipment : Ammeter Date:13 Feb,09 Revision: 0

1.0 Task

All the moving coil, moving iron or digital ammeters shall be calibrated to check their accuracy

2.0 Preconditions

2.1 Work Status • Erection has been completed. • Labelling of the equipment

2.2 Documentation • The Schematic diagrams of the electrical equipment cabinets are

available • Commissioning checklists TS-AM01

2.3 Personnel • 1 Commissioning engineer: Engineer or technician with experience in

commissioning of all types of electrical equipments. • 1 Helper: skilled worker with adequate on-the-job training.

2.4 Measuring Instruments and Tools

• Standard Ammeter or Fluke • Secondary Injection test set

3.0 Precautions • Observe the rules for handling electronic components sensitive to electrostatic

discharge (ESD measures). • Special safety arrangements shall be made for all areas which are not explicitly

designated as” electrical operating areas” when performing tests at voltages in excess of 50V.

4.0 Scope • Testing cable connections, • Checking that the mounting position is correct, • Checking of correct earthing,

5.0 Execution

5.1 Visual Checks • Checking of the cables for damage and that they are connected correctly, • Inspection for physical connection as per approved drawings. • Inspection of isolating terminals and earthing connections • Inspection for correct tightness for connection • Checking ferrules

5.2 Testing of Ammeter Metering calibration shall be done via front panel mounted test facilities.

• Enter the rating plate data in check list TS-AM01 and compare the

ammeter data with the data contained in the circuit documentation. The following test shall be carried out

Page 162

Page 163: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consult Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-AM01, Page 3 of 3 Equipment : Ammeter Date:13 Feb,09 Revision: 0

3. Electrical Function test 4. Secondary Injection

5.2.1 Electrical Function Test

• Check the function of ammeter selector switch • Check function of test switch or plug for correct function

5.2.2 Secondary Injection • Connect the current test set on the ammeter terminals. • Inject 25, 50, 75 & 100 % of the full-scale current of the ammeter. • Record the corresponding ammeter readings. • Inject 100 % of the normal current. • Record corresponding ammeter reading.

RELAY TEST SET

R

N

CU

RR

EN

TTE

RM

INA

LS

AMMETER TESTING ARRANGEMENT

A

5.2.3 Checking the Protective Earthing

Check the Earthing on the meter 6.0 Documents

Test sheet TS-AM01 shall be completed for each and every ammeter. 7.0 References: 8.0 Attachment

8.1 Test sheet for Ammeter TS-AM01 ***End of the Procedure****

Page 163

Page 164: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

Riyadh Po“1062

STARTU

TES

ower plant21166/00”

UP MANUA

ST SH

t # 10

AL DF

EETS

Date:13 Feb,09

Revision0

n:

Page 164

Page 165: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: .

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AM01, Page 1 of 1

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Ammeter

Date:13/02/09 Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning)

Confirm Remarks

1. Technical data Meter : _________ Type : _________ Make : _________ Serial No.(L1,L2,L3) : _________ Range : _________ Class : ___________ CT’S Data: Ratio : _________ Accuracy Class : ___________

2

Mechanical Checks and Visual Inspection 1. Inspect for physical damage/ defects 2. verify connection as per approved drawing 3. check tightness of all connection 4. check ferrules 5. check apparatus list

3

3.1

3.2

Electrical Test Functional test 1. functional check of selector switch 2. Test switch/plug checked for correct function Secondary Injection

INJECTED EXPECTED ACTUALCURRENT READING READING

ERROR in %PHASE

Test Equipment Model Cal due date Test Equipment Model Cal due date

Page 165

Page 166: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

TEST

Riyadh Po“1062

STARTU

TING PENER

ower plant21166/00”

UP MANUA

PROCRGY M

t # 10

AL DF

EDURMETER

Date:13 Feb,09

RE FORR

Revision0

R

n:

Page 166

Page 167: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-EM01, Page 1 of 3 Equipment : Energy meter Date:13 Feb,09 Revision: 0

TABLE OF CONTENT

1. Task a. Work Status----------------------------------------------------------------------------------------------------------2 b. Documentation------------------------------------------------------------------------------------------------------2 c. Personnel-------------------------------------------------------------------------------------------------------------2 d. Measuring Instrumentation---------------------------------------------------------------------------------------2

2. Preconditions-----------------------------------------------------------------------------------------------------------2 3. Precautions--------------------------------------------------------------------------------------------------------------2 4. Scope----------------------------------------------------------------------------------------------------------------------2 5. Execution-----------------------------------------------------------------------------------------------------------------2

a. Visual Inspection--------------------------------------------------------------------------------------------------2 b. Testing of Energy Meter

1. Electrical Function test----------------------------------------------------------------------------------3 2. Secondary Injection--------------------------------------------------------------------------------------3

6. Documents---------------------------------------------------------------------------------------------------------------3 7. Reference-----------------------------------------------------------------------------------------------------------------3 8. Attachment---------------------------------------------------------------------------------------------------------------3

Page 167

Page 168: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-EM01, Page 2 of 3 Equipment : Energy meter Date:13 Feb,09 Revision: 0

1.0 Task

The entire analogue or digital Energy meter shall be calibrated to check its accuracy

2.0 Preconditions 2.1 Work Status

• Erection has been completed. • Labelling of the equipment

2.2 Documentation • The Schematic diagrams of the electrical equipment cabinets are

available • Commissioning checklists TS-EM01

2.3 Personnel • 1 Commissioning engineer: Engineer or technician with experience in

commissioning of types of the electrical equipment systems employed in the plant.

• 1 Helper: skilled worker with adequate on-the-job training.

2.4 Measuring Instruments and Tools • Secondary Injection test set • Standard energy meter

3.0 Precautions • Observe the rules for handling electronic components sensitive to electrostatic

discharge (ESD measures). • Special safety arrangements shall be made for all areas which are not explicitly

designated as” electrical operating areas” when performing tests at voltages in excess of 50V.

4.0 Scope

• Testing cable connections, • Checking that the mounting position is correct, • Checking of correct earthing,

5.0 Execution

5.1 Visual Checks • Checking of the cables for damage and that they are connected correctly, • Inspection for physical connection as per approved drawings. • Inspection of isolating terminals and earthing connections • Inspection for correct tightness for connection • Checking ferrules

5.2 Testing of Energy Meter Metering calibration shall be done via front panel mounted test facilities.

• Enter the rating plate data in check list TS-EM01 and compare the

energy meter data with the data contained in the circuit documentation. The following test shall be carried out

Page 168

Page 169: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-EM01, Page 3 of 3 Equipment : Energy meter Date:13 Feb,09 Revision: 0

3. Electrical Function test 4. Secondary Injection

5.2.1 Electrical Function Test

• Check function pf test switch or plug for correct function

5.2.2 Secondary Injection ♦ Connect the current test set terminals to the Energy meter current

terminals. ♦ Connect the voltage test set terminals to the Energy meter voltage

terminals. ♦ Apply 0, 25, 50, 75 &100% of rated load and with rated voltage

and current at angles of 0, 45,180, 225, 270 and 315 degrees for time.

♦ Record the corresponding Energy meter readings and time duration.

♦ Compare the calculated reading with energy meter reading obtained.

R

Y

B

N

CU

RR

EN

TTE

RM

INA

LSKWH METERRELAY TEST SET

R

Y

B

N

CU

RR

EN

TTE

RM

INA

LS

KWH METER TESTING ARRANGEMENT

TEST PLUG

R

Y

B

N

VO

LTA

GE

TER

MIN

ALS

R

Y

B

N

VO

LTA

GE

TER

MIN

ALS

5.2.3 Checking the Protective Earthing

Check the earthing on the meter 6.0 Documentation

Test Sheet TS-EM01 shall be completed for each and every energy meter.

7.0 References: 8.0 9.0 Attachment

9.1 Test Sheet for Energy Meter TS-EM01 ***End of the Procedure***

Page 169

Page 170: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

Riyadh Po“1062

STARTU

TES

ower plant21166/00”

UP MANUA

ST SH

t # 10

AL DF

EETS

Date:13 Feb,09

Revision0

n:

Page 170

Page 171: PP10 startup manual (Unofficial as Requested)

Protection Panel Name: Unit Tag: Cubicle No.: Meter Serial No.: Meter Type: Bus -DMM Make: CT Ratio. VT Ratio: Drawing No.: Meter Accuracy Class:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No:TS-EM01 Page 1 of 4

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Commissioning Check List Multifunction Energy Meter- Bus

DMM Nexus 1250 Date:19/02/09 ,Revision: 0

1. Meter Accuracy Test

a). Ammeter function

Expected Meter Reading Actual Meter Reading % Error Injected Current(A) R Y B R Y B R Y B

25% 0.25 1500 1500 1500 -% -% -% 50% 0.5 3000 3000 3000 -% -% -% 100% 1 6000 6000 6000 -% -% -%

b).Voltmeter function

Expected Meter Reading

Actual Meter Reading % Error Applied Voltage Mode

R Y B R Y B R Y B 25% 17.32 L-N 2078.5 2078.5 2078.5

30 L-L 3600 3600 3600 50% 34.64 L-N 4157.1 4157.1 4157.1

60 L-L 7200 7200 7200 100% 69.3 L-N 8314.1 8314.1 8314.1

120 L-L 14400 14400 14400 Vr 66.4 L-N 7967.6 7967.6 7967.6 115 L-L 13800 13800 13800

c). Frequency meter function

Applied Frequency

Measured Frequency

% Error

50 55 60

60.5 61

61.5

Page 171

Page 172: PP10 startup manual (Unofficial as Requested)

Protection Panel Name: Unit Tag: Cubicle No.: Meter Serial No.: Meter Type: Bus -DMM Make: CT Ratio. VT Ratio: Drawing No.: Meter Accuracy Class:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No:TS-EM01 Page 2 of 4

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Commissioning Check List Multifunction Energy Meter- Bus

DMM Nexus 1250 Date:19/02/09 ,Revision: 0

d) Power Factor Meter function

Phase Angle Expected Power Factor

Measured Power Factor

% Error

0 1 30 0.866 45 0.707 60 0.5 90 0 135 -0.707 180 -1 225 -0.707 270 0 315 0.707

e) WH Meter Function

Tem No.

Applied Voltage(V)

Injected Current(A)

Phase Angle

Time(M) Expected Reading(MWH)

Actual Reading(MWH)

% Error

1 115 1 0 1 +2.39 2 115 1 30 1 +2.07 3 115 1 45 1 +1.69 4 115 1 60 1 +1.195 5 115 1 135 1 -1.69 6 115 1 180 1 -2.39 7 115 1 225 1 -1.69 8 115 1 315 1 +1.69 Note: Three phase energy caliberation test set to be used for above function

Page 172

Page 173: PP10 startup manual (Unofficial as Requested)

Protection Panel Name: Unit Tag: Cubicle No.: Meter Serial No.: Meter Type: Bus -DMM Make: CT Ratio. VT Ratio: Drawing No.: Meter Accuracy Class:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No:TS-EM01 Page 3 of 4

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Commissioning Check List Multifunction Energy Meter- Bus

DMM Nexus 1250 Date:19/02/09 ,Revision: 0

f).WHR Meter Function

Tem No.

Applied Voltage(V)

Injected Current(A)

Phase Angle

Time(M) Expected Reading(MWH)

Actual Reading(MWH)

% Error

1 115 1 0 1 0 2 115 1 30 1 +1.195 3 115 1 45 1 +1.69 4 115 1 60 1 +2.069 5 115 1 135 1 -1.69 6 115 1 180 1 0 7 115 1 225 1 1.69 8 115 1 315 1 -1.69 Note: Three phase energy caliberation test set to be used for above function

g). MW Meter Function

Tem No.

Applied Voltage(V)

Injected Current(A)

Phase Angle

Expected Reading(MW)

Actual Reading(MW)

% Error

1 115 1 0 143.41 2 115 1 30 124.2 3 115 1 45 101.41 4 115 1 60 71.71 5 115 1 135 -101.41 6 115 1 180 -143.41 7 115 1 225 -101.41 8 115 1 315 101.41

Page 173

Page 174: PP10 startup manual (Unofficial as Requested)

Protection Panel Name: Unit Tag: Cubicle No.: Meter Serial No.: Meter Type: Bus -DMM Make: CT Ratio. VT Ratio: Drawing No.: Meter Accuracy Class:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No:TS-EM01 Page 4 of 4

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Commissioning Check List Multifunction Energy Meter- Bus

DMM Nexus 1250 Date:19/02/09 ,Revision: 0

h).MVAR Meter Function Tem No.

Applied Voltage(V)

Injected Current(A)

Phase Angle

Expected Reading(MVAr)

Actual Reading(MVAr)

% Error

1 115 1 30 71.71 2 115 1 45 -101.41 3 115 1 60 124.2 4 115 1 90 -143.41 5 115 1 135 -101.41 6 115 1 225 101.41 7 115 1 315 101.41

Test Equipment Model Cal due date Test Equipment Model Cal due date

Page 174

Page 175: PP10 startup manual (Unofficial as Requested)

Protection Panel Name: Unit Tag: Cubicle No.: Meter Serial No.: Meter Type: Bus -DMM Make: CT Ratio. VT Ratio: Drawing No.: Meter Accuracy Class:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No:TS-EM01, Page 1 of 6

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Commissioning Check List Multifunction Energy Meter- Generator DMM Nexus 1250 Date:13/02/09, Revision: 0

1. Meter Accuracy Test a).Ammeter function

Expected Meter Reading Actual Meter Reading % Error Injected Current(A) R Y B R Y B R Y B 25% 0.25 1500 1500 1500 50% 0.5 3000 3000 3000 100% 1 6000 6000 6000

b).Voltmeter function

Expected Meter Reading Actual Meter Reading % Error Applied Voltage Mode R Y B R Y B R Y B

25% L-N 2078.5 2078.5 2075 30 L-L 3600 3600 3600

50% L-N 4157.1 4157.1 4157.1 60 L-L 7200 7200 7200

100% L-N 8314.1 8314.1 8314.1 120 L-L 14400 14400 14400

Vr L-N 7967.6 7967.6 7967.6 115 L-L 13800 13800 13800

c).Frequency meter function

Applied Frequency

Measured Frequency

% Error

50 55 60

60.5 61

61.5

Page 175

Page 176: PP10 startup manual (Unofficial as Requested)

Protection Panel Name: Unit Tag: Cubicle No.: Meter Serial No.: Meter Type: Bus -DMM Make: CT Ratio. VT Ratio: Drawing No.: Meter Accuracy Class:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No:TS-EM01, Page 2 of 6

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Commissioning Check List Multifunction Energy Meter- Generator DMM Nexus 1250 Date:13/02/09, Revision: 0

d).Power Factor Meter function

Phase Angle Expected Power Factor

Measured Power Factor

% Error

0 1 30 0.866 45 0.707 60 0.5 90 0 135 -0.707 180 -1 225 -0.707 270 0 315 0.707

f). MWH Meter Function

Tem No.

Applied Voltage(V)

Injected Current(A)

Phase Angle

Time(M) Expected Reading(MWH)

Actual Reading(MWH)

% Error

1 115 1 0 1 +2.39 2 115 1 30 1 +2.07 3 115 1 45 1 +1.69 4 115 1 60 1 +1.195 5 115 1 135 1 -1.69 6 115 1 180 1 -2.39 7 115 1 225 1 -1.69 8 115 1 315 1 +1.69 Note: Three phase energy caliberation test set to be used for above function

Page 176

Page 177: PP10 startup manual (Unofficial as Requested)

Protection Panel Name: Unit Tag: Cubicle No.: Meter Serial No.: Meter Type: Bus -DMM Make: CT Ratio. VT Ratio: Drawing No.: Meter Accuracy Class:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No:TS-EM01, Page 3 of 6

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Commissioning Check List Multifunction Energy Meter- Generator DMM Nexus 1250 Date:13/02/09, Revision: 0

f).WHR Meter Function

Tem No.

Applied Voltage(V)

Injected Current(A)

Phase Angle

Time(M) Expected Reading(MWH)

Actual Reading(MWH)

% Error

1 115 1 0 1 0 2 115 1 30 1 +1.195 3 115 1 45 1 +1.69 4 115 1 60 1 +2.069 5 115 1 135 1 -1.69 6 115 1 180 1 0 7 115 1 225 1 1.69 8 115 1 315 1 -1.69 Note: Three phase energy caliberation test set to be used for above function

g).MW Meter Function

Tem No.

Applied Voltage(V)

Injected Current(A)

Phase Angle

Expected Reading(MW)

Actual Reading(MW)

% Error

1 115 1 0 143.41 2 115 1 30 124.2 3 115 1 45 101.41 4 115 1 60 71.70 5 115 1 135 -101.41 6 115 1 180 -143.41 7 115 1 225 -101.41 8 115 1 315 101.41

Page 177

Page 178: PP10 startup manual (Unofficial as Requested)

Protection Panel Name: Unit Tag: Cubicle No.: Meter Serial No.: Meter Type: Bus -DMM Make: CT Ratio. VT Ratio: Drawing No.: Meter Accuracy Class:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No:TS-EM01, Page 4 of 6

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Commissioning Check List Multifunction Energy Meter- Generator DMM Nexus 1250 Date:13/02/09, Revision: 0

h).MVAR Meter Function

Tem No.

Applied Voltage(V)

Injected Current(A)

Phase Angle

Expected Reading(MVA)

Actual Reading(MVA)

% Error

1 115 1 30 71.70 2 115 1 45 -101.41 3 115 1 60 124.2 4 115 1 90 -143.41 5 115 1 135 -101.41 6 115 1 225 101.41 7 115 1 315 101.41

2.Caliberation for Transducer out put

1. G-MOD#5 (Power Factor and Current)

Transducer Data

Type: 20MNA0N4, Range: out put: 4-20mA, 4mA = 0 Amps, -0.5 PF 20mA = 6000 Amps, +0.5 PF

S/N : a. Current Transducer

Actual Reading % Error Item No

Applied Current

Expected Reading IA IB IC IA IB IC

1 0 4 2 0.25 8 3 0.5 12 4 0.75 16 5 1 20

b. Power Factor Transducer

Item No Applied Voltage

Injected Current

Phase Angle

Expected Reading

Actual Reading

% Error

1 115V 1 A 60 4 2 115V 1 A 41.5 8 3 115V 1 A 0 12 4 115V 1 A 318.6 16 5 115V 1 A 300 20

Page 178

Page 179: PP10 startup manual (Unofficial as Requested)

Protection Panel Name: Unit Tag: Cubicle No.: Meter Serial No.: Meter Type: Bus -DMM Make: CT Ratio. VT Ratio: Drawing No.: Meter Accuracy Class:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No:TS-EM01, Page 5 of 6

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Commissioning Check List Multifunction Energy Meter- Generator DMM Nexus 1250 Date:13/02/09, Revision: 0

2. G-MOD#4 (Frequency and Voltage) Transducer data: Type: 20MNA0N4, Range: out put: 4-20mA, 4mA = 0 Volts , 55hz 20mA = 18kv , 65hz

S/N No. : a. Voltage Transducer

Actual Reading % Error Item No

Applied Voltage

Expected Reading VAB VBC VCA VAB VBC VCA

1 0 4 2 37.5 8 3 75 12 4 112.5 16 5 150 20

b. Frequency Transducer

Item No Applied Voltage

Applied Frequency

Expected Reading

Actual Reading

% Error

1 115V 55 4 2 115V 57.5 8 3 115V 60 12 4 115V 62.5 16 5 115V 65 20

3. G-MOD#3 (MVARs and MWatts)

Transducer Data Type: 20MNA0N4, Range: out put: 4-20mA, 4mA = -96MW , -64M 20mA = +96MW , +64MVAR

S/N No.: a. MW Transducer

Item No Applied Voltage

Applied Current

Phase Angle

Expected Reading

Actual Reading

% Error

1 115V 1A 132 4 2 115V 1A 109.5 8 3 115V 1A 90 12 4 115V 1A 70.5 16 6 115V 1A 48 20

Page 179

Page 180: PP10 startup manual (Unofficial as Requested)

Protection Panel Name: Unit Tag: Cubicle No.: Meter Serial No.: Meter Type: Bus -DMM Make: CT Ratio. VT Ratio: Drawing No.: Meter Accuracy Class:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No:TS-EM01, Page 6 of 6

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Commissioning Check List Multifunction Energy Meter- Generator DMM Nexus 1250 Date:13/02/09, Revision: 0

b. MVAR Transducer

Item No Applied Voltage

Applied Current

Phase Angle

Expected Reading

Actual Reading

% Error

1 115V 1A 26.5 4 2 115V 1A 12.5 8 3 115V 1A 0 12 4 115V 1A 347 16 5 115V 1A 333.5 20

96GG-1 (MVARs and MWatts) Transducer Data

Type: 20MNA0N4, Range: out put: 4-20mA, 4mA = -96MW , -64MVAR 20mA = +96MW, +64MVAR

S/N. : a. MW Transducer

Item No Applied Voltage

Applied Current

Phase Angle

Expected Reading

Actual Reading

% Error

1 115V 1A 132 4 2 115V 1A 109.5 8 3 115V 1A 90 12 4 115V 1A 70.5 16 5 115V 1A 48 20

c. MVAR Transducer

Item No Applied Voltage

Applied Current

Phase Angle

Expected Reading

Actual Reading

% Error

1 115V 1A 26.5 4 2 115V 1A 12.8 8 3 115V 1A 0 12 4 115V 1A 347 16 5 115V 1A 333.5 20

Test Equipment Model Cal due date Test Equipment Model Cal due date

Page 180

Page 181: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

TESTF

Riyadh Po“1062

STARTU

TING PFREQU

ower plant21166/00”

UP MANUA

PROCUENCY

t # 10

AL DF

EDURY MET

Date:13 Feb,09

RE FORTER

Revision0

R

n:

Page 181

Page 182: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-FM01, Page 1 of 3 Equipment : Frequency Meter Date:13 Feb,09 Revision: 0

TABLE OF CONTENT

1. Task a. Work Status----------------------------------------------------------------------------------------------------------2 b. Documentation------------------------------------------------------------------------------------------------------2 c. Personnel-------------------------------------------------------------------------------------------------------------2 d. Measuring Instrumentation---------------------------------------------------------------------------------------2

2. Preconditions-----------------------------------------------------------------------------------------------------------2 3. Precautions--------------------------------------------------------------------------------------------------------------2 4. Scope----------------------------------------------------------------------------------------------------------------------2 5. Execution-----------------------------------------------------------------------------------------------------------------2

a. Visual Inspection--------------------------------------------------------------------------------------------------2 b. Testing of Frequency Meter

1. Electrical Function test----------------------------------------------------------------------------------3 2. Secondary Injection--------------------------------------------------------------------------------------3

6. Documents---------------------------------------------------------------------------------------------------------------3 7. Reference-----------------------------------------------------------------------------------------------------------------3 8. Attachment---------------------------------------------------------------------------------------------------------------3

Page 182

Page 183: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-FM01, Page 2 of 3 Equipment : Frequency Meter Date:13 Feb,09 Revision: 0

1.0 Task

The analogue or digital Frequency meter shall be calibrated to check its accuracy 2.0 Preconditions

2.1 Work Status • Erection has been completed. • Labelling of the equipment

2.2 Documentation • The Schematic diagrams of the electrical equipment cabinets are

available • Commissioning checklists TS-EM01

2.3 Personnel • 1 Commissioning engineer: Engineer or technician with experience in

commissioning of all types of Electrical equipments. • 1 Helper: skilled worker with adequate on-the-job training.

2.4 Measuring Instruments and Tools

• Secondary Injection test set • Standard energy meter

3.0 Precautions • Observe the rules for handling electronic components sensitive to electrostatic

discharge (ESD measures). • Special safety arrangements shall be made for all areas which are not explicitly

designated as” electrical operating areas” when performing tests at voltages in excess of 50V.

4.0 Scope • Testing cable connections, • Checking that the mounting position is correct, • Checking of correct earthing,

5.0 Execution

5.1 Visual Checks • Checking of the cables for damage and that they are connected correctly, • Inspection for physical connection as per approved drawings. • Inspection of isolating terminals and earthing connections • Inspection for correct tightness for connection • Checking ferrules

5.2 Testing of Frequency Meter Metering calibration shall be done via front panel mounted test facilities.

• Enter the rating plate data in check list TS-FM01 and compare the

frequency meter data with the data contained in the circuit documentation. The following test shall be carried out

Page 183

Page 184: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-FM01, Page 3 of 3 Equipment : Frequency Meter Date:13 Feb,09 Revision: 0

3. Electrical Function test 4. Secondary Injection

5.2.1 Electrical Function Test

• Check function pf test switch or plug for correct function

5.2.2 Secondary Injection ♦ Connect the voltage test set terminals to the frequency meter

voltage terminals. ♦ Apply rated voltage ♦ Vary the frequency and note the readings as mention in the test

sheet

5.2.3 Checking the Protective Earthing

Check the earthing on the meter 6.0 Documents

Test Sheet TS-EM01 shall be completed for each and every Frequency meter.

7.0 References 8.0 Attachment

8.1 Test Sheet For Frequency Meter TS-PFM01 ***End of the Procedure ***

Page 184

Page 185: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

Riyadh Po“1062

STARTU

TES

ower plant21166/00”

UP MANUA

ST SH

t # 10

AL DF

EETS

Date:13 Feb,09

Revision0

n:

Page 185

Page 186: PP10 startup manual (Unofficial as Requested)

Switch Gear Location: Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.:

Subcontract/Tested by Arabian BEMCO SEC-EOA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-FM01, Page 1 of 1

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Frequency Meter

Date:13/02/09, Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

1. Technical data Meter : _________ Type : _________ Make : _________ Serial No.(L1,L2,L3) : _________ Range : _________ Class : ___________

VT’s data : VT Ratio : _________ Accuracy Class : ___________

2

Mechanical Checks and Visual Inspection 1. Inspect for physical damage/ defects 2. verify connection as per approved drawing 3. check tightness of all connection 4. check ferrules 5. check apparatus list

3

3.1

3.2

Electrical Test Functional test 1. Functional check of selector switch 2. Test switch/plug checked for correct function

Secondary Injection:

Applied Frequency

Measured Frequency

% Error

50 55 60

60.5 61

61.5

Test Equipment Model Cal due date Test Equipment Model Cal due date

Page 186

Page 187: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

TESTPO

Riyadh Po“1062

STARTU

TING PWER

ower plant21166/00”

UP MANUA

PROCFACTO

t # 10

AL DF

EDUROR ME

Date:13 Feb,09

RE FORETER

Revision0

R

n:

Page 187

Page 188: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-PFM01, Page 1 of 3 Equipment : Power Factor Meter Date:13 Feb,09 Revision: 0

TABLE OF CONTENT

1. Task a. Work Status----------------------------------------------------------------------------------------------------------2 b. Documentation------------------------------------------------------------------------------------------------------2 c. Personnel-------------------------------------------------------------------------------------------------------------2 d. Measuring Instrumentation---------------------------------------------------------------------------------------2

2. Preconditions-----------------------------------------------------------------------------------------------------------2 3. Precautions--------------------------------------------------------------------------------------------------------------2 4. Scope----------------------------------------------------------------------------------------------------------------------2 5. Execution-----------------------------------------------------------------------------------------------------------------2

a. Visual Inspection--------------------------------------------------------------------------------------------------2 b. Testing of Power Factor Meter

1. Electrical Function test----------------------------------------------------------------------------------3 2. Secondary Injection--------------------------------------------------------------------------------------3

6. Documents---------------------------------------------------------------------------------------------------------------3 7. Reference-----------------------------------------------------------------------------------------------------------------3 8. Attachment---------------------------------------------------------------------------------------------------------------3

Page 188

Page 189: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-PFM01, Page 2 of 3 Equipment : Power Factor Meter Date:13 Feb,09 Revision: 0

1.0 Task

The analogue or digital power factor meter shall be calibrated to check its accuracy 2.0 Preconditions

2.1 Work Status • Erection has been completed. • Labelling of the equipment

2.2 Documentation • The schematic diagrams of the electrical equipment cabinets are available • Commissioning checklists TS-EM01.

2.3 Personnel • 1 Commissioning engineer: Engineer or technician with experience in

commissioning of all types of the Electrical equipment, • 1 Helper: skilled worker with adequate on-the-job training.

2.4 Measuring Instruments and Tools

• Secondary Injection test set • Standard energy meter

3.0 Precautions • Observe the rules for handling electronic components sensitive to electrostatic

discharge (ESD measures). • Special safety arrangements shall be made for all areas which are not explicitly

designated as” electrical operating areas” when performing tests at voltages in excess of 50V.

4.0 Scope • Testing cable connections, • Checking that the mounting position is correct, • Checking of correct earthing,

5.0 Execution

5.1 Visual Checks • Checking of the cables for damage and that they are connected correctly, • Inspection for physical connection as per approved drawings. • Inspection of isolating terminals and earthing connections • Inspection for correct tightness for connection • Checking ferrules

Page 189

Page 190: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-PFM01, Page 3 of 3 Equipment : Power Factor Meter Date:13 Feb,09 Revision: 0

5.2 Testing of Power Factor Meter

Metering calibration shall be done via front panel mounted test facilities. • Enter the rating plate data in check list TS-PFM01 and compare the

energy meter data with the data contained in the circuit documentation. The following test shall be carried out

3. Electrical Function test 4. Secondary Injection

5.2.1 Electrical Function Test

• Check function pf test switch or plug for correct function

5.2.2 Secondary Injection ♦ Connect the current test set terminals to the Power factor meter

current terminals. ♦ Connect the voltage test set terminals to the Power factor meter

voltage terminals. ♦ Apply rated current and rated voltage and current at angles of 0,

30, 45, 60,180, 225, 270 and 315 degrees. ♦ Record the corresponding power factor meter readings. ♦ Compare the calculated reading with Actual meter reading

obtained.

5.2.3 Checking the Protective Earthing

Check the earthing on the meter 6.0 Documents Test Sheet TS-PFM01 shall be completed for each and every Power Factor Meter 7.0 References: 8.0 Attachment:

8.1 Test Sheet For Power Factor Meter TS-PFM01 *** End of the Procedure ***

Page 190

Page 191: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

Riyadh Po“1062

STARTU

TES

ower plant21166/00”

UP MANUA

ST SH

t # 10

AL DF

EETS

Date:13 Feb,09

Revision0

n:

Page 191

Page 192: PP10 startup manual (Unofficial as Requested)

Switch Gear Location: Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-FM01 Page 1 of 1

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Power Factor Meter

Date:13/02/09 , Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

1. Technical data Meter : _________ Type : _________ Make : _________ Serial No.(L1,L2,L3) : _________ Range : _________ Class : ___________

VT’s & CT’S data : VT Ratio : _________ Accuracy Class : ___________ CT Ratio : _________ Accuracy Class : ___________

2 Mechanical Checks and Visual Inspection 1. Inspect for physical damage/ defects 2. verify connection as per approved drawing 3. check tightness of all connection 4. check ferrules 5. check apparatus list

3 3.1

Electrical Test Functional test 1. Functional check of selector switch 2. Test switch/plug checked for correct function

Secondary Injection: Phase Angle Expected

Power Factor Measured Power Factor

% Error

0 1 30 0.866 45 0.707 60 0.5 90 0

135 -0.707 180 -1 225 -0.707 270 0 315 0.707

Test Equipment Model Cal due date Test Equipment Model Cal due date

Page 192

Page 193: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

TEST

Riyadh Po“1062

STARTU

TING PPOW

ower plant21166/00”

UP MANUA

PROCWER M

t # 10

AL DF

EDURMETER

Date:13 Feb,09

RE FORR

Revision0

R

n:

Page 193

Page 194: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-PM01, Page 1 of 3 Equipment : Power Meter Date:13 Feb,09 Revision: 0

TABLE OF CONTENT

1. Task a. Work Status----------------------------------------------------------------------------------------------------------2 b. Documentation------------------------------------------------------------------------------------------------------2 c. Personnel-------------------------------------------------------------------------------------------------------------2 d. Measuring Instrumentation---------------------------------------------------------------------------------------2

2. Preconditions-----------------------------------------------------------------------------------------------------------2 3. Precautions--------------------------------------------------------------------------------------------------------------2 4. Scope----------------------------------------------------------------------------------------------------------------------2 5. Execution-----------------------------------------------------------------------------------------------------------------2

a. Visual Inspection--------------------------------------------------------------------------------------------------2 b. Testing of Power Meter

1. Electrical Function Test---------------------------------------------------------------------------------3 2. Secondary Injection--------------------------------------------------------------------------------------3

6. Documents---------------------------------------------------------------------------------------------------------------3 7. Reference-----------------------------------------------------------------------------------------------------------------3 8. Attachment---------------------------------------------------------------------------------------------------------------3

Page 194

Page 195: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-PM01, Page 2 of 3 Equipment : Power Meter Date:13 Feb,09 Revision: 0

1.0 Task

The all analogue or digital Power meters shall be calibrated to check their accuracy

2.0 Preconditions

2.1 Work Status • Erection has been completed. • Labelling of the equipment.

2.2 Documentation • The circuit diagrams of the electrical equipment cabinets are available • Commissioning checklists TS-PM01

2.3 Personnel • 1 Commissioning engineer: Engineer or technician with experience in

commissioning of types of the electrical equipment systems employed in the plant.

• 1 Helper: skilled worker with adequate on-the-job training.

2.4 Measuring Instruments and Tools • Secondary Injection test set

3.0 Precautions • Observe the rules for handling electronic components sensitive to electrostatic

discharge (ESD measures). • Special safety arrangements shall be made for all areas which are not explicitly

designated as” electrical operating areas” when performing tests at voltages in excess of 50V.

4.0 Scope • Testing cable connections, • Checking that the mounting position is correct, • Checking of correct earthing,

5.0 Execution

5.1 Visual Checks • Checking of the cables for damage and that they are connected correctly, • Inspection for physical connection as per approved drawings. • Inspection of isolating terminals and earthing connections • Inspection for correct tightness for connection • Checking ferrules

5.2 Testing of Power Meter Metering calibration shall be done via front panel mounted test facilities.

Page 195

Page 196: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-PM01, Page 3 of 3 Equipment : Power Meter Date:13 Feb,09 Revision: 0

• Enter the rating plate data in check list TS-PM01 and compare the power meter data with the data contained in the circuit documentation. The following test shall be carried out

3. Electrical Function test 4. Secondary Injection

5.2.1 Electrical Function Test

• Check function of test switch or plug for correct function

5.2.2 Secondary Injection ♦ Connect the current test set terminals to the Power meter current

terminals. ♦ Connect the voltage test set terminals to the Power meter voltage

terminals. ♦ Apply 0, 25, 50, 75 &100% of rated load and with rated voltage

and current at angles of 0, 45,180, 225, 270 and 315 degrees. ♦ Record the corresponding Power meter readings. ♦ Compare the calculated reading like power factor, VAR, and

WATTS with meter reading.

R

Y

B

N

CU

RR

ENT

TER

MIN

ALS

KW METERRELAY TEST SET

R

Y

B

N

CU

RR

ENT

TER

MIN

ALS

KW METER TESTING ARRANGEMENT

TEST PLUG

R

Y

B

N

VO

LTA

GE

TER

MIN

ALS

R

Y

B

N

VO

LTA

GE

TER

MIN

ALS

5.2.3 Checking the protective Earthing

Check the Earthing on the meter 6.0 Documents

Test Sheet TS-PM01 shall be completed for each and every Power meter.

7.0 References

8.0 Attachment

8.1 Test Sheet for Power Meter TS-PM01

***End of the Procedure***

Page 196

Page 197: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

TEST

Riyadh Po“1062

STARTU

TING PVO

ower plant21166/00”

UP MANUA

PROCOLTME

t # 10

AL DF

EDURETER

Date:13 Feb,09

RE FOR

Revision0

R

n:

Page 197

Page 198: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-VM01, Page 1 of 3 Equipment : Voltmeter Date:13 Feb,09 Revision: 0

TABLE OF CONTENT

1. Task a. Work Status----------------------------------------------------------------------------------------------------------2 b. Documentation------------------------------------------------------------------------------------------------------2 c. Personnel-------------------------------------------------------------------------------------------------------------2 d. Measuring Instrumentation---------------------------------------------------------------------------------------2

2. Preconditions-----------------------------------------------------------------------------------------------------------2 3. Precautions--------------------------------------------------------------------------------------------------------------2 4. Scope----------------------------------------------------------------------------------------------------------------------2 5. Execution-----------------------------------------------------------------------------------------------------------------2

a. Visual Inspection--------------------------------------------------------------------------------------------------2 b. Testing of Voltmeter

1. Electrical Function test----------------------------------------------------------------------------------3 2. Secondary Injection--------------------------------------------------------------------------------------3

6. Documents---------------------------------------------------------------------------------------------------------------3 7. Reference-----------------------------------------------------------------------------------------------------------------3 8. Attachment---------------------------------------------------------------------------------------------------------------3

Page 198

Page 199: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-VM01, Page 2 of 3 Equipment : Voltmeter Date:13 Feb,09 Revision: 0

1.0 Task

All the moving coil, moving iron or digital Voltmeters shall be calibrated to check their accuracy

2.0 Preconditions

2.1 Work Status • Erection has been completed. • Labelling of the equipment .

2.2 Documentation • The circuit diagrams of the electrical equipment cabinets are available • Commissioning checklists TS-VM01

2.3 Personnel • 1 Commissioning engineer: Engineer or technician with experience in

commissioning of all types of Electrical equipments. • 1 Helper: skilled worker with adequate on-the-job training.

2.4 Measuring Instruments and Tools

• Standard Voltmeter or Fluke • Secondary Injection test set

3.0 Precautions • Observe the rules for handling electronic components sensitive to electrostatic

discharge (ESD measures). • Special safety arrangements shall be made for all areas which are not explicitly

designated as” electrical operating areas” when performing tests at voltages in excess of 50V.

4.0 Scope • Testing cable connections, • Checking that the mounting position is correct, • Checking of correct earthing,

5.0 Execution

5.1 Visual Checks • Checking of the cables for damage and that they are connected correctly, • Inspection for physical connection as per approved drawings. • Inspection of isolating terminals and earthing connections • Inspection for correct tightness for connection • Checking ferrules

5.2 Testing of Voltmeter

Metering calibration shall be done via front panel mounted test facilities. • Enter the rating plate data in check list TS-VM01 and compare the

voltmeter data with the data contained in the circuit documentation. The following test shall be carried out 3. Electrical Function test

Page 199

Page 200: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-VM01, Page 3 of 3 Equipment : Voltmeter Date:13 Feb,09 Revision: 0

4. Secondary Injection 5.2.1 Electrical Function test

• Check the function of voltmeter selector switch • Check function of test switch or plug for correct function

5.2.2 Secondary Injection • Connect the Voltage test set on the voltmeter terminals. • Inject 25, 50, 75 & 100 % of the full-scale Voltage of the ammeter. • Record the corresponding ammeter readings. • Inject 100 % of the normal Voltage. • Record corresponding voltmeter reading.

RELAY TEST SET

R

N

VOLT

AGE

TER

MIN

ALS

VOLTMETER TESTING ARRANGEMENT

V

5.2.3 Checking the Protective Earthing

Check the earthing on the meter 6.0 Documentation

Test Sheet TS-VM01 shall be completed for each and every voltmeter. 7.0 References 8.0 Attachment

8.1 Test Sheet for Voltmeter TS-VM01 ***End of the Procedure ***

Page 200

Page 201: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

Riyadh Po“1062

STARTU

TES

ower plant21166/00”

UP MANUA

ST SH

t # 10

AL DF

EETS

Date:13 Feb,09

Revision0

n:

Page 201

Page 202: PP10 startup manual (Unofficial as Requested)

Switch Gear Location: Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-VM01 Page 1 of 1

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Volt Meter

Date:13/02/09, Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

1. Technical data Meter : _________ Type : _________ Make : _________ Serial No.(L1,L2,L3) : _________ Range : _________ Class : ___________

VT’s data : VT Ratio : _________ Accuracy Class : ___________

2

Mechanical Checks and Visual Inspection 1. Inspect for physical damage/ defects 2. verify connection as per approved drawing 3. check tightness of all connection 4. check ferrules 5. check apparatus list

3

3.1

3.2

Electrical Test Functional test 1. Functional check of selector switch 2. Test switch/plug checked for correct function Secondary Injection

INJECTED EXPECTED ACTUALVOLTAGE READING READING

16.5933.1949.7966.39

ERROR in %PHASE

Test Equipment Model Cal due date Test Equipment Model Cal due date

Page 202

Page 203: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

M

: SEC-C : : BEMCO

10-BS-SU-

MEDIU

COA

O

R

-001

TESTM VO

Riyadh Po“1062

STARTU

TING PLTAGE

ower plant21166/00”

UP MANUA

PROCE SWI

t # 10

AL DF

EDURTCHG

Date:13 Feb,09

RE FORGEAR B

Revision0

R BUS B

n:

BAR

Page 203

Page 204: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-BB01, Page 1 of 7 Equipment : MV Bus Bar Date:13 Feb,09 Revision: 0

TABLE OF CONTENT

1. Task

a. Work Status------------------------------------------------------------------------------------------------2 b. Documentation--------------------------------------------------------------------------------------------2 c. Personnel---------------------------------------------------------------------------------------------------2 d. Measuring Instrumentation-----------------------------------------------------------------------------2

2. Preconditions---------------------------------------------------------------------------------------------------2 3. Precautions------------------------------------------------------------------------------------------------------2 4. Scope--------------------------------------------------------------------------------------------------------------3 5. Execution---------------------------------------------------------------------------------------------------------3

a. Visual Inspection------------------------------------------------------------------------------------------3 b. Testing of MV Bus Bar

1. Bus continuity and phasing test----------------------------------------------------------------3 2. Torque test------------------------------------------------------------------------------------------3 3. Contact Resistance test--------------------------------------------------------------------------4 4. Main Circuit Contact Resistance test---------------------------------------------------------4 5. Insulation resistance test before hipot--------------------------------------------------------5 6. High Voltage test-----------------------------------------------------------------------------------6 7. Insulation Resistance test after hipot---------------------------------------------------------7 8. Protective earthing check------------------------------------------------------------------------7

6. Documents-------------------------------------------------------------------------------------------------------7 7. Reference---------------------------------------------------------------------------------------------------------7 8. Attachment-------------------------------------------------------------------------------------------------------7

Page 204

Page 205: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-BB01, Page 2 of 7 Equipment : MV Bus Bar Date:13 Feb,09 Revision: 0

1.0 Task

The purpose of this procedure is to test and document the integrity bus bar of metal enclosed switchgear assemblies of 480, 4.16kV and 13.8 kV levels using an ac/dc source.

2.0 Preconditions

2.1 Work Status • Erection has been completed. • Labelling of the equipment and designation of live enclosed plant sections has

been carried out.

2.2 Documentation • The bus bar diagram of the switch gear is available • Commissioning checklists TS-BB01

2.3 Personnel • 1 Commissioning engineer: Engineer or technician with experience in

commissioning of all types of the electrical equipments • 1 Helper: skilled worker with adequate on-the-job training.

2.4 Measuring Instruments and Tools

• Torque wrench • Micro ohm meter 10A and 100A • Insulation Tester 5000V dc • High voltage tester AC (up to 50 KV or DC (up to 80 KV) • Discharge hot stick

3.0 Precautions The work will only proceed when a Permit to Work (PTW) in work permit area has been obtained. The PTW will be kept on site for consultation during the testing works.

Special attention will be given to: • Due to high voltage being used, adequate safety precautions should be taken to avoid

injury to personnel and damage to the property. • Cordoning off specified working area and provision of applicable safety warning sign

board. • Ensure that all the necessary test equipment are made available at the test area and

with valid calibration stickers and certificate. • Hand insulating gloves and grounding sticks / wire jumpers shall be provided for safe

handling and draining of residual voltage. • Switch gear should be disconnected from the bus duct by removing the flexible braid.

The bus bur of the bus duct should be connected to ground. • Ensure that all voltage transformers are disconnected for the duration of the test and

that all current transformers are short-circuited. • Immediately after testing of each phase, voltage residue shall be drain by using

grounding stick / wire which is directly connected to earth. • Test equipment operation shall be in accordance with the manufacturer's instructions. • Closing of the work permit after completion of the work (if the test area is to be

considered in work permit area) is necessary.

Page 205

Page 206: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-BB01, Page 3 of 7 Equipment : MV Bus Bar Date:13 Feb,09 Revision: 0

4.0 Scope • Testing of bus bar • High voltage test on complete switch gear assembly • Circuit resistance for complete switch gear assembly • Checking that the bus bar mounting position is correct, • Checking of the phase and continuity • Checking of correct earthing,

5.0 Execution

5.1 Visual Checks • Check the bus bar for any damage and that they are bolted correctly, • Check the insulating boots on joints • Inspect for cleanliness, connections etc. • Check that complete bus bar is insulated and no damage of insulation • Check that all bus bar joints are silver plated • Check the enclosure for paint work

5.2 Testing the Bus Bar Enter the rating plate data in check list TS-BB01 and compare the switch gear data with the data contained in the circuit documentation. The following test shall be carried out

1. Bus continuity and phasing test 2. Torque test 3. Contact Resitance test 4. Main Circuit Contact Resitance test 5. Insulation resistance test before hipot 6. High Voltage test 7. Insulation resistance test after hipot 8. Protective earthing check

5.2.1 Bus Continuity and Phasing Test

Continuity and phasing test can be done by simple ohm meter or fluk Connect the extreme end of the single phase of the bus with ground and check the resistance between phases and ground. All the phases should read infinity except the grounded phase. Thus the phase is identified and continuity is checked. Repeat the test on remaining two phases.

5.2.2 Torque Test Torque shall be applied to all joints made at site. The bolts shall be tightened according to manufacturer instruction after the bus bar erection completion. Spot check shall be carried out using a calibrated torque wrench. Following is reference in case data from manufacturer is not available Bolt tighten maximum value,

Page 206

Page 207: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-BB01, Page 4 of 7 Equipment : MV Bus Bar Date:13 Feb,09 Revision: 0

Bolt Maximum Size value M 6 8 Nm M 8 20 Nm M 10 40 Nm M 12 70 Nm M 16 140 Nm Tolerance : ± 20 %

5.2.3 Contact Resistance Test The contact resistance test will be carried out after torque completion and will be applied to all bus bar joints. The test requires to measure very small fluctuations in resistance while simulating actual operating conditions. A DC power source will inject the test current up to 100 A and digital voltmeter will measure the voltage drop across the joints under test, Thus V/I gives Resistance Contact resistance can also be measured using micro ohm meter as shown in figure below.

• Check the resistance for all the bus bar joints using micro-ohm meter 100 A.

• Check the over all resistance of the bus bar for each phase using micro-ohm meter 100A.

M IC R O O H M M E T E R

C O N T A C T R E S I S T A N C E T E S T A R R A N G E M E N T F O R P R I M A R Y C IR C U IT S

5.2.4 Main Circuit Contact Resistance Test. • The main circuit resistance test shall be performed by 10A or 100

Ampere DC micro-ohmmeter from panel to panel on each phase from cable spouts with all circuit breakers racked in service and close position.

• For judgment, the resistance values from panel to panel should not vary too much if the number of joints and length of bus bar remains the same.

• Contact Resistance Measurment shall be performed on all the bus including ground bus

Page 207

Page 208: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-BB01, Page 5 of 7 Equipment : MV Bus Bar Date:13 Feb,09 Revision: 0

5.2.5 Insulation Resistance Test Before High Voltage Test

Before performing high voltage test Perform the Insulation resistance test with 1000Vdc for LV switch gear and 5000Vdc for MV switch gear as under

• Close all the breakers in service position make sure out going cables and bus duct is still not connected.

• Isolate the VTs and short the CTs secondary of all the feeders • Connect the phases Y, B to ground and apply the test voltage

between phase R and ground and note down the readings. • Connect the phases B, R to ground and apply the test voltage

between phase Y and ground and note down the readings. • Connect the phases R, Y to ground and apply the test voltage

between phase B and ground and note down the readings. • Open all the breakers in service position, • Connect the phases R, Y, B Cable side to the ground on all the

breakers. • Connect the phases R, Y, B Bus side to the test set. • Record the corresponding leakage current readings.

Page 208

Page 209: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-BB01, Page 6 of 7 Equipment : MV Bus Bar Date:13 Feb,09 Revision: 0

5.2.6 High Voltage Test AC high- pot test shall be carried out in accordance with IEC standard at site. The test shall be carried out on MV Bus bar with all CB’s racked in close and open position. In LV panel all Breakers to be kept racked out. Test is performed as under

• Incoming and out going cables disconnected • Voltage transformers primary disconnected. • Current transformer secondary shorted. • Electronic component of measuring and control equipment, if

assembled to be removed to avoid damages. • The test voltage to carry out the test is as per table below for different

voltage levels • Test voltage for LV switch gear is 2kv.

When all the CB are Closed • Connect the phases Y, B to ground and apply the test voltage

between phase R and ground. Record the leakage current • Connect the phases B, R to ground and apply the test voltage

between phase Y and ground. Record the leakage current • Connect the phases R, Y to ground and apply the test voltage

between phase B and ground. Record the leakage current

When all the CBs are Opened • Connect the phases R, Y, B Cable side of all the breakers to the

ground. • Connect the phases R, Y, B Bus side to the test set. • Record the corresponding leakage current readings.

Page 209

Page 210: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-BB01, Page 7 of 7 Equipment : MV Bus Bar Date:13 Feb,09 Revision: 0

Table-1

AC Testing High-potential

Test Partial Discharge Test DC Testing

Equipment Rated

Voltage, kV Test

Level, kV

Time, Min

Extinction Level, kV

Pulse Magnitude,

pC

Time, Min

Test level,

kV

Time, Min

Bus Duct : Isolated phase Bus (IPB) 25 45(60) 1 19 100 2 64 1

Metal-Enclosed Rigid Bus 13.8 27(36) 1 10.5(10.5) 100(100) 2 37(50) 1

4.16 14(19) 1 3.5(3.5) 100(100) 2 N/A N/A Switchgear 13.8 27(36) 1 10.5(10.5) 100(100) 2 N/A N/A

5.2.7 Insulation Resitance test after High Voltage Test

After performing high voltage test Perform the Insulation resistance test with 1000Vdc for LV switch gear and 5000Vdc for MV switch gear as describe in 5.2.5

5.2.8 Checking the protective earthing Switch gear protective earthing bond must be earthed in order to afford protection to human beings. Protective earthing bond should be checked for it continuity between each panel, it is preferable to check total resistance of grounding bus.

6.0 Documents Test Sheet TS-BB01 shall be completed.

7.0 References: 8.0 Attachment

8.1 Test Sheet for MV Bus Bar TS-BB01

***End of the Procedure ***

Page 210

Page 211: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

Riyadh Po“1062

STARTU

TES

ower plant21166/00”

UP MANUA

ST SH

t # 10

AL DF

EETS

Date:13 Feb,09

Revision0

n:

Page 211

Page 212: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10 “10621166/00”

Form No: TS-BB01 Page 1 of 6

Customer Consultant Contractor

: : :

SEC-EOA : BEMCO

Testing of Bus Bar of MV Switch board

Date:13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

1. Technical data

Manufacturer:...............................................................................................

Type designation:.........................................................................................

Serial No / year of manufacturing:...............................................................

Rated voltage:.............................................................................................. Rated nominal current:.................................................................................

2.

Visual check

i. Check the bus bar for any damage and they are bolted correctly, ii. Check the insulating boots on joints iii. Check that complete bus bar is insulated and no damage of insulation iv. Check that all bus bar joints are silver plated v. Check the enclosure for paint work vi. Check the insulator for any cracks or damage vii. Check insulation damage, cleanliness, connections etc.

3.

Mechanical check Torque Check Perform and Check the torque for all the interconnection joints of the bus bar which are made at site. Torque should be checked as per following values.

Bolt Maximum Size value M 6 8 Nm M 8 20 Nm M 10 40 Nm M 12 70 Nm M 16 140 Nm

Page 212

Page 213: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10 “10621166/00”

Form No: TS-BB01 Page 2 of 6

Customer Consultant Contractor

: : :

SEC-EOA : BEMCO

Testing of Bus Bar of MV Switch board

Date:13/02/09 ,Revision: 0

No

ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

4.

4.1

Electrical test on Bus Bar Bus Bar Continuity and phasing test

Continuity Phases From Tie CB- left extreme CB

From Tie CB- Right extreme CB

Phasing

Phase A Phase B Phase C Neutral Ground

4.2

Contact Resistance Test: Test results for Bus bar Joints is attached Injected Current -------------Amps DC

Contact Resistance in µ Ohms Phases Joint-1 Joint-2 Joint-3 Joint-4 Joint-5 Joint-6 Phase R Phase Y Phase B Neutral Ground

4.3

Main Circuit Contact Resitance test. Note: Resistance to be measured from line terminal of the main breaker to all the out going breaker terminals when breakers are closed

a. Main-1- CLOSE. Tie-CLOSE and Main-2 –CLOSE Total Resistance:

Phase Resistance in µΩ Phase A Phase B Phase C

Page 213

Page 214: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10 “10621166/00”

Form No: TS-BB01 Page 3 of 6

Customer Consultant Contractor

: : :

SEC-EOA : BEMCO

Testing of Bus Bar of MV Switch board

Date:13/02/09 ,Revision: 0

No

ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

b. When Main -1 and Branch breakers are closed

Contact Resistance in Micro Ohms Cubicle No.

Phase A Phase B Phase C Neutral

Contact Resistance in Micro Ohms Cubicle No.

Phase A Phase B Phase C Neutral

c. When Main -2 and Branch breakers are closed

Contact Resistance in Micro Ohms Cubicle No.

Phase A Phase B Phase C Neutral

Contact Resistance in Micro Ohms Cubicle No.

Phase A Phase B Phase C Neutral

Page 214

Page 215: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10 “10621166/00”

Form No: TS-BB01 Page 4 of 6

Customer Consultant Contractor

: : :

SEC-EOA : BEMCO

Testing of Bus Bar of MV Switch board

Date:13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

4.4

Insulation Resistance Measurment. Before Hipot Test. Minimum Value: BUS A

Condition When breaker are closed Phase R-G Y-G B-G R-Y Y-B B-R G-ohms Test Voltage

BUS B

Condition When breaker are closed Phase R-G Y-G B-G R-Y Y-B B-R G-ohms Test Voltage

4.5

Hipot Test at ------------ KV AC for I minute. (Power Frequency) Bus A

Leakage Current in m A (All breaker closed) Duration R-Y+B+G Y-R+B+G B-R+Y+G

15 Sec 30 Sec 45 Sec 60 Sec

Bus B

Leakage Current in m A (All breaker closed) Duration R-Y+B+G Y-R+B+G B-R+Y+G

15 Sec 30 Sec 45 Sec 60 Sec

Page 215

Page 216: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10 “10621166/00”

Form No: TS-BB01 Page 5 of 6

Customer Consultant Contractor

: : :

SEC-EOA : BEMCO

Testing of Bus Bar of MV Switch board

Date:13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

Hipot Test at ------------ KV AC for I minute. (Power Frequency) Bus A

Leakage Current in m A (all breaker are opened) Duration R-Y+B+G Y-R+B+G B-R+Y+G

15 Sec

30 Sec

45 Sec

60 Sec

Bus B Leakage Current in m A (all are opened) Duration R-Y+B+G Y-R+B+G B-R+Y+G

15 Sec

30 Sec

45 Sec

60 Sec

4.6

Insulation Resistance Measurment. After Hipot Test. BUS A

Condition When breaker are Opened Phase R-G Y-G B-G R-Y Y-B B-R G-ohms Test Voltage

Page 216

Page 217: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10 “10621166/00”

Form No: TS-BB01 Page 6 of 6

Customer Consultant Contractor

: : :

SEC-EOA : BEMCO

Testing of Bus Bar of MV Switch board

Date:13/02/09 ,Revision: 0

Test Equipment Model Cal due date Test Equipment Model Cal due date

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

BUS A

Condition When breaker are Opened Phase R-G Y-G B-G R-Y Y-B B-R G-ohms Test Voltage

4.7

Protective Earthing

1. Check that earthing bus bar is grounded at minimum two points 2. earthing bar is passing all the cubicles

Page 217

Page 218: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

LOW

COA

O

R

-001

TEST VOLT

Riyadh Po“1062

STARTU

TING PTAGE S

ower plant21166/00”

UP MANUA

PROCSWITC

t # 10

AL DF

EDURCHGEA

Date:13 Feb,09

RE FORAR BU

Revision0

R US BAR

n:

R

Page 218

Page 219: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-BB02, Page 1 of 7 Equipment : LV Bus Bar Date:13 Feb,09 Revision: 0

TABLE OF CONTENT

1. Task

a. Work Status------------------------------------------------------------------------------------------------2 b. Documentation--------------------------------------------------------------------------------------------2 c. Personnel---------------------------------------------------------------------------------------------------2 d. Measuring Instrumentation-----------------------------------------------------------------------------2

2. Preconditions---------------------------------------------------------------------------------------------------2 3. Precautions------------------------------------------------------------------------------------------------------2 4. Scope--------------------------------------------------------------------------------------------------------------3 5. Execution---------------------------------------------------------------------------------------------------------3

a. Visual Inspection------------------------------------------------------------------------------------------3 b. Testing of LV Bus Bar

1. Bus continuity and phasing test----------------------------------------------------------------3 2. Torque test------------------------------------------------------------------------------------------3 3. Contact Resistance test--------------------------------------------------------------------------4 4. Main Circuit Contact Resistance test---------------------------------------------------------4 5. Insulation resistance test before hipot--------------------------------------------------------5 6. High Voltage test-----------------------------------------------------------------------------------6 7. Insulation Resistance test after hipot---------------------------------------------------------7 8. Protective earthing check------------------------------------------------------------------------7

6. Documents-------------------------------------------------------------------------------------------------------7 7. Reference---------------------------------------------------------------------------------------------------------7 8. Attachment-------------------------------------------------------------------------------------------------------7

Page 219

Page 220: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-BB02, Page 2 of 7 Equipment : LV Bus Bar Date:13 Feb,09 Revision: 0

1.0 Task The purpose of this procedure is to test and document the integrity bus bar of metal enclosed switchgear assemblies of 480V levels using an ac/dc source.

2.0 Preconditions

2.1 Work Status • Erection has been completed. • Labelling of the equipment and designation of live enclosed plant sections has

been carried out.

2.2 Documentation • The bus bar diagram of the electrical equipment cabinets are available • Commissioning checklists TS-BB02

2.3 Personnel • 1 Commissioning engineer: Engineer or technician with experience in

commissioning of all types of the electrical equipments • 1 Helper: skilled worker with adequate on-the-job training.

2.4 Measuring Instruments and Tools

• Torque wrench • Micro ohm meter 10A and 100A • Insulation Tester 5000V dc • High voltage tester AC (up to 2 KV • Discharge hot stick

3.0 Precautions The work will only proceed when a Permit to Work (PTW) in work permit area has been obtained. The PTW will be kept on site for consultation during the testing works.

Special attention will be given to: • Due to high voltage being used, adequate safety precautions should be taken to avoid

injury to personnel and damage to the property. • Cordoning off specified working area and provision of applicable safety warning sign

board. • Ensure that all the necessary test equipment are made available at the test area and

with valid calibration stickers and certificate. • Hand insulating gloves and grounding sticks / wire jumpers shall be provided for safe

handling and draining of residual voltage. • Switch gear should be disconnected from the bus duct by removing the flexible braid.

The bus bur of the bus duct should be connected to ground. • Ensure that all voltage transformers are disconnected for the duration of the test and

that all current transformers are short-circuited. • Immediately after testing of each phase, voltage residue shall be drain by using

grounding stick / wire which is directly connected to earth. • Test equipment operation shall be in accordance with the manufacturer's instructions. • Closing of the work permit after completion of the work (if the test area is to be

considered in work permit area) is necessary.

Page 220

Page 221: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-BB02, Page 3 of 7 Equipment : LV Bus Bar Date:13 Feb,09 Revision: 0

4.0 Scope

• Testing of bus bar • High voltage test on complete switch gear assembly • Circuit resistance for complete switch gear assembly • Checking that the bus bar mounting position is correct, • Checking of the phase and continuity • Checking of correct earthing,

5.0 Execution

5.1 Visual Checks • Check the bus bar for any damage and that they are bolted correctly, • Check the insulating boots on joints • Inspect for cleanliness, connections etc. • Check that complete bus bar is insulated and no damage of insulation • Check that all bus bar joints are silver plated • Check the enclosure for paint work

5.2 Testing the Bus Bar Enter the rating plate data in check list TS-BB01 and compare the switch gear data with the data contained in the circuit documentation. The following test shall be carried out

1. Bus continuity and phasing test 2. Torque test 3. Contact Resitance test 4. Main Circuit Contact Resitance test 5. Insulation resistance test before hipot 6. High Voltage test 7. Insulation resistance test after hipot 8. Protective earthing check

5.2.1 Bus Continuity and Phasing Test

Continuity and phasing test can be done by simple ohm meter or fluk Connect the extreme end of the single phase of the bus with ground and check the resistance between phases and ground. All the phases should read infinity except the grounded phase. Thus the phase is identified and continuity is checked. Repeat the test on remaining two phases.

5.2.2 Torque Test Torque shall be applied to all joints made at site. The bolts shall be tightened according to manufacturer instruction after the bus bar erection completion. Spot check shall be carried out using a calibrated torque wrench. Following is reference in case data from manufacturer is not available Bolt tighten maximum value,

Page 221

Page 222: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-BB02, Page 4 of 7 Equipment : LV Bus Bar Date:13 Feb,09 Revision: 0

Bolt Maximum Size value M 6 8 Nm M 8 20 Nm M 10 40 Nm M 12 70 Nm M 16 140 Nm Tolerance: ± 20 %

5.2.3 Contact Resistance Test The contact resistance test will be carried out after torque completion and will be applied to all bus bar joints. The test requires to measure very small fluctuations in resistance while simulating actual operating conditions. A DC power source will inject the test current up to 100 A and digital voltmeter will measure the voltage drop across the joints under test, Thus V/I gives Resistance Contact resistance can also be measured using micro ohm meter as shown in figure below.

• Check the resistance for all the bus bar joints using micro-ohm meter 100 A.

• Check the over all resistance of the bus bar for each phase using micro-ohm meter 100A.

M IC R O O H M M E T E R

C O N T A C T R E S I S T A N C E T E S T A R R A N G E M E N T F O R P R I M A R Y C IR C U IT S

5.2.4 Main Circuit Contact Resistance Test. • The main circuit resistance test shall be performed by 10A or 100

Ampere DC micro-ohmmeter from panel to panel on each phase from cable spouts with all circuit breakers racked in service and close position.

• For judgment, the resistance values from panel to panel should not vary too much if the number of joints and length of bus bar remains the same.

• Contact Resistance Measurement shall be performed on all the bus including ground bus

Page 222

Page 223: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-BB02, Page 5 of 7 Equipment : LV Bus Bar Date:13 Feb,09 Revision: 0

5.2.5 Insulation Resistance Test Before High Voltage Test

Before performing high voltage test perform the Insulation resistance test with 1000Vdc for LV switch gear as under

• Close all the breakers in service position make sure out going cables and bus duct is still not connected.

• Isolate the VTs and short the CTs secondary of all the feeders • Connect the phases Y, B to ground and apply the test voltage

between phase R and ground and note down the readings. • Connect the phases B, R to ground and apply the test voltage

between phase Y and ground and note down the readings. • Connect the phases R, Y to ground and apply the test voltage

between phase B and ground and note down the readings. • Open all the breakers in service position, • Connect the phases R, Y, B Cable side to the ground on all the

breakers. • Connect the phases R, Y, B Bus side to the test set. • Record the corresponding leakage current readings.

Page 223

Page 224: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-BB02, Page 6 of 7 Equipment : LV Bus Bar Date:13 Feb,09 Revision: 0

5.2.6 High Voltage Test AC high- pot test shall be carried out in accordance with IEC standard at site. The test shall be carried out on LV Bus bar with all CB’s racked in close and open position. Test is performed as under

• Incoming and out going cables disconnected • Voltage transformers primary disconnected. • Current transformer secondary shorted. • Electronic component of measuring and control equipment, if

assembled to be removed to avoid damages. • Test voltage for LV switch gear is 2kv.

When all CBs are Closed • Connect the phases Y, B to ground and apply the test voltage

between phase R and ground. Record the leakage current • Connect the phases B, R to ground and apply the test voltage

between phase Y and ground. Record the leakage current • Connect the phases R, Y to ground and apply the test voltage

between phase B and ground. Record the leakage current

When all CBs are Opened • Connect the phases R, Y, B Cable side of all the breakers to the

ground. • Connect the phases R, Y, B Bus side to the test set. • Record the corresponding leakage current readings.

Page 224

Page 225: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-BB02, Page 7 of 7 Equipment : LV Bus Bar Date:13 Feb,09 Revision: 0

5.2.7 Insulation Resistance Test after High Voltage Test After performing high voltage test Perform the Insulation resistance test with 1000Vdc for LV switch gear as describe in 5.2.5

5.2.8 Checking the Protective Earthing Switch gear protective earthing bond must be earthed in order to afford protection to human beings. Protective earthing bond should be checked for it continuity between each panel, it is preferable to check total resistance of grounding bus.

6.0 Documentation Test Sheet TS-BB02 shall be completed.

7.0 References: 8.0 Attachment

8.1 Test Sheet for LV Bus Bar TS-BB02

***End of the Procedure ***

Page 225

Page 226: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

Riyadh Po“1062

STARTU

TES

ower plant21166/00”

UP MANUA

ST SH

t # 10

AL DF

EETS

Date:13 Feb,09

Revision0

n:

Page 226

Page 227: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10 “10621166/00”

Form No: TS-BB02, Page 1 of 7

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Bus Bar of LV Switch board

Date: 13/02/09,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

1. Technical data

Manufacturer:...............................................................................................

Type designation:.........................................................................................

Serial No / year of manufacturing:...............................................................

Rated voltage:.............................................................................................. Rated nominal current:.................................................................................

2.

Visual check

i. Check the bus bar for any damage and they are bolted correctly, ii. Check the insulating boots on joints iii. Check that complete bus bar is insulated and no damage of insulation iv. Check that all bus bar joints are silver plated v. Check the enclosure for paint work vi. Check the insulator for any cracks or damage vii. Check insulation damage, cleanliness, connections etc.

3.

Mechanical check Torque Check Perform and Check the torque for all the interconnection joints of the bus bar which are made at site. Torque should be checked as per following values.

Bolt Maximum Size value M 6 8 Nm M 8 20 Nm M 10 40 Nm M 12 70 Nm M 16 140 Nm

Page 227

Page 228: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10 “10621166/00”

Form No: TS-BB02, Page 2 of 7

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Bus Bar of LV Switch board

Date: 13/02/09,Revision: 0

No

ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

4.

4.1

Electrical test on Bus Bar Bus Bar Continuity and phasing test

Continuity Phases From Tie CB- left extreme CB

From Tie CB- Right extreme CB

Phasing

Phase A Phase B Phase C Neutral Ground

4.2

Contact Resistance Test: Test results for Bus bar Joints is attached Injected Current -------------Amps DC

Contact Resistance in µ Ohms Phases Joint-1 Joint-2 Joint-3 Joint-4 Joint-5 Joint-6 Phase R Phase Y Phase B Neutral Ground

Page 228

Page 229: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10 “10621166/00”

Form No: TS-BB02, Page 3 of 7

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Bus Bar of LV Switch board

Date: 13/02/09,Revision: 0

No

ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

4.3

Main Circuit Contact Resitance test. Note: Resistance to be measured from line terminal of the main breaker to all the out going breaker terminals when breakers are closed

a. Main-1- CLOSE. Tie-CLOSE and Main-2 –CLOSE Total Resistance:

Phase Resistance in µΩ Phase A Phase B Phase C

b. When Main -1 and Branch breakers are closed

Contact Resistance in Micro Ohms Cubicle No.

Phase A Phase B Phase C Neutral

Contact Resistance in Micro Ohms Cubicle No.

Phase A Phase B Phase C Neutral

Page 229

Page 230: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10 “10621166/00”

Form No: TS-BB02, Page 4 of 7

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Bus Bar of LV Switch board

Date: 13/02/09,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

c. When Main -2 and Branch breakers are closed

Contact Resistance in Micro Ohms Cubicle No.

Phase A Phase B Phase C Neutral

Contact Resistance in Micro Ohms Cubicle No.

