ipa regional workshop new challenges for railway authorities of western balkan · 2018. 10. 26. ·...
TRANSCRIPT
-
IPA REGIONAL WORKSHOP
New Challenges for railway authorities of
Western Balkan
EXPERIENCES ON CLEANING UP OF NATIONAL RULES OF HUNGARY
TAMÁS ALSCHERHEAD OF DEPARTMENT
-
2
THE BEGINNING I.
XVI. century wood tracking horse rail in mines
1760 England, first iron made track
1803 First public horse rail service (Surrey Iron Railway)
1804 First steam loco (Richard Trevitchick; 5 wagon & 16 passengers)
1825 The first steam engined public rail service in the world (Stephenson; Stockton – Darlington)
1829 Stephenson the Loco named Rocket
1836 First Hungarian Railway Act
1846. július 15. Pest-Vác railway line cutting-open ceremoni
1847. Pest –Szolnok railway line opening
1869. The grounding of the Hungarian State Railway
1876-tól Starting the nationalization of the railways (14 companies)
http://www.google.hu/url?sa=i&rct=j&q=az+els%C5%91+vas%C3%BAtvonal&source=images&cd=&cad=rja&docid=WIikgyiCfiqroM&tbnid=4JuGvRIZcGoFVM:&ved=0CAUQjRw&url=http://huszadikszazad.hu/index.php?apps=treasury&action=cikk&id=88&ei=9bZRUdaHPI7fPeX-gegE&bvm=bv.44158598,d.bGE&psig=AFQjCNEjHnqFajquhxQJJ6PHbnZBZgRbng&ust=1364396117953021http://www.google.hu/url?sa=i&rct=j&q=az+els%C5%91+vas%C3%BAtvonal&source=images&cd=&cad=rja&docid=WIikgyiCfiqroM&tbnid=4JuGvRIZcGoFVM:&ved=0CAUQjRw&url=http://huszadikszazad.hu/index.php?apps=treasury&action=cikk&id=88&ei=9bZRUdaHPI7fPeX-gegE&bvm=bv.44158598,d.bGE&psig=AFQjCNEjHnqFajquhxQJJ6PHbnZBZgRbng&ust=1364396117953021http://www.google.hu/url?sa=i&rct=j&q=stephenson+rocket&source=images&cd=&cad=rja&docid=YYLdKcbiZpAd2M&tbnid=8W8gRSouZ_-d-M:&ved=0CAUQjRw&url=http://commons.wikimedia.org/wiki/File:Stephenson's_Rocket.jpg&ei=Z7dRUYSHF4PcPZD9gLAB&bvm=bv.44158598,d.bGE&psig=AFQjCNHE8xjGjI5qNzgs2DLkHoNHffQgOQ&ust=1364396254494866http://www.google.hu/url?sa=i&rct=j&q=stephenson+rocket&source=images&cd=&cad=rja&docid=YYLdKcbiZpAd2M&tbnid=8W8gRSouZ_-d-M:&ved=0CAUQjRw&url=http://commons.wikimedia.org/wiki/File:Stephenson's_Rocket.jpg&ei=Z7dRUYSHF4PcPZD9gLAB&bvm=bv.44158598,d.bGE&psig=AFQjCNHE8xjGjI5qNzgs2DLkHoNHffQgOQ&ust=1364396254494866//upload.wikimedia.org/wikipedia/commons/d/d4/Kando_mozdony.jpg//upload.wikimedia.org/wikipedia/commons/d/d4/Kando_mozdony.jpg
-
3
THE BEGINNING II.
XIX. century the period of private and state railways
1st World War rail transport became a strategic traffic mode
2nd World War strenghtening the strategial state of railway
1945 – 29th July 1991 development of the Community's railways(91/440/EEC)
19 June 1995 the licensing of railway undertakings (95/18/EC)
2001 1st Railway Package
2004 2nd Railway Package
2007 3rd Railway Package
2016 - 4th Railway Package
-
4
EVOLUTION OF THE NATIONAL RULES
NTR• National Technical Rules
• More or less related to the NSR
NSR• National Safety Rules
• More or less related to the NTR
NR
• National Rules
• Combine NTR & NSR
• More comformable use for MS & ERA
-
5
CLASSIFICATION OF THE NATIONAL RULES
• TSI BASED Rules
• TSI open points
• NON TSI BASED SUBSYSTEMS
• NON TSI regulated Subsystems (Interlocking, etc.)
• ANY OTHER KIND OF RULES
• Rules for elements of SS’s not regulated in TSI
• NON TSI railway lines and RS operational and maintenance rules
-
6LE
GIS
LA
TIO
N S
YS
TE
M I
N
HU
NG
AR
Y
PARLIAMENT
GOVERNMENT
MINISTER
-
RULES
ACT
DECREE
NATIONAL STANDARDS
TECHNICAL RULES
TECHNICAL RULE
DESIGNING PRINCIPLES
STATEMENTS OF RU /
IM (MÁV)
HUNGARIAN LEGISLATION MODEL
http://www.google.hu/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=4KQdcwRJuY5BEM&tbnid=xtbX7OW_6bYcMM:&ved=0CAUQjRw&url=http://iplaw.hu/oltalmi-formak/novenyfajta-oltalom/europai-unios-jogalkotas&ei=W3qWUuGEH-Sl0AXh4oG4Bw&bvm=bv.57155469,d.bGQ&psig=AFQjCNE4_zcnfcEP20gQ2g57AHUhIcdlFw&ust=1385679822034504http://www.google.hu/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=4KQdcwRJuY5BEM&tbnid=xtbX7OW_6bYcMM:&ved=0CAUQjRw&url=http://iplaw.hu/oltalmi-formak/novenyfajta-oltalom/europai-unios-jogalkotas&ei=W3qWUuGEH-Sl0AXh4oG4Bw&bvm=bv.57155469,d.bGQ&psig=AFQjCNE4_zcnfcEP20gQ2g57AHUhIcdlFw&ust=1385679822034504
-
8
THE STATUS OF THE HUNGARIAN
CLEANING UP PROGRAM
1st. MOVEMENT
• Collect of the rules
• Classification of therules
• Level
• Actuality
• FINALIZED
2nd MOVEMENT
• Separated for legislation
• Lift up RU / IM Statements
• Act or Decree
• New or
• Modification
• FINALIZED
3rd MOVEMENT
• Public procurements for
• LEGISLATION
• NATIONAL RULES
• PROCESS RUN
• Partly finalized
-
9
CHALLANGES IN THE IMPLEMENTATION
PROCESS
• More then 2000 different level of rules, statements and top manager order
• Most of the regulations are issued by the State Railway
• Copyrights problem
• Setting up the state operational system (legal, institute, etc)
• Reductions of the technical rules
• Harmonization of the rules with TSIs
• Establish a dinamic and transparent system
-
10
THANK YOU FOR YOUR ATTENTION!