IRTF POETS (Orange) Preship review Anticipated shipment date 22 APR 2008 Anticipated mounting 30 APR – 05 MAY 2008 18 April 2008, aasg

Upload: david-montgomery

Post on 31-Dec-2015

216 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: IRTF POETS (Orange) Preship review Anticipated shipment date 22 APR 2008 Anticipated mounting 30 APR – 05 MAY 2008 18 April 2008, aasg Anticipated shipment

IRTF POETS (Orange)Preship review

IRTF POETS (Orange)Preship review

Anticipated shipment date 22 APR 2008

Anticipated mounting 30 APR – 05 MAY 2008

18 April 2008, aasg

Anticipated shipment date 22 APR 2008

Anticipated mounting 30 APR – 05 MAY 2008

18 April 2008, aasg

Page 2: IRTF POETS (Orange) Preship review Anticipated shipment date 22 APR 2008 Anticipated mounting 30 APR – 05 MAY 2008 18 April 2008, aasg Anticipated shipment

OutlineOutline

• Overview of POETS IRTF Project

• Lab testing results

• Packing plan

• Shipping Plan

• Mounting Plan

Page 3: IRTF POETS (Orange) Preship review Anticipated shipment date 22 APR 2008 Anticipated mounting 30 APR – 05 MAY 2008 18 April 2008, aasg Anticipated shipment

POETS IRTF teamPOETS IRTF team

MIT, Boston• Amanda Gulbis (P.I.)• Jim Elliot (Co-I.)• Folkers Rojas (mechanical design and fabrication)• Mike Person & Matt Lockhart (instrument consultation &

observers)

MIT, Boston• Amanda Gulbis (P.I.)• Jim Elliot (Co-I.)• Folkers Rojas (mechanical design and fabrication)• Mike Person & Matt Lockhart (instrument consultation &

observers)IfA, Hawaii

• Bobby Bus (observing and long term support)• John Rayner (optical design, SpeX interface)• Vern Stahlberger (mechanical design)• Lars Bergknut (mounting & work at summit)• Alan Tokunaga (IRTF division chief)

Page 4: IRTF POETS (Orange) Preship review Anticipated shipment date 22 APR 2008 Anticipated mounting 30 APR – 05 MAY 2008 18 April 2008, aasg Anticipated shipment

POETS IRTF SummaryPOETS IRTF Summary

• Our goal is to mount a high-speed, visible wavelength camera system on the IRTF (NASA’s 3-m Infrared Telescope Facility)

• The instrument is based on existing MIT-Williams College POETS (Portable Occultation, Eclipse, and Transit Systems)

• The instrument will be mounted on the side-facing exit window of SpeX – a dichroic allows entry for light < 8000 Å or 9500 Å

• Our goal is to mount a high-speed, visible wavelength camera system on the IRTF (NASA’s 3-m Infrared Telescope Facility)

• The instrument is based on existing MIT-Williams College POETS (Portable Occultation, Eclipse, and Transit Systems)

• The instrument will be mounted on the side-facing exit window of SpeX – a dichroic allows entry for light < 8000 Å or 9500 Å

• Fore-optics box uses 3:1 reducing optics to return f/9.32 beam and 60” FOV

Page 5: IRTF POETS (Orange) Preship review Anticipated shipment date 22 APR 2008 Anticipated mounting 30 APR – 05 MAY 2008 18 April 2008, aasg Anticipated shipment

POETS IRTF OverviewPOETS IRTF Overview

• Schematic of full setup• Schematic of full setup

Page 6: IRTF POETS (Orange) Preship review Anticipated shipment date 22 APR 2008 Anticipated mounting 30 APR – 05 MAY 2008 18 April 2008, aasg Anticipated shipment
Page 7: IRTF POETS (Orange) Preship review Anticipated shipment date 22 APR 2008 Anticipated mounting 30 APR – 05 MAY 2008 18 April 2008, aasg Anticipated shipment