Phase A Phase B Phase C Neutral

4.4

Insulation Resistance Measurment. Before Hipot Test. Minimum Value: BUS A

Condition When breaker are closed Phase R-G Y-G B-G R-Y Y-B B-R G-ohms Test Voltage

Page 230

Page 231: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10 “10621166/00”

Form No: TS-BB02, Page 5 of 7

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Bus Bar of LV Switch board

Date: 13/02/09,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

BUS B

Condition When breaker are closed Phase R-G Y-G B-G R-Y Y-B B-R G-ohms Test Voltage

4.5

Hipot Test at ------------ KV AC for I minute. (Power Frequency) Bus A

Leakage Current in m A (All breaker closed) Duration R-Y+B+G Y-R+B+G B-R+Y+G

15 Sec

30 Sec

45 Sec

60 Sec

Bus B

Leakage Current in m A (All breaker closed) Duration R-Y+B+G Y-R+B+G B-R+Y+G

15 Sec

30 Sec

45 Sec

60 Sec

Page 231

Page 232: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10 “10621166/00”

Form No: TS-BB02, Page 6 of 7

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Bus Bar of LV Switch board

Date: 13/02/09,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

Hipot Test at ------------ KV AC for I minute. (Power Frequency) Bus A

Leakage Current in m A (all breaker are opened) Duration R-Y+B+G Y-R+B+G B-R+Y+G

15 Sec

30 Sec

45 Sec

60 Sec

Bus B Leakage Current in m A (all are opened) Duration R-Y+B+G Y-R+B+G B-R+Y+G

15 Sec

30 Sec

45 Sec

60 Sec

4.6

Insulation Resistance Measurment. After Hipot Test. BUS A

Condition When breaker are Opened Phase R-G Y-G B-G R-Y Y-B B-R G-ohms Test Voltage

Page 232

Page 233: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10 “10621166/00”

Form No: TS-BB02, Page 7 of 7

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Bus Bar of LV Switch board

Date: 13/02/09,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

BUS A

Condition When breaker are Opened Phase R-G Y-G B-G R-Y Y-B B-R G-ohms Test Voltage

4.7

Protective Earthing

1. Check that earthing bus bar is grounded at minimum two points 2. earthing bar is passing all the cubicles

Test Equipment Model Cal due date Test Equipment Model Cal due date

Page 233

Page 234: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

M

COA

O

R

-001

TESTEDIUM

Riyadh Po“1062

STARTU

TING PM VOLBREA

ower plant21166/00”

UP MANUA

PROCLTAGEAKER F

t # 10

AL DF

EDURE SWITFEEDE

Date:13 Feb,09

RE FORTCHGEER

Revision0

R EAR

n:

Page 234

Page 235: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-MB01, Page 1 of 12 Equipment : MV Switch gear(Feeders) Date:13 Feb,09 Revision: 0

TABLE OF CONTENT

1. Task a. Work Status--------------------------------------------------------------------------------------------------------2 b. Documentation----------------------------------------------------------------------------------------------------2 c. Personnel-----------------------------------------------------------------------------------------------------------2 d. Measuring Instrumentation-------------------------------------------------------------------------------------2

2. Preconditions------------------------------------------------------------------------------------------------------------2 3. Precautions---------------------------------------------------------------------------------------------------------------2 4. Scope-----------------------------------------------------------------------------------------------------------------------3 5. Execution------------------------------------------------------------------------------------------------------------------3

a. Visual Inspection-----------------------------------------------------------------------------------------------------3 b. Testing of MV CB and Feeder-----------------------------------------------------------------------------------3

1. Operation and alignment Checks of breaker liftingTrolley----------------------------------------4 2. Tests on the CB

a. Breaker Manual closing/opening, and manual spring charging-----------------------------4 b. Contact gap Measurement for main contact of the VCB--------------------------------------5 c. Contact Resistance test-------------------------------------------------------------------------------5 d. Insulation resistance test before hipot-------------------------------------------------------------6 e. Vacuum Integrity test on VCB f. High Voltage test.---------------------------------------------------------------------------------------6 g. Insulation resistance test after hipot.---------------------------------------------------------------7 h. Minimum operating voltage for close and trip coil.----------------------------------------------8 i. Breaker operating time. (Only Main Breaker which has Synch. Facilities)---------------8 j. Spring charging motor current and time measurement.---------------------------------------8 k. Stored energy and spring charge mechanism checks.----------------------------------------9

3. Breaker operation a. CB Racking IN and OUT Checks-------------------------------------------------------------------9 b. CB operation in service position mechanical and electrical----------------------------------9 c. CB operation in test position electrical------------------------------------------------------------9 d. Anti pumping functional check----------------------------------------------------------------------9 e. Functional test of local controls, alarm and Indication---------------------------------------10 f. Functional Test of Remote control, alarm, and indication-----------------------------------10

4. Checks for operation of Auxiliary switches ,limit switches for test, service ----------------10 5. Functional check of interlock and limit switches.---------------------------------------------------10 6. Operation of Earth Switch--------------------------------------------------------------------------------11 7. Electrical control and protection/Measuring Devices----------------------------------------------11 8. Protective Earthing check--------------------------------------------------------------------------------11 9. Check for interchangeable of CB of same rating for Interference interlock-----------------11 10. Commissioning of Heater Circuit-----------------------------------------------------------------------12 11. Checks before and After initial Energization --------------------------------------------------------12

6. Documents--------------------------------------------------------------------------------------------------------------12 7. Reference----------------------------------------------------------------------------------------------------------------12 8. Attachment--------------------------------------------------------------------------------------------------------------12

Page 235

Page 236: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-MB01, Page 2 of 12 Equipment : MV Switch gear(Feeders) Date:13 Feb,09 Revision: 0

1.0 Task

The purpose of this procedure is to test, commission and document feeder and MV circuit breaker feeder in metal enclosed switchgear assemblies of 4.16kV and 13.8 kV levels.

2.0 Preconditions

2.1 Work Status • Erection has been completed. • Labelling of the equipment and designation of live enclosed plant sections has

been carried out.

2.2 Documentation • The schematic and single line diagram of the medium voltage switchgear are

available • Commissioning checklists TS-MB01

2.3 Personnel • 1 Commissioning engineer: Engineer or technician with experience in

commissioning of all types of Electrical equipments. • 1 Helper: skilled worker with adequate on-the-job training.

2.4 Measuring Instruments and Tools

• Micro ohm meter 10A and 100A • Insulation Tester 5000V dc • High voltage tester AC (up to 50 KV or DC (up to 80 KV) • Discharge hot stick • Secondary Injection • Fluke-2 Nos

3.0 Precautions The work will only proceed when a Permit to Work (PTW) in work permit area has been obtained. The PTW will be kept on site for consultation during the testing works.

Special attention will be given to: • Due to high voltage being used, adequate safety precautions should be taken to avoid

injury to personnel and damage to property. • Cordoning off specified working area and provision of applicable safety warning sign

board. • Ensure that all the necessary test equipment are made available at the test area and

with valid calibration stickers and certificate. • Hand insulating gloves and grounding sticks / wire jumpers shall be provided for safe

handling and draining of residual voltage. • Breaker should be withdrawn from the cubicle during breaker testing. • Immediately after testing of each phase, voltage residue shall be drain by using

grounding stick / wire which is directly connected to earth. • Closing of the work permit after completion of the work (if the test area is to be

considered in work permit area) is necessary.

Page 236

Page 237: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-MB01, Page 3 of 12 Equipment : MV Switch gear(Feeders) Date:13 Feb,09 Revision: 0

4.0 Scope • Testing of CB • Testing of Anti pumping facility • Operation of CB inside the feeder • Operation of Earting switch • Checking CB mounting.

5.0 Execution

5.1 Visual Checks • Check nameplate information for correctness. • Inspect enclosures for proper alignment, foundation fixing and grounding. • Inspect covers, panel section and door for paint work and proper fit. • Check for smooth and proper movement of racking mechanisms for alignment,

shutters, rollers, rails and guides. • Check for proper alignment of the breaker primary and secondary contacts. • Check operation of all mechanical interlocks. • Check tightness of all bolted connections (torque wrench method). • Check bus and supports for defects such as cracked welds, chipped porcelain,

cracked insulation, etc., and free of dust accumulation. • Verify that all front panel mounted devices (meters, push buttons, switches, indicator

lamps, mimic buses, etc.) are installed as per drawings • Perform mechanical check and visual inspection on the circuit breaker. • Perform mechanical check and visual inspection on disconnect and grounding

switches. • Check for correct breaker position indication. • Check for correct spring status indication (spring charged/discharged). • Perform all specific checks on the breaker and spring operating mechanism. • Check that all control wiring is correct according to the approved drawing and

terminal connections are secure.

WIRING AND FERRULING CHECK • Ensure the numbers on the ferules are from left to right beginning at the terminal

block i.e. at the end of the wire and from bottom to top. • The wire nos. should be checked against the wiring table and the schematic drawing.

5.2 Testing of CB and Feeder

Enter the rating plate data in check list TS-MB01 and compare the CB data with the data contained in the circuit documentation. The following test shall be carried out

1. Operation and alignment Checks of breaker liftingTrolley 2. Tests on the CB

a. Breaker Manual closing/opening, and manual spring charging b. Contact gap Measurement for main contact of the VCB c. Contact Resitance test d. Insulation resistance test before hipot e. Vacuum Integrity test on VCB f. High Voltage test.

Page 237

Page 238: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-MB01, Page 4 of 12 Equipment : MV Switch gear(Feeders) Date:13 Feb,09 Revision: 0

g. Insulation resistance test after hipot. h. Minimum operating voltage for close and trip coil. i. Breaker operating time. j. Spring charging motor current and time measurement. k. Stored energy and spring charge mechanism checks l. Functional check of C.B Operation counter

3. Breaker operation m. CB Racking IN and OUT Checks n. CB operation in service position mechanical and electrical o. CB operation in test position electrical p. Anti pumping functional check q. Functional test of local controls, alarm and Indication r. Functional Test of Remote control, alarm, and indication

4. Checks for operation of Auxiliary switches ,limit switches for test, service and

5. Operation of Earth Switch 6. Functional check of interlock and limit switches. 7. Electrical control and protection/Measuring Devices

s. Testing of protection devices t. Testing of CT and VT u. Testing of Transducers v. Testing of Alarm Devices

8. Protective earthing check 9. Check for interchangeable of CB of same rating for Interference interlock 10. Commissioning of Heater Circuit

w. Visual Checks x. Measurement of insulation resistance of heater and lamp circuit y. Functional checks of thermostat , Heaters, z. Measurement of Current and voltage

11. Checks before and After initial energization 5.2.1 Operation and Alignment Checks of Breaker Lifting Trolley.

Lifting trolley shall be checked for alignment, correct loading and unloading of the breaker as under • Aligned the trolley to the breaker roller guides in the cubicle • Engage the trolley with roller guides • Check for correct locking and unlocking of trolley with roller guides • Check for smooth rolling of the breaker in to the trolley • Check locking of trolley when breaker is boarded on the trolley • Disconnect the trolley from roller guides

5.2.2 Tests on Circuit Breaker

Breaker can be withdrawn from the feeder cubicle and test out side the feeder as this will ease the testing as under 5.2.2.1 Breaker Manual Closing/Opening and Manual Spring Charging

Mechanical operation of the breaker is checked as under • Charge the spring manually with help of lever. • Observe the spring charging indicator position, it should be

showing spring charged.

Page 238

Page 239: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-MB01, Page 5 of 12 Equipment : MV Switch gear(Feeders) Date:13 Feb,09 Revision: 0

• Push the mechanical push button for close. Breaker should be closed.

• Observe the breaker close indicator it should be red or “I”. • Once the breaker is close spring will get discharged and indicator

shows spring discharged. • Push the mechanical push button for open. Breaker should be.

opened. • Observe the breaker opened indicator it should be Blue or “O”. • Operation shall be done several times.

5.2.2.2 Contact Gap Measurement for Main Contact VCB Contact gap measurement is done with the help of dialed caliper as described in Vendor Manual

Curtsey: Cutler and hammer

5.2.2.3 Contact Resistance Test Breaker Contact resistance can be measured using micro ohm meter on each pole of the breaker when breaker is closed

• Connect the current and voltage leads of the micro ohmmeter

across the pole of the breaker • Apply a current of 100 amps and note down the reading • Repeat the test for other two pole also • For judgment, the resistance values from one pole to another

pole should not vary with big difference and the value should also be cross checked with manufacturer recommendation.

MICRO OHMMETER BYR

CB MAIN CONTACTS

CB CONTACT RESISTANCE TESTING ARRANGEMENT

Page 239

Page 240: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-MB01, Page 6 of 12 Equipment : MV Switch gear(Feeders) Date:13 Feb,09 Revision: 0

5.2.2.4 Insulation Resitance Test Before High Voltage Test Before performing high voltage test, perform the Insulation resistance test with 5000Vdc insulation tester. • Close the breaker. • Connect the phases Y, B to ground and apply the test voltage

between phase R and ground and note down the readings. • Connect the phases B, R to ground and apply the test voltage

between phase Y and ground and note down the readings. • Connect the phases R, Y to ground and apply the test voltage

between phase B and ground and note down the readings. • Open the breaker, • Connect the phases R, Y, B Cable side to the ground on all the

breakers. • Connect the phases R, Y, B Bus side to the test set. • Record the corresponding leakage current readings.

5.2.2.5 Vacuum Integrity Test Vacuum integrity test is done when breaker is opened. In this test a dc high voltage is applied across the interrupter for around 5-10 cycles and observed healthiness of the vacuum interrupter as under • Breaker shall be kept open • Tester shall be connected across the vacuum bottle of one of the

phase , other two phase to be grounded both at top and bottom • Test Voltage is applied on the object to be tested for 5 cycles

and condition of the vacuum bottle is observed • Test shall be repeated for other two phases too • Test voltage value to be noted from the vendor manual. • Test can be done by using Programma Vacuum integrity tester Note: the vacuum integrity tester usually are of half wave rectified DC out put which can generate X ray when it is applied across the vacuum bottle, hence maximum distance to be maintained from the test object

5.2.2.6 High Voltage Test Note: high voltage test shall be done only in case breaker is not tested for high voltage along with the bus AC high- pot test shall be carried out in accordance with IEC standard at site. The test shall be carried out on MV CB in both close and open position. Test is performed as under

When the CB is Closed( shown in figure below) • The test voltage to carry out the test is as per below table. • Connect the phases Y, B to ground and apply the test voltage

gradually between phase R and ground. Record the leakage current

• Connect the phases B, R to ground and apply the test voltage gradually between phase Y and ground. Record the leakage current

Page 240

Page 241: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-MB01, Page 7 of 12 Equipment : MV Switch gear(Feeders) Date:13 Feb,09 Revision: 0

• Connect the phases R, Y to ground and apply the test voltage gradually between phase B and ground. Record the leakage current

HIGH POTTESTER BYR

CB MAIN CONTACTS

AC WITHSTAND VOLTAGE TESTING ARRANGEMENT

When the CB is Open(as shown in figure below) • Connect the phases R, Y, B Cable side of the breakers to the

ground. • Connect the phases R, Y, B Bus side of the breaker to the test

set. • Apply the test voltage gradually between ground and cable side

terminal of the breaker and ground • Record the corresponding leakage current readings.

HIGH POTTESTER BYR

CB MAIN CONTACTS

AC WITHSTAND VOLTAGE TESTING ARRANGEMENT

Table-1

AC Testing High-potential

Test Partial Discharge Test DC Testing

Equipment Rated

Voltage, kV Test

Level, kV

Time, Min

Extinction Level, kV

Pulse Magnitude,

pC

Time, Min

Test level,

kV

Time, Min

4.16 14(19) 1 3.5(3.5) 100(100) 2 N/A N/A Switchgear 13.8 27(36) 1 10.5(10.5) 100(100) 2 N/A N/A

5.2.2.7 Insulation Resitance Test after High Voltage Test

After performing high voltage test Perform the Insulation resistance test with 5000Vdc insulation tester as describe in 5.2.2

Page 241

Page 242: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-MB01, Page 8 of 12 Equipment : MV Switch gear(Feeders) Date:13 Feb,09 Revision: 0

5.2.2.8 Minimum Operating Voltage for Close and Trip Coil

5.2.2.8.1 Close Coil Minimum voltage required to close the breaker is measured by applying variable DC voltage to the closing coil of the breaker

• Connect the DC source to the closing coil of the breaker in series with dc ammeter

• Increase the voltage slowly till the breaker get closed , note down voltage and current readings

5.2.2.8.2 Trip Coil Minimum voltage required to Trip the breaker is measured by applying variable DC voltage to the Trip coil of the breaker

• Connect the DC source to the Trip coil of the breaker in series with dc ammeter

• Increase the voltage slowly till the breaker get opened , note down voltage and current readings

• Test should be repeated for both trip coils 5.2.2.9 Breaker Operating Time

Breaker closing and tripping time can be measured either by a timer or a breaker analyzer Timing Test Using an Electronic Oscillograph. • Connect the test set to the CB. • Perform the following operations at the rated DC • Close ( C ) , Open ( O ) , Close - Open ( C – O ) & Open –

Close – Open ( O – C – O ) • Record the corresponding readings.

R Y B

CB MAIN CONTACTS

CB CLOSING TERMINALS

CB TRIPPING TERMINALS

DC SUPPLY +

-

TRIPPINGORDER

CLOSINGORDER

CH. 1

CH. 2

CH. 3

CB TIMING TEST ARRANGEMENT

5.2.2.10 Spring Charging Time and Motor Current Measurement Spring charging motor current is measured by ammeter or DC clamp meter as under. • Switch off the CB of motor circuit • Connect the clamp meter in spring charging motor circuit • Discharge the spring if it is charged • Switch on the CB for motor circuit

Page 242

Page 243: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-MB01, Page 9 of 12 Equipment : MV Switch gear(Feeders) Date:13 Feb,09 Revision: 0

• Note down the current 5.2.2.11 Stored Energy and Spring Charge Mechanism Checks

Stored energy and spring charging is checked by performing several operations.

5.2.2.12 Functional Check of C.B Operation Counter Check the operation of the counter each time breaker is operated. Reading for the counter shall be recorded as reference

5.2.3 Breaker operation

5.2.3.1 CB Racking IN and OUT Checks CB Racking IN and OUT must be checked for a smooth movement. This should be checked several times

5.2.3.2 CB Operation in Service Position Mechanical and Electrical • Put the breaker in service position • Perform several Close and Open operation of the breaker

manually by operating mechanical buttons • Performer several Close and Open operation of the breaker

electrically both local and remote

5.2.3.3 CB Operation in Test Position • Put the breaker in Test position. • Perform several Close and Open operation of the breaker

manually by operating mechanical buttons. • Performer several Close and Open operation of the breaker

electrically from local.

5.2.3.4 Anti Pumping Functional Check Anti pump Relay function should be checked as per table below

Step Operation Trip signal applied

Breaker Operation

Breaker status

1

Breaker control switch switched to “CLOSE” and held in CLOSE position

NO Breaker CLOSED

Breaker remains CLOSED

2 Breaker control switch held in

“CLOSE” position

YES Electrically

Breaker Trips and does not

attempt to RECLOSE

Breaker remains OPENS

3 Breaker control

switch returned to NORMAL

NO None Breaker remains OPEN

4

Breaker control switch switched to “CLOSE” and held in CLOSE position

NO Breaker CLOSED

Breaker remains CLOSED

5 Breaker control switch held in

“CLOSE” position

YES Mechanically

Breaker Trips and does not

attempt to RECLOSE

Breaker OPEN

Page 243

Page 244: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-MB01, Page 10 of 12 Equipment : MV Switch gear(Feeders) Date:13 Feb,09 Revision: 0

From the above table it is noted that o When the breaker is closed and the control switch is held in

CLOSE position. The breaker was still closed. o when the breaker was tripped either Manually or Electrically,

the breaker does not attempt to re close if a permanent closing signal is applied

5.2.3.5 Functional Test of Local Controls, Alarm and Indication.

• Alarm and Indication for spring charging once the spring is charged shall be checked.

• Alarm and indication for mal function of the drive should be checked by interrupting the dc power to charging motor while charging.

• Alarm and indication for DC supervision relay shall be checked.

• Alarm and indication for trip coil supervision shall be checked. • Indication for closing, opening, rack in and rack out of the

breaker shall be checked.

5.2.3.6 Functional test of Remote Controls, Alarm and Indication. • Alarm and Indication for spring charging once the spring is

charged shall be checked on remote or DCS • Alarm and indication for mal function of the drive should be

checked by interrupting the dc power to charging motor while charging shall be checked on DCS or remote

• Alarm and indication for DC supervision relay shall be checked on DCS or remote

• Alarm and indication for trip coil supervision shall be checked on DCS or remote

• Indication for closing, opening, rack in and rack out of the breaker shall be checked on DCS or Remote.

5.2.4 Checks for Operation of Auxiliary Switches, Limit Switches for Test/

Service. Contacts of auxiliary switches for breaker position, MOC, earth switch etc shall be checked for its correct operation, and contacts resistance is measured for each and every contacts output.

5.2.5 Operation of Earth Switch Operation of earth switch for closing and opening to be checked, also indication to be checked

5.2.6 Functional Checks of Interlocks and Limits Switches

Following Interlock should be checked as per manufacturer instruction manual Positive interlock Negative interlock Spring discharge interlock Interference interlock Closing spring gag interlock

Page 244

Page 245: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-MB01, Page 11 of 12 Equipment : MV Switch gear(Feeders) Date:13 Feb,09 Revision: 0

Limits switches should be checked for its proper operation and function an adjustment is made if required.

5.2.7 Electrical control and protection/Measuring Devices 5.2.7.1 Insulation Resitance Measurement for Control Wiring and

cabling with 500 V DC • Insulation resitance measurement shall be done for control

circuit, motor circuit , tripping and closing circuit with help of 500 v dc Insulation resistance tester

• All the external control and protection cables shall be checked for loop check and insulation resistance measurement.

5.2.7.2 Control Power and Current Measurement

• Current on MCB of each circuit to be measured when all the devices are in service

• Mixing of voltage between the two circuits should be checked by keeping off MCB of one circuit and checking the voltage on other circuit MCB towards load side +V and –V terminals with respect to ground

• Above test should be done for closing, tripping, charging and power to the devices circuits.

5.2.7.3 Testing of Protection Devices

All the protection and monitoring relays to be tested, please refer related test procedure.

5.2.7.4 Testing of CT and VT

All the CT’s and VT’s shall be tested, please refer related test procedure

5.2.7.5 Testing of Transducer

All the current, voltage, frequency and power transducer shall be tested, please refer related test procedure

5.2.7.6 Testing of Alarm Devices All the current, voltage, frequency and power transducer shall be tested, please refer related test procedure

5.2.8 Protective Earthing Check Switch gear protective earthing bond must be earthed in order to afford protection to human beings. Minimum two point’s preferable extreme end of ground bus shall be connected to the ground mesh • Check all protective relays have been grounded • Check the doors have been grounded

5.2.9 Checks for interchangeable of CB of same rating for interference

interlock CB should be checked for interference interlock • Remove the breaker from the cubicle • Put the breaker of same rating in to the cubicle, breaker should move

freely inside. • Remove the breaker again from the cubicle

Page 245

Page 246: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-MB01, Page 12 of 12 Equipment : MV Switch gear(Feeders) Date:13 Feb,09 Revision: 0

• But the breaker of different rating , breaker should not move inside the cubicle, do not put more force in order not to damage the beaker and interface plate

5.2.10 Commissioning of Heaters

Space heater shall be commissioned as under. 5.2.10.1 Visual Checks of Heaters

• Check the rating of the heater match with the supply voltage. • Check the KW rating of the heater match with drawing. • Check the breaker which supplying power to heater circuit for

correct rating with respect to total load of the heaters.

5.2.10.2 Measurement of Insulation Resistance Perform insulation resistance measurement on space heater circuit with 500 VDC megger

5.2.10.3 Measurement of Current and Voltage Switch on the breaker and measured the total current and individual heater load with mini clamp meter

5.2.10.4 Functional Checks of Thermostat

Check the operation of the thermostat and hygrometer for cut in and cut out operation

5.2.11 Checks After Initial Energization

After energization service load checks to be performed as under • Current should be measured on all the secondary terminal of the current

transformer. • Phase to phase and phase to ground Voltage measurement should be

done on all the phase and core of the voltage transformer. • Phase sequence checks to be done on Voltage transformer. • All the measuring devices including protective relay to be checked for

their metering function. 6.0 Documents

Test Sheet TS-MB01 shall be completed.

7.0 References 8.0 Attachment

8.1 Test Sheet for MV CB Feeder TS-MB01

***End of the Procedure ***

Page 246

Page 247: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

Riyadh Po“1062

STARTU

TES

ower plant21166/00”

UP MANUA

ST SH

t # 10

AL DF

EETS

Date:13 Feb,09

Revision0

n:

Page 247

Page 248: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MB01, Page 1 of 11

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Medium Voltage Circuit Breaker and

Feeder Date: 13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

1. Technical data

Circuit breaker (name plate details)

Manufacturer:...............................................................................................

Type designation:.........................................................................................

Serial No / year of manufacturing:...............................................................

Rated voltage:..............................................................................................

Rated nominal current:.................................................................................

2. Visual check 1. Check nameplate information for correctness. 2. Inspect covers, panel section and door for paint work and proper fit. 3. Check for smooth and proper movement of racking mechanisms, shutters rollers, rails

and guides. 4. Check for proper alignment of the breaker primary and secondary contacts. 5. Check operation of all mechanical interlocks. 6. Check tightness of all bolted connections (torque wrench method). 7. Check bus and supports for defects such as cracked welds, chipped porcelain, cracked

insulation, etc., and free of dust accumulation. 8. Verify that all front panel mounted devices (meters, push buttons, switches, indicator

lamps, mimic buses, etc.) are installed as per drawings 9. Perform mechanical check and visual inspection on the circuit breaker. 10. Perform mechanical check and visual inspection on disconnect and grounding switches. 11. Check for correct breaker position indication. 12. Check for correct spring status indication (spring charged/discharged). 13. Perform all specific checks on the breaker and spring operating mechanism. 14. Check that all control wiring is correct according to the approved drawing and terminal

connections are secure. 15. Inspect enclosure for proper alignment foundation fixing and grounding. 16. Check thermostat/space heaters for right position. 17. Check the alignment and smooth operation of lifting trolley

Page 248

Page 249: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MB01, Page 2 of 11

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Medium Voltage Circuit Breaker and

Feeder Date: 13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

3.

3.1

Tests on Circuit breaker Breaker Mechanical Checks

1. check Manual spring charging 2. check manual spring discharging 3. manual closing 4. manual opening 5. indicator for spring charging/discharging, close and open

3.2

Contact Gap Measurment: Factory Value For The Contact Gap:---------------mm

Phase Red Yellow Blue Gap In mm

3.3

Contact Resistance test: Injected current: 100 Amps Dc

Phase(breaker Closed) Red Yellow Blue Resistance in Micro ohms

3.4

Insulation Test Before High Pot: Minimum Value--------- GΩ

Condition When breaker is closed When breaker is opened

Phase R-G Y-G B-G R-Y Y-B B-R R-R1 Y-Y1 B-B1 G-ohms Test Voltage

Page 249

Page 250: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MB01, Page 3 of 11

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Medium Voltage Circuit Breaker and

Feeder Date: 13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

3.5

Vacuum Integrity Test , Test Voltage:___________ Volts AC DC For 5 Cycles Only for Vacuum Circuit Breaker

Phase Red Yellow Blue Results Remarks

3.6

High Voltage(Hi-pot) Test , Test Voltage:___________ Volts AC DC

Phase Red Yellow Blue Leakage current in Micro Amps after One Minute

Remarks Note: above test is not required if this is done with bus bar

3.7

Insulation Test After High Pot: Minimum Value--------- GΩ

Condition When breaker is closed When breaker is opened

Phase R-G Y-G B-G R-Y Y-B B-R R-R1 Y-Y1 B-B1 G-ohms Test Voltage

3.8

Minimum operating voltage test for trip and close coil

Minimum Operating Voltage in volts Closing coil Trip coil-1 Trip Coil-2

Page 250

Page 251: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MB01, Page 4 of 11

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Medium Voltage Circuit Breaker and

Feeder Date: 13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

3.9

Breaker Operating Time/Coil current Mesurment :

a) Time Measurment Operating Time in m Sec Phase Red Yellow Blue Closing Opening Coil TC-1 Opening Coil TC-2

b) Current Measurment

Voltage

in Volts Current in Amps

Closing Coil Opening Coil TC-1 Opening Coil TC-2

Print out from Breaker Analyser to be attached:

3.10

Spring Charging time and current measurment:

Charging Time in Sec

Voltage in Volts Motor Current in Amps

- spring charge time monitoring timer - set:..................sec

3.11

Stored energy and spring charge mechanism checks :

- motor charge - manual charge

3.11

Functional check of C.B operation counter

Page 251

Page 252: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MB01, Page 5 of 11

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Medium Voltage Circuit Breaker and

Feeder Date: 13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

4.

4.1

Breaker operation Breaker Rack in/out Checks CB Rack in CB Rack out Spring Discharge during Rack out Breaker Trip during rack out

4.2

CB Operation in service position: - manual close operation (Mechanical) - manual open operation (Mechanical) - local close operation ( Electrical) - local open operation( Electrical) - remote close operation - remote open operation

4.4

CB Operation in Test Position -manual close operation (Mechanical) - manual open operation (Mechanical) - local close operation ( Electrical) - local open operation( Electrical)

Page 252

Page 253: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MB01, Page 6 of 11

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Medium Voltage Circuit Breaker and

Feeder Date: 13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

4.5

Anti Pumping Functional Test: Test as per below table

Step Operation Trip signal applied

Breaker Operation Breaker status

1

Breaker control switch switched to

“CLOSE” and held in CLOSE position

NO Breaker CLOSED

2 Breaker control switch held in

“CLOSE” position

YES Electrically

Breaker Trips and does not

attempt to RECLOSE

3 Breaker control

switch returned to NORMAL

NO None

4

Breaker control switch switched to

“CLOSE” and held in CLOSE position

NO Breaker CLOSED

5 Breaker control switch held in

“CLOSE” position

YES Mechanically

Breaker Trips and does not

attempt to RECLOSE

4.6

Functional test of local control, alarm and Indication:

SL NO. Alarm/indication Description Indication

on Panel Alarm on

Relays 1 Panel Heater ON indication 2 Circuit breaker Close indication 3 Circuit breaker Open indication 4 Earthing switch close 5 Arc Protection healthy 6 Trip coil supervision(Breaker close) 7 Trip coil supervision(Breaker open) 8 CB in service position 9 CB in test position

Page 253

Page 254: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MB01, Page 7 of 11

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Medium Voltage Circuit Breaker and

Feeder Date: 13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

4.6

SL NO. Alarm/indication Description Indication

on Panel Alarm on

Relays 10 ES CLOSE 11 ES OPEN 12 Prot. Relay healthy 13 Lockout F86 trip 14 Prot. Relay trip 15 Trip circuit supervision Healthy

4.7

Functional test of Remote control, Alarm and indication: 1) Breaker operation checks Remote DCS

Item No

DEVICE OPERATIONS / CHECK

Aux relay Breaker

1 CLOSE Signal from DCS

2 OPEN Signal from DCS

2) Alarms on DCS:

SL NO. Alarm/indication Description ON DCS

1 CB CLOSE 2 CB OPEN 3 CB in service position 4 CB in test position 5 ES CLOSE 6 ES OPEN 7 Prot. Relay healthy 8 Lockout F86 trip

Page 254

Page 255: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MB01, Page 8 of 11

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Medium Voltage Circuit Breaker and

Feeder Date: 13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

SL NO. Alarm/indication Description ON DCS

9 Prot. Relay trip 10 DC supervision Healthy 12 DC MCB trip 13 Lose of voltage 15 Local /remote signal( Remote position

3) Analog signals on DCS:

Analog signal for voltage and current can be checked by either by simulation with the help of function calibrator or it can also be checked online/live live when board is energized.

4.8

Checks for operation of Auxiliary switches ,Position Switch and MOC

Contacts Function

Contact No Terminal No Function Results

Auxiliary switch

MOC

Position Switch

Page 255

Page 256: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MB01, Page 9 of 11

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Medium Voltage Circuit Breaker and

Feeder Date: 13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

5 Earthing switch operation - check close operation - check open operation - check, that blades and mating contacts are closed - check electromechanical interlock, where applicable

6.0

Interlocking test Following Interlock should be checked as per manufacturer instruction manual

Positive interlock Negative interlock Spring discharge interlock Interference interlock Closing spring gag interlock Limits switches adjusted and function normal

7

7.1

Electrical control and protection/Measuring Devices Rating and settings of control MCBs Checks MCBs

MCB Description Setting Check correct function: -............ motor drive ............A

-............ Closing Circuit, ............A -............ Trip circuit ...........A -............ VT ............A

-............ VT ............A

7.2

Insulation Resitance measurment for control wiring and cabling with 500 V DC

Function MCB No +V to Ground -V to Ground Closing and Motor Ckt Trip Coil-1 Ckt Trip Coil Ckt Relay and indication Ckt

For meggering of external cable please refer to multicore cable test sheet

Page 256

Page 257: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MB01, Page 10 of 11

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Medium Voltage Circuit Breaker and

Feeder Date: 13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

7.3

Control power and current measurment

Voltage(V DC) Current(A DC) Power(Watts)

7.3

Testing of protection devices Please refer specific test sheet of related divces

7.4

Testing of CT and VT Please refer separate test sheet of related divces

7.5

Testing of Transducer Please refer separate test sheet of related divces

7.6

Testing of Alarm Devices Please refer separate test sheet of related divces

8

Checks for interchangeable of CB of same rating for interference interlock

Action Expected observation Actual observation Same rating breaker inserted Breaker fix freely Different rating breaker inserted Breaker doesn’t fix freely

9 9.1

Commissioning of Heater Circuit Visual Checks Rating of the heater match with the supply voltage. KW rating of the heater match with drawing. Breaker for the heater circuit rated correct

Page 257

Page 258: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MB01, Page 11 of 11

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Medium Voltage Circuit Breaker and

Feeder Date: 13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

9.2

Measurment of insulation resistance of heater and lamp circuit

Function MCB No Phase to Ground Neutral to Ground Heater and lamp CKT

9.4

Measurment of Current and voltage

Voltage(V AC) Current(A AC) Power(VA)

9.5

Functional checks of thermostat Thermostat setting Range

Measured Ambient Temp Inside the cubicle

Thermostat Cut-in Temp

Thermostat cut-out temp

Final Setting of Thermostat

10 10.1

10.2

Initial Energization checks before energization: check earthing check cable connection tight check cable connection compartment and C.B. is clean and free from particles checks after initial energization: check indications of CT and VT, local and remote check CT current flow in protection relay Check Voltmeter readings For Load Service Checks please refer separate test sheet

Test Equipment Model Cal due date Test Equipment Model Cal due date

Page 258

Page 259: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MC01 Page 1 of 7

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Medium Voltage Contactor and Feeder

Date:13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

1. Technical data

Contactor (name plate details)

Manufacturer:...............................................................................................

Type designation:.........................................................................................

Serial No / year of manufacturing:...............................................................

Rated voltage:..............................................................................................

Rated nominal current:.................................................................................

2. Visual check 1. Check nameplate information for correctness. 2. Inspect covers, panel section and door for paint work and proper fit. 3. Check for smooth and proper movement of racking mechanisms, shutters rollers, rails

and guides. 4. Check for proper alignment of the breaker primary and secondary contacts. 5. Check operation of all mechanical interlocks. 6. Check tightness of all bolted connections (torque wrench method). 7. Check bus and supports for defects such as cracked welds, chipped porcelain, cracked

insulation, etc., and free of dust accumulation. 8. Verify that all front panel mounted devices (meters, push buttons, switches, indicator

lamps, mimic buses, etc.) are installed as per drawings 9. Perform mechanical check and visual inspection on the circuit breaker. 10. Perform mechanical check and visual inspection on disconnect and grounding switches. 11. Check for correct breaker position indication. 12. Check for correct spring status indication (spring charged/discharged). 13. Perform all specific checks on the breaker and spring operating mechanism. 14. Check that all control wiring is correct according to the approved drawing and terminal

connections are secure. 15. Inspect enclosure for proper alignment foundation fixing and grounding. 16. Check thermostat/space heaters for right position. 17. Check the alignment and smooth operation of lifting trolley

3.

3.1

Tests on Contactor Contact Gap Measurment: Factory Value For The Contact Gap:---------------mm

Phase Red Yellow Blue Gap In mm

Page 259

Page 260: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MC01 Page 2 of 7

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Medium Voltage Contactor and Feeder

Date:13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

3.2

Contact Resistance test: Injected current: 100 Amps Dc

Phase(Contactor Closed) Red Yellow Blue Resistance in Micro ohms

3.3

Insulation Test Before High Pot: Minimum Value--------- GΩ

Condition When Contactor is closed When Contactor is opened

Phase R-G Y-G B-G R-Y Y-B B-R R-R1 Y-Y1 B-B1 G-ohms Test Voltage

3.4

Vacuum Integrity Test , Test Voltage:___________ Volts AC DC For 5 Cycles Only for Vacuum Circuit Breaker

Phase Red Yellow Blue Results Remarks

3.5

High Voltage(Hi-pot) Test , Test Voltage:___________ Volts AC DC

Phase Red Yellow Blue Leakage current in Micro Amps after One Minute

Remarks Note: above test is not required if this is done with bus bar

Page 260

Page 261: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MC01 Page 3 of 7

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Medium Voltage Contactor and Feeder

Date:13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

3.6

Insulation Test After High Pot: Minimum Value--------- GΩ Condition When Contactor is closed When Contactor is

opened Phase R-G Y-G B-G R-Y Y-B B-R R-R1 Y-Y1 B-B1 G-ohms Test Voltage

3.7

Minimum operating voltage test for trip and close coil Operating Value Pickup Drop Out

volts amps volts amps Closing/Opening coil

3.8

Breaker Operating Time/Coil current Measurement :

a) Time Measurment Operating Time in m Sec Phase R Y B Closing Opening

Print out from Breaker Analyser to be attached:

b) Current Measurement @ rated voltage

Voltage in Volts

Current in Amps(A)

Closing/opening coil

4.

4.1

Contactor operation CB Operation in service position: - local close operation ( Electrical) - local open operation( Electrical) - remote close operation - remote open operation

Page 261

Page 262: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MC01 Page 4 of 7

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Medium Voltage Contactor and Feeder

Date:13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

4.2

CB Operation in Test Position - local close operation ( Electrical) - local open operation( Electrical)

4.3

Functional test of local control, alarm and Indication:

SL NO. Alarm/indication Description Indication

on Panel Alarm on

Relays 1 Panel Heater ON indication 2 Contactor Close indication 3 Contactor Open indication 5 Arc Protection healthy 6 Prot. Relay healthy 7 Lockout F86 trip 8 Prot. Relay trip

4.4

Functional test of Remote control, Alarm and indication: 1) Breaker operation checks Remote DCS

Item No

DEVICE OPERATIONS / CHECK

Aux relay Breaker

1 CLOSE Signal from DCS

2 OPEN Signal from DCS

2) Alarms on DCS: SL NO. Alarm/indication Description ON DCS

1 Contactor CLOSE 2 Contactor OPEN 3 Contactor in service position 4 Contactor in test position 7 Prot. Relay healthy 8 Lockout F86 trip

3) Analog signals on DCS:

Analog signal for voltage and current can be checked by either by simulation with the help of function calibrator or it can also be checked online/live live when board is energized

Page 262

Page 263: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MC01 Page 5 of 7

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Medium Voltage Contactor and Feeder

Date:13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

4.8

Checks for operation of Auxiliary switches ,Position Switch and MOC

Contacts Function

Contact No Terminal No Function Results

Auxiliary switch

6.0

Interlocking test Following Interlock should be checked as per manufacturer instruction manual

Inter lock with D S Limits switches adjusted and function normal

7

7.1

Electrical control and protection/Measuring Devices Rating and settings of control MCBs Checks MCBs

MCB Description Setting Check correct function: -............ Closing Circuit, ............A -............ VT ............A

7.2

Insulation Resitance measurment for control wiring and cabling with 500 V DC

Function MCB No +V to Ground -V to Ground Closing/Opening Ckt Relay and indication Ckt

For meggering of external cable please refer to multi core cable test sheet

7.3

Control power and current measurment

Voltage(V DC) Current(A DC) Power(Watts)

7.3

Testing of protection devices Please refer specific test sheet of related divces

Page 263

Page 264: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MC01 Page 6 of 7

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Medium Voltage Contactor and Feeder

Date:13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

7.4

Testing of CT and VT Please refer separate test sheet of related divces

7.5

Testing of Transducer Please refer separate test sheet of related divces

7.6

Testing of Alarm Devices Please refer separate test sheet of related divces

9 9.1

Commissioning of Heater Circuit Visual Checks Rating of the heater match with the supply voltage. KW rating of the heater match with drawing. Breaker for the heater circuit rated correct

9.2

Measurment of insulation resistance of heater and lamp circuit

Function MCB No Phase to Ground Neutral to Ground Heater and lamp CKT

Measurment of Current and voltage Voltage(V AC) Current(A AC) Power(VA)

9.4

9.5

Functional checks of thermostat Thermostat setting Range

Measured Ambient Temp Inside the cubicle

Thermostat Cut-in Temp

Thermostat cut-out temp

Final Setting of Thermostat

Page 264

Page 265: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MC01 Page 7 of 7

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Medium Voltage Contactor and Feeder

Date:13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

10 10.1

10.2

Initial Energization checks before energization: check earthing check cable connection tight check cable connection compartment and C.B. is clean and free from particles checks after initial energization: check indications of CT and VT, local and remote check CT current flow in protection relay Check Voltmeter readings For Load Service Checks please refer separate test sheet

Test Equipment Model Cal due date Test Equipment Model Cal due date

Page 265

Page 266: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

MD

COA

O

R

-001

TESTEDIUM

DISCO

Riyadh Po“1062

STARTU

TING PM VOL

ONNEC

ower plant21166/00”

UP MANUA

PROCLTAGECT SW

t # 10

AL DF

EDURE SWIT

WITCH

Date:13 Feb,09

RE FORTCHGEFEED

Revision0

R EAR ER

n:

Page 266

Page 267: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-MD01, Page 1 of 8 Equipment : MV Disconnect and Ground Switches Date:13 Feb,09 Revision: 0

TABLE OF CONTENT

1. Task a. Work Status--------------------------------------------------------------------------------------------------------2 b. Documentation----------------------------------------------------------------------------------------------------2 c. Personnel-----------------------------------------------------------------------------------------------------------2 d. Measuring Instrumentation-------------------------------------------------------------------------------------2

2. Preconditions------------------------------------------------------------------------------------------------------------2 3. Precautions---------------------------------------------------------------------------------------------------------------2 4. Scope-----------------------------------------------------------------------------------------------------------------------3 5. Execution------------------------------------------------------------------------------------------------------------------3

a. Visual Inspection-----------------------------------------------------------------------------------------------------3 b. Testing of MV DS and Feeder-----------------------------------------------------------------------------------3

1. Test on Disconnect switch a. Contact Resistance test.------------------------------------------------------------------------------4 b. Insulation resistance test before hipot.------------------------------------------------------------4 c. High Voltage test.---------------------------------------------------------------------------------------5 d. Insulation resistance test after hipot---------------------------------------------------------------5 e. Switch operating time /motor current measurement-------------------------------------------5 f. Minimum voltage operation (open/close) at 90V dc.-------------------------------------------6

2. Disconnect switch operation a. Disconect Switch operation at rated Voltage.----------------------------------------------------6 b. Functional test of local controls, alarm and indication.----------------------------------------6 c. Functional test of Remote controls, alarm and indication.------------------------------------7 d. Correct settings of motor limit switches.-----------------------------------------------------------7 e. Check correct operation of auxiliary switches.---------------------------------------------------7 f. Automatic disconnection of supply to the motor on insertion of handle-------------------7

3. Operation of Earth Switch.----------------------------------------------------------------------------------7 4. Correct Functioning of Interlocks--------------------------------------------------------------------------7 5. Electrical control and protection/Measuring Devices ------------------------------------------------7

a. Insulation resistance measurement for control circuit-----------------------------------------7 b. Control power and current measurement.--------------------------------------------------------7

6. Commissioning of Heater Circuit--------------------------------------------------------------------------7 7. Protective earthing check.-----------------------------------------------------------------------------------8

6. Documents---------------------------------------------------------------------------------------------------------------8 7. Reference----------------------------------------------------------------------------------------------------------------8 8. Attachment--------------------------------------------------------------------------------------------------------------8

Page 267

Page 268: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-MD01, Page 2 of 8 Equipment : MV Disconnect and Ground Switches Date:13 Feb,09 Revision: 0

1.0 Task The purpose of this procedure is to test, commission and document feeder and MV Disconnect and Ground switch in metal enclosed switchgear assemblies of 4.16kV and 13.8 kV levels.

2.0 Preconditions

2.1 Work status • Erection has been completed. • Labelling of the equipment and designation of live enclosed plant sections has

been carried out.

2.2 Documentation • The schematic and single line diagram of the medium voltage switchgear are

available • Commissioning checklists TS-MD01

2.3 Personnel • 1 Commissioning engineer: Engineer or technician with experience in

commissioning of all types of the electrical equipments. • 1 Helper: skilled worker with adequate on-the-job training.

2.4 Measuring Instruments and Tools

• Micro ohm meter 10A and 100A • Insulation Tester 5000V dc • High voltage tester AC (up to 50 KV or DC (up to 80 KV) • Discharge hot stick

3.0 Precautions The work will only proceed when a Permit to Work (PTW) in work permit area has been obtained. The PTW will be kept on site for consultation during the testing works.

Special attention will be given to: • Due to high voltage being used, adequate safety precautions should be taken to avoid

injury to personnel and damage to property. • Cordoning off specified working area and provision of applicable safety warning sign

board. • Ensure that all the necessary test equipment are made available at the test area and

with valid calibration stickers and certificate. • Hand insulating gloves and grounding sticks / wire jumpers shall be provided for safe

handling and draining of residual voltage. • Breaker should be withdrawn from the cubicle during breaker testing. • Immediately after testing of each phase, voltage residue shall be drain by using

grounding stick / wire which is directly connected to earth. • Closing of the work permit after completion of the work (if the test area is to be

considered in work permit area) is necessary.

Page 268

Page 269: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-MD01, Page 3 of 8 Equipment : MV Disconnect and Ground Switches Date:13 Feb,09 Revision: 0

4.0 Scope

• Testing of Disconnect switch • Testing Ground Switch • Operation of Disconnect switch • Checking Disconnect switch mounting.

5.0 Execution

5.1 Visual Checks • Check nameplate information for correctness. • Inspect enclosures for proper alignment, foundation fixing and grounding. • Inspect covers, panel section and door for paint work and proper fit. • Check for smooth and proper movement of closing and opening mechanisms for

alignment,. • Check operation of all mechanical interlocks. • Check tightness of all bolted connections (torque wrench method). • Check bus and supports for defects such as cracked welds, chipped porcelain,

cracked insulation, etc., and free of dust accumulation. • Verify that all front panel mounted devices (meters, push buttons, switches, indicator

lamps, mimic buses, etc.) are installed as per drawings. • Perform mechanical check and visual inspection on the Disconnect switch. • Check that all control wiring is correct according to the approved drawing and

terminal connections are secure. • Check simultaneous closing of all the three poles. • Check that end of travels stops are correctly adjusted, set and locked in position. • Check open gap and minimum clearance between phases and ground. • Check that the switch can be pad locked in both closed and open position. • Check that switch operating handle is grounded properly.

WIRING AND FERRULING CHECK • Ensure the numbers on the ferules are from left to right beginning at the terminal

block i.e. at the end of the wire and from bottom to top. • The wire nos. should be checked against the wiring table and the schematic drawing.

5.2 Testing of Disconnect and Feeder Enter the rating plate data in check list TS-DM01 and compare the DS data with the data contained in the circuit documentation. The following test shall be carried out

8. Test on Disconnect switch c. Contact Resitance test. d. Insulation resistance test before hipot. e. High Voltage test. f. Insulation resistance test after hipot g. Switch operating time /motor current measurement h. Minimum voltage operation (open/close) at 90V dc.

Page 269

Page 270: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-MD01, Page 4 of 8 Equipment : MV Disconnect and Ground Switches Date:13 Feb,09 Revision: 0

9. Disconnect switch operation i. Disconect Switch operation at rated Voltage. j. Functional test of local controls, alarm and indication. k. Functional test of Remote controls, alarm and indication. l. Correct settings of motor limit switches. m. Check correct operation of auxiliary switches. n. Automatic disconnection of supply to the motor on insertion of

handle 10. Operation of Earth Switch. 11. Correct Functioning of Interlocks 12. Electrical control and protection/Measuring Devices

o. Insulation resistance measurement for control circuit p. Control power and current measurement.

13. Commissioning of Heater Circuit q. Visual Checks r. Measurement of insulation resistance of heater and lamp circuit s. Functional checks of thermostat , Heaters, t. Measurement of Current and voltage

14. Protective earthing check.

5.2.1 Contact Resitance Test. Disconnect switch Contact resistance can be measured using micro ohm meter on each pole of the Disconnect switch when it is closed

• Connect the current and voltage leads of the micro ohmmeter across the pole of the disconnect switch.

• Apply a current of 100 amps and note down the reading • Repeat the test for other two pole also • For judgment, the resistance values from one pole to another pole

should not vary with big difference and the value should also be cross checked with manufacturer recommendation.

MICRO OHMMETER BYR

CB MAIN CONTACTS

CB CONTACT RESISTANCE TESTING ARRANGEMENT

5.2.2 Insulation Resistance Test before Hipot. Before performing high voltage test, perform the Insulation resistance test with 5000Vdc insulation tester.

• Close the disconnect switch. • Connect the phases Y, B to ground and apply the test voltage

between phase R and ground and note down the readings. • Connect the phases B, R to ground and apply the test voltage

between phase Y and ground and note down the readings.

Page 270

Page 271: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-MD01, Page 5 of 8 Equipment : MV Disconnect and Ground Switches Date:13 Feb,09 Revision: 0

• Connect the phases R, Y to ground and apply the test voltage between phase B and ground and note down the readings.

5.2.3 High Voltage Test

Note: high voltage test is to be done only in case disconnect switch is not tested for high voltage along with the bus.

AC high- pot test shall be carried out in accordance with IEC standard at site. The test shall be carried out on MV Disconnect switch in close position. Test is performed as under

When the Disconnect Switch is Closed( shown in figure below) • The test voltage to carry out the test is as per below table. • Connect the phases Y, B to ground and apply the test voltage

gradually between phase R and ground. Record the leakage current • Connect the phases B, R to ground and apply the test voltage

gradually between phase Y and ground. Record the leakage current • Connect the phases R, Y to ground and apply the test voltage

gradually between phase B and ground. Record the leakage current

HIGH POTTESTER BYR

CB MAIN CONTACTS

AC WITHSTAND VOLTAGE TESTING ARRANGEMENT

Table-1

AC Testing High-potential

Test Partial Discharge Test DC Testing

Equipment Rated

Voltage, kV Test

Level, kV

Time, Min

Extinction Level, kV

Pulse Magnitude,

pC

Time, Min

Test level,

kV

Time, Min

4.16 14(19) 1 3.5(3.5) 100(100) 2 N/A N/A Switchgear 13.8 27(36) 1 10.5(10.5) 100(100) 2 N/A N/A

5.2.4 Insulation Resistance test after hipot

After performing high voltage test Perform the Insulation resistance test with 5000Vdc insulation tester as describe in 5.2.2

5.2.5 Switch Operating Time/Motor Current Measurement

DS closing and tripping time can be measured either by a timer or a breaker analyzer Timing Test Using An Electronic Oscillo graph. • Connect the test set to the DS.

Page 271

Page 272: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-MD01, Page 6 of 8 Equipment : MV Disconnect and Ground Switches Date:13 Feb,09 Revision: 0

• Perform the following operations at the rated DC • Close ( C ) , Open ( O ) • Record the corresponding readings. • From the graph check the simultaneous touch of the contact of all the

phases

R Y B

CB MAIN CONTACTS

CB CLOSING TERMINALS

CB TRIPPING TERMINALS

DC SUPPLY +

-

TRIPPINGORDER

CLOSINGORDER

CH. 1

CH. 2

CH. 3

CB TIMING TEST ARRANGEMENT

5.2.6 Minimum Voltage Operation (Open/Close) at 90V dc. 5.2.6.1.1 Closing

Minimum voltage operation is checked at 90 volts • Connect the DC source to the closing circuit of the

disconnect switch in series with dc ammeter • Maintained voltage at 90 volts and check the operation of

the disconnect switch , note down the current 5.2.6.1.2 Opening

Minimum voltage operation is checked at 90 volts • Connect the DC source to the opening circuit of the

disconnect switch in series with dc ammeter • Maintained voltage at 90 volts and check the operation of

the disconnect switch , note down the current

5.2.7 Disconnect Switch Operation Tests. 5.2.7.1 Switch Operation at Rated Voltage

o Perform several Close and Open operation of the Disconnect switch manually by operating mechanical Levers

o Performer several Close and Open operation of the disconnect switch electrically both local and remote

5.2.7.2 Functional Test of Local Controls, alarm and indication.

• Alarm and indication for DC supervision relay shall be checked..

• Indication for closing, opening, of the disconnect switch shall be checked.

Page 272

Page 273: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-MD01, Page 7 of 8 Equipment : MV Disconnect and Ground Switches Date:13 Feb,09 Revision: 0

5.2.7.3 Functional test of Remote Controls, alarm and Indication.

• Alarm and indication for DC supervision relay shall be checked on DCS or remote

• Indication for closing, opening, of the disconnect switch shall be checked on DCS or Remote.

5.2.7.4 Correct Settings of Motor Limit Switches.

Limits switches should be checked for its proper operation and function an adjustment is made if required.

5.2.7.5 Check Correct Operation of auxiliary Switches.

Contacts of auxiliary switches for switch operation, earth switch etc shall be checked for its correct operation, and contacts resistance is measured for each and every contacts output.

5.2.7.6 Automatic Disconnection of Supply to the Motor on Insertion

of Hand While Operating Handle is inserted in to the notch, operation of the disconnect switch checked electrically, no operation should occur.

5.2.8 Operation of Earth Switch.

Operation of earth switch for closing and opening to be checked, also indication to be checked

5.2.9 Correct Functioning of Interlocks Interlock should be checked as per manufacturer instruction manual

5.2.10 Electrical control and protection/Measuring Devices

5.2.10.1 Insulation Resitance measurement for control wiring and cabling with 500 V DC Insulation resistance test for control wiring and auxiliary circuit should be done with 500V dc Insulation tester.

5.2.10.2 Control Power and Current Measurement. • Current on MCB of each circuit to be measured when all the

devices are in service • Mixing of voltage between the two circuits should be checked

by keeping off MCB of one circuit and checking the voltage on other circuit MCB towards load side +V and –V terminals with respect ground

5.2.11 Commissioning of Heaters

Space heater shall be commissioned as under. 5.2.11.1 Visual Checks of Heaters

• Check the rating of the heater match with the supply voltage. • Check the KW rating of the heater match with drawing. • Check the breaker which supplying power to heater circuit for

correct rating with respect to total load of the heaters.

Page 273

Page 274: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-MD01, Page 8 of 8 Equipment : MV Disconnect and Ground Switches Date:13 Feb,09 Revision: 0

5.2.11.2 Measurement of Insulation Resistance

Perform insulation resistance measurement on space heater circuit with 500 VDC megger

5.2.11.3 Measurement of Current and Voltage Switch on the breaker and measured the total current and individual heater load with mini clamp meter

5.2.11.4 Functional Checks of Thermostat

Check the operation of the thermostat and hygrometer for cut in and cut out operation

5.2.12 Protective Earthing Check Switch gear protective earthing bond must be earthed in order to afford protection to human beings.

6.0 Documents Test Sheet TS-MD01 shall be completed.

7.0 References 8.0 Attachment

8.1 Test Sheet for Disconnect Switch TS-MD01

***End of the Procedure ***

Page 274

Page 275: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

Riyadh Po“1062

STARTU

TES

ower plant21166/00”

UP MANUA

ST SH

t # 10

AL DF

EETS

Date:13 Feb,09

Revision0

n:

Page 275

Page 276: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-EOA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MB01 Page 1 of 6

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Medium Voltage Disconnect and Earth

Switch Date:13/02/09,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

1. Technical data

Circuit breaker (name plate details)

Manufacturer:...............................................................................................

Type designation:.........................................................................................

Serial No / year of manufacturing:...............................................................

Rated voltage:..............................................................................................

Rated nominal current:.................................................................................

2. Visual check • Check nameplate information for correctness. • Inspect enclosures for proper alignment, foundation fixing and grounding. • Inspect covers, panel section and door for paint work and proper fit. • Check for smooth and proper movement of closing and opening mechanisms

for alignment,. • Check operation of all mechanical interlocks. • Check tightness of all bolted connections (torque wrench method). • Check bus and supports for defects such as cracked welds, chipped porcelain,

cracked insulation, etc., and free of dust accumulation. • Verify that all front panel mounted devices (meters, push buttons, switches,

indicator lamps, mimic buses, etc.) are installed as per drawings. • Perform mechanical check and visual inspection on the Disconnect switch. • Check that all control wiring is correct according to the approved drawing and

terminal connections are secure. • Check simultaneous closing of all the three poles. • Check that end of travels stops are correctly adjusted, set and locked in

position. • Check open gap and minimum clearance between phases and ground. • Check that the switch can be pad locked in both closed and open position.

3.

3.1

Tests on Disconnect switch Contact Resistance test: Injected current: 100 Amps Dc

Phase(breaker Closed) Red Yellow Blue Resistance in Micro ohms

Page 276

Page 277: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-EOA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MB01 Page 2 of 6

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Medium Voltage Disconnect and Earth

Switch Date:13/02/09,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

3.2

Contact Resistance test: Injected current: 100 Amps Dc

Phase(breaker Closed) Red Yellow Blue Resistance in Micro ohms

3.3

Insulation Test Before High Pot: Minimum Value--------- GΩ

Condition When DS is closed When DS is opened Phase R-G Y-G B-G R-Y Y-B B-R R-R1 Y-Y1 B-B1 G-ohms Test Voltage

3.4

High Voltage(Hi-pot) Test , Test Voltage:___________ Volts AC DC

Phase Red Yellow Blue Leakage current in Micro Amps after One Minute

Remarks Note: above test is not required if this is done with bus bar

3.5

Insulation Test After High Pot: Minimum Value--------- GΩ

Condition When breaker is closed When breaker is opened

Phase R-G Y-G B-G R-Y Y-B B-R R-R1 Y-Y1 B-B1 G-ohms Test Voltage

Page 277

Page 278: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-EOA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MB01 Page 3 of 6

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Medium Voltage Disconnect and Earth

Switch Date:13/02/09,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

3.9

Breaker Operating Time/Coil current Mesurment :

a) Time Measurment Operating Time in m Sec Phase Red Yellow Blue Closing Opening Coil TC-1 Opening Coil TC-2

b) Motor Current Measurment

Voltage

in Volts Current in Amps

Closing Opening

Print out from Breaker Analyser to be attached:

3.10

Minimum voltage operation (open/close) at 90V dc.

Function

Voltage in Volts Motor Current in Amps

Closing

opening

4. 4.1

Disconnect switch operation DS Operation in service position:

- manual close operation (Mechanical) - manual open operation (Mechanical) - local close operation ( Electrical) - local open operation( Electrical) - remote close operation - remote open operation

Page 278

Page 279: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-EOA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MB01 Page 4 of 6

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Medium Voltage Disconnect and Earth

Switch Date:13/02/09,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

4.2

CB Operation in Test Position -manual close operation (Mechanical) - manual open operation (Mechanical) - local close operation ( Electrical) - local open operation( Electrical)

4.6

Functional test of local control, alarm and Indication:

SL NO. Alarm/indication Description Indication

on Panel Alarm on

Relays 1 Panel Heater ON indication 2 DS Close indication 3 DS Open indication 4 Earthing switch close 5 Earthing Switch Open

4.7

Functional test of Remote control, Alarm and indication: 1) Breaker operation checks Remote DCS

Item No

DEVICE OPERATIONS / CHECK

Aux relay Breaker

1 CLOSE Signal from DCS

2 OPEN Signal from DCS

Alarms on DCS:

SL NO. Alarm/indication Description ON DCS

1 CB CLOSE 2 CB OPEN 5 ES CLOSE 6 ES OPEN

Page 279

Page 280: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-EOA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MB01 Page 5 of 6

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Medium Voltage Disconnect and Earth

Switch Date:13/02/09,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

4.8

Checks for operation of Auxiliary switches ,Position Switch and MOC

Contacts Function

Contact No Terminal No Function Results

Auxiliary switch

MOC

5 Earthing switch operation - check close operation - check open operation - check, that blades and mating contacts are closed - check electromechanical interlock, where applicable

6.0

Interlocking test Following Interlock should be checked as per manufacturer instruction manual

Limits switches adjusted and function normal

7

7.1

Electrical control and protection/Measuring Devices Rating and settings of control MCBs Checks MCBs

MCB Description Setting Check correct function: -............ motor drive ............A

7.2

Insulation Resitance measurment for control wiring and cabling with 500 V DC

Function MCB No +V to Ground -V to Ground Closing and Motor Ckt

For meggering of external cable please refer to multi core cable test sheet

Page 280

Page 281: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-EOA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MB01 Page 6 of 6

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Medium Voltage Disconnect and Earth

Switch Date:13/02/09,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

7.3

Control power and current measurment

Voltage(V DC) Current(A DC) Power(Watts)

9 9.1

Commissioning of Heater Circuit Visual Checks Rating of the heater match with the supply voltage. KW rating of the heater match with drawing. Breaker for the heater circuit rated correct

9.2

Measurment of insulation resistance of heater and lamp circuit

Function MCB No Phase to Ground Neutral to Ground Heater and lamp CKT

9.4

Measurment of Current and voltage

Voltage(V AC) Current(A AC) Power(VA)

9.5

Functional checks of thermostat Thermostat setting Range

Measured Ambient Temp Inside the cubicle

Thermostat Cut-in Temp

Thermostat cut-out temp

Final Setting of Thermostat

Test Equipment Model Cal due date Test Equipment Model Cal due date

Page 281

Page 282: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

TESTLOW V

Riyadh Po“1062

STARTU

TING PVOLTABREA

ower plant21166/00”

UP MANUA

PROCAGE S

AKER F

t # 10

AL DF

EDURSWITCFEEDE

Date:13 Feb,09

RE FORCHGEAER

Revision0

R AR

n:

Page 282

Page 283: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-LB01, Page 1 of 11 Equipment : LV Switch gear(Feeders) Date:13 Feb,09 Revision: 0

TABLE OF CONTENT

1. Task a. Work Status--------------------------------------------------------------------------------------------------------2 b. Documentation----------------------------------------------------------------------------------------------------2 c. Personnel-----------------------------------------------------------------------------------------------------------2 d. Measuring Instrumentation-------------------------------------------------------------------------------------2

2. Preconditions------------------------------------------------------------------------------------------------------------2 3. Precautions---------------------------------------------------------------------------------------------------------------2 4. Scope-----------------------------------------------------------------------------------------------------------------------3 5. Execution------------------------------------------------------------------------------------------------------------------3

a. Visual Inspection-----------------------------------------------------------------------------------------------------3 b. Testing of LV CB and Feeder------------------------------------------------------------------------------------3

1. Operation and alignment Checks of breaker liftingTrolley----------------------------------------4 2. Tests on the CB

a. Breaker Manual closing/opening, and manual spring charging-----------------------------4 b. Contact Resistance test-------------------------------------------------------------------------------5 c. Insulation resistance test before hipot-------------------------------------------------------------5 d. High Voltage test.---------------------------------------------------------------------------------------6 e. Insulation resistance test after hipot.---------------------------------------------------------------7 f. Minimum operating voltage for close and trip coil.----------------------------------------------7 g. Breaker operating time. (Only Main Breaker which has Synch. Facilities)---------------7 h. Spring charging motor current and time measurement.---------------------------------------7 i. Stored energy and spring charge mechanism checks.----------------------------------------8

3. Breaker operation a. CB Racking IN and OUT Checks-------------------------------------------------------------------8 b. CB operation in service position mechanical and electrical----------------------------------8 c. CB operation in test position electrical------------------------------------------------------------8 d. Functional test of local controls, alarm and Indication----------------------------------------8 e. Functional Test of Remote control, alarm, and indication------------------------------------8

4. Checks for operation of Auxiliary switches ,limit switches for test, service ------------------9 5. Functional check of interlock and limit switches.-----------------------------------------------------9 6. Electrical control and protection/Measuring Devices-----------------------------------------------9 7. Protective Earthing check--------------------------------------------------------------------------------10 8. Commissioning of Heater Circuit-----------------------------------------------------------------------10 9. Checks before and After initial Energization --------------------------------------------------------11

6. Documents--------------------------------------------------------------------------------------------------------------11 7. Reference----------------------------------------------------------------------------------------------------------------11 8. Attachment--------------------------------------------------------------------------------------------------------------11

Page 283

Page 284: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-LB01, Page 2 of 11 Equipment : LV Switch gear(Feeders) Date:13 Feb,09 Revision: 0

1.0 Task The purpose of this procedure is to test, commission and document LV circuit breaker feeder in metal enclosed switchgear assemblies of 220/380/480V levels.

2.0 Preconditions

2.1 Work Status • Erection has been completed. • Labelling of the equipment and designation of live enclosed plant sections has

been carried out.

2.2 Documentation • The schematic and single line diagram of the medium voltage switchgear are

available • Commissioning checklists TS-MB02

2.3 Personnel • 1 Commissioning engineer: Engineer or technician with experience in

commissioning of all types of Electrical equipments. • 1 Helper: skilled worker with adequate on-the-job training.

2.4 Measuring instruments and tools

• Micro ohm meter 10A and 100A • Insulation Tester 1000V dc • High voltage tester AC (up to 2 KV) • Discharge hot stick • Secondary Injection • Fluke-2 Nos

3.0 Precautions The work will only proceed when a Permit to Work (PTW) in work permit area has been obtained. The PTW will be kept on site for consultation during the testing works.

Special attention will be given to: • Due to high voltage being used, adequate safety precautions should be taken to avoid

injury to personnel and damage to property. • Cordoning off specified working area and provision of applicable safety warning sign

board. • Ensure that all the necessary test equipment are made available at the test area and

with valid calibration stickers and certificate. • Hand insulating gloves and grounding sticks / wire jumpers shall be provided for safe

handling and draining of residual voltage. • Breaker should be withdrawn from the cubicle during breaker testing. • Immediately after testing of each phase, voltage residue shall be drain by using

grounding stick / wire which is directly connected to earth. • Closing of the work permit after completion of the work (if the test area is to be

considered in work permit area) is necessary.

Page 284

Page 285: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-LB01, Page 3 of 11 Equipment : LV Switch gear(Feeders) Date:13 Feb,09 Revision: 0

4.0 Scope

• Testing of CB • Testing of Anti pumping facility • Operation of CB inside the feeder • Operation of Earting switch • Checking CB mounting.

5.0 Execution

5.1 Visual Checks • Check nameplate information for correctness. • Inspect enclosures for proper alignment, foundation fixing and grounding. • Inspect covers, panel section and door for paint work and proper fit. • Check for smooth and proper movement of racking mechanisms for alignment,

shutters, rollers, rails and guides. • Check for proper alignment of the breaker primary and secondary contacts. • Check operation of all mechanical interlocks. • Check tightness of all bolted connections (torque wrench method). • Check bus and supports for defects such as cracked welds, chipped porcelain,

cracked insulation, etc., and free of dust accumulation. • Verify that all front panel mounted devices (meters, push buttons, switches, indicator

lamps, mimic buses, etc.) are installed as per drawings • Perform mechanical check and visual inspection on the circuit breaker. • Perform mechanical check and visual inspection on disconnect and grounding

switches. • Check for correct breaker position indication. • Check for correct spring status indication (spring charged/discharged). • Perform all specific checks on the breaker and spring operating mechanism. • Check that all control wiring is correct according to the approved drawing and

terminal connections are secure.

WIRING AND FERRULING CHECK • Ensure the numbers on the ferules are from left to right beginning at the terminal

block i.e. at the end of the wire and from bottom to top. • The wire nos. should be checked against the wiring table and the schematic drawing.

5.2 Testing of CB and Feeder Enter the rating plate data in check list TS-MB01 and compare the CB data with the data contained in the circuit documentation. The following test shall be carried out

1. Operation and alignment Checks of breaker liftingTrolley 2. Tests on the CB

a. Breaker Manual closing/opening, and manual spring charging b. Contact Resistance test c. Insulation resistance test before hipot d. High Voltage test. e. Insulation resistance test after hipot. f. Minimum operating voltage for close and trip coil.

Page 285

Page 286: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-LB01, Page 4 of 11 Equipment : LV Switch gear(Feeders) Date:13 Feb,09 Revision: 0

g. Breaker operating time. (Only Main Breaker which has Synch. Facilities)

h. Spring charging motor current and time measurement. i. Stored energy and spring charge mechanism checks.

3. Breaker operation j. CB Racking IN and OUT Checks k. CB operation in service position mechanical and electrical l. CB operation in test position electrical m. Functional test of local controls, alarm and Indication n. Functional Test of Remote control, alarm, and indication

4. Checks for operation of Auxiliary switches ,limit switches for test, service and

5. Functional check of interlock and limit switches. 6. Electrical control and protection/Measuring Devices

o. Testing of protection devices p. Testing of CT and VT q. Testing of Transducers r. Testing of Alarm Devices

7. Protective earthing check 8. Commissioning of Heater Circuit

s. Visual Checks t. Measurement of insulation resistance of heater and lamp circuit u. Functional checks of thermostat , Heaters, v. Measurement of Current and voltage

9. Checks before and After initial energization 5.2.1 Operation and Alignment Checks of Breaker Lifting Trolley.

Lifting trolley shall be checked for alignment, correct loading and unloading of the breaker as under • Aligned the trolley to the breaker roller guides in the cubicle • Engage the trolley with roller guides • Check for correct locking and unlocking of trolley with roller guides • Check for smooth rolling of the breaker in to the trolley • Check locking of trolley when breaker is boarded on the trolley • Disconnect the trolley from roller guides

5.2.2 Tests on Circuit Breaker

Breaker can be withdrawn from the feeder cubicle and test out side the feeder as this will ease the testing as under 5.2.2.1 Breaker Manual Closing/Opening and Manual Spring Charging

Mechanical operation of the breaker is checked as under • Charge the spring manually with help of lever. • Observe the spring charging indicator position, it should be

showing spring charged. • Push the mechanical push button for close. Breaker should be

closed. • Observe the breaker close indicator it should be red or “I”. • Once the breaker is close spring will get discharged and indicator

shows spring discharged.

Page 286

Page 287: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-LB01, Page 5 of 11 Equipment : LV Switch gear(Feeders) Date:13 Feb,09 Revision: 0

• Push the mechanical push button for open. Breaker should be. opened.

• Observe the breaker opened indicator it should be Blue or “O”. • Operation shall be done several times.

5.2.2.2 Contact Resistance Test Breaker Contact resistance can be measured using micro ohm meter on each pole of the breaker when breaker is closed

• Connect the current and voltage leads of the micro ohmmeter

across the pole of the breaker • Apply a current of 100 amps and note down the reading • Repeat the test for other two pole also • For judgment, the resistance values from one pole to another

pole should not vary with big difference and the value should also be cross checked with manufacturer recommendation.

