Iowa City Community School District Long Range Facility Master Plan 1725 North Dodge Street • Iowa City, IA 52245 • (319) 688-1000 • Fax (319) 688-1009 • www.iowacityschools.org One Vision Facility Master Plan Proposed Project Scope & Timeline Revisions School Template Comparisons Summary of Changes 4-4-15 to 1-10-17 Additional Project Recommendations January 10, 2017

Upload: others

Post on 20-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

Iowa City Community School District Long Range Facility Master Plan

1725 North Dodge Street • Iowa City, IA 52245 • (319) 688-1000 • Fax (319) 688-1009 • www.iowacityschools.org

One Vision Facility Master Plan

Proposed Project Scope & Timeline Revisions School Template Comparisons

Summary of Changes 4-4-15 to 1-10-17 Additional Project Recommendations

January 10, 2017

Page 2: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

Iowa City Community School District Educational Services Center

Stephen F. Murley Superintendent of Schools

1725 North Dodge Street • Iowa City, IA 52245 • (319) 688-1000 • Fax (319) 688-1009 • www.iowacityschools.org

Table of Contents

Executive Summary Page 1-2

Construction Timelines as per the Plan Page 3

Proposed Scope Revisions & Proposed Future Projects Page 4

Proposed Timeline Revisions Page 5

Future Possible Land Acquisitions Page 6

Building Templates and Capacity Page 7-9

Mann Elementary Template Comparison Page 10-12

Lincoln Elementary Template Comparison Page 13-15

Mann Elementary Template Comparison Page 14-16

Garner Elementary Template Comparison Page 17-19

Shimek Elementary Template Comparison Page 19-21

Wickham Elementary Template Comparison Page 22-24

Kirkwood Elementary Template Comparison Page 25-27

Horn Elementary Template Comparison Page 28-30

Wood Elementary Template Comparison Page 31-33

Lemme Elementary Template Comparison Page 34-36

Borlaug Elementary Template Comparison Page 37-39

Southeast Junior High Template Comparison Page 40-42

North Central Junior High Template Comparison Page 43-45

Northwest Junior High Template Comparison Page 46-48

Alexander Elementary Template Comparison Page 49-51

Hills Elementary Template Comparison Page 52-54

Coralville Central Elementary Template Comparison Page 55-57

Van Allen Elementary Template Comparison Page 58-60

Summary of Changes December 10, 2013 thru April 14, 2015 Page 61

Inflation Adjusted Costs April 14, 2015 Page 62

January 10, 2017

Page 3: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

Iowa City Community School District Long Range Facility Master Plan

1725 North Dodge Street • Iowa City, IA 52245 • (319) 688-1000 • Fax (319) 688-1009 • www.iowacityschools.org

Background of Annual Update to Faculties Master Plan

January 10, 2016

Between December 2012 and December 2013, the Board of Education, District staff, and significant

numbers of engaged community members worked together with BLDD Architects to develop a 10-year

Facilities Master Plan (FMP).

Following the July 23, 2013 Board meeting during which specific projects were approved for inclusion

in the plan, District staff worked to develop an associated timeline, funding and implementation model.

The final FMP incorporated all these components and was approved by the Board at their December 10,

2013 meeting.

The District at once began to implement the approved plan. The pace of changes occurring in the district

in the intervening months required another look at the FMP to see if revisions were needed. The Board

approved a contract with BLDD at the January 13, 2015 meeting to conduct this assessment. Updated

demographer’s projections on the rapid growth of student enrollment were provided to the district in

February 2015.

The resulting recommendations BLDD made from this plan re-assessment resulted in adjustments to the

plan to better serve the needs of a growing student population. One of the more significant changes was

the inclusion of athletic venue updates within the FMP. Also, a construction cost inflation factor was

applied to projects based on when they were scheduled to be completed per the FMP established

timeline. Taking this into account allowed the plan to reflect a much closer estimate of the final costs for

future projects. All of these changes were incorporated into an adjusted project funding model. These

plan adjustments were reviewed and approved by the Board April 4, 2015. (These adjustments are

summarized in the attached document) Since that time the district has been working diligently to

implement the revised plan.

The funding model of the revised FMP called for the District to first use available funding from both

PPEL and SAVE sources. By using this strategy, the first five years’ worth of projects could be done

without raising property taxes. We have now reached the point where we have to determine how the

final five years of the FMP projects are to be funded. At the Board’s request District staff has

undertaken to review the efficacy of the FMP and how it is fulfilling the projected needs.

To assist in this second plan assessment, the Board approved the demographer to update student

projections. This report was provided to the Board at their December 13, 2016 meeting. The report

indicates that strong student growth is anticipated for the foreseeable future. Thought Exchanges was

activated to gather community patron feedback. These comments were also provided to the Board at the

December 13, 2016 meeting. The Board currently has established three additional community input

opportunities with listening posts in the next two weeks.

Page 4: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

Over the past 16 years a working document/tool has been developed that assists school planners with the

educational adequacy and physical space requirements for analyzing and designing modern

schoolhouses. This tool will demonstrate both adequate spaces and deficiencies when analyzing existing

schoolhouses and also serves as a guide for designing new buildings. This tool is known as a School

Programming Template and has been a working document that has been revised as needs have evolved

by educators, architects, and planners.

The School Programming Template is based on optimal classroom sizes for their intended use and has

also been modified to reflect current building practices and codes. The template is also used to

determine optimal building capacities based on the number of classrooms and their best use. The

majority of elementary schools are defined in terms of the number of sections or classes per grade level.

For example, a school that has two classes of each grade 1st thru 6th would be known as a two section

school. Further the optimal school will have an extra section of Kindergarteners to accommodate smaller

class sizes and at least one Pre-Kindergarten room. The optimal template also includes spaces for

science, art, music, physical education, bonus room, resource rooms, special needs and administrative

uses.

The template is based on one variable, that being the number of students per classroom and per

classroom type. These numbers are used to generate the overall optimal capacity of the building using

the typical physical space per room. The template will assist in determining the optimal capacity for any

given building, old or new and lists the maximum capacity as plus 10% and the minimal capacity as less

10%. By example, a large three section school has an optimal capacity of 525 with the maximum

capacity at 578 and the minimal capacity at 472. The minimal capacity or below is the point at which the

building operational efficiency is diminished.

The School Programming Template was used to evaluate all of the Iowa City Community School

District, Elementary and Junior High Buildings. The analysis of the individual buildings in conjunction

with the demographer’s report were used to develop the proposed scope and schedule revisions included

as part of this report.

Based on the evaluation of the current facilities, the parameters set forth in the FMP, and the input

received through Board and community input, the administrative team has provided a summary of where

we are today and what needs to be done moving forward. The ONE Vision Proposed Scope and

Timeline Revisions provides a summary of the projects completed to date and a list of those projects that

the Board has approved for the future. This is followed by a list of projects for which there are

recommended changes in the scope of the project and/ or recommended changes in the timing of the

project. Finally, there are a list of additional projects that we offer for future consideration.

The plan as originally proposed and then modified over time was set up to balance the needs of existing

and new facilities, the needs of elementary and junior high school and high school facilities, and the

needs of the cities of Coralville, Hills, Iowa City, North Liberty, and University Heights and rural

Johnson County. The selection of the timeline for projects was designed to balance these needs and the

changes in scope and timeline proposed by the administrative team are a reflection of our understanding

of the need to continue to have this balance in the plan. In the end, the completion of this FMP will

provide outstanding educational environments for all students in the District now and for years to come!

Page 5: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

Budget Fund

to Completed $1,580,937 PPEL

to Completed $9,360,000 SAVE

to Completed $14,137,500 SAVE

to Completed $6,279,000 SAVE

to Completed $1,638,000 PPEL

to Completed $780,000 PPEL

to Completed $2,515,500 SAVE

to Completed $4,680,000 SAVE

to Construction $56,451,011 SAVE

to Construction $1,400,000 SAVE

to Construction $5,212,844 PPEL

to Construction $4,448,270 SAVE

to Design $11,739,142 SAVE

to Design $8,929,455 SAVE

to $11,731,041 GO Bond

to $4,760,709 GO Bond

to $20,189,450 GO Bond

to $12,543,905 GO Bond

to $14,270,434 GO Bond

to $3,970,148 GO Bond

to $16,791,951 GO Bond

to $4,938,859 GO Bond

to $30,374,650 GO Bond

to $1,490,071 GO Bond

to $15,715,683 GO Bond

to $13,203,649 GO Bond

to $10,474,250 GO Bond

to $1,241,725 GO Bond

to $7,700,000 GO Bond

to $6,212,869 GO Bond

to $8,328,019 GO Bond

to $4,240,758 GO Bond

to $1,691,947 GO Bond

to $108,271 GO Bond

Longfellow Elementary Summer 2017 Fall 2018

Lemme Elementary School

Borlaug Elementary School Spring 2022 Fall 2023

Spring 2019 Fall 2021

Northwest Junior High Spring 2020 Fall 2021

Kirkwood Elementary School Spring 2021 Fall 2022

Wickham Elementary School Spring 2020 Fall 2021

Fall 2021

City High School Phase 2

Mann Elementary School

West High School Phase 2

Liberty High School Ph 2 Athletics Spring 2018

Twain Elementary Summer 2014 Fall 2015

Summer 2016

Liberty High School Phase 1 Spring 2015 Fall 2017

Lucas Elementary Fall 2017

Summer 2016

Summer 2016

Hills Elementary Spring 2015 Fall 2015

Coralville Central Elementary Summer 2015

Fall 2016

Spring 2022 Winter 2023

Alexander Elementary Spring 2014 Fall 2015

Van Allen Elementary Summer 2014 Fall 2015

City High Third Floor Ph 1 Spring 2015

Horn Elementary School Spring 2021 Fall 2022

Liberty High School Phase 3 Spring 2021 Fall 2022

Wood Elementary School Spring 2021 Fall 2022

Spring 2018 Fall 2019

Shimek Elementary School Spring 2019 Fall 2020

Fall 2018 Fall 2020

West High Phase 1 Spring 2017 Fall 2018

Lincoln Elementary School Spring 2018 Fall 2019

Spring 2018 Fall 2019

Fall 2019

Garner Elementary School

Grant Elementary School Spring 2018 Fall 2019

South East Junior High Spring 2018 Fall 2019

Iowa City Community School DistrictLong Range Facility Master Plan

1725 North Dodge Street • Iowa City, IA 52245 • (319) 688-1000 • Fax (319) 688-1009 • www.iowacityschools.org

Long Range Facility Master Plan Construction Timelines

Hoover Elementary Spring 2014

Long Range Facility Master Plan Construction Timelines

Penn Elementary Spring 2014 Fall 2015

Fall 2014

Fall 2016

Weber Elementary Fall 2017

West High Ph 1 Tennis Courts Fall 2016

Spring 2022 Fall 2023

TREC Alternative School Spring 2022 Fall 2023

Tate High School

North Central Junior High Spring 2020

3

Page 6: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

Budget Fund

to $21,602,712 GO Bond

to $3,943,905 GO Bond

to Scope + Up $1,974,729 GO Bond

to $3,528,271 GO Bond

to Add $1,494,000

to Add $3,194,400

to Add $597,600

to Add $1,307,250

Add music and art room addition, program storage to gymnasium

Additional Projects for Future Consideration

Development work has been delayed

Savings in inflation with accelerated schedule

Additional costs for art and music room addition, inflation savings

Add gymnasium, 2 classrooms

Iowa City Community School DistrictLong Range Facility Master Plan

1725 North Dodge Street • Iowa City, IA 52245 • (319) 688-1000 • Fax (319) 688-1009 • www.iowacityschools.org

Add 4 classroom addition

Add new gymnasium, art, music and 2 new classrooms, building improvements

Tate High School Spring 2022 Winter 2023

Long Range Facility Master Plan Construction Timelines (Proposed Scope Revisions)

