island team 2011 final presentation

141
CM LCFM ARCH SE MEP Island Team Final Presentation Team Members CM LCFM ARCH SE MEP Team Members C l F h lt Seale Wong Ariel Bautista Carl Fosholt Frank Musiol Catherine Rebecca Diaz Catherine Boubekeur Rebecca Diaz Seale Wong Frank Musiol Katelin Crook Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur 1 Derek Ouyang Katelin Crook

Upload: derek-ouyang

Post on 11-Nov-2014

716 views

Category:

Documents


1 download

DESCRIPTION

http://pbl.stanford.eduFinal Presentation of Island Team 2011Winner of the Swinerton Native ChallengeAEC Global Teamwork ChallengePBL Lab, Stanford University

TRANSCRIPT

Page 1: Island Team 2011 Final Presentation

CM LCFMARCH SE MEP

Island TeamFinal PresentationTeam Members CM LCFMARCH SE MEPTeam Members

C l F h lt

Seale WongAriel Bautista

Carl Fosholt

Frank Musiol

Catherine

Rebecca Diaz

CatherineBoubekeur

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

1

Derek Ouyang Katelin Crook

Page 2: Island Team 2011 Final Presentation

2Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 3: Island Team 2011 Final Presentation

3Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 4: Island Team 2011 Final Presentation

4Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 5: Island Team 2011 Final Presentation

5Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 6: Island Team 2011 Final Presentation

Puzzle

Site Conditions and Location

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

6

Page 7: Island Team 2011 Final Presentation

Site Views

2.

1

1.1.

22.

7Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 8: Island Team 2011 Final Presentation

Site Information

Prevailing Winds: 

NE Trade WindsNE Trade Winds

Basic Design Wind Speed: 

145 mph

Seismic:

Site Classification D

Average Temp: 

Max ‐ 89° F

Min ‐ 71° F

Average Sunlight:Average Sunlight: 

8 hours/day

1,466 BTU/ft2/day

i i i 0 0” llPrecipitation: 50‐70” annually

8Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 9: Island Team 2011 Final Presentation

Winter Quarter Concepts

Hurricane Concept Puzzle Concept

9Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 10: Island Team 2011 Final Presentation

CM LCFMARCH SE MEP

Puzzle

CM LCFMARCH SE MEP

Winter DesigngPuzzle concept – integration of disciplines

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

10

Page 11: Island Team 2011 Final Presentation

CM LCFMARCH SE MEP

Decision Matrix

CM LCFMARCH SE MEP

Reassessment

ReevaluateSteel  Concrete

1.2.3.4.

11Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 12: Island Team 2011 Final Presentation

ARCH

Shape and Integration

ARCH

Grid & Modules

Cantilever & Open Spaces

12Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 13: Island Team 2011 Final Presentation

ARCH

Puzzle

ARCH

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

13

Page 14: Island Team 2011 Final Presentation

ARCH

Site Plan

ARCH

University Avenue

14Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 15: Island Team 2011 Final Presentation

ARCH

Basement

ARCH

Core

Auditorium

LargeLarge Classrooms

Café100‘

Server Room 

Tech Supportpp

100‘

15

100

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 16: Island Team 2011 Final Presentation

ARCH

First Floor

ARCH

Core

Small Classrooms

Instructional Labs

D bl H i h

100’

Double Height

Seminar Room 

Entrance Atrium

100’

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

16

Page 17: Island Team 2011 Final Presentation

ARCH

Second Floor

ARCH

Core

Faculty Offices

AdministrationAdministration

Faculty Lounge

S d Offi

100’

Student Offices

Terraces 

100’

17Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 18: Island Team 2011 Final Presentation

ARCH

Roof

ARCH

Core

PV Panels

Elevator ShaftElevator Shaft

18Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 19: Island Team 2011 Final Presentation

ARCH

North-South Section

ARCH

‐30’   0’   10’      40’                       70’                 93’  100’                      130’

30’

18’

6’

NS

‐6’

NS

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

19

Page 20: Island Team 2011 Final Presentation

ARCH SE MEP

Island Team

ARCH SE MEP

Corridor Section

Typical ConcreteTypical Vertical Shades Texture

Typical Concrete Texture Section

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

20

Page 21: Island Team 2011 Final Presentation

ARCH SE MEP

Floor Sandwich

ARCH SE MEP

1 S l P l

1. 