MICRO OHMMETER BYR

CB MAIN CONTACTS

CB CONTACT RESISTANCE TESTING ARRANGEMENT

5.2.2.3 Insulation Resitance Test Before High Voltage Test Before performing high voltage test, perform the Insulation resistance test with 1000Vdc insulation tester. • Close the breaker. • Connect the phases Y, B to ground and apply the test voltage

between phase R and ground and note down the readings. • Connect the phases B, R to ground and apply the test voltage

between phase Y and ground and note down the readings. • Connect the phases R, Y to ground and apply the test voltage

between phase B and ground and note down the readings. • Open the breaker, • Connect the phases R, Y, B Cable side to the ground on all the

breakers. • Connect the phases R, Y, B Bus side to the test set. • Record the corresponding leakage current readings.

Page 287

Page 288: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-LB01, Page 6 of 11 Equipment : LV Switch gear(Feeders) Date:13 Feb,09 Revision: 0

5.2.2.4 High Voltage Test

Note: high voltage test shall be done only in case breaker is not tested for high voltage along with the bus AC high- pot test shall be carried out in accordance with IEC standard at site. The test shall be carried out on LV CB in both close and open position. Test is performed as under

When the CB is Closed( shown in figure below) • The test voltage to carry out the test is as per below table. • Connect the phases Y, B to ground and apply the test voltage

gradually between phase R and ground. Record the leakage current

• Connect the phases B, R to ground and apply the test voltage gradually between phase Y and ground. Record the leakage current

• Connect the phases R, Y to ground and apply the test voltage gradually between phase B and ground. Record the leakage current

HIGH POTTESTER BYR

CB MAIN CONTACTS

AC WITHSTAND VOLTAGE TESTING ARRANGEMENT

When the CB is Open(as shown in figure below) • Connect the phases R, Y, B Cable side of the breakers to the

ground. • Connect the phases R, Y, B Bus side of the breaker to the test

set. • Apply the test voltage gradually between ground and cable side

terminal of the breaker and ground • Record the corresponding leakage current readings.

HIGH POTTESTER BYR

CB MAIN CONTACTS

AC WITHSTAND VOLTAGE TESTING ARRANGEMENT

Page 288

Page 289: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-LB01, Page 7 of 11 Equipment : LV Switch gear(Feeders) Date:13 Feb,09 Revision: 0

5.2.2.5 Insulation Resistance Test after High Voltage Test

After performing high voltage test Perform the Insulation resistance test with 1000Vdc insulation tester as describe in 5.2.2

5.2.2.6 Minimum Operating Voltage for Close and Trip Coil

5.2.2.6.1 Close Coil Minimum voltage required to close the breaker is measured by applying variable DC voltage to the closing coil of the breaker

• Connect the DC source to the closing coil of the breaker in series with dc ammeter

• Increase the voltage slowly till the breaker get closed , note down voltage and current readings

5.2.2.6.2 Trip Coil

Minimum voltage required to Trip the breaker is measured by applying variable DC voltage to the Trip coil of the breaker

• Connect the DC source to the Trip coil of the breaker in series with dc ammeter

• Increase the voltage slowly till the breaker get opened , note down voltage and current readings

• Test should be repeated for both trip coils 5.2.2.7 Breaker Operating Time(Only Main Breakers which has Synch

Facility) Breaker closing and tripping time can be measured either by a timer or a breaker analyzer Timing Test Using An Electronic Oscillograph. • Connect the test set to the CB. • Perform the following operations at the rated DC • Close ( C ) , Open ( O ) , Close - Open ( C – O ) & Open –

Close – Open ( O – C – O ) • Record the corresponding readings.

R Y B

CB MAIN CONTACTS

CB CLOSING TERMINALS

CB TRIPPING TERMINALS

DC SUPPLY +

-

TRIPPINGORDER

CLOSINGORDER

CH. 1

CH. 2

CH. 3

CB TIMING TEST ARRANGEMENT

Page 289

Page 290: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-LB01, Page 8 of 11 Equipment : LV Switch gear(Feeders) Date:13 Feb,09 Revision: 0

5.2.2.8 Spring Charging Time and Motor Current Measurement Spring charging motor current is measured by ammeter or DC clamp meter as under. • Switch off the CB of motor circuit • Connect the clamp meter in spring charging motor circuit • Discharge the spring if it is charged • Switch on the CB for motor circuit • Note down the current

5.2.2.9 Stored Energy and Spring Charge Mechanism Checks

Stored energy and spring charging is checked by performing several operations.

5.2.3 Breaker operation

5.2.3.1 CB Racking IN and OUT Checks CB Racking IN and OUT must be checked for a smooth movement. This should be checked several times

5.2.3.2 CB Operation in Service Position Mechanical and Electrical • Put the breaker in service position • Perform several Close and Open operation of the breaker

manually by operating mechanical buttons • Performer several Close and Open operation of the breaker

electrically both local and remote

5.2.3.3 CB Operation in Test Position • Put the breaker in Test position. • Perform several Close and Open operation of the breaker

manually by operating mechanical buttons. • Performer several Close and Open operation of the breaker

electrically from local.

5.2.3.4 Functional Test of Local Controls, Alarm and Indication. • Alarm and Indication for spring charging once the spring is

charged shall be checked. • Alarm and indication for mal function of the drive should be

checked by interrupting the dc power to charging motor while charging.

• Alarm and indication for DC supervision relay shall be checked.

• Alarm and indication for trip coil supervision shall be checked. • Indication for closing, opening, rack in and rack out of the

breaker shall be checked.

5.2.3.5 Functional Test of Remote Controls, Alarm and Indication. • Alarm and Indication for spring charging once the spring is

charged shall be checked on remote or DCS • Alarm and indication for mal function of the drive should be

checked by interrupting the dc power to charging motor while charging shall be checked on DCS or remote

Page 290

Page 291: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-LB01, Page 9 of 11 Equipment : LV Switch gear(Feeders) Date:13 Feb,09 Revision: 0

• Alarm and indication for DC supervision relay shall be checked on DCS or remote

• Alarm and indication for trip coil supervision shall be checked on DCS or remote

• Indication for closing, opening, rack in and rack out of the breaker shall be checked on DCS or Remote.

5.2.4 Checks for Operation of Auxiliary switches, Limit Switches for Test/

Service. Contacts of auxiliary switches for breaker position, MOC, earth switch etc shall be checked for its correct operation, and contacts resistance is measured for each and every contacts output.

5.2.5 Operation of Earth Switch Operation of earth switch for closing and opening to be checked, also indication to be checked

5.2.6 Functional Checks of Interlocks and Limits Switches

Following Interlock should be checked as per manufacturer instruction manual Positive interlock Negative interlock Spring discharge interlock Interference interlock Closing spring gag interlock Limits switches should be checked for its proper operation and function an adjustment is made if required.

5.2.7 Electrical Control and Protection/Measuring Devices 5.2.7.1 Insulation Resitance Measurement for Control Wiring and

cabling with 500 V DC • Insulation resitance measurement shall be done for control

circuit, motor circuit , tripping and closing circuit with help of 500 v dc Insulation resistance tester

• All the external control and protection cables shall be checked for loop check and insulation resistance measurement.

5.2.7.2 Control Power and Current Measurement

• Current on MCB of each circuit to be measured when all the devices are in service

• Mixing of voltage between the two circuits should be checked by keeping off MCB of one circuit and checking the voltage on other circuit MCB towards load side +V and –V terminals with respect to ground

• Above test should be done for closing, tripping, charging and power to the devices circuits.

5.2.7.3 Testing of Protection Devices

All the protection and monitoring relays to be tested, please refer related test procedure.

Page 291

Page 292: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-LB01, Page 10 of 11 Equipment : LV Switch gear(Feeders) Date:13 Feb,09 Revision: 0

5.2.7.4 Testing of CT and VT

All the CT’s and VT’s shall be tested, please refer related test procedure

5.2.7.5 Testing of Transducer

All the current, voltage, frequency and power transducer shall be tested, please refer related test procedure

5.2.7.6 Testing of Alarm Devices All the current, voltage, frequency and power transducer shall be tested, please refer related test procedure

5.2.8 Protective earthing check

Switch gear protective earthing bond must be earthed in order to afford protection to human beings. Minimum two point’s preferable extreme end of ground bus shall be connected to the ground mesh • Check all protective relays have been grounded • Check the doors have been grounded

5.2.9 Checks for interchangeable of CB of same rating for interference

interlock CB should be checked for interference interlock • Remove the breaker from the cubicle • Put the breaker of same rating in to the cubicle, breaker should move

freely inside. • Remove the breaker again from the cubicle • But the breaker of different rating , breaker should not move inside the

cubicle, do not put more force in order not to damage the beaker and interface plate

5.2.10 Commissioning of heaters

Space heater shall be commissioned as under. 5.2.10.1 Visual Checks of Heaters

• Check the rating of the heater match with the supply voltage. • Check the KW rating of the heater match with drawing. • Check the breaker which supplying power to heater circuit for

correct rating with respect to total load of the heaters.

5.2.10.2 Measurement of Insulation Resistance Perform insulation resistance measurement on space heater circuit with 500 VDC megger

5.2.10.3 Measurement of Current and Voltage Switch on the breaker and measured the total current and individual heater load with mini clamp meter

5.2.10.4 Functional Checks of Thermostat

Check the operation of the thermostat and hygrometer for cut in and cut out operation

Page 292

Page 293: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-LB01, Page 11 of 11 Equipment : LV Switch gear(Feeders) Date:13 Feb,09 Revision: 0

5.2.11 Checks After Initial Energization After energization service load checks to be performed as under • Current should be measured on all the secondary terminal of the current

transformer. • Phase to phase and phase to ground Voltage measurement should be

done on all the phase and core of the voltage transformer. • Phase sequence checks to be done on Voltage transformer. • All the measuring devices including protective relay to be checked for

their metering function. 6.0 Documents

Test Sheet TS-LB01 shall be completed.

7.0 References 8.0 Attachment

8.1 Test Sheet for LV CB Feeder TS-LB01

***End of the Procedure ***

Page 293

Page 294: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

Riyadh Po“1062

STARTU

TES

ower plant21166/00”

UP MANUA

ST SH

t # 10

AL DF

EETS

Date:13 Feb,09

Revision0

n:

Page 294

Page 295: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-LB01 Page 1 of 9

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Medium Voltage Circuit Breaker and

Feeder Date: 13/02/09,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

1. Technical data

Circuit breaker (name plate details)

Manufacturer:...............................................................................................

Type designation:.........................................................................................

Serial No / year of manufacturing:...............................................................

Rated voltage:..............................................................................................

Rated nominal current:.................................................................................

2.

Visual check 1. Check nameplate information for correctness. 2. Inspect covers, panel section and door for paint work and proper fit. 3. Check for smooth and proper movement of racking mechanisms, shutters rollers, rails

and guides. 4. Check for proper alignment of the breaker primary and secondary contacts. 5. Check operation of all mechanical interlocks. 6. Check tightness of all bolted connections (torque wrench method). 7. Check bus and supports for defects such as cracked welds, chipped porcelain, cracked

insulation, etc., and free of dust accumulation. 8. Verify that all front panel mounted devices (meters, push buttons, switches, indicator

lamps, mimic buses, etc.) are installed as per drawings 9. Perform mechanical check and visual inspection on the circuit breaker. 10. Perform mechanical check and visual inspection on disconnect and grounding switches. 11. Check for correct breaker position indication. 12. Check for correct spring status indication (spring charged/discharged). 13. Perform all specific checks on the breaker and spring operating mechanism. 14. Check that all control wiring is correct according to the approved drawing and terminal

connections are secure. 15. Inspect enclosure for proper alignment foundation fixing and grounding. 16. Check thermostat/space heaters for right position. 17. Check the alignment and smooth operation of lifting trolley

Page 295

Page 296: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-LB01 Page 2 of 9

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Medium Voltage Circuit Breaker and

Feeder Date: 13/02/09,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

3.

3.1

Tests on Circuit breaker Breaker Mechanical Checks

1. check Manual spring charging 2. check manual spring discharging 3. manual closing 4. manual opening 5. indicator for spring charging/discharging, close and open

3.2

Contact Resistance test: Injected current: 100 Amps Dc

Phase(breaker Closed) Red Yellow Blue Resistance in Micro ohms

3.3

Insulation Test Before High Pot: Minimum Value--------- GΩ

Condition When breaker is closed When breaker is opened

Phase R-G Y-G B-G R-Y Y-B B-R R-R1 Y-Y1 B-B1 G-ohms Test Voltage

3.4

High Voltage(Hi-pot) Test , Test Voltage:___________ Volts AC DC

Phase Red Yellow Blue Leakage current in Micro Amps after One Minute

Remarks Note: above test is not required if this is done with bus bar

Page 296

Page 297: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-LB01 Page 3 of 9

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Medium Voltage Circuit Breaker and

Feeder Date: 13/02/09,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

3.5

Insulation Test After High Pot: Minimum Value--------- GΩ

Condition When breaker is closed When breaker is opened

Phase R-G Y-G B-G R-Y Y-B B-R R-R1 Y-Y1 B-B1 G-ohms Test Voltage

3.6

Minimum operating voltage test for trip and close coil

Minimum Operating Voltage in volts Closing coil Trip coil-1 Trip Coil-2

3.7

Breaker Operating Time/Coil current Mesurment : Only Main and Tie Breaker which has Synch Facility

a) Time Measurement Operating Time in m Sec Phase Red Yellow Blue Closing Opening Coil TC

b) Current Measurement

Voltage

in Volts Current in Amps

Closing Coil Opening Coil TC

Print out from Breaker Analyser to be attached:

Page 297

Page 298: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-LB01 Page 4 of 9

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Medium Voltage Circuit Breaker and

Feeder Date: 13/02/09,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

3.8 Spring Charging time and current measurment:

Charging Time in Sec

Voltage in Volts Motor Current in Amps

- spring charge time monitoring timer - set:..................sec

3.9

Stored energy and spring charge mechanism checks :

- motor charge - manual charge

4.

4.1

Breaker operation Breaker Rack in/out Checks CB Rack in CB Rack out Spring Discharge during Rack out Breaker Trip during rack out

4.2 CB Operation in service position: - manual close operation (Mechanical) - manual open operation (Mechanical) - local close operation ( Electrical) - local open operation( Electrical) - remote close operation - remote open operation

4.4 CB Operation in Test Position -manual close operation (Mechanical) - manual open operation (Mechanical) - local close operation ( Electrical) - local open operation( Electrical)

Page 298

Page 299: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-LB01 Page 5 of 9

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Medium Voltage Circuit Breaker and

Feeder Date: 13/02/09,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

4.5

Functional test of local control, alarm and Indication:

SL NO. Alarm/indication Description Indication

on Panel Alarm on

Relays 1 Panel Heater ON indication 2 Circuit breaker Close indication 3 Circuit breaker Open indication 4 Earthing switch close 5 Arc Protection healthy 6 Trip coil supervision(Breaker close) 7 Trip coil supervision(Breaker open) 8 CB in service position 9 CB in test position

4.6

Functional test of Remote control, Alarm and indication: 1) Breaker operation checks Remote DCS

Item No

DEVICE OPERATIONS / CHECK

Aux relay Breaker

1 CLOSE Signal from DCS

2 OPEN Signal from DCS

2) Alarms on DCS:

SL NO. Alarm/indication Description ON DCS

1 CB CLOSE 2 CB OPEN 3 CB in service position 4 CB in test position 5 ES CLOSE 6 ES OPEN 7 Prot. Relay healthy 8 Lockout F86 trip

Page 299

Page 300: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-LB01 Page 6 of 9

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Medium Voltage Circuit Breaker and

Feeder Date: 13/02/09,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

SL NO. Alarm/indication Description ON DCS

9 Prot. Relay trip 10 DC supervision Healthy 12 DC MCB trip 13 Lose of voltage 15 Local /remote signal( Remote position

3) Analog signals on DCS:

Analog signal for voltage and current can be checked by either by simulation with the help of function calibrator or it can also be checked online/live live when board is energized.

4.8

Checks for operation of Auxiliary switches ,Position Switch and MOC

Contacts Function

Contact No Terminal No Function Results

Auxiliary switch

MOC

Position Switch

Page 300

Page 301: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-LB01 Page 7 of 9

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Medium Voltage Circuit Breaker and

Feeder Date: 13/02/09,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

5 Earthing switch operation - check close operation - check open operation - check, that blades and mating contacts are closed - check electromechanical interlock, where applicable

6.0

Interlocking test Following Interlock should be checked as per manufacturer instruction manual

Positive interlock Negative interlock Spring discharge interlock Interference interlock Closing spring gag interlock Limits switches adjusted and function normal

7

7.1

Electrical control and protection/Measuring Devices Rating and settings of control MCBs Checks MCBs

MCB Description Setting Check correct function: -............ motor drive ............A

-............ Closing Circuit, ............A -............ Trip circuit ...........A -............ VT ............A

-............ VT ............A

7.2

Insulation Resistance measurement for control wiring and cabling with 500 V DC

Function MCB No +V to Ground -V to Ground Closing and Motor Ckt Trip Coil-1 Ckt Trip Coil Ckt Relay and indication Ckt

For meggering of external cable please refer to multi core cable test sheet

Page 301

Page 302: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-LB01 Page 8 of 9

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Medium Voltage Circuit Breaker and

Feeder Date: 13/02/09,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

7.3

Control power and current measurment Voltage(V DC) Current(A DC) Power(Watts)

7.3 Testing of protection devices Please refer specific test sheet of related divces

7.4 Testing of CT and VT Please refer separate test sheet of related divces

7.5 Testing of Transducer Please refer separate test sheet of related divces

7.6 Testing of Alarm Devices Please refer separate test sheet of related divces

9 9.1

Commissioning of Heater Circuit Visual Checks Rating of the heater match with the supply voltage. KW rating of the heater match with drawing. Breaker for the heater circuit rated correct

9.2

Measurement of insulation resistance of heater and lamp circuit Function MCB No Phase to Ground Neutral to Ground Heater and lamp CKT

9.4

Measurment of Current and voltage

Voltage(V AC) Current(A AC) Power(VA)

9.5

Functional checks of thermostat Thermostat setting Range

Measured Ambient Temp Inside the cubicle

Thermostat Cut-in Temp

Thermostat cut-out temp

Final Setting of Thermostat

Page 302

Page 303: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-LB01 Page 9 of 9

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Medium Voltage Circuit Breaker and

Feeder Date: 13/02/09,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

10 10.1

10.2

Initial Energization checks before energization: check earthing check cable connection tight check cable connection compartment and C.B. is clean and free from particles checks after initial energization: check indications of CT and VT, local and remote check CT current flow in protection relay Check Voltmeter readings For Load Service Checks please refer separate test sheet

Test Equipment Model Cal due date Test Equipment Model Cal due date

Page 303

Page 304: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

TESTOV

Riyadh Po“1062

STARTU

TING PVER CU

ower plant21166/00”

UP MANUA

PROCURRE

t # 10

AL DF

EDURENT RE

Date:13 Feb,09

RE FORELAY

Revision0

R

n:

Page 304

Page 305: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-AR01, Page 1 of 8 Equipment : Phase and Ground Over Current Relay Date:13 Feb,09 Revision: 0

TABLE OF CONTENT

1. Task a. Work Status------------------------------------------------------------------------------------------------2 b. Documentation--------------------------------------------------------------------------------------------2 c. Personnel---------------------------------------------------------------------------------------------------2 d. Measuring Instrumentation-----------------------------------------------------------------------------2

2. Preconditions---------------------------------------------------------------------------------------------------2 3. Precautions------------------------------------------------------------------------------------------------------2 4. Scope--------------------------------------------------------------------------------------------------------------2 5. Execution---------------------------------------------------------------------------------------------------------2

a. Visual Inspection------------------------------------------------------------------------------------------3 b. Testing of Over Current Relay

1. Electrical Function test

1. Functional check of Test Plug---------------------------------------------------------- 3 2. Shorting of links on relay case when relay is withdrawn-------------------------3

2. Secondary Injection 1. Relay Power measurement--------------------------------------------------------------3 2. Configuration of the relay----------------------------------------------------------------4 3. Testing of LEDs----------------------------------------------------------------------------4 4. Testing of out put relays------------------------------------------------------------------4 5. Testing of input Devices------------------------------------------------------------------4 6. Metering function---------------------------------------------------------------------------4 7. Over current Pickup/Dropout test-------------------------------------------------------5 8. Time current characteristics-------------------------------------------------------------5 9. Testing of Instantaneous element -----------------------------------------------------5 10. Reduced voltage (at 90 Volts ) trip test for all output relays---------------------6 11. Testing at final setting --------------------------------------------------------------------7 12. Checking the protective Earthing ------------------------------------------------------8

6. Documents-------------------------------------------------------------------------------------------------------8 7. Reference---------------------------------------------------------------------------------------------------------8 8. Attachment-------------------------------------------------------------------------------------------------------8

Page 305

Page 306: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-AR01, Page 2 of 8 Equipment : Phase and Ground Over Current Relay Date:13 Feb,09 Revision: 0

1.0 Task

All the over current shall be tested to check their functions 2.0 Preconditions

2.1 Work Status • Erection has been completed. • Labelling of the equipment

2.2 Documentation • The circuit diagrams of the electrical equipment cabinets are available • Commissioning checklists TS-AR01 • Approved relay settings should be available

2.3 Personnel • 1 Commissioning engineer: Engineer or technician with experience in commissioning of

all types of the electrical equipments. • 1 Helper: skilled worker with adequate on-the-job training.

2.4 Measuring Instruments and Tools

• Three phase Secondary Injection test set • Fluke

3.0 Precautions • Observe the rules for handling electronic components sensitive to electrostatic discharge (ESD

measures). • Special safety arrangements shall be made for all areas which are not explicitly designated as”

electrical operating areas” when performing tests at voltages in excess of 50V. 4.0 Scope

• Testing cable connections, • Checking that the mounting position is correct,

5.0 Execution

5.1 Visual Checks • Check the cables for damage and that they are connected correctly, • Inspect physical connection as per approved drawings. • Remove the relay from the case and check for tightness and that all shorting terminals

are making proper contact • Check the tightness of the connection on the relay case • Check the ferrules • Check that all the test and setting switches operate properly and all are labelled.

Properly by device number and individual function.

Page 306

Page 307: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-AR01, Page 3 of 8 Equipment : Phase and Ground Over Current Relay Date:13 Feb,09 Revision: 0

5.2 Testing of Phase and Ground over Current Relay.

Relay can be tested by using three or single phase secondary injection test set at the front panel mounted test facilities. Final calibration test of all protective relays must be carried out on approved settings, Enter the rating plate data in check list TS-AR01 and compare the Relay data with the data contained in the circuit documentation. The following test shall be carried out

1. Electrical Function test 1. Functional check of Test Plug 2. Shorting of links on relay case when relay is withdrawn

2. Secondary Injection 1. Relay Power measurement 2. Configuration of the relay 3. Testing of LEDs 4. Testing of out put relays 5. Testing of input Devices 6. Metering function 7. Over current Pickup/Dropout test 8. Time current characteristics

i. IEC-Normal inverse ii. IEC-Very inverse iii. IEC- Extremely Inverse iv. Long time Inverse v. Definite Time

9. Testing of Instantaneous element 10. Reduced voltage (at 90 Volts ) trip test for all output relays 11. Testing at final setting 12. Checking the protective Earthing

5.2.1 Electrical Function Test 5.2.1.1 Functional check of Test Plug

Test Plug should be checked for its correct function, terminals should be checked for its correct current, auxiliary power and tripping assignment as per the circuit drawing.

5.2.1.2 Shorting of links on relay case when Relay is Withdrawn In case of withdrawal type relay, shorting facility on the relay case should be checked as under. • Connect the fluke to check the continuity across the current terminal on

the relay case and it shows some resistance. • Pull the relay out and check the fluke which shows now resistance less

then when relay was inside. • Repeat the test for other two phases too.

5.2.2 Secondary Injection Connection between the relay and secondary injection set is made as per figure below.

Page 307

Page 308: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-AR01, Page 4 of 8 Equipment : Phase and Ground Over Current Relay Date:13 Feb,09 Revision: 0

5.2.2.1 Relay Power Measurement • Apply rated DC or AC auxiliary voltage to the power terminal of the relay

through suitable ammeter and voltmeter • Measure the current and voltage. Product of two gives power consumption

of the relay.

5.2.2.2 Configuration of the Relay Relay should be configured for inputs, outputs, and LED assignment as per final setting either through front panel of the relay or through lap top communicating with relay.

5.2.2.3 Testing of LEDs • Check the operation of LEDs first by pressing reset button, all the LEDs

should light for 2 to 3 seconds • Check the operation of LEDs for their function by injecting current or by

simulating the software.

5.2.2.4 Testing of out put Relays • By simulation or by performing secondary injection, check the operation of

output relays as per the relay configuration. • Measure the contact resistance of the each output relay with fluke

5.2.2.5 Testing of Digital Inputs • Connect a variable auxiliary DC or AC voltage to each and every Digital

input • Increase the voltage till the digital input picks up (a temporary LED may be

assigned to see the pickup) thus a minimum voltage required to operate digital input is noted.

5.2.2.6 Metering Function • Configure the relay for Phase CT and neutral CT ratio. • Apply three phase 25%, 50%, 75% and 100% of nominal current on phase

over current relay and note down the corresponding readings on the relay. • Apply Single phase 25%, 50%, 75% and 100% of nominal current on

Ground over current relay and note down the corresponding readings on the relay.

5.2.2.7 Over Current Pickup/Dropout test

Page 308

Page 309: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-AR01, Page 5 of 8 Equipment : Phase and Ground Over Current Relay Date:13 Feb,09 Revision: 0

Apply the test relays setting for over current on the relay as follows. • Definite Time Curve with minimum time delay. • Disable all other protection elements. • Connect the current test set on the relay current terminals one at a time as

follows. o Red phase to Neutral.( for Phase over current relay) o Yellow phase to Neutral. ( for Phase over current relay) o Blue phase to neutral. ( for Phase over current relay) o Single phase current on Ground element(ground over current relay) o Connect the timer to the relay tripping contact

• Slowly increase the current until the relay picked-up. • Record the operating current. • Slowly decrease the current until relay reset • Record the operating current

5.2.2.8 Time Current Characteristics • Apply the test relay setting for over current on the relay as follows.

o Disable all other protection elements. o DT curve with 500ms delay. o IEC NI curve with 0.1 TMS. o IEC VI curve with 0.1 TMS. o IEC EI curve with 0.1 TMS. o IEC LT curve with 0.1 TMS. o IEC DT Curve with 1.0 TMS

• Select the time over current curve one at a time on the relay. • Connect the current test set on the relay current terminals one at a time as

follows. o Red phase to Neutral.( for Phase over current relay) o Yellow phase to Neutral. ( for Phase over current relay) o Blue phase to neutral. ( for Phase over current relay) o Single phase current on Ground element(ground over current relay)

• Connect the timer to the relay tripping contact • Inject testing current 2 times, 5 times and 10 times of the pickup settings and

note down the operating time of the relay. • Record the operating time. • Cross check the time as per figure below or calculate the time using below

formula. • Test shall be done for all the characteristics and all the phase and ground

element

Note: Testing should be done at minimum, middle and maximum range of the setting.

Page 309

Page 310: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-AR01, Page 6 of 8 Equipment : Phase and Ground Over Current Relay Date:13 Feb,09 Revision: 0

Page 310

Page 311: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-AR01, Page 7 of 8 Equipment : Phase and Ground Over Current Relay Date:13 Feb,09 Revision: 0

5.2.2.9 Instantaneous Unit Verification

• Apply the test relays setting for phase and ground over current on the relay as follows.

• Disable all other protection elements. • Connect the current test set on the relay current terminals one at a time

as follows. o Red phase to Neutral.( for Phase over current relay) o Yellow phase to Neutral. ( for Phase over current relay) o Blue phase to neutral. ( for Phase over current relay) o Single phase current on Ground element(ground over current relay)

Pickup/dropout test • Slowly increase the current until the relay picks-up. • Record the operating current. • Slowly decrease the current until relay reset • Record the operating current

Timing test • Connect the timer to the relay tripping contact • Inject testing current 2 times the pickup settings and note down the

operating time of the relay.

Page 311

Page 312: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-AR01, Page 8 of 8 Equipment : Phase and Ground Over Current Relay Date:13 Feb,09 Revision: 0

• Tripping time should be actual definite time multiply by TMS setting • Test shall be done for all the phase and ground element

5.2.2.10 Checking the Protective Earthing

Check the earthing connection on the relay. 6.0 Documents

Test Sheet TS-AR01 shall be completed for each and every Phase and Ground over Current Relay. 7.0 References 8.0 Attachment

8.1 Test Sheet for Over Current Relays 8.1.1 MIFI-GE TS-AR01A 8.1.2 SEL 551 TS-AR01B 8.1.3 GE C-60 TS-AR01C

***End of the Procedure***

Page 312

Page 313: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

Riyadh Po“1062

STARTU

TES

ower plant21166/00”

UP MANUA

ST SH

t # 10

AL DF

EETS

Date:13 Feb,09

Revision0

n:

Page 313

Page 314: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01A Page 1 of 5

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Ground Over Current Relay (GE-MIFII)

Date: 13/02/09 ,Revision: 0

1.0 Relay General Data Function Serial No. Make Model No. Diagram no. Aux. Voltage Frequency Firmware no. Rated voltage Rated current: No of logic Inputs: No of outputs:

2.0 Visual Inspection

Item Description Checked 1 S/L. No. on Module, Cover and Case are identical

2 Inspect for any physical damage or defects.

3 Verify connections as per approved drawings. 4 Check that serial no. of relay matching with serial no. of display.

5 Relay case connected to local earth bar

6 Tightness of contact of the relay and CT shorting terminal makes good contact when relay is withdrawn

7 Connection on Relay terminals are good

8 Ferrules are according to the drawings

9 Test and settings switches operate properly

10 CT shorting function checked.

3.0 Electrical Functional Test.

• Test switch / Test Block CT shorting contacts proved

• Relay CT shorting contacts proved

4.0 Secondary Injection test.

4.1. Relay Power Measurment at Rated Voltage(Burden Test) Current (mA) Burden (W) Nominal Burden (W)

Terminal Voltage (V) Quiescent Output

Operated Quiescent Output Operated Quiescent Max

< W < W

Page 314

Page 315: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01A Page 2 of 5

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Ground Over Current Relay (GE-MIFII)

Date: 13/02/09 ,Revision: 0

4.2. Testing Of LED’s

LED Number Assigned Function Results Remarks LED-1 TRIP LED-2 TIME LED-3 INSTANTANOUS LED-4 PICKUP

4.3. Testing Of Out Put Relays

Output Relay No.

Output Contact

No.

Output relay

status

Contact Operation

check

Actual Assignment

of Relays

Contact Resistance(

Ω) Remarks

Trip A5-B6 OUT-1 A7-B7 OUT-2 A7-B8 OUT-3 A7-B9 OUT-4 A7-B10

4.4. Testing Of Binary Inputs

(Energize only one OPTO INPUT at a time with relay rated OPTO input voltage – CAUTION!! -Check RATED OPTO INPUT VOLTAGE before apply voltage to OPTO Input terminal)

V DC Applied OPTO Input No. Terminal No. Minimum Pickup

Voltage(V)

Status of OPTO INPUT

Function assigned for OPTO INPUT

Remarks

CC1 A10-A8(CC1) CC1 A10-A9(CC2)

4.5. Metering Function

Phase Injected current (A) Applied CT ratio Displayed

current % Error Remarks

N

Page 315

Page 316: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01A Page 3 of 5

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Ground Over Current Relay (GE-MIFII)

Date: 13/02/09 ,Revision: 0

4.6. Testing of Time over current element (IEC CURVE) For Neutral Current

4.6.1. Pickup and drop out testing:

Test Elem. Pickup setting Time Multiplier Pickup (A) Drop out( A)

N 4.6.2. Time Characteristic

Operating time at current setting (Sec)

2*IP = 0.4A 5*IP = 1A 10*IP = 1A

Elem

.

Curve

Pickup Relay Setting (A

Time Multiplier

Tp Act Cal Act Cal Act Cal MI 0.2 1.0 VI 0.2 1.0 EI 0.2 1.0

N

DT 0.2 1.0 4.7. Testing of Instantaneous Element

4.7.1.1. Pickup/dropout Stage Pickup

setting(A) Time dial

Phase Pickup Current (A)

Drop out Current (A)

Remarks

50G1 0 mS N 50G2 0 mS N

4.7.1.2. Timing Test:

Stage Pickup setting(A)

Time dial

Phase Injected Current (A)

Time @ > pickup Value

Remarks

50G1 0 mS N 50G2 0 mS N

4.8. Testing at reduced voltage (90V Auxiliary Supply)

Testing of Time over current(Ground ) Output Realys/Tripping Time (Sec) Stage

Elem

.

Pickup setting(A)

Curve TD Actual Time

Trip Out-1 Out-2 Out-3 Out-4

51G1 N

Page 316

Page 317: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01A Page 4 of 5

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Ground Over Current Relay (GE-MIFII)

Date: 13/02/09 ,Revision: 0

4.9. Testing at Final Settings.

4.10. Testing at Final Settings.

4.10.1. Final Settings FUNCTION SETTINGS UNITS REMARKS

4.10.1.1. Product setup Relay Operation Enable Frequency 60 Hz Ground CT Ratio

4.10.1.2. 51 Function 51 Trip Enable 51 pickup X In 51 Curve 51 dial 51 Time Delay

4.10.1.3. 50 Function( high set) 50H Trip Enable 50H pickup X In 50H Time Delay

4.10.1.4. 50 Function( Low set) 50L Trip Enable 50L pickup X In 50L Time Delay

4.10.1.5. 49 Thermal Model ) Trip Enable Disable pickup 49 X In Alarm Level 49 Heat Time 49 Cool Time 49

4.10.1.6. Relay Configuration 4.10.1.6.1. INPUTS

Input 1 No Definition Input 2 No Definition

4.10.1.6.2. INPUTS Out put 1 General Trip Out put 2 General Trip Out put 3 General Trip Out put 4 General Trip

Page 317

Page 318: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01A Page 5 of 5

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Ground Over Current Relay (GE-MIFII)

Date: 13/02/09 ,Revision: 0

4.10.1.6.3. LED’s LED 1 51 Trip LED 2 50 Trip LED 3 49 Alarm LED 4 Pickup

4.10.1.6.4. Advance General Setting Identification Feeder Name Setting Group 1 Trip Minimum Time 100 milliseconds

4.10.1.6.5. Oscillograghy mask

Oscillo by Communication No Oscillo by Digital Input No Oscillo by Tripping Yes Oscillo by Pickup Yes

4.10.1.6.6. Event mask All Function Yes

4.10.1.7. Current sensitivity test:

4.10.1.7.1. Time Characteristic Operating time at current setting

(Sec) 2*IP = 0.4A 5*IP = 1A 10*IP = 1A

Elem

.

Curve

Pickup Relay Setting (A

Time Multiplier

Tp Act Cal Act Cal Act Cal N

4.10.1.7.2. Instantaneous Ground

Stage Pickup setting(A)

Time dial

Phase Injected Current (A)

Time @ > pickup Value

Remarks

50G1 mS N 50G2 mS N

4.10.2. Fault Record:

Fault record verification done. 4.10.3. Waveform Record:

Waveform record verification 4.11. Relay Setting:

Final relay setting retrieved through ‘ MIPC ’ software and printout attached. Test Equipment Model Cal due date Test Equipment Model Cal due date

Page 318

Page 319: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01B Page 1 of 14

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Over Current Relay (SEL-551)

Date:13/02/09, Revision: 0

1.0 Relay General Data Function Serial No. Make Model No. Diagram no. Aux. Voltage Frequency Firmware no. Rated voltage Rated current: No of logic Inputs: No of outputs:

2.0 Visual Inspection

Item Description Checked 1 S/L. No. on Module, Cover and Case are identical

2 Inspect for any physical damage or defects.

3 Verify connections as per approved drawings. 4 Check that serial no. of relay matching with serial no. of display.

5 Relay case connected to local earth bar

6 Tightness of contact of the relay and CT shorting terminal makes good contact when relay is withdrawn

7 Connection on Relay terminals are good

8 Ferrules are according to the drawings

9 Test and settings switches operate properly

10 CT shorting function checked.

3.0 Electrical Functional Test.

• Test switch / Test Block CT shorting contacts proved

• Relay CT shorting contacts proved

4.0 Secondary Injection test.

4.1. Relay Power Measurment at Rated Voltage(Burden Test) Current (mA) Burden (W) Nominal Burden (W)

Terminal Voltage (V) Quiescent Output

Operated Quiescent Output Operated Quiescent Max

< W < W

Page 319

Page 320: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01B Page 2 of 14

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Over Current Relay (SEL-551)

Date:13/02/09, Revision: 0

4.2. Testing Of LED’s

LED Number Assigned Function Results Remarks LED-EN Power LED-A Trip –Phase A LED-B Trip-Phase B LED-C Trip-Phase C LED-N Trip On Neutral LED-RS(79) CB Close LED-LO(79) CB Open

4.3. Testing Of Out Put Relays

Output Relay No.

Output Contact

No.

Output relay

status

Contact Operation

check

Actual Assignment

of Relays

Contact Resistance(

Ω) Remarks

OUT-1 203-204 NO trip TRIP OUT-2 205-206 NO input Close on

CB close OUT-3 209-210 NO trip SPARE OUT-4 211-212 NO Trip DCS

ALARM 213-214 NC alarm NA

4.4. Testing Of Binary Inputs (Energize only one OPTO INPUT at a time with relay rated OPTO input voltage – CAUTION!! -Check RATED OPTO INPUT VOLTAGE before apply voltage to OPTO Input terminal)

V DC Applied OPTO Input No. Terminal No. Minimum Pickup

Voltage(V)

Status of OPTO INPUT

Function assigned for OPTO INPUT

Remarks

IN-1 201-202 52a IN-2 207-208 External

4.5. Metering Function

Phase Injected current (A) Applied CT ratio Displayed

current % Error Remarks

R Y B N

Page 320

Page 321: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01B Page 3 of 14

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Over Current Relay (SEL-551)

Date:13/02/09, Revision: 0

4.6. Testing of Time over current element (IEC CURVE) For Phase current 4.6.1. Pickup and drop out testing:

Test Elem. Pickup setting Time Multiplier Pickup (A) Drop out( A)

R Y B N

4.6.2. Phase over current - Time Characteristic

4.6.2.1. ( Low set 51P1) Operating time at current setting

(Sec) 2*IP = 0.4A 5*IP = 1A 10*IP = 1A

Elem

.

Curve

51P1P-Relay Setting Ip* (A)

1P1TDT- time

Multiplier Tp Act Cal Act Cal Act Cal

R Y B

SI(C1) 0.2 1.0

5.015

2.14

1.485

R Y B

VI(C2) 0.2 1.0

6.75

1.675

0.75

R Y B

EI(C3) 0.2 1.0

13.33

1.66

.404

R Y B

LTI(C4)

60

15

6.66

R Y B

STI(C4) 0.2 1.0

0.889

0.376

0.259

Page 321

Page 322: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01B Page 4 of 14

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Over Current Relay (SEL-551)

Date:13/02/09, Revision: 0

4.6.2.2. ( High set 51P2)

Operating time at current setting (Sec)

2*IP = 0.4A 5*IP = 1A 10*IP = 1A

Elem

.

Curve

51P2P-Relay Setting Ip* (A)

51P2TDT- time

Multiplier Tp Act Cal Act Cal Act Cal

R Y B

SI(C1) 0.2 1.0

5.015

2.14

1.485

R Y B

VI(C2) 0.2 1.0

6.75

1.675

0.75

R Y B

EI(C3) 0.2 1.0

13.33

1.66

.404

R Y B

LTI(C4)

60

15

6.66

R Y B

STI(C4) 0.2 1.0

0.889

0.376

0.259

4.7. Testing of Instantaneous element For Phase current

4.7.1. Pickup and drop out testing: Stage Pickup

setting(A) Time dail-SV5&SV6

Phase Pickup Current (A)

Drop out Current (A)

Remarks

R Y 50P1P

2 B R Y

50P2P

3

Inst

B \

Page 322

Page 323: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01B Page 5 of 14

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Over Current Relay (SEL-551)

Date:13/02/09, Revision: 0

4.7.2. Timing test: Stage Pickup

setting(A) Time dail-SV5&SV6

Phase Injected Current > pickup Value

Time(S) Remarks

R Y 50P1P

2 B R Y

50P2P

3 B

4.7.3. Neutral over Current-Time Characteristic

4.7.3.1. (low set-51N1)

Operating time at current setting (Sec)

2*IP = 0.4A 5*IP = 1A 10*IP = 1A

Elem

.

Curve

51N1P-Relay Setting Ip* (A)

51N1TDT- time

Multiplier Tp Act Cal Act Cal Act Cal

SI(C1) 0.2 0.5 VI(C2) 0.2 0.5 EI(C3) 0.2 0.5 LI(C4) 0.2 0.5

N

SI(C5) 0.2 0.5

4.7.3.2. (High set-51N2) Operating time at current setting

(Sec) 2*IP = 0.4A 5*IP = 1A 10*IP = 1A

Elem

.

Curve

51N2P-Relay Setting Ip* (A)

51N2TDT- time

Multiplier Tp Act Cal Act Cal Act Cal

SI(C1) 0.2 0.5 VI(C2) 0.2 0.5 EI(C3) 0.2 0.5 LI(C4) 0.2 0.5

N

SI(C5) 0.2 0.5

Page 323

Page 324: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01B Page 6 of 14

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Over Current Relay (SEL-551)

Date:13/02/09, Revision: 0

4.8. Testing of Instantaneous element For Neutral current 4.8.1. Pickup and drop out testing:

Stage Pickup setting(A)

Time dail-SV5&SV6

Phase Pickup Current (A)

Drop out Current (A)

Remarks

50N1 2 N 50N2 3

Inst N

4.8.2. Timing test:

Stage Pickup setting(A)

Time dail-SV5&SV6

Phase Injected Current > pickup Value

Time(S) Remarks

50N1 2 N 50N2 3

Inst N

4.9. Testing at reduced voltage (90V Auxiliary Supply)

4.9.1. Testing of Time over current(Phase )

Operating time at current setting (Sec)

2*IP = 0.4A 5*IP = 1A 10*IP = 1A

Elem

.

Curve

51P1P-Relay Setting Ip* (A)

1P1TDT- time

Multiplier Tp Act Cal Act Cal Act Cal

R Y B

4.9.2. Testing of Instantaneous element For Phase current

Stage Pickup

setting(A) Time dail-SV5&SV6

Phase Injected Current > pickup Value

Time(S) Remarks

R Y 50P1P

2 B

Page 324

Page 325: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01B Page 7 of 14

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Over Current Relay (SEL-551)

Date:13/02/09, Revision: 0

4.9.2.1. Neutral over Current-Time Characteristic

Operating time at current setting (Sec)

2*IP = 0.4A 5*IP = 1A 10*IP = 1A

Elem

.

Curve

51N1P-Relay Setting Ip* (A)

51N1TDT- time

Multiplier Tp Act Cal Act Cal Act Cal

N SI(C1) 0.2 0.5

4.9.2.2. Instantaneous element For Neutral current

Stage Pickup setting(A)

Time dail-SV5&SV6

Phase Injected Current > pickup Value

Time(S) Remarks

50N1 2 Inst

N

4.10. Testing at Final Settings.

4.10.1. Final Settings FUNCTIONS SETTINGS UNITS REMARKS

4.10.2. Group 1 Identifier Labels Rid Relay Identifier (12 chars)

TID Terminal Identifier (12 chars)

Current Transformer Ratios CTR Phase (IA,IB IC)CT Ratio

CTRN Neutral (IN)CT Ratio

Minimum Trip Duration Timer TDURD Min. Trip Duration Time

Phase Instantaneous Over current Elements 50P1-50P6 50P1P Phase Inst.Pickup 50P2P Phase Inst.Pickup 50P3P Phase Inst.Pickup 50P4P Phase Inst.Pickup 50P5P Phase Inst.Pickup 50P6P Phase Inst.Pickup Single-Phase Instantaneous Over current Elements 50A,50B,50C

Page 325

Page 326: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01B Page 8 of 14

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Over Current Relay (SEL-551)

Date:13/02/09, Revision: 0

50ABCP Single Phase Inst.Pickup

Phase Time –Over current Elements 51P1T 51P1P Phase Time –Overcurrent Pick up

51P1C Phase Time – Overcurrent Curve

51P1TD Phase Time- Overcurrent Time-Dial

51P1RS Phase Time –Overcurrent EM Reset

Phase Time –Over current Elements 51P2T 51P2P Phase Time-Overcurrent Pick up

51P2C Phase Time-Overcurrent Curve

51P2TD Phase Time-Overcurrent Time-Dial

51P2RS Phase Time-Overcurrent EM Reset

Neutral Ground Instantaneous Over current Elements 50N1,50N2 50N1P Neutral Gnd. Inst. Pick up

50N2P Neutral Gnd. Inst. Pick up

Neutral Ground Time-Over current Elements 51N1T 51N1P Neutral Gnd Time-Overcurrent Pickup

51N1C Neutral Gnd. Time-Overcurrent Curve

51N1TD Neutral Gnd. Time-Overcurrent Time-Dial

51N1RS Neutral Gnd.Time-Overcurrent EM Reset

Residual Ground Instantaneous Over current Elements 50G1,50G2 50G1P Residual Gnd.Inst,Pick up

50G2P Residual Gnd.Inst,Pick up

Residual Ground Time-Over current Elements 51G1T

Page 326

Page 327: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01B Page 9 of 14

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Over Current Relay (SEL-551)

Date:13/02/09, Revision: 0

51G1P Residual Gnd.Time-Overcurrent,Pick up

51G1C Residual Gnd.Time-Overcurrent Curve

51G1TD Residual Gnd.Time-Overcurrent Time-Dial

51G1RS Residual Time-Overcurrent EM Reset

Negative Sequence Instantaneous Over current Elements 50Q1,50Q2 50Q1P Neg.Seq,Inst Pick up

50Q2P Neg.Seq,Inst Pick up

Negative-Sequence Time-Over current elements 51Q1T 51Q1P Neg.Seq. Time-Overcurrent Pickup

51Q1C Neg.Seq Time-Overcurrent Curve

51Q1TD Neg.Seq Time-Overcurrent Time-Dial

51Q2RS Neg.Seq.Time-Overcurrent EM Reset

Negative-Sequence Time-Over current Elements 51Q2T 51Q2P Neg-.Seq. Time-Overcurrent Pick up

51Q2C Neg,-Seq Time-Overcurrent Curve

51Q2TD Neg.-Seq Time-Overcurrent Time-Dial

51Q2RS Neg. -Seq. Time-Overcurrent EM Reset

Re closing Relay Open Interval Timer 790I1 Open Interval 1 Timer

790I2 Open Interval 2 Timer

790I3 Open Interval 3 Timer

Page 327

Page 328: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01B Page 10 of 14

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Over Current Relay (SEL-551)

Date:13/02/09, Revision: 0

790I4 Open Interval 4 Timer

Re closing Relay Reset Timer 79RSD Reset Time from Re close Cycle

79RLD Reset Time From Lockout

Close Failure Timer CFD Close Failure Time Demand Ammeter Settings DMTC Time Constant PDEMP Demand Phase Pickup

NDEMP Demand Neutral Ground Pickup

GDEMP Demand Residual Group Pickup

QDEMP Demand Negative-Sequence Pickup

SELogic Variable Timers SV5PU SV_Timer Pickup

SV5DO SV_Timer Dropout

SV6PU SV_Timer Pickup

SV6DO SV_Timer Dropout

SV7PU SV_Timer Pickup

SV7DO SV_Timer Dropout

SV8PU SV_Timer Pickup

SV8DO SV_Timer Dropout

SV9PU SV_Timer Pickup

SV9DO SV_Timer Pickup

SV10PU SV_Timer Pickup

Page 328

Page 329: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01B Page 11 of 14

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Over Current Relay (SEL-551)

Date:13/02/09, Revision: 0

SV10DO SV_Timer Dropout

SV11PU SV_Timer Pickup

SV11DO SV_Timer Dropout

SV12PU SV_Timer Pickup

SV12DO SV_Timer Dropout

SV13PU SV_Timer Pickup

SV13DO SV_Timer Dropout

SV14PU SV_Timer Pickup

SV14DO SV_Timer Dropout

Other System Parameters NFREQ Nominal Frequency

PHROT Phase Rotation DATE_F Date Format

4.10.3. Logic Trip Logic TR ULTR Torque Control For Time-Over current Elements 51P1TC 51P2TC 51N1TC 51G1TC 51Q1TC 51Q2TC Close Logic 52A CL ULCL Re closing Relay 79RI 79RI5 79DTL

Page 329

Page 330: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01B Page 12 of 14

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Over Current Relay (SEL-551)

Date:13/02/09, Revision: 0

79DLS 79SKP 79STL 79BRS 79SEQ Event Report Trigger Conditions ER1 ER2 SELogic Variables SV1 SV2 SV3 SV4 SELogic Variable Timer Inputs SV5 SV6 SV7 SV8 SV9 SV10 SV11 SV12 SV13 SV14 Output Contacts OUT1 OUT2 OUT3 OUT4 Display Points DP1 DP2 DP3 DP4 DP5 DP6 DP7 DP8

4.10.4. Report SER1 24 Elements max,(enter NA to null)

SER2 24 Elements

Page 330

Page 331: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01B Page 13 of 14

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Over Current Relay (SEL-551)

Date:13/02/09, Revision: 0

max,(enter NA to null) SER3 24 Elements max,(enter NA to null)

4.10.5. Rear Port Rear Port PROTOCOL Port Protocol

Communications Settings PREFIX LMD Prefix ADDRESS LMD Address

SETTLE_TIME LMD Setting Time

SPEED Baud Rate DATA_BITS Number Data Bits

PARITY Parity STOP Stop Bills SLAVEID Modbus Slave ID

Other Rear Port Settings TIMEOUT Timeout AUTO Send Auto Messages to Port

RTS_CTS Enable Hardware Handshaking

FAST_OP Fast Operate Enable

4.10.5.1. Current sensitivity test:

4.10.5.1.1. Testing of Time over current(Phase )

Operating time at current setting (Sec)

2*IP = 0.4A 5*IP = 1A 10*IP = 1A

Elem

.

Curve

51P1P-Relay Setting Ip* (A)

1P1TDT- time

Multiplier Tp Act Cal Act Cal Act Cal

R Y B

4.10.5.1.2. Testing of Instantaneous element For Phase current

Page 331

Page 332: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01B Page 14 of 14

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Over Current Relay (SEL-551)

Date:13/02/09, Revision: 0

Stage Pickup setting(A)

Time dail-SV5&SV6

Phase Injected Current > pickup Value

Time(S) Remarks

R Y 50P1P

2 B

4.10.5.1.3. Neutral over Current-Time Characteristic

Operating time at current setting

(Sec) 2*IP = 0.4A 5*IP = 1A 10*IP = 1A

Elem

.

Curve

51N1P-Relay Setting Ip* (A)

51N1TDT- time

Multiplier Tp Act Cal Act Cal Act Cal

N SI(C1) 0.2 0.5

4.10.5.1.4. Instantaneous element For Neutral current

Stage Pickup setting(A)

Time dail-SV5&SV6

Phase Injected Current > pickup Value

Time(S) Remarks

50N1 2 Inst

N

4.10.6. Fault Record: Fault record verification done.

4.10.7. Waveform Record:

Waveform record verification

4.11. Relay Setting: Final relay setting retrieved through ‘MIPC’ software and printout attached.

Test Equipment Model Cal due date Test Equipment Model Cal due date

Page 332

Page 333: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 1 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

1.0 Relay General Data Function Serial No. Make Model No. Diagram no. Aux. Voltage Frequency Firmware no. Rated voltage Rated current: No of logic Inputs: No of outputs:

2.0 Visual Inspection

Item Description Checked 1 S/L. No. on Module, Cover and Case are identical

2 Inspect for any physical damage or defects.

3 Verify connections as per approved drawings. 4 Check that serial no. of relay matching with serial no. of display.

5 Relay case connected to local earth bar

6 Tightness of contact of the relay and CT shorting terminal makes good contact when relay is withdrawn

7 Connection on Relay terminals are good

8 Ferrules are according to the drawings

9 Test and settings switches operate properly

10 CT shorting function checked.

3.0 Electrical Functional Test.

• Test switch / Test Block CT shorting contacts proved

• Relay CT shorting contacts proved

4.0 Secondary Injection test.

4.1. Relay Power Measurement at Rated Voltage(Burden Test) Current (mA) Burden (W) Nominal Burden (W)

Terminal Voltage (V) Quiescent Output

Operated Quiescent Output Operated Quiescent Max

B5b-B6a < W < W

Page 333

Page 334: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 2 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

4.2. Testing Of LED’s

First Column( Status) Second Column (Setting in use) LED No. Assigned Function Results LED No. Assigned Function Results LED-1 IN SERVICE LED-1 Group-1 LED-2 TROUBLE LED-2 Group-2 LED-3 TEST MODE LED-3 Group-3 LED-4 TRIP LED-4 Group-4 LED-5 ALARM LED-5 Group-5 LED-6 PICKUP LED-6 Group-6 LED-7 VOLTAGE LED-7 Group-7 LED-8 CURRENT LED-8 Group-8 LED-9 FREQUENCY LED-9 Spare LED-10 OTHER LED-10 Spare LED-11 PHASE A LED-11 Spare LED-12 PHASE B LED-12 Spare LED-13 PHASE C LED-14 NUETRAL GROOUND

Third Column(Breaker Function) Fourth Column(Synchronous function)

LED No. Assigned Function Results LED No. Assigned Function Results LED-1 BREAKER-1 CLOSE LED-1 NO-1 SYSNCH LED-2 BREAKER-1 TRBLE LED-2 NO-2 SYSNCH LED-3 BREAKER-1 OPEN LED-3 LED-4 LED-4 LED-5 LED-5 RCL ENABLE LED-6 BREAKER-1 CLOSE LED-6 RCL DISABLE LED-7 BREAKER-1 TRBLE LED-7 RCL IN PROGRESS LED-8 BREAKER-1 OPEN LED-8 RCL LOACKOUT LED-9 LED-9 LED-10 LED-10 LED-11 LED-11 LED-12 LED-12

Page 334

Page 335: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 3 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

4.3. Testing Of Out Put Relays

Output Relay No.

Output Contact No.

Output relay

status

Contact Operation

check

Actual Assignment

of Relays

Contact Resistan

ce(Ω)

Remarks

Critical

B1b-B1a (N.O) / B2b-B1a(NC)

H1 H1c-H1b(NO) H2 H2c-H2b(NO) H3 H3c-H3b(NO)

H4 H4c-H4b(NO) H5 H5c-H5b(NO) H6 H6c-H6b(NO)

P1 P1c-P1b(NO) P2 P2c-P2b(NO) P3 P3c-P3b(NO)

P4 P4c-P4b(NO) P5 P5c-P5b(NO) P6 P6c-P6b(NO)

U1 U1c-U1b(NO) U2 U2c-U2b(NO) U3 U3c-U3b(NO)

U4 U4c-U4b(NO) U5 U5c-U5b(NO) U6 U6c-U6b(NO)

Page 335

Page 336: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 4 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

4.4. Testing Of Binary Inputs (Energize only one OPTO INPUT at a time with relay rated OPTO input voltage – CAUTION!! -Check RATED OPTO INPUT VOLTAGE before apply voltage to OPTO Input terminal)

V DC Applied OPTO Input No. Terminal No. Minimum Pickup

Voltage(V)

Status of OPTO INPUT

Function assigned for OPTO INPUT

Remarks

H7 H7a(+)-H7b(-) H7 H7c(+)-H7b(-) H8 H8a(+)-H7b(-) H8 H8c(+)-H7b(-) P7 P7a(+)-P7b(-) P7 P7c(+)-P7b(-) P8 P8a(+)-P7b(-) P8 P8c(+)-P7b(-) U7 U7a(+)-U7b(-) U7 U7c(+)-U7b(-) U8 U8a(+)-U7b(-) U8 U8c(+)-U7b(-)

4.5. Metering Function(Meter Accuracy Test) 4.5.1. Phase Current Accuracy Test

Relay Setting CT F1 (SRC 1) Neutral side Phase CT primary: 6000A Phase CT secondary: 1A Test Result

Injected Current Expected Current Measured Current (A)

(A) (A) Phase A Phase B Phase C

0.2 1200 0.25 1500

0.3 1800

0.5 3000

0.75 4500

1 6000

Page 336

Page 337: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 5 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

4.5.2. Phase Current Accuracy Test Relay Setting CT M1 (SRC 2) Phase CT primary: 100A Phase CT secondary: 1A Test Result

Injected Current Expected Current Measured Current (A)

(A) (A) Phase A Phase B Phase C

0.2 20 0.25 25

0.3 30

0.5 50

0.75 75

1 100

4.5.3. Phase Voltage Accuracy Test Relay Setting VT F5 (SRC1) Phase VT Connection Star Phase VT Secondary 69.3 V Phase VT Ratio 120: 1 Test Results

Test Values Applied Voltage Expected Voltage Measured Voltage (kV)

(V) (V) (KV) Vab Vbc Vca

66.4 – 15% 56.4 11.723

66.4 – 10% 59.76 12.421

66.4 66.4 13.8

66.4 + 10% 73 15.17

66.4 + 15% 76.4 15.88

Page 337

Page 338: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 6 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

4.5.4. Auxiliary Voltage Accuracy Test Relay Setting VT M5 (SRC2) Phase VT Secondary 120 V Phase VT Ratio 120: 1 (14400/120)

Test Values Secondary Expected

Voltage Measured Voltage

30 3603

40 4800

60 7200

4.5.5. Phase Voltage Accuracy Test

Relay Setting VT M5 (SRC2) Phase VT Connection Star Phase VT Secondary 69.3 V Phase VT Ratio 120: 1 Test Results

Test Values Applied Voltage Expected Voltage Measured Voltage (kV)

(V) (V) (KV) Vab Vbc Vca

66.4 – 15% 56.4 11.723

66.4 – 10% 59.76 12.421

66.4 66.4 13.8

66.4 + 10% 73 15.17

66.4 + 15% 76.4 15.88

4.6. Testing of Group Elements

4.6.1. Circuit Breaker ( Neutral Side CT)

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Breaker Failure

Page 338

Page 339: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 7 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

PARAMETER Breaker Failure Function Enable Signal Source SRC 1 (SRC 1) Timer-1 Delay 0 Timer-2 Delay 1S Timer-3 Delay 2 S Phase Sup. P/U 0.5 Neutral Sup. P/U 0.2

TEST REULTS

Trip time (S) Phase Pickup Current (A)

Drop out Current (A) Timer -1 Timer-2 Timer-3

R Y B N

4.6.2. Circuit Breaker ( Line Side CT)

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Breaker Failure PARAMETER Breaker Failure Function Enable Signal Source SRC 2 (SRC 2) Timer-1 Delay 0 Timer-2 Delay 1S Timer-3 Delay 2 S Phase Sup. P/U 0.5 Neutral Sup. P/U 0.2

Trip time (S) Phase Pickup

Current (A) Drop out

Current (A) Timer -1 Timer-2 Timer-3 R Y B

4.6.3. Phase Current ( Neutral Side CT’S)

Setting / Inputs Outputs / Contact Outputs PARAMETER H1 Contact Output 1 Name Con Op 1 Operate PHASE TOC1 OP (Timing test)

Page 339

Page 340: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 8 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

4.6.3.1. Phase Time Over Current Test TOC 1 4.6.3.1.1. Pick up drop out test

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase TOC PARAMETER PHASE TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 1pu

Test Results Current (A) Phase Pick- up value Drop out value Calculated pick-up % Error

R 1 % Y 1 % B 1 %

4.6.3.1.2. Time Characteristic test – IEC Curve A

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase TOC ` PARAMETER PHASE TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 1pu Curve IEC Curve A TD Multiplier 0.40

Results

1.5 In=1.5A 2 In=2 A 3 In=3 A Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

R 6.878 4.012 2.521

Y 6.878 4.012 2.521

B 6.878 4.012 2.521

4.6.3.1.3. Time Characteristic test – IEC Curve B

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase TOC

Page 340

Page 341: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 9 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

PARAMETER PHASE TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 1pu Curve IEC Curve B TD Multiplier 0.4

Results

1.5 In=1.5A 2 In=2 A 3 In=1 A Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

R 10.8 5.4 2.7

Y 10.8 5.4 2.7

B 10.8 5.4 2.7

4.6.3.1.4. Characteristic test – IEC Curve C Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase TOC PARAMETER PHASE TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 1pu Curve IEC Curve C TD Multiplier 0.40

Results 1.5 In=1.5A 2 In=2 A 3 In=3 A

PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

R 25.6 10.667 4

Y 25.6 10.667 4

B 25.6 10.667 4

4.6.3.1.5. Time Characteristic test – IEC short time Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase TOC

Page 341

Page 342: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 10 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

Results 1.5 In=1.5A 2 In=2 A 3 In=3 A

PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

R 1.223 0.711 0.445 Y 1.223 0.711 0.445 B 1.223 0.711 0.445

4.6.3.2. Phase Instantaneous Over Current Test IOC 1 Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase IOC PARAMETER PHASE IOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 5 pu Delay 0.0sec

Results Phase Pick-up Current (A) Time setting Measured time(ms)

R Inst. Y Inst. B Inst.

4.6.4. Phase Current ( Line Side CT’s-SRC-2)

4.6.4.1. Phase Time Over Current Test TOC 1 4.6.4.1.1. Pick up drop out test

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase TOC PARAMETER PHASE TOC 1 Function Enable Signal Source SRC2 (SRC 2) Pickup 1pu

PARAMETER PHASE TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 1pu Curve IEC short time TD Multiplier 0.40

Page 342

Page 343: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 11 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

Results Current (A) Phase Pick- up value Drop out value Calculated pick-up % Error

R 1 % Y 1 % B 1 %

4.6.4.1.2. Time Characteristic test – IEC Curve A

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase TOC ` PARAMETER PHASE TOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 1pu Curve IEC Curve A TD Multiplier 0.40

Results

1.5 In=1.5A 2 In=2 A 3 In=3 A Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

R 6.878 4.04 2.521

Y 6.878 4.05 2.521

B 6.878 4.04 2.521

4.6.4.1.3. Time Characteristic test – IEC Curve B

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase TOC PARAMETER PHASE TOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 1pu Curve IEC Curve B TD Multiplier 0.4

Page 343

Page 344: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 12 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

Results 1.5 In=1.5A 2 In=2 A 3 In=1 A

Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

R 10.8 5.4 2.7

Y 10.8 5.4 2.7

B 10.8 5.4 2.7

4.6.4.1.4. Time Characteristic test – IEC Curve C Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase TOC PARAMETER PHASE TOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 1pu Curve IEC Curve C TD Multiplier 0.40

Results 1.5 In=1.5A 2 In=2 A 3 In=3 A

PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

R 25.6 10.667 4

Y 25.6 10.667 4

B 25.6 10.667 4

4.6.4.1.5. Time Characteristic test – IEC short time Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase TOC PARAMETER PHASE TOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 1pu Curve IEC short time TD Multiplier 0.40

Page 344

Page 345: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 13 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

Results 1.5 In=1.5A 2 In=2 A 3 In=3 A

PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

R 1.223 0.711 0.445

Y 1.223 0.711 0.445

B 1.223 0.711 0.445 4.6.4.2. Phase Instantaneous Over Current Test IOC 1 Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase IOC 1 PARAMETER PHASE IOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 5 pu Delay 0.0sec

Results Phase Pick-up Current (A) Time setting Measured time(ms)

R Inst. Y Inst. B Inst.

4.6.5. Neutral Current

Setting / Inputs Outputs / Contact Outputs PARAMETER H1 Contact Output 1 Name Con Op 1 Operate Neutral TOC1 OP (Timing test)

4.6.5.1. Neutral Time Over Current Test TOC 1—SRC-1(Neutral Side CT’s)

4.6.5.1.1. Pick up drop out test Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1 PARAMETER NEUTRAL TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.1pu

Current (A) Phase Pick- up value Drop out value Calculated pick-up % Error

B-N %

Page 345

Page 346: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 14 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

4.6.5.1.2. Time Characteristic test – IEC Curve A

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1 `PARAMETER NEUTRAL TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.1pu Curve IEC Curve A TD Multiplier 0.40

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

B-N 6.878 4.012 2.521

4.6.5.1.3. Time Characteristic test – IEC Curve B

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1 PARAMETER NEUTRAL TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 1pu Curve IEC Curve B TD Multiplier 0.4

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

B-N 10.8 5.4 2.7

4.6.5.1.4. Time Characteristic test – IEC Curve C

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1

Page 346

Page 347: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 15 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

PARAMETER NEUTRAL TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.1pu Curve IEC Curve C TD Multiplier 0.40

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

B-N 25.6 10.667 1 4

4.6.5.1.5. Time Characteristic test – IEC short time

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1 PARAMETER NEUTRAL TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.1pu Curve IEC short time TD Multiplier 0.40

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

B-Neutral 1.223 0.711 0.445

4.6.5.2. Neutral Instantaneous Over Current Test IOC 1 Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1 PARAMETER NEUTRAL IOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.5 pu Delay 0.0sec

Page 347

Page 348: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 16 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

Results Phase Pick-up Current (A) Time setting Measured time(ms)

B-Neutral Inst. 4.6.5.3. Neutral Time Over Current Test TOC 1—SRC-2(Line Side CT’s)

4.6.5.3.1. Pick up drop out test

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1 PARAMETER NEUTRAL TOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 0.1pu

Results

Current (A) Phase Pick- up value Drop out value Calculated pick-up % Error

B-Neutral 0.1 %

4.6.5.3.2. Time Characteristic test – IEC Curve A

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

B-Neutral 6.878 4.012 2.521

4.6.5.3.3. Time Characteristic test – IEC Curve B

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1

PARAMETER NEUTRAL TOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 0.1pu Curve IEC Curve A TD Multiplier 0.40

Page 348

Page 349: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 17 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

PARAMETER NEUTRAL TOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 0.1pu Curve IEC Curve B TD Multiplier 0.4

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

B-Neutral 10.8 5.4 2.7

4.6.5.3.4. Time Characteristic test – IEC Curve C

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1 PARAMETER NEUTRAL TOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 0.1pu Curve IEC Curve C TD Multiplier 0.40

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

B-Neutral 25.6 10.667 4

4.6.5.3.5. Time Characteristic test – IEC short time

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1

Page 349

Page 350: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 18 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

PARAMETER NEUTRAL TOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 0.1pu Curve IEC short time TD Multiplier 0.40

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

B-Neutral 1.223 0.711 0.445

4.6.5.4. Neutral Instantaneous Over Current Test IOC 1 Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1 PARAMETER NEUTRAL IOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 0.5 pu Delay 0.0sec

Results Phase Pick-up Current (A) Time setting Measured time(ms)

B-Neutral Inst.

4.6.6. Ground Current Setting / Inputs Outputs / Contact Outputs PARAMETER H1 Contact Output 1 Name Con Op 1 Operate Ground TOC1 OP (Timing test)

4.6.6.1. Ground Time Over Current Test TOC 1—SRC-1(Neutral Side CT’S)

4.6.6.1.1. Pick up drop out test Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Ground Current / Ground TOC1

Page 350

Page 351: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 19 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

PARAMETER Ground TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.1pu

Current (A) Phase Pick- up value Drop out value Calculated pick-up % Error

G 0.1 %

4.6.6.1.2. Time Characteristic test – IEC Curve A Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Ground Current / Ground TOC1 PARAMETER GROUND TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.1pu Curve IEC Curve A TD Multiplier 0.40

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

G 6.878 4.012 2.521

4.6.6.1.3. Time Characteristic test – IEC Curve B

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Ground Current / Ground TOC1 PARAMETER Ground TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 1pu Curve IEC Curve B TD Multiplier 0.4

Page 351

Page 352: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 20 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

G 10.8 5.4 2.7

4.6.6.1.4. Time Characteristic test – IEC Curve C

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Ground Current / Ground TOC1 PARAMETER GROUND TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.1pu Curve IEC Curve C TD Multiplier 0.40

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

G 25.6 10.667 4

4.6.6.1.5. Time Characteristic test – IEC short time

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Ground Current / Ground TOC1 PARAMETER GROUND TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.1pu Curve IEC short time TD Multiplier 0.40

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

G 1.223 0.711 0.445

Page 352

Page 353: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 21 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

4.6.6.2. Ground Instantaneous Over Current Test IOC 1 Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Ground Current / Ground IOC1 PARAMETER GROUND IOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.5 pu Delay 0.0sec

Results

Phase Pick-up Current (A) Time setting Measured time(ms) G Inst.

