isabella pagano [email protected] milano, 14 dec 20101plato tous an update on plato tous...
TRANSCRIPT
Isabella [email protected]
Milano, 14 Dec 2010 1PLATO TOUs
An update on PLATO TOUs
PLATO System & TOU Teams meetingMilano, 14-15 Dec 2010
Milano, 14 Dec 2010 PLATO TOUs 2
Main Milestones (from SMP)
Start of Definition Phase with two parallel industrial contracts: Jul 2010
Down-selection for CV M1/M2 missions: Jun 2011
Completion of the Definition Phase (A/B1): Dec 2011
Final adoption for the Implementation Phase (B2/C/D/E1): Feb 2012
Start of the Implementation Phase: Jul 2012
Launch (L): 2018Milano, 14 Dec 2010 PLATO TOUs 3
Oct 2011Oct 2011
More details
Milano, 14 Dec 2010 PLATO TOUs 4
16-17 Nov 2011 ??16-17 Nov 2011 ??
Feb 2012 ??Feb 2012 ??
Definition phase: a new start for the Consortium
Milano, 14 Dec 2010 PLATO TOUs 5
PLATO MISSION MANAGEMENT PLATO MISSION MANAGEMENT
PLATO MISSION CONSORTIUMPLATO MISSION CONSORTIUMPMC
LEAD
PMC
LEADPMC
BOARD
PMC
BOARD
PAYLOADPAYLOADDATA
CENTER
DATA
CENTER
SCIENCE
PREPARATION
MANAGEMENT
SCIENCE
PREPARATION
MANAGEMENT
PROJECT
MANAGER
PROJECT
MANAGERPROJECT
SCIENTIST
PROJECT
SCIENTIST
SCIENCE TEAMSCIENCE TEAM
6 PMC MEMBERS
2 LEGACY SCIENTISTS
6 PMC MEMBERS
2 LEGACY SCIENTISTS SOCSOC
MANAGEMENT TEAMMANAGEMENT TEAMMOCMOC
ESA project team
End-to-end Simulator
W. Zima
PLATO PayloadManagement
PIPM: P. Bodin
PDCPDPM: L. Gizon
Instrument System CoordinatorP. Levacher
Science Coordination
H. Rauer
Target/field Characterization
G. Piotto
FU Coordination
S. Udry
Stellar Science M.J. Goupil
Exoplanet scienceD. Pollacco
TOUR. Ragazzoni
Fast DPUG. Peter
Normal DPUPh. Plasson
PLATO Mission Consortium Science Preparation Management
AlgorithmsR. Samadi
Mission management
AEU S. Fredon
ICUR. Cosentino
Prototype& FM AIVP. Levacher
main / ancillary databasesystem architecture
R. Burston
exoplanet analysis System
N. Walton
data processing implementation
I. Pardowitz
stellar analysis systemT. Appourchaux
Input CatalogueP. Giommi
Data Centre
Normal TOUR. Ragazzoni
Fast TOUW. Benz
Project Manager
Project Scientist Science Team- 6 PMC members- 2 Legacy Scientists
PMC Board
ancillary database content management
M. Deleuil
data analysis support tools
L. Gizon
FPA/FEED. Walton/M. Mas
Hardware & boot softwareM. Mas
Application softwarePh. Plasson
PMC Lead
C. Catala
Camera ManagementD. Laubier
DPS ManagementB. Pontet
Payload
SOC
data processing algorithmsR. Samadi
Additional Science W. Weiss
End-to-end Simulator
W. Zima
PLATO PayloadManagement
PIPM: P. Bodin
PDCPDPM: L. Gizon
Instrument System CoordinatorP. Levacher
Science Coordination
H. Rauer
Target/field Characterization
G. Piotto
FU Coordination
S. Udry
Stellar Science M.J. Goupil
Exoplanet scienceD. Pollacco
TOUR. Ragazzoni
Fast DPUG. Peter
Normal DPUPh. Plasson
Science Preparation Management
AlgorithmsR. Samadi
AEU S. Fredon
ICUR. Cosentino
Prototype& FM AIVP. Levacher
main / ancillary databasesystem architecture
R. Burston
exoplanet analysis System
N. Walton
data processing implementation
I. Pardowitz
stellar analysis systemT. Appourchaux
Input CatalogueP. Giommi
Data Centre
Normal TOUR. Ragazzoni
Fast TOUW. Benz
ancillary database content management
M. Deleuil
data analysis support tools
L. Gizon
FPA/FEED. Walton/M. Mas
Hardware & boot softwareM. Mas
Application softwarePh. Plasson
Camera ManagementD. Laubier
DPS ManagementB. Pontet
Payload
data processing algorithmsR. Samadi
Additional Science W. Weiss
PLATO PayloadManagement
PIPM: P. Bodin
Instrument System CoordinatorP. Levacher
TOUR. Ragazzoni
Fast DPUG. Peter
Normal DPUPh. Plasson
AlgorithmsR. Samadi
AEU S. Fredon
ICUR. Cosentino
Prototype& FM AIVP. Levacher
Normal TOUR. Ragazzoni
Fast TOUW. Benz
FPA/FEED. Walton/M. Mas
Hardware & boot softwareM. Mas
Application softwarePh. Plasson
Camera ManagementD. Laubier
DPS ManagementB. Pontet
Payload
PLATO Mission Consortium: Cameras
LESIA + MSSLMEU + FEE
DLR + MSSLF-DPU + F-FEE
Prototype AIV P. Levacher
Industrial contractCameras AIT
Structure
TelescopeOptical UnitR. Ragazzoni
FPA N+FStructure & AIVM Mas
CCD + FEE
D. Walton
CAMERASD. Laubier
AEU S. Fredon
TOU + FPATests
FM CameraCompl. Tests
Detectors
F-CCD + F FEE
CEA
F-FEE
N CCD+N FEE
F-CCD+F-FEETests & calibration