Long Range Facility Master Plan Construction Timelines (Proposed Scope Revisions)

Hills Elementary

TREC Alternative School Spring 2020 Fall 2021

Borlaug Elementary School Spring 2021 Fall 2022

Grant Elementary School Spring 2020 Fall 2021

Spring 2022 Fall 2023

Coralville Central Elementary

Van Allen Elementary

Alexander Elementary Spring 2022 Fall 2023

Spring 2021 Fall 2022

Spring 2022 Fall 2023

Add new secure front entrance and remodeled admin office space

4

Page 7: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

Budget Fund

to $11,731,041 GO Bond

to Add $20,189,450 GO Bond

to Add $605,018 GO Bond

to $4,108,648 GO Bond

to $5,496,919 GO Bond

to $3,943,905 GO Bond

to Scope + Up $1,974,729 GO Bond

Add additional time for renovation as 10 Plex option not feasible on site

Accelerate project to accomplish air conditioning sooner

Accelerate project, offset inflation and revise addition to house art and music

Allow extra time for property acquisitions

New elementary school project in North Liberty

Road work required to develop site for new elementary in North Liberty

Delay schedule, allow for opening of new elementary school in North Liberty

Mann Elementary School Spring 2019 Fall 2020

Iowa City Community School DistrictLong Range Facility Master Plan

1725 North Dodge Street • Iowa City, IA 52245 • (319) 688-1000 • Fax (319) 688-1009 • www.iowacityschools.org

Shimek Elementary School Spring 2019 Fall 2021

Garner Elementary School Spring 2019 Fall 2020

Long Range Facility Master Plan Construction Timelines (Proposed Timeline Revisions)

Long Range Facility Master Plan Construction Timelines ( Proposed Timeline Revisions)

Spring 2018 Fall 2019

Spring 2018 Fall 2019

TREC Alternative School Spring 2020 Fall 2021

Borlaug Elementary School Spring 2021 Fall 2022

New Elem @ North Liberty

New Elem Road Development

5

Page 8: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

SAVE

SAVE

New Far South East Elementary Site SAVE

SAVE

SAVE

SAVE

consideration should be given to the purchase of adjacent properties.

$7,500,000Possible Budget

Long Range Facility Master Plan Future Possible Land Acquistions

is in a position to develop and build when desired. In addition land acquistions may be prudentfor the expansion of existing school sites to allow for building expansions, improved site traffic

Future District growth may require that land acquistions be planned to ensure that the District

conditions, adequate playgrounds or athletic venues.

These purchases can be made using excess SAVE funds as they become available and the

City High School Given the need for additional building expansions and the desire to move athletic venues closer to the campus, some

warranted. Location to be determined.

New Junior High Site Given the community's desire to maintain a reasonable capacityat the junior high buildings, an additional junior ihg site may be

Iowa City.New Southwest Elementary Site The District has considerable area for growth southwest of

The District has considerable area for growth southeast of Iowa City.

or the purchase of neighboring homes and street.Mann Elementary School Site is inadequate, cooperation with the City on use of park

Lincoln Elementary School Playground Expansion due to building additions

Proposed Purchases for the following uses

purchasses would be made on a pay as you go bsasis and no general obligation bonds would be used for this purpose.

Iowa City Community School DistrictLong Range Facility Master Plan

1725 North Dodge Street • Iowa City, IA 52245 • (319) 688-1000 • Fax (319) 688-1009 • www.iowacityschools.org

Long Range Facility Master Plan Future Possible Land Acquistions

6

Page 9: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

Iowa City Community School District Educational Services Center

Stephen F. Murley Superintendent of Schools

1725 North Dodge Street • Iowa City, IA 52245 • (319) 688-1000 • Fax (319) 688-1009 • www.iowacityschools.org

November 22, 2016

To: Stephen Murley, Superintendent

Dr. Craig Hansel, Chief Financial Officer

From: Duane Van Hemert, Director Facilities Management

Re: Proposed Building Templates and Capacity Calculations

Calculating capacity for buildings, use and type, are an important element for applying

building standards and ensuring both adequacy and equity across the district.

The Standardized Templates and capacities are based on the ideal number of

classrooms and the space required and their intended uses. They are also based on the

type of school building, be it elementary, junior or senior high school use.

These Templates have been developed over the past 15 years and have been modified

periodically to reflect both the current and desired use of our buildings. Special needs

programming and student support services have changed dramatically in recent years.

These Templates reflect the ideal spaces and sizes that are desired in all buildings but

may only be obtainable with the construction of new school buildings or major

renovations and additions. It is sometimes not practical, if not virtually impossible or

fiscally possible, to obtain these standards with existing or older buildings.

The Templates take into consideration both space that is intended for instructional use

or assigned spaces and that space which is considered unassigned such as corridors,

mechanical rooms and corridors.

The ideal ratio in a modern school building is 70% assignable with 30% unassignable.

Older buildings will quite typically be in the 55 to 60% range of assignable space and

are less efficient than most new buildings.

The Template assumes a capacity of 25 students for planning purposes per each

general education classroom at both the elementary and secondary grade levels.

Adjustments may be warranted with smaller classrooms in older buildings

The Template determines the Ideal Capacity for a building but also allows for a 10%

reduction for minimal capacity or 10% increase for maximum capacity.

At the elementary level, the Template is based on the number of sections per grade.

By example, a school with three classes each in grades 1 thru 6 would be a 3 section

school.

7

Page 10: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

Elementary School Templates

Assignable Space Includes:

1 Preschool Room at 1,250 Sq.Ft. with 20 students per building

Kindergarten Rooms at 1,200 Sq.Ft. with 20 students based on the number of

sections with one additional room.

Classrooms for 1st thru 6

th grades with 25 students at 950 Sq.Ft. based on the

number of sections. Three section schools would have 18 classrooms for this

purpose.

1 Science Room at 1,100 Sq.Ft. per building.

Special Needs Classrooms with 8 students based on the number of sections.

1 Art Room with Kiln and storage at 1,100 Sq.Ft. per building.

1 Music Room with storage and practice space at 1,550 Sq.Ft. per building.

Physical Education space with 1 gym, office and storage at 4,900 Sq.Ft..

A Library/Media Center to include general seating, storage, workroom and

office space at 2,600 Sq.Ft. per building.

Administration and Support, to include a main office, reception space, Principal

and assistant’s office space, workroom and staff restrooms at 1,450 Sq.Ft..

Spaces for a Guidance Office, Teacher Prep, Lounge and staff restrooms at

1,600 Sq.Ft..

A Community/Volunteer Workroom at150 Sq.Ft. per building.

Food Service area with serving and storage at 700 Sq.Ft.

Multipurpose/ Lunchroom with area for storage and staff dining at 3,010 Sq.Ft..

Adequate custodial storage and receiving area.

Note: Some of the common area spaces will be adjusted up or down based on the size and

number of sections per school. The spaces described above are for an average 3 section school.

8

Page 11: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

Junior High School Templates

Assignable Space Includes:

Various Template sizes have been developed from 500 to 1,000 students per

building.

Classrooms with 25 students at 750 to 850 Sq.Ft. based on the template size of

the school.

1 Science Labs at 1,500 Sq.Ft., number based on template size

Special Needs Classrooms with 8 students based on the template size.

1 Art Room with Kiln and storage at 2,000 Sq.Ft. per building.

Instrumental and Vocal Music Room with storage and practice space at 3,900

Sq.Ft. per building.

Physical Education space with 1 gym, office, locker rooms, restrooms and

storage at 19,040Sq.Ft..

A Wrestling/Multipurpose Room at 2,400 Sq.Ft. per building.

A Library/Media Center to include general seating, storage, workroom, adjacent

computer lab and office space at 6,270 Sq.Ft. per building.

A Business Education Room at 1,200 Sq.Ft. per building.

Family and Consumer Science/Health Labs at 2,200 Sq.Ft. per building.

Industrial Technology at 3,000 Sq.Ft. per building.

Administration and Support, to include a main office, reception space, Principal

and assistant’s office space, health services, workroom and staff restrooms at

3,325 Sq.Ft..

Spaces for a Guidance Office, Teacher Prep, Lounge and staff restrooms at

3,620 Sq.Ft..

Food Service area with serving and storage at 3,500 Sq.Ft.

Multipurpose/ Lunchroom with area for storage and staff dining at 3,150 Sq.Ft..

Auditorium Space for ½ of the student body + 25 at 6,188 Sq.Ft.

Note: Some of the common area spaces will be adjusted up or down based on the size and the

school template size. The spaces described above are for a 700 student school.

9

Page 12: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

Iowa City Community School DistrictElementary School Building Standards

Mann Elementary School

2014 Capacity 242 2015-417

Proposed Capacity & Template Size 330 - 2B

2015-16 Enrollment

2016-17 Enrollment 246

Projected 2022 Enrollment 225

Deficiencies Art, Science, Music, Gym, PK, K, Media

LRFMP budget $11,731,041

Recommended Additional Funds

Proposed Additions/ Changes

LRFMP Schedule 2018-19

Recommended Schedule 2019-2020

ICCSD Mann Mann

EL 2B 2B

SPACE EVALUATION CRITERIA MODEL Compare

Student Population

STUDENT ENROLLMENT (Ideal, excluding Preschool) 330 0 (330)

Enrollment Range -10% 297 0

Enrollment Range +10% 363 0

Grades 1-6 275

Special Education / ELL Included above

Kindergarten (All Day) 55

PRESCHOOL only (All day, every day) 20

Area in Square Feet:

TOTAL AREA TOTAL SF 50,429 31,910 (18,519)

SF / ENROLLMT 153 #DIV/0!