4.6.6.3. Ground Time Over Current Test TOC 1—SRC-2(Line Side CT’S)

4.6.6.3.1. Pick up drop out test Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Ground Current / Ground TOC1 PARAMETER Ground TOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 0.1pu

Current (A) Phase Pick- up value Drop out value Calculated pick-up % Error

G 0.1 %

4.6.6.3.2. Time Characteristic test – IEC Curve A Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Ground Current / Ground TOC1 PARAMETER GROUND TOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 0.1pu Curve IEC Curve A TD Multiplier 0.40

Page 353

Page 354: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 22 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

G 6.878 4.012 2.521

4.6.6.3.3. Time Characteristic test – IEC Curve B

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Ground Current / Ground TOC1 PARAMETER Ground TOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 1pu Curve IEC Curve B TD Multiplier 0.4

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

G 10.8 5.4 2.7

4.6.6.3.4. Time Characteristic test – IEC Curve C

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Ground Current / Ground TOC1 PARAMETER GROUND TOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 0.1pu Curve IEC Curve C TD Multiplier 0.40

Results 1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A

PHASE Expected

Time(s) Measured

Time(s) Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

G 25.6 10.667 4

Page 354

Page 355: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 23 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

4.6.6.3.5. Time Characteristic test – IEC short time

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Ground Current / Ground TOC1 PARAMETER GROUND TOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 0.1pu Curve IEC short time TD Multiplier 0.40

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

G 1.223 0.711 0.445

4.6.6.4. Ground Instantaneous Over Current Test IOC 1 Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Ground Current / Ground IOC1 PARAMETER GROUND IOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 0.5 pu Delay 0.0sec

Results Phase Pick-up Current (A) Time setting Measured time(ms)

G Inst. 4.6.7. Voltage elements

4.6.7.1. Phase Under Voltage Test UV1 Setting (Pickup, Dropout and Time) Setting / Grouped Elements / Group 1 / Voltage Elements / Phase UV PARAMETER PHASE UV 1 Function Enable Signal Source SRC 2 (SRC 2) Mode Phase to Ground Pickup 0.8 pu Curve Definite Time Delay 1.00 s Minimum Voltage 0.1 pu

Page 355

Page 356: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 24 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

Test Results Pick Up (V) Drop Off (V)

PHASE Calculated Measured Measured

Measured Time(s)At 55 V

R 55.44 Y 55.44 B 55.44

4.6.7.2. Phase Under Voltage Test UV2 Setting (Pickup, Dropout and Time) Setting / Grouped Elements / Group 1 / Voltage Elements / Phase UV PARAMETER PHASE UV 2 Function Enable Signal Source SRC 2 (SRC 2) Mode Phase to Ground Pickup 0.85 pu Curve Definite Time Delay 1.00 s Minimum Voltage 0.1 pu

Test Results

Pick Up (V) Drop Off (V) PHASE

Calculated Measured Measured Measured Time(s)

At 58 V

R 58.9 Y 58.9 B 58.9

4.6.7.3. Phase Over Voltage Test OV1 Setting (Pickup, Dropout and Time) Setting / Grouped Elements / Group 1 / Voltage Elements / Phase OV PARAMETER PHASE OV 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 0.9 pu Curve Definite Time Delay 1.00 s Minimum Voltage 0.1 pu

Page 356

Page 357: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 25 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

Test Results Pick Up Drop Off

PHASE Calculated Measured Measured

Measured Time At 63*√3 V

R-Y 108

Y-B 108

B-R 108 4.6.7.4. Negative Sequence Over Voltage Setting (Pickup, Dropout and Time) Setting / Grouped Elements / Group 1 / Voltage Elements / Neg Seq.OV PARAMETER Neg Seq OV Function Enable Signal Source SRC 2 (SRC 2) Pickup 0.2 pu Delay 1.00 s

Test Results

Pick Up Drop Off

PHASE Calculated Measured Measured

Measured Time

3 Ph.(-) sq 13.86 4.6.7.5. Neutral Over Voltage Test OV1 Setting (Pickup, Dropout and Time) Setting / Grouped Elements / Group 1 / Voltage Elements / Neutral OV1 PARAMETER Neutral OV 1 Function Enable Signal Source SRC 2 (SRC 2) Mode Phase to Ground Pickup 0.3 pu Curve Definite Time Delay 1.00 s Minimum Voltage 0.1 pu

Page 357

Page 358: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 26 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

Test Results Pick Up Drop Off

PHASE Calculated Measured Measured

Measured Time At 21 V

R 20.7 Y 20.7 B 20.7

4.6.7.6. Auxiliary Under Voltage Test UV 1 Setting (Pickup, Dropout and Time) Setting / Grouped Elements / Group 1 / Voltage Elements / Auxiliary UV1

PARAMETER AUX UV 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.6 pu Curve Definite Time Delay 1.00 s Minimum Voltage 0.1 pu

Test Results

Pick Up Drop Off

PHASE Calculated Measured Measured

Measured Time At 120 V

Neutral 144

4.6.7.7. Auxiliary Over Voltage Test OV1 Setting (Pickup, Dropout and Time) Setting / Grouped Elements / Group 1 / Voltage Elements / Auxiliary UV1 PARAMETER AUX OV 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.3 pu Curve Definite Time Delay 1.00 s Minimum Voltage 0.1 pu

Page 358

Page 359: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 27 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

Test Results

Pick Up Drop Off

PHASE Calculated Measured Measured

Measured Time At 80 V

Neutral 72 4.6.7.8. Volts per Hertz

4.6.7.8.1. Inverse Curve A: Ref equation page # 5-167 Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Voltage element / Volts per Hertz PARAMETER Volts per Hertz Function Enable Signal Source SRC 2(SRC 2) Pickup 0.8pu Curve Inverse Curve A TD Multiplier 1

Results

1.5 Vp=83.16 2 Vp= 110.88 PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

R-N 0.8 0.333 Y-N 0.8 0.333 B-N 0.8 0.333

4.6.7.8.2. Inverse Curve B:

Ref equation page # 5-167 Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Voltage element / Volts per Hertz PARAMETER Volts per Hertz Function Enable Signal Source SRC 2 (SRC2) Pickup 0.8pu Curve Inverse Curve B TD Multiplier 1

Page 359

Page 360: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 28 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

Test Results 1.5 Vp=83.16 2 Vp= 110.88

PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

R-N 2 1

Y-N 2 1

B-N 2 1 4.6.7.8.3. Inverse Curve C:

Ref equation page # 5-167 Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Voltage element / Volts per Hertz

Results 1.5 Vp=83.16 2 Vp= 110.88

PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

R-N 4.45 2.414 Y-N 4.45 2.414 B-N 4.45 2.414

4.6.7.8.4. Definite Time:

Ref equation page # 5-167 Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Voltage element / Volts per Hertz PARAMETER Volts per Hertz Function Enable Signal Source SRC 2 (SRC 2) Pickup 0.8pu Curve Definite time TD Multiplier 1

PARAMETER Volts per Hertz Function Enable Signal Source SRC 2 (SRC 2) Pickup 0.8pu Curve Inverse Curve C TD Multiplier 1

Page 360

Page 361: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 29 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

Results:

1.5 Vp=83.16 2 Vp= 110.88 PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

R-N 1 1

Y-N 1 1

B-N 1 1

4.6.8. Loss of Excitation Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Loss of Excitation

Results 4.6.8.1. Stage-1

3-Phase Injection Applied Voltage(V) Pick up Current @ -90 0

Z (Ohms)

2 4.6.8.2. Stage-2

3-Phase Injection Applied Voltage(V) Pick up Current @ -90 0

Z (Ohms)

2

4.6.9. Accidental Energization Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Accidental Energization

PARAMETER Loss of Exc Function Enable Signal Source SRC 2(SRC 2) C1(STAGE 1) 10 Ω R1(STAGE1) 8 Ω C2(STAGE 2) 12 Ω R2(STAGE2) 10 Ω

PARAMETER Acc Enr Function Enable Signal Source SRC 2(SRC 2) Alarming Mode UV OR offline OC Pick up 0.3 Pu UV Pick up 0.5 Pu

Page 361

Page 362: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 30 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

Results Phase Injected

Voltage(V) Pickup Current(A)

Dropout Current(A)

Operating time(ms)

R 20 Y 20 B 20

4.6.10. Sensitive directional Power

Setting Setting / Grouped Elements / Group 1/ sensitive Directional Power PARAMETER SENS DIR POWER 1 Function Enable Signal Source SRC 2 (SRC 2) SENS DIR POWER RCA 0O – 90 – 180 - 270 SENS DIR POWER CALIBRATI 0.00O STAGE 1 SMIN 0.100 pu STAGE 1 DELAY 3.0 s STAGE 2 SMIN 0.100 pu STAGE 2 DELAY 5.00s

4.6.10.1. Stage 1 (S MIN > 0) 3-Phase Injected Values Measured Values

RCA Angle Volts V Current

A P (w) Q (var) S (va) Operating Angle

Time sec

0 66.4 0.11 343.3-15.7

90 66.4 0.11 252.7-87.2

180 66.4 0.11 163.3-195.8

270 66.4 0.11 74.4 – 104.9

4.6.10.2. Stage 2 (S MIN > 0) 3-Phase Injected Values Measured Values

Angle Volts V Current A P (w) Q (var) S (va) Operating

Angle Time sec

0 66.4 0.11 343.4 – 15.9

90 66.4 0.11 252.4 -286.8

180 66.4 0.11 163.5 – 195.8

270 66.4 0.11 74.4 – 104.9

Page 362

Page 363: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 31 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

4.7. Testing of Controlled Element 4.7.1. Synchronous Check

Setting Setting / Grouped Elements / Group / Synch check/synch1 PARAMETER Synch check1 Function Enable Synch 1 Block NO Synch 1 V1 Source SRC-1 Synch 1 V2 Source SRC-2 Synch 1 Max Volt diff. 1380V Synch 1 Max Angle diff. 5 0 Synch 1 Max Freq diff. 0.19 HZ Synch 1 Dead Source LV1 and DV2 Synch 1 Dead V1 Max Volt 0.3 Pu Synch 1 Dead V2 Max Volt 0.3 Pu Synch 1 Live V1 Min Volt 0.7 Pu Synch 1 Live V2 Min Volt 0.7 Pu

Test Results 4.7.1.1. Difference in Voltage test

Line

Voltage- V1(V)

Bus Voltage- V2(V)

Line Frequency

Bus Frequency

Line Angle Bus Angle Difference in Voltage

115 103.5 60 60 0 0 11.5 103.5 115 60 60 0 0 11.5

4.7.1.2. Difference in Angle test

Line

Voltage- V1(V)

Bus Voltage- V2(V)

Line Frequency

Bus Frequency

Line Angle Bus Angle Difference in Angle

115 115 60 60 115 115 60 60

4.7.1.3. Difference in Frequency test

Line

Voltage- V1(V)

Bus Voltage- V2(V)

Line Frequency

Bus Frequency

Line Angle Bus Angle Difference in

Frequency Hz

115 115 60 60.19 115 115 60.1960.19 60

Page 363

Page 364: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 32 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

4.7.1.4. Dead Bus test

Line Voltage-

V1(V)

Bus Voltage- V2(V)

Line Frequency

Bus Frequency

Line Angle Bus Angle Permissive to close the

breaker 115 0 60 0 0 115 0 60

4.7.2. Final Setting test: 4.7.2.1. Final Setting

4.7.2.1.1. OSCILLOGRAPHY Description Settings Units Remarks Number Of Records 6 Trigger Mode Automatic Overwrite Trigger Position 25% Trigger Source ANY TRIP On (VO4) AC Input waveforms 64 Samples/cycle Digital Channel 1 Gen OFFLINE ON (H7a) Digital Channel 2 IBF On (H7a) Digital Channel 3 50/62BF ION (H1) Digital Channel 4 BKR FAIL 1 T1 OP Digital Channel 5 BKR FAIL 1 TRIP OP Digital Channel 6 50BF TC1 ION (H2) Digital Channel 7 50BF TC2 ION (H3) Digital Channel 8 BKR FAIL RETRIP Digital Channel 9 INAD ENERG ION (H4) Digital Channel 10 IE ARMED On (VO1) Digital Channel 11 IE (DE1) OP Digital Channel 12 PHASE IOC1 OP A Digital Channel 13 PHASE IOC1 OP B Digital Channel 14 PHASE IOC1 OP C Digital Channel 15 BUS GND Ion (H5) Digital Channel 16 NEUTRAL OV1 PKP Digital Channel 17 NEUTRAL OV1 OP Digital Channel 18 50/51(AT4)Ion(H6) Digital Channel 28 C60 TRIP Ion (P1) Digital Channel 29 ANY TRIP ON (VO4) Digital Channel 30 BKR FAIL IOn(P2) Digital Channel 31 BUS VTFF IOn (P3) Digital Channel 32 BUS VTFF (DE2) OP Digital Channel 34 DB CL TCP IOn(P4)

Page 364

Page 365: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 33 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

Digital Channel 35 DB CL GPP IOn (P5) Digital Channel 36 SYN CHK 52G IOn (P6) Digital Channel 37 27 DB(DE4) OP Digital Channel 39 SYN CHK 52G IOn (U1) Digital Channel 40 SYNC 1 SYNC OP Digital Channel 41 SYN CHK 52S IOn (U2) Digital Channel 42 SYNC 2 SYNC OP Description Settings Units Remarks Digital Channel 44 TRIG T60 IOn (U3) Digital Channel 45 TRIG G60A IOn (U4) Digital Channel 46 TRIG G60A IOn (U5) Analog Channel 1 SRC1 la Mag Analog Channel 2 SRC1 LB Mag Analog Channel 3 SRC1 lc Mag Analog Channel 4 SRC1 Vab Mag Analog Channel 5 SRC1 Vbc Mag Analog Channel 6 SRC1 Vca Mag Analog Channel 7 SCR1 V_O Mag Analog Channel 8 SRC2 V_O Mag Analog Channel 9 SRC1 V_2 Mag Analog Channel 10 SRC2 V_2 Mag Analog Channel 11 SRC1 P Analog Channel 12 SRC1 Q Analog Channel 13 SRC1 FREQ

4.7.2.1.2. DEMAND

Description Settings Units Remarks Current Method Thermal Exponential Power Method Thermal Exponential Interval 15 MIN Trigger OFF

4.7.2.1.3. USER PROGRAMMBLE LEDS:LED TEST

Description Settings Units Remarks Function Disabled Control OFF

4.7.2.1.4. TRIP AND ALARMS LEDS

Description Settings Units Remarks Trip LED Input ANY TRIP On(VO4) Alarm LED Input ANY SELF TESTS

Page 365

Page 366: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 34 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

4.7.2.1.5. USER PROGRAMMABLE LEDS Description Settings Units Remarks LED 1:OPERAND IE ARMED On(VO4) LED 1:TYPE Self-Reset LED 3:OPERAND Gen OFFLINE Off(H7a) LED 3:TYPE Self-Reset LED 4:OPERAND IBF On (H7c) LED 4:TYPE Self Reset LED 5:OPERAND 50/62BF IOn(H1) LED 5:TYPE Latched LED 6:OPERAND BKR FAIL 1 T1 OP LED 6:TYPE Latched LED 7:OPERAND 50BFTC1 IOn(H2) LED 7:TYPE Latched LED 8:OPERAND 50BF TC2 IOn (H3) LED 8:TYPE Latched LED 9;OPERAND BKR FAIL 1 RETRIP LED 9:TYPE Latched LED 10:OPERAND INAD ENERG IOn (H4) LED 10:TYPE Latched LED 11:OPERAND IE(DE1)op LED11:TYPE Latched LED 12:OPERAND BUS GND IOn (H5) LED 12:TYPE Latched LED 13:OPERAND NEUTRAL OV1 OP LED 13:TYPE Latched LED 14:OPERAND 50/51(AT4) On(H6) LED 14:TYPE Latched LED 15:OPERAND PHASE IOC2 OP LED 15:TYPE Latched LED 16:OPERAND PHASE TOC1 OP LED 16:TYPE Latched LED 17:OPERAND C60 TRIP IOn (P1) LED17:TYPE Self-Reset LED 18:OPERAND BKR FAIL IOn (P2) LED 18:TYPE Self Reset LED 19:OPERAND BUS VTFF IOn (P3) LED 19:TYPE Self Reset LED 20:OPERAND DB CL TCP ION (P4) LED 20:TYPE Self Reset Description Settings Units Remarks LED 21:OPERAND DB CL GPP ION (P5)

Page 366

Page 367: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 35 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

LED 21:TYPE Self Reset LED 22:OPERAND SYN CHK 52G IOn (P6) LED 22:TYPE Self Reset LED 23:OPERAND SYN CHK 52G IOn (U1) LED 23:TYPE Self Reset LED 24:OPERAND SYN CHK 52S IOn (U2) LED 24:TYPE Self Reset LED 25:OPERAND TRIG T60A IOn (U3) LED 25:TYPE Self Reset LED 26:OPERAND TRIG G60A IOn (U4) LED 26:TYPE Self Reset LED 27:OPERAND TRIG G60B IOn (U5) LED 27:TYPE Self Reset

4.7.2.1.6. USER-PROGRAMMABLE SELF TESTS

Description Settings Units Remarks Remote Device Off Function CUSTOMER Pri-ethernet fail Function CUSTOMER Battery Fail Function CUSTOMER SNTP Fail Function CUSTOMER IRIG B Fail Function CUSTOMER

4.7.2.1.7. INSTALLATION

Description Settings Units Remarks Relay Settings Not Programmed Relay Name CUSTOMER_C60

4.7.2.1.8. SYSTEM SET UP AC INPUTS: CURRENT

Description Settings Units Remarks CT F1:Phase CT Primary 6000 A CT F1: Phase CT Secondary 1 A CT F1:Ground CT Primary 1 A CT F1:Ground Secondary 1 A CT M1:Phase CT Primary CUSTOMER CT M1:Phase CT Secondary 1 A CT M1:Ground CT Primary 1 A CT M1:Ground CT Secondary 1 A

4.7.2.1.9. VOLTAGE Description Settings Units Remarks VT F5:Phase VT Connection WYE VT F5:Phase VT Secondary 66.4 V

Page 367

Page 368: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 36 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

VT F5:Phase VT Ratio 120.1 VT F5:Auxiliary VT connection None VT F5:Auxiliary VT Secondary None VT F5:Auxilairy VT Ratio None VT M5:Phase VT Connection WYE VT M5: Phase VT Secondary 66.4 V VT M5: Phase VT Ratio 120.1 VT M5:AuxilairyVT connection CUSTOMER VT M5:AuxilairyVT Secondary CUSTOMER VT M5:Auxilairy VT Ratio CUSTOMER

4.7.2.1.10. POWER SYSTEM

Description Settings Units Remarks Nominal Frequency 60 Hz Phase Rotation ABC Frequency and phase Reference SRC 1 Frequency Tracking Function Enabled

4.7.2.1.11. SIGNAL SOURCES

Description Settings Units Remarks SOURCE 1:Name BRKR SOURCE 1:Phase CT None SOURCE 1:Ground CT None SOURCE 1:Phase VT F5 SOURCE 1:Auxilairy VT None SOURCE 2:Name BUS SOURCE 2:Phase CT F1 SOURCE 2:Ground CT None SOURCE 2:Phase VT M5 SOURCE 2:Auxilairy VT None SOURCE 3:Name AUX SOURCE 3:Phase CT M1 SOURCE 3:Ground CT None SOURCE 3:Phase VT None SOURCE 3:Auxilairy VT M5

4.7.2.1.12. LEXLOGIC: FLEXLOGIC EQUATION EDITOR

Description Settings Units Remarks FlexLogic Entry 1 PHASE UV1 OP A FlexLogic Entry 2 PHASE UV1 OP B FlexLogic Entry 3 PHASE UV1 OP C

Page 368

Page 369: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 37 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

FlexLogic Entry 4 AND (3) FlexLogic Entry 5 Gen OFFLINE Off (H7a) FlexLogic Entry 6 AND (2) FlexLogic Entry 7 TIMER 1 FlexLogic Entry 8 = IE ARMED (VO1) FlexLogic Entry 9 PHASE IOC1 OP FlexLogic Entry 10 IE ARMED On (VO1) FlexLogic Entry 11 AND (VO2) FlexLogic Entry 12 =50/27(VO2) FlexLogic Entry 13 PHASE IOC2 OP FlexLogic Entry 14 PHASE TOC1 OP FlexLogic Entry 15 OR (2) FlexLogic Entry 16 =51/52(AT4) (VO3) FlexLogic Entry 17 BKR FAIL 1 RETRIP FlexLogic Entry 18 BKR FAIL 1 T1 OP FlexLogic Entry 19 50/27 On (VO2) FlexLogic Entry 20 NEUTRAL OV1 OP FlexLogic Entry 21 50/51(AT4) On (VO3) FlexLogic Entry 22 OR (5) FlexLogic Entry 23 =ANY TRIP (VO4) FlexLogic Entry 24 END

4.7.2.1.13. FLEXLOGIC TIMERS

Description Settings Units Remarks TIMER 1:Type Millisecond TIMER 1:Pick up Delay 5000 TIMER 1:Dropout Delay 250

4.7.2.1.14. PHASE CURRENT: PHASE TOC [GROUP1]

Description Settings Units Remarks PHASE TOC1:Function Enabled PHASE TOC1:Signal Source SRC3 PHASE TOC1:Input CUSTOMER PHASE TOC1:Pick up CUSTOMER PHASE TOC1:Curve CUSTOMER PHASE TOC1:TD Multiplier CUSTOMER PHASE TOC1:Reset CUSTOMER PHASE TOC1:Voltage Restraint CUSTOMER PHASE TOC1:Block A OFF PHASE TOC1:Block B OFF PHASE TOC1:Block C OFF

Page 369

Page 370: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 38 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

PHASE TOC1:Target Latched PHASE TOC1:Events Enabled

4.7.2.1.15. PHASE CIRRENT: PHASE IOC [GROUP 1]

Description Settings Units Remarks PHASE IOC1:Function Enabled PHASE IOC1:Source SRC2 PHASE IOC1:pick up CUSTOMER PHASE IOC1:Delay CUSTOMER PHASE IOC1:Reset Delay CUSTOMER PHASE IOC1:Block A OFF PHASE IOC1:Block B OFF PHASE IOC1:Block C OFF PHASE IOC1:Target Self Reset PHASE IOC1:Events Enabled PHASE IOC2:Function Enabled PHASE IOC2:Source SRC3 PHASE IOC2:Pick up CUSTOMER PHASE IOC2:Delay CUSTOMER PHASE IOC2:Rest Delay CUSTOMER PHASE IOC2:Block A OFF PHASE IOC2:Block B OFF PHASE IOC2:Block C OFF PHASE IOC2:Target Latched PHASE IOC2:Events Enabled

4.7.2.1.16. BREAKER FAILURE [GROUP 1]

Description Settings Units Remarks BF1:Function Enabled BF1:Mode 3-Pole BF1:Source SRC 2 BF1:Current Supervision No BF1:Use Seal In No BF1:Three pole Intiate IBF On(H7c) BF1:Block OFF BF1:Phase Current Supervision Pick up

CUSTOMER

BF1:Neutral Current Supervision Pick up

CUSTOMER

BF1:Use Timer 1 Yes BF1:Timer1Pick up Delay CUSTOMER BF1:Use Time 2 No

Page 370

Page 371: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 39 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

BF1:Timer 2 Pick up Delay 0.0000 s BF1:Use Timer 3 No BF1:Timer 3 Pick up Delay 0.0000 s BF1:Breaker Pos1 Phase A/3P Gen OFFLINE On (H7a) BF1:Breaker Pos 2 Phase A/3P OFF BF1:Breaker Test On OFF BF1:Phase Current Hiset Pickup CUSTOMER BF1:Neutral Current HiSet Pickup CUSTOMER BF1:Phase Current LoSet Pickup CUSTOMER BF1:Neutral Current LoSet pick up CUSTOMER BF1:LoSet time Delay CUSTOMER BF1:Trip Dropout Delay CUSTOMER BF1:Target Latched BF1:Events Enabled BF1:Phase A Initiate OFF BF1:Phase B Initiate OFF BF1:Phase C Initiate OFF BF1:Breaker Pos1 Phase B OFF BF1:Breaker Pos1 Phase C OFF BF1:Breaker pos2 Phase B OFF BF1:Breaker Pos2 Phase C OFF

4.7.2.1.17. VOLTAGE ELEMENTS PHASE UV [GROUP 1]

Description Settings Units Remarks PHASE UV1:Function Enabled PHASE UV1:Signal Source SRC 1 PHASE UV1:Mode Phase to Phase PHASE UV1:Pick up CUSTOMER PHASE UV1:Curve Definite Time PHASE UV1:Delay CUSTOMER PHASE UV1:Minimum Voltage CUSTOMER PHASE UV1:Block OFF PHASE UV1:Target Self Reset PHASE UV1:Events Enabled

4.7.2.1.18. NEUTRAL OV [GROUP 1] Description Settings Units Remarks NEUTRAL OV 1:Function Enabled NEUTRAL OV 1:Source SRC 2 NEUTRAL OV 1:Pick up CUSTOMER NEUTRAL OV 1:Pick up Delay CUSTOMER NEUTRAL OV 1:Reset Delay CUSTOMER

Page 371

Page 372: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 40 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

NEUTRAL OV 1:Block OFF NEUTRAL OV 1:Target Latched NEUTRAL OV 1:Events Enabled

4.7.2.1.19. CONTROL ELEMENTS SYNCHROCHECK Description Settings Units Remarks SYCHROCHECK 1:Function Enabled SYCHROCHECK 1:Block Gen OFFLINE on (H7a) SYCHROCHECK 1:V1 Source BRKR (SRC 1) SYCHROCHECK 1:V2 Source BBUS (SRC 2) SYCHROCHECK 1:Max Volt Diff 690 V SYCHROCHECK 1:max Angle Diff 10 SYCHROCHECK 1:Max Freq Diff 0.32 Hz SYCHROCHECK 1:Freq Hysteresis 0.00 Hz SYCHROCHECK 1:Dead Source Select

None

SYCHROCHECK 1:Dead V1 Max Volt

DEFAULT

SYCHROCHECK 1:Dead V2 Max Volt

DEFAULT

SYCHROCHECK 1:Live V1 Min Volt

DEFAULT

Description Settings Units Remarks SYCHROCHECK 1:Live V2 Min Volt

DEFAULT

SYCHROCHECK 1:Target Self reset SYCHROCHECK 1:Events Enabled SYCHROCHECK 2:Function Enabled SYCHROCHECK 2:Block OFF SYCHROCHECK 2:V1 Source BRKR (SRC 1) SYCHROCHECK 2:V2 Source AUX (SRC 3) SYCHROCHECK 2:Max Volt Diff 690 V SYCHROCHECK 2:Max Angle Diff 10 SYCHROCHECK 2:Max Freq Diff 0.32 Hz SYCHROCHECK 2:Freq Hysteresis 0.00 Hz SYCHROCHECK 2:Dead Source Select

None

SYCHROCHECK 2:Dead V1 Max Volt

DEFAULT

SYCHROCHECK 2:Dead V2 Max Volt

DEFAULT

SYCHROCHECK 2:Live V1 Min DEFAULT

Page 372

Page 373: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 41 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

Volt SYCHROCHECK 2:Live V2 Min Volt

DEFAULT

SYCHROCHECK 2:Target Self reset SYCHROCHECK 2:Events Enabled

4.7.2.1.20. DIGITAL ELEMENTS

Description Settings Units Remarks DIGITAL ELEMENTS 1:Function Enabled DIGITAL ELEMENTS 1:Name IE DIGITAL ELEMENTS 1:Input 50/27 On (VO2) DIGITAL ELEMENTS 1:Pik up Delay

0.0000 s

DIGITAL ELEMENTS 1:Reset Delay

0.0000 s

DIGITAL ELEMENTS 1:Pick up Led

Disable

DIGITAL ELEMENTS 1:Block OFF DIGITAL ELEMENTS 1: Target Latched Description Settings Units Remarks DIGITAL ELEMENTS 1:Events Enabled DIGITAL ELEMENTS 2:Function Enabled DIGITAL ELEMENTS 2:Name BUS VTFF DIGITAL ELEMENTS 2:Input SRC 2 VT FUSE FAIL OP DIGITAL ELEMENTS 2:pick up Delay

0.0000 s

DIGITAL ELEMENTS 2:reset Delay 0.0000 s DIGITAL ELEMENTS 2:Block OFF DIGITAL ELEMENTS 2:Target Self reset DIGITAL ELEMENTS 2:events Enabled DIGITAL ELEMENTS 4:Function Enabled DIGITAL ELEMENTS 4:Name 27DB DIGITAL ELEMENTS 4:Input SRC2 VT FUSE FAIL VOLT

LOSS

DIGITAL ELEMENTS 4:Pick up Delay

0.0000 s

DIGITAL ELEMENTS 4:reset Delay 0.0000 s DIGITAL ELEMENTS 4:Block OFF DIGITAL ELEMENTS 4:Target Self Reset DIGITAL ELEMENTS 4:Events Enabled

Page 373

Page 374: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 42 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

4.7.2.1.21. VT FUSE FAILURE Description Settings Units Remarks VT FUSE FAILURE 1:Function Enabled

4.7.2.1.22. INOUTS/OUTPUTS: CONTACT INPUTS

Description Settings Units Remarks H7A:ID Gen OFFLINE H7A :Debounce time 2.0 ms H7A:Events Enabled H7C: ID IBF H7C: DebounceTime 2.0 ms H7C:Events Enabled H8A: ID Cont lp 3 H8A: Debounce time 2.0 ms H8A: Events Disabled H8C:ID Cont lp 4 H8C:Debounce Time 2.0 ms Description Settings Units Remarks H8C:Events Disabled P7A:ID Cont lp 5 P7A:Debounce time 2.0 ms P7A:Events Disabled P7C:ID Cont lp 6 P7C:Debounce time 2.00 ms P7C:Events Disabled P8A:ID Cont lp 7 P8A:Debounce time 2.0 ms P8A:Events Disabled P8C:ID Cont lp 8 P8C:Debounce Time 2.0 ms P8C:Events Disabled U7A:ID Cont lp 9 U7A:Debounce Time 2.0 ms U7A:Events Disabled U7C:ID Cont lp 10 U7C:Debounce 2.0 ms U7C:Events Disabled U8A:ID Cont lp 11 U8A:Debounce Time 2.0 ms U8A:Events Disabled U8C:ID Cont lp 12

Page 374

Page 375: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 43 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

U8C:Debounce Time 2.0 ms U8C:Events Disabled

4.7.2.1.23. CONTACT INPUT THRESHOLDS

Description Settings Units Remarks Gen OFFLINE:IBF:Cont lp 3 : Cont lp 4(H7a:H7c:H8a:H8c)

84 Vdc

Cont lp 5 :Cont lp 6 : Cont lp 7 : Cony lp 8(P7a:P7c:P8a : P8c)

84 Vdc

Cont lp 9: Cont lp 10 :Cont lp 11 :Cont lp 12(U7a :U7c :U8a :U8c)

84 Vdc

4.7.2.1.24. CONTACT OUTPUTS

Description Settings Units Remarks H1 :ID 50/62BF H1 :Operate BKR FAIL 1 T1 OP H1 : Seal In OFF H1 :Events Enabled H2 :ID 50BF TC1 H2 : Operate BKR FAIL RETRIP H2 :Seal In OFF H2 :Events Enabled H3 :ID 50BF TC2 H3 :Operate BKR FAIL 1 RETRIP H3 :Seal in OFF H3 :Events Enabled H4 :ID INAD ENERG H4 :Operate IE (DE1)OP H4 :Seal In OFF H4 :events Enabled H5 :ID BUS GND H5 :Operate NEUTRAL OV1 OP H5 :Seal In OFF H5 :Events Enabled H6 :ID 50/51(AT4) H6 :Operate 50/51 (AT4) On (VO4) H6 ;Seal In OFF H6 Events Enabled P1 :ID C60 TRIP P1 :Operate ANT Y TRIP On (VO4) P1 :Seal in OFF

Page 375

Page 376: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 44 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

P1 :events Enabled P2 :ID BKR FAIL P2 :Operate BKR FAIL 1 RETRIP P2 :Seal in OFF P2 :Events Enabled P3 :ID BUS VTFF P3 Operate BUS VTFF (DE2) OP P3 :Seal in OFF P3 :Events Enabled P4 :ID DB CL TCP P4 :Operate 27DB (DE4) OP

Description Settings Units Remarks P4 :Seal In OFF P4 :Events Enabled P5 :ID DB CL GPP P5 :Operate 27DB (DE4) OP P5 :Seal in OFF P5 :Events Enabled P6 :ID SYN CHK 52G P6 :Operate SYNC1 SYNC OP P6 :Seal in OFF P6 :Events Enabled U1 :ID SYN CHK 52G U1 :Operate SYNC1 SYNC OP U1 :Seal in OFF U1 :Events Enabled U2 :ID SYN CHK 52S U2 :Operate SYNC2 SYNC OP U2 :Seal in OFF U2 :Events Enabled U3 :ID TRIG T60 U3 Operate ANY TRIP ON (VO4) U3 :Seal in OFF U3 :Events Enabled U4 ;ID TRIG G60A U4 :Operate ANY TRIP On (VO4) U4 :Seal In OFF U4 :Events Enabled U5 :ID TRIG G60B U5 ;Operate ANY TRIP On (VO4) U5 :Seal in OFF

Page 376

Page 377: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AR01C, Page 45 of 45

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Breaker Management Relay –

C60(Make: GE) Date:13/02/09, Revision: 0

U5 :Events Enabled 4.7.2.1.25. VIRTUAL OUTPUTS

Description Settings Units Remarks VIRTUAL OUTPUT 1:ID IE ARMED VIRTUAL OUTPUT 1:Events Enabled VIRTUAL OUTPUT 2:ID 50/27 VIRTUAL OUTPUT 2:Events Enabled VIRTUAL OUTPUT 3:ID 50/51(AT4) VIRTUAL OUTPUT 3:Events Enabled VIRTUAL OUTPUT 4:ID ANY TRIP VIRTUAL OUTPUT 4:Events Enabled

4.7.2.1.26. REMOTE DEVICES

Description Settings Units Remarks Remote Device! ID Remote Device

4.7.2.2. Current sensitivity test: .

4.7.2.3. Voltage sensitivity test: 4.7.2.4. Timing Test:

4.7.3. Fault Record:

Fault record verification done.

4.7.4. Waveform Record: Waveform record verification

4.8. Relay Setting: Final relay setting retrieved through ‘UR’ software and printout attached.

Test Equipment Model Cal due date Test Equipment Model Cal due date

Page 377

Page 378: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

TR

COA

O

R

-001

TESTRIP CIR

Riyadh Po“1062

STARTU

TING PRUIT S

ower plant21166/00”

UP MANUA

PROCSUPER

t # 10

AL DF

EDURRVISIO

Date:13 Feb,09

RE FORON RE

Revision0

R ELAY

n:

Page 378

Page 379: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-CR01, Page 1 of 4 Equipment : Trip Coil Supervision Relay Date:13 Feb,09 Revision: 0

TABLE OF CONTENT

1. Task a. Work Status------------------------------------------------------------------------------------------------2 b. Documentation--------------------------------------------------------------------------------------------2 c. Personnel---------------------------------------------------------------------------------------------------2 d. Measuring Instrumentation-----------------------------------------------------------------------------2

2. Preconditions---------------------------------------------------------------------------------------------------2 3. Precautions------------------------------------------------------------------------------------------------------2 4. Scope--------------------------------------------------------------------------------------------------------------2 5. Execution---------------------------------------------------------------------------------------------------------2

a. Visual Inspection------------------------------------------------------------------------------------------2 b. Testing of Trip Circuit Supervision Relay

1. Electrical Function test a. Functional check of Test Plug----------------------------------------------------------3 b. Shorting of links on relay case when relay is withdrawn-------------------------3

2. Secondary Injection a. Voltage Pick-Up Verification--------------------------------------------------------------3 b. Voltage Drop-Out Verification------------------------------------------------------------3 c. Function Check------------------------------------------------------------------------------3

6. Documents-------------------------------------------------------------------------------------------------------4 7. Reference---------------------------------------------------------------------------------------------------------4 8. Attachment-------------------------------------------------------------------------------------------------------4

Page 379

Page 380: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-CR01, Page 2 of 4 Equipment : Trip Coil Supervision Relay Date:13 Feb,09 Revision: 0

1.0 Task

All the Trip circuit supervision relays shall be tested for Breaker trip circuit supervision in for both breaker open and close position

2.0 Preconditions

2.1 Work Status • Erection has been completed. • Labelling of the equipment

2.2 Documentation • The circuit diagrams of the electrical equipment cabinets are available • Commissioning checklists TS-CR01

2.3 Personnel • 1 Commissioning engineer: Engineer or technician with experience in

commissioning of all types of Electrical equipments. • 1 Helper: skilled worker with adequate on-the-job training.

2.4 Measuring Instruments and Tools

• Three or single phase Secondary Injection test set • Fluke

3.0 Precautions • Observe the rules for handling electronic components sensitive to electrostatic

discharge (ESD measures). • Special safety arrangements shall be made for all areas which are not explicitly

designated as” electrical operating areas” when performing tests at voltages in excess of 50V.

4.0 Scope • Testing cable connections, • Checking that the mounting position is correct,

5.0 Execution

5.1 Visual Checks • Checking of the cables for damage and that they are connected correctly, • Inspection for physical connection as per approved drawings. • Inspection for correct tightness for connection • Checking ferrules

5.2 Testing of Trip Circuit Supervision Relay.

Relay can be tested by using single phase secondary injection test set at the front panel mounted test facilities.

Page 380

Page 381: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-CR01, Page 3 of 4 Equipment : Trip Coil Supervision Relay Date:13 Feb,09 Revision: 0

Enter the rating plate data in check list TS-CR01 and compare the Relay data with the data contained in the circuit documentation. The following test shall be carried out

1. Electrical Function test

a. Functional check of Test Plug 2. Secondary Injection

a. Voltage Pick-Up Verification b. Voltage Drop-Out Verification c. Function Check

i. The CB Is In Open Position ii. The CB In Close Position

5.2.1 Electrical Function Test

5.2.1.1 Functional check of Test Plug Test Plug should be checked for its correct function. Terminals should be checked for its correct, auxiliary power and tripping assignment as per the circuit drawing

5.2.2 Secondary Injection Connection between the relay and secondary injection set is made as per figure below.

RE

LAY

CO

NTA

CT

TCS RELAYRELAY TEST SET

+

-

DC

VO

LTA

GE

TER

MIN

ALS

TIM

ER

TRIP CIRCUIT SUPERVISION RELAY TESTING ARRANGEMENT

TEST PLUG

CO

ILTE

RM

INA

LS+

-

5.2.2.1 Voltage Pick-Up Verification

♦ Slowly increase the voltage until the relay pick-up ♦ Record the pick-up voltage.

5.2.2.2 Voltage Drop-Out Verification

♦ Slowly increase the voltage until the relay pick-up ♦ While relay is still picking-up, slowly reduce the voltage

until the relay dropout. ♦ Record the dropout voltage.

5.2.2.3 Function Check

All the internal and external wiring should be completed

5.2.2.3.1 When CB Is In Open Position ♦ At the CB control panel / box open tripping coil

circuit. ♦ The trip circuit supervision relay should operate.

Page 381

Page 382: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-CR01, Page 4 of 4 Equipment : Trip Coil Supervision Relay Date:13 Feb,09 Revision: 0

5.2.2.3.2 When CB in Close Position.

♦ At the CB control panel / box open tripping coil circuit.

♦ The trip circuit supervision relay should operate.

6.0 Documents Test sheet TS-CR01 shall be completed for each and every trip circuit supervision Relay.

7.0 References 8.0 Attachment

8.1 Test Sheet for Supervision Relay ABB. TS-CR01 ***End of the Procedure***

Page 382

Page 383: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

Riyadh Po“1062

STARTU

TES

ower plant21166/00”

UP MANUA

ST SH

t # 10

AL DF

EETS

Date:13 Feb,09

Revision0

n:

Page 383

Page 384: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-CR01 Page 1 of 2

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Trip supervision Relay (ABB)

Date: 13/02/09,Revision: 0

1.0 Relay General Data Function Serial No. Make Model No. Diagram no. Aux. Voltage Frequency Firmware no. Rated voltage Rated current: No of logic Inputs: No of outputs:

2.0 Visual Inspection

Item Description Checked 1 Inspect for any physical damage or defects.

2 Verify connections as per approved drawings. 3 Connection on Relay terminals are good

4 Ferrules are according to the drawings 3.0 Electrical Test: 4.1. Function Test

1 Indications checked.

2 All contacts checked.

4.2. Measurement of Aux, supply voltage and current

TERMINALS VOLTAGE MEASURED CURRENT MEASURED

18(+) & 28(-)

The limit of supply voltage should be 40 – 265V DC (Table 3 of Buyer’s Guide 1MRS 750 428-MBG). The drain current should be 7mA (Table 3 of Buyer’s Guide 1MRS 750 428-MBG). * While testing the drain current, Keep the supply at 11(+) & 21(-) 125V DC.

4.3. Pickup and Dropout Test :

VOLT. MEAS. CURR. MEAS. VOLT. MEAS. CURR. MEAS.

11(+) & 21(-)

PICK-UP DROP-OFFTERMINALS

Page 384

Page 385: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-CR01 Page 2 of 2

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Trip supervision Relay (ABB)

Date: 13/02/09,Revision: 0

Drop-off voltage should be < 40V DC (Table 1 of Buyer’s Guide 1MRS 750 428-MBG).

TERMINALS VOLTAGE APPLIED CURRENT MEASURED

11(+) & 21(-)

Current through the circuit 11(+) & 21(-) at 125V DC should be 1.5mA (Table 1 of Buyer’s Guide 1MRS 750 428-MBG).

Note: For testing purpose, the Aux. Supply for the terminal 11, 21 and the Aux. supply for The terminal 18, 28 must be different. The Pick-up & Drop off test should be done at the relay terminal 11(+), 21(-). During the pick-up & drop off test do not disturb the Aux. Supply at terminal 18(+), 28(-). During drop-off test the voltage should be reduced gradually in steps. For each step wait 3 Sec to find correct drop off value.

4.4. Operate and Reset Time Test :

OPERATE TIME (Sec) RESET TIME (Sec)

Typical operate time 3 Sec (Table 2 of Buyer’s Guide 1MRS 750 428-MBG). Typical reset time 1 Sec (Table 2 of Buyer’s Guide 1MRS 750 428-MBG).

Note: The timing test should be done at the relay terminal 11(+), 21(-). During the timing test do not disturb the Aux. Supply at terminal 18(+), 28(-). For the operating time, the voltage at the terminal should be reduced from 125V DC to 0V DC. For the resetting time, the voltage at the terminal should be increased from 0V DC to 125V DC.

Test Equipment Model Cal due date Test Equipment Model Cal due date

Page 385

Page 386: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

TESTD

Riyadh Po“1062

STARTU

TING PIFFER

ower plant21166/00”

UP MANUA

PROCRENTIA

t # 10

AL DF

EDURAL RE

Date:13 Feb,09

RE FORLAY

Revision0

R

n:

Page 386

Page 387: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc No: TP-DR01, Page 1 of 9 Equipment : Differential Current Relay Date:13 Feb,09 Revision: 0

TABLE OF CONTENT

1. Task a. Work Status------------------------------------------------------------------------------------------------2 b. Documentation--------------------------------------------------------------------------------------------2 c. Personnel---------------------------------------------------------------------------------------------------2 d. Measuring Instrumentation-----------------------------------------------------------------------------2

2. Preconditions---------------------------------------------------------------------------------------------------2 3. Precautions------------------------------------------------------------------------------------------------------2 4. Scope--------------------------------------------------------------------------------------------------------------2 5. Execution---------------------------------------------------------------------------------------------------------2

a. Visual Inspection------------------------------------------------------------------------------------------2 b. Testing of Differential Relay

1. Electrical Function test 1. Functional check of Test Plug----------------------------------------------------------3 2. Shorting of links on relay case when relay is withdrawn------------------------3

2. Secondary Injection i. Relay Power measurement-----------------------------------------------------------4 ii. Testing of LEDs--------------------------------------------------------------------------4 iii. Testing of out put relays----------------------------------------------------------------4 iv. Testing of input Devices----------------------------------------------------------------4 v. Metering function-------------------------------------------------------------------------5 vi. Differential Function---------------------------------------------------------------------5

1. Differential current Function----------------------------------------------------5 2. Differential restraint characteristic --------------------------------------------5 3. Harmonic Function----------------------------------------------------------------5 4. Instantaneous Differential current function----------------------------------5 5. Timing Test-------------------------------------------------------------------------6

vii. Backup over current --------------------------------------------------------------------6 1. current Pickup/Dropout test-----------------------------------------------------6 2. Time current characteristics--------------------------------------------------- -6

a. IEC-Very inverse-----------------------------------------------------------6 b. IEC- Extremely Inverse---------------------------------------------------6 c. Long time Inverse----------------------------------------------------------6 d. Definite Time----------------------------------------------------------------6

3. Testing of Instantaneous element---------------------------------------------6

6. Documents------------------------------------------------------------------------------------------------------9 7. Reference--------------------------------------------------------------------------------------------------------9 8. Attachment------------------------------------------------------------------------------------------------------9

Page 387

Page 388: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc No: TP-DR01, Page 2 of 9 Equipment : Differential Current Relay Date:13 Feb,09 Revision: 0

1.0 Task

All the Differential current Relays shall be tested to check their functions 2.0 Preconditions

2.1 Work Status • Erection has been completed. • Labelling of the equipment 2.2 Documentation • The circuit diagrams of the electrical equipment cabinets are available • Commissioning checklists TS-DR01 • Approved relay settings should be available 2.3 Personnel • 1 Commissioning engineer: Engineer or technician with experience in

commissioning protection Relays. • 1 Helper: skilled worker with adequate on-the-job training. 2.4 Measuring Instruments and Tools • Three phase Secondary Injection test set • Fluke

3.0 Precautions • Observe the rules for handling electronic components sensitive to electrostatic

discharge (ESD measures). • Special safety arrangements shall be made for all areas which are not explicitly

designated as” electrical operating areas” when performing tests at voltages in excess of 50V.

4.0 Scope

• Testing cable connections, • Checking that the mounting position is correct,

5.0 Execution 5.1 Visual Checks • Checking of the cables for damage and that they are connected correctly, • Inspection for physical connection as per approved drawings. • Inspection for correct tightness for connection • Checking ferrules 5.2 Testing of Differential Current Relay.

Relay can be tested by using three or single phase secondary injection test set at the front panel mounted test facilities. Final calibration test of all protective relays must be carried out on approved settings,

Enter the rating plate data in check list TS-DR01 and compare the Relay data with the data contained in the circuit documentation. The following test shall be carried out

Page 388

Page 389: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc No: TP-DR01, Page 3 of 9 Equipment : Differential Current Relay Date:13 Feb,09 Revision: 0

2. Electrical Function test

i. Functional check of Test Plug ii. Shorting of links on relay case when relay is withdrawn

3. Secondary Injection i. Relay Power measurement ii. Testing of LEDs iii. Testing of out put relays iv. Testing of input Devices v. Metering function vi. Differential Function

1. Differential current Function 2. Differential restraint characteristic 3. Harmonic Function 4. Instantaneous Differential current function 5. Timing Test

vii. Backup over current 1. current Pickup/Dropout test 2. Time current characteristics

a. IEC-Very inverse b. IEC- Extremely Inverse c. Long time Inverse d. Definite Time

3. Testing of Instantaneous element

5.2.1 Electrical Function test 5.2.1.1 Functional Check of Test Plug

Test Plug should be checked for its correct function, terminals should be checked for its correct current, auxiliary power and tripping assignment as per the circuit drawing

5.2.1.2 Shorting of links on Relay Case when relay is Withdrawn

In case of withdrawal type relay, shorting facility on the relay case should be checked as under.

• Connect the fluke to check the continuity across the current terminal at low side on the relay case which shows some resistance.

• Pull the relay out and check the fluke which shows now resistance less then when relay was inside.

• Repeat the test for other two phases at low side too. • Repeat the test for all three phases at high side current of the

relay

Note: Above test can also be checked with secondary current injection. Relay can be pulled out while injecting the current and reading on the relay must show zero.

5.2.2 Secondary Injection Connection between the relay and secondary injection set is made as per figure below.

Page 389

Page 390: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc No: TP-DR01, Page 4 of 9 Equipment : Differential Current Relay Date:13 Feb,09 Revision: 0

R

Y

B

N

CU

RR

AN

TTE

RM

INA

LS

TRIP

CO

NTA

CT

OC & EF RELAYRELAY TEST SET

R

Y

B

NC

UR

RA

NT

TER

MIN

ALS

TIM

ER

OVER CURRENT AND EARTH FAULT RELAY TESTING ARRANGEMENT

TEST PLUG

5.2.2.1 Relay Power Measurement Apply rated DC or AC auxiliary voltage to the power terminal of the relay through suitable ammeter and voltmeter

Measure the current and voltage. Product of two gives power consumption of the relay.

5.2.2.2 Configuration of the Relay

Relay should be configured for inputs, outputs, and LED assignment as per final setting either through front panel of the relay or through lap top communicating with relay.

5.2.2.3 Testing of LEDs

Check the operation of LEDs first by pressing reset button, all the LEDs should light for 2 to 3 seconds

Check the operation of LEDs for their function by injecting current or by simulating the software.

5.2.2.4 Testing of out put Relays

By simulation or by performing secondary injection, check the operation of output relays as per the relay configuration.

Measure the contact resistance of the each output relay with fluke

5.2.2.5 Testing of Digital Inputs

Connect a variable auxiliary DC or AC voltage to each and every Digital input

Increase the voltage till the digital input picks up (a temporary LED may be assigned to see the pickup) thus a minimum voltage required to operate digital input is noted.

5.2.2.6 Metering Function

Configure the relay for Phase CT Ratio at low and high side.

Apply three phase 25%, 50%, 75% and 100% of nominal current on high and low side CT connection of the relay and note down the corresponding readings on the relay.

Page 390

Page 391: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc No: TP-DR01, Page 5 of 9 Equipment : Differential Current Relay Date:13 Feb,09 Revision: 0

5.2.2.7 Differential Function

5.2.2.7.1 Differential Current Function • Disable the harmonic restraints, and enable the

differential function • Apply the testing relays setting. • Apply current to High side and low side windings .so

that the relay will have a differential current of 0.00. • Increase the current in the High side, and check that it

trips when the differential occur. • Check that it trips with an error margin of less than 5%

for different through currents, and different sensitivity and percentage restraint settings.

5.2.2.7.2 Differential Restraint Characteristic.

• Disable the harmonic restraints, and enable the differential function

• Apply the testing relays setting. • Apply current to High side and low side windings. • Increase the current in High side, and check slope1 is

achieved according to the relay specification. • Repeat the test to check slope2 is achieved.

5.2.2.7.3 Harmonic Function

• Enable the harmonic restraints, and the differential function.

• Apply the testing relays setting. • Apply current to High side and low, so that the relay

will have a differential current of 0.00. • Apply a second harmonic current at high side, besides

the current it already had. • Increase the current in the High side, and check that it

trips when the differential occur. • Check that it trips with an error margin of less than 5%

for different through currents, and different sensitivity and percentage restraint settings

5.2.2.7.4 Differential Instantaneous Function

• Disable the harmonic restraints, and the differential function, and enable the instantaneous function.

• Set the instantaneous function to 4 times the tap. • Apply current to High side, and check that it trips

when the differential current reaches the set value. • Check that it trips with an error margin of less than 5%

for different differential currents, and different instantaneous function settings.

5.2.2.7.5 Timing Test • Check that it trips with an error margin of less than 5%

for different through currents, and different sensitivity and percentage restraint settings

Page 391

Page 392: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc No: TP-DR01, Page 6 of 9 Equipment : Differential Current Relay Date:13 Feb,09 Revision: 0

5.2.2.8 Backup Over Current Function

While checking Backup over current function differential function has to be disabled

5.2.2.8.1 Over current Pickup/Dropout test

Apply the testing relays setting for over current on the relay as follows.

• Definite Time Curve with minimum time delay. • Disable all other protection elements. • Connect the current test set on the relay current

terminals one at a time as follows. • Red phase to Neutral.( for Phase over current relay) • Yellow phase to Neutral(for Phase over current Relay) • Blue phase to neutral. ( for Phase over current relay) • Connect the timer to the relay tripping contact • Slowly increase the current until the relay picked-up. • Record the operating current. • Slowly decrease the current until relay reset • Record the operating current

5.2.2.8.2 Time current characteristics Apply the testing relays setting for over current on the relay as follows.

• Disable all other protection elements. • DT curve with 500ms delay. • IEC NI curve with 0.1 TMS. • IEC VI curve with 0.1 TMS. • IEC EI curve with 0.1 TMS. • IEC LT curve with 0.1 TMS. • IEC DT Curve with 1.0 TMS • Select the time over current curve one at a time on the

relay. • Connect the current test set on the relay current

terminals one at a time as follows. • Red phase to Neutral.( for Phase over current relay) • Yellow phase to Neutral. ( for Phase over current relay) • Blue phase to neutral. ( for Phase over current relay) • Single phase current on Ground element(ground over

current relay) • Connect the timer to the relay tripping contact • Inject testing current 2 times, 5 times and 10 times of

the pickup settings and note down the operating time of the relay.

• Record the operating time. • Cross check the time as per figure below or calculate

the time using below formula. • Test shall be done for all the characteristics and all the

three phases and ground element.

Page 392

Page 393: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc No: TP-DR01, Page 7 of 9 Equipment : Differential Current Relay Date:13 Feb,09 Revision: 0

Page 393

Page 394: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc No: TP-DR01, Page 8 of 9 Equipment : Differential Current Relay Date:13 Feb,09 Revision: 0

5.2.2.8.2.1 Instantaneous Unit Verification

• Apply the testing relays setting for phase and ground over current on the relay as follows.

• Disable all other protection elements. • Connect the current test set on the relay current

terminals one at a time as follows. o Red phase to Neutral.( for Phase over

current relay) o Yellow phase to Neutral. ( for Phase over

current relay) o Blue phase to neutral. ( for Phase over

current relay) o Single phase current on Ground

element(ground over current relay) Pickup/dropout test • Slowly increase the current until the relay

picked-up.

Page 394

Page 395: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc No: TP-DR01, Page 9 of 9 Equipment : Differential Current Relay Date:13 Feb,09 Revision: 0

• Record the operating current. • Slowly decrease the current until relay reset • Record the operating current

Pickup/dropout test • Connect the timer to the relay tripping contact • Inject testing current 2 times the pickup settings

and note down the operating time of the relay. • Tripping time should be actual definite time

multiply by TMS setting • Test shall be done for all the phase and ground

element

6.0 Documents Test sheet TS-AR01 shall be completed for each and every differential Relay.

7.0 References: 8.0 Attachment

8.1 Test Sheets for Differential Relays 8.1.1 GE-G60 TS-DR01 8.1.2 GE-T60 TS-DR02 8.1.3 AREVA-MFAC TS-DR03

***End of the Procedure***

Page 395

Page 396: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

Riyadh Po“1062

STARTU

TES

ower plant21166/00”

UP MANUA

ST SH

t # 10

AL DF

EETS

Date:13 Feb,09

Revision0

n:

Page 396

Page 397: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 1 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

1.0 Relay General Data Function Serial No. Make Model No. Diagram no. Aux. Voltage Frequency Firmware no. Rated voltage Rated current: No of logic Inputs: No of outputs:

2.0 Visual Inspection

Item Description Checked 1 S/L. No. on Module, Cover and Case are identical

2 Inspect for any physical damage or defects.

3 Verify connections as per approved drawings. 4 Check that serial no. of relay matching with serial no. of display.

5 Relay case connected to local earth bar

6 Tightness of contact of the relay and CT shorting terminal makes good contact when relay is withdrawn

7 Connection on Relay terminals are good

8 Ferrules are according to the drawings

9 Test and settings switches operate properly

10 CT shorting function checked.

3.0 Electrical Functional Test.

• Test switch / Test Block CT shorting contacts proved

• Relay CT shorting contacts proved

4.0 Secondary Injection test.

4.1. Relay Power Measurment at Rated Voltage(Burden Test) Current (mA) Burden (W) Nominal Burden (W)

Terminal Voltage (V) Quiescent Output

Operated Quiescent Output Operated Quiescent Max

B5b-B6a < W < W

Page 397

Page 398: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 2 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

4.2. Testing Of LED’s

First Column( Status) Second Column (Setting in use) LED No. Assigned Function Results LED No. Assigned Function Results LED-1 IN SERVICE LED-1 Group-1 LED-2 TROUBLE LED-2 Group-2 LED-3 TEST MODE LED-3 Group-3 LED-4 TRIP LED-4 Group-4 LED-5 ALARM LED-5 Group-5 LED-6 PICKUP LED-6 Group-6 LED-7 VOLTAGE LED-7 Group-7 LED-8 CURRENT LED-8 Group-8 LED-9 FREQUENCY LED-9 Spare LED-10 OTHER LED-10 Spare LED-11 PHASE A LED-11 Spare LED-12 PHASE B LED-12 Spare LED-13 PHASE C LED-14 NUETRAL GROOUND

Third Column(Breaker Function) Fourth Column(Synchronous function)

LED No. Assigned Function Results LED No. Assigned Function Results LED-1 BREAKER-1 CLOSE LED-1 NO-1 SYSNCH LED-2 BREAKER-1 TRBLE LED-2 NO-2 SYSNCH LED-3 BREAKER-1 OPEN LED-3 LED-4 LED-4 LED-5 LED-5 RCL ENABLE LED-6 BREAKER-1 CLOSE LED-6 RCL DISABLE LED-7 BREAKER-1 TRBLE LED-7 RCL IN PROGRESS LED-8 BREAKER-1 OPEN LED-8 RCL LOACKOUT LED-9 LED-9 LED-10 LED-10 LED-11 LED-11 LED-12 LED-12

Page 398

Page 399: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 3 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

4.3. Testing Of Out Put Relays

Output Relay No.

Output Contact No.

Output relay

status

Contact Operation

check

Actual Assignment

of Relays

Contact Resistance

(Ω) Remarks

Critical

B1b-B1a (N.O) / B2b-B1a(NC)

H1 H1c-H1b(NO) H2 H2c-H2b(NO) H3 H3c-H3b(NO) H4 H4c-H4b(NO) H5 H5c-H5b(NO) H6 H6c-H6b(NO)

P1 P1c-P1b(NO) P2 P2c-P2b(NO) P3 P3c-P3b(NO) P4 P4c-P4b(NO) P5 P5c-P5b(NO) P6 P6c-P6b(NO)

U1 U1c-U1b(NO) U2 U2c-U2b(NO) U3 U3c-U3b(NO) U4 U4c-U4b(NO) U5 U5c-U5b(NO) U6 U6c-U6b(NO)

Page 399

Page 400: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 4 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

4.4. Testing Of Binary Inputs

(Energize only one OPTO INPUT at a time with relay rated OPTO input voltage – CAUTION!! -Check RATED OPTO INPUT VOLTAGE before apply voltage to OPTO Input terminal)

V DC Applied OPTO Input No. Terminal No. Minimum Pickup

Voltage(V)

Status of OPTO INPUT

Function assigned for OPTO INPUT

Remarks

H7 H7a(+)-H7b(-) H7 H7c(+)-H7b(-) H8 H8a(+)-H7b(-) H8 H8c(+)-H7b(-) P7 P7a(+)-P7b(-) P7 P7c(+)-P7b(-) P8 P8a(+)-P7b(-) P8 P8c(+)-P7b(-) U7 U7a(+)-U7b(-) U7 U7c(+)-U7b(-) U8 U8a(+)-U7b(-) U8 U8c(+)-U7b(-)

4.5. Metering Function(Meter Accuracy Test)

4.5.1. Phase Current Accuracy Test Relay Setting CT F1 (SRC 3) Neutral side Phase CT primary: 6000A Phase CT secondary: 1A Test Result

Injected Current Expected Current Measured Current (A)

(A) (A) Phase A Phase B Phase C

0.2 1200 0.25 1500

0.3 1800

0.5 3000

0.75 4500

1 6000

Page 400

Page 401: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 5 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

4.5.2. Phase Current Accuracy Test Relay Setting CT M1 (SRC 2) w Phase CT primary: 6000A Phase CT secondary: 1A Test Result

Injected Current Expected Current Measured Current (A)

(A) (A) Phase A Phase B Phase C

0.2 1200 0.25 1500

0.3 1800

0.5 3000

0.75 4500

1 6000

4.5.3. Phase Voltage Accuracy Test

Relay Setting VT F5 (SRC 2) Phase VT Connection Star Phase VT Secondary 69.3 V Phase VT Ratio 120: 1 Test Results

Test Values Applied Voltage Expected Voltage Measured Voltage (kV)

(V) (V) (KV) Vab Vbc Vca

66.4 – 15% 56.4 11.723

66.4 – 10% 59.76 12.421

66.4 66.4 13.8

66.4 + 10% 73 15.17

66.4 + 15% 76.4 15.88

Page 401

Page 402: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 6 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

4.5.4. Auxiliary Voltage Accuracy Test Relay Setting VT F5 (SRC1) Phase VT Secondary 240 V Phase VT Ratio 50: 1 (12000/240)

Test Values Secondary Expected

Voltage Measured Voltage

60 3000

100 5000

120 6000

150 7500

4.6. Distance protection Check

4.6.1. Phase Distance Z1 Forward

Settings Setting / Grouped Elements / Group 1 / Distance Parameter Phase Distance Z1 Function Enable Signal Source SRC 2(SRC2) Direction Forward Shape MHO Reach 2 Ω RCA 85 Deg Reveres Reach 2 Ω Rev. Rch RCA 85 Deg DIR RCA 85 Deg Supervision 0.05 pu Delay 0.0 sec

Results

3-Phase Injection Applied Voltage Pick up current @ 265 0 Z (Ohms) Operating time in

m sec 2

Page 402

Page 403: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 7 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

4.6.2. Phase Distance Z1 Reverse Settings Setting / Grouped Elements / Group 1 / Distance Parameter Phase Distance Z1 Function Enable Signal Source SRC 2(SRC2) Direction Reverse Shape MHO Reach 2 Ω RCA 85 Deg Reveres Reach 2 Ω Rev. Rch RCA 85 Deg DIR RCA 85 Deg Supervision 0.05 pu Delay 0.0 sec

Results

3-Phase Injection Applied Voltage Pick up current @ 85 0 Z (Ohms) Operating time in m

sec 2

4.6.3. Phase Distance Z2 Forward

Settings Setting / Grouped Elements / Group 1 / Distance Parameter Phase Distance Z2 Function Enable Signal Source SRC 2(SRC2) Direction Forward Shape MHO Reach 6 Ω RCA 85 Deg Reveres Reach 6 Ω Rev. Rch RCA 85 Deg DIR RCA 85 Deg Supervision 0.05 pu Delay 0.45 sec

Results

3-Phase Injection Applied Voltage Pick up current @ 265 0 Z (Ohms) Operating time in

msec 6

Page 403

Page 404: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 8 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

4.6.4. Phase Distance Z2 Reverse Settings Setting / Grouped Elements / Group 1 / Distance Parameter Phase Distance Z2 Function Enable Signal Source SRC 2(SRC2) Direction Reverse Shape MHO Reach 6 Ω RCA 85 Deg Reveres Reach 6 Ω Rev. Rch RCA 85 Deg DIR RCA 85 Deg Supervision 0.05 pu Delay 0.45 sec

Results 3-Phase Injection

Applied Voltage Pick up current @ 85 0 Z (Ohms) Operating time in m sec

6 4.6.5. Phase Distance Z3 Forward

Settings Setting / Grouped Elements / Group 1 / Distance Parameter Phase Distance Z3 Function Enable Signal Source SRC 2(SRC2) Direction Forward Shape MHO Reach 12 Ω RCA 85 Deg Reveres Reach 6 Ω Rev. Rch RCA 85 Deg DIR RCA 85 Deg Supervision 0.05 pu Delay 0.7 sec

Results 3-Phase Injection

Applied Voltage Pick up current @ 265 0 Z (Ohms) Operating time in m sec

12 4.6.6. Phase Distance Z3 Reverse

Settings Setting / Grouped Elements / Group 1 / Distance

Page 404

Page 405: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 9 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

Parameter Phase Distance Z3 Function Enable Signal Source SRC 2(SRC2) Direction Reverse Shape MHO Reach 6 Ω RCA 85 Deg Reveres Reach 6 Ω Rev. Rch RCA 85 Deg DIR RCA 85 Deg Supervision 0.05 pu Delay 0.7 sec

Results 3-Phase Injection

Applied Voltage Pick up current @ 85 0 Z (Ohms) Operating time in m sec

6

4.6.7. Power swing detect 4.6.7.1. Power wing detect- Mho

Settings Setting / Grouped Elements / Group 1 /Power Swing Detect Parameter Power Swing Detect Function Enable Signal Source SRC 2(SRC2) Shape MhO Forward Reach 40 Ω Reveres Reach 40Ω

Results

3- Phase Injection Pick up Current @ 90 0 (A) Z (ohm) Applied

Voltage(V) Outer Middle Inner Outer Middle Inner 40V

4.6.7.2. Power wing detect- QUAD

Settings Setting / Grouped Elements / Group 1 /Power Swing Detect Parameter Power Swing Detect Function Enable Signal Source SRC 2(SRC2) Shape QUAD Forward Reach 40 Ω Reveres Reach 40Ω

Page 405

Page 406: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 10 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

Results 3- Phase Injection

Pick up Current @ 90 0 (A) Z (ohm) Applied Voltage(V) Outer Middle Inner Outer Middle Inner

40V 4.6.8. Stator Differential

Settings Setting / Grouped Elements / Group 1 /Stator Differential Parameter Stator Differential Function Enable Neutral End Source SRC 1(SRC1) Line End Source SRC 2(SRC2) Pick up 0.2 Slope-1 30% Break-1 1.5 Pu Slope-2 80% Break-2 2 Pu

4.6.8.1. Line and Neutral Source Pick up Test

Pickup Current (A) Operating Time(mS) Phase SRC-1 SRC-2 SRC-1 SRC-2 R Y B

4.6.8.2. Stability Test by secondary injection

Injected Current (A) Phase SRC-1 SRC-2 Expected operation

Actual operation

R 0.5 0.5 Y 0.5 0.5 B 0.5 0.5

No operation

4.6.8.3. Slope Test

4.6.8.3.1. Slope-0 Operation

Injected Current (A) Phase SRC-1 SRC-2 Expected operation

Actual operation

R 0.2 0.2 No operation R 0.2 0.4 Operate Y 0.2 0.2 No operation Y 0.2 0.4 Operate B 0.2 0.2 No operation B 0.2 0.4 Operate

Page 406

Page 407: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 11 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

4.6.8.3.2. Slope-1 Operation

Injected Current (A) Phase SRC-1 SRC-2

Expected operation

Actual operation

R 1.38 1.02 No operation R 1.38 0.95 Operate Y 1.38 1.02 No operation Y 1.38 0.95 Operate B 1.38 1.02 No operation B 1.38 0.95 Operate

4.6.8.3.3. Slope-2 Operation

Injected Current (A) Phase SRC-1 SRC-2 Expected operation

Actual operation

R 4.2 1.8 No operation R 4.2 0.83 Operate Y 4.2 1.8 No operation Y 4.2 0.83 Operate B 4.2 1.8 No operation B 4.2 0.83 Operate

4.6.9. Phase Current ( Neutral Side CT’S)

Setting / Inputs Outputs / Contact Outputs PARAMETER H1 Contact Output 1 Name Con Op 1 Operate PHASE TOC1 OP (Timing test)

4.6.9.1. Phase Time Over Current Test TOC 1

4.6.9.1.1. Pick up drop out test Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase TOC PARAMETER PHASE TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 1pu

Test Results Current (A) Phase Pick- up value Drop out value Calculated pick-up % Error

R 1 % Y 1 % B 1 %

Page 407

Page 408: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 12 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

4.6.9.1.2. Time Characteristic test – IEC Curve A Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase TOC ` PARAMETER PHASE TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 1pu Curve IEC Curve A TD Multiplier 0.40

Results

1.5 In=1.5A 2 In=2 A 3 In=3 A Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

R 6.878 4.012 2.521

Y 6.878 4.012 2.521

B 6.878 4.012 2.521

4.6.9.1.3. Time Characteristic test – IEC Curve B Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase TOC PARAMETER PHASE TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 1pu Curve IEC Curve B TD Multiplier 0.4

Results

1.5 In=1.5A 2 In=2 A 3 In=1 A Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

R 10.8 5.4 2.7

Y 10.8 5.4 2.7

B 10.8 5.4 2.7

4.6.9.1.4. Characteristic test – IEC Curve C Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase TOC

Page 408

Page 409: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 13 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

PARAMETER PHASE TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 1pu Curve IEC Curve C TD Multiplier 0.40

Results 1.5 In=1.5A 2 In=2 A 3 In=3 A

PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

R 25.6 10.667 4

Y 25.6 10.667 4

B 25.6 10.667 4

4.6.9.1.5. Time Characteristic test – IEC short time Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase TOC

Results 1.5 In=1.5A 2 In=2 A 3 In=3 A

PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

R 1.223 0.711 0.445 Y 1.223 0.711 0.445 B 1.223 0.711 0.445

4.6.9.2. Phase Instantaneous Over Current Test IOC 1

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase IOC PARAMETER PHASE IOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 5 pu Delay 0.0sec

PARAMETER PHASE TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 1pu Curve IEC short time TD Multiplier 0.40

Page 409

Page 410: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 14 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

Results Phase Pick-up Current (A) Time setting Measured time(ms)

R Inst. Y Inst. B Inst.

4.6.10. Phase Current ( Line Side CT’s-SRC-2)

4.6.10.1. Phase Time Over Current Test TOC 1 4.6.10.1.1. Pick up drop out test Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase TOC PARAMETER PHASE TOC 1 Function Enable Signal Source SRC2 (SRC 2) Pickup 1pu

Results

Current (A) Phase Pick- up value Drop out value Calculated pick-up % Error

R 1 % Y 1 % B 1 %

4.6.10.1.2. Time Characteristic test – IEC Curve A Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase TOC ` PARAMETER PHASE TOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 1pu Curve IEC Curve A TD Multiplier 0.40

Results

1.5 In=1.5A 2 In=2 A 3 In=3 A Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

R 6.878 4.04 2.521

Y 6.878 4.05 2.521

B 6.878 4.04 2.521

Page 410

Page 411: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 15 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

4.6.10.1.3. Time Characteristic test – IEC Curve B Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase TOC PARAMETER PHASE TOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 1pu Curve IEC Curve B TD Multiplier 0.4

Results

1.5 In=1.5A 2 In=2 A 3 In=1 A Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

R 10.8 5.4 2.7

Y 10.8 5.4 2.7

B 10.8 5.4 2.7

4.6.10.1.4. Time Characteristic test – IEC Curve C Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase TOC PARAMETER PHASE TOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 1pu Curve IEC Curve C TD Multiplier 0.40

Results 1.5 In=1.5A 2 In=2 A 3 In=3 A

PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

R 25.6 10.667 4

Y 25.6 10.667 4

B 25.6 10.667 4

Page 411

Page 412: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 16 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

4.6.10.1.5. Time Characteristic test – IEC short time Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase TOC PARAMETER PHASE TOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 1pu Curve IEC short time TD Multiplier 0.40

Results

1.5 In=1.5A 2 In=2 A 3 In=3 A PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

R 1.223 0.711 0.445

Y 1.223 0.711 0.445

B 1.223 0.711 0.445 4.6.10.2. Phase Instantaneous Over Current Test IOC 1

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase IOC 1 PARAMETER PHASE IOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 5 pu Delay 0.0sec

Results Phase Pick-up Current (A) Time setting Measured time(ms)

R Inst. Y Inst. B Inst.