1. Solar Panels

2. Concrete Texture2.  3. 

6. 

3. Vertical Shades

4. Operable Windows

4. 

5. 

5. Fixed Windows

6 Dropped Ceiling6. Dropped Ceiling

21Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 22: Island Team 2011 Final Presentation

ARCH SE MEP

Detailed Section – Floor Sandwich

ARCH SE MEP

1 H i t l Sh d

5. 

1. Horizontal Shades

2. Operable Windows1. 2. 

4. 

6. 

3. Fixed Windows

4. Beams3. 

5. Solar Panels

6 MEP Ducts6. MEP Ducts 

22Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 23: Island Team 2011 Final Presentation

CM LCFMARCH SE MEP

Island Team

CM LCFMARCH SE MEP

Why Change y gfrom Steel to Concrete?Concrete?

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

23

Page 24: Island Team 2011 Final Presentation

ARCH

Change to Concrete

ARCH

Integration with Site Common material on Campus

24Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 25: Island Team 2011 Final Presentation

SE

Change to Concrete

SE

Why concrete structure instead of steel?y

System Availability

25Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 26: Island Team 2011 Final Presentation

CM

Change to Concrete

CM

Why concrete structure instead of steel?y

Cost and availability of raw materials.

26Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 27: Island Team 2011 Final Presentation

MEP

Change to Concrete

MEP

Why concrete structure instead of steel?y

Thermal mass of concrete better for coolingThermal mass of concrete better for cooling

27Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 28: Island Team 2011 Final Presentation

LCFM

Change to Concrete

LCFM

Why concrete structure instead of steel?y

80%20%Decreased 80%

28Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 29: Island Team 2011 Final Presentation

29

Page 30: Island Team 2011 Final Presentation

30

Page 31: Island Team 2011 Final Presentation

31

Page 32: Island Team 2011 Final Presentation

32

Page 33: Island Team 2011 Final Presentation

CM LCFMARCH SE MEP

Social Puzzle

CM LCFMARCH SE MEP

How can we foster collaboration in 2015?

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

33

Page 34: Island Team 2011 Final Presentation

CM LCFMARCH SE MEP

Integration Spaces

CM LCFMARCH SE MEP

34Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 35: Island Team 2011 Final Presentation

CM LCFMARCH SE MEP

Integration Spaces

CM LCFMARCH SE MEP

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

35

Page 36: Island Team 2011 Final Presentation

CM LCFMARCH SE MEP

Integration Spaces

CM LCFMARCH SE MEP

36Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 37: Island Team 2011 Final Presentation

CM LCFMARCH SE MEP

Social Puzzle

CM LCFMARCH SE MEP

Cost ReductionsConcrete Vs Steel - Concrete: $6.8 M$- Steel: $ 7.2 M

Excavation Reduction:- Winter Cost: $560,000- Final Cost: $374,444

Glass:- Winter Area: 10,000 ft2

Final Area: 5 100 ft2

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

- Final Area: 5,100 ft2

37

Page 38: Island Team 2011 Final Presentation

LCFMlCMSE

Cost Reductions

LCFMlCMSE

Concrete

38Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 39: Island Team 2011 Final Presentation

CM

Cost Reductions

CM

Excavation

39Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 40: Island Team 2011 Final Presentation

LCFMCMARCH MEP

Cost Reductions

LCFMCMARCH MEP

Glass reduction Beforefloor plansBefore

Before (Screen 4)And After (Screen And After (Screen 5)

Concrete

GlassGlass

40Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 41: Island Team 2011 Final Presentation

LCFMCMARCH MEP

Cost Reductions

LCFMCMARCH MEP

AfterAfter

Concrete

GlassGlass

41Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 42: Island Team 2011 Final Presentation