UNASSIGNABLE AREA TOTAL SF 15,129 11,777 (3,352)

(Toilets, Mechanical, Corridors, Walls, Etc.) % of TOTAL 30% 37% 6.91%

ASSIGNABLE AREA TOTAL SF 35,300 20,133 (15,167)

(Total of assignable spaces listed below) % of TOTAL 70% 63% -6.91%

Assignable Spaces:

1 Classroom Area - Preschool AVG SIZE 1,250 805

# STU / RM 20 872

SF / STU 63

# RMS THUS 1 2TOTAL SF 1,250 1,677 427

2 Classroom Area - Kindergarten AVG SIZE 1,200 864

# STU / RM 18

SF / STU 65

# RMS THUS 3 1 (2)

TOTAL SF 3,600 865 (2,735)

3 Classroom Area - Grades 1-6 AVG SIZE 950 819

including "extra" classrooms for enrollments inbetween # STU / RM 25 740

SF / STU 739

798

712

774

819

854

772

38 737

# RMS THUS 11 10 (1)

TOTAL SF 10,450 7,774 (2,676)

Mann Elementary

1/8/2017

10

Page 13: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

ICCSD Mann Mann

EL 2B 2B

SPACE EVALUATION CRITERIA MODEL Compare

4 Special Needs AVG SIZE 500 900

Special Ed Support Staff # STU / RM 10 566

ESL SF / STU 50

Tutorial # RMS THUS 4 2 (2)

Gifted/Talented TOTAL SF 2,000 1,467 (533)

5 Art Room AVG SIZE 1,100 827

# STU / RM 25

SF / STU 44# RMS THUS 1 1 0

TOTAL SF 1,100 827 (273)]

6 Science Room AVG SIZE 1,100 0

# STU / RM 25

SF / STU 44# RMS THUS 1 1 0

TOTAL SF 1,100 0 (1,100)

7 Music AVG SIZE 1,550 632

Includes ensemble room, small practice # STU / RM 25

room and storage space. SF / STU 62# RMS THUS 1 1 0

TOTAL SF 1,550 632 (918)

8 Physical Education

Gymnasium (84' x 50' w/ BB floor 70' x 40') 4,200 2,773

Office(s) 150

Storage 550 84

Lockers/Showers/Toilets 0

# STU / RM 58

SF / STU 72TOTAL SF 4,900 2,857 (2,043)

9 Library / Media Center

Entrance-Circulation-Distribution 500 1,577

Seating 1,000

Office 150 143

Conference Room(s) 200

Audio-visual equipment storage 250

Materials storage and production 200 356

Computer Lab 305

Workroom 200

# STU / RM 50

SF / STU 50TOTAL SF 2,500 2,381 (119)

10 Administration & Support

Repcpt / Secretary / General Office 300 128

Principal's Office 175 136

Assistant Principals' Offices 0

Conference Room 300 176

Staff Toilet 60

Workroom 150 235

Scheduling 0

In-school Suspension 150

Storage

Internal Circulation 140 150TOTAL SF 1,275 825 (450)

Mann Elementary

1/8/2017

11

Page 14: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

ICCSD Mann Mann

EL 2B 2B

SPACE EVALUATION CRITERIA MODEL Compare

11 Health Services TOTAL SF 600 61 (539)

12 Guidance and Counseling TOTAL SF 300 127 (173)

13 Student Support 80

Social Worker Speech Pathologist 202

Psychologist Therapist 116

Team Rooms

1 to 3 days per week

Shared rooms of 150 SF eachTOTAL SF 300 317 17

14 Teachers' Prep + Lounge + Toilets TOTAL SF 400 (400)

15 Volunteer / Community Workroom TOTAL SF 150 0 (150)

16 Food Service

Receiving / Storage 100

Kitchen / Serving 380 262

Dishwashing 160

Office / Locker 60TOTAL SF 700 262 (438)

17 Lunch & Multi-purpose Room

Student Lunch Room 2,145

Storage

Teacher Dining Room 480

# STU / RM 165

SF / STU 13

# SETTINGS 2TOTAL SF 2,625 0 (2,625)

18 Custodial, Receiving & Storage TOTAL SF 500 59 (441)

19 Other Spaces (If Any):

2nd Gymnasium

Storqge

Custodian

Commons

Storage

TOTAL SF 0 0 0

NOTES:

#1 Toilets, elevators, stairs, mechanical/electrical space, and wall thickness are

included in Unassigned Area.

#2 The general class size is optimized at 25 students for space planning purpose.

Actual class size could vary from 20 to 25 or more.

#3 The areas shown as models for Iowa Community Schools Schools should be

considered as the ideal. Concern for available budget, practicality, and common

sense lead to acceptance of existing spaces smaller than ideal, but all new

construction should strive to be at template standards.

#4 The size shown includes related storage.

Mann Elementary

1/8/2017

12

Page 15: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

Iowa City Community School DistrictElementary School Building Standards

Lincon Elementary School

2014 Capacity 187 237

Proposed Capacity & Template Size

2015-16 Enrollment

2016-17 Enrollment 256

Projected 2022 Enrollment 215

Deficiencies 1-PK, 1-K, Gym, Science, Kitchen, Music

LRFMP budget $4,760,709

Recommended Additional Funds

Proposed Additions/ Changes

LRFMP Schedule 2018-19

Recommended Schedule

ICCSD Lincoln Lincoln

EL 1A 1A

SPACE EVALUATION CRITERIA MODEL Compare

Student Population

STUDENT ENROLLMENT (Ideal, excluding Preschool) 240 256 16

Enrollment Range -10% 216 230

Enrollment Range +10% 264 282

Grades 1-6 150

Special Education / ELL 30 Kindergarten (All Day) 40

PRESCHOOL only (All day, every day) 20

Area in Square Feet:

TOTAL AREA TOTAL SF 52,236 31,604 (20,632)

SF / ENROLLMT 127 123

UNASSIGNABLE AREA TOTAL SF 15,671 14,423 (1,247)

(Toilets, Mechanical, Corridors, Walls, Etc.) % of TOTAL 30% 46% 15.64%

ASSIGNABLE AREA TOTAL SF 36,565 17,181 (19,384)

(Total of assignable spaces listed below) % of TOTAL 70% 54% -15.64%

Assignable Spaces:

1 Classroom Area - Preschool AVG SIZE 1,250

# STU / RM 20

SF / STU 63

# RMS THUS 1 0 (1)TOTAL SF 1,250 0 (1,250)

2 Classroom Area - Kindergarten AVG SIZE 1,200 1,092

# STU / RM 20 727

SF / STU 60 886

# RMS THUS 2 2 0

TOTAL SF 3,600 2,705 (895)2,705

3 Classroom Area - Grades 1-6 AVG SIZE 950 597

including "extra" classrooms for enrollments inbetween # STU / RM 25 614

SF / STU 860

850

850

850

952

849

38

# RMS THUS 6 8 2

TOTAL SF 11,400 6,423 (4,977)

Lincoln Elementary

1/8/2017

13

Page 16: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

ICCSD Lincoln Lincoln

EL 1A 1A

SPACE EVALUATION CRITERIA MODEL Compare

4 Special Needs AVG SIZE 500 171

Special Ed Support Staff # STU / RM 8 192

ESL SF / STU 67

Tutorial # RMS THUS 4 2 (2)

Gifted/Talented TOTAL SF 2,000 363 (1,637)

5 Art Room AVG SIZE 1,100 926

# STU / RM 25

SF / STU 44# RMS THUS 1 (1)

TOTAL SF 1,100 926 (174)]

6 Science Room AVG SIZE 1,100 0

# STU / RM 25

SF / STU 44# RMS THUS 1 1 0

TOTAL SF 1,100 0 (1,100)

7 Music AVG SIZE 1,550

Includes ensemble room, small practice # STU / RM 25 279

room and storage space. SF / STU 62# RMS THUS 1 1 0

TOTAL SF 1,550 279 (1,271)

8 Physical Education

Gymnasium (84' x 50' w/ BB floor 70' x 40') 4,200 2,001

Office(s) 150 183

Storage 550 135

Lockers/Showers/Toilets 0

# STU / RM 58

SF / STU 72TOTAL SF 4,900 2,319 (2,581)

9 Library / Media Center

Entrance-Circulation-Distribution 500

Seating 1,000 1,950

Office 150

Conference Room(s) 200

Audio-visual equipment storage 250

Materials storage and production 200 118

Computer Lab 580

Workroom 200

# STU / RM 50

SF / STU 50TOTAL SF 2,500 2,648 148

10 Administration & Support

Repcpt / Secretary / General Office 300 149

Principal's Office 175 124

Assistant Principals' Offices 0

Conference Room 300 169

Staff Toilet 60

Workroom 150 279

Scheduling 0

In-school Suspension 150

Storage

Internal Circulation 140 150TOTAL SF 1,275 872 (403)

Lincoln Elementary

1/8/2017

14

Page 17: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

ICCSD Lincoln Lincoln

EL 1A 1A

SPACE EVALUATION CRITERIA MODEL Compare

11 Health Services TOTAL SF 600 143 (457)

12 Guidance and Counseling TOTAL SF 300 126 (174)

13 Student Support

Social Worker Speech Pathologist

Psychologist Therapist

Team Rooms

1 to 3 days per week

Shared rooms of 150 SF eachTOTAL SF 300 0 (300)

14 Teachers' Prep + Lounge + Toilets TOTAL SF 400 0 (400)

15 Volunteer / Community Workroom TOTAL SF 150 0 (150)

16 Food Service

Receiving / Storage 100

Kitchen / Serving 380 197

Dishwashing 160

Office / Locker 60TOTAL SF 700 197 (503)

17 Lunch & Multi-purpose Room

Student Lunch Room 2,460

Storage 181

Teacher Dining Room 480

# STU / RM 205

SF / STU 12

# SETTINGS 2TOTAL SF 2,940 181 (2,759)

18 Custodial, Receiving & Storage TOTAL SF 500 0 (500)

19 Other Spaces (If Any):

2nd Gymnasium

Storqge 1,832

Custodian

Commons

Storage 351

TOTAL SF 0 2,183 2,183

NOTES:

#1 Toilets, elevators, stairs, mechanical/electrical space, and wall thickness are

included in Unassigned Area.

