  • 8/10/2019 ISPS presentation 16_04_04.PPT

    1/8

    SEOP Distribution

    ISPS Code Implementation Pauillac Terminal

    Introduction + Safety rules

    Program for the visit/timing etc

    Presentation:

    Distribution Organisation

    Responsibilities for the Terminal

    Process followed

    Questions we have

    Site visit?

    Feedback from Port Authorities

    Way forward

  • 8/10/2019 ISPS presentation 16_04_04.PPT

    2/8

    SEOP Distribution

    ISPS Code Implementation Pauillac Terminal

    Atlantic

    Mediterranean

    Nordic

    Central

    Rhine

    BeNeFrux

  • 8/10/2019 ISPS presentation 16_04_04.PPT

    3/8

    SEOP Distribution

    ISPS Code Implementation Pauillac Terminal

    59

    62

    02

    80

    60

    76

    14

    50

    2229

    56

    35 53

    72

    61

    28

    78

    95

    91

    77

    27

    08

    55

    54

    57

    67

    88

    52

    10

    51

    90

    68

    70

    21

    89

    58

    7139

    25

    45

    18

    41

    37

    36

    49

    44

    8579

    86

    87

    23

    03

    63

    43

    48

    15

    19

    46

    1716

    24

    33

    40

    4269

    0174

    73

    38

    0507

    26

    30 8404 06

    831334

    12

    81

    11

    66

    09

    31

    82

    47

    32

    65

    64

    DPC St Pol

    Pt Couronne

    DPC Caen

    Bassens

    Le Boucau

    Shell Berre

    Puget

    Valence

    GP Annecy

    RM Dijon EP Mulhouse

    Reichstett

    Tours GPSPC

    RM Orlans

    RM Mitry Mory

    EP Valenciennes

    Villette de ViennePauillac

    Lyon Port Herriot

    91

    94

    939278

    95

    75

    ChoisyRM Coignires

    77

    RM Chlon/Sane

    DP Corse Bastia

    DP Corse Ajaccio

    Dpts 100% Shell

    Dpts o Shell possde une participation

    (actionnariat)

    DPC Concarneau

  • 8/10/2019 ISPS presentation 16_04_04.PPT

    4/8

    SEOP Distribution

    ISPS Code Implementation Pauillac Terminal

    Distribution Area

    Manager

    Benefrux

    Order to Delivery

    Operational

    Excellence Manager

    QHSSE

    Manager

    Facilities

    Manager

    Joint Venture

    Manager

    Road Transport

    ManagerEngineerings

    Manager

    Business

    Development

    Manager

    Finance

    Manager

    Draft: 12-03-2003, V01

    Petit Couronne

    Terminal

    Manager

    6 operators

    1 Admin

    Arnhem

    Terminal Manager

    3 Operators

    Pernis

    Terminal Manager

    3 Operators

    Valence/Villette

    TerminalManager

    3 Admin

    Bertrange

    Terminal Manager

    4 Operators1 Admin

    Gent / Hasselt

    Terminal Manager

    5 Operators

    3 Admin

    Grande Bastide

    Terminal Manager

    8 Operators

    1 Admin

    Pauillac

    Terminal Manager

    10 Operators

    1 Admin

    1 Assistant

    2 Transport

    Inspector France

    1 B(Fr)/L/France

    (north)

    1 Transport

    Inspector

    Netherlands/

    (NL)Belgium

    Team leader NL

    Data Manager

    5 Schedulers

    7 Trip conformation

    1 Account

    Manager

    1 Safety

    adviser

    BNF

    1 QHSSE MS

    Custodian

    BNF

    1 Soil remediation

    BNF

    2 Engineer(s) BNF

    1 Transport

    Economics

    Team leader BL

    Data Manager

    5 Schedulers

    7 Trip conformation

    IT/Cross focal

    point BNF

    Team leader

    FranceData Manager

    6 Schedulers

    1 Admin

    3 Trip

    conformation

    2 Projects &

    Economical

    studies

    1 TAS Support BNF

    Team leader Lub BNL

    4 Lub-oil BNL * (+1)

    1/2 Adm.

    Assistant

    Marine

    Technical

    Advisor

  • 8/10/2019 ISPS presentation 16_04_04.PPT

    5/8

    SEOP Distribution

    ISPS Code Implementation Pauillac Terminal

    Facility Manager Responsible for Terminals

    Terminal Manager Responsible for Pauillac Terminal

    Engineering's Manager Responsible for Projects, plant change, Standards, etc

    QHSSE Manager Responsible for QHSSE for Terminals (and Road Transport)

    Port Facility Security Officer assigned to The QHSSE Manager (temporary)

    Marine Technical Advisor Advise Terminals on Marine interface issues

    Team to Operating the Terminal according our Business Principles

  • 8/10/2019 ISPS presentation 16_04_04.PPT

    6/8

    SEOP Distribution

    ISPS Code Implementation Pauillac Terminal

    Security Assessment of the Terminal/Jetty area

    Appoint a Port Facility Security officer

    Training/certification of the PFSO

    Draft a Port Facility Security Plan

    Review and finalise the PFSP

    Invite Bordeaux Port Authority to review/discuses next steps

    ISPS Process followed

  • 8/10/2019 ISPS presentation 16_04_04.PPT

    7/8

    SEOP Distribution

    ISPS Code Implementation Pauillac Terminal

    1. What is/will be the connection between Vigipirate and MARSEC levels?

    2. Is the ISPS-code only applicable for the Jetty or for the site?

    3. Which documents do we need to handover to the Port Authorities?

    4. What is the certification process including timing (deadline end June)?5. What is the interface process between

    (Port authorities/Ship owner/Agencies/ Ship Master/Terminal)

    6. Is there a waterfront police to guard the waterfront if a ship is alongside?

    7. Housekeeping surrounding area of the Jetty

  • 8/10/2019 ISPS presentation 16_04_04.PPT

    8/8

    SEOP Distribution

    ISPS Code Implementation Pauillac Terminal

    Way forward ?