4.6.11. Phase Directional Over Current Test

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase Directional1

PARAMETER PHASE Directional Function Enable Signal Source SRC 2 (SRC 2) ECA 30 ° Pol V Thld 0.3 Pu

Page 412

Page 413: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 17 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

4.6.11.1. Pickup Test

Phase Injected current(A)

Injected 3P voltage(V)

Operate Angle Target

R-N 66.4 30-209.8 H1 op Y-N 66.4 269,8-90 H1 op B-N 66.4 149.7-329.7 H1 op

4.6.11.2. Timing Test

Phase Injected current(A)

Injected voltage(V)

Operate Angle Time(ms)

R-N 1.00 66.4 40 Y-N 1.00 66.4 280 B-N 1.00 66.4 160

4.6.12. Neutral Current

Setting / Inputs Outputs / Contact Outputs PARAMETER H1 Contact Output 1 Name Con Op 1 Operate Neutral TOC1 OP (Timing test)

4.6.12.1. Neutral Time Over Current Test TOC 1—SRC-1(Neutral Side CT’s)

4.6.12.1.1. Pick up drop out test Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1 PARAMETER NEUTRAL TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.1pu

Current (A) Phase Pick- up value Drop out value Calculated pick-up % Error

B-N %

4.6.12.1.2. Time Characteristic test – IEC Curve A Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1 `PARAMETER NEUTRAL TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.1pu Curve IEC Curve A TD Multiplier 0.40

Page 413

Page 414: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 18 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

B-N 6.878 4.012 2.521

4.6.12.1.3. Time Characteristic test – IEC Curve B Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1 PARAMETER NEUTRAL TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 1pu Curve IEC Curve B TD Multiplier 0.4

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

B-N 10.8 5.4 2.7

4.6.12.1.4. Time Characteristic test – IEC Curve C Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1 PARAMETER NEUTRAL TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.1pu Curve IEC Curve C TD Multiplier 0.40

Results 1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A

PHASE Expected

Time(s) Measured

Time(s) Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

B-N 25.6 10.667 1 4

Page 414

Page 415: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 19 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

4.6.12.1.5. Time Characteristic test – IEC short time Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1 PARAMETER NEUTRAL TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.1pu Curve IEC short time TD Multiplier 0.40

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

B-Neutral 1.223 0.711 0.445

4.6.12.2. Neutral Instantaneous Over Current Test IOC 1

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1 PARAMETER NEUTRAL IOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.5 pu Delay 0.0sec

Results Phase Pick-up Current (A) Time setting Measured time(ms)

B-Neutral Inst. 4.6.12.3. Neutral Time Over Current Test TOC 1—SRC-2(Line Side CT’s)

4.6.12.3.1. Pick up drop out test Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1 PARAMETER NEUTRAL TOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 0.1pu

Results Current (A)

Phase Pick- up value Drop out value Calculated pick-up % Error B-

Neutral 0.1 %

Page 415

Page 416: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 20 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

4.6.12.3.2. Time Characteristic test – IEC Curve A Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

B-Neutral 6.878 4.012 2.521

4.6.12.3.3. Time Characteristic test – IEC Curve B Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1 PARAMETER NEUTRAL TOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 0.1pu Curve IEC Curve B TD Multiplier 0.4

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

B-Neutral 10.8 5.4 2.7

PARAMETER NEUTRAL TOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 0.1pu Curve IEC Curve A TD Multiplier 0.40

Page 416

Page 417: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 21 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

4.6.12.3.4. Time Characteristic test – IEC Curve C Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1 PARAMETER NEUTRAL TOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 0.1pu Curve IEC Curve C TD Multiplier 0.40

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

B-Neutral 25.6 10.667 4

4.6.12.3.5. Time Characteristic test – IEC short time Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1 PARAMETER NEUTRAL TOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 0.1pu Curve IEC short time TD Multiplier 0.40

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

B-Neutral 1.223 0.711 0.445

4.6.12.4. Neutral Instantaneous Over Current Test IOC 1

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1 PARAMETER NEUTRAL IOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 0.5 pu Delay 0.0sec

Page 417

Page 418: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 22 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

Results Phase Pick-up Current (A) Time setting Measured time(ms)

B-Neutral Inst.

4.6.13. Ground Current Setting / Inputs Outputs / Contact Outputs PARAMETER H1 Contact Output 1 Name Con Op 1 Operate Ground TOC1 OP (Timing test)

4.6.13.1. Ground Time Over Current Test TOC 1—SRC-1(Neutral Side CT’S)

4.6.13.1.1. Pick up drop out test Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Ground Current / Ground TOC1 PARAMETER Ground TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.1pu

Current (A) Phase Pick- up value Drop out value Calculated pick-up % Error

G 0.1 %

4.6.13.1.2. Time Characteristic test – IEC Curve A Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Ground Current / Ground TOC1 PARAMETER GROUND TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.1pu Curve IEC Curve A TD Multiplier 0.40

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

G 6.878 4.012 2.521

Page 418

Page 419: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 23 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

4.6.13.1.3. Time Characteristic test – IEC Curve B Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Ground Current / Ground TOC1 PARAMETER Ground TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 1pu Curve IEC Curve B TD Multiplier 0.4

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

G 10.8 5.4 2.7

4.6.13.1.4. Time Characteristic test – IEC Curve C Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Ground Current / Ground TOC1 PARAMETER GROUND TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.1pu Curve IEC Curve C TD Multiplier 0.40

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

G 25.6 10.667 4

Page 419

Page 420: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 24 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

4.6.13.1.5. Time Characteristic test – IEC short time Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Ground Current / Ground TOC1

PARAMETER GROUND TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.1pu Curve IEC short time TD Multiplier 0.40

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

G 1.223 0.711 0.445

4.6.13.2. Ground Instantaneous Over Current Test IOC 1

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Ground Current / Ground IOC1 PARAMETER GROUND IOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.5 pu Delay 0.0sec

Results Phase Pick-up Current (A) Time setting Measured time(ms)

G Inst.

4.6.13.3. Ground Time Over Current Test TOC 1—SRC-2(Line Side CT’S) 4.6.13.3.1. Pick up drop out test Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Ground Current / Ground TOC1 PARAMETER Ground TOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 0.1pu

Page 420

Page 421: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 25 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

Current (A) Phase Pick- up value Drop out value Calculated pick-up % Error

G 0.1 %

4.6.13.3.2. Time Characteristic test – IEC Curve A Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Ground Current / Ground TOC1 PARAMETER GROUND TOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 0.1pu Curve IEC Curve A TD Multiplier 0.40

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

G 6.878 4.012 2.521

4.6.13.3.3. Time Characteristic test – IEC Curve B Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Ground Current / Ground TOC1 PARAMETER Ground TOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 1pu Curve IEC Curve B TD Multiplier 0.4

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

G 10.8 5.4 2.7

Page 421

Page 422: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 26 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

4.6.13.3.4. Time Characteristic test – IEC Curve C Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Ground Current / Ground TOC1 PARAMETER GROUND TOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 0.1pu Curve IEC Curve C TD Multiplier 0.40

Results 1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A

PHASE Expected

Time(s) Measured

Time(s) Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

G 25.6 10.667 4

4.6.13.3.5. Time Characteristic test – IEC short time Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Ground Current / Ground TOC1

PARAMETER GROUND TOC 1

Function Enable Signal Source SRC 2 (SRC 2) Pickup 0.1pu Curve IEC short time TD Multiplier 0.40

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

G 1.223 0.711 0.445

4.6.13.4. Ground Instantaneous Over Current Test IOC 1

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Ground Current / Ground IOC1 PARAMETER GROUND IOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 0.5 pu Delay 0.0sec

Page 422

Page 423: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 27 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

Results Phase Pick-up Current (A) Time setting Measured time(ms)

G Inst.

4.6.14. Negative Sequence Directional over Current- line Side CT. 4.6.14.1. Stage -1

Setting (Pickup and Time Stage 1) Setting / Grouped Elements / Group 1 / Negative Sequence current/NEG SEQ PARAMETER NEG SEQ DIR OC Function Enable Signal Source SRC2 (SRC 2) Fwd ECA 75 0 Fwd LA 90 0 Rev LA 90 0 Fwd Pickup 0.05 Pu Rev Pick up 0.05 Pu

4.6.14.1.1. Pickup test Phase Injected

Current(A) Injected Voltage (V)

Fwd Op Angle Rev Op Angle

R-N 0.3<0 66.4<270 284.8- 104.6 104.8-284.7

4.6.14.1.2. Timing Test Phase Injected

current(A) Injected

Voltage(V) Fwd Op Angle

Rev Op Angle

Operating Time Fwd

Operating Time Rev

R-N 0.3 66.4 350 180 4.6.14.2. Stage-2

Setting (Pickup and Time Stage 2) Setting / Grouped Elements / Group 1 / Negative Sequence current/NEG SEQ PARAMETER NEG SEQ DIR OC Function Enable Signal Source SRC2 (SRC 2) Fwd ECA 90 0 Fwd LA 80 0 Rev LA 80 0 Fwd Pickup 0.05 Pu Rev Pick up 0.05 Pu

4.6.14.2.1. Pickup test Phase Injected

Current(A) Injected Voltage (V)

Fwd Op Angle Rev Op Angle

R-N 0.3<0 66.4<270 279.8-79.5 100- 259.8

Page 423

Page 424: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 28 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

4.6.14.2.2. Timing Test Phase Injected

current(A) Injected

Voltage(V) Fwd Op Angle

Rev Op Angle

Operating Time Fwd

Operating Time Rev

R-N 0.3 66.4 350 180

4.6.15. Generator unbalance 4.6.15.1. Stage-1

Setting (Pickup and Time Stage 1) Setting / Grouped Elements / Group 1 / Generator Unbalance Parameter GEN UNBAL Function Enable Signal Source SRC 2 (SRC 2) Inom 1.00 pu Stage 1 Pickup 10 % Stage 1 K-Value 1 Gen Unbal Stage1 Tmin 0.25 s Gen Unbal Stage1 Tmax 15 s

Results Ref. Curve page 5-153

Injected Current (1Pu =1 Amps)

Phase Pick Up Drop Off

Injected Current(A)

Measured Time(s)

Injected Current(A)

Measured Time(s)

R-N 0.8 A 2 A

Y-N 0.8 A 2 A

B-N 0.8 A 2A

4.6.15.2. Stage-2 Setting (Pickup and Time Stage 2 ) Setting / Grouped Elements / Group 1 / Generator Unbalance PARAMETER GEN UNBAL Function Enable Signal Source SRC 2 (SRC 2) Inom 1.00 pu Stage 2 Pickup 10 % Sage 2 Pickup Delay 6 s Block Off

Page 424

Page 425: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 29 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

Test Results Ref. Curve page 5-153

Injected Current (1 pu =1 Amps)

PHASE Pick Up Drop Off

Injected Current

Measured Time(s)

R-N 0.31A

Y-N 0.31A

B-N 0.31A

4.6.16. Split Phase Protection Setting (Pickup and Time Stage 2 ) Setting / Grouped Elements / Group 1 / Split Phase PARAMETER SPLIT PHASE Function Enable Signal Source SRC 1 (SRC 1) Phase-A P/U 0.3 Pu Phase-B P/U 0.3 Pu Phase-C P/U 0.3 Pu Offset 0.0 Pu Slop 0%

Test Results Phase Pickup Drop out Operating Time(ms)

R Y B

4.6.17. Voltage elements 4.6.17.1. Phase Under Voltage Test UV1

Setting (Pickup, Dropout and Time) Setting / Grouped Elements / Group 1 / Voltage Elements / Phase UV PARAMETER PHASE

UV 1 Function Enable Signal Source SRC 2 (SRC 2) Mode Phase to Ground Pickup 0.8 pu Curve Definite Time Delay 1.00 s Minimum Voltage 0.1 pu

Page 425

Page 426: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 30 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

Test Results Pick Up (V) Drop Off (V)

PHASE Calculated Measured Measured

Measured Time(s)At 55 V

R 55.44 Y 55.44 B 55.44

4.6.17.2. Phase Under Voltage Test UV2

Setting (Pickup, Dropout and Time) Setting / Grouped Elements / Group 1 / Voltage Elements / Phase UV PARAMETER PHASE UV 2 Function Enable Signal Source SRC 2 (SRC 2) Mode Phase to Ground Pickup 0.85 pu Curve Definite Time Delay 1.00 s Minimum Voltage 0.1 pu

Test Results

Pick Up (V) Drop Off (V) PHASE

Calculated Measured Measured Measured Time(s)

At 58 V

R 58.9 Y 58.9 B 58.9

4.6.17.3. Phase Over Voltage Test OV1

Setting (Pickup, Dropout and Time) Setting / Grouped Elements / Group 1 / Voltage Elements / Phase OV PARAMETER PHASE OV 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 0.9 pu Curve Definite Time Delay 1.00 s Minimum Voltage 0.1 pu

Page 426

Page 427: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 31 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

Test Results Pick Up Drop Off

PHASE Calculated Measured Measured

Measured Time At 63*√3 V

R-Y 108

Y-B 108

B-R 108 4.6.17.4. Negative Sequence Over Voltage

Setting (Pickup, Dropout and Time) Setting / Grouped Elements / Group 1 / Voltage Elements / Neg Seq.OV PARAMETER Neg Seq OV Function Enable Signal Source SRC 2 (SRC 2) Pickup 0.2 pu Delay 1.00 s

Test Results Pick Up Drop Off

PHASE Calculated Measured Measured

Measured Time

3 Ph.(-) sq 13.86 4.6.17.5. Neutral Over Voltage Test OV1

Setting (Pickup, Dropout and Time) Setting / Grouped Elements / Group 1 / Voltage Elements / Neutral OV1 PARAMETER Neutral OV 1 Function Enable Signal Source SRC 2 (SRC 2) Mode Phase to Ground Pickup 0.3 pu Curve Definite Time Delay 1.00 s Minimum Voltage 0.1 pu

Test Results Pick Up Drop Off

PHASE Calculated Measured Measured

Measured Time At 21 V

R 20.7 Y 20.7 B 20.7

Page 427

Page 428: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 32 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

4.6.17.6. Auxiliary Under Voltage Test UV 1 Setting (Pickup, Dropout and Time) Setting / Grouped Elements / Group 1 / Voltage Elements / Auxiliary UV1 PARAMETER AUX UV 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.6 pu Curve Definite Time Delay 1.00 s Minimum Voltage 0.1 pu

Test Results

Pick Up Drop Off PHASE

Calculated Measured Measured Measured Time

At 120 V

Neutral 144

4.6.17.7. Auxiliary Over Voltage Test OV1 Setting (Pickup, Dropout and Time) Setting / Grouped Elements / Group 1 / Voltage Elements / Auxiliary UV1 PARAMETER AUX OV 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.3 pu Curve Definite Time Delay 1.00 s Minimum Voltage 0.1 pu

Test Results

Pick Up Drop Off PHASE

Calculated Measured Measured Measured Time

At 80 V

Neutral 72

Page 428

Page 429: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 33 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

4.6.17.8. Volts per Hertz 4.6.17.8.1. Inverse Curve A: Ref equation page # 5-167 Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Voltage element / Volts per Hertz PARAMETER Volts per Hertz Function Enable Signal Source SRC 2(SRC 2) Pickup 0.8pu Curve Inverse Curve A TD Multiplier 1

Results 1.5 Vp=83.16 2 Vp= 110.88

PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

R-N 0.8 0.333 Y-N 0.8 0.333 B-N 0.8 0.333

4.6.17.8.2. Inverse Curve B: Ref equation page # 5-167 Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Voltage element / Volts per Hertz PARAMETER Volts per Hertz Function Enable Signal Source SRC 2 (SRC2) Pickup 0.8pu Curve Inverse Curve B TD Multiplier 1

Test Results

1.5 Vp=83.16 2 Vp= 110.88 PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

R-N 2 1

Y-N 2 1

B-N 2 1

Page 429

Page 430: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 34 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

4.6.17.8.3. Inverse Curve C: Ref equation page # 5-167 Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Voltage element / Volts per Hertz

Results

1.5 Vp=83.16 2 Vp= 110.88 PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

R-N 4.45 2.414 Y-N 4.45 2.414 B-N 4.45 2.414

4.6.17.8.4. Definite Time: Ref equation page # 5-167 Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Voltage element / Volts per Hertz PARAMETER Volts per Hertz Function Enable Signal Source SRC 2 (SRC 2) Pickup 0.8pu Curve Definite time TD Multiplier 1

Results:

1.5 Vp=83.16 2 Vp= 110.88 PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

R-N 1 1

Y-N 1 1

B-N 1 1

PARAMETER Volts per Hertz Function Enable Signal Source SRC 2 (SRC 2) Pickup 0.8pu Curve Inverse Curve C TD Multiplier 1

Page 430

Page 431: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 35 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

4.6.18. Loss of Excitation

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Loss of Excitation

Results Stage-1

3-Phase Injection Applied Voltage(V) Pick up Current @ -90 0

Z (Ohms)

2 Stage-2

3-Phase Injection Applied Voltage(V) Pick up Current @ -90 0

Z (Ohms)

2 4.6.19. Accidental Energization

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Accidental Energization

Results Phase Injected

Voltage(V) Pickup Current(A)

Dropout Current(A)

Operating time(ms)

R 20 Y 20 B 20

PARAMETER Loss of Exc Function Enable Signal Source SRC 2(SRC 2) C1(STAGE 1) 10 Ω R1(STAGE1) 8 Ω C2(STAGE 2) 12 Ω R2(STAGE2) 10 Ω

PARAMETER Acc Enr Function Enable Signal Source SRC 2(SRC 2) Alarming Mode UV OR offline OC Pick up 0.3 Pu UV Pick up 0.5 Pu

Page 431

Page 432: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 36 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

4.6.20. Sensitive directional Power

Setting Setting / Grouped Elements / Group 1/ sensitive Directional Power PARAMETER SENS DIR POWER 1 Function Enable Signal Source SRC 2 (SRC 2) SENS DIR POWER RCA 0O – 90 – 180 - 270 SENS DIR POWER CALIBRATI 0.00O STAGE 1 SMIN 0.100 pu STAGE 1 DELAY 3.0 s STAGE 2 SMIN 0.100 pu STAGE 2 DELAY 5.00s

Stage 1 (S MIN > 0) 3-Phase Injected Values Measured Values

RCA Angle Volts V Current

A P (w) Q (var) S (va) Operating Angle

Time sec

0 66.4 0.11 343.3-15.7

90 66.4 0.11 252.7-87.2

180 66.4 0.11 163.3-195.8

270 66.4 0.11 74.4 – 104.9

Stage 2 (S MIN > 0) 3-Phase Injected Values Measured Values

Angle Volts V Current A P (w) Q (var) S (va) Operating

Angle Time sec

0 66.4 0.11 343.4 – 15.9

90 66.4 0.11 252.4 -286.8

180 66.4 0.11 163.5 – 195.8

270 66.4 0.11 74.4 – 104.9

Page 432

Page 433: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 37 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

4.7. Testing of Controlled Element 4.7.1. Under Frequency

Setting (Pickup, Dropout and Time) Setting / Control elements / under frequency PARAMETER Under Frequency 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 59 Hz Pickup Delay 0.00 s Minimum Voltage/Amp 0.10 pu

Test Results Setting F Pick Up F Drop Off

59 Hz Timing Test:

F Setting F Applied Measured Time

59 Hz 55 Hz

4.7.2. Over Frequency Setting (Pickup, Dropout and Time) Setting / Control elements /Over frequency PARAMETER Over Frequency 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 61 Hz Pickup Delay 0.00 s

Test Results

Setting F Pick Up F Drop Off

61 Hz

Timing Test: F Setting F Applied Measured Time

61 Hz 63 Hz s

Page 433

Page 434: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 38 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

4.7.3. Final Setting test: 4.7.3.1. Final Setting

4.7.3.1.1. PRODUCT SET UP FUNCTION SETTINGS UNIT REMARKS DISPLAY PROPERTIES DEFAULT CLEAR RELAY RECORDS DEFAULT COMMUNICATIONS CUSTOMER MODBUS CUSTOMER

4.7.3.1.2. REAL TIME CLOCK IRIG-B Signal Type NONE USER-PROGRAMMABLE FAULT REPORT

DEFAULT

4.7.3.1.3. OSCILLOGRAPHY Number of Records 3 Trigger Mode Automatic overwrite Trigger Position 25% Trigger Source TRIG OSC ON (VO6) AC Input Waveforms 64 samples/cycle Digital Channel 1 52G ON (H7a) Digital Channel 2 86G1 0n(VO1) Digital Channel 3 STATOR DIFF OPA Digital Channel 4 STATOR DIFF OPB Digital Channel 5 STATOR DIFF OPC Digital Channel 6 3RD HARM NRTL UV PKP Digital Channel 7 3RD HARM NRTL UV OP Digital Channel 8 59GN(DE1)PKP Digital Channel 9 59GN(DE1)OP Digital Channel 10 82G2 On (V02) Digital Channel 12 LOSS EXCIT STG1 PKP Digital Channel 13 LOSS EXCIT STG1 OP Digital Channel 14 LOSS EXCIT STG2 PKP Digital Channel 15 LOSS EXCIT STG2 OP Digital Channel 16 VOLTS PER HERTZ 1 PKP Digital Channel 17 VOLTS PER HERTZ 1 OP Digital Channel 18 VOLTS PER HERTZ 2 PKP Digital Channel 19 VOLTS PER HERTZ 2 OP Digital Channel 20 GEN UNBAL STG1 PKP Digital Channel 21 GEN UNBAL STG1 OP Digital Channel 22 BRKR TRP On (VO3) Digital Channel 23 PH DIST Z1 PKP Digital Channel 24 PH DIST Z2 PKP Digital Channel 25 PH DIST Z3 PKP

Page 434

Page 435: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 39 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

Digital Channel 26 PH DIST Z1 OP AB Digital Channel 27 PH DIST Z2 OP AB Digital Channel 28 PH DIST Z3 OP AB Digital Channel 29 PH DIST Z1 OP BC Digital Channel 30 PH DIST Z2 OP BC Digital Channel 31 PH DIST Z3 OP BC Digital Channel 32 PH DIST Z1 OP CA Digital Channel 33 PH DIST Z2 OP CA Digital Channel 34 PH DIST Z3 OP CA Digital Channel 35 DIR POWER 1 STG1 PKP Digital Channel 36 DIR POWER 1 STG1 OP Digital Channel 37 DIR POWER 1 STG1 PKP Digital Channel 38 DIR POWER 1 STG1 OP Digital Channel 39 ACCDNT ENRG ARMED Digital Channel 40 ACCDNT ENRG OP Digital Channel 41 PHASE TOC1 PKP Digital Channel 42 PHASE TOC1 OP Digital Channel 43 POWER SWING TRIP Digital Channel 44 UNDERFREQ 1 OP Digital Channel 44 ANY TRIP On (VO4) Digital Channel 46 24A (FE1) OP Digital Channel 47 GEN UNBAL STG2 PKP Digital Channel 48 GEN UNBAL STG2 OP Digital Channel 49 OVERFRQ 1 OP Digital Channel 50 VT2 VTFF (DE2)OP Digital Channel 51 PHASE UV1 OP A Digital Channel 52 PHASE UV1 OP B Digital Channel 53 PHASE UV1 OP C Digital Channel 54 PHASE OV1 OP A Digital Channel 56 PHASE OV1 OP B Digital Channel 57 TRIG OSC On (VO6) Digital Channel 58 EXT TRIG On (U7a) Digital Channel 59 TRIG G60 On (U5) Digital Channel 60 TRIG T60 On (U6) Analog Channel 1 Stator Diff lad Analog Channel 2 Stator Diff lar Analog Channel 3 Stator Diff lbd Analog Channel 4 Stator Rest lbr Analog Channel 5 Stator Diff lcd Analog Channel 6 Stator Rest lcr Analog Channel 7 Stator Gnd Vn 3rd Analog Channel 8 Stator Gnd Vn+VO 3rd Analog Channel 9 Sns Dir Power 1

Page 435

Page 436: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 40 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

Analog Channel 11 SRCI la Mag Analog Channel 12 SRC2 P Analog Channel 13 SCR1 lb Mag Analog Channel 14 SCR2 Q Analog Channel 15 SRC1 lc Mag Analog Channel 16 Scr2 Freq

4.7.3.1.4. DATA LOGGER Rate 5 min Channel 1 Stator Gnd Vn 3rd Channel 2 Stator Gnd Vn+VO 3rd Channel 3 SRC2 P Channel 4 SRC2 Q Channel 5 SRC2 PF

4.7.3.1.5. USER- PROGRAMMBLE LEDS TRIP AND ALARMS LED Trip LED Input ANY TRIP On (VO4) Alarm LED Input ANY SELF TESTS

4.7.3.1.6. USER PROGRAMMBLE LEDS LED 1:OPERAND 3RD HARM NTRL UV OP LED 1: TYPE Latched LED 2:OPERAND 59GN (DE1) OP LED 2: TYPE Latched LED 3:OPERAND STATOR DIFF OP A LED 3: TYPE Latched LED 4: OPERAND STATOR DIFF OP B LED 4: TYPE Latched LED 5:OPERAND STATOR DIFF OP C LED 5: TYPE Latched LED 8:OPERAND VOLTS PER HERTZ 1 OP LED 8: TYPE Latched LED 9: OPERAND VOLTS PER HERTZ 1 OP LED 9: TYPE Latched LED 10:OPERAND LOSS EXCIT STG1 OP LED 10: TYPE Latched LED 11:OPERAND LOSS EXCIT STG2 OP LED 11: TYPE Latched LED 12: OPERAND LOSS EXCIT STG1 PKP LED 12: TYPE Latched LED 13:OPERAND LOSS EXCIT STG2 PKP LED 13:TYPE Latched LED 14:OPERAND GEN UNBAL STG1 OP LED 14 : TYPE Latched LED 15 : OPERAND GEN UNBAL STG1 PKP

Page 436

Page 437: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 41 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

LED 15 : TYPE Latched LED 16: OPERAND PH DIST Z1 OP LED 16: TYPE Latched LED 17: OPERAND PH DIST Z2 OP LED 17: TYPE Latched LED 18: OPERAND PH DIST Z3 OP LED 18: TYPE Latched LED 19:OPERAND DIR POWER STG1 OP LED 19: TYPE Latched LED 20: OPERAND DIR POWER STG2 OP LED 20: TYPE Latched LED 21: OPERAND ACCDNT ENRG OP LED 21: TYPE Latched LED 22: OPERAND ACCDNT ENRG ARMED LED 22: TYPE Latched LED 23:OPERAND PHASE TOC1 OP LED 23: TYPE Latched LED 24: OPERAND POWER SWING TRIP LED 24: TYPE Latched LED 25: OPERAND UNDERFREQ 1 OP LED 25:TYPE Latched LED 26: OPERAND 24A (FE1) OP LED 26: TYPE Self- Reset LED 27: OPERAND GEN UNBAL STG2 OP LED 27: TYPE Self-Reset LED 28: OPERAND GEN UNBAL STG2 PKP LED 28: TYPE Self-Reset LED 29: OPERAND OVERFREQ 1 OP LED 29: TYPE Self-Reset LED 30:OPERAND VT2 VTFF (DE2) OP LED 30: TYPE Self-Reset LED 31: OPERAND PHASE UV1 OP LED 31: TYPE Self-Reset LED 32:OPERAND PHASE OV1 OP LED 32: TYPE Self-Reset

4.7.3.1.7. USER PROGRAMMBLE SELF TESTS

Remote Device Off Function Disable Pre-ethernet fail Function Disable Battery Fail Function Enabled SNTP Fail Function Disable IRIG B Fail Function Disable

Page 437

Page 438: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 42 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

4.7.3.1.8. INSTALLATION Relay Settings Not Programmable Relay Name G60

4.7.3.1.9. SYSTEM SETUP: AC INPUTS:CURRENT CT F1:Phase CT Primary 6000A CT F:Phase CT Secondary 1A CT F1:Ground CT Primary 1A CT F1:Ground CT Secondary 1A CT M1: Phase CT Primary 6000 A CT M1: Phase CT Secondary 1A CT M!:Ground CT Primary 1A CT M1:Ground Secondary 1A

4.7.3.1.10. VOLTAGE VT F5:Phase VT Connection Wye VT F5: Phase VT Secondary 66.4 V VT F5: Phase VT Ratio 120.1 VT F5:Auxiliary VT Connection Vn VT F5:Auxiliary VT Secondary 240. V VT F5: Auxiliary VT Ratio 50.1

4.7.3.1.11. POWER SYSTEM Nominal Frequency 60 Hz Phase Rotation ABC Frequency And Phase Reference LINE (SRC 2) Frequency Tracking Function Enabled

4.7.3.1.12. SIGNAL SOURCES SOURCE 1: Name NEUTRAL SOURCE 1: Phase CT F1 SOURCE 1: Ground CT None SOURCE 1:Phase VT None SOURCE 1Auxiliary VT None SOURCE 2:Name LINE SOURCE 2:Phase CT M1 SOURCE 2:Ground CT None SOURCE 2: Phase VT F5 SOURCE 2:Auxiliary F5

4.7.3.1.13. FLEXLOGIC: FLEXLOGIC EQUATION EDITOR FlexLogic Entry 1 3RD HARM NTRL UV OP FlexLogic Entry 2 59GN (DE1) OP FlexLogic Entry 3 STATOR DIFF OP FlexLogic Entry 4 OR(3) FlexLogic Entry 5 +86G1 (VO1) FlexLogic Entry 6 VOLTS PER HERTZ 1 OP

Page 438

Page 439: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 43 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

FlexLogic Entry 7 VOLTS PER HERTZ 2 OP FlexLogic Entry 8 LOSS EXCIT STG1 OP FlexLogic Entry 9 LOSS STG2 OP FlexLogic Entry 10 GEN UNBAL STG1 OP FlexLogic Entry 11 OR (5) FlexLogic Entry 12 =86G2 (VO2) FlexLogic Entry 13 PH DIST Z1 OP FlexLogic Entry 14 DIR POWER 1 STG1 OP FlexLogic Entry 15 DIR POWER 1 STG2 OP FlexLogic Entry 16 PHASE TOC1 OP FlexLogic Entry 17 POWER SWING TRIP FlexLogic Entry 18 UNDERFREQ 1 OP FlexLogic Entry 19 ACCDNT ENRG OP FlexLogic Entry 20 OR (7) FlexLogic Entry 21 =BRKR TRP (VO3) FlexLogic Entry 22 86G1 On (VO1) FlexLogic Entry 23 86G2 On (VO2) FlexLogic Entry 24 BRKR TRP On (VO3) FlexLogic Entry 25 OR(3) FlexLogic Entry 26 =ANY TRP (VO4) FlexLogic Entry 27 VT2 VTFF (DE2) OP FlexLogic Entry 28 52G On (H7a) FlexLogic Entry 29 OR(2) FlexLogic Entry 30 =TRIG OSC(VO6) FlexLogic Entry 31 END

4.7.3.1.14. FLEXLOGIC TIMERS TIMER 1 :Type Millisend TIMER 1: Pickup Delay 1 TIMER 1: Dropout Delay 0

4.7.3.1.15. FLEXELEMENTS Function Enabled Name 24A Input Plus Volts Per Hertz 1 InputMinus OFF Input Mode ABSOLUTE Compare Mode LEVEL Direction type OVER Pick up 1.060 pu Hysteresis 3.00% Delat T Units Milliseconds Delta T 20 Pick up Delay 10.000s

Page 439

Page 440: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 44 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

Reset Delay 60.000s Block OFF Target Self-Reset Events Enabled

GROUPED ELEMENTS: GROUP 1: 4.7.3.1.15.1. DISTANCE [GROUP 1

Source SRC 2 Memory Duration 10 cycles

PHASE DISTANCE [GROUP 1] PHASE DISTANCE Z1:Function

Enabled

PHASE DISTANCE Z1:Direction

CUSTOMER

PHASE DISTANCE Z1:Shape CUSTOMER PHASE DISTANCE Z1:Xfmr Vol

CUSTOMER

Connection PHASE DISTANCE Z1:Xfmr Curr

CUSTOMER

Connection PHASE DISTANCE Z1:Reach CUSTOMER PHASE DISTANCE Z1:RCA CUSTOMER PHASE DISTANCE Z1:Comp Limit

CUSTOMER

PHASE DISTANCE Z1:DIR RCA

CUSTOMER

PHASE DISTANCE Z1:DIR Comp Limit

CUSTOMER

PHASE DISTANCE Z1:QUAD Right Blinder

CUSTOMER

PHASE DISTANCE Z1:QUAD Right Blinder RCA

CUSTOMER

PHASE DISTANCE Z:1QUAD Left Blinder

CUSTOMER

PHASE DISTANCE Z1:quad Left Blinder RCA

CUSTOMER

PHASE DISTANCE Z1:Supervision

CUSTOMER

PHASE DISTANCE Z1:Volt Level

CUSTOMER

PHASE DISTANCE Z1:Delay CUSTOMER PHASE DISTANCE Z1:Block BLK On (VO5)

Page 440

Page 441: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 45 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

PHASE DISTANCE Z1:Target Latched PHASE DISTANCE Z1:Events Enabled

4.7.3.1.15.2. POWER SWING DETECT [GROUP 1] Function Enabled Source CUSTOMER Mode CUSTOMER Supv CUSTOMER Fwd Reach CUSTOMER Fwd Rca CUSTOMER Rev Reach CUSTOMER Rev Rca CUSTOMER Outer Limit Angle CUSTOMER Middle Limit Angle CUSTOMER Inner Limet Angle CUSTOMER Delay 1 Pick up CUSTOMER Delay 1 Reset CUSTOMER Delay 2 Pick up CUSTOMER Delay 3 Pick up CUSTOMER Delay 4 Pick up CUSTOMER Seal-In Delay CUSTOMER Trip mode CUSTOMER Block BLK ON (VO5) Targets Latched Events Enabled

4.7.3.1.15.3. STATOR DIFFERENTAL [GROUP 1] Function Enabled Line End Source SCR 2 Neutral End Source SCR 1 Pick up 0.090 pu Slope 1 12% Break 1 1.50 pu Slope 2 50% Break 2 3.11 pu Block OFF Targets Latched Evens Enabled

Page 441

Page 442: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 46 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

4.7.3.1.15.4. PHASE CURRENT .PHASE TOC[GROUP 1] PHASE TOC 1:Funtion Enabled PHASE TOC 1:Signal Source SRC 2 PHASE TOC 1:Input CUSTOMER PHASE TOC 1:Pick up CUSTOMER PHASE TOC 1:Curve CUSTOMER PHASE TOC 1:TD Multiplier CUSTOMER PHASE TOC 1:Reset CUSTOMER PHASE TOC 1:Voltage Restraint

ENABLED

PHASE TOC 1:Block A CUSTOMER PHASE TOC 1:Block B CUSTOMER PHASE TOC 1:Block C CUSTOMER PHASE TOC 1:Targets Latched PHASE TOC 1:Events Enabled

4.7.3.1.15.5. GENERATOR UNBALANCE [GROUP 1] Function Enabled Source SRC 2 Inom 0.725 pu Stage Pick up 8% Stage 1 K-Value 10 Stage 1 Tmin 0.0000 s Stage 1 Tmax 1000.0 s Stage 1 K-Reset 600.0 s Stage Pick up 5.60% Stage Pick Delay 2.0 s Block OFF Targets Latched Events Enabled

4.7.3.1.15.6. VOLTAGE ELEMENTS:PHASE UV [GROUP 1] PHASE UV1:Function Enabled PHASE UV1:Signal Source SRC 2 PHASE UV1:Mode Phase to Phase PHASE UV1:Pick up 0.900 pu PHASE UV1:Curve Definite Time PHASE UV1:Delay 1.00 s PHASE UV1Minimum Voltage 0.100 pu PHASE UV1:Block BLK On (VO5) PHASE UV1:Targets Latched PHASE UV1:Events Enabled

4.7.3.1.15.7. PHASE OV [GROUP 1] AUXILIARY OV 1:Function Enabled AUXILIARY OV 1:Source SRC 2

Page 442

Page 443: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 47 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

AUXILIARY OV 1:Pick up 0.021 pu AUXILIARY OV 1:Pick up Delay

5.00 s

AUXILIARY OV 1:Reset Delay 0.00 s AUXILIARY OV 1:Block OFF AUXILIARY OV 1:Targets Self Reset AUXILIARY OV 1:Events Disabled

4.7.3.1.15.8. VOLTS PER HERTS [GROUP 1] VOLTS PER HERTZ 1:Function

Enabled

VOLTS PER HERTZ 1:Source SRC 2 VOLTS PER HERTZ 1:Pick up 1.11 pu VOLTS PER HERTZ 1:Curves Inverse A VOLTS PER HERTZ 1:TD Multiplier

6

VOLTS PER HERTZ 1:T Reset 600 VOLTS PER HERTZ 1:Block OFF VOLTS PER HERTZ 1:Targets Latched VOLTS PER HERTZ 1:Events Enabled VOLTS PER HERTZ 2:Function

Enabled

VOLTS PER HERTZ 2:Source SRC 2 VOLTS PER HERTZ 2:Pick up 1.18 pu VOLTS PER HERTZ 2:Curves Definite time VOLTS PER HERTZ 2:TD Multiplier

2

VOLTS PER HERTZ 2:T Reset 600 VOLTS PER HERTZ 1:Block OFF VOLTS PER HERTZ 1:Targets Latched VOLTS PER HERTZ 1:Events Enabled

4.7.3.1.15.9. LOSS OF EXCITATION [GROUP 1] Function Enabled Source SRC 2 Center 1 56.77 Ohm Radius 1 45.78 Ohm UV Supervision Enable 1 Disabled Pick up Delay 1 0.060 s Center 2 106.21 Ohm Radius 2 95.22 Ohm UV Supervision Enable 2 Disabled Pick up Delay 2 0.500 s UV Supervision 0.000 pu Block VT2VTFF (DE2) OP

Page 443

Page 444: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 48 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

Targets Latched Events Enabled

4.7.3.1.15.10. SENSITIVE DIRECTIONAL POWER:SENSITIVE DIRECTIONAL POWER [GROUP 1]

SENS DIR POWER 1:Function Enabled SENS DIR POWER 1:Signal Source

SRC 2

SENS DIR POWER 1:Sensitive 180 Directional Power RCA SENS DIR POWER 1:Sensitive 0.00 Directional Power Calibration SENS DIR POWER 1:Stage 1 SMIN

0.04 PU

SENS DIR POWER 1:Stage 1 Delay

10.00 s

SENS DIR POWER 1:Stage 2 SMIN

0.04 pu

SENS DIR POWER 1:Stage 2 Delay

10.00 s

SENS DIR POWER 1:Block 52g On (H7a) SENS DIR POWER 1:Target Latched SENS DIR POWER 1:Events Enabled

4.7.3.1.15.11. 3RD HARMONIC NTRL UV [GROUP 1] Stator Ground Source SRC 1 Function Disabled(See Note 1) Pick up FIELD DATE REQ’D Delay FIELD DATE REQ’D Max power FIELD DATE REQ’D Min Power FIELD DATE REQ’D Volt Supervision FIELD DATE REQ’D Block 52G On(H7a) Target Latched Events Enabled

4.7.3.1.15.12. UNDERFREQUENCY UNDERFREQUENCY 1:Function

Enabled

UNDERFREQUENCY 1:Block 52G On(hH7a) UNDERFREQUENCY 1:Source

SRC 2

UNDERFREQUENCY 1:Min Volt/Amp

0.10 pu

UNDERFREQUENCY 1:Pick 57 Hz

Page 444

Page 445: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 49 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

up UNDERFREQUENCY 1:Pick up

0.100 s

UNDERFREQUENCY 1:Reset Delay

0.0000 s

UNDERFREQUENCY 1:Target Latched UNDERFREQUENCY 1:Events

Enabled

4.7.3.1.15.13. OVERFREQUENCY OVERFREQUENCY 1:Function

Enabled

OVERFREQUENCY 1:Block 52G On (H7a) OVERFREQUENCY 1:Source SRC 2 OVERFREQUENCY 1:Pick up CUSTOMER OVERFREQUENCY 1:Pick up Delay

CUSTOMER

OVERFREQUENCY 1:Reset Delay

CUSTOMER

OVERFREQUENCY 1:Target Latched OVERFREQUENCY 1:Events Enabled

4.7.3.1.15.14. MONITORING ELEMENTS:VT FUSE FAILURE Function Enabled

4.7.3.1.15.15. INPUTS/OUTPUTS: CONTACTS INPUTS H7A:ID 52G H7A:Debounce Time 2.0 ms H7A: Events Enabled H7C: ID Cont lp 2 H7C:Debounce Time 2.0 ms H7C: Events Disabled H8A : ID Cont lp 3 H8A:Debounce Time 2.0 ms H8A:Events Disabled H8C:ID Cont lp 4 H8C:Debounce Time H8C:Events

2.0 ms Disabled

P7A:ID Contl lp 5 P7A:Debounce 2.0 ms P7A:Events Disabled P7C:ID Cont lp 6 P7C:Debounce Time 2.0 ms P7C:Events Disabled P8A:ID Cont lp 7 P8A:Debounce Time 2.0 ms

Page 445

Page 446: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 50 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

P8A:Evens Disabled P8C:ID Cont lp 8 P8C:Debounce Time 2.0 ms P8C:Events Disabled U7A:ID EXT TRIG U7A:Debounce Time 2.0 ms U7A:Events Enabled U7C:ID Cont lp 10 U7C:Debounce Time 2.0 ms U7C:Events Disabled U8A:ID Cont lp 11 U8A:Debounce Time 2.0 ms U8A:Events Disabled U8C:CID Cont lp 12 U8C:Debounce Time 2.0 ms

4.7.3.1.15.16. CONTACT INPUT THRESHOLDS 52G:Cont lp 2:Cont lp 3:Cont lp 4(H7a:H7c:H8a:H8c)

84 Vdc

Cont lp 5:Cont lp 6:Cont lp 7:cCont lp 8(P7a:P7c:P8a:P8c)

54 Vdc

EXT TRIG: Contl lp 11.Cont lp 12(U7a U7c U8a:U8c)

84 Vdc

4.7.3.1.15.17. CONTACT OUTPUTS H1:ID UNIT TRIP H1:Operate 86G1 On(VO1) H1:Seal in OFF H1:Events Enabled H2:ID GEN TRIP H2: Operate 86G2 On (VO2) H2:Seal in OFF H2:Events Enabled H3:ID BRKR TRP TC1 H3:Operate BRKR TRP On(VO3) H3:Seal in OFF H3:Events Enabled H4:ID BRKR TRP TC2 H4:Operate BRKR TRP On(VO3) H4:Seal in OFF H4:Events Enabled P1:ID G60 trip P1:Operate Any trip On (VO4) P1:Seal in OFF P1:Events Enabled

Page 446

Page 447: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 51 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

P2:ID 24A P2:Operate 24A (FE1)OP P2:Seal in OFF P2:Events Enabled P3:ID 46A P3:Operate GEN UNBAL STG2 OP P3:Seal in OFF P3:Events Enabled P4:ID 810 P4:Operate OVERFREQ 1OP P4:Seal in OFF P4:Events Enabled P5:ID VT2 VTFF P5:Operate VT2 VTFF(DE1) OP P5:Seal in OFF P5;Events Enabled U1:ID 27A U1:Operate PHASE UV1 OP U1:Seal in OFF U1:events Enabled U2:ID 59A U2:Operate PHASE OV1 OP U2:Seal in OFF U2:Events Enabled U3:ID IBF U3:Operate BRKR TRP On (Vo3) U3:Seal in OFF U3:Events Enabled U5:ID TRIG OSC G60/B U5:Oprate ANY TRIP On (VO4) U5:Seal in OFF U5:Events Enabled U6:ID TRIG OSC T60 U6:Operate ANY TRIP On (VO4) U6:Seal in OFF U6:Events Enabled

4.7.3.1.15.18. VIRTUAL OUTPUTS VIRTUAL OUTPUT 1:ID 86G1 VIRTUAL OUTPUT 1:Events Enabled VIRTUAL OUTPUT 2:ID 86G2 VIRTUAL OUTPUT 2:Events Enabled VIRTUAL OUTPUT 3:ID BRKR TRP VIRTUAL OUTPUT 3:Events Enabled

Page 447

Page 448: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 52 of 52

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Generator Differential Relay –

G60(MAKE: GE) Date:13/02/09, Revision: 0

VIRTUAL OUTPUT 4:ID ANY TRIP VIRTUAL OUTPUT 4:Events Enabled VIRTUAL OUTPUT 5:ID BLK VIRTUAL OUTPUT 5:Events Enabled VIRTUAL OUTPUT 6:ID TRIG OSC VIRTUAL OUTPUT 6:Events Enabled

4.7.3.1.15.19. REMOTE DEVICES Remote Device 1 ID Remote Device 1

4.7.3.2. Current sensitivity test:

. 4.7.3.3. Voltage sensitivity test: 4.7.3.4. Timing Test:

4.7.4. Fault Record:

Fault record verification done.

4.7.5. Waveform Record: Waveform record verification

4.8. Relay Setting: Final relay setting retrieved through ‘UR ’ software and printout attached.

Test Equipment Model Cal due date Test Equipment Model Cal due date

Page 448

Page 449: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 1 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

1.0 Relay General Data Function Serial No. Make Model No. Diagram no. Aux. Voltage Frequency Firmware no. Rated voltage Rated current: No of logic Inputs: No of outputs:

2.0 Visual Inspection

Item Description Checked 1 S/L. No. on Module, Cover and Case are identical

2 Inspect for any physical damage or defects.

3 Verify connections as per approved drawings. 4 Check that serial no. of relay matching with serial no. of display.

5 Relay case connected to local earth bar

6 Tightness of contact of the relay and CT shorting terminal makes good contact when relay is withdrawn

7 Connection on Relay terminals are good

8 Ferrules are according to the drawings

9 Test and settings switches operate properly

10 CT shorting function checked.

3.0 Electrical Functional Test.

• Test switch / Test Block CT shorting contacts proved

• Relay CT shorting contacts proved

4.0 Secondary Injection test.

4.1. Relay Power Measurment at Rated Voltage(Burden Test) Current (mA) Burden (W) Nominal Burden (W)

Terminal Voltage (V) Quiescent Output

Operated Quiescent Output Operated Quiescent Max

B5b-B6a < W < W

Page 449

Page 450: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 2 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

4.2. Testing Of LED’s

First Column( Status) Second Column (Setting in use) LED No. Assigned Function Results LED No. Assigned Function Results LED-1 IN SERVICE LED-1 Group-1 LED-2 TROUBLE LED-2 Group-2 LED-3 TEST MODE LED-3 Group-3 LED-4 TRIP LED-4 Group-4 LED-5 ALARM LED-5 Group-5 LED-6 PICKUP LED-6 Group-6 LED-7 VOLTAGE LED-7 Group-7 LED-8 CURRENT LED-8 Group-8 LED-9 FREQUENCY LED-9 Spare LED-10 OTHER LED-10 Spare LED-11 PHASE A LED-11 Spare LED-12 PHASE B LED-12 Spare LED-13 PHASE C LED-14 NUETRAL GROOUND

Third Column(Breaker Function) Fourth Column(Synchronous function)

LED No. Assigned Function Results LED No. Assigned Function Results LED-1 BREAKER-1 CLOSE LED-1 NO-1 SYSNCH LED-2 BREAKER-1 TRBLE LED-2 NO-2 SYSNCH LED-3 BREAKER-1 OPEN LED-3 LED-4 LED-4 LED-5 LED-5 RCL ENABLE LED-6 BREAKER-1 CLOSE LED-6 RCL DISABLE LED-7 BREAKER-1 TRBLE LED-7 RCL IN PROGRESS LED-8 BREAKER-1 OPEN LED-8 RCL LOACKOUT LED-9 LED-9 LED-10 LED-10 LED-11 LED-11 LED-12 LED-12

Page 450

Page 451: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 3 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

4.3. Testing Of Out Put Relays

Output Relay No.

Output Contact No.

Output relay

status

Contact Operation

check

Actual Assignment

of Relays

Contact Resistan

ce(Ω)

Remarks

Critical

B1b-B1a (N.O) / B2b-B1a(NC)

H1 H1c-H1b(NO) H2 H2c-H2b(NO) H3 H3c-H3b(NO) H4 H4c-H4b(NO) H5 H5c-H5b(NO) H6 H6c-H6b(NO)

P1 P1c-P1b(NO) P2 P2c-P2b(NO) P3 P3c-P3b(NO) P4 P4c-P4b(NO) P5 P5c-P5b(NO) P6 P6c-P6b(NO)

4.4. Testing Of Binary Inputs

(Energize only one OPTO INPUT at a time with relay rated OPTO input voltage – CAUTION!! -Check RATED OPTO INPUT VOLTAGE before apply voltage to OPTO Input terminal)

V DC Applied OPTO Input No. Terminal No. Minimum Pickup

Voltage(V)

Status of OPTO INPUT

Function assigned for OPTO INPUT

Remarks

U1 U1a(+)-U1b(-) U1 U1c(+)-U1b(-) U2 U2a(+)-U1b(-) U2 U2c(+)-U1b(-) U3 U3a(+)-U3b(-) U3 U3a(+)-U1b(-) U4 U4a(+)-U3b(-) U4 U4c(+)-U3b(-) U5 U5a(+)-U5b(-) U5 U5c(+)-U5b(-)

Page 451

Page 452: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 4 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

V DC Applied OPTO

Input No. Terminal No. Minimum Pickup Voltage(V)

Status of OPTO INPUT

Function assigned for OPTO INPUT

Remarks

U6 U6a(+)-U5b(-) U6 U6a(+)-U5b(-) U7 U7a(+)-U7b(-) U7 U7c(+)-U7b(-) U8 U8a(+)-U7b(-) U8 U8c(+)-U7b(-) H7 H7a(+)-H7b(-) H7 H7c(+)-H7b(-) H8 H8a(+)-H7b(-) H8 H8c(+)-H7b(-)

4.5. Metering Function(Meter Accuracy Test)

4.5.1. Phase Current Accuracy Test Relay Setting CT F1 (SRC 3) Neutral side Phase CT primary: 6000A Phase CT secondary: 1A Test Result

Injected Current Expected Current Measured Current (A)

(A) (A) Phase A Phase B Phase C

0.2 1200 0.25 1500

0.3 1800

0.5 3000

0.75 4500

1 6000

Page 452

Page 453: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 5 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

4.5.2. Phase Current Accuracy Test

Relay Setting CT M1 (SRC 2) w Phase CT primary: 6000A Phase CT secondary: 1A Test Result

Injected Current Expected Current Measured Current (A)

(A) (A) Phase A Phase B Phase C

0.2 1200 0.25 1500

0.3 1800

0.5 3000

0.75 4500

1 6000

4.5.3. Phase Current Accuracy Test

Relay Setting CT M5 (SRC 1) Phase CT primary: 600A Phase CT secondary: 1A Test Result

Injected Current Expected Current Measured Current (A)

(A) (A) Phase A Phase B Phase C

0.2 120 0.25 150

0.3 180

0.5 300

0.75 450

1 600

Page 453

Page 454: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 6 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

4.5.4. Ground Current Accuracy Test Relay Setting CT M5 (SRC 1) Phase CT primary: 600A Phase CT secondary: 1A Test Result

Injected Current Expected Current Measured Current

(A) (A) (A)

0.2 120 0.25 150

0.3 180

0.5 300

0.75 450

1 600

4.5.5. Phase Voltage Accuracy Test

Relay Setting VT F5 (SRC 1) Phase VT Connection Star Phase VT Secondary 69.3 V Phase VT Ratio 120: 1 Test Results

Test Values Applied Voltage Expected Voltage Measured Voltage (kV)

(V) (V) (KV) Vab Vbc Vca

66.4 – 15% 56.4 11.723

66.4 – 10% 59.76 12.421

66.4 66.4 13.8

66.4 + 10% 73 15.17

66.4 + 15% 76.4 15.88

Page 454

Page 455: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 7 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

4.6. Testing of Grouped Element

4.6.1. Transformer Differential Setting / Grouped Elements / Group 1 / Transformer/percent differential TRANSFORMER DATA: 110 MVA, 380/13.8 kV, CT (HV) = 600:1, CT (LV) = 6000:1, Yn/d1d1 OPERATING CRITERIA: The differential element operates if the differential current (Id) exceeds the characteristic defined by the relay settings for restraint current magnitude (Ir) The differential current Id is the vector sum of the compensated currents, and Ir is the largest compensated current. Compensation refers to vector and magnitude corrections applied to the currents from the HV and LV transformer sides. The tests verify the operation and no-operation response for points from all regions of the percentage differential characteristic. These tests are:

• Test for zero differential current • Minimum Pickup • Slope 1 • The region between Slope 1 and Slope 2 • Slope 2 RELAY CONFIGURATION: NOTE: WARNING: APPLICATION OF EXCESSIVE CURRENT (> 3 x In) FOR EXTENTED PERIODS WILL CAUSE DAMAGE TO THE RELAY!

SOURCE SETTING SOURCE 1 SOURCE 2 SOURCE3

Name SRC1 SRC2 SRC3

Phase CT M5 M1 F1

Ground CT M5 X X

Phase VT F5 X X

AC INPUTS SETTING CT M5

CT M1 CT F1

Phase CT Primary 600 6000 6000

Phase CT Secondary 1 1 1

Ground CT Primary 600 X X

Ground CT Secondary 1 X X

Page 455

Page 456: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 8 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

WINDING I SETTINGS VALUE WINDING 2 SETTINGSVALUE WINDING 3 SETTINGS VALUE

Source SRC 1 Source SRC2 Source SRC3

Rated MVA 110MVA Rated MVA 110MVA Rated MVA 110MVA

Nom Ph-Ph Voltage 380 kV Nom Ph-Ph Voltage 13.8 kV Nom Ph-Ph Voltage 13.8 kV

Connection Wye Connection Delta Connection Delta

Grounding within zone Grounding Not Within zone Grounding Not Within zone

Angle WRT -30° Angle WRT 0° Angle WRT 0°

Resistance 3Ph 10.000 ohms Resistance 3Ph 10.000 ohms Resistance 3Ph 10.000 ohms

Test setting

PERCENT DIFF VALUE

Minimum PKP 0.2 pu

Slope 1 25%

Breakpoint 1 2 pu

Breakpoint 2 6 pu

Slope 2 80%

DIFFERENTIAL CHARACTERISTIC TEST BETWEEN W1, W2 AND W1, W3

4.6.1.1. Test For Zero Differential Current (Balanced Condition ) Injected Current (A) Displayed Current (A) Phase I(w1) I(w2) Id Ir

A 0.126 <180° 0.2 <0° B 0 <0° 0 <0° C 0 <0° 0.2 <180°

Page 456

Page 457: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 9 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

Injected Current (A) Displayed Current (A) Phase I(w1) I(w2) Id Ir A 0.943 <180° 1.5 <0° B 0 <0° 0 <0° C 0 <0° 1.5 <180°

Injected Current (A) Displayed Current (A) Phase I(w1) I(w2) Id Ir

A 4.402 <180° 7 <0° B 0 <0° 0 <0° C 0 <0° 7 <180°

Injected Current (A) Displayed Current (A) Phase I(w1) I(w3) Id Ir

A 0 <0° 0.2 <60° B 0.126 <60° 0.2 <240° C 0 <0° 0 <0°

Injected Current (A) Displayed Current (A) Phase I(w1) I(w3) Id Ir

A 0 <0° 1.5 <60° B 0.943 <60° 1.5 <240° C 0 <0° 0 <0°

Injected Current (A) Displayed Current (A) Phase I(w1) I(w3) Id Ir

A 0 <0° 7 <60° B 4.402 <60° 7 <240° C 0 <0° 0 <0°

4.6.1.2. Minimum Pickup Test Stable

Injected Current (A) Displayed Current (A) Phase I(w1) I(w2) Id Ir A 0.252<180° 0.2 <0° B 0 <0° 0 <0° C 0 <0° 0.2 <180°

Page 457

Page 458: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 10 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

Operate Injected Current (A) Displayed Current (A) Phase I(w1) I(w2) Id Ir

A 0.252 <180° 0.2 <0° B 0 <0° 0 <0° C 0 <0° 0.2 <180°

Stable Injected Current (A) Displayed Current (A) Phase I(w1) I(w3) Id Ir

A 0 <0° 0.2 <60° B 0.250 <60° 0.2 <240° C 0 <0° 0 <0°

Operate Injected Current (A) Displayed Current (A) Phase I(w1) I(w3) Id Ir

A 0 <0° 0.2 <60° B 0.252 <60° 0.2 <240° C 0 <0° 0 <0°

4.6.1.3. Slop 1 Test Stable

Injected Current (A) Displayed Current (A) Phase I(w1) I(w2) Id Ir A 0.710 <180° 1.5 <0° B 0 <0° 0 <0° C 0 <0° 1.5 <180°

Operate Injected Current (A) Displayed Current (A) Phase I(w1) I(w2) Id Ir

A 0.709 <180° 1.5 <0° B 0 <0° 0 <0° C 0 <0° 1.5 <180°

Stable

Injected Current (A) Displayed Current (A) Phase I(w1) I(w3) Id Ir A 0 <0° 1.5 <60° B 0.711 <60° 1.5 <240° C 0 <0° 0 <0°

Page 458

Page 459: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 11 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

Operate Injected Current (A) Displayed Current (A) Phase I(w1) I(w3) Id Ir

A 0 <0° 1.5 <60° B 0.709 <60° 1.5 <240° C 0 <0° 0 <0°

4.6.1.4. Slop 2 Test Stable

Injected Current (A) Displayed Current (A) Phase I(w1) I(w2) Id Ir A 0.885 <180° 7 <0° B 0 <0° 0 <0° C 0 <0° 7 <180°

Operate Injected Current (A) Displayed Current (A) Phase I(w1) I(w2) Id Ir

A 0.883 <0° 7 <0° B 0 <0° 0 <0° C 0 <0° 7 <180°

Stable

Injected Current (A) Displayed Current (A) Phase I(w1) I(w3) Id Ir A 0 <0° 7 <60° B 0.885 <60° 7 <240° C 0 <0° 0 <0°

Operate Injected Current (A) Displayed Current (A) Phase I(w1) I(w3) Id Ir

A 0 <0° 7 <60° B 0.884 <60° 7 <240° C 0 <0° 0 <0°

4.6.1.5. Instantaneous Differential Setting: Pickup 3.5 pu

Injected Current (A) Displayed Current (A) Time Phase

I(w1) I(w2) Id Ir A 2.521 <180° 0.5 <0° B 0 <0° 0<0° C 0 <0° 0.5 <180°

25 ms

Page 459

Page 460: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 12 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

4.6.1.6. Harmonic Testing

4.6.1.6.1. 2nd Harmonic Setting = 20% Injection

Phase W1 Current W1 Harm.% W2 Current W3 Current Block/ Op.

1 18 0 0 Operate A 1 20 0 0 Block

1 18 0 0 Operate B 1 20 0 0 Block

1 18 0 0 Operate C 1 20 0 0 Block

4.6.1.6.2. 5th Harmonic Testing 5th Harmonic Setting = 10% 1. Connect the relay test set to inject current into the Winding 1 Phase A CT input. 2. Inject currents into the relay as shown in the table below until the biased differential element picks up. 3. Confirm that only the percent differential element has operated. 4. Increase the harmonic content until the element drops out. Record this value as the Inrush Inhibit Level Pickup. 5. Gradually decrease the harmonic content level until the element picks up. Record this value as the Inrush Inhibit Level Dropout. 6. Switch off the current. 7. Repeat steps 1 through 6 for phases B and C. 8. Repeat steps 1 through 7 for Winding 2 and Windings 3.

Injected Current (A) Displayed Current (A) Time Phase

I(w1) I(w3) Id Ir A 0 <0° 0.5 <60° B 2.521< 60° 0.5<240° C 0 <0° 0 <0°

25.9 ms

Page 460

Page 461: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 13 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

Injection phase

W1 Current W1 Harm.% W2 Current W3 Current Block/ Op.

1 9.6 0 0 Operate A 1 10 0 0 Block

1 9.6 0 0 Operate B 1 10 0 0 Block

1 9.6 0 0 Operate C 1 10 0 0 Block

4.6.2. Phase Current ( Winding -1 SRC-1)

Setting / Inputs Outputs / Contact Outputs PARAMETER H1 Contact Output 1 Name Con Op 1 Operate PHASE TOC1 OP (Timing test)

4.6.2.1. Phase Time Over Current Test TOC 1 4.6.2.1.1. Pick up drop out test

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase TOC PARAMETER PHASE TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 1pu

Current (A) Phase Pick- up value Drop out value Calculated pick-up % Error

R 1 % Y 1 % B 1 %

4.6.2.1.2. Time Characteristic test – IEC Curve A Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase TOC ` PARAMETER PHASE TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 1pu Curve IEC Curve A TD Multiplier 0.40

Page 461

Page 462: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 14 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

Results

1.5 In=1.5A 2 In=2 A 3 In=3 A Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

R 6.878 4.012 2.521

Y 6.878 4.012 2.521

B 6.878 4.012 2.521

4.6.2.1.3. Time Characteristic test – IEC Curve B

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase TOC PARAMETER PHASE TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 1pu Curve IEC Curve B TD Multiplier 0.4

Results 1.5 In=1.5A 2 In=2 A 3 In=1 A

Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

R 10.8 5.4 2.7

Y 10.8 5.4 2.7

B 10.8 5.4 2.7

4.6.2.1.4. Characteristic test – IEC Curve C Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase TOC PARAMETER PHASE TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 1pu Curve IEC Curve C TD Multiplier 0.40

Page 462

Page 463: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 15 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

Results 1.5 In=1.5A 2 In=2 A 3 In=3 A

PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

R 25.6 10.667 4

Y 25.6 10.667 4

B 25.6 10.667 4

4.6.2.1.5. Time Characteristic test – IEC short time Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase TOC

Results 1.5 In=1.5A 2 In=2 A 3 In=3 A

PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

R 1.223 0.711 0.445 Y 1.223 0.711 0.445 B 1.223 0.711 0.445

4.6.2.2. Phase Instantaneous Over Current Test IOC 1 Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase IOC PARAMETER PHASE IOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 5 pu Delay 0.0sec

Results Phase Pick-up Current (A) Time setting Measured time(ms)

R Inst. Y Inst. B Inst.

PARAMETER PHASE TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 1pu Curve IEC short time TD Multiplier 0.40

Page 463

Page 464: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 16 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

4.6.3. Phase Current ( SRC-2) 4.6.3.1. Phase Time Over Current Test TOC 1

4.6.3.1.1. Pick up drop out test Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase TOC PARAMETER PHASE TOC 1 Function Enable Signal Source SRC2 (SRC 2) Pickup 1pu

Results Current (A) Phase Pick- up value Drop out value Calculated pick-up % Error

R 1 % Y 1 % B 1 %

4.6.3.1.2. Time Characteristic test – IEC Curve A Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase TOC ` PARAMETER PHASE TOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 1pu Curve IEC Curve A TD Multiplier 0.40

Results

1.5 In=1.5A 2 In=2 A 3 In=3 A Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

R 6.878 4.04 2.521

Y 6.878 4.05 2.521

B 6.878 4.04 2.521

4.6.3.1.3. Time Characteristic test – IEC Curve B Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase TOC PARAMETER PHASE TOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 1pu Curve IEC Curve B TD Multiplier 0.4

Page 464

Page 465: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 17 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

Results 1.5 In=1.5A 2 In=2 A 3 In=1 A

Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

R 10.8 5.4 2.7

Y 10.8 5.4 2.7

B 10.8 5.4 2.7

4.6.3.1.4. Time Characteristic test – IEC Curve C Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase TOC PARAMETER PHASE TOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 1pu Curve IEC Curve C TD Multiplier 0.40

Results 1.5 In=1.5A 2 In=2 A 3 In=3 A

PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

R 25.6 10.667 4

Y 25.6 10.667 4

B 25.6 10.667 4 4.6.3.1.5. Time Characteristic test – IEC short time

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase TOC PARAMETER PHASE TOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 1pu Curve IEC short time TD Multiplier 0.40

Page 465

Page 466: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 18 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

Results 1.5 In=1.5A 2 In=2 A 3 In=3 A

PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

R 1.223 0.711 0.445

Y 1.223 0.711 0.445

B 1.223 0.711 0.445 4.6.3.2. Phase Instantaneous Over Current Test IOC 1 Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase IOC 1 PARAMETER PHASE IOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 5 pu Delay 0.0sec

Results Phase Pick-up Current (A) Time setting Measured time(ms)

R Inst. Y Inst. B Inst.

4.6.4. Phase Current ( SRC-3)

4.6.4.1. Phase Time Over Current Test TOC 1 4.6.4.1.1. Pick up drop out test

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase TOC PARAMETER PHASE TOC 1 Function Enable Signal Source SRC3 (SRC 3) Pickup 1pu

Results Current (A)

Phase Pick- up value Drop out value Calculated pick-up % Error R 1 % Y 1 % B 1 %

Page 466

Page 467: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 19 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

4.6.4.1.2. Time Characteristic test – IEC Curve A Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase TOC ` PARAMETER PHASE TOC 1 Function Enable Signal Source SRC 3 (SRC 3) Pickup 1pu Curve IEC Curve A TD Multiplier 0.40

Results

1.5 In=1.5A 2 In=2 A 3 In=3 A Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

R 6.878 4.012 2.521

Y 6.878 4.012 2.521

B 6.878 4.012 2.521

4.6.4.1.3. Time Characteristic test – IEC Curve B Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase TOC PARAMETER PHASE TOC 1 Function Enable Signal Source SRC 3 (SRC 3) Pickup 1pu Curve IEC Curve B TD Multiplier 0.4

Results

1.5 In=1.5A 2 In=2 A 3 In=1 A Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

R 10.8 5.4 2.7

Y 10.8 5.4 2.7

B 10.8 5.4 2.7

Page 467

Page 468: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 20 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

4.6.4.1.4. Time Characteristic test – IEC Curve C Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase TOC PARAMETER PHASE TOC 1 Function Enable Signal Source SRC 3 (SRC 3) Pickup 1pu Curve IEC Curve C TD Multiplier 0.40

Results 1.5 In=1.5A 2 In=2 A 3 In=3 A

PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

R 25.6 10.667 4

Y 25.6 10.667 4

B 25.6 10.667 4

4.6.4.1.5. Time Characteristic test – IEC short time Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase TOC PARAMETER PHASE TOC 1 Function Enable Signal Source SRC 3 (SRC 3) Pickup 1pu Curve IEC short time TD Multiplier 0.40

Results 1.5 In=1.5A 2 In=2 A 3 In=3 A

PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

R 1.223 0.711 0.445

Y 1.223 0.711 0.445

B 1.223 0.711 0.445

Page 468

Page 469: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 21 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

4.6.4.2. Phase Instantaneous Over Current Test IOC 1 Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Phase Current / Phase IOC 1 PARAMETER PHASE IOC 1 Function Enable Signal Source SRC 3 (SRC 3) Pickup 5 pu Delay 0.0sec

Results Phase Pick-up Current (A) Time setting Measured time(ms)

R Y B

4.6.5. Neutral Current

Setting / Inputs Outputs / Contact Outputs PARAMETER H1 Contact Output 1 Name Con Op 1 Operate Neutral TOC1 OP (Timing test)

4.6.6. Neutral Time Over Current Test TOC 1—SRC-1

4.6.6.1. Pick up drop out test Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1 PARAMETER NEUTRAL TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.1pu

Current (A) Phase Pick- up value Drop out value Calculated pick-up % Error

B-N %

4.6.6.1.1. Time Characteristic test – IEC Curve A Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1 `PARAMETER NEUTRAL TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.1pu Curve IEC Curve A TD Multiplier 0.40

Page 469

Page 470: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 22 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

B-N 6.878 4.012 2.521

4.6.6.1.2. Time Characteristic test – IEC Curve B

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1 PARAMETER NEUTRAL TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 1pu Curve IEC Curve B TD Multiplier 0.4

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

B-N 10.8 5.4 2.7

4.6.6.1.3. Time Characteristic test – IEC Curve C Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1 PARAMETER NEUTRAL TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.1pu Curve IEC Curve C TD Multiplier 0.40

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

B-N 25.6 10.667 1 4

Page 470

Page 471: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 23 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

4.6.6.1.4. Time Characteristic test – IEC short time Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1 PARAMETER NEUTRAL TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.1pu Curve IEC short time TD Multiplier 0.40

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

B-Neutral 1.223 0.711 0.445

4.6.6.2. Neutral Instantaneous Over Current Test IOC 1 Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1 PARAMETER NEUTRAL IOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.5 pu Delay 0.0sec

Results Phase Pick-up Current (A) Time setting Measured time(ms)

B-Neutral Inst. 4.6.6.3. Neutral Time Over Current Test TOC 1—SRC-2

4.6.6.3.1. Pick up drop out test

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1 PARAMETER NEUTRAL TOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 0.1pu

Results

Current (A) Phase Pick- up value Drop out value Calculated pick-up % Error

B-Neutral 0.1 %

Page 471

Page 472: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 24 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

4.6.6.3.2. Time Characteristic test – IEC Curve A Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

B-Neutral 6.878 4.012 2.521

4.6.6.3.3. Time Characteristic test – IEC Curve B

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1 PARAMETER NEUTRAL TOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 0.1pu Curve IEC Curve B TD Multiplier 0.4

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

B-Neutral 10.8 5.4 2.7

PARAMETER NEUTRAL TOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 0.1pu Curve IEC Curve A TD Multiplier 0.40

Page 472

Page 473: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 25 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

4.6.6.3.4. Time Characteristic test – IEC Curve C Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1 PARAMETER NEUTRAL TOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 0.1pu Curve IEC Curve C TD Multiplier 0.40

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

B-Neutral 25.6 10.667 4

4.6.6.3.5. Time Characteristic test – IEC short time Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1 PARAMETER NEUTRAL TOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 0.1pu Curve IEC short time TD Multiplier 0.40

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

B-Neutral 1.223 0.711 0.445

4.6.6.3.6. Neutral Instantaneous Over Current Test IOC 1

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1 PARAMETER NEUTRAL IOC 1 Function Enable Signal Source SRC 2 (SRC 2) Pickup 0.5 pu Delay 0.0sec

Page 473

Page 474: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 26 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

Results Phase Pick-up Current (A) Time setting Measured time(ms)

B-Neutral Inst.