#2 The general class size is optimized at 25 students for space planning purpose.

Actual class size could vary from 20 to 25 or more.

#3 The areas shown as models for Iowa Community Schools Schools should be

considered as the ideal. Concern for available budget, practicality, and common

sense lead to acceptance of existing spaces smaller than ideal, but all new

construction should strive to be at template standards.

#4 The size shown includes related storage.

Lincoln Elementary

1/8/2017

15

Page 18: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

Iowa City Community School DistrictElementary School Building Standards

Garner Elementary School

2014 Capacity 445

Proposed Capacity & Template Size 633 - 3B

2015-16 Enrollment

2016-17 Enrollment 617

Projected 2022 Enrollment 468

Deficiencies Music Room Art Room

LRFMP budget $3,970,148

Recommended Additional Funds $138,500 $4,108,648

Proposed Additions/ Changes Music &Art

LRFMP Schedule 2018-19

Recommended Schedule 2019-20

ICCSD Garner Garner

EL 3B 3B

SPACE EVALUATION CRITERIA MODEL Compare

Student Population

STUDENT ENROLLMENT (Ideal, excluding Preschool) 633 619 (14)

Enrollment Range -10% 569

Enrollment Range +10% 696

Grades 1-6 500

Special Education / ELL 53 Kindergarten (All Day) 80

PRESCHOOL only (All day, every day) 20

Area in Square Feet:

TOTAL AREA TOTAL SF 67,800 64,946 (2,854)

SF / ENROLLMT 113 105

UNASSIGNABLE AREA TOTAL SF 20,340 17,222 (3,118)

(Toilets, Mechanical, Corridors, Walls, Etc.) % of TOTAL 30% 27% -3.48%

ASSIGNABLE AREA TOTAL SF 47,460 47,724 264

(Total of assignable spaces listed below) % of TOTAL 70% 73% 3.48%

Assignable Spaces:

1 Classroom Area - Preschool AVG SIZE 1,250 1,289

# STU / RM 20

SF / STU 63# RMS THUS 1 1 0TOTAL SF 1,250 1,289 39

2 Classroom Area - Kindergarten AVG SIZE 1,200 1,287

# STU / RM 20 998

SF / STU 60 998

998

998# RMS THUS 4 5 1TOTAL SF 4,800 5,279 479

3 Classroom Area - Grades 1-6 AVG SIZE 950 835

including "extra" classrooms for enrollments inbetween # STU / RM 25 837

SF / STU 38 864

835

837

864

835

837

864

"perfect" section sizes 864

837

835

835

836

864

864

837

835# RMS THUS 20 18 (2)TOTAL SF 19,000 15,215 (3,785)

Garner Elementary

1/8/2017

16

Page 19: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

ICCSD Garner Garner

EL 3B 3B

SPACE EVALUATION CRITERIA MODEL Compare

4 Special Needs AVG SIZE 500 864

Special Ed Support Staff # STU / RM 8 362

ESL SF / STU 67 202

382

144

144

362

382 Tutorial # RMS THUS 7 8 1 Gifted/Talented TOTAL SF 3,500 2,842 (658)

5 Art Room AVG SIZE 1,100 842

# STU / RM 25 102

SF / STU 44 42# RMS THUS 1 1 0TOTAL SF 1,100 986 (114)

]

6 Science Room AVG SIZE 1,100 0

# STU / RM 25

SF / STU 44# RMS THUS 1 0 (1)TOTAL SF 1,100 0 (1,100)

7 Music AVG SIZE 1,550 852

Includes ensemble room, small practice # STU / RM 25 361

room and storage space. SF / STU 62# RMS THUS 1 1 0TOTAL SF 1,550 1,213 (337)

8 Physical Education

Gymnasium (84' x 50' w/ BB floor 70' x 40') 4,200 7,502

Office(s) 150 94

Storage 550 110

Lockers/Showers/Toilets 0 328

# STU / RM 58

SF / STU 72TOTAL SF 4,900 8,034 3,134

9 Library / Media Center

Entrance-Circulation-Distribution 500

Seating 1,000 2,314

Office 150

Conference Room(s) 200 148

Audio-visual equipment storage 250

Materials storage and production 200

Computer Lab 448

Workroom 200

# STU / RM 50

SF / STU 50TOTAL SF 2,500 2,910 410

10 Administration & Support

Repcpt / Secretary / General Office 300 273

Principal's Office 175 191

Assistant Principals' Offices 175 199

Conference Room 300

Staff Toilet 60 96

Workroom 150 508

Scheduling 0

In-school Suspension 150

Storage 120

Internal Circulation 140 240TOTAL SF 1,450 1,627 177

Garner Elementary

1/8/2017

17

Page 20: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

ICCSD Garner Garner

EL 3B 3B

SPACE EVALUATION CRITERIA MODEL Compare

11 Health Services TOTAL SF 600 290 (310)

12 Guidance and Counseling TOTAL SF 450 202 (248)

13 Student Support

Social Worker Speech Pathologist

Psychologist Therapist

Team Rooms Reading 1,346

1,346

1,346

1 to 3 days per week

Shared rooms of 150 SF eachTOTAL SF 300 4,038 3,738

14 Teachers' Prep + Lounge + Toilets TOTAL SF 600

15 Volunteer / Community Workroom TOTAL SF 150 455 305

16 Food Service

Receiving / Storage 100 612

Kitchen / Serving 380

Dishwashing 160

Office / Locker 60TOTAL SF 700 612 (88)

17 Lunch & Multi-purpose Room

Student Lunch Room 2,530 2,042

Storage 214

Teacher Dining Room 480

# STU / RM 211

SF / STU 12

# SETTINGS 3TOTAL SF 3,010 2,256 (754)

18 Custodial, Receiving & Storage TOTAL SF 500 476 (24)

19 Other Spaces (If Any):

Exterior Storqge

TOTAL SF 0 0 0

NOTES:

#1 Toilets, elevators, stairs, mechanical/electrical space, and wall thickness are

included in Unassigned Area.

#2 The general class size is optimized at 25 students for space planning purpose.

Actual class size could vary from 20 to 25 or more.

#3 The areas shown as models for Iowa Community Schools Schools should be

considered as the ideal. Concern for available budget, practicality, and common

sense lead to acceptance of existing spaces smaller than ideal, but all new

construction should strive to be at template standards.

#4 The size shown includes related storage.

Garner Elementary

1/8/2017

18

Page 21: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

Iowa City Community School DistrictElementary School Building Standards

Shimek Elementary School

2014 Capacity 229 2015-339

Proposed Capacity & Template Size 330 - 2B

2015-16 Enrollment

2016-17 Enrollment 216

Projected 2022 Enrollment 209

Deficiencies 1-PK, 1-K, Art, music, Science, Admin, Support

LRFMP budget $4,938,859

Recommended Additional Funds $558,060 $5,496,919

Proposed Additions/ Changes

LRFMP Schedule 2019-20

Recommended Schedule 2019-21

ICCSD Shimek Shimek

EL 2B 2B

SPACE EVALUATION CRITERIA MODEL Compare

Student Population

STUDENT ENROLLMENT (Ideal, excluding Preschool) 330 216 (114)

Enrollment Range -10% 297 194

Enrollment Range +10% 363 238

Grades 1-6 275

Special Education / ELL Included above

Kindergarten (All Day) 55

PRESCHOOL only (All day, every day) 20

Area in Square Feet:

TOTAL AREA TOTAL SF 50,429 28,213 (22,216)

SF / ENROLLMT 153 131

UNASSIGNABLE AREA TOTAL SF 15,129 6,632 (8,497)

(Toilets, Mechanical, Corridors, Walls, Etc.) % of TOTAL 30% 24% -6.49%

ASSIGNABLE AREA TOTAL SF 35,300 21,581 (13,719)

(Total of assignable spaces listed below) % of TOTAL 70% 76% 6.49%

Assignable Spaces:

1 Classroom Area - Preschool AVG SIZE 1,250

# STU / RM 20

SF / STU 63

# RMS THUS 1TOTAL SF 1,250 0 (1,250)

2 Classroom Area - Kindergarten AVG SIZE 1,200 1,070

# STU / RM 18 1,034

SF / STU 65

# RMS THUS 3 2 (1)

TOTAL SF 3,600 2,106 (1,494)

3 Classroom Area - Grades 1-6 AVG SIZE 950 971

including "extra" classrooms for enrollments inbetween # STU / RM 25 972

SF / STU 871

979

983

970

967

973

890

38 890

890

# RMS THUS 11 11 0

TOTAL SF 10,450 10,359 (91)

Shimek Elementary

1/8/2017

19

Page 22: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

ICCSD Shimek Shimek

EL 2B 2B

SPACE EVALUATION CRITERIA MODEL Compare

4 Special Needs AVG SIZE 500 82

Special Ed Support Staff # STU / RM 10 158

ESL SF / STU 50 220

325

83

89

Tutorial # RMS THUS 4 6 2

Gifted/Talented TOTAL SF 2,000 956 (1,044)

5 Art Room AVG SIZE 1,100

# STU / RM 25

SF / STU 44# RMS THUS 1 (1)

TOTAL SF 1,100 0 (1,100)]

6 Science Room AVG SIZE 1,100 0

# STU / RM 25

SF / STU 44# RMS THUS 1 1 0

TOTAL SF 1,100 0 (1,100)

7 Music AVG SIZE 1,550 791

Includes ensemble room, small practice # STU / RM 25 203

room and storage space. SF / STU 62# RMS THUS 1 1 0

TOTAL SF 1,550 994 (556)

8 Physical Education

Gymnasium (84' x 50' w/ BB floor 70' x 40') 4,200 2,365

Office(s) 150 78

Storage 550 187

Lockers/Showers/Toilets 0

# STU / RM 58

SF / STU 72TOTAL SF 4,900 2,630 (2,270)

9 Library / Media Center

Entrance-Circulation-Distribution 500

Seating 1,000 2,091

Office 150 114

Conference Room(s) 200

Audio-visual equipment storage 250 167

Materials storage and production 200

Computer Lab 486

Workroom 200

# STU / RM 50

SF / STU 50TOTAL SF 2,500 2,857 357

10 Administration & Support

Repcpt / Secretary / General Office 300 263

Principal's Office 175 158

Assistant Principals' Offices 0

Conference Room 300

Staff Toilet 60

Workroom 150 267

Scheduling 0

In-school Suspension 150

Storage 58

Internal Circulation 140 100TOTAL SF 1,275 847 (428)

Shimek Elementary

1/8/2017

20

Page 23: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

ICCSD Shimek Shimek

EL 2B 2B

SPACE EVALUATION CRITERIA MODEL Compare

11 Health Services TOTAL SF 600 95 (505)

12 Guidance and Counseling TOTAL SF 300 0 (300)

13 Student Support

Social Worker Speech Pathologist

Psychologist Therapist

Team Rooms

1 to 3 days per week

Shared rooms of 150 SF eachTOTAL SF 300 0 (300)

14 Teachers' Prep + Lounge + Toilets TOTAL SF 400 339 (61)

15 Volunteer / Community Workroom TOTAL SF 150 0 (150)

16 Food Service

Receiving / Storage 100

Kitchen / Serving 380 127

Dishwashing 160

Office / Locker 60TOTAL SF 700 127 (573)

17 Lunch & Multi-purpose Room

Student Lunch Room 2,145

Storage 212

Teacher Dining Room 480

# STU / RM 165

SF / STU 13

# SETTINGS 2TOTAL SF 2,625 212 (2,413)

18 Custodial, Receiving & Storage TOTAL SF 500 59 (441)

19 Other Spaces (If Any):

Exterior Storqge 79

Custodian

TOTAL SF 0 79 79

NOTES:

#1 Toilets, elevators, stairs, mechanical/electrical space, and wall thickness are

included in Unassigned Area.