N-CCD+N-FEETests & calibration
System
CCD + FEE
Thermalsupport
PLATO Instrument Manager
P. Bodin
RAIVR. Pérez
PA/QP S. Mellé
CNES + MSSLFPA + AEU
MSSL/INTA FPA + FEE
CAMERA/System teamManager P. Levacher (LAM)Optical arch P. Bernardi (LESIA)Detection arch T. Buey (LESIA)Mechanical arch P. Vola (LAM)Thermal arch H. Pasquier (CNES)Electrical arch. S. Fredon (CNES)
TOUOptical tests
Coupling tests AIV R. Perez
FM AIVR. Perez
Structure
AIV
N-TOUR. Ragazzoni Management
Optics
straylight
F-TOUW. Benz
OMT
Thermal
AIV
GSE
AIV
GSE
Filters
OGSE
OGSE
Alternative F-FPA
LAMLESIA DLR INAF INTA MSSL Bern Univ.GEPI
Definition phaseTOU WBS
Milano, 14 Dec 2010 11PLATO TOUs
Definition Phase Plan
Validate technical critical points▪ Confirm no need for new development
▪ Demonstrate TRL > 5 at the end of the definition phase
▪ Confirm no critical aspects in the procurement and AIV schedule of the implementation phase
Allow fast transition to implementation phase
Milano, 14 Dec 2010 PLATO TOUs 12
TOUs Specific Activities Study of spherical and aspherical lenses manufacturability
Validation of TOU AIV procedures at industrial level
CaF2 lens: handling, protection Coatings (thermal, filter, AR): performance and low temperature
Alignment at ambient temperature Assessment of performances in operational temperature environment Link between performances in operational and ambient environment
Thermal refocusing efficiency
Milano, 14 Dec 2010 PLATO TOUs 13
PLATO Payload Schedule (DP)
Milano, 14 Dec 2010 PLATO TOUs 14
1er trim 2010 2e trim 2010 3e trim 2010 4e trim 2010 1er trim 2011 2e trim 2011 3e trim 2011 4e trim 2011 1er trim 2012 2e trim 2012 3e trim 2012
N-FEE breadboard
F-FEE breadboard
N-AEU breadboard
CCD Prototypes
coupling&
Thermal test
LAM Cam Proto tests
TOU / N-FPA / N-FEE / NAEU
Feedback toTOU QM
TOU breadboard
TOU Design Definition
N-FEE Requirement Definition
F-FEE Requirement Definition
N-FPARequirement Definition N-FPA breadboard
N-AEURequirement Definition
FPA ProtoN-FEE BB/N-AEU BB
Feedback toFPA EM
Feedback toN-FEE EM
N-DPU /N-FEE
F-FEE / F-DPU
Feedback toMEU EM
Feedback toF-FEE EQMF-DPU EM
PIRR
CCD coupling Mock-up
mock-up CCD coupling
CCD
CCD mechanical model
CNEScoupling
N-coupling
N-F-coupling
coupling
MSSL coupling
TOU Prototype
CCDF-FEE
updated
N-FEE updated
N-FPA Prototype
Where we are
Contract to manufacture 6 spherical lenses: assigned
Procurement of GSE for breadboard AIT: ongoing
Contract for study of industrial production of (34x5) spherical and (34) aspherical lenses: ready to start
Contract for study of industrial AIV procedures: ready to start
Contract for support to perform alignment test (on – axis): ready start
Milano, 14 Dec 2010 PLATO TOUs 15
Updated reference documents
16
TWIKITWIKI
Terminology / jargon
PIRR (Preliminary Instrument Requirement Review) May 2010
Breadboard (ready for tests to be done in time for the PIRR) 6 spherical lenses + dummy structure having the same thermal behavior as the final structure, using the same holders for the lenses as the final structure and having its end (at the I/F with the FP) equivalent in terms of opto-mechanical interfaces to the final structure
Prototype (after the PIRR) 1 aspherical + 5 spherical lenses + modified dummy structure
Milano, 14 Dec 2010 PLATO TOUs 17
Agenda - 14 Dec 2010
OD: open issues (e.g., stop/L3) (D. Magrin, R. Ragazzoni)
TOU breadboard (Introduction by J. Farinato Discussion)
The way lens will be integrated in barrels for the breadboard
The detailed schedule for the breadboard CaF2 Verification tests Tolerance of the OD to thermal variation
(to agree a work plan) TOU prototype (after PIRR)
Milano, 14 Dec 2010 PLATO TOUs 18
PRM#1 PRM#2 PRR SRR WPNov 2010 Jan 2011 Apr 2011 Oct 2011 221001 - PM
TOU implem. plan TOU implem. plan TOU implem. plan 221001 - PM
TOU cost docum. TOU cost docum. 221001 - PM
TOUs Manag Plan TOUs Manag Plan 221001 - PM
PA Plan PA Plan 221002 - PA
CADM Plan CADM Plan 221002 - PA
Preliminary Lists (Materials, Parts, Processes, Critical Items)
Preliminary Lists (Materials, Parts, Processes, Critical Items)
221002 - PA
RFDs RFDs 221002 - PA
Technical Report Technical Report 221100 - SE
Milano, 14 Dec 2010 PLATO TOUs 19
Milano, 14 Dec 2010 20PLATO TOUs