POETS IRTF OverviewPOETS IRTF Overview

• Schematic of full setup

• Optical path

• Schematic of full setup

• Optical path

Page 8: IRTF POETS (Orange) Preship review Anticipated shipment date 22 APR 2008 Anticipated mounting 30 APR – 05 MAY 2008 18 April 2008, aasg Anticipated shipment
Page 9: IRTF POETS (Orange) Preship review Anticipated shipment date 22 APR 2008 Anticipated mounting 30 APR – 05 MAY 2008 18 April 2008, aasg Anticipated shipment

POETS IRTF ComponentsPOETS IRTF Components

• Fore-optics box (28 pieces, 1 mirror, 3 lenses, 1 filter wheel, 1 filter wheel motor, and assorted dowel pins and screws)

• Camera (Andor Ixon, 512 x 512 frame transfer BI E2V CCD with 16 m pixels; including power cable & computer cable)

• Computer (Shuttle; including power cord, PCI card, keyboard, & mouse)

• GPS (Spectrum Inst.; including power supply, 25-m cable, control cable, and antenna)

• Fore-optics box (28 pieces, 1 mirror, 3 lenses, 1 filter wheel, 1 filter wheel motor, and assorted dowel pins and screws)

• Camera (Andor Ixon, 512 x 512 frame transfer BI E2V CCD with 16 m pixels; including power cable & computer cable)

• Computer (Shuttle; including power cord, PCI card, keyboard, & mouse)

• GPS (Spectrum Inst.; including power supply, 25-m cable, control cable, and antenna)

Page 10: IRTF POETS (Orange) Preship review Anticipated shipment date 22 APR 2008 Anticipated mounting 30 APR – 05 MAY 2008 18 April 2008, aasg Anticipated shipment

• Fore-optics box• Fore-optics box

Page 11: IRTF POETS (Orange) Preship review Anticipated shipment date 22 APR 2008 Anticipated mounting 30 APR – 05 MAY 2008 18 April 2008, aasg Anticipated shipment

• Camera• Camera

Page 12: IRTF POETS (Orange) Preship review Anticipated shipment date 22 APR 2008 Anticipated mounting 30 APR – 05 MAY 2008 18 April 2008, aasg Anticipated shipment

• Computer• Computer

Two computers are shown here -- the top is a current POETS machine. The bottom is the IRTF machine, which we have yet to get functioning properly with the camera. We have ordered a new computer, as similar to the top machine as we possible. If that machine does not work, we will ship a current POETS computer and swap at a later date.

Two computers are shown here -- the top is a current POETS machine. The bottom is the IRTF machine, which we have yet to get functioning properly with the camera. We have ordered a new computer, as similar to the top machine as we possible. If that machine does not work, we will ship a current POETS computer and swap at a later date.

Page 13: IRTF POETS (Orange) Preship review Anticipated shipment date 22 APR 2008 Anticipated mounting 30 APR – 05 MAY 2008 18 April 2008, aasg Anticipated shipment

• GPS• GPS

Page 14: IRTF POETS (Orange) Preship review Anticipated shipment date 22 APR 2008 Anticipated mounting 30 APR – 05 MAY 2008 18 April 2008, aasg Anticipated shipment

Lab TestingLab Testing

• Setup:• All components assemble and disassemble as planned• Dowel pins are used for accurate alignment during assembly• No play in components once assembled• Light tightness can’t be tested until mounted – all components overlap

• Remaining issues:• attachment to SpeX (was tested onsite)• Manual shutter (functions, but attachment not tested)• Instrument Computer (original system won’t work with the camera. new system

ordered, ETA at MIT 18 April 2008)• Filter wheel (parts are in place, no filters or driving mechanism)• Replacement lenses (lens 1 chipped at edges during initial fitting - doesn’t seem to

effect images, but spare lenses have been ordered)

• Setup:• All components assemble and disassemble as planned• Dowel pins are used for accurate alignment during assembly• No play in components once assembled• Light tightness can’t be tested until mounted – all components overlap

• Remaining issues:• attachment to SpeX (was tested onsite)• Manual shutter (functions, but attachment not tested)• Instrument Computer (original system won’t work with the camera. new system

ordered, ETA at MIT 18 April 2008)• Filter wheel (parts are in place, no filters or driving mechanism)• Replacement lenses (lens 1 chipped at edges during initial fitting - doesn’t seem to

effect images, but spare lenses have been ordered)