#2 The general class size is optimized at 25 students for space planning purpose.

Actual class size could vary from 20 to 25 or more.

#3 The areas shown as models for Iowa Community Schools Schools should be

considered as the ideal. Concern for available budget, practicality, and common

sense lead to acceptance of existing spaces smaller than ideal, but all new

construction should strive to be at template standards.

#4 The size shown includes related storage.

Shimek Elementary

1/8/2017

21

Page 24: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

Iowa City Community School DistrictElementary School Building Standards

Wickham Elementary School

2014 Capacity 428

Proposed Capacity & Template Size 575 - 3A

2015-16 Enrollment 513

2016-17 Enrollment

Projected 2022 Enrollment 448

Deficiencies Science Rm Pre-K Room Guid & Stud Support Kitchen

LRFMP budget $1,490,071

Recommended Additional Funds

Proposed Additions/ Changes

LRFMP Schedule 2020-21

Recommended Schedule

ICCSD Wickham Wickham

EL 3A 3A

SPACE EVALUATION CRITERIA MODEL Compare

Student Population

STUDENT ENROLLMENT (Ideal, excluding Preschool) 575 513 (62)

Enrollment Range -10% 518 462

Enrollment Range +10% 633 564

Grades 1-6 450

Special Education / ELL 45 Kindergarten (All Day) 80

PRESCHOOL only (All day, every day) 20

Area in Square Feet:

TOTAL AREA TOTAL SF 64,757 55,430 (9,327)

SF / ENROLLMT 113 108

UNASSIGNABLE AREA TOTAL SF 19,427 16,256 (3,171)

(Toilets, Mechanical, Corridors, Walls, Etc.) % of TOTAL 30% 29% -0.67%

ASSIGNABLE AREA TOTAL SF 45,330 39,174 (6,156)

(Total of assignable spaces listed below) % of TOTAL 70% 71% 0.67%

Assignable Spaces:

1 Classroom Area - Preschool AVG SIZE 1,250 0 (1,250)

# STU / RM 20 20 0

SF / STU 63 0 (63)

# RMS THUS 1 0 (1)TOTAL SF 1,250 0 (1,250)

2 Classroom Area - Kindergarten AVG SIZE 1,200 1,115 (85)

# STU / RM 20 1,115 1,095

SF / STU 60 1,115 1,055

1,115

# RMS THUS 4 4 0

TOTAL SF 4,800 4,463 (337)

3 Classroom Area - Grades 1-6 AVG SIZE 950 889

including "extra" classrooms for enrollments inbetween # STU / RM 25 894

SF / STU 889

889

894

898

847

852

847

847

852

847

847

852

852

852

852

847

# RMS THUS 18 18 0

TOTAL SF 17,100 15,549 (1,551)

Wickham Elementary

1/8/2017

22

Page 25: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

ICCSD Wickham Wickham

EL 3A 3A

SPACE EVALUATION CRITERIA MODEL Compare

4 Special Needs AVG SIZE 500 255

Special Ed Support Staff # STU / RM 8 212

ESL SF / STU 67 258

159

159

311

389

Tutorial # RMS THUS 6 7 1

Gifted/Talented TOTAL SF 3,000 1,742 (1,258)

5 Art Room AVG SIZE 1,100 1,198

# STU / RM 25 25

SF / STU 44 48# RMS THUS 1 1 0

TOTAL SF 1,100 1,198 98]

6 Science Room AVG SIZE 1,100 0

# STU / RM 25

SF / STU 44# RMS THUS 1 0 (1)

TOTAL SF 1,100 0 (1,100)

7 Music AVG SIZE 1,550 899

Includes ensemble room, small practice # STU / RM 25 108

room and storage space. SF / STU 62# RMS THUS 1 1 0

TOTAL SF 1,550 1,007 (543)

8 Physical Education

Gymnasium (84' x 50' w/ BB floor 70' x 40') 4,200 5,770

Office(s) 150 109

Storage 550 212

Lockers/Showers/Toilets 0 0

# STU / RM 58

SF / STU 72TOTAL SF 4,900 6,091 1,191

9 Library / Media Center

Entrance-Circulation-Distribution 500

Seating 1,000 2,835

Office 150 195

Conference Room(s) 200

Audio-visual equipment storage 250 222

Materials storage and production 200 108

Computer Lab 500 599

Workroom 200

# STU / RM 50

SF / STU 60TOTAL SF 3,000 3,960 960

10 Administration & Support

Repcpt / Secretary / General Office 300 266

Principal's Office 175 225

Assistant Principals' Offices 175 266

Conference Room 300 202

Staff Toilet 60 120

Workroom 150 675

Scheduling 0

In-school Suspension 150

Storage 89

Internal Circulation 140 100TOTAL SF 1,450 1,943 493

Wickham Elementary

1/8/2017

23

Page 26: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

ICCSD Wickham Wickham

EL 3A 3A

SPACE EVALUATION CRITERIA MODEL Compare

11 Health Services TOTAL SF 600 286 (314)

12 Guidance and Counseling TOTAL SF 450 0 (450)

13 Student Support

Social Worker Speech Pathologist

Psychologist Therapist

Team Rooms

1 to 3 days per week

Shared rooms of 150 SF eachTOTAL SF 300 0 (300)

14 Teachers' Prep + Lounge + Toilets TOTAL SF 600 0 (600)

15 Volunteer / Community Workroom TOTAL SF 150 0 (150)

16 Food Service

Receiving / Storage 100

Kitchen / Serving 380 303

Dishwashing 160

Office / Locker 60TOTAL SF 700 303 (397)

17 Lunch & Multi-purpose Room

Student Lunch Room 2,300 2,211

Storage

Teacher Dining Room 480

# STU / RM 192

SF / STU 12

# SETTINGS 3TOTAL SF 2,780 2,211 (569)

18 Custodial, Receiving & Storage TOTAL SF 500 421 (79)

19 Other Spaces (If Any):

Exterior Storqge 60

TOTAL SF 0 60 60

NOTES:

#1 Toilets, elevators, stairs, mechanical/electrical space, and wall thickness are

included in Unassigned Area.

#2 The general class size is optimized at 25 students for space planning purpose.

Actual class size could vary from 20 to 25 or more.

#3 The areas shown as models for Iowa Community Schools Schools should be

considered as the ideal. Concern for available budget, practicality, and common

sense lead to acceptance of existing spaces smaller than ideal, but all new

construction should strive to be at template standards.

#4 The size shown includes related storage.

Wickham Elementary

1/8/2017

24

Page 27: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

Iowa City Community School DistrictElementary School Building Standards

Kirkwood Elementary School

2014 Capacity 306 356

Proposed Capacity & Template Size 575 - 3A

2015-16 Enrollment

2016-17 Enrollment 344

Projected 2022 Enrollment 369

Deficiencies 1-PK, 1-K, Science, Art, Music, Support

LRFMP budget $10,474,250

Recommended Additional Funds $321,000 $10,795,250

Proposed Additions/ Changes 1-PK, 1-K, Science, Art, Music, Support

LRFMP Schedule 2020-21

Recommended Schedule

ICCSD Kirkwood Kirkwood

EL 3A 3A

SPACE EVALUATION CRITERIA MODEL Compare

Student Population

STUDENT ENROLLMENT (Ideal, excluding Preschool) 575 344 (231)

Enrollment Range -10% 518 310

Enrollment Range +10% 633 378

Grades 1-6 450

Special Education / ELL 45 Kindergarten (All Day) 80

PRESCHOOL only (All day, every day) 20

Area in Square Feet:

TOTAL AREA TOTAL SF 64,757 43,486 (21,271)

SF / ENROLLMT 113 126

UNASSIGNABLE AREA TOTAL SF 19,427 10,233 (9,195)

(Toilets, Mechanical, Corridors, Walls, Etc.) % of TOTAL 30% 24% -6.47%

ASSIGNABLE AREA TOTAL SF 45,330 33,254 (12,077)

(Total of assignable spaces listed below) % of TOTAL 70% 76% 6.47%

Assignable Spaces:

1 Classroom Area - Preschool AVG SIZE 1,250

# STU / RM 20

SF / STU 63

# RMS THUS 1TOTAL SF 1,250 0 (1,250)

2 Classroom Area - Kindergarten AVG SIZE 1,200 1,218

# STU / RM 20 1,213

SF / STU 60 1,215

# RMS THUS 4 3 (1)

TOTAL SF 4,800 3,646 (1,154)3,646

3 Classroom Area - Grades 1-6 AVG SIZE 950 759

including "extra" classrooms for enrollments inbetween # STU / RM 25 685

SF / STU 748

741

984

974

993

972

972

993

974

984

814

812

809

# RMS THUS 18 15 (3)

TOTAL SF 17,100 13,214 (3,886)

Kirkwood Elementary

1/8/2017

25

Page 28: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

ICCSD Kirkwood Kirkwood

EL 3A 3A

SPACE EVALUATION CRITERIA MODEL Compare

4 Special Needs AVG SIZE 500 820

Special Ed Support Staff # STU / RM 8 758

ESL SF / STU 67 393

Tutorial # RMS THUS 6 2 (4)