CM LCFMARCH SE MEP

PV Panel Story

CM LCFMARCH SE MEP

MEPEnergy consumption

+

CM LCFMARCH + +

Improve aesthetics light Improve LEED Achieve energy savingsImprove aesthetics, light Improve LEED Achieve energy savings

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

42

Page 43: Island Team 2011 Final Presentation

LCFMMEP

PV Panels

LCFMMEP

Energy Consumptiongy

eQUEST Energy AnalysisTotal Energy Consumption: 551,440 kWh/yrgy p , y

43Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 44: Island Team 2011 Final Presentation

LCFM

O&M Cost Containment

LCFM

44Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 45: Island Team 2011 Final Presentation

CM LCFMARCH MEP

PV Panels

CM LCFMARCH MEP

N

45Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 46: Island Team 2011 Final Presentation

CM LCFMARCH MEP

PV Panels

CM LCFMARCH MEP

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

46

Page 47: Island Team 2011 Final Presentation

CM LCFMARCH MEP

PV Panels

CM LCFMARCH MEP

Calculations

Total Area = 3,000 ft2

Total Cost = $394,000

Quantity = 427 panels, 3.9 ft x 1.8 ft ea

Total output = 179,667kWh/yr

47Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 48: Island Team 2011 Final Presentation

LCFM

PV Panels

LCFM

Trade Off Analysis

Break‐EvenBreak‐Even16 years8 years

48Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 49: Island Team 2011 Final Presentation

SE CM LCFMARCH MEP

Native

SE CM LCFMARCH MEP

Atrium Shading PV Panels

Shades

Integration Space

N

Integration Space

Transformable Wall

Terraces Entrance Planter Green Roof

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

49

Page 50: Island Team 2011 Final Presentation

SE CM LCFMARCH MEP

Cultural

SE CM LCFMARCH MEP

50Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 51: Island Team 2011 Final Presentation

SE CM LCFMARCH MEP

Social

SE CM LCFMARCH MEP

51Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 52: Island Team 2011 Final Presentation

SE CM LCFMARCH MEP

Nature

SE CM LCFMARCH MEP

52Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 53: Island Team 2011 Final Presentation

SE CM LCFMARCH MEP

Energy

SE CM LCFMARCH MEP

53Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 54: Island Team 2011 Final Presentation

ARCH MEP

Atrium

ARCH MEP

54Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 55: Island Team 2011 Final Presentation

ARCH SE

Atrium

ARCH SE

55Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 56: Island Team 2011 Final Presentation

SE

Social Puzzle

SE

Social Puzzle: The Structural Evolution

N

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

56

Page 57: Island Team 2011 Final Presentation

SE

Social Puzzle

SE

Design Loads on Structureg

Dead

Roof 70 psfGreen Roof 120 psf

Basic Wind Speed  145 mph

Base Shear  450 kip

Site Class  D 

Floor 120 psf

Live

Roof 20 psfGreen Roof 20 psf

Site ClassSs=  0.852

S1=  0.279

Floor 60 psf

Seismic

First Story 50 kip Second Story 150 kip

Roof 300 kip

WindFirst Story 25 kip

Second Story 75 kip

R f 30 kiRoof 30 kip

57Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 58: Island Team 2011 Final Presentation

ARCH SE

Social Puzzle

ARCH SE

Foundation 3D

N

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

58

Page 59: Island Team 2011 Final Presentation

SE

Social Puzzle

SE

Foundation PlanSpread Footings:10' x 10' x 2'

8’ x 8’ x 2’

Combined Footings:8’ id8’ Wide

10’ Wide

Slab on GradeSlab on Grade6”

Prefabricated Retaining WallsPrefabricated Retaining Walls

59Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 60: Island Team 2011 Final Presentation

SE

Load Path

SE

Force Flow: Gravityy

W EW60Rebecca Diaz Seale Wong Frank Musiol Katelin Crook

Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 61: Island Team 2011 Final Presentation