4.6.6.4. Neutral Time Over Current Test TOC 1—SRC-3 4.6.6.4.1. Pick up drop out test

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1 PARAMETER NEUTRAL TOC 1 Function Enable Signal Source SRC 3 (SRC 3) Pickup 0.1pu

Results Current (A) Phase Pick- up value Drop out value Calculated pick-up % Error

B-N 0.1 % 4.6.6.4.2. Time Characteristic test – IEC Curve A

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

B-N 6.878 4.012 2.521

4.6.6.4.3. Time Characteristic test – IEC Curve B

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1 PARAMETER NEUTRAL TOC 1 Function Enable Signal Source SRC 3 (SRC 3) Pickup 0.1pu Curve IEC Curve B TD Multiplier 0.4

PARAMETER NEUTRAL TOC 1 Function Enable Signal Source SRC 3 (SRC 3) Pickup 0.1pu Curve IEC Curve A TD Multiplier 0.40

Page 474

Page 475: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 27 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

B-Neutral 10.8 5.4 2.7

4.6.6.4.4. Time Characteristic test – IEC Curve C

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1 PARAMETER NEUTRAL TOC 1 Function Enable Signal Source SRC 3 (SRC 3) Pickup 0.1pu Curve IEC Curve C TD Multiplier 0.40

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

B-N 25.6 10.667 4

4.6.6.4.5. Time Characteristic test – IEC short time

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1 PARAMETER NEUTRAL TOC 1 Function Enable Signal Source SRC 3 (SRC 3) Pickup 0.1pu Curve IEC short time TD Multiplier 0.40

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

B-N 1.223 0.711 0.445

Page 475

Page 476: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 28 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

4.6.6.4.6. Neutral Instantaneous Over Current Test IOC 1 Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Neutral Current / Neutral TOC1 PARAMETER NEUTRAL IOC 1 Function Enable Signal Source SRC 3 (SRC 3) Pickup 0.5 pu Delay 0.0sec

Results

Phase Pick-up Current (A) Time setting Measured time(ms) B-Neutral Inst.

4.6.7. Ground Current Setting / Inputs Outputs / Contact Outputs PARAMETER H1 Contact Output 1 Name Con Op 1 Operate Ground TOC1 OP (Timing test)

4.6.7.1. Ground Time Over Current Test TOC 1—SRC-1

4.6.7.1.1. Pick up drop out test Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Ground Current / Ground TOC1 PARAMETER Ground TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.1pu

Current (A) Phase Pick- up value Drop out value Calculated pick-up % Error

G 0.1 %

4.6.7.1.2. Time Characteristic test – IEC Curve A Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Ground Current / Ground TOC1 PARAMETER GROUND TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.1pu Curve IEC Curve A TD Multiplier 0.40

Page 476

Page 477: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 29 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

G 6.878 4.012 2.521

4.6.7.1.3. Time Characteristic test – IEC Curve B

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Ground Current / Ground TOC1 PARAMETER Ground TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 1pu Curve IEC Curve B TD Multiplier 0.4

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A Phase

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

G 10.8 5.4 2.7

4.6.7.1.4. Time Characteristic test – IEC Curve C

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Ground Current / Ground TOC1 PARAMETER GROUND TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.1pu Curve IEC Curve C TD Multiplier 0.40

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

G 25.6 10.667 4

Page 477

Page 478: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 30 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

4.6.7.1.5. Time Characteristic test – IEC short time

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Ground Current / Ground TOC1 PARAMETER GROUND TOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.1pu Curve IEC short time TD Multiplier 0.40

Results

1.5 In=0.15A 2 In=0.2 A 3 In=0.3 A PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

Expected Time(s)

MeasuredTime(s)

G 1.223 0.711 0.445

4.6.7.1.6. Ground Instantaneous Over Current Test IOC 1

Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Ground Current / Ground IOC1 PARAMETER GROUND IOC 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.5 pu Delay 0.0sec

Results

Phase Pick-up Current (A) Time setting Measured time(ms) G Inst.

4.6.8. Voltage elements

4.6.8.1. Phase Under Voltage Test UV1 Setting (Pickup, Dropout and Time) Setting / Grouped Elements / Group 1 / Voltage Elements / Phase UV PARAMETER PHASE UV 1 Function Enable Signal Source SRC 1 (SRC 1) Mode Phase to Ground Pickup 0.8 pu Curve Definite Time Delay 1.00 s Minimum Voltage 0.1 pu

Page 478

Page 479: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 31 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

Test Results Pick Up (V) Drop Off (V)

PHASE Calculated Measured Measured

Measured Time(s)At 55 V

R 55.44 Y 55.44 B 55.44

4.6.8.2. Phase Under Voltage Test UV2 Setting (Pickup, Dropout and Time) Setting / Grouped Elements / Group 1 / Voltage Elements / Phase UV PARAMETER PHASE UV 2 Function Enable Signal Source SRC 1 (SRC 1) Mode Phase to Ground Pickup 0.85 pu Curve Definite Time Delay 1.00 s Minimum Voltage 0.1 pu

Test Results

Pick Up (V) Drop Off (V) PHASE

Calculated Measured Measured Measured Time(s)

At 58 V

R 58.9 Y 58.9 B 58.9

4.6.8.3. Phase Over Voltage Test OV1 Setting (Pickup, Dropout and Time) Setting / Grouped Elements / Group 1 / Voltage Elements / Phase OV PARAMETER PHASE OV 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.9 pu Curve Definite Time Delay 1.00 s Minimum Voltage 0.1 pu

Page 479

Page 480: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 32 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

Test Results Pick Up Drop Off

PHASE Calculated Measured Measured

Measured Time At 63*√3 V

R-Y 108

Y-B 108

B-R 108 4.6.8.4. Neutral Over Voltage Test OV1 Setting (Pickup, Dropout and Time) Setting / Grouped Elements / Group 1 / Voltage Elements / Neutral OV1 PARAMETER Neutral OV 1 Function Enable Signal Source SRC 1 (SRC 1) Mode Phase to Ground Pickup 0.3 pu Curve Definite Time Delay 1.00 s Minimum Voltage 0.1 pu

Test Results

Pick Up Drop Off PHASE

Calculated Measured Measured Measured Time

At 21 V

R 20.7 Y 20.7 B 20.7

4.6.8.5. Volts per Hertz

4.6.8.5.1. Inverse Curve A: Ref equation page # 5-167 Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Voltage element / Volts per Hertz PARAMETER Volts per Hertz Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.8pu Curve Inverse Curve A TD Multiplier 1

Page 480

Page 481: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 33 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

Results 1.5 Vp=83.16 2 Vp= 110.88

PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

R-N 0.8 0.333 Y-N 0.8 0.333 B-N 0.8 0.333

4.6.8.5.2. Inverse Curve B:

Ref equation page # 5-167 Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Voltage element / Volts per Hertz PARAMETER Volts per Hertz Function Enable Signal Source SRC 1 (SRC1) Pickup 0.8pu Curve Inverse Curve B TD Multiplier 1

Test Results

1.5 Vp=83.16 2 Vp= 110.88 PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

R-N 2 1

Y-N 2 1

B-N 2 1 4.6.8.5.3. Inverse Curve C:

Ref equation page # 5-167 Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Voltage element / Volts per Hertz

PARAMETER Volts per Hertz Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.8pu Curve Inverse Curve C TD Multiplier 1

Page 481

Page 482: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 34 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

Results 1.5 Vp=83.16 2 Vp= 110.88

PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

R-N 4.45 2.414 Y-N 4.45 2.414 B-N 4.45 2.414

4.6.8.5.4. Definite Time:

Ref equation page # 5-167 Setting (Pickup and Time) Setting / Grouped Elements / Group 1 / Voltage element / Volts per Hertz PARAMETER Volts per Hertz Function Enable Signal Source SRC 1 (SRC 1) Pickup 0.8pu Curve Definite time TD Multiplier 1

Results : 1.5 Vp=83.16 2 Vp= 110.88

PHASE

Expected Time(s)

Measured Time(s)

Expected Time(s)

Measured Time(s)

R-N 1 1

Y-N 1 1

B-N 1 1 4.7. Testing of Controlled Element

4.7.1. Under Frequency Setting (Pickup, Dropout and Time) Setting / Control elements / under frequency PARAMETER Under Frequency 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 59 Hz Pickup Delay 0.00 s Minimum Voltage/Amp 0.10 pu

Page 482

Page 483: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 35 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

Test Results Setting F Pick Up F Drop Off

59 Hz Timing Test:

F Setting F Applied Measured Time

59 Hz 55 Hz 4.7.2. Over Frequency

Setting (Pickup, Dropout and Time) Setting / Control elements /Over frequency PARAMETER Over Frequency 1 Function Enable Signal Source SRC 1 (SRC 1) Pickup 61 Hz Pickup Delay 0.00 s

Test Results Setting F Pick Up F Drop Off

61 Hz 61 Hz Hz Timing Test:

F Setting F Applied Measured Time

61 Hz 63 Hz

4.7.3. Final Setting test: 4.7.3.1. Final Setting

4.7.3.1.1. OSCILLOGRAPHY FUNCTION SETTINGS UNITS REMARKS Number Of records 6 Trigger Mode Automatic Overwrite Trigger Position 25% Trigger Source TRIG OSC On (VO5) AC Input Waveforms 64 samples/cycle Digital Channel 2 EXT TRIG On(P7a) Digital Channel 4 GSU PRESS On (H7a) Digital Channel 5 TRIP 86U IOn (H1) Digital Channel 6 XFMR INST DIFF OP A Digital Channel 7 XFMR INST DIFF OP B Digital Channel 8 XFMR INST DIFF OP C Digital Channel 9 XFMR PCNT DIFF OP A Digital Channel 10 XFMR PCNT DIFF OP B

Page 483

Page 484: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 36 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

Digital Channel 11 XFMR PCNT DIFF OP C Digital Channel 12 XFMR PCNT DIFF PKP A Digital Channel 13 XFMR PCNT DIFF PKP B Digital Channel 14 XFMR PCNT DIFF PKP C Digital Channel 15 RESTD GND FT1 OP Digital Channel 16 REST GND FT1 PKP Digital Channel 17 PHASE IOC1 OP A Digital Channel 18 PHASE IOC1 OP B Digital Channel 19 PHASE IOC1 OP C Digital Channel 20 PHASE TOC1 OP A Digital Channel 21 PHASE TOC1 OP B Digital Channel 22 PHASE TOC1 OP C Digital Channel 23 PHASE TOC1 PKP A Digital Channel 24 PHASE TOC1 PKP B Digital Channel 25 PHASE TOC1 PKP C Digital Channel 26 VOLT PER HERTZ 1 OP Digital Channel 27 VOLT PER HERTZ 1 PKP Digital Channel 28 VOLT PER HERTZ 2 OP Digital Channel 29 VOLT PER HERTZ 2 PKP Digital Channel 30 GSU GND OC 1 IOn (H2) Digital Channel 31 GSU GND OC 2 IOn (H3) Digital Channel 32 GSU GND OC IOn (H4) Digital Channel 33 GROUND TOC1 OP Digital Channel 34 GROUND TOC 1 PKP Digital Channel 36 T60 TRIP IOn (P1) Digital Channel 37 TRIG G60A IOn (P5) Digital Channel 38 TRIG G60 IOn (P6) Digital Channel 39 ANY TRIP On (VO4) Analog Channel 1 SRC1 La Mag Analog Channel 2 SRC2 la Mag Analog Channel 3 SRC3 la Mag Analog Channel 4 SRC1 lb Mag Analog Channel 5 SRC2 lb Mag Analog Channel 6 SRC3 lb Mag Analog Channel 7 SRC1 lc Mag Analog Channel 8 SRC2 lc Mag Analog Channel 9 SRC3 lc Mag Analog Channel 10 Xfmr lad Mag Analog Channel 11 Xfmr lad Angle Analog Channel 12 Xfmr lar Mag Analog Channel 13 Xfmr lar Angle Analog Channel 14 Volts Per Hertz 1 Analog Channel 15 SRC2 LG Mag

Page 484

Page 485: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 37 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

4.7.3.1.2. DEMAND Current Method CUSTOMER Power Method CUSTOMER Interval CUSTOMER Trigger CUSTOMER

4.7.3.1.3. USER-PROGRAMMBLE LEDS:LED TEST Function Disabled Control OFF

4.7.3.1.4. TRIP AND ALARMS LEDS Trip LED Input ANY TRIP On (VO4) Alarms LED Input ANY SELF TESTS

4.7.3.1.5. USER PROGRAMMABLE LEDS LED 4: OPERAND GSU PRESS On (H7a) LED 4: TYPE Self Reset LED 6: OPERAND EXT TRIP On (P7a) LED 6: TYPE Self Reset LED 7: OPERAND TRIP 86U IOn (H1) LED 7: TYPE Latched LED 8: OPERAND XFMR INST DIFF OP A LED 8: TYPE Latched LED 9: OPERAND XFMR INST DIFF OP B LED 9: TYPE Latched LED 10: OPERAND XFMR PCNT DIFF OP C LED 10:TYPE Latched LED 11: OPERAND XFMR PCNT DIFF OP A LED 11: TYPE Latched LED 12: OPERAND XFMR PCNT DIFF OP B LED 12: TYPE Latched LED 13: OPERAND XFMR PCNT DIFF OP C LED 13: TYPE Latched LED 14: OPERAND RESTD GND FT1 OP LED 14: TYPE Latched LED 15: OPERAND PHASE IOC1 OP LED 15: TYPE Latched LED 16: OPERAND PHASE TOC1 OP LED 16: TYPE Latched LED 17: OPERAND VOLTS PER HERTZ 1 OP LED 17: TYPE Latched LED 18: OPERAND VOLTS PER HERTZ 1 OP LED 18: TYPE Latched LED 19: OPERAND GSU GND OC 1 IOn (H2) LED 19: TYPE Lathed LED 20: OPERAND GSU GND OC 2 IOn (H3)

Page 485

Page 486: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 38 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

LED 20: TYPE Latched LED 21: OPERAND GSU GND OC IOn (H4) LED 21: TYPE Latched LED 22: OPERAND GROUND TOC1 OP LED 22: TYPE Latched LED 23: OPERAND T60 TRIP IOn (P1) LED 23: TYPE Self reset LED 24: OPERAND TRGI G60 IOn (P5) LED 24: TYPE Self Reset LED 25: OPERAND TRIG G60B IOn (P6) LED 25: TYPE Self Reset

4.7.3.1.6. USER-PROGRAMMABLE SELF TESTS Remote Device Off Function CUSTOMER Pri-ethernet Fail Function CUSTOMER Battery Fail Function CUSTOMER SNTP Fail Function CUSTOMER IRIG B Fail Function CUSTOMER

4.7.3.1.7. INSTALLATION Relay Settings Not Programmable Relay Name CUSTOMER

4.7.3.1.8. SYSTEM SETUP: AC INPUTS: CURRENT CT F1:Phase CT Primary 6000 A CT F1:Phase CT Secondary 1 A CT F1 :Ground CT Primary 1 A CT F1 : Ground CT Secondary 1 A CT M1:Phase CT Primary 6000 A CT M1:Phase CT Secondary 1 A CT M1 :Ground CT Primary 1 A CT M1: Ground CT Secondary 1 A CT M5 :Phase CT Primary CUSTOMER CT M5 :Phase CT Secondary CUSTOMER CT M5 :Ground CT Primary CUSTOMER CT M5 : Ground CT Secondary CUSTOMER

4.7.3.1.9. VOLTAGE VT F5: Phase VT Connection Wye VT F5 : Phase VT Secondary 66.4 V VT F5 :Phase VT Ratio 120:1 VT F5 : Auxiliary VT Connection

None

VT F5 : Auxiliary VT Secondary

None

VT F5 :Auxiliary VT Ratio None 4.7.3.1.10. SIGNAL SOURCES

Page 486

Page 487: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 39 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

SOURCE 1:Name GEN SOURCE 1: Phase CT F1 SOURCE 1: Ground CT None SOURCE 1: Phase VT F5 SOURCE 1: Auxiliary VT None SOURCE 2: Name AUX SOURCE 2: Phase CT M1 SOURCE 2: Ground CT None SOURCE 2: Phase VT None SOURCE 2: Auxiliary VT None SOURCE 3: Name GSU SOURCE 3: Phase CT M5 SOURCE 3: Ground CT M5 SOURCE 3: Phase VT None SOURCE 3: Auxiliary VT None

4.7.3.1.11. TRANSFORMER: GENERAL Number Of Windings CUSTOMER Phase Compensation Internal (software) Load Loss At rated load CUSTOMER Rated Windings Temperature Rise

CUSTOMER

No Load Loss CUSTOMER Type Of Cooling CUSTOMER Top-Oil Rise Over Ambient CUSTOMER Thermal Capacity CUSTOMER Winding Thermal Time Constant

CUSTOMER

4.7.3.1.12. WINDINGS WINDING 1: Source CUSTOMER WINDING 1: Rated MVA CUSTOMER WINDING 1: Nominal Phs-phs Voltage

CUSTOMER

WINDING 1: Connection CUSTOMER WINDING 1: Grounding CUSTOMER WINDING 1: Angle Wrt Winding

CUSTOMER

WINDING 1: Resistance CUSTOMER WINDING 2: Source CUSTOMER WINDING 2: Rated MVA CUSTOMER WINDING 2: Nominal Phs-phs Voltage

CUSTOMER

WINDING 2: Connection CUSTOMER WINDING 2: Grounding CUSTOMER

Page 487

Page 488: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 40 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

WINDING 2: Angle Wrt Winding

CUSTOMER

WINDING 2: Resistance CUSTOMER WINDING 3: Source CUSTOMER WINDING 3: Rated MVA CUSTOMER WINDING 3: Nominal Phs-phs Voltage

CUSTOMER

WINDING 3: Connection CUSTOMER WINDING 3: Grounding CUSTOMER WINDING 3: Angle Wrt Winding

CUSTOMER

WINDING 3 : Resistance CUSTOMER 4.7.3.1.13. FLEXLOGIC: FLEXLOGIC EQUATION EDITOR

FlexLogic Entry 1 XFMR INST DIFF OP FlexLogic Entry 2 XFMR PCNT DIFF OP FlexLogic Entry 3 REST GND FT1 OP FlexLogic Entry 4 PHASE IOC1 OP FlexLogic Entry 5 PHASE TOC1 OP FlexLogic Entry 6 VOLTS PER HERTZ 1 OP FlexLogic Entry 7 VOLTS PER HERTZ 2 OP FlexLogic Entry 8 OR(7) FlexLogic Entry 9 =TRIP 86U (VO1) FlexLogic Entry 10 TRIP 86U On (VO1) FlexLogic Entry 11 GROUND TOC1 OP FlexLogic Entry 12 OR(2) FlexLogic Entry 13 =ANY TRIP (VO4) FlexLogic Entry 14 EXT TRIG On (P7a) FlexLogic Entry 15 TMER 1 FlexLogic Entry 16 ANY TRIP On (VO4) FlexLogic Entry 17 OR (2) FlexLogic Entry 18 =TRIG OSC (V05) FlexLogic Entry 19 END

4.7.3.1.14. FLEXLOGIC TIMERS TIMER 1 Type Millisecond TIMER 1 Pick up Delay 1 TIMER 1 Dropout Delay 0

4.7.3.1.15. GROUP ELEMENTS GROUP 1: TRANSFORMER: PERCENT DIFFERENTIAL [GROUP 1] Function Enabled Pickup CUSTOMER Slope1 CUSTOMER Break 1 CUSTOMER Break 2 CUSTOMER Slope 2 CUSTOMER

Page 488

Page 489: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 41 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

Inrush Inhibit Function CUSTOMER Inrush Inhibit Mode CUSTOMER Inrush Inhibit Level CUSTOMER Overexcitation Inhibit Function CUSTOMER Overexcitition Inhibit Level CUSTOMER Block OFF Target Latched Events Enabled

4.7.3.1.16. INSTANTENEOUS DIFFENTIAL [GOURP 1] Function Enabled Pick up CUSTOMER Block OFF Target Latched Events Enabled

4.7.3.1.17. GROUP CURRENT: Restricted Ground Fault [GROUP 1] Function Enabled Source Customer Pickup Customer Slope Customer Pick up Delay Customer Reset Delay Customer Block OFF Target Latched Events Enabled

4.7.3.1.18. PHASE CURRENT: PHASE IOC [GROUP 1] PHASE TOC1: Function Enabled PHASE TOC1: Signal Source SCR3 PHASE TOC1: Input CUSTOMER PHASE TOC1: Pick up CUSTOMER PHASE TOC1: Curve CUSTOMER PHASE TOC1: TD Multiplier CUSTOMER PHASE TOC1: Reset CUSTOMER PHASE TOC1: Voltage Restraint

CUSTOMER

PHASE TOC1: Block A OFF PHASE TOC1: Block B OFF PHASE TOC1: Block C OFF PHASE TOC1: Target Latched PHASE TOC1: Events Enabled

4.7.3.1.19. PHASE CURRENT: PHASE IOC [GROUP 1] PHASE IOC 1: Function Enabled PHASE IOC 1: Source SRC3 PHASE IOC 1: Pickup CUSTOMER

Page 489

Page 490: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 42 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

PHASE IOC 1:Delay CUSTOMER PHASE IOC 1: Reset Delay CUSTOMER PHASE IOC 1:Block A OFF PHASE IOC 1:Block B OFF PHASE IOC 1: Block C OFF PHASE IOC 1:Target Self Reset PHASE IOC 1: Events Enabled

4.7.3.1.20. VOLTS PER HERTZ [GROUP 1] VOLTS PER HERTZ 1:Function

Enabled

VOLTS PER HERTZ 1: Source SRC 1 VOLTS PER HERTZ 1: Pickup CUSTOMER VOLTS PER HERTZ 1: Curves CUSTOMER VOLTS PER HERTZ 1:TD Multiplier

CUSTOMER

VOLTS PER HERTZ 1: T Reset CUSTOMER VOLTS PER HERTZ 1: Block OFF VOLTS PER HERTZ 1: Target Latched VOLTS PER HERTZ 2: Events Enabled VOLTS PER HERTZ 2: Function

Enabled

VOLTS PER HERTZ 2: Source SRC 1 VOLTS PER HERTZ 2: Pickup CUSTOMER VOLTS PER HERTZ 2: Curves CUSTOMER VOLTS PER HERTZ 2: TD Multiplier

CUSTOMER

VOLTS PER HERTZ 2: T reset CUSTOMER VOLTS PER HERTZ 2: Block OFF VOLTS PER HERTZ 2: Target Latched VOLTS PER HERTZ 2: Events Enabled

4.7.3.1.21. GROUND CURRENT: GROUND TOC [GROUP 1] GROUND TOC1: Function Enabled GROUND TOC1: Source SRC 3 GROUND TOC1: Input CUSTOMER GROUND TOC1: Pickup CUSTOMER GROUND TOC1: Curve CUSTOMER GROUND TOC1: TD Multiplier

CUSTOMER

GROUND TOC1: Reset CUSTOMER GROUND TOC1: Block OFF GROUND TOC1: Target Latched GROUND TOC1: Events Enabled

Page 490

Page 491: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 43 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

4.7.3.1.22. INPUTS/OUPUTS: 4.7.3.1.22.1. CONTACT INPUTS

H7A : ID Cont lp 1 H7A :Debounce Time 2.0 ms H7A :Events Enabled H7C: ID Cont lp 2 H7C :Debounce Time 2.0 ms H7C :Events Disabled H8A : : ID Cont lp 3 H8A :Debounce Time 2.0 ms H8A :Events Disabled H8C : ID Cont lp 4 H8C :Debounce Time 2.0 ms H8C :Events Disabled P7A : ID EXT TRIG P7A :Debounce Time 2.0 ms P7A :Events Enabled P7C : ID Cont lp 6 P7C : Debounce Time 2.0 ms P7C :Events Disabled P8 A : ID Cont lp 7 P8A :Debounce Time 2.0 ms P8A :Events Disabled P8C : : ID Cont lp 8 P8C :Debounce Time 2.0 ms P8C :Events Disabled

4.7.3.1.22.2. CONTACT OUTPUTS Cont lp 1: Cont lp 2: Cont lp 3: Cont lp 4:(H7a:H7c:H8a:H8c)

84 Vdc

EXT TRIG :Cont lp 6:Cont lp 7 : Cont lp 8(P7a:P7c:P8a:P8c)

84 Vdc

4.7.3.1.22.3. CONTACT OUTPUTS H1: ID TRIP 86U1 H1 :Operate TRIP 86U1 On (VO1) H1 :Seal in OFF H1 :Events Enabled H2: ID TRIP 86U2 H2 :Operate TRIP 86U2 On (VO1) H2 :Seal in OFF H2 :Events Enabled H3: ID GSU GND OC H3 :Operate GROUND TOC1 OP H3 :Seal in OFF

Page 491

Page 492: PP10 startup manual (Unofficial as Requested)

Panel Location Panel Name: Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR02, Page 44 of 44

Customer Contractor

: :

SEC-EOA BEMCO

Testing of Transformer Differential Relay –

T60(MAKE: GE) Date: 13/02/09,Revision: 0

H3 :Events Enabled P1: ID T60 TRIP P1 :Operate ANY TRIP On(VO4) P1 :Seal in OFF P1 :Events Enabled P5: ID TRIG OSC G60A P5 :Operate ANY TRIP On(VO4) P5 :Seal in OFF P5 :Events Enabled P6: ID TRIG OSC G60B P6 :Operate ANY TRIP On (VO4) P6 :Seal in OFF P6 :Events Enabled

4.7.3.1.22.4. VIRTUAL OUTPUTS

VIRTUAL OUTPUTS 1: ID TRIP 86U VIRTUAL OUTPUTS 1:Events Enabled VIRTUAL OUTPUTS 4: ID ANY TRIP VIRTUAL OUTPUTS 4:Events Enabled VIRTUAL OUTPUTS 5:ID TRIG OSC VIRTUAL OUTPUTS 5:Events Enabled

4.7.3.1.23. REMOTE DEVICES Remote Device 1 ID Remote Device 1

4.7.3.2. Current sensitivity test: .

4.7.3.3. Voltage sensitivity test: 4.7.3.4. Timing Test:

4.7.4. Fault Record:

Fault record verification done.

4.7.5. Waveform Record: Waveform record verification

4.8. Relay Setting: Final relay setting retrieved through ‘UR ’ software and printout attached.

Test Equipment Model Cal due date Test Equipment Model Cal due date

Page 492

Page 493: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR03 Page 1 of 3

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of High Impedance Relay-MFAC(AREVA)

Date: 13/02/09,Revision: 0

1.0 Relay General Data Function Serial No. Make Model No. Diagram no. Aux. Voltage Frequency Firmware no. Rated voltage Rated current: No of logic Inputs: No of outputs:

2.0 Visual Inspection

Item Description Checked 1 S/L. No. on Module, Cover and Case are identical

2 Inspect for any physical damage or defects.

3 Verify connections as per approved drawings. 4 Check that serial no. of relay matching with serial no. of display.

5 Relay case connected to local earth bar

6 Tightness of contact of the relay and CT shorting terminal makes good contact when relay is withdrawn

7 Connection on Relay terminals are good

8 Ferrules are according to the drawings

9 Test and settings switches operate properly

10 CT shorting function checked.

3.0 Electrical Functional Test.

• Test switch / Test Block CT shorting contacts proved

• Relay CT shorting contacts proved

4.0 Secondary Injection test. 4.1. Testing Of Out Put Relays

Output Relay No.

Output Contact No. Output relay

status

Contact Operation

check

Actual Assignment

of Relays

Contact Resistance(

Ω) Remarks

Page 493

Page 494: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR03 Page 2 of 3

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of High Impedance Relay-MFAC(AREVA)

Date: 13/02/09,Revision: 0

4.2. Testing Of Voltage Taps Tap Selections:

Voltage (Vs): as shown V OL. ERROR

=DROP-OFFPICK-UP %

25 18-20 22-27 19

75 18-20 67-82 19

125 18-23 112-137 19

175 18-23 157-192 19

225 19-28 202-247 19

275 20-39 247-302 19

350 24-60 315-385 19

Plugout 24-60 315-385 19

25 18-20 22-27 19

75 18-20 67-82 19

125 18-23 112-137 19

175 18-23 157-192 19

225 19-28 202-247 19

275 20-39 247-302 19

350 24-60 315-385 19

Plugout 24-60 315-385 19

25 18-20 22-27 19

75 18-20 67-82 19

125 18-23 112-137 19

175 18-23 157-192 19

225 19-28 202-247 19

275 20-39 247-302 19

350 24-60 315-385 19

Plugout 24-60 315-385 19

A

SETV s

B

C

PHASEMETROSILCURRENT

(mA )

RELA YCURRENT

MEA S.(mA )

TOTA LCURRENT

MEA S.(mA )

limits w ith

metros il(mA )

PICK-UPV OLTA GE

MEA S.(V )

LIMITS(V )

limits f or relay only(mA )

DROP-OFFV OLTA GE

MEA S.(V )

Limits: Total current limit is as per MFAC14 Technical Manual page 7 The Ratio of Drop-off/ Pick-up should be >50% (as per Service Manual page 7)

Pick-up voltage limit = ± 10% (as per Service Manual page 7)

Page 494

Page 495: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DR03 Page 3 of 3

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of High Impedance Relay-MFAC(AREVA)

Date: 13/02/09,Revision: 0

4.3. Operating Time Testing

Switch Selections: Voltage (Vs): V

A FIXED

B FIXED

C FIXED

PHASESETTING

TIME MEASUREDOPERATING TIME (ms) AT 2xVs INJECTED

VOLTAGE

Limit: Operating Time AT 2 x Vs should be between 14ms – 28 ms (Refer sh.4 of the manual)

4.4. Final Settings

i) FINAL TAP SETTING: Voltage (Vs):

4.4.1. Secondary Injection at Final Settings VOL. ERROR

=DROP-OFFPICK-UP %

A

B

C

limits for relay only

(mA)

PHASE

SETVs

METROSILCURRENT

(mA)

RELAYCURRENT

MEAS.(mA)

TOTALCURRENT

MEAS.(mA)

limits with

metrosil(mA)

PICK-UPVOLTAGE

MEAS.(V)

LIMITS(V)

DROP-OFFVOLTAGE

MEAS.(V)

Note: The Ratio of Drop-off / Pick-up should be > 50%

4.4.2. Operating Time Testing

OPERATING TIME (ms) AT 2xVs MEASURED

FIXED

PHASESETTING

TIMEINJECTEDVOLTAGE

Note: Operating Time AT 2 x Vs should be between 14ms – 28 ms (Refer sh.4 of the manual)

Test Equipment Model Cal due date Test Equipment Model Cal due date

Page 495

Page 496: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

TEST

Riyadh Po“1062

STARTU

TING PTIM

ower plant21166/00”

UP MANUA

PROCING R

t # 10

AL DF

EDURRELAY

Date:13 Feb,09

RE FORY

Revision0

R

n:

Page 496

Page 497: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-HR01, Page 1 of 3 Equipment : Timing Relay Date:13 Feb,09 Revision: 0

TABLE OF CONTENT

1. Task a. Work Status------------------------------------------------------------------------------------------------2 b. Documentation--------------------------------------------------------------------------------------------2 c. Personnel---------------------------------------------------------------------------------------------------2 d. Measuring Instrumentation-----------------------------------------------------------------------------2

2. Preconditions---------------------------------------------------------------------------------------------------2 3. Precautions------------------------------------------------------------------------------------------------------2 4. Scope--------------------------------------------------------------------------------------------------------------2 5. Execution---------------------------------------------------------------------------------------------------------2

a. Visual Inspection------------------------------------------------------------------------------------------2 b. Testing of Timing Relay

1. Secondary Injection 1. Minimum Voltage Pick-Up Verification------------------------------------------------3 2. Operating time Measurment-------------------------------------------------------------3

6. Documents-------------------------------------------------------------------------------------------------------3 7. Reference---------------------------------------------------------------------------------------------------------3 8. Attachment-------------------------------------------------------------------------------------------------------3

Page 497

Page 498: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-HR01, Page 2 of 3 Equipment : Timing Relay Date:13 Feb,09 Revision: 0

1.0 Task

All the Timing or Timer Relays shall be tested for correct operation 2.0 Preconditions

2.1 Work status • Erection has been completed. • Labelling of the equipment

2.2 Documentation • The circuit diagrams of the electrical equipment cabinets are available • Commissioning checklists TS-LR01

2.3 Personnel • 1 Commissioning engineer: Engineer or technician with experience in

commissioning of Protection Relays. • 1 Helper: skilled worker with adequate on-the-job training.

2.4 Measuring instruments and tools

• Three or single phase Secondary Injection test set • Fluke

3.0 Precautions • Observe the rules for handling electronic components sensitive to electrostatic

discharge (ESD measures). • Special safety arrangements shall be made for all areas which are not explicitly

designated as” electrical operating areas” when performing tests at voltages in excess of 50V.

4.0 Scope • Testing cable connections, • Checking that the mounting position is correct,

5.0 Execution

5.1 Visual Checks • Checking of the cables for damage and that they are connected correctly, • Inspection for physical connection as per approved drawings. • Inspection for correct tightness for connection • Checking ferrules

5.2 Testing of Trip Circuit Supervision Relay. Relay can be tested by using single phase secondary injection test set at the front panel mounted test facilities. Enter the rating plate data in check list TS-LR01 and compare the Relay data with the data contained in the circuit documentation. The following test shall be carried out

Page 498

Page 499: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-HR01, Page 3 of 3 Equipment : Timing Relay Date:13 Feb,09 Revision: 0

1. Secondary Injection

1. Minimum Voltage Pick-Up Verification 2. Operating time Measurment

5.2.1 Secondary Injection

Connection between the relay and secondary injection set is made as per figure below.

TRIP

CO

NTA

CT

TRIPPINGRELAYRELAY TEST SET

+

-

DC

VO

LTA

GE

TER

MIN

ALS

TIM

ER

TRIPPING RELAY TESTING ARRANGEMENT

TEST PLUG

CO

ILTE

RM

INA

LS+

-

5.2.1.1 Voltage Pick-Up Verification

♦ Connect the voltage test set on the relay voltage terminals

♦ Set Timing dial to minimum or zero ♦ Connect the timer to the relay output contact ♦ Slowly increase the voltage until the relay pick-up ♦ Record the pick-up voltage

5.2.1.2 Delay Time Verification

♦ Connect the voltage test set on the relay voltage terminals

♦ Connect the timer to the relay tripping contact ♦ Set the time on time dial ♦ Apply the Rated voltage and monitor the operating time

of the relay ♦ Record the operating time. ♦ Repeat the test for different time dial.

6.0 Documents

Test sheet TS-LR01 shall be completed for each and every lockout or tipping Relay. 7.0 References 8.0 Attachment

8.1 Test Sheet for timing Relays

***End of the Procedure***

Page 499

Page 500: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

Riyadh Po“1062

STARTU

TES

ower plant21166/00”

UP MANUA

ST SH

t # 10

AL DF

EETS

Date:13 Feb,09

Revision0

n:

Page 500

Page 501: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-HR01 Page 1 of 2

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Timing Relay

Date: 13/02/09,Revision: 0

1.0 Relay General Data Function Serial No. Make Model No. Diagram no. Aux. Voltage Frequency Firmware no. Rated voltage Rated current: No of logic Inputs: No of outputs:

2.0 Visual Inspection

Item Description Checked 1 Inspect for any physical damage or defects.

2 Verify connections as per approved drawings. 3 Connection on Relay terminals are good

4 Ferrules are according to the drawings 3.0 Electrical Test: 4.1. Function Test

ITEM DESCRIPTION CHECKED

1 Flag Operation checked.

2 ALL contacts checked.

3 Output contacts checked.

4 All output contacts resistance measured 4.2. Pickup and dropout test

Volts(V) Current(mA) Volts(V) Current(mA) PICK UP Value for operate PICK UP Value for Reset

Operating range:

Page 501

Page 502: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-HR01 Page 2 of 2

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Timing Relay

Date: 13/02/09,Revision: 0

4.3. Operating Time Test (at 100 % of rated voltage).

T im e fo r o p e r a te ( m sec ) C o n ta c ts T im e fo r re st ( m sec ) C o n ta c ts

4.4. Relay Burden During Operation

Operate

Rest

Coil Voltage(V) Current(mA) Watts(W)

Test Equipment Model Cal due date Test Equipment Model Cal due date

Page 502

Page 503: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

TEST

Riyadh Po“1062

STARTU

TING PTRIP

ower plant21166/00”

UP MANUA

PROCPING

t # 10

AL DF

EDURRELAY

Date:13 Feb,09

RE FORY

Revision0

R

n:

Page 503

Page 504: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-LR1, Page 1 of 3 Equipment : Tripping/lockout Relay Date:13 Feb,09 Revision: 0

TABLE OF CONTENT

1. Task a. Work Status------------------------------------------------------------------------------------------------2 b. Documentation--------------------------------------------------------------------------------------------2 c. Personnel---------------------------------------------------------------------------------------------------2 d. Measuring Instrumentation-----------------------------------------------------------------------------2

2. Preconditions---------------------------------------------------------------------------------------------------2 3. Precautions------------------------------------------------------------------------------------------------------2 4. Scope--------------------------------------------------------------------------------------------------------------2 5. Execution---------------------------------------------------------------------------------------------------------2

a. Visual Inspection------------------------------------------------------------------------------------------2 b. Testing of Tripping Relay

a. Electrical Function test i. Manual operation checks---------------------------------------------------------------3

b. Secondary Injection i. Minimum Voltage Pick-Up Verification----------------------------------------------3 ii. Operating time Measurment-----------------------------------------------------------3

6. Documents-------------------------------------------------------------------------------------------------------3 7. Reference---------------------------------------------------------------------------------------------------------3 8. Attachment-------------------------------------------------------------------------------------------------------3

Page 504

Page 505: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-LR1, Page 2 of 3 Equipment : Tripping/lockout Relay Date:13 Feb,09 Revision: 0

1.0 Task

All the tripping or lockout relays shall be tested for correct operation 2.0 Preconditions

2.1 Work Status • Erection has been completed. • Labelling of the equipment

2.2 Documentation • The circuit diagrams of the electrical equipment cabinets are available • Commissioning checklists TS-LR01

2.3 Personnel • 1 Commissioning engineer: Engineer or technician with experience in

commissioning of Protection Relays • 1 Helper: skilled worker with adequate on-the-job training.

2.4 Measuring Instruments and Tools

• Three or single phase Secondary Injection test set • Fluke

3.0 Precautions • Observe the rules for handling electronic components sensitive to electrostatic

discharge (ESD measures). • Special safety arrangements shall be made for all areas which are not explicitly

designated as” electrical operating areas” when performing tests at voltages in excess of 50V.

4.0 Scope • Testing cable connections, • Checking that the mounting position is correct,

5.0 Execution

5.1 Visual Checks • Checking of the cables for damage and that they are connected correctly, • Inspection for physical connection as per approved drawings. • Inspection for correct tightness for connection • Checking ferrules

5.2 Testing of Trip Circuit Supervision Relay. Relay can be tested by using single phase secondary injection test set at the front panel mounted test facilities. Enter the rating plate data in check list TS-LR01 and compare the Relay data with the data contained in the circuit documentation. The following test shall be carried out

1. Electrical Function test 1. Manual operation checks

2. Secondary Injection 1. Minimum Voltage Pick-Up Verification

Page 505

Page 506: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-LR1, Page 3 of 3 Equipment : Tripping/lockout Relay Date:13 Feb,09 Revision: 0

2. Operating time Measurment 3. Measurment of coil Resistance

5.2.1 Electrical Function test 5.2.1.1 Manual operation checks

Lockout or tripping relay should be checked for manual operation by operating plunger or the lever

5.2.2 Secondary Injection

Connection between the relay and secondary injection set is made as per figure below.

TRIP

CO

NTA

CT

TRIPPINGRELAYRELAY TEST SET

+

-

DC

VO

LTA

GE

TER

MIN

ALS

TIM

ER

TRIPPING RELAY TESTING ARRANGEMENT

TEST PLUG

CO

ILTE

RM

INA

LS+

-

5.2.2.1 Voltage Pick-Up Verification

♦ Connect the voltage test set on the relay voltage terminals

♦ Connect the timer to the relay tripping contact ♦ Slowly increase the voltage until the relay pick-up ♦ Record the pick-up voltage

Delay Time Verification ♦ Connect the voltage test set on the relay voltage

terminals ♦ Connect the timer to the relay tripping contact ♦ Apply the testing voltage and monitor the operating time

of the relay ♦ Record the operating time.

5.2.2.2 Coil Resistance Measurment.

♦ Connect the fluke across the terminal of the coil and measure the Resistance

6.0 Documents Test sheet TS-LR01 shall be completed for each and every lockout or tipping Relay.

7.0 References 8.0 Attachment

8.1 Test Sheet for Tripping Relays TS-LR01

***End of the Procedure***

Page 506

Page 507: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

Riyadh Po“1062

STARTU

TES

ower plant21166/00”

UP MANUA

ST SH

t # 10

AL DF

EETS

Date:13 Feb,09

Revision0

n:

Page 507

Page 508: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-LR01 Page 1 of 2

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Tripping Relay-MVAJ (AREVA)

Date: 13/02/09,Revision: 0

1.0 Relay General Data Function Serial No. Make Model No. Diagram no. Aux. Voltage Frequency Firmware no. Rated voltage Rated current: No of logic Inputs: No of outputs:

2.0 Visual Inspection

Item Description Checked 1 Inspect for any physical damage or defects.

2 Verify connections as per approved drawings. 3 Connection on Relay terminals are good

4 Ferrules are according to the drawings 3.0 Electrical Test: 4.1. Function Test

ITEM DESCRIPTION CHECKED

1 Flag Operation checked.

2 ALL contacts checked.

3 Trip contacts checked.

4 All output contacts resistance measured 4.2. Measurement of Aux, supply voltage and current

Volts(V) Current(mA) Volts(V) Current(mA) PICK UP Value for operate PICK UP Value for Reset

Operating range: Minimum Operating Voltage 35 % of lower Rated Voltage (Technical data page 8)

Page 508

Page 509: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-LR01 Page 2 of 2

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Tripping Relay-MVAJ (AREVA)

Date: 13/02/09,Revision: 0

4.3. Operating Time Test (at 100 % of rated voltage).

T im e fo r o p e r a te ( m sec ) C o n ta c ts T im e fo r re st ( m sec ) C o n ta c ts

Limits:

Time limits for operate Coil: < 10 m sec Time limits for Reset Coil: <20 m sec (AS per Technical Data Page 8)

4.4. Relay Burden During Operation

Operate

Rest

Coil Voltage(V) Current(mA) Watts(W)

Limits: Relay Burden for Operate Coil < 150 W Relay Burden for Reset Coil < 40 W (AS per Technical Data Page 8)

Test Equipment Model Cal due date Test Equipment Model Cal due date

Page 509

Page 510: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

TESTSY

Riyadh Po“1062

STARTU

TING PYNCH

ower plant21166/00”

UP MANUA

PROCCHEC

t # 10

AL DF

EDURCK RE

Date:13 Feb,09

RE FORLAY

Revision0

R

n:

Page 510

Page 511: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-SR01, Page 1 of 8 Equipment : Synchronous Check Relay Date:13 Feb,09 Revision: 0

TABLE OF CONTENT

1. Task a. Work Status------------------------------------------------------------------------------------------------2 b. Documentation--------------------------------------------------------------------------------------------2 c. Personnel---------------------------------------------------------------------------------------------------2 d. Measuring Instrumentation-----------------------------------------------------------------------------2

2. Preconditions---------------------------------------------------------------------------------------------------2 3. Precautions------------------------------------------------------------------------------------------------------2 4. Scope--------------------------------------------------------------------------------------------------------------2 5. Execution---------------------------------------------------------------------------------------------------------2

a. Visual Checks ------------------------------------------------------------------------------------------2 b. Testing of Tripping Relay

1. Electrical Function test

1. Functional check of Test Plug------------------------------------------------------------3 2. Secondary Injection

1. Relay Power measurement---------------------------------------------------------------3 2. Testing of LEDs------------------------------------------------------------------------------3 3. Testing of out put relays-------------------------------------------------------------------4 4. Testing of input Devices-------------------------------------------------------------------4 5. Metering function----------------------------------------------------------------------------4 6. Live line- Live bus (synchronous ) test-------------------------------------------------4

i. Difference in voltage test-------------------------------------------------------------5 ii. Difference in frequency --------------------------------------------------------------5 iii. Difference in phase angle------------------------------------------------------------5 iv. Under voltage blocking test----------------------------------------------------------6

7. Dead line –Dead bus test-----------------------------------------------------------------6 8. Dead Bus-Live line test--------------------------------------------------------------------6 9. Dead Line – Dead bus---------------------------------------------------------------------7 10. MCB for bus and line under voltage trip blocking-----------------------------------7

6. Documents-------------------------------------------------------------------------------------------------------8 7. Reference---------------------------------------------------------------------------------------------------------8 8. Attachment-------------------------------------------------------------------------------------------------------8

Page 511

Page 512: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-SR01, Page 2 of 8 Equipment : Synchronous Check Relay Date:13 Feb,09 Revision: 0

1.0 Task:

All the Synchronous check relays shall be tested for their correct function.

2.0 Preconditions:

2.1 Work status • Erection has been completed. • Labelling of the equipment

2.2 Documentation • The circuit diagrams of the electrical equipment cabinets are available • Commissioning checklists TS-SR01 • Approved relay settings should be available

2.3 Personnel • 1 Commissioning engineer: Engineer or technician with experience in

commissioning of Protection Relays • 1 Helper: skilled worker with adequate on-the-job training.

2.4 Measuring Instruments and Tools

• Three or single phase Secondary Injection test set • Phase Shifter • Fluke

3.0 Precautions • Observe the rules for handling electronic components sensitive to electrostatic

discharge (ESD measures). • Special safety arrangements shall be made for all areas which are not explicitly

designated as” electrical operating areas” when performing tests at voltages in excess of 50V.

4.0 Scope • Testing cable connections, • Checking that the mounting position is correct,

5.0 Execution

5.1 Visual Checks • Checking of the cables for damage and that they are connected correctly, • Inspection for physical connection as per approved drawings. • Inspection for correct tightness for connection • Checking ferrules

5.2 Testing of Synchronous Check Relay.

Relay can be tested by using three or single phase secondary injection test set at the front panel mounted test facilities. Final calibration test of all protective relays must be carried out on approved settings,

Page 512

Page 513: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-SR01, Page 3 of 8 Equipment : Synchronous Check Relay Date:13 Feb,09 Revision: 0

Enter the rating plate data in check list TS-SR01 and compare the Relay data with the data contained in the circuit documentation. The following test shall be carried out

1. Electrical Function test 1. Functional check of Test Plug

2. Secondary Injection 1. Relay Power measurment 2. Testing of LEDs 3. Testing of out put relays 4. Testing of input Devices 5. Metering function 6. Live line- Live bus (synchronous ) test

i. Difference in voltage test ii. Difference in frequency iii. Difference in phase angle iv. Under voltage blocking test

7. Dead line –Dead bus test 8. Dead Bus-Live line test 9. Dead Line – Dead Bus 10. MCB for bus and line under voltage trip blocking

5.2.1 Electrical Function Test

5.2.1.1 Functional check of Test Plug Test Plug should be checked for its correct function, terminals should be checked for its correct current, auxiliary power and tripping assignment as per the circuit drawing

5.2.2 Secondary Injection Connection between the relay and secondary injection set is made as per figure below.

RE

LAY

CO

NTA

CT

SYNCH. CHECKRELAYRELAY TEST SET

R

Y

B

N

VO

LTA

GE

TER

MIN

ALS

TIM

ER

SYNCHRO-CHECK RELAY TESTING ARRANGEMENT

TEST PLUG

BUSVOLTAGE

LINEVOLTAGE

5.2.2.1 Relay Power Measurement Apply rated DC or AC auxiliary voltage to the power terminal of the relay through suitable ammeter and voltmeter Measure the current and voltage. Product of two gives power consumption of the relay.

Page 513

Page 514: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-SR01, Page 4 of 8 Equipment : Synchronous Check Relay Date:13 Feb,09 Revision: 0

5.2.2.2 Configuration of the Relay

Relay should be configured for inputs, outputs, and LED assignment as per final setting either through front panel of the relay or through lap top, communicating with relay.

5.2.2.3 Testing of LEDs Check the operation of LEDs first by pressing reset button, all the LEDs should light for 2 to 3 seconds Check the operation of LEDs for their function by injecting Voltage or by simulating the software.

5.2.2.4 Testing of out Put Relays By simulation or by performing secondary injection, check the operation of output relays as per the relay configuration. Measure the contact resistance of the each output relay with fluke

5.2.2.5 Testing of Digital Inputs Connect a variable auxiliary DC or AC voltage to each and every Digital input Increase the voltage till the digital input picks up (a temporary LED may be assigned to see the pickup) thus a minimum voltage required to operate digital input is noted.

5.2.2.6 Metering Function Configure the relay for VT ratio Apply three phase 25%, 50%, 75% and 100% of nominal Voltage on Voltage relay and note down the corresponding readings on the relay.

5.2.2.7 Live line- Live bus (synchronous ) test 5.2.2.7.1 Difference in Voltage test

♦ Apply the testing relay setting on the relay noting that. Only live line- live bus function is enabled.

♦ Connect the voltage test set on the relay voltage terminals

♦ Connect test set stop input to the relay output contact

♦ Apply the line and bus voltage with o Zero differential voltage. o Zero differential frequency. o Zero differential phase angle.

Page 514

Page 515: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-SR01, Page 5 of 8 Equipment : Synchronous Check Relay Date:13 Feb,09 Revision: 0

♦ The relay should operate now giving CB close permissive signal.

♦ Slowly increase the bus voltage in order to increase the voltage difference until out put relay for CB close permissive drops out.

♦ Record the differential voltage ♦ Slowly decrease the bus voltage in order to reduce

voltage difference until the out put relay for CB close permissive picks up.

♦ Slowly increase the line voltage in order to increase the voltage difference until out put relay for CB close permissive drops out.

♦ Record the differential voltage 5.2.2.7.2 Difference in Frequency

♦ Apply the testing relay setting on the relay noting that. o Only live line live bus function is enabled.

♦ Connect the voltage test set on the relay voltage terminals

♦ Connect test set stop input to the relay output contact

♦ Apply the line and bus voltage with o Zero differential voltage. o Zero differential frequency. o Zero differential phase angle.

♦ The relay should operate now giving CB close permissive signal.

♦ Slowly increase the Frequency of bus voltage in order to increase the Frequency difference until out put relay for CB close permissive drops out.

♦ Record the differential Frequency ♦ Slowly decrease the Frequency of bus voltage in

order to decrease the Frequency difference until out put relay for CB close permissive picks out.

♦ Slowly increase the Frequency of line voltage in order to increase the Frequency difference until out put relay for CB close permissive drops out.

♦ Record the differential Frequency 5.2.2.7.3 Difference in Phase Angle

♦ Apply the testing relay setting on the relay noting that. o Only live line live bus function is enabled.

♦ Connect the voltage test set on the relay voltage terminals

♦ Connect test set stop input to the relay output contact

♦ Apply the line and bus voltage with o Zero differential voltage.

Page 515

Page 516: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-SR01, Page 6 of 8 Equipment : Synchronous Check Relay Date:13 Feb,09 Revision: 0

o Zero differential frequency. o Zero differential phase angle

♦ The relay should operate now giving CB close permissive signal.

♦ Slowly increase the phase angle difference until out put relay for CB close permissive drops out.

♦ Record the differential phase angle 5.2.2.7.4 Under Voltage blocking Test

♦ Apply the testing relay setting on the relay noting that. o Only live line live bus function is enabled.

♦ Connect the voltage test set on the relay voltage terminals

♦ Connect test set stop input to the relay output contact

♦ Apply rated voltage to the line and bus voltage with o Zero differential voltage o Zero differential frequency o Zero differential phase angle

♦ The relay should operate now giving CB close permissive signal.

♦ Slowly reduce both of line and bus voltage simultaneously till the under voltage blocking output relay operate

♦ Record the under voltage blocking voltage

5.2.2.8 Dead line –Live Bus Test ♦ Apply the testing relay setting on the relay noting that.

o Enable live line live bus function o Enable Dead line live bus function

♦ Connect the voltage test set on the relay voltage terminals ♦ Connect test set stop input to the relay output contact ♦ Apply rated voltage to the line and bus voltage with

o Zero differential voltage o Zero differential frequency o Zero differential phase angle

♦ The relay should operate now giving CB close permissive signal.

♦ Slowly reduce line voltage until the out put relay for CB close permissive drops out.

♦ Continue reducing line voltage until the out put relay for CB close permissive picks up

♦ Record the dead line voltage

5.2.2.9 Dead Bus-Live line Test ♦ Apply the testing relay setting on the relay noting that.

o Enable live line live bus function o Enable Dead bus live line function

♦ Connect the voltage test set on the relay voltage terminals

Page 516

Page 517: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-SR01, Page 7 of 8 Equipment : Synchronous Check Relay Date:13 Feb,09 Revision: 0

♦ Connect test set stop input to the relay output contact ♦ Apply rated voltage to the line and bus voltage with

o Zero differential voltage o Zero differential frequency o Zero differential phase angle

♦ The relay should operate now giving CB close permissive signal.

♦ Slowly reduce bus voltage until the out put relay for CB close permissive drops out.

♦ Continue reducing bus voltage until the out put relay for CB close permissive picks up

♦ Record the dead line voltage

5.2.2.10 Dead Line – Dead Bus ♦ Apply the testing relay setting on the relay noting that.

o Enable live line live bus function o Enable Dead line Dead bus function

♦ Connect the voltage test set on the relay voltage terminals ♦ Connect test set stop input to the relay output contact ♦ Apply rated voltage to the line and bus voltage with

o Zero differential voltage o Zero differential frequency o Zero differential phase angle

♦ The relay should operate now giving CB close permissive signal.

♦ Slowly reduce line and bus voltage simultaneously until the out put relay for CB close permissive drops out.

♦ Continue reducing line and bus voltage simultaneously until the out put relay for CB close permissive picks up.

♦ Record the dead line voltage 5.2.2.11 MCB for Bus and line Voltage trip blocking

♦ Apply the testing relay setting on the relay noting that. o Enable live line-live bus function o Enable Dead Bus –live line function o Enable Dead Line –live bus function o Enable Dead line Dead bus function

♦ Connect the voltage test set on the relay voltage terminals ♦ Connect test set stop input to the relay output contact ♦ Apply rated voltage to the line and bus voltage with

o Zero differential voltage o Zero differential frequency o Zero differential phase angle

♦ The relay should operate now giving CB close permissive signal.

♦ Simulate MCB Trip input to the relay and Reduce Bus voltage ♦ Check there should not be any permissive from the relay for

CB close ♦ Repeat the test for Line voltage MCB trip

Page 517

Page 518: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-SR01, Page 8 of 8 Equipment : Synchronous Check Relay Date:13 Feb,09 Revision: 0

6.0 Documents

Test sheet TS-SR01 shall be completed for each and every Voltage Relay.

7.0 References 8.0 Attachment

8.1 Test Sheet for Synchronous Relay TS-SR01

***End of the Procedure***

Page 518

Page 519: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

Riyadh Po“1062

STARTU

TES

ower plant21166/00”

UP MANUA

ST SH

t # 10

AL DF

EETS

Date:13 Feb,09

Revision0

n:

Page 519

Page 520: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-SR01A Page 1 of 3

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Synch Check Relay-SPUA140C (ABB)

Date: 13/02/09,Revision: 0

1.0 Relay General Data Function Serial No. Make Model No. Diagram no. Aux. Voltage Frequency Firmware no. Rated voltage Rated current: No of logic Inputs: No of outputs:

2.0 Visual Inspection

Item Description Checked 1 Inspect for any physical damage or defects.

2 Verify connections as per approved drawings. 3 Connection on Relay terminals are good

4 Ferrules are according to the drawings 3.0 Electrical Test: 4.1. Function Test

Item Description

1 Test switch/plug checked for correct function. Yes N/A

2 Case earthing checked. Yes N/A

3 Indications checked. Yes N/A

4 Output contacts checked. Yes N/A

5 Hot line Dead bus condition checked. Yes N/A

6 Dead line Hot bus condition checked. Yes N/A

7 Pulse/Continuous output checked Yes N/A

Page 520

Page 521: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-SR01A Page 2 of 3

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Synch Check Relay-SPUA140C (ABB)

Date: 13/02/09,Revision: 0

4.2. Secondary Injection Test 3.2.1. Synch-Check Unit , Voltage Check set Umax=

Set value Δu /un

Applied Voltage u3

Measured voltage Stage-1

Measured voltage u3 stage-2 Limits

PICK-UP DROP-OFF PICK-UP DROP-OFF

0.1XUn 110

0.2XUn 110

0.3XUn 110

± 3 % of set value

3.2.2. Synch-check Unit, Frequency Check

Pick-up Set frequency Δf Hz Stage-1 Hz Stage-2 hz

Limits

0.05

0.10

0.15

± 0.02 Hz

3.2.3. Synch-check Unit , Phase Angle Check Set Value Angle difference

∆Ф Pick-up Stage-1 Pick-up Stage-2 Limits

10°

15°

± 2°

3.2.4. Voltage-check Unit:, Voltage Check Set Umax= Direction U1→U2 and U2→U3 Umin=

Set Value min

Measured voltage min stage-1 stage-2

Pick-up Drop-off Pick-up Drop-off Limits (%)

0.2 Un ± 3 % of set value

Page 521

Page 522: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-SR01A Page 3 of 3

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Synch Check Relay-SPUA140C (ABB)

Date: 13/02/09,Revision: 0

3.2.5. Voltage-check Unit:, Timing Test

Operating time Limits (s) Set value

Stage 1 Stage 2

1 s

5 s

20 s

± 2% or 25ms

Test Equipment Model Cal due date Test Equipment Model Cal due date

Page 522

Page 523: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

TEST

Riyadh Po“1062

STARTU

TING PVOLT

ower plant21166/00”

UP MANUA

PROCTAGE

t # 10

AL DF

EDURRELAY

Date:13 Feb,09

RE FORY

Revision0

R

n:

Page 523

Page 524: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-VR01, Page 1 of 7 Equipment : Over Voltage and Under Relay Date:13 Feb,09 Revision: 0

TABLE OF CONTENT

1. Task a. Work Status------------------------------------------------------------------------------------------------2 b. Documentation--------------------------------------------------------------------------------------------2 c. Personnel---------------------------------------------------------------------------------------------------2 d. Measuring Instrumentation-----------------------------------------------------------------------------2

2. Preconditions---------------------------------------------------------------------------------------------------2 3. Precautions------------------------------------------------------------------------------------------------------2 4. Scope--------------------------------------------------------------------------------------------------------------2 5. Execution---------------------------------------------------------------------------------------------------------2

a. Visual Checks ------------------------------------------------------------------------------------------2 b. Testing of Tripping Relay

1. Electrical Function test----------------------------------------------------------------------------3 1. Functional check of Test Plug

2. Secondary Injection 1. Relay Power measurement------------------------------------------------------------3 2. Testing of LEDs--------------------------------------------------------------------------4 3. Testing of out put relays----------------------------------------------------------------4 4. Testing of input Devices----------------------------------------------------------------4 5. Metering function-------------------------------------------------------------------------4 6. Under Voltage Function----------------------------------------------------------------4 7. Over voltage test-------------------------------------------------------------------------5

6. Documents-------------------------------------------------------------------------------------------------------7 7. Reference---------------------------------------------------------------------------------------------------------7 8. Attachment-------------------------------------------------------------------------------------------------------7

Page 524

Page 525: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-VR01, Page 2 of 7 Equipment : Over Voltage and Under Relay Date:13 Feb,09 Revision: 0

1.0 Task

All the voltage relays shall be tested for under and over voltage function 2.0 Preconditions

2.1 Work Status • Erection has been completed. • Labelling of the equipment

2.2 Documentation • The circuit diagrams of the electrical equipment cabinets are available • Commissioning checklists TS-VR01 • Approved relay settings should be available

2.3 Personnel • 1 Commissioning engineer: Engineer or technician with experience in

commissioning of Protection Relays • 1 Helper: skilled worker with adequate on-the-job training.

2.4 Measuring Instruments and Tools

• Three or single phase Secondary Injection test set • Fluke

3.0 Precautions • Observe the rules for handling electronic components sensitive to electrostatic

discharge (ESD measures). • Special safety arrangements shall be made for all areas which are not explicitly

designated as” electrical operating areas” when performing tests at voltages in excess of 50V.

4.0 Scope • Testing cable connections, • Checking that the mounting position is correct,

5.0 Execution

5.1 Visual Checks • Checking of the cables for damage and that they are connected correctly, • Inspection for physical connection as per approved drawings. • Inspection for correct tightness for connection • Checking ferrules

5.2 Testing of Over and under Voltage Relay.

Relay can be tested by using three or single phase secondary injection test set at the front panel mounted test facilities. Final calibration test of all protective relays must be carried out on approved settings,

Page 525

Page 526: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-VR01, Page 3 of 7 Equipment : Over Voltage and Under Relay Date:13 Feb,09 Revision: 0

Enter the rating plate data in check list TS-VR01 and compare the Relay data with the data contained in the circuit documentation. The following test shall be carried out

3. Electrical Function test

1. Functional check of Test Plug 4. Secondary Injection

1. Relay Power measurment 2. Testing of LEDs 3. Testing of out put relays 4. Testing of input Devices 5. Metering function 6. Under Voltage Function

i. Pickup/dropout test ii. Timing test

7. Over voltage test i. Pickup/dropout ii. Timing test

5.2.1 Electrical Function Test

5.2.1.1 Functional check of Test Plug Test Plug should be checked for its correct function, terminals should be checked for its correct current, auxiliary power and tripping assignment as per the circuit drawing

5.2.2 Secondary Injection Connection between the relay and secondary injection set is made as per figure below.

TRIP

CO

NTA

CT

RES. VOLTAGEE/F RELAYRELAY TEST SET

R

Y

B

N

VO

LTA

GE

TER

MIN

ALS

TIM

ER

RESIDUAL VOLTAGE E/F RELAY TESTING ARRANGEMENT

TEST PLUG

VO

LTA

GE

TER

MIN

ALS

5.2.2.1 Relay Power Measurment Apply rated DC or AC auxiliary voltage to the power terminal of the relay through suitable ammeter and voltmeter Measure the current and voltage. Product of two gives power consumption of the relay.

5.2.2.2 Configuration of the Relay Relay should be configured for inputs, outputs, and LED assignment as per final setting either through front panel of the relay or through lap top, communicating with relay.

Page 526

Page 527: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-VR01, Page 4 of 7 Equipment : Over Voltage and Under Relay Date:13 Feb,09 Revision: 0

5.2.2.3 Testing of LEDs Check the operation of LEDs first by pressing reset button, all the LEDs should light for 2 to 3 seconds Check the operation of LEDs for their function by injecting Voltage or by simulating the software.

5.2.2.4 Testing of out put Relays By simulation or by performing secondary injection, check the operation of output relays as per the relay configuration. Measure the contact resistance of the each output relay with fluke

5.2.2.5 Testing of Digital Inputs Connect a variable auxiliary DC or AC voltage to each and every Digital input. Increase the voltage till the digital input picks up (a temporary LED may be assigned to see the pickup) thus a minimum voltage required to operate digital input is noted.

5.2.2.6 Metering function Configure the relay for VT ratio. Apply three phase 25%, 50%, 75% and 100% of nominal Voltage on Voltage relay and note down the corresponding readings on the relay.

5.2.2.7 Under Voltage Function

i. Pickup/dropout test ♦ Apply the testing relays setting with instantaneous

tripping time on the relay ♦ Connect the voltage test set on the relay voltage

terminals ♦ Connect the timer to the relay tripping contact ♦ Slowly Increase the applied voltage until the relay

Drop out ♦ Record the Drop out voltage ♦ Slowly Decrease the applied voltage until the relay

pick-up ♦ Record the pick-up voltage

ii. Timing test ♦ Select the operating time on the relay ♦ Connect the voltage test set on the relay voltage

terminals ♦ Connect the timer to the relay tripping contact ♦ Apply the testing voltage(fault Voltage) and monitor

the operating time of the relay ♦ Record the operating time.

Page 527

Page 528: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-VR01, Page 5 of 7 Equipment : Over Voltage and Under Relay Date:13 Feb,09 Revision: 0

5.2.2.8 Over Voltage Test

i. Pickup/dropout test ♦ Apply the testing relays setting with instantaneous

tripping time on the relay ♦ Connect the voltage test set on the relay voltage

terminals ♦ Connect the timer to the relay tripping contact ♦ Slowly Increase the applied voltage until the relay

Picks up. ♦ Record the Pick-up voltage ♦ Slowly Decrease the applied voltage until the relay

Drops out ♦ Record the Drop-out voltage

ii. Timing test ♦ Select the operating time on the relay ♦ Connect the voltage test set on the relay voltage

terminals ♦ Connect the timer to the relay tripping contact ♦ Apply the testing voltage(fault voltage) and monitor

the operating time of the relay ♦ Record the operating time.

5.2.2.9 Voltage Relay Testing by SVERKER-750 To test the voltage relay by SVERKER-750 fallow the below procedure

Page 528

Page 529: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-VR01, Page 6 of 7 Equipment : Over Voltage and Under Relay Date:13 Feb,09 Revision: 0

Page 529

Page 530: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-VR01, Page 7 of 7 Equipment : Over Voltage and Under Relay Date:13 Feb,09 Revision: 0

6.0 Documents Test sheet TS-VR01 shall be completed for each and every Voltage Relay. 7.0 References 8.0 Attachment

8.1 Test Sheet for Voltage Relay : TS-VR01 ***End of the Procedure***

Page 530

Page 531: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

Riyadh Po“1062

STARTU

TES

ower plant21166/00”

UP MANUA

ST SH

t # 10

AL DF

EETS

Date:13 Feb,09

Revision0

n:

Page 531

Page 532: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-VR01 Page 1 of 6

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Voltage Relay(GE-MVII)

Date:13/02/09, Revision: 0

1.0 Relay General Data Function Serial No. Make Model No. Diagram no. Aux. Voltage Frequency Firmware no. Rated voltage Rated current: No of logic Inputs: No of outputs:

2.0 Visual Inspection

Item Description Checked 1 S/L. No. on Module, Cover and Case are identical

2 Inspect for any physical damage or defects.

3 Verify connections as per approved drawings. 4 Check that serial no. of relay matching with serial no. of display.

5 Relay case connected to local earth bar

6 Tightness of contact of the relay and CT shorting terminal makes good contact when relay is withdrawn

7 Connection on Relay terminals are good

8 Ferrules are according to the drawings

9 Test and settings switches operate properly

10 CT shorting function checked.

3.0 Electrical Functional Test.

• Test switch / Test Block CT shorting contacts proved

• Relay CT shorting contacts proved

4.0 Secondary Injection test.

4.1. Relay Power Measurment at Rated Voltage(Burden Test) Current (mA) Burden (W) Nominal Burden (W)

Terminal Voltage (V) Quiescent Output

Operated Quiescent Output Operated Quiescent Max

< W < W

Page 532

Page 533: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-VR01 Page 2 of 6

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Voltage Relay(GE-MVII)

Date:13/02/09, Revision: 0

4.2. Testing Of LED’s

LED Number Assigned Function Results Remarks LED-1 LED-2 LED-3 LED-4

4.3. Testing Of Out Put Relays

Output Relay No.

Output Contact

No.

Output relay

status

Contact Operation

check

Actual Assignment

of Relays

Contact Resistance(

Ω) Remarks

Trip A5-B6 OUT-1 A7-B7 OUT-2 A7-B8 OUT-3 A7-B9 OUT-4 A7-B10

4.4. Testing Of Binary Inputs

(Energize only one OPTO INPUT at a time with relay rated OPTO input voltage – CAUTION!! -Check RATED OPTO INPUT VOLTAGE before apply voltage to OPTO Input terminal)

V DC Applied OPTO Input No. Terminal No. Minimum Pickup

Voltage(V)

Status of OPTO INPUT

Function assigned for OPTO INPUT

Remarks

CC1 A10-A8(CC1) CC1 A10-A9(CC2)

4.5. Metering Function

Phase Injected Voltage(A) Applied VT ratio Displayed

Voltage % Error Remarks

R-N Y-N B-N R-Y Y-B B-R

Page 533

Page 534: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-VR01 Page 3 of 6

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Voltage Relay(GE-MVII)

Date:13/02/09, Revision: 0

4.6. Testing of Time Voltage element (IEC CURVE).t

4.6.1. Under voltage function(<27)

4.6.2. Pickup/dropout test

Function Test

Phase.

Pickup Setting

P/U(V)

D/O(V) Remarks

27P1 R,Y, B 27P2 R,Y,B

4.6.3. Timing Test

Measured time at 0 volts Function

Phase.

Pickup Setting

Time Settings

Actual time Cal Time Remarks

27P1 R,Y, B 27P2 R,Y,B

4.7. Over Voltage function(>27)

4.7.1. Pickup/dropout test

Function Test

Phase.

Pickup Setting

P/U(V)

D/O(V) Remarks

27P3 R,Y,B 27P4 R,Y,B

4.7.2. Timing Test

Measured time at 0 volts Function

Phase.

Pickup Setting

Time Settings

Actual time Cal Time Remarks

27P3 R,Y,B 27P4 R,Y,B

Page 534

Page 535: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-VR01 Page 4 of 6

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Voltage Relay(GE-MVII)

Date:13/02/09, Revision: 0

4.7.3. Over Voltage (59P)

4.7.4. Pickup/dropout test

Function Test

Phase.

Pickup Setting

P/U(V)

D/O(V) Remarks

59P1 R,Y, B 59P2 R,Y,B

4.7.5. Timing Test

Measured time at 0 volts Function

Phase.

Pickup Setting

Time Settings

Actual time Cal Time Remarks

59P1 R,Y, B 59P2 R,Y,B

4.8. Over Voltage (59N) Neutral over voltage

4.8.1. Pickup/dropout test

Function Test

Phase.