Gifted/Talented TOTAL SF 3,000 1,971 (1,029)

5 Art Room AVG SIZE 1,100 747

# STU / RM 25 170

SF / STU 44# RMS THUS 1 (1)

TOTAL SF 1,100 917 (183)]

6 Science Room AVG SIZE 1,100 0

# STU / RM 25

SF / STU 44# RMS THUS 1 1 0

TOTAL SF 1,100 0 (1,100)

7 Music AVG SIZE 1,550 224

Includes ensemble room, small practice # STU / RM 25 218

room and storage space. SF / STU 62# RMS THUS 1 1 0

TOTAL SF 1,550 442 (1,108)

8 Physical Education

Gymnasium (84' x 50' w/ BB floor 70' x 40') 4,200 3,440

Office(s) 150 124

Storage 550 243

Lockers/Showers/Toilets 0

# STU / RM 58

SF / STU 72TOTAL SF 4,900 3,807 (1,093)

9 Library / Media Center

Entrance-Circulation-Distribution 500

Seating 1,000 2,096

Office 150 88

Conference Room(s) 200

Audio-visual equipment storage 250

Materials storage and production 200

Computer Lab 500 301

Workroom 200 543

# STU / RM 50

SF / STU 60TOTAL SF 3,000 3,028 28

10 Administration & Support

Repcpt / Secretary / General Office 300 543

Principal's Office 175 156

Assistant Principals' Offices 175 166

Conference Room 300 169

Staff Toilet 60

Workroom 150 205

Scheduling 0

In-school Suspension 150

Storage 66

Internal Circulation 140 150TOTAL SF 1,450 1,455 5

Kirkwood Elementary

1/8/2017

26

Page 29: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

ICCSD Kirkwood Kirkwood

EL 3A 3A

SPACE EVALUATION CRITERIA MODEL Compare

11 Health Services TOTAL SF 600 44 (556)

12 Guidance and Counseling TOTAL SF 450 126 (324)

13 Student Support 143

Social Worker Speech Pathologist 115

Psychologist Therapist 203

Team Rooms 295

101

101

1 to 3 days per week 89

Shared rooms of 150 SF each 97TOTAL SF 300 1,144 844

14 Teachers' Prep + Lounge + Toilets TOTAL SF 600 0 (600)

15 Volunteer / Community Workroom TOTAL SF 150 0 (150)

16 Food Service

Receiving / Storage 100

Kitchen / Serving 380 299

Dishwashing 160

Office / Locker 60TOTAL SF 700 299 (401)

17 Lunch & Multi-purpose Room

Student Lunch Room 2,300 2,939

Storage 221

Teacher Dining Room 480

# STU / RM 192

SF / STU 12

# SETTINGS 3TOTAL SF 2,780 3,160 380

18 Custodial, Receiving & Storage TOTAL SF 500 0 (500)

19 Other Spaces (If Any):

2nd Gymnasium

Storqge 737

Custodian

Commons

Storage 308

TOTAL SF 0 1,044 1,044

NOTES:

#1 Toilets, elevators, stairs, mechanical/electrical space, and wall thickness are

included in Unassigned Area.

#2 The general class size is optimized at 25 students for space planning purpose.

Actual class size could vary from 20 to 25 or more.

#3 The areas shown as models for Iowa Community Schools Schools should be

considered as the ideal. Concern for available budget, practicality, and common

sense lead to acceptance of existing spaces smaller than ideal, but all new

construction should strive to be at template standards.

#4 The size shown includes related storage.

Kirkwood Elementary

1/8/2017

27

Page 30: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

Iowa City Community School DistrictElementary School Building Standards

Horn Elementary School

2014 Capacity 410 410

Proposed Capacity & Template Size 468 - 2B

2015-16 Enrollment

2016-17 Enrollment 483

Projected 2022 Enrollment 474

Deficiencies 1-PK, 1-K, Science, Band

LRFMP budget $1,241,725

Recommended Additional Funds

Proposed Additions/ Changes

LRFMP Schedule 2020-21

Recommended Schedule

ICCSD Horn Horn

EL 2B 3A

SPACE EVALUATION CRITERIA MODEL Compare

Student Population

STUDENT ENROLLMENT (Ideal, excluding Preschool) 468 483 16

Enrollment Range -10% 421 435

Enrollment Range +10% 514 531

Grades 1-6 350

Special Education / ELL 38 Kindergarten (All Day) 60

PRESCHOOL only (All day, every day) 20

Area in Square Feet:

TOTAL AREA TOTAL SF 55,044 50,179 (4,865)

SF / ENROLLMT 118 104

UNASSIGNABLE AREA TOTAL SF 16,513 14,214 (2,299)

(Toilets, Mechanical, Corridors, Walls, Etc.) % of TOTAL 30% 28% -1.67%

ASSIGNABLE AREA TOTAL SF 38,531 35,965 (2,566)

(Total of assignable spaces listed below) % of TOTAL 70% 72% 1.67%

Assignable Spaces:

1 Classroom Area - Preschool AVG SIZE 1,250

# STU / RM 20

SF / STU 63

# RMS THUS 1TOTAL SF 1,250 0 (1,250)

2 Classroom Area - Kindergarten AVG SIZE 1,200 933

# STU / RM 20 1,013

SF / STU 60 1,083

# RMS THUS 3 3 0

TOTAL SF 3,600 3,029 (571)

3 Classroom Area - Grades 1-6 AVG SIZE 950 815

including "extra" classrooms for enrollments inbetween # STU / RM 25 799

SF / STU 797

815

799

797

1,035

730

932

38 864

934

937

937

937

960

1,001

1,039

933

# RMS THUS 14 18 4

TOTAL SF 13,300 16,061 2,761

Horn Elementary

1/8/2017

28

Page 31: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

ICCSD Horn Horn

EL 2B 3A

SPACE EVALUATION CRITERIA MODEL Compare

4 Special Needs AVG SIZE 500 233

Special Ed Support Staff # STU / RM 8 389

ESL SF / STU 67 700.61

436

240.58

166.65

226.34

Tutorial # RMS THUS 5 (5)

Gifted/Talented TOTAL SF 2,500 2,393 (107)

5 Art Room AVG SIZE 1,100 1,259

# STU / RM 25

SF / STU 44# RMS THUS 1 (1)

TOTAL SF 1,100 1,259 159]

6 Science Room AVG SIZE 1,100 0

# STU / RM 25

SF / STU 44# RMS THUS 1 1 0

TOTAL SF 1,100 0 (1,100)

7 Music AVG SIZE 1,550 629

Includes ensemble room, small practice # STU / RM 25

room and storage space. SF / STU 62# RMS THUS 1 1 0

TOTAL SF 1,550 629 (921)

8 Physical Education

Gymnasium (84' x 50' w/ BB floor 70' x 40') 4,200 3,517

Office(s) 150 171

Storage 550 109

Lockers/Showers/Toilets 0 266

# STU / RM 58

SF / STU 72TOTAL SF 4,900 4,063 (837)

9 Library / Media Center

Entrance-Circulation-Distribution 500

Seating 1,000 2,605

Office 150 82

Conference Room(s) 200

Audio-visual equipment storage 250

Materials storage and production 200

Computer Lab 778

Workroom 200

# STU / RM 50

SF / STU 50TOTAL SF 2,500 3,465 965

10 Administration & Support

Repcpt / Secretary / General Office 300 252

Principal's Office 175 257

Assistant Principals' Offices 0 130

Conference Room 300

Staff Toilet 60 39

Workroom 150 228

Scheduling 0

In-school Suspension 150

Storage 250

Internal Circulation 140 150TOTAL SF 1,275 1,306 31

Horn Elementary

1/8/2017

29

Page 32: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

ICCSD Horn Horn

EL 2B 3A

SPACE EVALUATION CRITERIA MODEL Compare

11 Health Services TOTAL SF 600 182 (418)

12 Guidance and Counseling TOTAL SF 300 0 (300)

13 Student Support 88

Social Worker Speech Pathologist 138

Psychologist Therapist

Team Rooms

1 to 3 days per week

Shared rooms of 150 SF eachTOTAL SF 300 226 (74)

14 Teachers' Prep + Lounge + Toilets TOTAL SF 400 563 163

15 Volunteer / Community Workroom TOTAL SF 150 0 (150)

16 Food Service

Receiving / Storage 100

Kitchen / Serving 380 134

Dishwashing 160

Office / Locker 60TOTAL SF 700 134 (566)

17 Lunch & Multi-purpose Room

Student Lunch Room 2,026 2,335

Storage 184

Teacher Dining Room 480

# STU / RM 156

SF / STU 13

# SETTINGS 3TOTAL SF 2,506 2,519 13

18 Custodial, Receiving & Storage TOTAL SF 500 136 (364)

19 Other Spaces (If Any):

2nd Gymnasium

Storqge 143

Custodian

Commons

Storage

TOTAL SF 0 143 143

NOTES:

#1 Toilets, elevators, stairs, mechanical/electrical space, and wall thickness are

included in Unassigned Area.

#2 The general class size is optimized at 25 students for space planning purpose.

Actual class size could vary from 20 to 25 or more.

#3 The areas shown as models for Iowa Community Schools Schools should be

considered as the ideal. Concern for available budget, practicality, and common

sense lead to acceptance of existing spaces smaller than ideal, but all new

construction should strive to be at template standards.

#4 The size shown includes related storage.