ARCH SE

Social Puzzle

ARCH SE

First Floor 3D

N

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

61

Page 62: Island Team 2011 Final Presentation

SE

Social Puzzle

SE

First FloorPost-Tensioned Beams:24” x 36”

20” x 30”12” x 18”12” x 24”

Columns:16” x 16”

14” x 14”14  x 14

9” Post Tensioned Slabs

62Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 63: Island Team 2011 Final Presentation

SE

Social Puzzle

SE

First Floor

N

Adapt Post-Tension Model Max Deflection: 1.13”

N

Adapt Post Tension Model Max Deflection: 1.13

63Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 64: Island Team 2011 Final Presentation

ARCH SE

Social Puzzle

ARCH SE

Second Floor 3D

N

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

64

Page 65: Island Team 2011 Final Presentation

SE

Social Puzzle

SE

Second Floor

Post-Tensioned Beams:16” x 30”

12” x 18”

C lColumns:16” x 16”

14” x 14” 

9” Post Tensioned Slabs

65Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 66: Island Team 2011 Final Presentation

SE

Social Puzzle

SE

Second Floor

N

ADAPT Post-Tension Model Max Deflection: 1.21”

N

ADAPT Post Tension Model Max Deflection: 1.21

66Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 67: Island Team 2011 Final Presentation

ARCH SE

Social Puzzle

ARCH SE

Roof 3D

N

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

N

67

Page 68: Island Team 2011 Final Presentation

SE

Social Puzzle

SE

RoofPost-Tensioned Beams:16” x 30”

12” x 18”

Columns:6” 6”16” x 16”

14” x 14” 

9” Post Tensioned Slabs 9 Post Tensioned Slabs

68Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 69: Island Team 2011 Final Presentation

SE

Social Puzzle

SE

Roof

Adapt Post-Tension Model Max Deflection: 1.37” N

69Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 70: Island Team 2011 Final Presentation

ARCH SE

Social Puzzle

ARCH SE

Lateral System: Shear Walls 3D

N

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

70

Page 71: Island Team 2011 Final Presentation

ARCH SE

Social Puzzle

ARCH SE

Lateral Systemy

12” Shear Wall

71Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 72: Island Team 2011 Final Presentation

ARCH SE

Social Puzzle

ARCH SE

Force Flow: Lateral

W EW72Rebecca Diaz Seale Wong Frank Musiol Katelin Crook

Derek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 73: Island Team 2011 Final Presentation

SE

Social Puzzle

SE

Analysis for Lateral Loading: ETABSy g

Dominate Period: 0.29 sec Max Elastic: 0.4” IDR: 1.0%

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Dominate Period: 0.29 sec Max Elastic: 0.4 IDR: 1.0%

73

Page 74: Island Team 2011 Final Presentation

SE

Social Puzzle

SE

Structural Analysis Summaryy y

ADAPT Vertical Deflection Max Allowable Loading

Roof 1.37 in 1.5 in  D+LL

2nd Floor 1.21 in  1.25 in  D+LL

1st Floor 1.13 in  1.25 in  D+LL

ETABS Code Amplified IDR Max Allowable

Total 1% 2% 

74Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 75: Island Team 2011 Final Presentation

MEP

Social Puzzle

MEP

Heat

Team Decision:

Average Temperature Range: 76 83F

No HeatingSystem

Average Temperature Range: 76-83F

75Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 76: Island Team 2011 Final Presentation

MEP

Social Puzzle

MEP

Humidityy

Indoor Air Quality GoalyTemperature: 77FRelative Humidity: 60%

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Average Relative Humidity Range: 60-90%

76

Page 77: Island Team 2011 Final Presentation

ARCH MEP

Social Puzzle

ARCH MEP

Green Roof and Cool Roof

24’Green Roof

Cool Roof

60’

Cool Roof

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

77

Page 78: Island Team 2011 Final Presentation

ARCH MEP

Social Puzzle

ARCH MEP

Green Roof and Cool Roof

78Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 79: Island Team 2011 Final Presentation