Pickup Setting

P/U(V)

D/O(V) Remarks

59N1 R,Y,B 59N2 R,Y,B

4.8.2. Timing Test

Measured time at 0 volts Function

Phase.

Pickup Setting

Time Settings

Actual time Cal Time Remarks

59N1 R,Y,B 59N2 R,Y,B

4.9. Testing at reduced voltage (90V Auxiliary Supply)

Testing of Time over current(Ground ) Output Relays/Tripping Time (Sec) Stage

Elem

.

Pickup setting(V)

TD Actual Time

Trip Out-1 Out-2 Out-3 Out-4

27P RYB

Page 535

Page 536: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-VR01 Page 5 of 6

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Voltage Relay(GE-MVII)

Date:13/02/09, Revision: 0

4.10. Testing at Final Settings.

4.10.1. Final Settings FUNCTION SETTINGS UNITS REMARKS

4.10.1.1. Product setup Relay Operation Enable Frequency 60 Hz Application 3P+N WYE

4.10.1.2. 27P1 Function 27P1 Trip Enable 27P1 pickup X In 27P1 Time Delay 27P1 52 Supervision No

4.10.1.3. 27P2 Function 27P2 Trip Disable 27P2 pickup X In 27P2 Time Delay 27P2 52 Supervision No

4.10.1.4. 59P1Function 59P1 Trip Disable 59P1 pickup X In 59P1 Time Delay

4.10.1.5. 59P2Function 59P2 Trip Disable 59P2 pickup X In 59P2 Time Delay

4.10.1.6. 59N1Function 59N1 Trip Disable 59N1 pickup X In 59N1 Time Delay

4.10.1.7. 59N2Function 59N2 Trip Disable 59N2 pickup X In 59N2 Time Delay

4.10.1.8. Relay Configuration 4.10.1.8.1. INPUTS

Input 1 No Definition Input 2 No Definition

Page 536

Page 537: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: CT Ratio: CT Class: CT Core No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-VR01 Page 6 of 6

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Voltage Relay(GE-MVII)

Date:13/02/09, Revision: 0

4.10.1.8.2. INPUTS Out put 1 General Trip Out put 2 General Trip Out put 3 General Trip Out put 4 General Trip

4.10.1.8.3. LED’s LED 1 Under Voltage LED 2 Over Voltage LED 3 No Definition LED 4 No Definition

4.10.1.8.4. Advance General Setting Identification Feeder Name Setting Group 1 Trip Minimum Time 100 milliseconds

4.10.1.8.5. Oscillograghy mask Oscillo by Communication No Oscillo by Digital Input No Oscillo by Tripping Yes Oscillo by Pickup Yes

4.10.1.8.6. Event mask All Function Yes

4.10.1.9. Voltage Sensitivity test:

4.10.1.9.1. Time Characteristic Measured time at 0 volts

Function Phase.

Pickup Setting

Time Settings

Actual time Cal Time Remarks

27P1 R,Y, B 27P2 R,Y,B

4.10.2. Fault Record:

Fault record verification done.

4.10.3. Waveform Record: Waveform record verification

4.11. Relay Setting: Final relay setting retrieved through ‘ MIPC ’ software and printout attached.

Test Equipment Model Cal due date Test Equipment Model Cal due date

Page 537

Page 538: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

TESTCU

Riyadh Po“1062

STARTU

TING PRREN

ower plant21166/00”

UP MANUA

PROCT TRA

t # 10

AL DF

EDURANSDU

Date:13 Feb,09

RE FORUCER

Revision0

R

n:

Page 538

Page 539: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consult Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-AX01, Page 1 of 3 Equipment : Current Transducer Date:13 Feb,09 Revision: 0

TABLE OF CONTENT

1. Task a. Work Status----------------------------------------------------------------------------------------------------------2 b. Documentation------------------------------------------------------------------------------------------------------2 c. Personnel-------------------------------------------------------------------------------------------------------------2 d. Measuring Instrumentation---------------------------------------------------------------------------------------2

2. Preconditions-----------------------------------------------------------------------------------------------------------2 3. Precautions--------------------------------------------------------------------------------------------------------------2 4. Scope----------------------------------------------------------------------------------------------------------------------2 5. Execution-----------------------------------------------------------------------------------------------------------------2

a. Visual Inspection--------------------------------------------------------------------------------------------------2 b. Testing of Current Transducer

1. Electrical Function test----------------------------------------------------------------------------------3 2. Secondary Injection--------------------------------------------------------------------------------------3

6. Documents---------------------------------------------------------------------------------------------------------------3 7. Reference-----------------------------------------------------------------------------------------------------------------3 8. Attachment---------------------------------------------------------------------------------------------------------------3

Page 539

Page 540: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consult Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-AX01, Page 2 of 3 Equipment : Current Transducer Date:13 Feb,09 Revision: 0

1.0 Task

All the Current transducers shall be calibrated to check the accuracy for their output. 2.0 Preconditions

2.1 Work Status • Erection has been completed. • Labelling of the equipment

2.2 Documentation • The circuit diagrams of the electrical equipment are available • Commissioning checklists TS-AX01

2.3 Personnel • 1 Commissioning engineer: Engineer or technician with experience in

commissioning of Protection Relays • 1 Helper: skilled worker with adequate on-the-job training.

2.4 Measuring Instruments and Tools

• Standard Ammeter or Fluke • Secondary Injection test set • DC milli ammeter

3.0 Precautions • Observe the rules for handling electronic components sensitive to electrostatic

discharge (ESD measures). • Special safety arrangements shall be made for all areas which are not explicitly

designated as” electrical operating areas” when performing tests at voltages in excess of 50V.

4.0 Scope • Testing cable connections, • Checking that the mounting position is correct,

5.0 Execution

5.1 Visual Checks • Checking of the cables for damage and that they are connected correctly, • Inspection for physical connection as per approved drawings. • Inspection for correct tightness for connection • Checking ferrules

5.2 Testing of Current Transducer Transducer calibration shall be done via front panel mounted test facilities.

• Enter the rating plate data in check list TS-AX01 and compare the

transducer data with the data contained in the circuit documentation. The following test shall be carried out

Page 540

Page 541: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consult Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-AX01, Page 3 of 3 Equipment : Current Transducer Date:13 Feb,09 Revision: 0

3. Electrical Function test 4. Secondary Injection

5.2.1 Electrical Function Test

• Check function of test switch or plug for correct function

5.2.2 Secondary Injection • Connect the current test set on the Current Transducer terminals. • Inject 25, 50, 75 & 100 % of the full-scale current of the Current

Transducer. • Record the corresponding Current Transducer out put. • Inject 100 % of the rated current. • Record corresponding Current Transducer out put.

RELAY TEST SET

R

CU

RR

EN

TTE

RM

INA

LS

CURRENT TRANSDUCER TESTING ARRANGEMENT

A

N INP

UT

TER

MIN

ALS

OU

TPU

TTE

RM

INA

LS

CURRENTTRANSDUCER

6.0 Documents Test Sheet TS-AX01 shall be completed for each and every transducer.

7.0 References 8.0 Attachment

8.1 Test Sheet For Current Transducers TP-AX01 ***End of the Procedure***

Page 541

Page 542: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

Riyadh Po“1062

STARTU

TES

ower plant21166/00”

UP MANUA

ST SH

t # 10

AL DF

EETS

Date:13 Feb,09

Revision0

n:

Page 542

Page 543: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AX01 Page 1 of 2

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Current Transducer

Date:13/02/09, Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

1. Technical data Device : _________ Type : _________ Make : _________ Serial No.(L1,L2,L3) : _________ Input : _________ Class : ___________ Output :__________ CT’S Data: Ratio : _________ Accuracy Class : ___________

2

Mechanical Checks and Visual Inspection 1. Inspect for physical damage/ defects 2. verify connection as per approved drawing 3. check tightness of all connection 4. check ferrules 5. check apparatus list

3

3.1

Electrical Test Functional test 1. Functional check of selector switch 2. Test switch/plug checked for correct function

Page 543

Page 544: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-AX01 Page 2 of 2

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Current Transducer

Date:13/02/09, Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

3.2

Secondary Injection

Phase Injected current A

% of Injection

Measured XDCR O/P

Actual XDCR O/P

% Error

0 25 50 75

R

100 0 25 50 75

Y

100 0 25 50 75

B

100

Test Equipment Model Cal due date Test Equipment Model Cal due date

Page 544

Page 545: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

TESTVO

Riyadh Po“1062

STARTU

TING PLTAG

ower plant21166/00”

UP MANUA

PROCE TRA

t # 10

AL DF

EDURANSDU

Date:13 Feb,09

RE FORUCER

Revision0

R

n:

Page 545

Page 546: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consult Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-VX01, Page 1 of 3 Equipment : Voltage Transducer Date:13 Feb,09 Revision: 0

TABLE OF CONTENT

1. Task a. Work Status----------------------------------------------------------------------------------------------------------2 b. Documentation------------------------------------------------------------------------------------------------------2 c. Personnel-------------------------------------------------------------------------------------------------------------2 d. Measuring Instrumentation---------------------------------------------------------------------------------------2

2. Preconditions-----------------------------------------------------------------------------------------------------------2 3. Precautions--------------------------------------------------------------------------------------------------------------2 4. Scope----------------------------------------------------------------------------------------------------------------------2 5. Execution-----------------------------------------------------------------------------------------------------------------2

a. Visual Inspection--------------------------------------------------------------------------------------------------2 b. Testing of Voltage Transducer

1. Electrical Function test----------------------------------------------------------------------------------3 2. Secondary Injection--------------------------------------------------------------------------------------3

6. Documents---------------------------------------------------------------------------------------------------------------3 7. Reference-----------------------------------------------------------------------------------------------------------------3 8. Attachment---------------------------------------------------------------------------------------------------------------3

Page 546

Page 547: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consult Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-VX01, Page 2 of 3 Equipment : Voltage Transducer Date:13 Feb,09 Revision: 0

1.0 Task

All the Voltage transducers shall be calibrated to check the accuracy for their output.

2.0 Preconditions

2.1 Work status • Erection has been completed. • Labelling of the equipment

2.2 Documentation • The circuit diagrams of the electrical equipment are available • Commissioning checklists TS-VX01

2.3 Personnel • 1 Commissioning engineer: Engineer or technician with experience in

commissioning of Protection Relays • 1 Helper: skilled worker with adequate on-the-job training.

2.4 Measuring instruments and tools

• Standard Ammeter or Fluke • Secondary Injection test set • DC Milli ammeter

3.0 Precautions • Observe the rules for handling electronic components sensitive to electrostatic

discharge (ESD measures). • Special safety arrangements shall be made for all areas which are not explicitly

designated as” electrical operating areas” when performing tests at voltages in excess of 50V.

4.0 Scope • Testing cable connections, • Checking that the mounting position is correct,

5.0 Execution

5.1 Visual checks • Checking of the cables for damage and that they are connected correctly, • Inspection for physical connection as per approved drawings. • Inspection for correct tightness for connection • Checking ferrules

5.2 Testing of Voltage Transducer Transducer calibration shall be done via front panel mounted test facilities.

• Enter the rating plate data in check list TS-AX01 and compare the transducer data with the data contained in the circuit documentation. The following test shall be carried out

3. Electrical Function test 4. Secondary Injection

Page 547

Page 548: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consult Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-VX01, Page 3 of 3 Equipment : Voltage Transducer Date:13 Feb,09 Revision: 0

5.2.1 Electrical Function test

• Check function of test switch or plug for correct function

5.2.2 Secondary Injection • Connect the Voltage test set on the Voltage Transducer terminals. • Inject 25, 50, 75 & 100 % of the full-scale Voltage of the Voltage

Transducer. • Record the corresponding Voltage Transducer out put. • Inject 100 % of the rated Voltage. • Record corresponding Voltage Transducer out put.

RELAY TEST SET

R

VOLT

AG

E

TER

MIN

ALS

VOLTAGE TRANSDUCER TESTING ARRANGEMENT

V

N INP

UT

TER

MIN

ALS

OU

TPU

T TE

RM

INAL

S

VOLTAGE TRANSDUCER

6.0 Documents Test Sheets TS-VX01 shall be completed for each and every transducer.

7.0 References 8.0 Attachment

8.1 Test Sheet for Voltage Transducer TS-VX01 ***End of the Procedure***

Page 548

Page 549: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

Riyadh Po“1062

STARTU

TES

ower plant21166/00”

UP MANUA

ST SH

t # 10

AL DF

EETS

Date:13 Feb,09

Revision0

n:

Page 549

Page 550: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: VT Ratio.

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-VX01, Revision: 0 Page 1 of 2

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Testing of Voltage Transducer

Date: 13/02/09, Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

1. Technical data Device : _________ Type : _________ Make : _________ Serial No.(L1,L2,L3) : _________ Input : _________ Class : ___________ Output :__________ VT’S Data: Ratio : _________ Accuracy Class : __________

2

Mechanical Checks and Visual Inspection 1. Inspect for physical damage/ defects 2. verify connection as per approved drawing 3. check tightness of all connection 4. check ferrules 5. check apparatus list

3

3.1

Electrical Test Functional test 1. Functional check of selector switch 2. Test switch/plug checked for correct function

Page 550

Page 551: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: VT Ratio.

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-VX01, Revision: 0 Page 2 of 2

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Testing of Voltage Transducer

Date: 13/02/09, Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

3.2

Secondary Injection

Phase Injected Voltage (V)

% of Injection

Measured XDCR O/P

Actual XDCR O/P

% Error

0 25 50 75

R

100 0 25 50 75

Y

100 0 25 50 75

B

100

Test Equipment Model Cal due date Test Equipment Model Cal due date

Page 551

Page 552: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

TESTPO

Riyadh Po“1062

STARTU

TING POWER

ower plant21166/00”

UP MANUA

PROCR TRAN

t # 10

AL DF

EDURNSDUC

Date:13 Feb,09

RE FORCER

Revision0

R

n:

Page 552

Page 553: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-PX01, Page 1 of 3 Equipment : Power Transducer Date:13 Feb,09 Revision: 0

TABLE OF CONTENT

1. Task a. Work Status----------------------------------------------------------------------------------------------------------2 b. Documentation------------------------------------------------------------------------------------------------------2 c. Personnel-------------------------------------------------------------------------------------------------------------2 d. Measuring Instrumentation---------------------------------------------------------------------------------------2

2. Preconditions-----------------------------------------------------------------------------------------------------------2 3. Precautions--------------------------------------------------------------------------------------------------------------2 4. Scope----------------------------------------------------------------------------------------------------------------------2 5. Execution-----------------------------------------------------------------------------------------------------------------2

a. Visual Inspection--------------------------------------------------------------------------------------------------2 b. Testing of Power Transducer

1. Electrical Function test----------------------------------------------------------------------------------3 2. Secondary Injection--------------------------------------------------------------------------------------3

6. Documents---------------------------------------------------------------------------------------------------------------3 7. Reference-----------------------------------------------------------------------------------------------------------------3 8. Attachment---------------------------------------------------------------------------------------------------------------3

Page 553

Page 554: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-PX01, Page 2 of 3 Equipment : Power Transducer Date:13 Feb,09 Revision: 0

1.0 Task

All the Power transducers shall be calibrated to check the accuracy for their output.

2.0 Preconditions

2.1 Work status • Erection has been completed. • Labelling of the equipment and designation of live enclosed plant sections

has been carried out.

2.2 Documentation • The circuit diagrams of the electrical equipment are available • Commissioning checklists TS-PX01

2.3 Personnel • 1 Commissioning engineer: Engineer or technician with experience in

commissioning of Protection Relays. • 1 Helper: skilled worker with adequate on-the-job training.

2.4 Measuring instruments and tools

• Standard Ammeter or Fluke • Secondary Injection test set • DC Milli ammeter

3.0 Precautions • Observe the rules for handling electronic components sensitive to electrostatic

discharge (ESD measures). • Special safety arrangements shall be made for all areas which are not explicitly

designated as” electrical operating areas” when performing tests at voltages in excess of 50V.

4.0 Scope • Testing cable connections, • Checking that the mounting position is correct,

5.0 Execution

5.1 Visual checks • Checking of the cables for damage and that they are connected correctly, • Inspection for physical connection as per approved drawings. • Inspection for correct tightness for connection • Checking ferrules

5.2 Testing of Power Transducer Transducer calibration shall be done via front panel mounted test facilities.

• Enter the rating plate data in check list TS-PX01 and compare the

transducer data with the data contained in the circuit documentation. The following test shall be carried out

Page 554

Page 555: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-PX01, Page 3 of 3 Equipment : Power Transducer Date:13 Feb,09 Revision: 0

3. Electrical Function test 4. Secondary Injection

5.2.1 Electrical Function test

• Check function of test switch or plug for correct function

5.2.2 Secondary Injection

• Connect the current test set terminals to the Power Transducer current terminals.

• Connect the voltage test set terminals to the Power Transducer voltage terminals.

• Apply 0, 25, 50, 75,100% of rated load with rated voltage and current at angles of 0, 45,180, 225, 270 and 315 degrees.

• Record the corresponding Power Transducer O/P readings.

6.0 Documents Test Sheet TS-PX01 shall be completed for each and every transducer.

7.0 References

8.0 Attachment

8.1 Test Sheet for Power Transducer TP-PX01

***End of the Procedure***

Page 555

Page 556: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

Riyadh Po“1062

STARTU

TES

ower plant21166/00”

UP MANUA

ST SH

t # 10

AL DF

EETS

Date:13 Feb,09

Revision0

n:

Page 556

Page 557: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: VT Ratio.

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-PX01 Page 1 of 2

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Testing of Power Transducer

Date:13/02/09 , Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

1. Technical data Device : _________ Type : _________ Make : _________ Serial No.(L1,L2,L3) : _________ Input : _________ Class : ___________ Output :__________ VT’S Data: Ratio : _________ Accuracy Class : __________ CT’S Data: Ratio : _________ Accuracy Class : __________

2

Mechanical Checks and Visual Inspection 1. Inspect for physical damage/ defects 2. verify connection as per approved drawing 3. check tightness of all connection 4. check ferrules 5. check apparatus list

3

3.1

Electrical Test Functional test 1. Functional check of selector switch 2. Test switch/plug checked for correct function

Page 557

Page 558: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: VT Ratio.

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-PX01 Page 2 of 2

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Testing of Power Transducer

Date:13/02/09 , Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

3.2

Secondary Injection a. MW Transducer Item No

Applied

Voltage

Applied

Current

Phase Angle

Expected Reading

Actual Reading

% Error

1 115V 1A 4 2 115V 1A 8 3 115V 1A 12 4 115V 1A 16 6 115V 1A 20

b. MVAR Transducer Item No

Applied

Voltage

Applied

Current

Phase Angle

Expected Reading

Actual Reading

% Error

1 115V 1A 4 2 115V 1A 8 3 115V 1A 12 4 115V 1A 16 5 115V 1A 20

Test Equipment Model Cal due date Test Equipment Model Cal due date

Page 558

Page 559: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

TESTVOL

Riyadh Po“1062

STARTU

TING PLTAGE

ower plant21166/00”

UP MANUA

PROCE TRAN

t # 10

AL DF

EDURNSFOR

Date:13 Feb,09

RE FORRMER

Revision0

R R

n:

Page 559

Page 560: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-VT01, Page 1 of 9 Equipment : Voltage Transformer Date:13 Feb,09 Revision: 0

TABLE OF CONTENT

1. Task a. Work Status----------------------------------------------------------------------------------------------------------2 b. Documentation------------------------------------------------------------------------------------------------------2 c. Personnel-------------------------------------------------------------------------------------------------------------2 d. Measuring Instrumentation---------------------------------------------------------------------------------------2

2. Preconditions-----------------------------------------------------------------------------------------------------------2 3. Precautions--------------------------------------------------------------------------------------------------------------2 4. Scope----------------------------------------------------------------------------------------------------------------------2 5. Execution-----------------------------------------------------------------------------------------------------------------3

a. Visual Inspection--------------------------------------------------------------------------------------------------3 b. Testing of Voltage Transformer

1. Winding insulation Resistance test----------------------------------------------------------------------3 2. Voltage Ratio test by primary injection-----------------------------------------------------------------4 3. Phase Angle Error-------------------------------------------------------------------------------------------5 4. Winding Resistance Measurement----------------------------------------------------------------------5 5. Polarity Test---------------------------------------------------------------------------------------------------6 6. Loop Resistance Measurement--------------------------------------------------------------------------6 7. Burden test----------------------------------------------------------------------------------------------------7 8. Phase Sequence test---------------------------------------------------------------------------------------8 9. Fuse Failure checks-----------------------------------------------------------------------------------------8 10. Protective earthing-------------------------------------------------------------------------------------------8 11. Back Energization Test at rated Voltage for 15 minutes-------------------------------------------8

6. Documents---------------------------------------------------------------------------------------------------------------9 7. Reference-----------------------------------------------------------------------------------------------------------------9 8. Attachment---------------------------------------------------------------------------------------------------------------9

Page 560

Page 561: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-VT01, Page 2 of 9 Equipment : Voltage Transformer Date:13 Feb,09 Revision: 0

1.0 Task

The measuring circuits for protection, synchronisation, closed-loop control and operational instrumentation are to be tested.

2.0 Preconditions

2.1 Work status • Erection has been completed. • Labelling of the equipment and designation of live enclosed plant sections

has been carried out.

2.2 Documentation • The Schematic diagrams of Switch gears are available • Commissioning checklists TS-VT01

2.3 Personnel • 1 Commissioning engineer: Engineer or technician with experience in

commissioning of Protection Relays • 1 Helper: skilled worker with adequate on-the-job training.

2.4 Measuring instruments and tools

• Single-phase variable-voltage transformer (approx. 0 -1200 V secondary voltage),

• 1 Voltmeter (AC), or Fluk • Multimeter (A, V, Ohms) or Wheatstone bridge • Insulation Tester 500V dc • Instead of above all CPC100

3.0 Precautions • The work will only proceed when a Permit to Work (PTW) in work permit area

has been obtained. The PTW will be kept on site for consultation during the testing works.

• Observe the rules for handling electronic components sensitive to electrostatic discharge (ESD measures).

• Special safety arrangements shall be made for all areas which are not explicitly designated as” electrical operating areas” when performing tests at voltages in excess of 50V.

• Closing of the work permit after completion of the work (if the test area is to be considered in work permit area).

4.0 Scope

• Testing of the cable connections, • Checking that the mounting position is correct, • Checking of the phase and core assignment, • Checking of correct earthing, • Checking of the function.

Page 561

Page 562: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-VT01, Page 3 of 9 Equipment : Voltage Transformer Date:13 Feb,09 Revision: 0

5.0 Execution

5.1 Visual checks • Check the cables for damage and that they are connected correctly, • Check the mounting position of the Voltage transformers (polarity), • Check the labelling of the individual cores, check the phase/core • Inspect for cleanliness of voltage transformers, high voltage connections

and associated cable connections • Inspection of isolators, support structures and earthing connections • Check tightness of all bolted connection by torque wrench method • Check Rack in/Rack out of V.T’s along with its primary side fuse.

5.2 Testing the Voltage transformers Enter the rating plate data in check list TS-VT01 and compare the voltage transformer data with the data contained in the circuit documentation. Disconnect the primary-side connections at a suitable location and also remove the secondary fuse

1. Winding insulation Resistance test 2. Voltage Ratio test by primary injection 3. Phase Angle Error 4. Winding Resitance Measurment 5. Polarity Test 6. Loop Resistance Measurment 7. Burden test 8. Phase Sequence test 9. Fuse Failure checks 10. Protective earthing 11. Back Energization Test at rated Voltage for 15 minutes

5.2.1 Winding insulation test Insulation resistance for the Primary and secondary Winding is done by using 5000V dc insulation resistance tester as per following schematic • Insulation resistance measurement is done between secondary

winding and ground with primary being grounded with the help of 500V dc insulation resistance tester.

• Insulation resistance measurment is done between primary and ground with secondary being grounded with the help of 5000V dc Tester for 13.8 KV VT and 2500V dc tester for 41.6kv VT

Page 562

Page 563: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-VT01, Page 4 of 9 Equipment : Voltage Transformer Date:13 Feb,09 Revision: 0

Insulation test by CPC100

5.2.2 Voltage ratio test

Voltage ratio can be done by applying voltage on primary circuit and measuring the voltage at secondary by variable single phase transfomer as per following schematic diagram • Apply the maximum available voltage not exceeding the rated

primary Voltage to the primary winding. • Measured the voltage at the secondary, thus primary voltage

divided by secondary voltage gives VT ratio • The test is to be carried out independently on each core and

phase. • Test has to be carried out by using precision voltmeter at both

primary and secondary voltage measurment.

N

Aa1

n1a2

n2

VT RATIO TESTING ARRANGEMENT

STEP UPTRANSFORMER

AC

SU

PP

LY

VARIAC

V

V

Page 563

Page 564: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-VT01, Page 5 of 9 Equipment : Voltage Transformer Date:13 Feb,09 Revision: 0

Ratio test can also be done by using CPC100 as below

5.2.3 Phase Angle Error o Phase angle can be measured by using CPC100 as shown in

above figure , phase angle is the angle measured between Voltage across the primary winding and voltage across the secondary winding with the relay in its circuit

o This test can also be performed by Applying voltage across the primary of the VT and angle is measured between Primary and secondary voltages with relay or meters connected

5.2.4 Winding Resistance test

Winding resistance can be measured either by FLUK or Wheatstone bridge as per fallowing schematic diagram • Connect the test lead on to the primary winding of the VT and

measure the resistance. • Connect the test lead on to the Secondary winding of the VT and

measure the resistance. • Repeat the test for second core if available.

Page 564

Page 565: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-VT01, Page 6 of 9 Equipment : Voltage Transformer Date:13 Feb,09 Revision: 0

5.2.5 Polarities Test.

VT polarities can be checked by 9 volts DC battery and Galvanometer as per the following Schematic Drawing

A

N

Aa1

n1a2

n2

VT POLARITY TESTING ARRANGEMENT

BATTERY

SWITCH

+

-+

-

On pressing the switch momentarily in above circuit, the needle on center zero galvanometer or sensitive ammeter reads positive deflection thus polarity of the transformer is subtractive. Subtractive polarity exists when current going into the primary polarity terminal causes to go out of the secondary polarity at the same instant in time

By CPC 100(OMICRON)

5.2.6 Loop Resistance test

Loop Resistance can be measured either by FLUK or Wheatstone bridge as per fallowing schematic diagram • Loop resitance shall be done for every used core

Page 565

Page 566: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-VT01, Page 7 of 9 Equipment : Voltage Transformer Date:13 Feb,09 Revision: 0

5.2.7 VT Burden test

VT Burden test can be done by a variable voltage source with voltmeter and ammeter as per schematic diagram • The burden in each core of each phase is determined by applying

secondary rated voltage in the direction of the load and measure the current flowing in to the circuit. The product of current and voltage gives burden of the circuit. The measured burden should be compared with the rated data of the voltage transformer.

Burden measurement by CPC100

Page 566

Page 567: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-VT01, Page 8 of 9 Equipment : Voltage Transformer Date:13 Feb,09 Revision: 0

5.2.8 Phasing test

Phasing test can be done by applying three different voltages across the primary side bus bar or line terminals of all three phase and measuring voltage at secondary of all the three VTs • Apply three different voltage across the bus bar or line terminals

of the switch gear say A-B= 100 volts B-C = 120 volts, and C-A 150 Volts

• Measure the voltage at the secondary of VT of all the three phase,. • Small voltage at the corresponding secondary should read in

sequence as above

5.2.9 Fuse Failure Checks 5.2.9.1 Primary Fuse

• Micro switch for fuse failure shall be checked for correct operation

• If required correct alignment to be carried out • Fuse position shall be checked for correct striker

operation

5.2.9.2 Secondary fuse Failure Relay • Relay shall be calibrated for pickup and dropout value • Relay alarm contacts to be checked • Alarm to remote (DCS) to be checked

5.2.10 Checking the protective Earthing

Voltage transformers must be earthed on the secondary side in order to afford protection to human beings (In case of physical separation of the phases the three earthing points shall be regarded as being one earthing point.)

5.2.11 Back Energization Test

Back energization of the VT can be done by energizing the secondary circuit to its rated voltage as shown in below diagram. • In this test, load shall be disconnected and Primary fuses are

removed so that no voltage can exists on bus bar or line terminal of the switch gear

• Voltage shall be applied gradually across the secondary of the VT not more then the rated voltage of the secondary winding

• When rated voltage is applied across the secondary winding, primary winding will have full rated induced voltage across it.

• Voltage is applied for 15 minutes and observe for any abnormalities

Page 567

Page 568: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-VT01, Page 9 of 9 Equipment : Voltage Transformer Date:13 Feb,09 Revision: 0

6.0 Documents

Test Sheet TS-VT01 shall be completed for each set of instrumentation transformers. 7.0 References 8.0 Attachment

8.1 Test Sheet for Voltage transformer TS-VT01

***End of the procedure***

Page 568

Page 569: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

Riyadh Po“1062

STARTU

TES

ower plant21166/00”

UP MANUA

ST SH

t # 10

AL DF

EETS

Date:13 Feb,09

Revision0

n:

Page 569

Page 570: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: Ambient Temp:

Tested by/Company Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No:TS-VT01 Page 1 of 5

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Voltage Transformer

Date: 13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

1. .

Technical data Manufacturer: ........................................................... Type: ...........................................................

Phase Ratio of First

Winding

Ratio of

Second

Winding

Class of

First

winding

Class of

Second

winding

Serial

No

VA

Rating

R

Y

B Fuse primary: .............................A Fuse secondary: ..............................A

2.

Visual check

ITEM DESCRIPTION

1 Inspect for physical damage / defects.

2 Verify nameplate information for correctness

3 Check tightness of all bolted connections by torque wrench

4 Check all grounding connections are securely

5 Check Rack-in and Rack-out of VT’s along with Primary side fuse

6 Check apparatus lists

Page 570

Page 571: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: Ambient Temp:

Tested by/Company Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No:TS-VT01 Page 2 of 5

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Voltage Transformer

Date: 13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

3. Cable connection tests Disconnect high voltage connection. Disconnect all power cables from core terminals. Check all MCB in OFF-position. Check all cable connections to measurement and protection cubicles. Check insulation resistance of the cable by 500v dc megger

4 4.1

Electrical Tests Winding Insulation Resitance tests of voltage transformer Rated Voltage of Test Object ----------------- DC Test voltage: .................

Primary & Secondary Secondary

PHASE

Primary with GND with

Core 1 with

Core 2

Criteria

Mohm

Core1 with GND

Core2 with GND

Core1 with Core 2

Criteria

Mohm

R Y B

More than 1000

More than

2

4.2.

Voltage Ratio of voltage transformer

Secondary Voltage (V) PHASE

Primary Voltage (V) Core 1 Error% Core 2 Error%

R Y B

Page 571

Page 572: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: Ambient Temp:

Tested by/Company Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No:TS-VT01 Page 3 of 5

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Voltage Transformer

Date: 13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

4.3

Phase Angle Error Test

Secondary Voltage (V) PHASE

Primary Voltage (V) Core 1 Phase Angle Core 2 Phase Angle

R Y B

4.4

Winding Resistance Measurment:

By Fluke or Wheatstone bridge

Secondary Winding (Ohm) PHASE Primary Winding (Ohm) Core 1(1-n) Core 2(1-n)

R Y B

4.5

Polarity checks of voltage transformer:

By Battery and Galvanometer

Primary Secondary Core 1 Secondary Core 2

P1 +

P2 -

5

Normalize and reconnect cables to terminals. Check terminal screws are tightened correctly. Reconnect high voltage side.

Page 572

Page 573: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: Ambient Temp:

Tested by/Company Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No:TS-VT01 Page 4 of 5

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Voltage Transformer

Date: 13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

6

Lop Resistance Check

Measurment of Resistance in Ω

Core 1(1-n) Core 2(1-n) Phase Terminal No Resistance Terminal No Resistance

R Y B

7.

VT Burden Test/ Ground Connection checks

Remark: If open delta (1-n) winding exists, check value of burden resistance RB =..............Ω.

Rated burden

[VA]

Phase

U [V]

I [A]

U*I [VA]

Ground connection

Core-1 R 1 - n Core-1 Y 1 - n Core-1 B 1 - n Core-2 R 1 - n Core-2 Y 1 - n Core-2 B 1 - n

Page 573

Page 574: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Device No.: Ambient Temp:

Tested by/Company Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No:TS-VT01 Page 5 of 5

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Voltage Transformer

Date: 13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

8 Phase Sequence Test

Secondary Winding Voltage PHASE Primary Winding Voltage Core 1(1-n) Core 2(1-n)

R-N 100V Y-N 130V B-N 150V

9 Fuse Failure Checks

1. Operation of Micro switch for primary fuse is checked 2. Alarm to remote DCS is checked 3. Secondary fuse failure Relay is calibrated 4. Alarm for secondary fuse failure to DCS is checked

10. Remarks: .......................................................................................................................................................................................... 1

....................................................................................................................................................................................... …2

Test Equipment Model Cal due date Test Equipment Model Cal due date

Page 574

Page 575: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

TESTBATT

Riyadh Po“1062

STARTU

TING PERY A

ower plant21166/00”

UP MANUA

PROCAND D

t # 10

AL DF

EDURISCHA

Date:13 Feb,09

RE FORARGIN

Revision0

R NG

n:

Page 575

Page 576: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-BT01, Page 1 of 5 Equipment : Batteries Date:13 Feb,09 Revision: 0

TABLE OF CONTENT

1. Task a. Work Status-------------------------------------------------------------------------2 b. Documentation---------------------------------------------------------------------2 c. Personnel----------------------------------------------------------------------------2 d. Measuring Instrumentation------------------------------------------------------2

2. Preconditions-------------------------------------------------------------------------------2 3. Precautions----------------------------------------------------------------------------------2 4. Scope------------------------------------------------------------------------------------------3 5. Execution-------------------------------------------------------------------------------------3

a. Visual Checks----------------------------------------------------------------------3 b. Testing of Batteries

1. Torque for the battery inter-cell connection-----------------------3 2. Battery Internal Resistance Measurement------------------------3 3. Battery Initial Charging-------------------------------------------------3 4. Battery Discharge Test-------------------------------------------------4 5. Protective Earthing------------------------------------------------------5

6. Documents-----------------------------------------------------------------------------------5 7. Reference-------------------------------------------------------------------------------------5 8. Attachment-----------------------------------------------------------------------------------5

Page 576

Page 577: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-BT01, Page 2 of 5 Equipment : Batteries Date:13 Feb,09 Revision: 0

1. Task This instruction comprises a complete description of the testing of Batteries

2. Preconditions 2.1. Work Satus

• Erection has been completed. • Labelling of the equipment and designation of live enclosed plant sections has

been carried out.

2.2. Documentation • The single line diagram for the battery system, charger schematic drawings • Test Sheet TS-BT01 is available • Product manual of the Batteries

2.3. Personnel • Commissioning engineer: - (1) engineer with experience in commissioning of

Battery and Chargers usually • Technician or helper:- (2) skilled worker with adequate on -the-job training • Witness from the client‘s concern department

2.4. Measuring Instruments

• Multi meter (calibrated)—2 • Clamp Meter DC(calibrated)—1 • Hydro Meter to Check Specific Gravity • Battery Tester • Load Bank up to 300 Amps

3. Precautions The work will only proceed when a Permit to Work (PTW) in work permit area has been obtained. The PTW will be kept on site for consultation during the testing works. • Special safety arrangements shall be made for all areas which are not explicitly

designated as” electrical operating areas” when performing tests at voltages in excess of 50V.

• Closing of the work permit after completion of the work (if the test area is to be considered in work permit area) is necessary.

• Nickel Cadmium Batteries contain a corrosive alkali causing chemical burns if it comes into contact with skin or eyes. Eye wash and safety facilities must be in place prior to any work on the batteries. Also operators working on batteries must wear protective clothing like rubber, gloves, face mask, etc. and eye protection and use insulated tools and correct working techniques, which forbids lone working.

• As part of the charging cycle the cells will give off hydrogen gas. Hydrogen/ Air mixture is an incendiary mixture that can be ignited by electrical sparking/ arcing / naked flame. For this reason correct ventilation of cells and the battery room is essential to prevent the build up and ignition of hydrogen / air mixtures.

Page 577

Page 578: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-BT01, Page 3 of 5 Equipment : Batteries Date:13 Feb,09 Revision: 0

4. Scope

• Testing of Batteries • Checking that the mounting, • Testing of Cables • Checking of correct Earthing,

5. Execution 5.1. Visual Inspection.

Prior to carrying out electrical tests, a visual check of the transformer should be carried out paying particular attention to the following points • Correct labeling of devices and cables • Equipment and cables are undamaged • Correct execution of the cable gland/sealing end • Name plate data, match with drawing and ambient condition • Firm cable termination/terminal connection and ferruling • Battery Rack is in good condition • Vent Plugs are Installed correct • Inter-cell Connections are checked and torque • Electrolyte Level in all cells is correct • Battery and Bus are free of grounds • Battery Room has Proper Ventilation and in service

5.2. Testing of Batteries Following tests to be carried out

1. Torque for the battery inter-cell connection 2. Battery Internal Resistance Measurement 3. Battery Initial Charging 4. Battery Discharge Test 5. Protective Earthing

5.2.1. Torque for the Battery Inter-Cell Connection

Tightness of the bolt on inter cell connection shall be checked and torque to the value recommended by the manufacturer.

5.2.2. Battery Internal Resistance Measurement Battery internal resistance can be measured by the battery tester

5.2.3. Battery Initial Charging For those batteries which were delivered pre-filled perform a new or initial commissioning charge with a constant Voltage at 1.63V/Cell for duration of 20 hours with a current limit to 0.2itA and electrolyte temp within 20 degC with Specific Gravity of 1.19-1.22. If the charger has a limit to deliver the charging current, then duration for charging to meet 100% battery capacity can be calculated by Battery 2*Ah * 1.63/Charging current

Page 578

Page 579: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-BT01, Page 4 of 5 Equipment : Batteries Date:13 Feb,09 Revision: 0

Cell voltage gradually rises with progress of the charging, so that it is necessary to raise the rectifier’s output voltage accordingly by means of its manual output voltage regulator in order to maintain the charging current constant at the specified rate

When the charging is to be carried out online where charger is supplying power to the load as well and the voltage can not be controlled. The charging shall be done on a part of the bank at a time, say half the bank (48 cells) per charge. Also, if the discharge test fails the first time, then a second test shall be done after another commissioning charge. After Constant charging the batteries shall be kept on float charging at the rate 1.43/cell for at least 1 hour.

5.2.4. Battery Discharge Test

Ensure that all the preliminary tests listed above are completed. Also ensure that the battery has been fully charged to 100% Capacity before the discharge test start. The discharge test shall be made on each individual battery bank. The duration of the test is five hours and the discharge current shall be the battery AHr capacity divided by 5. The voltage per cell at the end of discharge shall be at least 1.0 Volt(or as per Manufacturer’s data). This is true for cells which are 5 hour rated. For cells which are 8 hour rated, the discharge time may be less than 5 hours and this has to be taken into consideration while interpreting the results. The step by step procedure is as follows:

• Open battery disconnect switch or disconnect battery supply cable from 125 volts terminals of the charger.

• Connect battery discharge resistance bank, but leave open circuit. • Measure and record individual cell voltage and ensure each cell is

within tolerance as stated in 5.2.3,

• Record Individual cell specific gravity, and temperature of electrolyte

• Put on load which is equal to 0.2C; Take the readings of cell voltage, specific gravity for 1st, 2nd, 3rd, 4th and every 15 minutes after 4th hour till 5th hour.

• At the end of the test, total battery voltage is recorded

Page 579

Page 580: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-BT01, Page 5 of 5 Equipment : Batteries Date:13 Feb,09 Revision: 0

5.2.5. Protective Earthing

All the battery Racks must be earthed in order to afford protection to human beings

6. Documents Test sheet TS-BT01 shall be completed.

7. References: IEC60623

Operating Guide for Nickel Cadmium Alkaline batteries by HONDA

8. Attachment

8.1. Test Sheet for Battery Testing TS-BT01

***End of the procedure***

Page 580

Page 581: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

Riyadh Po“1062

STARTU

TES

ower plant21166/00”

UP MANUA

ST SH

t # 10

AL DF

EETS

Date:13 Feb,09

Revision0

n:

Page 581

Page 582: PP10 startup manual (Unofficial as Requested)

Battery Name Battery Tag No Location: Ambient Temp: Humidity:

Tested by/Company Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No:TS-BT01 Page 1 of 10

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Testing of Battery Testing

Date:13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

1.

Technical data Manufacturer:........................................................... Type:........................................................... Serial No............................................................ Ah Rating: Total No. OF Cell -------------

2.

Visual check ITEM DESCRIPTION

1 Inspect for physical damage / defects. 2 Verify nameplate information for correctness 3 Check tightness of all bolted connections.

4 Check all grounding connections are securely connected

5 Check apparatus lists

3

3.1

Electrical Tests Battery Impedance Measurement: Cell No

Imp(Ω) Cell No

Imp(Ω) Cell No

Imp(Ω)

1 11 21 2 12 22 3 13 23 4 14 24 5 15 25 6 16 26 7 17 27 8 18 28 9 19 29 10 20 30

Page 582

Page 583: PP10 startup manual (Unofficial as Requested)

Battery Name Battery Tag No Location: Ambient Temp: Humidity:

Tested by/Company Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No:TS-BT01 Page 2 of 10

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Testing of Battery Testing

Date:13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

3.2

Cell No

Imp(Ω) Cell No

Imp(Ω) Cell No

Imp(Ω)

31 54 77 32 55 78 33 56 79 34 57 80 35 58 81 36 59 82 37 60 83 38 61 84 39 62 85 40 63 86 41 64 87 42 65 88 43 66 89 44 67 90 45 68 91 46 69 92 47 70 93 48 71 94 49 72 95 50 73 96 51 74 52 75 53 76

Page 583

Page 584: PP10 startup manual (Unofficial as Requested)

Battery Name Battery Tag No Location: Ambient Temp: Humidity:

Tested by/Company Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No:TS-BT01 Page 3 of 10

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Testing of Battery Testing

Date:13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Remarks

3.3

Discharge Test Specification: Discharge test for _____ hours @ ____ amps ____ oC temperature with constant current.

Each cell should be greater than or equal to __________V after the test.

Cell No. Pretest 1st

Hour 2nd

Hour 3rd

Hour 4th

Hour 4.15 Hour

4.30 Hour

4.75 Hour

5th Hour

Sp Gr. Temp

1

2

3

4

5

6

7

8

9

10

Page 584

Page 585: PP10 startup manual (Unofficial as Requested)

Battery Name Battery Tag No Location: Ambient Temp: Humidity:

Tested by/Company Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No:TS-BT01 Page 4 of 10

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Testing of Battery Testing

Date:13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Remarks

Cell No. Pretest 1st Hour

2nd Hour

3rd Hour

4th Hour

4.15 Hour

4.30 Hour

4.75 Hour

5th Hour

Sp Gr. Temp

11

12

13

14

15

16

17

18

19

20

21

22

23

24

Page 585

Page 586: PP10 startup manual (Unofficial as Requested)

Battery Name Battery Tag No Location: Ambient Temp: Humidity:

Tested by/Company Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No:TS-BT01 Page 5 of 10

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Testing of Battery Testing

Date:13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Remarks

Cell No. Pretest 1st Hour

2nd Hour

3rd Hour

4th Hour

4.15 Hour

4.30 Hour

4.75 Hour

5th Hour

Sp Gr. Temp

25

26

27

28

29

30

31

32

33

34

35

36

37

38

Page 586

Page 587: PP10 startup manual (Unofficial as Requested)

Battery Name Battery Tag No Location: Ambient Temp: Humidity:

Tested by/Company Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No:TS-BT01 Page 6 of 10

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Testing of Battery Testing

Date:13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Remarks

Cell No. Pretest 1st Hour

2nd Hour

3rd Hour

4th Hour

4.15 Hour

4.30 Hour

4.75 Hour

5th Hour

Sp Gr. Temp

39

40

41

42

43

44

45

46

47

48

49

50

51

52

Page 587

Page 588: PP10 startup manual (Unofficial as Requested)

Battery Name Battery Tag No Location: Ambient Temp: Humidity:

Tested by/Company Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No:TS-BT01 Page 7 of 10

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Testing of Battery Testing

Date:13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Remarks

Cell No. Pretest 1st Hour

2nd Hour

3rd Hour

4th Hour

4.15 Hour

4.30 Hour

4.75 Hour

5th Hour

Sp Gr. Temp

53

54

55

56

57

58

59

60

61

62

63

64

65

66

Page 588

Page 589: PP10 startup manual (Unofficial as Requested)

Battery Name Battery Tag No Location: Ambient Temp: Humidity:

Tested by/Company Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No:TS-BT01 Page 8 of 10

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Testing of Battery Testing

Date:13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Remarks

Cell No. Pretest 1st Hour

2nd Hour

3rd Hour

4th Hour

4.15 Hour

4.30 Hour

4.75 Hour

5th Hour

Sp Gr. Temp

67

68

69

70

71

72

73

74

75

76

77

78

79

80

Page 589

Page 590: PP10 startup manual (Unofficial as Requested)

Battery Name Battery Tag No Location: Ambient Temp: Humidity:

Tested by/Company Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No:TS-BT01 Page 9 of 10

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Testing of Battery Testing

Date:13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Remarks

Cell No. Pretest 1st Hour

2nd Hour

3rd Hour

4th Hour

4.15 Hour

4.30 Hour

4.75 Hour

5th Hour

Sp Gr. Temp

81

82

83

84

85

86

87

88

90

91

92

93

94

95

96

Page 590

Page 591: PP10 startup manual (Unofficial as Requested)

Battery Name Battery Tag No Location: Ambient Temp: Humidity:

Tested by/Company Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No:TS-BT01 Page 10 of 10

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Testing of Battery Testing

Date:13/02/09 ,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Remarks

3.4

Insulation Resistance Measurement for the cable. Minimum Value: Phase R-G BK-G R-BK IR in G-ohms

Test Voltage

Test Equipment Model Cal due date Test Equipment Model Cal due date

Page 591

Page 592: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

TESTB

Riyadh Po“1062

STARTU

TING PBATTE

ower plant21166/00”

UP MANUA

PROCERY CH

t # 10

AL DF

EDURHARG

Date:13 Feb,09

RE FORER

Revision0

R

n:

Page 592

Page 593: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

TEST

Riyadh Po“1062

STARTU

TING PUP

ower plant21166/00”

UP MANUA

PROCPS (LAT

t # 10

AL DF

EDURTER)

Date:13 Feb,09

RE FOR

Revision0

R

n:

Page 593

Page 594: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

TES

COA

O

R

-001

STING

Riyadh Po“1062

STARTU

G PROC

ower plant21166/00”

UP MANUA

CEDU

t # 10

AL DF

URE FO

Date:13 Feb,09

OR MO

Revision0

OTOR

n:

Page 594

Page 595: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-AT01, Page 1 of 5 Equipment : Motors Date:13 Feb,09 Revision: 0

TABLE OF CONTENT

1. Task a. Work Status----------------------------------------------------------------------------------------------------------2 b. Documentation------------------------------------------------------------------------------------------------------2 c. Personnel-------------------------------------------------------------------------------------------------------------2 d. Measuring Instrumentation---------------------------------------------------------------------------------------2

2. Preconditions-----------------------------------------------------------------------------------------------------------2 3. Precautions--------------------------------------------------------------------------------------------------------------2 4. Scope----------------------------------------------------------------------------------------------------------------------2 5. Execution-----------------------------------------------------------------------------------------------------------------2

a. Visual Inspection--------------------------------------------------------------------------------------------------3 b. Testing of Motor

1. Resistance measurements through bolted connections---------------------------------------------4 2. Insulation-resistance tests----------------------------------------------------------------------------------4 3. Stator resistance test phase-to-phase.-------------------------------------------------------------------4 4. Insulation-resistance test on bearing pedestal---------------------------------------------------------4 5. Resistance tests on RTDs.----------------------------------------------------------------------------------4 6. Commissioning of Heater Circuit.--------------------------------------------------------------------------4 7. Rotation test to insure correct shaft direction.----------------------------------------------------------5 8. Measurement of current and voltages-------------------------------------------------------------------5 9. Vibration baseline test---------------------------------------------------------------------------------------5

6. Documents---------------------------------------------------------------------------------------------------------------5 7. Reference-----------------------------------------------------------------------------------------------------------------5 8. Attachment---------------------------------------------------------------------------------------------------------------5

Page 595

Page 596: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-AT01, Page 2 of 5 Equipment : Motors Date:13 Feb,09 Revision: 0

1. Task This instruction comprises a complete description of the testing of the MV and LV Motors.

2. Preconditions 2.1. Work Status

• Erection has been completed. • Labelling of the equipment and designation of live enclosed plant sections has

been carried out.

2.2. Documentation • The circuit diagrams of Motor is available • Test Sheet TS-MT01 is available • Product manual of the Motor

2.3. Personnel • Commissioning engineer: - (1) engineer with experience in commissioning of

Motors and its control. • Technician or helper:- (2) skilled worker with adequate on -the-job training • Witness from the client‘s concern department

2.4. Measuring Instrument

• Multi meter (calibrated)—2 • Insulation resistance meter –megger(calibrated)—1 • Wheat stone bridge to measure the winding resistance • Vibration Meter

3. Precautions The work will only proceed when a Permit to Work (PTW) in work permit area has been obtained. The PTW will be kept on site for consultation during the testing works. • Observe the rules for handling electronic components sensitive to electrostatic

discharge (ESD measures). • Special safety arrangements shall be made for all areas which are not explicitly

designated as” electrical operating areas” when performing tests at voltages in excess of 50V.

• Closing of the work permit after completion of the work (if the test area is to be considered in work permit area) is necessary.

• Before test voltages are applied a check shall be carried out to ensure that no unauthorized persons are working at the corresponding load-where ever necessary barriers should be provided

4. Scope

• Testing of Motors • Checking RTD’s and Thermocouple • Checking of the mounting pad, • Checking of correct Earthing,

Page 596

Page 597: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-AT01, Page 3 of 5 Equipment : Motors Date:13 Feb,09 Revision: 0

5. Execution 5.1. Visual Inspection.

Prior to carrying out electrical tests, a visual check of the transformer should be carried out paying particular attention to the following points 1. Compare equipment nameplate data with drawings and specifications. 2. Inspect physical and mechanical condition. 3. Inspect anchorage, alignment, and grounding. 4. Inspect air baffles, filter media, cooling fans, slip rings, brushes, and brush

rigging. 5. Verify the unit is clean. 6. Inspect bolted electrical connections for high resistance using one of the following

methods: 1. Use of low-resistance ohmmeter. 2. Verify tightness of accessible bolted electrical connections by calibrated

torque-wrench 7. Verify correct application of appropriate lubrication and lubrication systems. 8. Verify the absence of unusual mechanical or electrical noise or signs of

overheating during initial test run. 9. Verify that resistance temperature detector (RTD) circuits conform to drawings. 10. Verify that metering or relaying devices utilizing RTDs have the correct rating.

5.2. Testing of Motors Following tests to be carried out

10. Resistance measurements through bolted connections with a low-resistance ohmmeter, if applicable

11. Insulation-resistance tests a. Motors larger than 200 horsepower: Test duration shall be for ten

minutes. Calculate polarization index. b. Motors 200 horsepower and less: Test duration shall be for one minute.

Calculate the dielectric-absorption ratio. 12. Stator resistance test phase-to-phase. 13. Insulation-resistance test on bearing pedestal in accordance with

manufacturer’s published data, if applicable. 14. Resistance tests on RTDs. 15. Commissioning of Heater Circuit. If applicable

a. Visual Checks b. Measurement of insulation resistance of heater. c. Measurement of Current and voltage

16. Rotation test to insure correct shaft direction. 17. Measurement of current and voltages 18. Vibration baseline test

Page 597

Page 598: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-AT01, Page 4 of 5 Equipment : Motors Date:13 Feb,09 Revision: 0

5.2.1. Resistance Measurements through bolted connections with a low-

Resistance Ohmmeter. Bolted connection shall be torque and contact resistance measurement shall be done with the help of low resistance meter

5.2.2. Insulation-Resistance Tests The test voltage for LV Motors is 1000 V dc and For MV motors 5000V dc Apply the test voltage between Phase to ground and then phase to phase. Checking of the insulation resistance shall be carried out as under

5.2.2.1. Motors larger than 200 horsepower: Test duration shall be for ten

minutes. Polarization index. The insulation resistance measurement is done from 15 seconds to 1 minute with 15 seconds interval and then for every one minute up to ten minutes. Value obtained at 10 minute divided by value at 1 minute gives polarization index

5.2.2.2. Motors 200 horsepower and less: Test duration shall be for one minute. Dielectric-absorption ratio. The insulation resistance measurement is done from 15 seconds to 1 minute with 15 seconds interval and then for every one minute up to ten minutes. Value obtained at 60 seconds divided by value at 15 seconds gives Dielectric absorption ratio

5.2.3. Perform Stator Resistance Test Phase-to-Phase.

Winding Resistance Test shall be done with wheat stone bridge or fluke In this test the resistance measurement is done on each phase winding

5.2.4. Insulation-Resistance Test on Bearing Pedestal in accordance with manufacturer’s published data, if applicable. This test is done by measuring the insulation resistance between the rotor shaft and ground in accordance with manufacturer’s manual. The test voltage in this case is 500v dc

5.2.5. Resistance Tests on RTDs.

Resistance measurement shall be carried out for all the RTD’s and compare with corresponding temperature. For this test a multi loop calibrator can be used

5.2.6. Commissioning of Heaters. If Applicable Space heater shall be commissioned as under

5.2.6.1. Visual Checks of Heaters • Check the rating of the heater on name plate match with the supply

voltage. • Check the KW rating of the heater match with drawing. • Check the breaker which supplying power to heater circuit for correct

rating with respect to total load of the heaters.

Page 598

Page 599: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by : MAH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-AT01, Page 5 of 5 Equipment : Motors Date:13 Feb,09 Revision: 0

5.2.6.2. Measurement of Insulation Resistance

Perform insulation resistance measurement on space heater circuit with 500 VDC megger

5.2.6.3. Measurement of Current and Voltage Switch on the breaker and measured the total current and individual heater load with mini clamp meter

5.2.7. Rotation or Bump Test to Insure Correct shaft Direction. Direction of rotation shall be checked by running the motor momentarily on uncoupled motor. Direction of rotation should match with mark on the motor enclosure

5.2.8. Measurement Current and Voltages 5.2.8.1. No load Measurement

Voltage, running Current. Inrush current and vibration shall be checked by running the motor uncoupled

5.2.8.2. No load Measurement Voltage, Running Current. Inrush current and vibration shall be checked by running the motor coupled to the load

5.2.9. Vibration Baseline Test.

Vibration measurement is done when motor is running on full load; the following table gives the approximate acceptable values.

5.2.10. Protective Earthing Check

Motor protective earthing bond must be earthed in order to afford protection to human beings. Protective earthing bond should be checked for it continuity between motor and the grid,

6. Documents Test sheet TS-MT01 shall be completed for each and every motor

7. Reference

8. Attachment

8.1. Test Sheet for Motor TS-MT01

***End of the procedure***

Page 599

Page 600: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

Riyadh Po“1062

STARTU

TES

ower plant21166/00”

UP MANUA

ST SH

t # 10

AL DF

EETS

Date:13 Feb,09

Revision0

n:

Page 600

Page 601: PP10 startup manual (Unofficial as Requested)

Motor Name Motor Tag No Location: Feeder Name SWBD Tag SWBD Name

Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MT01, Page 1 of 6

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Testing of Electrical Consumers (Motor/Cable

Feeders) Date:13/02/09 Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirms Remarks Item not applicable for motors or feeders to be marked N/A

1.

1.1

1.2

Information

Motor Name Plate Details…………………………………………………..

Power:……………….kW (HP) Voltage……………V

Current………………A Speed……………..Rev..min-1

Serial No……………… Type of Motor……………………..

Make…………………………….. No of RTDS……………………….

Type of RTDs Space heater …………………KW/Volts

Feeder Information

Cable No:……………………………………Cable Size……………………….

CB Rating :………………………………. Overload rating……………………… cable test sheet available Motor heater Cable No:…………………………………………. Cable test sheet available Motor heater checked

2. Visual Checks 1. Equipment nameplate data is matching with drawings and specifications. 2. Physical and mechanical condition is good. 3. Anchorage, alignment, and grounding is good 4 air baffles, filter media, cooling fans, slip rings, brushes, and brush rigging are ok. 5. Overall unit is clean. 6. Bolted electrical connections was verified by

1. Using low-resistance ohmmeter. 2. checking the tightness by calibrated torque-wrench

7. Application of lubrication and lubrication systems verified. 8. Unusual mechanical or electrical noise or signs of overheating during initial test

run is verified . 9. Resistance temperature detector (RTD) circuits are matching with the drawings

drawings. 10. Metering or relaying devices utilizing RTDs were checked for it is correct rating.

Page 601

Page 602: PP10 startup manual (Unofficial as Requested)

Motor Name Motor Tag No Location: Feeder Name SWBD Tag SWBD Name

Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MT01, Page 2 of 6

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Testing of Electrical Consumers (Motor/Cable

Feeders) Date:13/02/09 Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirms Remarks

3

3.1

3.11

3.12

Electrical Testing

Motor Insulation Resistance Test:

Test Voltage:………………..Volts DC Minimum Accepted Value:……………MΩ

Insulation Resistance In MΩ Time

U-V+W+G V-U+W+G W-U+V+G

15 sec

30 sec

60 sec

2 Min

3 Min

4 Min

5 Min

6 Min

7 Min

8 Min

9 Min

10 Min

Dielectric Absorption Factor for Motors Less then 200HP

DAF = R60/R15

U-V+W+G V-U+W+G W-U+V+G

Polarization Index for Motors 200HP and above

PI = R10/R1

U-V+W+G V-U+W+G W-U+V+G

Page 602

Page 603: PP10 startup manual (Unofficial as Requested)

Motor Name Motor Tag No Location: Feeder Name SWBD Tag SWBD Name

Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MT01, Page 3 of 6

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Testing of Electrical Consumers (Motor/Cable

Feeders) Date:13/02/09 Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

3.2

Stator Resistance

Resistance in Ω

U-U1 V-V1 W-W1

3.3

Insulation Resistance Test For Bearing Pedal

Test Voltage:………………..Volts DC Minimum Accepted Value:……………MΩ

Insulation Resistance in MΩ

Rotor Shaft to Motor Body

3.4 RTD Testing

RTD1 RTD2 RTD3

Resistance

Measured

Temp

Actual Temp

Resistance

Measured

Temp

Actual Temp

Resistance

Measured

Temp

Actual Temp

Temperature protection (winding./bearing)

Alarm and trip settings for winding and bearing temperature protection adjusted according to manufacturer’s instruction of multlin 369

4. Electrical Function Tests for the feeder:

- DC control tested: - Fault signal from plug-in unit tested: - On/Off switching manually/from local control tested:

5 Electrical Protection Devices:

Type of MCB:…………………………..

High current setting I>>:……………….A

Over current I>: Range:………………A Setting…………..

Page 603

Page 604: PP10 startup manual (Unofficial as Requested)

Motor Name Motor Tag No Location: Feeder Name SWBD Tag SWBD Name

Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MT01, Page 4 of 6

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Testing of Electrical Consumers (Motor/Cable

Feeders) Date:13/02/09 Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Remarks

6. Phase Rotation / Direction test according to Mechanical requirement

Motors -carried with driven machine -without drive machine -connection of cable L1L2L3 – UVW L1L2L3 – VUW -direction (view from driven machine to motor)

clockwise counterclockwise

Cable Feeders -connection of cable L1L2L3 – UVW -phase rotation clockwise

7 Motor Space Heater

Rating:

Voltage:_________ Volts, Power :_________ Watts

Cable Insulation resistance test

R-G: ___________ M Ohms N-G:___________ M Ohms

Power supply

Voltage_________ Volts

Current_________ Amps

8

8.1

8.2

8.3

Measurement (de coupled)

a) Motor in rush Current: . L1………A, L2………..A, L3…………….A

b) RPM ………………….Rev min-1

c) Vibration:

Velocity ……………..…

Acceleration …………

Displacement………….

Page 604

Page 605: PP10 startup manual (Unofficial as Requested)

Motor Name Motor Tag No Location: Feeder Name SWBD Tag SWBD Name

Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MT01, Page 5 of 6

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Testing of Electrical Consumers (Motor/Cable

Feeders) Date:13/02/09 Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Remarks

8.4 Heat Run Test(De Coupled)

Running Current(A)

Voltage (V) Temperature in C

L1 L2 L3 L1-L1 L2-L3 L3-L1 Drive end

Non drive

RTD1

RTD2

RTD3

15 min

30min

45 min

60 min

9

9.1

9.2

9.3

Measurement (coupled with Load)

a) Motor in rush Current: . L1………A, L2………..A, L3…………….A

b) RPM ………………….Rev min-1

c) Vibration:

Velocity ……………..…

Acceleration …………

Displacement………….

Page 605

Page 606: PP10 startup manual (Unofficial as Requested)

Motor Name Motor Tag No Location: Feeder Name SWBD Tag SWBD Name

Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MT01, Page 6 of 6

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Testing of Electrical Consumers (Motor/Cable

Feeders) Date:13/02/09 Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Remarks

9.4 Heat Run Test(Coupled- with Load)

Running Current(A)

Voltage (V) Temperature in C

L1 L2 L3 L1-L1 L2-L3 L3-L1 Drive end

Non drive

RTD1

RTD2

RTD3

15 min

30min

45 min

60 min

Page 606

Page 607: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

T

: SEC-C : : BEMCO

10-BS-SU-

TESTI

COA

O

R

-001

NG PR

Riyadh Po“1062

STARTU

ROCE

ower plant21166/00”

UP MANUA

DURE

t # 10

AL DF

E FOR

Date:13 Feb,09

GENE

Revision0

ERATO

n:

OR

Page 607

Page 608: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-GT01, Page 1 of 5 Equipment : Generator Date:13 Feb,09 Revision: 0

TABLE OF CONTENT

1. Task a. Work Status-------------------------------------------------------------------------2 b. Documentation---------------------------------------------------------------------2 c. Personnel----------------------------------------------------------------------------2 d. Measuring Instrumentation------------------------------------------------------2

2. Preconditions-------------------------------------------------------------------------------2 3. Precautions----------------------------------------------------------------------------------2 4. Scope------------------------------------------------------------------------------------------3 5. Execution-------------------------------------------------------------------------------------3

a. Visual Checks----------------------------------------------------------------------3 b. Testing of Generators

1. Resistance measurements through bolted----------------------------3 2. Insulation-resistance tests-------------------------------------------------4 3. Stator resistance test phase-to-phase----------------------------------4. 4. Insulation-resistance test on bearing pedestal-----------------------4 5. Resistance tests on Reds. If Applicable-------------------------------4 6. Commissioning of Heater Circuit. If applicable-----------------------5 7. Insulation-resistance tests on the main rotating field winding, the exciter-field winding and the exciter-armature winding------- 5

6. Documents-----------------------------------------------------------------------------------5 7. Reference-------------------------------------------------------------------------------------5 8. Attachment-----------------------------------------------------------------------------------5

Page 608

Page 609: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-GT01, Page 2 of 5 Equipment : Generator Date:13 Feb,09 Revision: 0

1. Task This instruction comprises a complete description of the testing of the MV and LV Generators.

2. Preconditions 2.1. Work Status

• Erection has been completed. • Labelling of the equipment and designation of live enclosed plant sections has

been carried out.

2.2. Documentation • The circuit diagrams of Motor is available • Test Sheet TS-GT01 is available • Product manual of the Motor

2.3. Personnel • Commissioning engineer: - (1) engineer with experience in commissioning of

Motors and its control. • Technician or helper:- (2) skilled worker with adequate on -the-job training • Witness from the client‘s concern department

2.4. Measuring Instruments

• Multi meter (calibrated)—2 • Insulation resistance meter –megger(calibrated)—1 • Wheat stone bridge to measure the winding resistance • Vibration Meter

3. Precautions The work will only proceed when a Permit to Work (PTW) in work permit area has been obtained. The PTW will be kept on site for consultation during the testing works. • Observe the rules for handling electronic components sensitive to electrostatic

discharge (ESD measures). • Special safety arrangements shall be made for all areas which are not explicitly

designated as” electrical operating areas” when performing tests at voltages in excess of 50V.

• Closing of the work permit after completion of the work (if the test area is to be considered in work permit area) is necessary.

• Before test voltages are applied a check shall be carried out to ensure that no unauthorized persons are working at the corresponding load-where ever necessary barriers should be provided

4. Scope

• Testing of Generator • Checking RTD’s and Thermocouple • Checking of the mounting pad, • Checking of correct Earthing,

Page 609

Page 610: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-GT01, Page 3 of 5 Equipment : Generator Date:13 Feb,09 Revision: 0

5. Execution 5.1. Visual Inspection.

Prior to carrying out electrical tests, a visual check of the transformer should be carried out paying particular attention to the following points 1. Compare equipment nameplate data with drawings and specifications. 2. Inspect physical and mechanical condition. 3. Inspect anchorage, alignment, and grounding. 4. Inspect air baffles, filter media, cooling fans, slip rings, brushes, and brush

rigging. 5. Verify the unit is clean. 6. Inspect bolted electrical connections for high resistance using one of the following

methods: 1. Use of low-resistance ohmmeter. 2. Verify tightness of accessible bolted electrical connections by calibrated

torque-wrench 7. Verify correct application of appropriate lubrication and lubrication systems. 8. Verify the absence of unusual mechanical or electrical noise or signs of

overheating during initial test run. 9. Verify that resistance temperature detector (RTD) circuits conform to drawings. 10. Verify that metering or relaying devices utilizing RTDs have the correct rating.

5.2. Testing of Generator Following tests to be carried out

1. Resistance measurements through bolted connections with a low-resistance ohmmeter, if applicable

2. Insulation-resistance tests a. Generators larger than 15O KVA: Test duration shall be for ten

minutes. Calculate polarization index. b. Generators 150 KVA horsepower and less: Test duration shall be for

one minute. Calculate the dielectric-absorption ratio. 3. Stator resistance test phase-to-phase. 4. Insulation-resistance test on bearing pedestal in accordance with

manufacturer’s published data, if applicable. 5. Resistance tests on RTDs. If Applicable 6. Commissioning of Heater Circuit. If applicable

a. Visual Checks b. Measurement of insulation resistance of heater. c. Measurement of Current and voltage

7. Insulation-resistance tests on the main rotating field winding, the exciter-field winding, and the exciter-armature winding

5.2.1. Resistance Measurements through Bolted Connections with a Low-

Resistance Ohmmeter. Bolted connection shall be torque and contact resistance measurement shall be done with the help of low resistance meter

Page 610

Page 611: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-GT01, Page 4 of 5 Equipment : Generator Date:13 Feb,09 Revision: 0

5.2.2. Insulation-Resistance Tests

The test voltage for LV Generators is 1000 V dc and For MV Generators is 5000V dc Apply the test voltage between Phase to ground and then phase to phase. Checking of the insulation resistance shall be carried out as under

5.2.2.1. Generator Larger than 150 KVA: Test duration shall be for ten

minutes. Polarization index. The insulation resistance measurement is done from 15 seconds to 1 minute with 15 seconds interval and then for every one minute up to ten minutes. Value obtained at 10 minute divided by value at 1 minute gives polarization index

5.2.2.2. Generators 150 KVA and less: Test duration shall be for one minute. Dielectric-absorption ratio. The insulation resistance measurement is done from 15 seconds to 1 minute with 15 seconds interval and then for every one minute up to ten minutes. Value obtained at 60 seconds divided by value at 15 seconds gives Dielectric absorption ratio

5.2.3. Stator Resistance Test Phase-to-Phase.

Winding Resistance Test shall be done with wheat stone bridge or fluke. In this test the resistance measurement is done on each phase winding

5.2.4. Insulation-Resistance Test on Bearing Pedestal in accordance with manufacturer’s published data, if applicable. This test is done by measuring the insulation resistance between the rotor shaft and ground in accordance with manufacturer’s manual. The test voltage in this case is 500V dc

5.2.5. Resistance Tests on RTDs. If Applicable

Resistance measurement shall be carried out for all the RTD’s and compare with corresponding temperature. For this test a multi loop calibrator can be used

5.2.6. Commissioning of Heaters. If Applicable Space heater shall be commissioned as under

5.2.6.1. Visual Checks of Heaters • Check the rating of the heater on name plate match with the supply

voltage. • Check the KW rating of the heater match with drawing. • Check the breaker which supplying power to heater circuit for correct

rating with respect to total load of the heaters.

5.2.6.2. Measurement of Insulation Resistance Perform insulation resistance measurement on space heater circuit with 500 VDC megger

Page 611

Page 612: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing Procedure Doc. No: TP-GT01, Page 5 of 5 Equipment : Generator Date:13 Feb,09 Revision: 0

5.2.6.3. Measurement of Current and Voltage

Switch on the breaker and measured the total current and individual heater load with mini clamp meter

5.2.7. Insulation-Resistance Tests on the Main Rotating Field Winding, the

Exciter-Field Winding, and the Exciter-Armature Winding Insulation resistance measurement shall be done with 500v dc megger between Rotor winding and Rotor Shaft, Exciter –field winding and ground, and Exciter Armature winding and ground

5.2.8. Protective Earthing Check

Motor protective earthing bond must be earthed in order to afford protection to human beings. Protective earthing bond should be checked for it continuity between motor and the grid,

6. Documents Test sheet TS-GT01 shall be completed for Generator

7. Reference

8. Attachment

8.1. Test Sheet for Generator TS-GT01

***End of the procedure***

Page 612

Page 613: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

Riyadh Po“1062

STARTU

TES

ower plant21166/00”

UP MANUA

ST SH

t # 10

AL DF

EETS

Date:13 Feb,09

Revision0

n:

Page 613

Page 614: PP10 startup manual (Unofficial as Requested)

Generator Name Generator Tag No Unit No Location

Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MT01, Page 1 of 4

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Testing of Generator

Date:13/02/09 Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirms Remarks Item not applicable for motors or feeders to be marked N/A

1.

1.1

Information

Motor Name Plate Details…………………………………………………..