Horn Elementary

1/8/2017

30

Page 33: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

Iowa City Community School DistrictElementary School Building Standards

Wood Elementary School

2014 Capacity 408

Proposed Capacity & Template Size 575 - 3A

2015-16 Enrollment

2016-17 Enrollment 425

Projected 2022 Enrollment 477 Science Rm Small PreK

Deficiencies Music Art Admin/Guidance Lacks 3- K size rooms

LRFMP budget $7,701,964

Recommended Additional Funds

Proposed Additions/ Changes

LRFMP Schedule 2021-22

Recommended Schedule

ICCSD Wood Wood

EL 3A 3A

SPACE EVALUATION CRITERIA MODEL Compare

Student Population

STUDENT ENROLLMENT (Ideal, excluding Preschool) 575 425 (150)

Enrollment Range -10% 518 383

Enrollment Range +10% 633 468

Grades 1-6 450

Special Education / ELL 45 Kindergarten (All Day) 80

PRESCHOOL only (All day, every day) 20

Area in Square Feet:

TOTAL AREA TOTAL SF 64,757 57,218 (7,539)

SF / ENROLLMT 113 135

UNASSIGNABLE AREA TOTAL SF 19,427 16,994 (2,433)

(Toilets, Mechanical, Corridors, Walls, Etc.) % of TOTAL 30% 30% -0.30%

ASSIGNABLE AREA TOTAL SF 45,330 40,224 (5,106)

(Total of assignable spaces listed below) % of TOTAL 70% 70% 0.30%

Assignable Spaces:

1 Classroom Area - Preschool AVG SIZE 1,250 948 (302)

# STU / RM 20 20 0

SF / STU 63 47 (15)

# RMS THUS 1 1 0TOTAL SF 1,250 948 (302)

2 Classroom Area - Kindergarten AVG SIZE 1,200 1,064 (136)

# STU / RM 20 20 0

SF / STU 60 53 (7)

# RMS THUS 4 1 (3)

TOTAL SF 4,800 1,138 (3,662)

3 Classroom Area - Grades 1-6 AVG SIZE 950 845

including "extra" classrooms for enrollments inbetween # STU / RM 25 845

SF / STU 845

845

845

886

764

900

763

766

817

805

748

740

758

761

759

763

759

770

755

733

# RMS THUS 18 22 4

TOTAL SF 17,100 17,471 371

Wood Elementary

1/8/2017

31

Page 34: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

ICCSD Wood Wood

EL 3A 3A

SPACE EVALUATION CRITERIA MODEL Compare

4 Special Needs AVG SIZE 500 761

Special Ed Support Staff # STU / RM 8 367

ESL SF / STU 67 372

159

129

270

Tutorial # RMS THUS 6 6 0

Gifted/Talented TOTAL SF 3,000 2,057 (943)

5 Art Room AVG SIZE 1,100 805

# STU / RM 25 25

SF / STU 44 32# RMS THUS 1 1 0

TOTAL SF 1,100 805 (295)]

6 Science Room AVG SIZE 1,100 0

# STU / RM 25

SF / STU 44# RMS THUS 1 0 (1)

TOTAL SF 1,100 0 (1,100)

7 Music AVG SIZE 1,550 761

Includes ensemble room, small practice # STU / RM 25 25

room and storage space. SF / STU 62 30# RMS THUS 1 1 0

TOTAL SF 1,550 817 (733)

8 Physical Education

Gymnasium (84' x 50' w/ BB floor 70' x 40') 4,200 6,685

Office(s) 150 126

Storage 550 848

Lockers/Showers/Toilets 0 51

# STU / RM 58

SF / STU 72TOTAL SF 4,900 7,711 2,811

9 Library / Media Center

Entrance-Circulation-Distribution 500

Seating 1,000 2,614

Office 150 191

Conference Room(s) 200

Audio-visual equipment storage 250 146

Materials storage and production 200

Computer Lab 500 664

Workroom 200

# STU / RM 50

SF / STU 60TOTAL SF 3,000 3,615 615

10 Administration & Support

Repcpt / Secretary / General Office 300 164

Principal's Office 175 276

Assistant Principals' Offices 175 147

Conference Room 300 226

Staff Toilet 60 0

Workroom 150 454

Scheduling 0

In-school Suspension 150

Storage

Internal Circulation 140 100TOTAL SF 1,450 1,367 (83)

Wood Elementary

1/8/2017

32

Page 35: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

ICCSD Wood Wood

EL 3A 3A

SPACE EVALUATION CRITERIA MODEL Compare

11 Health Services TOTAL SF 600 147 (453)

12 Guidance and Counseling TOTAL SF 450 0 (450)

13 Student Support 270

Social Worker Speech Pathologist 270

Psychologist Therapist 129

Team Rooms 124

1 to 3 days per week

Shared rooms of 150 SF eachTOTAL SF 300 523 223

14 Teachers' Prep + Lounge + Toilets TOTAL SF 600 174 (426)

15 Volunteer / Community Workroom TOTAL SF 150 146 (4)

16 Food Service

Receiving / Storage 100

Kitchen / Serving 380 563

Dishwashing 160

Office / Locker 60TOTAL SF 700 563 (137)

17 Lunch & Multi-purpose Room

Student Lunch Room 2,300 2,317

Storage 309

Teacher Dining Room 480

# STU / RM 192

SF / STU 12

# SETTINGS 3TOTAL SF 2,780 2,626 (154)

18 Custodial, Receiving & Storage TOTAL SF 500 117 (383)

19 Other Spaces (If Any):

Exterior Storqge 112

TOTAL SF 0 112 112

NOTES:

#1 Toilets, elevators, stairs, mechanical/electrical space, and wall thickness are

included in Unassigned Area.

#2 The general class size is optimized at 25 students for space planning purpose.

Actual class size could vary from 20 to 25 or more.

#3 The areas shown as models for Iowa Community Schools Schools should be

considered as the ideal. Concern for available budget, practicality, and common

sense lead to acceptance of existing spaces smaller than ideal, but all new

construction should strive to be at template standards.

#4 The size shown includes related storage.

Wood Elementary

1/8/2017

33

Page 36: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

Iowa City Community School DistrictElementary School Building Standards

Lemme Elementary School

2014 Capacity 351 401

Proposed Capacity & Template Size 420 - 2E

2015-16 Enrollment

2016-17 Enrollment 377

Projected 2022 Enrollment 318

Deficiencies 1PK, 2K, Science, Art, Music, Gym

LRFMP budget $8,328,019

Recommended Additional Funds

Proposed Additions/ Changes

LRFMP Schedule 2022-23

Recommended Schedule

ICCSD Lemme Lemme

EL 2E 2E

SPACE EVALUATION CRITERIA MODEL Compare

Student Population

STUDENT ENROLLMENT (Ideal, excluding Preschool) 420 377 (43)

Enrollment Range -10% 378

Enrollment Range +10% 462

Grades 1-6 350

Special Education / ELL Included above

Kindergarten (All Day) 70

PRESCHOOL only (All day, every day) 20

Area in Square Feet:

TOTAL AREA TOTAL SF 55,950 36,878 (19,072)

SF / ENROLLMT 133 105

UNASSIGNABLE AREA TOTAL SF 16,785 3,608 (13,177)

(Toilets, Mechanical, Corridors, Walls, Etc.) % of TOTAL 30% 10% -20.22%

ASSIGNABLE AREA TOTAL SF 39,165 33,270 (5,895)

(Total of assignable spaces listed below) % of TOTAL 70% 90% 20.22%

Assignable Spaces:

1 Classroom Area - Preschool AVG SIZE 1,250

# STU / RM 20

SF / STU 63# RMS THUS 1 0 (1)TOTAL SF 1,250 0 (1,250)

2 Classroom Area - Kindergarten AVG SIZE 1,200 1,341

# STU / RM 18 1,336

SF / STU 69 998

# RMS THUS 4 3 (1)

TOTAL SF 4,800 3,675 (1,125)

3 Classroom Area - Grades 1-6 AVG SIZE 950 1,000

including "extra" classrooms for enrollments inbetween # STU / RM 25 1,003

SF / STU 1,003

1,004

1,002

996

1,004

1,002

1,001

"perfect" section sizes 38 1,004

997

1,003

1,003

996

# RMS THUS 14 14 0

TOTAL SF 13,300 14,018 718

Lemme Elementary

1/8/2017

34

Page 37: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

ICCSD Lemme Lemme

EL 2E 2E

SPACE EVALUATION CRITERIA MODEL Compare

4 Special Needs AVG SIZE 500 154

Special Ed Support Staff # STU / RM 10 189

ESL SF / STU 50 94

99

99

137

210

Tutorial # RMS THUS 4 7 3

Gifted/Talented TOTAL SF 2,000 989 (1,011)

5 Art Room AVG SIZE 1,100 823

# STU / RM 25 140

SF / STU 44# RMS THUS 1 1 0

TOTAL SF 1,100 963 (137)]

6 Science Room AVG SIZE 1,100 0

# STU / RM 25

SF / STU 44# RMS THUS 1 0 (1)

TOTAL SF 1,100 0 (1,100)

7 Music AVG SIZE 1,550 838

Includes ensemble room, small practice # STU / RM 25 143

room and storage space. SF / STU 62# RMS THUS 1 1 0

TOTAL SF 1,550 981 (569)

8 Physical Education

Gymnasium (84' x 50' w/ BB floor 70' x 40') 4,200

Office(s) 150

Storage 550 338

Lockers/Showers/Toilets 0 95

# STU / RM 58

SF / STU 72TOTAL SF 4,900 433 (4,467)

9 Library / Media Center

Entrance-Circulation-Distribution 500

Seating 1,000 2,751

Office 150 333

Conference Room(s) 200

Audio-visual equipment storage 250 117

Materials storage and production 200

Computer Lab 447

Workroom 200

# STU / RM 50

SF / STU 50TOTAL SF 2,500 3,648 1,148

10 Administration & Support

Repcpt / Secretary / General Office 300 287

Principal's Office 175 141

Assistant Principals' Offices 0

Conference Room 300 165

Staff Toilet 60 121

Workroom 150 432

Scheduling 0

In-school Suspension 150

Storage

Internal Circulation 140 100TOTAL SF 1,275 1,246 (29)

Lemme Elementary

1/8/2017

35

Page 38: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

ICCSD Lemme Lemme

EL 2E 2E

SPACE EVALUATION CRITERIA MODEL Compare

11 Health Services TOTAL SF 600 144 (456)

12 Guidance and Counseling TOTAL SF 300 202 (98)

13 Student Support

Social Worker Speech Pathologist

Psychologist Therapist

Team Rooms 1,346

1,346

1,346

1 to 3 days per week

Shared rooms of 150 SF eachTOTAL SF 300 4,038 3,738

14 Teachers' Prep + Lounge + Toilets TOTAL SF 400 (400)

15 Volunteer / Community Workroom TOTAL SF 150 146 (4)

16 Food Service

Receiving / Storage 100

Kitchen / Serving 380 165

Dishwashing 160

Office / Locker 60 97TOTAL SF 700 262 (438)

17 Lunch & Multi-purpose Room

Student Lunch Room 1,960 2,412

Storage

Teacher Dining Room 480

# STU / RM 140

SF / STU 14

# SETTINGS 3TOTAL SF 2,440 2,412 (28)

18 Custodial, Receiving & Storage TOTAL SF 500 113 (387)

19 Other Spaces (If Any):

Exterior Storqge 48

TOTAL SF 0 48 48

NOTES:

#1 Toilets, elevators, stairs, mechanical/electrical space, and wall thickness are

included in Unassigned Area.