ARCH MEP

Social Puzzle

ARCH MEP

Façade Horizontal Shadingç g

North Façade

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

79

Page 80: Island Team 2011 Final Presentation

ARCH MEP

Social Puzzle

ARCH MEP

Façade Vertical Shadingç g

East Façade

80Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 81: Island Team 2011 Final Presentation

CM MEP

Social Puzzle

CM MEP

Exposed concrete façade Exposed concrete façade

Façade Attachment

81Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 82: Island Team 2011 Final Presentation

CM MEP

Social Puzzle

CM MEP

Stainless Steel DuctsStainless Steel DuctsTo Prevent Rust

Double pane, Low-e coating glass with metal frame

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

glass with metal frame

82

Page 83: Island Team 2011 Final Presentation

MEP

Social Puzzle

MEP

HVAC Systemy

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

83

Page 84: Island Team 2011 Final Presentation

MEP

Social Puzzle

MEP

Chilled Water ChillersChillers

Site

84Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 85: Island Team 2011 Final Presentation

ARCH MEP

Social Puzzle

ARCH MEP

Air Handling Unitsg

Basement Floor

85Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 86: Island Team 2011 Final Presentation

MEP

Social Puzzle

MEP

Ventilation Requirementsq(CA Title 24)

L f 2> Larger of 2

+ 30% (LEED) + 30% (LEED) =

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

86

Page 87: Island Team 2011 Final Presentation

MEP

Social Puzzle

MEP

Air Conditioning Requirementsg q(ASHRAE)

Internal HeatLighting

External Heat•Solar radiation (windows)•Lighting

•Plugs•Occupants

•Solar radiation (windows)•Conduction (windows)•Conduction (façade)

87Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 88: Island Team 2011 Final Presentation

MEP

Social Puzzle

MEP

Ductwork

88Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 89: Island Team 2011 Final Presentation

MEPARCH

Social Puzzle

MEPARCH

Ventilation

89Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 90: Island Team 2011 Final Presentation

MEPARCH

Social Puzzle

MEPARCH

Basement

NN

90Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 91: Island Team 2011 Final Presentation

MEPARCH

Social Puzzle

MEPARCH

1st Floor

Supply

ReturnReturn

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Stanford UniversityComputer Integrated A/E/C

91

Page 92: Island Team 2011 Final Presentation

MEPARCH

Social Puzzle

MEPARCH

2nd Floor

N

92Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 93: Island Team 2011 Final Presentation

MEPARCH

Island TeamFinal PresentationMEP MEPARCHMEP

South Elevation

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

93

Page 94: Island Team 2011 Final Presentation

MEP

Island TeamFinal PresentationMEP MEPMEP

Energy Star Ratinggy gTotal Energy Consumption: 551,440 kWh/yr

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

94

Page 95: Island Team 2011 Final Presentation

CM

Social Puzzle

CM

Site

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

95

Page 96: Island Team 2011 Final Presentation

CM

Social Puzzle

CM

Existing Site Conditionsg

96Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 97: Island Team 2011 Final Presentation

ARCH CM

Social Puzzle

ARCH CM

Trees to Protect/Relocate

97Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 98: Island Team 2011 Final Presentation

CM

Social Puzzle

CM

Construction Site

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

98

Page 99: Island Team 2011 Final Presentation

CM

Social Puzzle

CM

Site Layout

99Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 100: Island Team 2011 Final Presentation

CM

Social Puzzle

CM

Pedestrian Protection

100Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 101: Island Team 2011 Final Presentation

CM

Social Puzzle

CM

E t

Equipment SelectionMobile Crane ExcavatorMobile Crane

Lift Capacity: 18 tonsReach: 160 ft.                                                                                                 

KomatsuMax. Digging Depth: 21’‐9”

101Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 102: Island Team 2011 Final Presentation