Power:……………….kW (HP) Voltage……………V

Current………………A Speed……………..Rev..min-1

Serial No……………… Type of Motor……………………..

Make…………………………….. No of RTDS……………………….

Type of RTDs Space heater …………………KW/Volts

Visual Checks 1. Equipment nameplate data is matching with drawings and specifications. 2. Physical and mechanical condition is good. 3. Anchorage, alignment, and grounding is good 4 air baffles, filter media, cooling fans, slip rings, brushes, and brush rigging are ok. 5. Overall unit is clean. 6. Bolted electrical connections was verified by

1. Using low-resistance ohmmeter. 2. checking the tightness by calibrated torque-wrench

7. Application of lubrication and lubrication systems verified. 8. Unusual mechanical or electrical noise or signs of overheating during initial test

run is verified. 9. Resistance temperature detector (RTD) circuits are matching with the drawings

drawings. 10. Metering or relaying devices utilizing RTDs were checked for it is correct rating

Page 614

Page 615: PP10 startup manual (Unofficial as Requested)

Generator Name Generator Tag No Unit No Location

Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MT01, Page 2 of 4

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Testing of Generator

Date:13/02/09 Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirms Remarks

3

3.1

3.11

3.12

Electrical Testing

Insulation Resistance Test:

Test Voltage:………………..Volts DC Minimum Accepted Value:……………MΩ

Insulation Resistance In MΩ Time

L1-L2+L3+G L1-L2+L3+G L2+L3+G

15 sec

30 sec

60 sec

2 Min

3 Min

4 Min

5 Min

6 Min

7 Min

8 Min

9 Min

10 Min

Dielectric Absorption Factor for Generators Less then 150KVA

DAF = R60/R15

U-V+W+G V-U+W+G W-U+V+G

Polarization Index for Generators 150KVA and above

PI = R10/R1

U-V+W+G V-U+W+G W-U+V+G

Page 615

Page 616: PP10 startup manual (Unofficial as Requested)

Generator Name Generator Tag No Unit No Location

Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MT01, Page 3 of 4

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Testing of Generator

Date:13/02/09 Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

3.2

Stator Resistance

Resistance in Ω

Red Phase Yellow phase Blue phase

3.3

Insulation Resistance Test For Bearing Pedal

Test Voltage:………………..Volts DC Minimum Accepted Value:……………MΩ

Insulation Resistance in MΩ

Rotor Shaft to Generator Body

3.4

Insulation Resistance test for Rotor

Test Voltage:………………..Volts DC Minimum Accepted Value:……………MΩ

Insulation Resistance in M Ω

Rotor – Ground

Insulation Resistance test for Exciter Armature

Test Voltage:………………..Volts DC Minimum Accepted Value:……………MΩ

Insulation Resistance in M Ω

Armature – Ground

Page 616

Page 617: PP10 startup manual (Unofficial as Requested)

Generator Name Generator Tag No Unit No Location

Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MT01, Page 4 of 4

Customer Consultant Contractor

: : :

SEC-COA BEMCO

Testing of Generator

Date:13/02/09 Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Remarks

3.5

Motor Space Heater

Rating:

Voltage:_________ Volts, Power :_________ Watts

Cable Insulation resistance test

R-G: ___________ M Ohms N-G:___________ M Ohms

Power supply

Voltage_________ Volts

Heater -1(23HG-1) Heater -2(23HG-3) Heater -3(23HG-5)

IR @ 250v dc L1-L2 L2-L3 L3-L1 L1-L2 L2-L3 L3-L1 L1-L2 L2-L3 L3-L1 Measurement

of Voltage in volts

L1 L2 L3 L1 L2 L3 L1 L2 L3 Measurement of current in

amps

Total current_________ Amps

Page 617

Page 618: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

TEST

COA

O

R

-001

TING PC

Riyadh Po“1062

STARTU

PROCECONT

ower plant21166/00”

UP MANUA

EDURTROL C

t # 10

AL DF

RE FORCENTE

Date:13 Feb,09

R LV MER

Revision0

MOTOR

n:

R

Page 618

Page 619: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-MM01, Page 1 of 8 Equipment : LV Motor Control Center Date:13 Feb,09 Revision: 0

TABLE OF CONTENT

1. Task a. Work Status--------------------------------------------------------------------------------------------------------2 b. Documentation----------------------------------------------------------------------------------------------------2 c. Personnel-----------------------------------------------------------------------------------------------------------2 d. Measuring Instrumentation-------------------------------------------------------------------------------------2

2. Preconditions------------------------------------------------------------------------------------------------------------2 3. Precautions---------------------------------------------------------------------------------------------------------------2 4. Scope-----------------------------------------------------------------------------------------------------------------------3 5. Execution------------------------------------------------------------------------------------------------------------------3

a. Visual Inspection-----------------------------------------------------------------------------------------------------3 b. Testing of MCC(Motor Control Center)------------------------------------------------------------------------3

1. Testing of Bus Bar-----------------------------------------------------------------------------------------4 2. Testing of Circuit breakers(MCCB)-------------------------------------------------------------------6 3. ATS functional check--------------------------------------------------------------------------------------6 4. Functional Test of Local Controls, Alarm and Indication-----------------------------------------6 5. Functional Test of Remote Controls, Alarm and Indication.-------------------------------------6 6. Control Power ,Current and Voltage Measurement of the MCC------------------------------7 7. Electrical control and protection/Measuring Devices ---------------------------------------------7 8. Protective earthing check -------------------------------------------------------------------------------8 9. Commissioning of Heater Circuit-----------------------------------------------------------------------8 10. Checks before and After initial energization --------------------------------------------------------8

6. Documents--------------------------------------------------------------------------------------------------------------9 7. Reference----------------------------------------------------------------------------------------------------------------9 8. Attachment--------------------------------------------------------------------------------------------------------------9

Page 619

Page 620: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-MM01, Page 2 of 8 Equipment : LV Motor Control Center Date:13 Feb,09 Revision: 0

1.0 Task The purpose of this procedure is to test, commission and document the motor control center of 220/380/480V levels.

2.0 Preconditions

2.1 Work Status • Erection has been completed. • Labelling of the equipment and designation of live enclosed plant sections has

been carried out.

2.2 Documentation • The schematic and single line diagram of the low voltage motor control centre

are available • Commissioning checklists TS-MM01

2.3 Personnel • 1 Commissioning engineer: Engineer or technician with experience in

commissioning of all types of Electrical equipments. • 1 Helper: skilled worker with adequate on-the-job training.

2.4 Measuring instruments and tools

• Micro ohm meter 10A and 100A • Insulation Tester 1000V dc • Primary injection test set • Secondary Injection test set • Fluke-2 Nos

3.0 Precautions The work will only proceed when a Permit to Work (PTW) in work permit area has been obtained. The PTW will be kept on site for consultation during the testing works.

Special attention will be given to: • Due to high voltage being used, adequate safety precautions should be taken to avoid

injury to personnel and damage to property. • Cordoning off specified working area and provision of applicable safety warning sign

board. • Ensure that all the necessary test equipment are made available at the test area and

with valid calibration stickers and certificate. • Hand insulating gloves and grounding sticks / wire jumpers shall be provided for safe

handling and draining of residual voltage. • Immediately after testing of each phase, voltage residue shall be drain by using

grounding stick / wire which is directly connected to earth. • Closing of the work permit after completion of the work (if the test area is to be

considered in work permit area) is necessary.

Page 620

Page 621: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-MM01, Page 3 of 8 Equipment : LV Motor Control Center Date:13 Feb,09 Revision: 0

4.0 Scope

• Testing of Bus Bar • Testing of MCCB • Operation of MCCB inside the feeder • Testing Of ATS • Operation of Earting switch • Checking CB mounting.

5.0 Execution

5.1 Visual Checks • Check nameplate information for correctness. • Inspect enclosures for proper alignment, foundation fixing and grounding. • Inspect covers, panel section and door for paint work and proper fit. • Check operation of all mechanical interlocks. • Check tightness of all bolted connections (torque wrench method). • Check bus and supports for defects such as cracked welds, chipped porcelain,

cracked insulation, etc., and free of dust accumulation. • Verify that all front panel mounted devices (meters, push buttons, switches, indicator

lamps, mimic buses, etc.) are installed as per drawings • Perform mechanical check and visual inspection on the circuit breaker. • Check for correct breaker position indication. • Check that all control wiring is correct according to the approved drawing and

terminal connections are secure.

WIRING AND FERRULING CHECK • Ensure the numbers on the ferules are from left to right beginning at the terminal

block i.e. at the end of the wire and from bottom to top. • The wire nos. should be checked against the wiring table and the schematic drawing.

5.2 Testing MCC(Motor Control Centre)

Enter the rating plate data in check list TS-MM01 and compare the data with the data contained in the circuit documentation. The following test shall be carried out on whole MCC

1. Testing of Bus Bar a. Bus Continuity and phasing test b. Torque Test c. Contact Resistance test d. Main Circuit Resistance Test e. Insulation Resiatnce Measurment

2. Testing of Circuit breakers(MCCB) a. Breaker Manual closing/opening b. Tripping by trip test button c. Primary Injection and Trip time measurement

3. ATS functional check 4. Functional Test of Local Controls, Alarm and Indication. 5. Functional Test of Remote Controls, Alarm and Indication. 6. Control Power ,Current and Voltage Measurement of the MCC

Page 621

Page 622: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-MM01, Page 4 of 8 Equipment : LV Motor Control Center Date:13 Feb,09 Revision: 0

7. Electrical control and protection/Measuring Devices d. Testing of protection devices e. Testing of CT and VT f. Testing of Transducers g. Testing of Alarm Devices

8. Protective earthing check 9. Commissioning of Heater Circuit

h. Visual Checks i. Measurement of insulation resistance of heater and lamp circuit j. Functional checks of thermostat , Heaters, k. Measurement of Current and voltage

10. Checks before and After initial energization 5.2.1 Testing of Bus Bar

5.2.1.1 Bus Continuity and Phasing Test Continuity and phasing test can be done by simple ohm meter or fluk Connect the extreme end of the single phase of the bus with ground and check the resistance between phases and ground. All the phases should read infinity except the grounded phase, thus the phase is identified and continuity is checked. Repeat the test on remaining two phases. 5.2.1.2 Torque Test Torque shall be applied to all joints which are made at site. The bolts shall be tightened according to the manufacturer instructions after the bus bar erection is completed. Spot check shall be carried out using a calibrated torque wrench. Following is reference in case data from the manufacturer is not available, Bolt shall be tighten to maximum value, Bolt Maximum Size value M 6 8 Nm M 8 20 Nm M 10 40 Nm M 12 70 Nm M 16 140 Nm Tolerance: ± 20 % 5.2.1.3 Contact Resistance Test The contact resistance test shall be carried out after torque check is done on all the bus bar joints. The test requires to measure very small fluctuations in resistance while simulating actual operating conditions. A DC power source will inject the test current up to 100 A and digital voltmeter will measure the voltage drop across the joints under test, thus V/I gives Resistance Contact resistance can also be measured using micro ohm meter as shown in figure below.

• Check the resistance for all the bus bar joints using micro-ohm meter of 100 Amps.

Page 622

Page 623: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-MM01, Page 5 of 8 Equipment : LV Motor Control Center Date:13 Feb,09 Revision: 0

• Check the over all resistance of the bus bar for each phase and a ground by using micro-ohm meter of 100 Amps.

M IC R O O H M M E T E R

C O N T A C T R E S I S T A N C E T E S T A R R A N G E M E N T F O R P R I M A R Y C IR C U IT S

5.2.2 Main Circuit Resistance Test. • The main circuit resistance test shall be performed by 10A or 100

Ampere DC micro-ohmmeter from panel to panel on each phase from cable spouts with all circuit breakers racked in (service) and close position.

• For judgment, the resistance values from panel to panel should not vary too much if the number of joints and length of bus bar remains the same.

• Contact Resistance Measurement shall be performed on all the bus including ground bus

5.2.3 Insulation Resistance Test

Perform Insulation resistance test with 1000Vdc for LV MCC bus and Breakers as below

• Close all the breakers in service position make sure out going cables and bus duct is still not connected.

• Isolate the VTs and short the CTs secondary of all the feeders • Connect the phases Y, B to ground and apply the test voltage

between phase R and ground and note down the readings. • Connect the phases B, R to ground and apply the test voltage

between phase Y and ground and note down the readings. • Connect the phases R, Y to ground and apply the test voltage

between phase B and ground and note down the readings. • Open all the breakers in service position,

Page 623

Page 624: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-MM01, Page 6 of 8 Equipment : LV Motor Control Center Date:13 Feb,09 Revision: 0

• Connect the phases R, Y, B Cable side to the ground on all the breakers.

• Connect the phases R, Y, B Bus side to the test set. • Record the corresponding leakage current readings.

5.2.4 Testing of Circuit breakers(MCCB) 5.2.4.1 Breaker Manual closing/opening

All the MCCB's (Moulded Circuit breaker) shall be checked for its operation by closing and opening the breakers several times

5.2.4.2 Tripping by trip test button All the MCCB's (Moulded Circuit breaker) shall be checked for tripping by pressing the test button and at the same time resetting of the breaker shall be checked.

5.2.4.3 Primary Injection and Trip time measurement(for the breaker 100 amps and high) All the MCCB's (Moulded Circuit breaker) shall be checked for tripping by injecting the primary current equivalent to 2 or 3 times of breaker rated current In this the test current is injected through the phases of the breaker and tripping time is noted. Trip time shall be verified with the manufactures thermal curve. Test shall be done for all the three phases Note: Only breaker 100 Amps and above will be tested for time test

5.2.5 ATS functional check If ATS (Automatic Transfer System) is provided on the MCC needs to be checked as per the circuit diagrams

5.2.6 Functional Test of Local Controls, Alarm and Indication. • Alarm and indication for DC supervision relay shall be checked. • Indication for closing, opening, of the breaker shall be checked.

5.2.7 Functional Test of Remote Controls, Alarm and Indication.

• Alarm and indication for DC supervision relay shall be checked on DCS or remote

• Alarm and indication for trip coil supervision shall be checked on DCS or remote

Page 624

Page 625: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-MM01, Page 7 of 8 Equipment : LV Motor Control Center Date:13 Feb,09 Revision: 0

• Indication for closing, opening of the breaker shall be checked on DCS or Remote.

5.2.8 Control Power ,Current and Voltage Measurement of the MCC • Current on MCB of each circuit to be measured when all the devices are

in service • Mixing of voltage between the two circuits should be checked by keeping

off MCB of one circuit and checking the voltage on other circuit MCB towards load side +V and –V terminals with respect to ground

5.2.9 Testing of Protection Devices

All the protection and monitoring relays shall be tested for their functionality and integrity, please refer related test procedure. 5.2.9.1 Testing of CT's and VT's

All the CT’s and VT’s shall be tested, please refer related test procedure

5.2.9.2 Testing of Transducer All the current, voltage, frequency and power transducer shall be tested, please refer related test procedure

5.2.9.3 Testing of Alarm Devices Alarms for DC supervision, trip coil supervision, spring charging etc shall be checked up to the DCS

5.2.10 Protective Earthing check Switch gear protective Earthing bond must be earthed in order to afford protection to human beings. Minimum two point’s preferable extreme end of ground bus shall be connected to the ground mesh • Check all protective relays have been grounded • Check the doors have been grounded

5.2.11 Commissioning of heaters Space heater shall be commissioned as under. 5.2.11.1 Visual Checks of Heaters

• Check the rating of the heater match with the supply voltage. • Check the KW rating of the heater match with drawing. • Check the breaker which supplying power to heater circuit for

correct rating with respect to total load of the heaters. 5.2.11.2 Measurement of Insulation Resistance

Perform insulation resistance measurement on space heater circuit with 500 VDC megger

5.2.11.3 Measurement of Current and Voltage Switch on the breaker and measured the total current and individual heater load with mini clamp meter

5.2.11.4 Functional Checks of Thermostat Check the operation of the thermostat and hygrometer for cut in and cut out operation

5.2.12 Checks After Initial Energization After energization service load checks to be performed as under • Current should be measured on all the secondary terminal of the current

transformer. • Phase to phase and phase to ground Voltage measurement should be

done on all the phase and core of the voltage transformer. • Phase sequence checks to be done on Voltage transformer.

Page 625

Page 626: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-MM01, Page 8 of 8 Equipment : LV Motor Control Center Date:13 Feb,09 Revision: 0

• All the measuring devices including protective relay to be checked for their metering function.

6.0 Documents

Test Sheet TS-MM01 shall be completed.

7.0 References 8.0 Attachment

8.1 Test Sheet for MCC TS-MM01

***End of the Procedure ***

Page 626

Page 627: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

Riyadh Po“1062

STARTU

TES

ower plant21166/00”

UP MANUA

ST SH

t # 10

AL DF

EETS

Date:13 Feb,09

Revision0

n:

Page 627

Page 628: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MM01 Page 1 of 7

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Low Voltage Control Center

Date: 13/02/09,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

1. Technical data

MCC (name plate details)

Manufacturer:...............................................................................................

Type designation:.........................................................................................

Serial No / year of manufacturing:...............................................................

Rated voltage:..............................................................................................

Rated nominal current:.................................................................................

2.

Visual check 1. Check nameplate information for correctness. 2. Inspect covers, panel section and door for paint work and proper fit. 3. Check for smooth and proper movement of racking mechanisms, shutters rollers, rails

and guides. 4. Check operation of all mechanical interlocks. 5. Check tightness of all bolted connections (torque wrench method). 6. Check bus and supports for defects such as cracked welds, chipped porcelain, cracked

insulation, etc., and free of dust accumulation. 7. Verify that all front panel mounted devices (meters, push buttons, switches, indicator

lamps, mimic buses, etc.) are installed as per drawings 8. Perform mechanical check and visual inspection on the circuit breaker. 9. Perform all specific checks on the breaker and spring operating mechanism. 10. Check that all control wiring is correct according to the approved drawing and terminal

connections are secure. 11. Inspect enclosure for proper alignment foundation fixing and grounding. 12. Check thermostat/space heaters for right position. 13. Bus Bar

i. Check the bus bar for any damage and they are bolted correctly, ii. Check the insulating boots on joints iii. Check that complete bus bar is insulated and no damage of insulation iv. Check that all bus bar joints are silver plated v. Check the enclosure for paint work vi. Check the insulator for any cracks or damage vii. Check insulation damage, cleanliness, connections

Page 628

Page 629: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MM01 Page 2 of 7

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Low Voltage Control Center

Date: 13/02/09,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

1.0 1.1

Bus Bar Testing Mechanical check Torque Check Perform and Check torque for all the interconnection joints of the bus bar which are made at site. Torque should be checked as per following values if manufacturer recommended values are not available.

Bolt Maximum Size value M 6 8 Nm M 8 20 Nm M 10 40 Nm M 12 70 Nm M 16 140 Nm

1.2

Electrical test on Bus Bar Bus Bar Continuity and phasing test:

Continuity Phases From Tie CB- left extreme CB

From Tie CB- Right extreme CB

Phasing

Phase A Phase B Phase C Neutral Ground

1.3

Contact Resistance Test: Test results for Bus bar Joints shall be attached Injected Current -------------Amps DC

Contact Resistance in µ Ohms Phases Joint-1 Joint-2 Joint-3 Joint-4 Joint-5 Joint-6 Phase R Phase Y Phase B Neutral Ground

Page 629

Page 630: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MM01 Page 3 of 7

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Low Voltage Control Center

Date: 13/02/09,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

1.4 Main Circuit Contact Resistance test. Note: Resistance to be measured from line terminal of the main breaker to all the out going breaker terminals when breakers are closed Total Resistance: Bus A

Phase Resistance in µΩ Phase A Phase B Phase C Neutral Ground

Bus B Phase Resistance in µΩ Phase A Phase B Phase C Neutral Ground

1.5

Insulation Test Before Minimum Value--------- GΩ

Condition When breaker are closed When breaker are opened

Phase R-G Y-G B-G R-Y Y-B B-R R-R1 Y-Y1 B-B1 G-ohms Test Voltage

Page 630

Page 631: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MM01 Page 4 of 7

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Low Voltage Control Center

Date: 13/02/09,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

2.0 2.1

Testing of MCCB (Moulded cases Circuit Breaker) Breaker Manual Closing and Opening and Trip push button test

Operational Check Sl No Cubicle No Tag Name Closing

Trip Test

1 2 3 4 5 6 7 8 9 10 11 12

2.2

Primary Injection and timing test

Measured Time (s) Sl No

Cubicle No

Tag Name

Breaker Rating Injected

current(A) Phase a Phase b Phase c

Actual Time (Sec)

Remarks

1 2 3 4 5 6 7 8 9 10 11 12

Page 631

Page 632: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MM01 Page 5 of 7

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Low Voltage Control Center

Date: 13/02/09,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

2.3

Functional Check of ATS Auto operation between Main and Tie Breakers Checked Hot Transfer Between Main and Tie Breakers Checked Manual Operation of all the breakers checked Remote operation of all the breakers checked

2.4

Functional test of local control, alarm and Indication:

SL NO. Alarm/indication Description Indication

on Panel Alarm on

Relays 1 Panel Heater ON indication 2 Circuit breaker Close indication 3 Circuit breaker Open indication

2.5

Functional test of Remote control, Alarm and indication: 1) Breaker operation checks Remote DCS ( all Breakers)

Item No

DEVICE OPERATIONS / CHECK

Aux relay Breaker

1 CLOSE Signal from DCS

2 OPEN Signal from DCS

2) Alarms on DCS:

SL NO. Alarm/indication Description ON DCS

1 CB CLOSE 2 CB OPEN 6 ES OPEN

Page 632

Page 633: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MM01 Page 6 of 7

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Low Voltage Control Center

Date: 13/02/09,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

3

3.1

Electrical control and protection/Measuring Devices Rating and settings of control MCBs Checks MCBs

MCB Description Setting Check correct function: -............ motor drive ............A

-............ Closing Circuit, ............A -............ Trip circuit ...........A -............ VT ............A

-............ VT ............A

3.2

Insulation Resistance measurement for control wiring and cabling with 500 V DC

Function MCB No +V to Ground -V to Ground Closing and Motor Ckt Trip Coil-1 Ckt

For meggering of external cable please refer to multi core cable test sheet

3.3

Control power and current measurment Voltage(V DC) Current(A DC) Power(Watts)

3.3 Testing of protection devices Please refer specific test sheet of related divces

3.4 Testing of CT and VT Please refer separate test sheet of related divces

3.5 Testing of Transducer Please refer separate test sheet of related divces

3.6

Testing of Alarm Devices Please refer separate test sheet of related divces

Page 633

Page 634: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-MM01 Page 7 of 7

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of Low Voltage Control Center

Date: 13/02/09,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

4 4.1

Commissioning of Heater Circuit Visual Checks Rating of the heater match with the supply voltage. KW rating of the heater match with drawing. Breaker for the heater circuit rated correct

4.2

Measurement of insulation resistance of heater and lamp circuit Function MCB No Phase to Ground Neutral to Ground Heater and lamp CKT

4.4

Measurement of Current and voltage

Voltage(V AC) Current(A AC) Power(VA)

4.5

Functional checks of thermostat Thermostat setting Range

Measured Ambient Temp Inside the cubicle

Thermostat Cut-in Temp

Thermostat cut-out temp

Final Setting of Thermostat

5 5.1

5.2

Initial Energization checks before energization: check earthing check cable connection tight check cable connection compartment and C.B. is clean and free from particles checks after initial energization: check indications of CT and VT, local and remote check CT current flow in protection relay Check Voltmeter readings For Load Service Checks please refer separate test sheet

Test Equipment Model Cal due date Test Equipment Model Cal due date

Page 634

Page 635: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

TESTD

Riyadh Po“1062

STARTU

TING PD.C SW

ower plant21166/00”

UP MANUA

PROCWITCH

t # 10

AL DF

EDURHBOAR

Date:13 Feb,09

RE FORRD

Revision0

R

n:

Page 635

Page 636: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-DB01, Page 1 of 7 Equipment : DC Switch Board Date:13 Feb,09 Revision: 0

TABLE OF CONTENT

1. Task a. Work Status--------------------------------------------------------------------------------------------------------2 b. Documentation----------------------------------------------------------------------------------------------------2 c. Personnel-----------------------------------------------------------------------------------------------------------2 d. Measuring Instrumentation-------------------------------------------------------------------------------------2

2. Preconditions------------------------------------------------------------------------------------------------------------2 3. Precautions---------------------------------------------------------------------------------------------------------------2 4. Scope-----------------------------------------------------------------------------------------------------------------------3 5. Execution------------------------------------------------------------------------------------------------------------------3

a. Visual Inspection-----------------------------------------------------------------------------------------------------3 b. Testing of DC Switch Board---------------------------------------------------------------------------------------3

1. Testing of Bus Bar-----------------------------------------------------------------------------------------4 2. Testing of Circuit breakers(MCCB)-------------------------------------------------------------------6 3. Functional Test of Local Controls, Alarm and Indication-----------------------------------------6 4. Functional Test of Remote Controls, Alarm and Indication.-------------------------------------6 5. Control Power ,Current and Voltage Measurement of the MCC------------------------------6 6. Electrical control and protection/Measuring Devices ---------------------------------------------6 7. Protective earthing check -------------------------------------------------------------------------------7 8. Commissioning of Heater Circuit-----------------------------------------------------------------------7 9. Checks before and After initial energization --------------------------------------------------------7

6. Documents--------------------------------------------------------------------------------------------------------------7 7. Reference----------------------------------------------------------------------------------------------------------------7 8. Attachment--------------------------------------------------------------------------------------------------------------7

Page 636

Page 637: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-DB01, Page 2 of 7 Equipment : DC Switch Board Date:13 Feb,09 Revision: 0

1.0 Task

The purpose of this procedure is to test, commission and document the 125V DC Switch board

2.0 Preconditions

2.1 Work Status • Erection has been completed. • Labelling of the equipment and designation of live enclosed plant sections has

been carried out.

2.2 Documentation • The schematic and single line diagram of the low voltage motor control centre

are available • Commissioning checklists TS-DB01

2.3 Personnel • 1 Commissioning engineer: Engineer or technician with experience in

commissioning of all types of Electrical equipments. • 1 Helper: skilled worker with adequate on-the-job training.

2.4 Measuring instruments and tools

• Micro ohm meter 10A and 100A • Insulation Tester 1000V dc • Primary injection test set • Secondary Injection test set • Fluke-2 Nos

3.0 Precautions The work will only proceed when a Permit to Work (PTW) in work permit area has been obtained. The PTW will be kept on site for consultation during the testing works.

Special attention will be given to: • Due to high voltage being used, adequate safety precautions should be taken to avoid

injury to personnel and damage to property. • Cordoning off specified working area and provision of applicable safety warning sign

board. • Ensure that all the necessary test equipment are made available at the test area and

with valid calibration stickers and certificate. • Hand insulating gloves and grounding sticks / wire jumpers shall be provided for safe

handling and draining of residual voltage. • Immediately after testing of each phase, voltage residue shall be drain by using

grounding stick / wire which is directly connected to earth. • Closing of the work permit after completion of the work (if the test area is to be

considered in work permit area) is necessary.

Page 637

Page 638: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-DB01, Page 3 of 7 Equipment : DC Switch Board Date:13 Feb,09 Revision: 0

4.0 Scope • Testing of Bus Bar • Testing of MCCB • Operation of MCCB inside the feeder • Checking CB mounting.

5.0 Execution

5.1 Visual Checks • Check nameplate information for correctness. • Inspect enclosures for proper alignment, foundation fixing and grounding. • Inspect covers, panel section and door for paint work and proper fit. • Check operation of all mechanical interlocks. • Check tightness of all bolted connections (torque wrench method). • Check bus and supports for defects such as cracked welds, chipped porcelain,

cracked insulation, etc., and free of dust accumulation. • Verify that all front panel mounted devices (meters, push buttons, switches, indicator

lamps, mimic buses, etc.) are installed as per drawings • Perform mechanical check and visual inspection on the circuit breaker. • Check for correct breaker position indication. • Check that all control wiring is correct according to the approved drawing and

terminal connections are secure.

WIRING AND FERRULING CHECK • Ensure the numbers on the ferules are from left to right beginning at the terminal

block i.e. at the end of the wire and from bottom to top. • The wire nos. should be checked against the wiring table and the schematic drawing.

5.2 Testing MCC(Motor Control Centre)

Enter the rating plate data in check list TS-MM01 and compare the data with the data contained in the circuit documentation. The following test shall be carried out on whole DC Switch board

1. Testing of Bus Bar a. Bus Continuity and phasing test b. Torque Test c. Contact Resistance test d. Main Circuit Resistance Test e. Insulation Resiatnce Measurment

2. Testing of Circuit breakers(MCCB) a. Breaker Manual closing/opening b. Tripping by trip test button c. Primary Injection and Trip time measurement

3. Functional Test of Local Controls, Alarm and Indication. 4. Functional Test of Remote Controls, Alarm and Indication. 5. Control Power ,Current and Voltage Measurement of the MCC 6. Electrical control and protection/Measuring Devices

d. Testing of protection devices e. Testing of Transducers f. Testing of Alarm Devices

7. Protective earthing check

Page 638

Page 639: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-DB01, Page 4 of 7 Equipment : DC Switch Board Date:13 Feb,09 Revision: 0

8. Commissioning of Heater Circuit g. Visual Checks h. Measurement of insulation resistance of heater and lamp circuit i. Functional checks of thermostat , Heaters, j. Measurement of Current and voltage

9. Checks before and After initial energization 5.2.1 Testing of Bus Bar

5.2.1.1 Bus Continuity and Phasing Test Continuity and phasing test can be done by simple ohm meter or fluk Connect the extreme end of the single phase of the bus with ground and check the resistance between phases and ground. All the phases should read infinity except the grounded phase, thus the phase is identified and continuity is checked. Repeat the test on remaining two phases. 5.2.1.2 Torque Test Torque shall be applied to all joints which are made at site. The bolts shall be tightened according to the manufacturer instructions after the bus bar erection is completed. Spot check shall be carried out using a calibrated torque wrench. Following is reference in case data from the manufacturer is not available, Bolt shall be tighten to maximum value, Bolt Maximum Size value M 6 8 Nm M 8 20 Nm M 10 40 Nm M 12 70 Nm M 16 140 Nm Tolerance: ± 20 % 5.2.1.3 Contact Resistance Test The contact resistance test shall be carried out after torque check is done on all the bus bar joints. The test requires to measure very small fluctuations in resistance while simulating actual operating conditions. A DC power source will inject the test current up to 100 A and digital voltmeter will measure the voltage drop across the joints under test, thus V/I gives Resistance Contact resistance can also be measured using micro ohm meter as shown in figure below.

• Check the resistance for all the bus bar joints using micro-ohm meter of 100 Amps.

• Check the over all resistance of the bus bar for each phase and a ground by using micro-ohm meter of 100 Amps.

Page 639

Page 640: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-DB01, Page 5 of 7 Equipment : DC Switch Board Date:13 Feb,09 Revision: 0

M IC R O O H M M E T E R

C O N T A C T R E S IS T A N C E T E S T A R R A N G E M E N T F O R P R IM A R Y C IR C U IT S

5.2.2 Main Circuit Resistance Test.

• The main circuit resistance test shall be performed by 10A or 100 Ampere DC micro-ohmmeter from panel to panel on each phase from cable spouts with all circuit breakers racked in (service) and close position.

• For judgment, the resistance values from panel to panel should not vary too much if the number of joints and length of bus bar remains the same.

• Contact Resistance Measurement shall be performed on all the bus including ground bus

5.2.3 Insulation Resistance Test

Perform Insulation resistance test with 1000Vdc for LV MCC bus and Breakers as below

• Close all the breakers in service position make sure out going cables and bus duct is still not connected.

• Isolate the VTs and short the CTs secondary of all the feeders • Connect the phases Y, B to ground and apply the test voltage

between phase R and ground and note down the readings. • Connect the phases B, R to ground and apply the test voltage

between phase Y and ground and note down the readings. • Connect the phases R, Y to ground and apply the test voltage

between phase B and ground and note down the readings. • Open all the breakers in service position, • Connect the phases R, Y, B Cable side to the ground on all the

breakers. • Connect the phases R, Y, B Bus side to the test set. • Record the corresponding leakage current readings.

Page 640

Page 641: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-DB01, Page 6 of 7 Equipment : DC Switch Board Date:13 Feb,09 Revision: 0

5.2.4 Testing of Circuit breakers(MCCB)

5.2.4.1 Breaker Manual closing/opening All the MCCB's (Moulded Circuit breaker) shall be checked for its operation by closing and opening the breakers several times

5.2.4.2 Tripping by trip test button All the MCCB's (Moulded Circuit breaker) shall be checked for tripping by pressing the test button and at the same time resetting of the breaker shall be checked.

5.2.4.3 Primary Injection and Trip time measurement(for the breaker 100 amps and high) All the MCCB's (Moulded Circuit breaker) shall be checked for tripping by injecting the primary current equivalent to 2 or 3 times of breaker rated current In this the test current is injected through the phases of the breaker and tripping time is noted. Trip time shall be verified with the manufactures thermal curve. Test shall be done for all the three phases Note: Only breaker 100 Amps and above will be tested for time test

5.2.5 Functional Test of Local Controls, Alarm and Indication. • Alarm and indication for DC supervision relay shall be checked. • Indication for closing, opening, of the breaker shall be checked.

5.2.6 Functional Test of Remote Controls, Alarm and Indication. • Alarm and indication for DC supervision relay shall be checked on DCS or

remote • Alarm and indication for trip coil supervision shall be checked on DCS or

remote • Indication for closing, opening of the breaker shall be checked on DCS or

Remote. 5.2.7 Control Power ,Current and Voltage Measurement of the DC Switch

board • Current on MCB of each circuit to be measured when all the devices are

in service • Mixing of voltage between the two circuits should be checked by keeping

off MCB of one circuit and checking the voltage on other circuit MCB towards load side +V and –V terminals with respect to ground

5.2.8 Testing of Protection Devices All the protection and monitoring relays shall be tested for their functionality and integrity, please refer related test procedure.

Page 641

Page 642: PP10 startup manual (Unofficial as Requested)

Originator: BEMCO Services Prepared by :M AH

The above contents may not be reproduced, transmitted, or distributed to any form or by any means with out prior permission of the originator

Client Consultant Contractor

: : :

SEC-COA BEMCO

Riyadh Power plant # 10

“10621166/00”

Subject : Testing procedure Doc. No: TP-DB01, Page 7 of 7 Equipment : DC Switch Board Date:13 Feb,09 Revision: 0

5.2.8.1 Testing of Over/Under Voltage, and Ground relays All the voltage and ground relays shall be tested, please refer related test procedure

5.2.8.2 Testing of Transducer All the current and voltage transducer shall be tested, please refer related test procedure

5.2.8.3 Testing of Alarm Devices All alarms from the voltage and ground detection relays shall be checked, please refer related test procedure

5.2.9 Protective Earthing check Switch gear protective Earthing bond must be earthed in order to afford protection to human beings. Minimum two point’s preferable extreme end of ground bus shall be connected to the ground mesh • Check all protective relays have been grounded • Check the doors have been grounded

5.2.10 Commissioning of heaters Space heater shall be commissioned as under. 5.2.10.1 Visual Checks of Heaters

• Check the rating of the heater match with the supply voltage. • Check the KW rating of the heater match with drawing. • Check the breaker which supplying power to heater circuit for

correct rating with respect to total load of the heaters. 5.2.10.2 Measurement of Insulation Resistance

Perform insulation resistance measurement on space heater circuit with 500 VDC megger

5.2.10.3 Measurement of Current and Voltage Switch on the breaker and measured the total current and individual heater load with mini clamp meter

5.2.10.4 Functional Checks of Thermostat Check the operation of the thermostat and hygrometer for cut in and cut out operation

5.2.11 Checks After Initial Energization After energization service load checks to be performed as under • +V to –V and phase to ground Voltage measurement shall be done. • All the measuring devices including protective relay to be checked for

their metering function. 6.0 Documents

Test Sheet TS-BD01 shall be completed.

7.0 References 8.0 Attachment

8.1 Test Sheet for MCC TS-DB01

***End of the Procedure ***

Page 642

Page 643: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

Riyadh Po“1062

STARTU

TES

ower plant21166/00”

UP MANUA

ST SH

t # 10

AL DF

EETS

Date:13 Feb,09

Revision0

n:

Page 643

Page 644: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DB01 Page 1 of 7

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of DC Switch Board or MCC

Date: 13/02/09,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

1. Technical data

MCC (name plate details)

Manufacturer:...............................................................................................

Type designation:.........................................................................................

Serial No / year of manufacturing:...............................................................

Rated voltage:..............................................................................................

Rated nominal current:.................................................................................

2.

Visual check 1. Check nameplate information for correctness. 2. Inspect covers, panel section and door for paint work and proper fit. 3. Check for smooth and proper movement of racking mechanisms, shutters rollers, rails

and guides. 4. Check operation of all mechanical interlocks. 5. Check tightness of all bolted connections (torque wrench method). 6. Check bus and supports for defects such as cracked welds, chipped porcelain, cracked

insulation, etc., and free of dust accumulation. 7. Verify that all front panel mounted devices (meters, push buttons, switches, indicator

lamps, mimic buses, etc.) are installed as per drawings 8. Perform mechanical check and visual inspection on the circuit breaker. 9. Perform all specific checks on the breaker and spring operating mechanism. 10. Check that all control wiring is correct according to the approved drawing and terminal

connections are secure. 11. Inspect enclosure for proper alignment foundation fixing and grounding. 12. Check thermostat/space heaters for right position. 13. Bus Bar

i. Check the bus bar for any damage and they are bolted correctly, ii. Check the insulating boots on joints iii. Check that complete bus bar is insulated and no damage of insulation iv. Check that all bus bar joints are silver plated v. Check the enclosure for paint work vi. Check the insulator for any cracks or damage vii. Check insulation damage, cleanliness, connections

Page 644

Page 645: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DB01 Page 2 of 7

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of DC Switch Board or MCC

Date: 13/02/09,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

1.0 1.1

Bus Bar Testing Mechanical check Torque Check Perform and Check torque for all the interconnection joints of the bus bar which are made at site. Torque should be checked as per following values if manufacturer recommended values are not available.

Bolt Maximum Size value M 6 8 Nm M 8 20 Nm M 10 40 Nm M 12 70 Nm M 16 140 Nm

1.2

Electrical test on Bus Bar Bus Bar Continuity and phasing test:

Continuity Phases From Tie CB- left extreme CB

From Tie CB- Right extreme CB

Phasing

Phase A Phase B Ground

1.3

Contact Resistance Test: Test results for Bus bar Joints shall be attached Injected Current -------------Amps DC

Contact Resistance in µ Ohms Phases Joint-1 Joint-2 Joint-3 Joint-4 Joint-5 Joint-6 Phase R Phase Y Ground

Page 645

Page 646: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DB01 Page 3 of 7

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of DC Switch Board or MCC

Date: 13/02/09,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

1.4 Main Circuit Contact Resistance test. Note: Resistance to be measured from line terminal of the main breaker to all the out going breaker terminals when breakers are closed Total Resistance: Bus A

Phase Resistance in µΩ Phase A Phase B Ground

Bus B Phase Resistance in µΩ Phase A Phase B Ground

1.5

Insulation Test Before Minimum Value--------- GΩ When Breakers are Closed

Condition When breaker are closed Phase +V-G -V-G (+V)-(-V) G-ohms Test Voltage

When Breakers are Opened

Condition When breaker are opened Phase +V-G -V-G (+V)-(-V) G-ohms Test Voltage

Page 646

Page 647: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DB01 Page 4 of 7

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of DC Switch Board or MCC

Date: 13/02/09,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

2.0 2.1

Testing of MCCB (Moulded cases Circuit Breaker) Breaker Manual Closing and Opening and Trip push button test

Operational Check Sl No Cubicle No Tag Name Closing

Trip Test

1 2 3 4 5 6 7 8 9 10 11 12

2.2

Primary Injection and timing test

Measured Time (s) Sl No

Cubicle No

Tag Name

Breaker Rating Injected

current(A) Phase a Phase b Phase c

Actual Time (Sec)

Remarks

1 2 3 4 5 6 7 8 9 10 11 12

Page 647

Page 648: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DB01 Page 5 of 7

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of DC Switch Board or MCC

Date: 13/02/09,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

2.3

Functional test of local control, alarm and Indication:

SL NO. Alarm/indication Description Indication

on Panel Alarm on

Relays 1 Panel Heater ON indication 2 Circuit breaker Close indication 3 Circuit breaker Open indication

2.4

Functional test of Remote control, Alarm and indication: 1) Breaker operation checks Remote DCS ( all Breakers)

Item No

DEVICE OPERATIONS / CHECK

Aux relay Breaker

1 CLOSE Signal from DCS

2 OPEN Signal from DCS

2) Alarms on DCS:

SL NO. Alarm/indication Description ON DCS

1 CB CLOSE 2 CB OPEN 6 ES OPEN

3

3.1

Electrical control and protection/Measuring Devices Rating and settings of control MCBs Checks MCBs

MCB Description Setting Check correct function: -............ motor drive ............A

-............ Closing Circuit, ............A -............ Trip circuit ...........A -............ VT ............A

-............ VT ............A

Page 648

Page 649: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DB01 Page 6 of 7

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of DC Switch Board or MCC

Date: 13/02/09,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

3.2 Insulation Resistance measurement for control wiring and cabling with 500 V DC

Function MCB No +V to Ground -V to Ground Closing and Motor Ckt Trip Coil-1 Ckt

For meggering of external cable please refer to multi core cable test sheet

3.3

Control power and current measurment Voltage(V DC) Current(A DC) Power(Watts)

3.4 Testing of protection devices Please refer specific test sheet of related divces

3.5 Testing of Transducer Please refer separate test sheet of related divces

3.6

Testing of Alarm Devices Please refer separate test sheet of related divces

4 4.1

Commissioning of Heater Circuit Visual Checks Rating of the heater match with the supply voltage. KW rating of the heater match with drawing. Breaker for the heater circuit rated correct

4.2

Measurement of insulation resistance of heater and lamp circuit Function MCB No Phase to Ground Neutral to Ground Heater and lamp CKT

4.3

Measurement of Current and voltage

Voltage(V AC) Current(A AC) Power(VA)

Page 649

Page 650: PP10 startup manual (Unofficial as Requested)

Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.: Feeder Name. Feeder No:

Subcontract/Tested by Arabian BEMCO SEC-COA

Name:

Signature:

Date:

Riyadh Power plant # 10

“10621166/00”

Form No: TS-DB01 Page 7 of 7

Customer Consultant Contractor

: : :

SEC-EOA BEMCO

Testing of DC Switch Board or MCC

Date: 13/02/09,Revision: 0

No ACTIVITIES/CHECKS (All activities are part of field commissioning) Confirm Remarks

4.4

Functional checks of thermostat Thermostat setting Range

Measured Ambient Temp Inside the cubicle

Thermostat Cut-in Temp

Thermostat cut-out temp

Final Setting of Thermostat

5 5.1

5.2

Initial Energization checks before energization: check earthing check cable connection tight check cable connection compartment and C.B. is clean and free from particles checks after initial energization: Check Voltmeter readings For Load Service Checks please refer separate test sheet

Test Equipment Model Cal due date Test Equipment Model Cal due date

Page 650

Page 651: PP10 startup manual (Unofficial as Requested)

Client : SEC-COA Consultant : Contractor : BEMCO

Riyadh Power plant # 10

“10621166/00”

Doc. No.: PP10-BS-SU-001 STARTUP MANUAL Date:13 Feb,09

Revision: 0

Page 1 of 1

Author: Asif Page 1 2/18/2009

1. Attachment for Section–12Testing and commissioning-Instrumentation (Later) 1.1. CI-01 Calibration of Pressure Switches 1.2. CI-02 Calibration of Temperature gauges 1.3. CI-03 Calibration of Pressure gauges 1.4. CI-04 Exhaust over temperature alarm & trip 1.5. CI-05 Exhaust duct over pressure protection 1.6. CI-06 Compressor bleed Valves 1.7. CI 07 Emergency oil pump test & low lube oil pressure trip 1.8. CI-08 Exhaust frame blower (lead / lag test) 1.9. CI-09 Firing checks 1.10. CI-10 Flame detection test and loss of flame trip 1.11. CI-11 Cooling water lead lag test & cooling water fans vibration alarm trip 1.12. CI-12 Hydraulic oil System 1.13. CI-13 Compartment cooling Fans 1.14. CI-14 Hydraulic ratchet System 1.15. CI-15 Trip oil system checks 1.16. CI-16 Vibration protection system 1.17. CI-17 Vanadium inhibitor pip trip, lead lag and change

over distillate 1.18. CI-18 Manual emergency shutdown 1.19. CI-19 High lube oil header temperature alarm & trip 1.20. CI-20 Low and high lube oil alarm 1.21. CI-21 IGV position calibration 1.22. CI-22 Mark VI processor hard 1.23. CI-23 Inlet air-filter 1.24. Instrumentation Test Sheets

1.24.1. Test Sheet - Orifice Plate Verification Report 1.24.2. Test sheet – Thermo well Verification. 1.24.3. Test sheet -Instrument Calibration Report For Temperature

Element Transmitters 1.24.4. Test sheet -Instrument Calibration Report(Transmitters) 1.24.5. Test sheet- Switch Calibration Report (PS/TS/LS-DPS) 1.24.6. Test sheet-Local Instrument Calibration Report (PG/TG/LG) 1.24.7. Test sheets - Instrument Loop Test Sheet-

Pressure/Level/Flow/Temperature Transmitter/Other Transmitters 1.24.8. Test sheets - Instrument Loop Test Sheet-RTD 1.24.9. Test sheets - Instrument Loop Test Sheet-DCS Digital Input

Signal(Switches) 1.24.10. Test sheets - Instrument Loop Test Sheet- Motor Operated Valve 1.24.11. Test sheets - Instrument Loop Test Sheet- Pneumatic Valves 1.24.12. Test sheets - Instrument Loop Test -Solenoid valve 1.24.13. Test sheet-Switch Calibration Report (PS/TS/LS-DPS) 1.24.14. Test sheet - Instrument Control Cable -Megger/Continuity

Page 651

Page 652: PP10 startup manual (Unofficial as Requested)

ClieConCon

Doc

ent nsultant ntractor

c. No.: PP1

: SEC-C : : BEMCO

10-BS-SU-

COA

O

R

-001

Riyadh Po“1062

STARTU

TES

ower plant21166/00”

UP MANUA

ST SH

t # 10

AL DF

EETS

Date:13 Feb,09

Revision0

n:

Page 652

Page 653: PP10 startup manual (Unofficial as Requested)

Form No: TS-I4002

Dtae: 13/02/09 Rev: 0Tag No. : Type :

Make : P&ID No :

Line Size : Plate Dia(D) :

Plate Thickness : Bore Dia(d) :

Plate Material : Service :

Location :

Verification as per Data sheet :

Yes No

Tag no is correct :Plate Thickness is correct :Plate material is correct :Bore dia is correct :Plate dia is correct :Vent / Drain holes are correct :

Test Equipment Used

Equip.Make

Equip.Model No

Equip.Sl.No

Equip.Calibration Certification No

Equip.Calibration ValidityRemarks

Company

Signature

Name

Date

SUB CONTRACTOR ARABIAN BEMCO SEC

Date of Calibration :

Client : SEC-EOA Riyadh Power Plant # 10 " 10721026/00'Contractor: BEMCO

Sub Cont:

Orifice Plate Verification Report

Page 653

Page 654: PP10 startup manual (Unofficial as Requested)

Client : SEC-EOARiyadh Power Plant # 10 " 10721026/00'

Contractor: BEMCO

Sub Cont:

Verification of Thermowell Form No: TS-I4003

Dtae: 13/02/09 Rev: 0

Tag No. : Name/ Appln :

Flange rating : Type :

End connection : Make :

Insertion Length : Service

Verification as per Data sheet :

Yes No

Tag no is correct :Thermowell length is correct :Process connection is correct :Material is correct :Thermoelement length is correct :

Test Equipment Used

Equip.Make

Equip.Model No

Equip.Sl.No

Equip.Calibration Certification No

Equip.Calibration ValidityRemarks

Company SUB CONTRACTOR ARABIAN BEMCO SEC

Signature

Name

Date Page 654

Page 655: PP10 startup manual (Unofficial as Requested)

Form No: TS-I4004

Dtae: 13/02/09 Rev: 0

:TAG NO. : AREA/LOCATION :

TYPE : MAKE :

MODEL NO : RANGE :

P & ID NO. : SERVICE :

DATA SHEET REF : DATE OF CALIBRATION :

INST. SERIAL NO :

PRE-CALIBRATION INSPECTION :

TAG NUMBER CORRECT : YES / NO COMPLIANCE WITH SPECS. : YES / NO

GENERAL CONDITION SATISFACTORY : YES / NO INPUT RANGE :

BODY MATERIAL CORRECT : YES / NO OUTPUT RANGE :

FIELD/LAB ______________

TEST EQUIPMENT USED :

EQUIPMENT TYPE : RANGE :

EQUIPMENT SERIAL NO. : ACCURACY :

MAKE / MODEL : CALIBRATION DATE :

CERTIFICATE NO. : RE-CALIBRATION DUE :

% Deg C EXPECTED

REMARKS :

SIGN

NAME

DATE

Client : SEC-EOA

Contractor: BEMCO

Sub Cont:

OBSERVED

Riyadh Power Plant # 10 " 10721026/00'

INSTRUMENT CALIBRATION REPORT FOR TEMPERATURE ELEMENT

% ERROR REMARKS

SEC SUB CONTRACTOR ARABIAN BEMCO

INPUT OUTPUT IN Ohm/Mv

AMBIENT CONDITION:

NAME/APPLN

Page 655

Page 656: PP10 startup manual (Unofficial as Requested)

Form No: TS-I4005

Dtae: 13/02/09 Rev: 0TAG NO. :TYPE :MAKE/MODEL : CALIBRATION RANGE: P & ID NO. : SPECIFIED ACCURACY:DATA SHEET REF. : SERVICE DESCRIPTION:INST. SERIAL NO : DATE OF CALIBRATION:

PRE-CALIBRATION INSPECTION :TAG NUMBER CORRECT SAFETY PROTECTION : GENERAL CONDITION SATISFACTION INPUT CALIBRATION RANGE :COMPLIANCE WITH SPECIFICATION OUTPUT CALIBRATION RANGE : ZERO ELEVATION /SUPRESSION (IN ENGG. UNIT) :AMBIENT CONDITION : FIELD / LAB. TEMP. : HUMIDITY :

TRANSMITTER DETAILS :

TYPE

SMART ANALOG LINEAR BURNOUT UPSCALE FAIL TO UPSCALE ANALOG DIGITAL SQRT BURNOUT DOWNSCALE FAIL TO DOWNSCALE

HART SPECIAL BURNOUT LAST GOOD VALUE UNDEFINED

TEST EQUIPMENT USED :EQUIPMENT TYPE : RANGE :

EQUIP. SERIAL NO. : ACCURACY :

MAKE : : CALIBRATED DATE :

CERTIFICATE NO. : CALIBRATION DUE DATE :

RESULT :

REMARKS :

Contractor: BEMCO

Sub Cont:INSTRUMENT CALIBRATION REPORT

(TRANSMITTERS)

Client : SEC-EOARiyadh Power Plant # 10 " 10721026/00'

INSTRUMENT DESCRIPTION :__________________________:__________________________

:_______________________

:__________________________:__________________________:__________________________

AREA/LOCATION

50%

COMMUNICATION MODE

ACTUAL INPUT

25%

% OF CALIBRATED SPAN

0%

SEC

OUTPUT FORM

ARABIAN BEMCO

% ERRORACTUAL OUTPUT EXPECTED OUTPUT % OR mA

SUB CONTRACTOR

REMARKS

FAIL SAFE DIRECTION

25%

0%

75%

100%

75%

50%

SIGN

NAME

DATE Page 656

Page 657: PP10 startup manual (Unofficial as Requested)

Client : SEC-EOA

Contractor: BEMCO

Sub Cont:

Form No: TS-I4006Date: 13/02/09 Rev: 0

: __________________________AREA/LOCATIONCALIBRATION RANGESPECIFIED ACCURACYSERVICE DESCRIPTIONDATE OF CALIBRATION

Y / NY / NY / N

VALVE DETAILS :COMMUNICATION

SMARTANALOG

SERIAL # CERT NO CAL DATE EXP DATE

RESULTS :ACTUAL INPUT ACTUAL OUTPUT EXPECTED OUTPUT % ERROR REMARKS

REMARKS :

SEC

SIGN

NAMEDATE

SUBCONTRACTOR BEMCO

0

100755025

0255075

INPUT %

SPECIAL

TEST EQUIPMENT :

TYPE OF EQPT MAKE MODEL #

HART

AMBIENT CONDITION : FIELD / LAB TEMP : ________ HUMIDITY :___________

MODE ANALOG DIGITAL

TYPE OUTPUT FORM LINEAR SQRT

ACCUMULATOR PRE CHARGE TO : _______ BAR

ZERO ELEVATION / SUPRESSION ( IN ENGG UNITS ) : __________________

VALVE FUNCTION CORRECTLYVALVE ACCUMULATOR FITTEDOPERATION OF ACCUMULATOR CHECKEDVALVE ACTION ON AIR / POWER FAILURE : FAIL OPEN / FAIL CLOSE

: __________________________: _________________________

OPENING TIME : ______________ SecCLOSING TIME : ______________ Sec

PRE- CALIBRATION INSPECTION :

INSTRUMENT DESCRIPTION

INSTRUMENT SERIAL NO :____________________ : __________________________

TYPE : _______________________ MAKE / MODEL : _______________________P & ID NO : _______________________DATA SHEET NO & PAGE :____________________

: _________________________: __________________________

Riyadh Power Plant # 10 " 10721026/00'

SWITCH CALIBRATION REPORT ( PS/TS/LS-DPS )

TAG NO : _______________________

Page 657

Page 658: PP10 startup manual (Unofficial as Requested)

Client : SEC-EOA

Contractor: BEMCO

Sub Cont:

Form No: TS-4007

Date: 13/02/09 Rev: 0

: ___________________________AREA/LOCATIONCALIBRATION RANGESPECIFIED ACCURACYSERVICE DESCRIPTIONDATE OF CALIBRATION

Y / NY / NY / NY / N ACCURACY : ______________

Y / N

SERIAL # CERT NO CAL DATE EXP DATE

TEST RESULTS :

APPLIED INPUT BAR INSTRUMENT READING % ERROR REMARKS

deg c

REMARKS :

SEC / SAUD CONSULT

SIGN

NAMEDATE

Riyadh Power Plant # 10 " 10721026/00'

LOCAL INSTRUMENT CALIBRATION REPORT ( PG/TG/LG )

50

INSTRUMENT DESCRIPTION

INITIAL / FINAL TIMER SETTING

SUBCONTRACTOR BEMCO

0

deg C

100755025

025

NAME PLATE AVAILABLE

75

AMBIENT CONDITION : FIELD / LAB TEMP : ________ HUMIDITY :___________

TEST EQUIPMENT USED :

TYPE OF EQPT MAKE MODEL #

P & ID NO : _______________________DATA SHEET NO & PAGE :____________________

INPUT %

COMPLIANCE WITH SPECIFICATION: _____________INPUT CALIBRATION RANGE : ______________OUTPUT CALIBRATION RANGE : ______________

ZERO ELEVATION / SUPRESSION ( IN ENGG UNITS ) : __________________

TAG NUMBER CORRECTGENERAL CONDITION SATISFACTORYBODY MATERIAL CORRECT

TAG NO : _______________________

PRE- CALIBRATION INSPECTION

INSTRUMENT SERIAL NO :____________________

: _________________________: __________________________: __________________________: _________________________: __________________________

TYPE : _______________________ MAKE / MODEL : _______________________

Page 658

Page 659: PP10 startup manual (Unofficial as Requested)

Form No: TS-I4008Dtae: 13/02/09 Rev: 0

INSTRUMENT KKS NO : ___________________________________INSTRUMENT DESCRIPTION : ___________________________________SERVICE : ___________________________________REFERENCE P&I DIAGRAM : ___________________________________REFERENCE LOOP DIAGRAM : ___________________________________MANUFACTURER : ___________________________________TYPE : ___________________________________MODEL : ___________________________________RANGE : ___________________________________INPUT SIGNAL : ___________________________________

CABLE CONTINUITY TEST/ IR TEST OK NA

DOUBLE/TRIPLE MEASUREMENT OK NA

DISCREPANCY OK NA

TREND OK NA

TOTALIZER OK NA

MEASURE INPUT

DCS INDICATION

MEASURE INPUT

DCS INDICATION

0% 75%25% 50%50% 25%75% 0%

100%OVER RANGEUNDER RANGE

STATIC HEAD CORRECTION (PRESSURE TRANSMITTERS) ……………………..mm of liquid column

Value During Increase

INVALID SIGNAL

MAX 2MAX 1MIN 1MIN 2

REMARKS:

SIGNATURE

NAME

DATE

During Decrease

TRANSMITTER OUTPUT

SET SWITCHING VALUE

TRANSMITTER OUTPUT

THRESHOLDSERROR

Percentage

THRESHOLDS DEAD BAND

SUBCONTRACTOR ARABIAN BEMCO SEC / SAUD CONSULT

LOGIC FUNCTIONALARM%

Meas.

Client : SEC-EOARiyadh Power Plant # 10 " 10721026/00'

Contractor: BEMCOSub Cont: INSTRUMENT LOOP TEST SHEET - PRESSURE /

LEVEL / FLOW / TEMPERATURE TRANSMITTER /OTHER TRANSMITTERS

Page 659

Page 660: PP10 startup manual (Unofficial as Requested)

Form No: TS-I4009Dtae: 13/02/09 Rev:

INSTRUMENT DESCRIPTION : ___________________________________SERVICE : ___________________________________K.K.S.NUMBER : ___________________________________REFERENCE P&I DIAGRAM : ___________________________________REFERENCE LOOP DIAGRAM : ___________________________________MANUFACTURER : ___________________________________TYPE : ___________________________________MODEL : ___________________________________RANGEINPUT SIGNAL

CABLE CONTINUITY TEST / IR TEST OK NA

DOUBLE/TRIPLE MEASUREMENT OK NA

DISCREPANCY OK NA

TREND OK NA

TOTALIZER OK NA

Value During Increase

INVALID SIGNAL

MAX 2MAX 1MIN 1MIN 2

REMARKS:

SIGNATURE

NAME

DATE

SUBCONTRACTOR ARABIAN BEMCO SEC / SAUD CONSULT

RESISTANCE VALUE Ω DCS INDICATION 0C

% Meas. Range

ERROR

PercentagDuring

Decrease

LOGIC FUNCTIONALARM

THRESHOLDS

THRESHOLDS DEAD BAND

___________________________________: RTD PT-100(Ω)

100Ω = 00C

SET SWITCHING VALUE

Client : SEC-EOARiyadh Power Plant # 10 " 10721026/00'

Contractor: BEMCOSub Cont:

INSTRUMENT LOOP TEST SHEET - RTD

Page 660

Page 661: PP10 startup manual (Unofficial as Requested)

Form No: TS-I4010Dtae: 13/02/09 Rev: 0

INSTRUMENT DESCRIPTION : ___________________________________SERVICE : ___________________________________K.K.S.NUMBER : ___________________________________REFERENCE P&I DIAGRAM : ___________________________________REFERENCE LOOP DIAGRAM : ___________________________________MANUFACTURER : ___________________________________TYPE : ___________________________________MODEL : ___________________________________RANGE : ___________________________________ALARM SET POINT : ___________________________________

CABLE CONTINUITY TEST / IR TEST OK NA

DOUBLE /TRIPLE MEASUREMENT OK NA

DISCREPANCY OK NA

Value During Increase

INVALID SIGNAL

MAX 2MAX 1MIN 1MIN 2

SHORT CIRCUITWIRE BREAK

REMARKS:

SIGNATURE

NAME

DATE

LOGIC FUNCTIONALARM

THRESHOLDS

THRESHOLDS DEAD BAND% Meas.

Range

ERROR

PercentageDuring

Decrease

SET SWITCHING VALUE

SUBCONTRACTOR ARABIAN BEMCO SEC / SAUD CONSULT

SEE RELEVANT CALIBRATION CERTIFICATE FROM I&C LABORATORY

Client : SEC-EOARiyadh Power Plant # 10 " 10721026/00'

Contractor: BEMCOSub Cont: INSTRUMENT LOOP TEST SHEET - DCS DIGITAL

INPUT SIGNALS ( SWITCHES )

Page 661

Page 662: PP10 startup manual (Unofficial as Requested)

Form No: TS-I4011Dtae: 13/02/09 Rev: 0

INSTRUMENT DESCRIPTION : ___________________________________

SERVICE : ___________________________________

K.K.S.NUMBER : ___________________________________

REFERENCE P&I DIAGRAM : ___________________________________

REFERENCE LOOP DIAGRAM : ___________________________________

MANUFACTURER : ___________________________________

TYPE : ___________________________________

SERIAL NUMBER : ___________________________________

FULL STROKE TIME OPEN / CLOSE : ________/________ Sec.

RUNNING TIME MONITORING : _________________ Sec.

OPEN : _________________ NmCLOSED : _________________ Nm

CABLE CONTINUITY TEST / IR TEST OK N/A

VALVE LIMIT SWITCH OPEN POSITION CLOSE POSITION

CLOSING ON TORQUE LIMIT

OPENING ON TORQUE LIMIT

TRIP INTERLOCK

RELEASE INTERLOCK

OPERATION FROM LOCAL PANEL OPEN CLOSE

OPERATION FROM LOCAL OPEN CLOSE

ALARMS ELECTRICAL FAILURE LIMIT SWITCH DISCREPANCYRUN TIME

STATUS INDICATION ON DCS NA OPEN CLOSE FAULT

REMARKS:

SIGNATURE

NAME

DATE

SUBCONTRACTOR ARABIAN BEMCO SEC

Client : SEC-EOARiyadh Power Plant # 10 " 10721026/00'

Contractor: BEMCOSub Cont: INSTRUMENT LOOP TEST SHEET- MOTOR

OPERATED VALVE

Page 662

Page 663: PP10 startup manual (Unofficial as Requested)

Form No: TS-I4012Dtae: 13/02/09 Rev: 0

INSTRUMENT DESCRIPTION : ___________________________________

SERVICE : ___________________________________

K.K.S.NUMBER : ___________________________________

REFERENCE P&I DIAGRAM : ___________________________________

REFERENCE LOOP DIAGRAM : ___________________________________

LOCAL PANEL NAME : ___________________________________

MANUFACTURER : ___________________________________

TYPE : ___________________________________

SOLENOID TYPE : ___________________________________

POWER SUPPLY : ___________________________________

FULL STROKE TIME OPEN / CLOSE : ________/________ Sec.

CABLE CONTINUITY TEST / IR TEST OK N/A

POWER FAIL POSITION OPEN CLOSE

AIR FAIL POSITION OPEN CLOSE

VALVE OPERATION FROM LOCAL CONTROL PANEL OPEN CLOSE

STATUS INDICATION ON DCS NA OPEN CLOSE FAULT

REMARKS:

SIGNATURE

NAME

DATE

SUBCONTRACTOR ARABIAN BEMCO SEC

Client : SEC-EOARiyadh Power Plant # 10 " 10721026/00'

Contractor: BEMCOSub Cont: INSTRUMENT LOOP TEST SHEET - PNEUMATIC

VALVES

Page 663

Page 664: PP10 startup manual (Unofficial as Requested)

Form No: TS-I4013Dtae: 13/02/09 Rev: 0

INSTRUMENT DESCRIPTION : ___________________________________

SERVICE : ___________________________________

K.K.S.NUMBER : ___________________________________

REFERENCE P&I DIAGRAM : ___________________________________

REFERENCE LOOP DIAGRAM : ___________________________________

LOCAL PANEL NAME : ___________________________________

MANUFACTURER : ___________________________________

TYPE : ___________________________________

SOLENOID TYPE : ___________________________________

POWER SUPPLY : ___________________________________

CABLE CONTINUITY TEST / IR TEST OK N/A

OPERATION FROM LOCAL PANEL OPEN CLOSE

POWER FAIL POSITION OPEN CLOSE

STATUS INDICATION ON DCS NA OPEN CLOSE FAULT

REMARKS:

SIGNATURE

NAME

DATE

Riyadh Power Plant # 10 " 10721026/00'Client : SEC-EOA

Contractor: BEMCO

Instrument Loop Test - Solenoid Valve

SEC SUBCONTRACTOR ARABIAN BEMCO

Sub Cont:

Page 664

Page 665: PP10 startup manual (Unofficial as Requested)

Client : SEC-EOA

Contractor: BEMCO

Sub Cont:

Form No: TS-I4014Date: 13/02/09 Rev: 0

:______________________AREA/LOCATIONOVERRANGEPROOF RANGEDIFFERENTIAL ADJUSTABLEDIFFERENTIAL VALUEDATE OF CALIBRATION :___________________________

Y / N SAFETY PROTECTION : ______________Y / N INPUT CALIBRATION RANGE : ______________Y / N

AMBIENT CONDITION : FIELD / LAB TEMP : ________ HUMIDITY :___________

OPEN ON RISING H SWITCH SET ___________ RESET ____________ CLOSE ON FALLING OPEN ON RISING H H SWITCH SET ___________ RESET ____________

CLOSE ON FALLING

MAKE MODEL # SERIAL # CERT NO CAL DATE EXP DATE

RESULTS :NC CONTACT CABLE CORE

REMARKS :

SEC / SAUD CONSULT

SIGN

NAMEDATE

SUBCONTRACTOR ARABIAN BEMCO

DEAD BANDNO CONTACT

:__________________________

TEST EQUIPMENT USED :

TYPE OF EQPT

:_________________________:_________________________

GENERAL CONDITION SATISFACTORY

INSTRUMENT SERIAL NO :____________________

DATA SHEET NO & PAGE :____________________

SERVICE :________________:________________

Riyadh Power Plant # 10 " 10721026/00'

SWITCH CALIBRATION REPORT ( PS/TS/LS-DPS )

: ___________________: __________________________

TAG NO : _______________________

PRE- CALIBRATION INSPECTION :

SET VALUE

INSTRUMENT DESCRIPTION

TAG NUMBER CORRECT

TYPE : _______________________ MAKE / MODEL : _______________________P & ID NO : _______________________

COMPLIANCE WITH SPECIFICATION

Page 665

Page 666: PP10 startup manual (Unofficial as Requested)

O

Client : SEC-EOARiyadh Power Plant # 10 " 10721026/00'

Contractor: BEMCO

Sub Cont:

TRUMENT & CONTROL CABLE MEGGER / CONTINUITY TEST REP Form No: TS-I4001

Dtae: 13/02/09 Rev: 0

PANEL / JB No .: AREA/LOCATION .: REPORT No.:

DRWG. REF. NO .: APPLIED VOLTAGE .: DATE.:

ITEM NO.

CABLE NO. CABLE TYPE/SIZE FROM TOCABLE

LENGTH - Mtrs

CONDUCTOR TO CONDUCTOR

CONDUCTOR TO SHIELD

CONDUCTOR TO ARMOUR

SHIELD TO SHIELD

SCREEN/ SHIELD TO ARMOUR

CONTINUITY TEST REMARKS

N/A

N/A

N/A

N/A

N/A

N/A

N/A

TYPE OF INSTRUMENT : Remarks:

INSTRUMENT NO/SR. NO. :

INSTRUMENT MAKE/MODEL :

CALIBRATION CERTIFICATE NO. :

INSTRUMENT CALIBRATION DATE/DUE :

SUB CONTRACTOR ARABIAN BEMCO SEC

Name

Signature

Date Page 666

Page 667: PP10 startup manual (Unofficial as Requested)

Client : SEC-COA Consultant : Contractor : BEMCO

Riyadh Power plant # 10

“10621166/00”

Doc. No.: PP10-BS-SU-001 STARTUP MANUAL Date:13 Feb,09

Revision: 0

Page 1 of 1

Author: Asif Page 1 2/18/2009

1. Section –13 Testing and commissioning-Mechanical (Later) 1.1. CM-01 Commissioning of Fuel Oil System 1.2. CM-02 Commissioning of Fuel Treatment Plant (Vendor) 1.3. CM-01 Commissioning of Fuel Oil System 1.4. CM-04 Commissioning of Oily Water Drainage System 1.5. CM-05 Commissioning of GT Wash Water Supply System 1.6. CM-06 Commissioning of GT Wash Water Drain System 1.7. CM-07 Commissioning of Raw Water Transfer Pumps 1.8. CM-08 Commissioning of Water Treatment Plant (Vendor) 1.9. CM-09 Commissioning of Dimin Water Plant (Vendor) 1.10. CM-10 Commissioning of Dimin Water Supply Pumps

1.11. CM-11 Commissioning of Service Water Distribution Pumps 1.12. CM-12 Commissioning of Drinking Water Distribution Pumps 1.13. CM-13 Commissioning of Instrument Air Compressors and Air Dryers 1.14. CM-14 Commissioning of Service Air Compressors 1.15. CM-15 Commissioning of Fire Water System Pumps 1.16. CM-16 Commissioning of Foam System Equipments 1.17. CM-17 Commissioning of Fire Water and Fire Foam Deluge System 1.18. CM-18 Commissioning of HVAC Equipments 1.19. CM-19 Commissioning of Sewage Treatment Plant (Vendor) 1.20. CM-20 Commissioning of Irrigation System Pumps and Equipments 1.21. CM-21 Commissioning and Load Testing of Overhead Cranes and Hoists 1.22. CM-22 Commissioning of Black Start Diesel Generator (Vendor) 1.23. Gas Turbine and Associated Auxiliaries (By GE)

Page 667

Page 668: PP10 startup manual (Unofficial as Requested)

Client : SEC-COA Consultant : Contractor : BEMCO

Riyadh Power plant # 10

“10621166/00”

Doc. No.: PP10-BS-SU-001 STARTUP MANUAL Date:13 Feb,09

Revision: 0

Page 1 of 1

Author: Asif Page 1 2/18/2009

1. Attachment for Section –14 Velocity Flushing

1.1. Lube Oil Flushing

Page 668