Page 15: IRTF POETS (Orange) Preship review Anticipated shipment date 22 APR 2008 Anticipated mounting 30 APR – 05 MAY 2008 18 April 2008, aasg Anticipated shipment

Lab TestingLab Testing

• Calibrations• Cooling: TE cooler run for hours at -70º C at room temp• Read Noise and Gain

• Were measured in lab prior to fore-optics box setup, are consistent with spec. sheet• Difficulties in obtaining accurate flatfields while camera is attached to fore optics

Page 16: IRTF POETS (Orange) Preship review Anticipated shipment date 22 APR 2008 Anticipated mounting 30 APR – 05 MAY 2008 18 April 2008, aasg Anticipated shipment

Lab TestingLab Testing

Page 17: IRTF POETS (Orange) Preship review Anticipated shipment date 22 APR 2008 Anticipated mounting 30 APR – 05 MAY 2008 18 April 2008, aasg Anticipated shipment

Lab TestingLab Testing

• Vignetting• Illuminated frames show slight vignetting at corners• Vignetting pattern changes with adjustment of lens 2 & 3 positions, but cannot be eliminated

Page 18: IRTF POETS (Orange) Preship review Anticipated shipment date 22 APR 2008 Anticipated mounting 30 APR – 05 MAY 2008 18 April 2008, aasg Anticipated shipment

• As evenly illuminated as possible: note vignetting (spots are dust on lenses)

• As evenly illuminated as possible: note vignetting (spots are dust on lenses)

Lab TestingLab Testing

Page 19: IRTF POETS (Orange) Preship review Anticipated shipment date 22 APR 2008 Anticipated mounting 30 APR – 05 MAY 2008 18 April 2008, aasg Anticipated shipment

Lab TestingLab Testing

• Images• Test charts placed at approximate TFP (0.3” in front of lens 1) can be made to come into a clear focus

• Camera can be adjusted greater than 1” in z-extension for focusing adjustment – threaded at 32 threads per inch to allow fine tuning • No distortions are apparent across the image, centering looks OK – can’t confirm without higher accuracy of TFP

Page 20: IRTF POETS (Orange) Preship review Anticipated shipment date 22 APR 2008 Anticipated mounting 30 APR – 05 MAY 2008 18 April 2008, aasg Anticipated shipment

Test charts placed at TFP Images Test charts placed at TFP Images

Lab TestingLab Testing

Page 21: IRTF POETS (Orange) Preship review Anticipated shipment date 22 APR 2008 Anticipated mounting 30 APR – 05 MAY 2008 18 April 2008, aasg Anticipated shipment

Packing PlanPacking Plan

• F. Rojas to be in charge of packing fore-optics box• Preassembled, with lens mounts removed• shipped in hard, ex-PCCD container• All associated box hardware and camera cables can fit in this package

• Packages to ship • Fore-optics box• GPS (packaged as shipped to us)• Computer (packaged as shipped to us)• Some possibility for consolidation (i.e. GPS may fit in fore-optics box)

• F. Rojas to be in charge of packing fore-optics box• Preassembled, with lens mounts removed• shipped in hard, ex-PCCD container• All associated box hardware and camera cables can fit in this package

• Packages to ship • Fore-optics box• GPS (packaged as shipped to us)• Computer (packaged as shipped to us)• Some possibility for consolidation (i.e. GPS may fit in fore-optics box)

Page 22: IRTF POETS (Orange) Preship review Anticipated shipment date 22 APR 2008 Anticipated mounting 30 APR – 05 MAY 2008 18 April 2008, aasg Anticipated shipment

Shipping PlanShipping Plan

• Online quote for DHL 2-day shipping from zip codes 02139 to 96720 is ~ $500 (100 lb. box with rough dimensions of our fore optics box)

• Plan to ship no later than 23 April (Wed.) for mounting one week later (30 April)• If computer testing takes longer, can ship as late as the 25th

• Hand-carried components• Camera• Optics

• Online quote for DHL 2-day shipping from zip codes 02139 to 96720 is ~ $500 (100 lb. box with rough dimensions of our fore optics box)