CM

Social Puzzle

CM

Estimates Comparison

$8,000,000

$9,000,000

Square Foot Estimate

$4 000 000

$5,000,000

$6,000,000

$7,000,000

Reference Building EstimateManual Base Estimate

$1,000,000

$2,000,000

$3,000,000

$4,000,000 Manual Base Estimate

Model Base Estimate

$0

Square Foot Estimate

Reference Building Estimate

Manual Base Estimate

Model Base Estimate

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Estimate

102

Page 103: Island Team 2011 Final Presentation

CM

Social Puzzle

CM

Manual EstimateSystem Cost/ SF Total CostSystem Cost/ SF Total CostSubstructure $15.00 $569,920.00Superstructure $34.00 $1,328,595.00Exterior Enclosure $20.00 $791,168.00Interiors $16.00 $620,810.00Mechanical $41 00 $1 628 057 00Mechanical $41.00 $1,628,057.00Electrical  $17.00 $650,679.00Plumbing $3.00 $115,196.00Site Work $23.00 $909,532.00Equipment & Furnishing $10.00 $394,872.00Special Construction & Demolitio $0.18 $7,253.20Special Construction & Demolitio $0.18 $7,253.20Subtotal $179.00 $7,016,080.00Contractor Fees (10%) $18.00 $701,608.00Architectural Fees (7%) $12.00 $491,126.00Contigencies (5%) $9.00 $350,804.00Total Building Cost $218.00 $8,559,617.00

Construction Cost = $7.01 M

Cost per SQ. FT = $218.71

Annual Inflation Rate of 2% over 4 Years2015 Cost (W/O&P) = $9.3 MM

Total Building Cost $218.00 $8,559,617.00

Cost per SQ. FT = $218.71 ( )

103Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 104: Island Team 2011 Final Presentation

ARCH CM

Social Puzzle

ARCH CM

Model Base EstimateSystem Cost/ SF Total Costy /Substructure 34.00$            1,345,000.00$          Superstructure 30.00$            1,191,000.00$          Exterior Enclosure 10.00$            398,110.00$              Interiors 17.00$            649,770.00$              Mechanical 54.00$            2,125,000.00$         Electrical  16.00$            646,000.00$              Plumbing 3.00$              121,000.00$              Site Work 14.00$            568,000.00$              Equipment & Furnishing 11.00$            426,000.00$              Special Construction & Demolition 0.20$              7,850.00$                  Subtotal 191.00$         7,477,730.00$         Contractor Fees (10%) 19.00$            747,773.00$              Architectural Fees (7%) 13.00$            523,441.10$              Contigencies (5%) 10.00$            373,886.50$              Total Building Cost 232.00$         9,122,830.60$          

Construction Cost = $ 7.48 M

Cost per SQ. FT = $ 232

Annual Inflation Rate of 2% over 4 Years2015 Cost (W/O&P) = $ 9.8MMCost per SQ. FT   $ 232 ( )

104Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 105: Island Team 2011 Final Presentation

CM

Social Puzzle

CM

Actual Cost vs. Budget

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

105

Page 106: Island Team 2011 Final Presentation

CM

Social Puzzle

CM

Target Cost

System Actual Cost Budget CostSubstructure $570 000 00 $573 750 00Substructure $570,000.00 $573,750.00Superstructure $1,329,000.00 $1,350,000.00Exterior Enclosure $791,500.00 $825,000.00

$ $Interiors $620,800.00 $675,000.00Mechanical $1,630,000.00 $1,714,500.00Electrical $650,680.00 $900,000.00$ , $ ,Plumbing $115,196.00 $825,000.00Site Work $909,532.00 $956,300.00E i t & F i h t $395 000 00 $416 300 00Equipment & Furnishment $395,000.00 $416,300.00

106Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 107: Island Team 2011 Final Presentation

ARCH CM

Social Puzzle

ARCH CM

Exterior Enclosure Challengeg

li i l l ( )Preliminary Total Glass Area (Sq. Ft) Cost

Glass 10555 $854,000.00$ ,Glass Reduction 2445 $293,000.00

• Reduction in Cost allowed for the implementation of PV Panels and 2 AHU.

107Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 108: Island Team 2011 Final Presentation

SE CMARCH MEP

Social Puzzle

SE CMARCH MEP

Modeling:BIM Modeling g- Quantities from model

Estimating:A i C t d P d ti

g

- Assign Cost and Production Rates to activities

Scheduling:g- Obtain Durations With

Production Rates

4D Simulation:4D Simulation:- Link Elements and

Sequencing Activities

108Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 109: Island Team 2011 Final Presentation

SE CMARCH MEP

Social Puzzle

SE CMARCH MEP

Basement First Floor

109Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 110: Island Team 2011 Final Presentation

SE CMARCH MEP

Social Puzzle

SE CMARCH MEP

Second Floor Roof

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

110

Page 111: Island Team 2011 Final Presentation

CM

Schedule

CM

Flow Line

111Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 112: Island Team 2011 Final Presentation

CM

Schedule

CM

Resources

Schedule JPEG 2

112Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 113: Island Team 2011 Final Presentation

ARCH CM

Social Puzzle

ARCH CM

113Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 114: Island Team 2011 Final Presentation

ARCH CM

Social Puzzle

ARCH CM

114Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 115: Island Team 2011 Final Presentation

SE

Social Puzzle

SE

Connection Details

Beam/Column Connection

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Beam/Column Connection

115

Page 116: Island Team 2011 Final Presentation

SE

Connections

SE

Typical Beam/Slab ConnectionTypical Beam/Slab Connection

116Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 117: Island Team 2011 Final Presentation

SE

Connections

SE

4D Simulation

Anchorage of Tendons

117

Anchorage of Tendons

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 118: Island Team 2011 Final Presentation

LCFM

Social Puzzle

LCFM• Roof Covering• Electrical Equipment• Monitoring SystemReplacement Intervals

• Interior fittings

g y• Fire Installations• Doors

p• Ceilings• Doors (outside)

g• Fixtures

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

118

Page 119: Island Team 2011 Final Presentation

LCFM

Social Puzzle

LCFM

IdeaFrom certain Costs  Uncertain costs

od od

80%20%

Likelihoo

Likelihoo

$ $10$ 100%

10 ‐ 15$  80%8 ‐10$  20%

119Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 120: Island Team 2011 Final Presentation

LCFM

Social Puzzle

LCFM

Calculate Risks with @risk

Operation Phase(yearly):

Building Phase:

$180 000

80%

$20,497 $180,000 

( 50 % depends onConcrete Price)

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

120

Page 121: Island Team 2011 Final Presentation

LCFM

Social Puzzle

LCFM

Project Cash Flow of Operation Phase

80%20%

ingCosts

Build

121Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 122: Island Team 2011 Final Presentation

LCFM

Social Puzzle

LCFM

Accumulated Property Cashflow

Break Even

80%20%

ea e

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

122

Page 123: Island Team 2011 Final Presentation

LCFM

Social Puzzle

LCFM

DSCR(>1,15) for Annuity Loan Return on equity:

A it L 10 8%

1,15

Annuity  L. :  10.8%

Installment L. :  8.7%

Fi l M t

80%20%LLCR(>1,25) for Annuity Loan

Final Mat.        :   ‐

( , ) y

1,25

123Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 124: Island Team 2011 Final Presentation

LCFM

Social Puzzle

LCFM

Sensitivity Analysisy y

80%20%

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

124

Page 125: Island Team 2011 Final Presentation

SE CM LCFMARCH MEP

Social Puzzle

SE CM LCFMARCH MEP

LEED: Sustainability Reviewy

CategoryMaximum Possible

points

Actual Pointspoints

Sutainable Sites 26 17Water Efficiency 10 5Energy and Atmosphere 35 21Materials and Resources 14 9Indoor Environmental Quality 15 13Innovation in design 6 4Regional Priority 4 3Total LEED points 110 72