• Plan to ship no later than 23 April (Wed.) for mounting one week later (30 April)• If computer testing takes longer, can ship as late as the 25th

• Hand-carried components• Camera• Optics

Page 23: IRTF POETS (Orange) Preship review Anticipated shipment date 22 APR 2008 Anticipated mounting 30 APR – 05 MAY 2008 18 April 2008, aasg Anticipated shipment

B. Bus (observing, long term support), J. Rayner (SpeX interfacing, testing), L. Bergknut (mounting, summit work), A. Tokunaga (big problems)

Mounting PlanMounting Plan

Page 24: IRTF POETS (Orange) Preship review Anticipated shipment date 22 APR 2008 Anticipated mounting 30 APR – 05 MAY 2008 18 April 2008, aasg Anticipated shipment

Engineering Run Preparation

Engineering Run Preparation

• Submitted plan to A. Tokunaga• Verified plan is reasonable with B. Bus• Completed ORF - requested lodging at PH and IRTF

vehicle• Faxed Driver’s Clearance form• Contacted George Koenig re: instrument delivery

• Confirmed DHL 2-day shipping will work• Confirmed shipping address

• Working on night plans for observations with C. Zuluaga

• Submitted plan to A. Tokunaga• Verified plan is reasonable with B. Bus• Completed ORF - requested lodging at PH and IRTF

vehicle• Faxed Driver’s Clearance form• Contacted George Koenig re: instrument delivery

• Confirmed DHL 2-day shipping will work• Confirmed shipping address

• Working on night plans for observations with C. Zuluaga

Page 25: IRTF POETS (Orange) Preship review Anticipated shipment date 22 APR 2008 Anticipated mounting 30 APR – 05 MAY 2008 18 April 2008, aasg Anticipated shipment

Engineering Run Preparation

Engineering Run Preparation

Immediate to do• Telecon with Hawaii to ensure we’re all on the same page• Contact Miranda Hawarden-Ogata re: network interface• Confirm engineering observing times

Longer term to do• Compile documentation

• Engineering diagrams• Setup and usage manual

Basic version for observers and more advanced for supporters• Maintenance manual

Immediate to do• Telecon with Hawaii to ensure we’re all on the same page• Contact Miranda Hawarden-Ogata re: network interface• Confirm engineering observing times

Longer term to do• Compile documentation

• Engineering diagrams• Setup and usage manual

Basic version for observers and more advanced for supporters• Maintenance manual

Page 26: IRTF POETS (Orange) Preship review Anticipated shipment date 22 APR 2008 Anticipated mounting 30 APR – 05 MAY 2008 18 April 2008, aasg Anticipated shipment

The EndThe End

Slides on possible observing targets to follow

Slides on possible observing targets to follow

Page 27: IRTF POETS (Orange) Preship review Anticipated shipment date 22 APR 2008 Anticipated mounting 30 APR – 05 MAY 2008 18 April 2008, aasg Anticipated shipment

POETS IRTF Engineering ObservationsPOETS IRTF Engineering Observations

• Calibrations• On-telescope biases• On-telescope flats (sky and dome)

• Focus • standard star target?• ensure co-focal with SpeX

• Image variations due to pointing • Check variations with telescope pointing• Check variations at different airmass

• Calibrations• On-telescope biases• On-telescope flats (sky and dome)

• Focus • standard star target?• ensure co-focal with SpeX

• Image variations due to pointing • Check variations with telescope pointing• Check variations at different airmass

• Throughput & exp. times• standard star target grid – range of stars from

~ 8 to 20 mag., B & R stars, versus range of exposure times in conv.and EM modes

• Throughput & exp. times• standard star target grid – range of stars from

~ 8 to 20 mag., B & R stars, versus range of exposure times in conv.and EM modes

Page 28: IRTF POETS (Orange) Preship review Anticipated shipment date 22 APR 2008 Anticipated mounting 30 APR – 05 MAY 2008 18 April 2008, aasg Anticipated shipment

Engineering Observations IIEngineering Observations II

• Possible science targets • KBO and star for 06 May 2008 appulse• Other KBOs• Occultation candidate stars

• Possible science targets • KBO and star for 06 May 2008 appulse• Other KBOs• Occultation candidate stars