PV Panels Construction Waste Management Plan

Passive Design Strategies

Reduction of CO2 Emissions

Regional Materials

Energy Performance

Green Roof Water Efficient Fixtures

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Reduction of CO2 Emissions Green Roof Water Efficient Fixtures

125

Page 126: Island Team 2011 Final Presentation

SE CM LCFMARCH MEP

Social Puzzle

SE CM LCFMARCH MEP

Integration

ARCHSE

ARCHSE MEP

SE

CMLCFM MEP

126Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 127: Island Team 2011 Final Presentation

SE CM LCFMARCH MEP

Social Puzzle

SE CM LCFMARCH MEP

Teleplacep

127Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 128: Island Team 2011 Final Presentation

LCFMCMARCH SE MEP

Social Puzzle

LCFMCMARCH SE MEP

Task List

Successfully completed Successfully completed our Winter Quarter Goal

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Stanford UniversityComputer Integrated A/E/C

128

Page 129: Island Team 2011 Final Presentation

SE CM LCFMARCH MEP

Social Puzzle

SE CM LCFMARCH MEP

Google Wave Total number of messages: 3200g Total number of messages: 3200

129Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 130: Island Team 2011 Final Presentation

SE CM LCFMARCH MEP

Skype & Webinar

SE CM LCFMARCH MEP

Skype & GoToMeetingyp g

InterdisciplinaryInterdisciplinaryCo-locatedMentor meetings

130Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

Page 131: Island Team 2011 Final Presentation

As a design team we provide a 

Having excellent communication meant p

service as well as a product. The team collaboration is j t i t t

that our productivity rate was the same when we were in many locations as it hjust as important 

as the final design.it was when we were 

together.

131

Page 132: Island Team 2011 Final Presentation

LCFMCMARCH SE MEP

Social Puzzle

LCFMCMARCH SE MEP

Lessons LearnedAriel: Organization determines the flow of the process.Derek: Before anything: honesty, humility, and humor.Seale: Don’t assume that basic interdisciplinary knowledge is properly communicated. Rebecca: Communicating our process rather than our final decisions isthe key to a good design. Katelin: Having excellent communication meant that our productivity rate was the same when we were in many locations as it was when we were togetherFrank: Different time zones can be difficult for productivity but we overcame!

Before anything: honesty, 

Communicating our process rather than our final decisions isFrank: Different time zones can be difficult for productivity, but we overcame!

Carl: As a design team we provide a service as well as a product. The team collaboration is just as important as the final design.Catherine: Don’t leave work until the last minute!

humility, and humor.

our final decisions isthe key to a good 

design.

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

132

Catherine: Don t leave work until the last minute!

Page 133: Island Team 2011 Final Presentation

OrganizationOrganization determines the flow of the process

Don’t leave work until the the process.last minute!

133

Page 134: Island Team 2011 Final Presentation

Don’t assume that b i Diff t tibasic 

interdisciplinary knowledge is properly 

Different time zones can be difficult for 

productivity, but we overcame!p p y

communicated.

134

Page 135: Island Team 2011 Final Presentation

LCFMCMARCH SE MEP

Social Puzzle

LCFMCMARCH SE MEP

Thank You!

Matthias Ehrlich

Humberto Cavallín

Erik Kneer

Florian AalamiG L h

Björn WündschHumberto Cavallín

David Bendet

Hossein Nasseri

Renate Fruchter

Eric Borchers

Florian AalamiGreg LuthDustin Rothwell

Glenn KatzJohn Nelson

Dennis Kwan

Eric Borchers

Rebecca Diaz Seale Wong Frank Musiol Katelin CrookDerek Ouyang Carl Fosholt Ariel Bautista Catherine Boubekeur

135

Page 136: Island Team 2011 Final Presentation

136

Page 137: Island Team 2011 Final Presentation

137

Page 138: Island Team 2011 Final Presentation

138

Page 139: Island Team 2011 Final Presentation

Pictures of US at teleplace or pwhatever ☺

139

Page 140: Island Team 2011 Final Presentation

140

Page 141: Island Team 2011 Final Presentation

141