#2 The general class size is optimized at 25 students for space planning purpose.

Actual class size could vary from 20 to 25 or more.

#3 The areas shown as models for Iowa Community Schools Schools should be

considered as the ideal. Concern for available budget, practicality, and common

sense lead to acceptance of existing spaces smaller than ideal, but all new

construction should strive to be at template standards.

#4 The size shown includes related storage.

Lemme Elementary

1/8/2017

36

Page 39: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

Iowa City Community School DistrictElementary School Building Standards

Borlaug Elementary School

2014 Capacity 451

Proposed Capacity & Template Size 575 - 3A

2015-16 Enrollment

2016-17 Enrollment 440

Projected 2022 Enrollment 339

Deficiencies Science Special Needs Art Music

LRFMP budget $1,691,947

Recommended Additional Funds -$321,000

Proposed Additions/ Changes Science & Art Room Addition

LRFMP Schedule 2022-23

Recommended Schedule 2022-23

ICCSD Borlaug Borlaug

EL 3A 3A

SPACE EVALUATION CRITERIA MODEL Compare

Student Population

STUDENT ENROLLMENT (Ideal, excluding Preschool) 575 440 (135)

Enrollment Range -10% 518 396

Enrollment Range +10% 633 484

Grades 1-6 450

Special Education / ELL 45 Kindergarten (All Day) 80

PRESCHOOL only (All day, every day) 20

Area in Square Feet:

TOTAL AREA TOTAL SF 64,757 68,206 3,449

SF / ENROLLMT 113 155

UNASSIGNABLE AREA TOTAL SF 19,427 23,967 4,539

(Toilets, Mechanical, Corridors, Walls, Etc.) % of TOTAL 30% 35% 5.14%

ASSIGNABLE AREA TOTAL SF 45,330 44,239 (1,091)

(Total of assignable spaces listed below) % of TOTAL 70% 65% -5.14%

Assignable Spaces:

1 Classroom Area - Preschool AVG SIZE 1,250 1,006

# STU / RM 20 1,074

SF / STU 63 140

# RMS THUS 1 2 1TOTAL SF 1,250 2,220 970

2 Classroom Area - Kindergarten AVG SIZE 1,200 1,076

# STU / RM 20 1,082

SF / STU 60 1,057

997

# RMS THUS 4 4 0

TOTAL SF 4,800 4,211 (589)

3 Classroom Area - Grades 1-6 AVG SIZE 950 833

including "extra" classrooms for enrollments inbetween # STU / RM 25 833

SF / STU 833

833

832

832

832

833

833

833

832

832

832

833

833

833

832

832

832

# RMS THUS 18 19 1

TOTAL SF 17,100 15,817 (1,283)

Borlaug Elementary

1/8/2017

37

Page 40: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

ICCSD Borlaug Borlaug

EL 3A 3A

SPACE EVALUATION CRITERIA MODEL Compare

4 Special Needs AVG SIZE 500 435

Special Ed Support Staff # STU / RM 8 435

ESL SF / STU 67

Tutorial # RMS THUS 6 2 (4)

Gifted/Talented TOTAL SF 3,000 872 (2,129)

5 Art Room AVG SIZE 1,100 811

# STU / RM 25 141

SF / STU 44# RMS THUS 1 (1)

TOTAL SF 1,100 952 (148)]

6 Science Room AVG SIZE 1,100 0

# STU / RM 25

SF / STU 44# RMS THUS 1 1 0

TOTAL SF 1,100 0 (1,100)

7 Music AVG SIZE 1,550 762

Includes ensemble room, small practice # STU / RM 25 207

room and storage space. SF / STU 62 141# RMS THUS 1 1 0

TOTAL SF 1,550 1,111 (439)

8 Physical Education

Gymnasium (84' x 50' w/ BB floor 70' x 40') 4,200 7,753

Office(s) 150 95

Storage 550 205

Lockers/Showers/Toilets 0 100

# STU / RM 58 205

SF / STU 72TOTAL SF 4,900 8,358 3,458

9 Library / Media Center

Entrance-Circulation-Distribution 500

Seating 1,000 2,247

Office 150 103

Conference Room(s) 200

Audio-visual equipment storage 250

Materials storage and production 200 103

Computer Lab 500 715

Workroom 200

# STU / RM 50

SF / STU 60TOTAL SF 3,000 3,167 167

10 Administration & Support

Repcpt / Secretary / General Office 300 274

Principal's Office 175 192

Assistant Principals' Offices 175 81

Conference Room 300 188

Staff Toilet 60 100

Workroom 150 583

Scheduling 0

In-school Suspension 150

Storage

Internal Circulation 140 150TOTAL SF 1,450 1,568 118

Borlaug Elementary

1/8/2017

38

Page 41: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

ICCSD Borlaug Borlaug

EL 3A 3A

SPACE EVALUATION CRITERIA MODEL Compare

11 Health Services TOTAL SF 600 288 (312)

12 Guidance and Counseling TOTAL SF 450 122 (328)

13 Student Support 169

Social Worker Speech Pathologist 166

Psychologist Therapist 169

Team Rooms 169

166

166

169

169

175

134

1 to 3 days per week

Shared rooms of 150 SF eachTOTAL SF 300 1,652 1,352

14 Teachers' Prep + Lounge + Toilets TOTAL SF 600 767 167

15 Volunteer / Community Workroom TOTAL SF 150 0 (150)

16 Food Service

Receiving / Storage 100

Kitchen / Serving 380 609

Dishwashing 160

Office / Locker 60TOTAL SF 700 609 (91)

17 Lunch & Multi-purpose Room

Student Lunch Room 2,300 1,896

Storage 200

Teacher Dining Room 480

# STU / RM 192

SF / STU 12

# SETTINGS 3TOTAL SF 2,780 2,096 (684)

18 Custodial, Receiving & Storage TOTAL SF 500 431 (69)

19 Other Spaces (If Any):

Commons 634

Commons 634

Commons 634

Custodian

BASP 100

TOTAL SF 0 2,002 2,002

NOTES:

#1 Toilets, elevators, stairs, mechanical/electrical space, and wall thickness are

included in Unassigned Area.

#2 The general class size is optimized at 25 students for space planning purpose.

Actual class size could vary from 20 to 25 or more.

#3 The areas shown as models for Iowa Community Schools Schools should be

considered as the ideal. Concern for available budget, practicality, and common

sense lead to acceptance of existing spaces smaller than ideal, but all new

construction should strive to be at template standards.

#4 The size shown includes related storage.

Borlaug Elementary

1/8/2017

39

Page 42: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

2014 Capacity 724 824

Proposed Capacity & Template Size 850

2015-16 Enrollment

2016-17 Enrollment 823

Projected 2022 Enrollment 694

Deficiencies Art, Teacher Workroom, Admin, Kitchen, Cafeteria

LRFMP budget $14,270,434

Recommended Additional Funds

Proposed Additions/ Changes

LRFMP Schedule 2018-19

Recommended Schedule

Junior High SEJH SEJH

850 850

SPACE EVALUATION CRITERIA MODEL Compare

Student and Teacher Population

STUDENT ENROLLMENT 850 823 (27)

Enrollment Range - 10% 765

Enrollment Range + 10% 935

Area in Square Feet:

TOTAL AREA TOTAL SF 129,207 134,601 5,394

SF / ENROLLMT 152.0 163.5 12

UNASSIGNABLE AREA TOTAL SF 38,762 45,974 7,212

(Toilets, Mechanical, Corridors, Walls, Etc.) % of TOTAL 30% 34% 4.16%

ASSIGNABLE AREA TOTAL SF 90,445 88,627 (1,818.48)

(Total of assignable spaces listed below) % of TOTAL 70% 66% -4.16%

Assignable Spaces:

1 Classrooms AVG SIZE "A" 850 645 Language Arts, Drama, Mathematics, Reading/ # RMS THUS 8 628

Writing, Social Studies, Foreign Language (all AVG SIZE "B" 800 628 are including storage) # RMS THUS 6 624

AVG SIZE "C" 750 665# RMS THUS 5 654

654648631648662618648668667668667645

TOTAL SF 15,350 11,668 (3,682)

TOTAL # RMS 19 12 (7)

2 Science Labs AVG SIZE 1,200 1,014+ STORAGE @ 300 1,025

1,1501,0131,014

238270216337

# RMS THUS 6

TOTAL SF 9,000 5,940 (3,060)

TOTAL # RMS 6 9 3

3 Special Needs / Resource Rooms AVG SIZE "A" 400 867 ESL SWS # RMS THUS 4 865

806864912477649629438332455276687

Spec Ed Support Staff AVG SIZE "B" 350 697# RMS THUS 4

AVG SIZE "C" 250# RMS THUS 2

TOTAL SF 3,500 8,954 5,454

TOTAL # RMS 10 5 (5)

Iowa City Community School District

South East Junior High Template Comparison

South East Junior High

1/10/2017

40

Page 43: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

Junior High SEJH SEJH

850 850

SPACE EVALUATION CRITERIA MODEL Compare

4 Art Art Room 1,200 1,017 Teacher office 150 140 Storage 500

Kiln Room 150 48

TOTAL SF 2,000 1,205 (795)

5 Music Instrumental 1,500 1,481

Vocal 1,200 1,593

Music Tech / Classroom 862

Practice Rooms Instruments 400 276

Practice Rooms Vocal 370

Office / Library 200 396 Storage 600 608

TOTAL SF 3,900 5,586 1,686

6 Physical Education Gymnasium w/ seating for 400 8,000 9,199 Auxillary Gymnasium 6,000 5,152 Office(s) 240 801 Storage 1,250 594 Storage 204 Storage 263 Lockers/Showers/Toilets 3,600 3,741

TOTAL SF 19,090 19,954 864

7 Multipurpose / Wrestling Room 2,400 2,537

Physical Educ. & Misc. TOTAL SF 2,400 2,537 137

8 Library / Media Center

Entrance / Circulation 200 4,359

Seating / Reading 2,750 1,236

Stack Area 300 127

Office 120 330

Classroom 900 416

Audio-visual equipment storage 400 129

Workroom 400

TOTAL SF 5,070 6,597 1,527

9 Computer / Resource Labs AVG SIZE 1,200 416 (proximity to Media Center) + STORAGE @ incl

# RMS THUS 1

TOTAL SF 1,200 416 (784)

10 Business Education AVG SIZE 1200 994+ STORAGE @ incl # RMS THUS 1

TOTAL SF 1,200 994 (206)

11 Health / AVG SIZE 2,000 2,291Family and Consumer Science + STORAGE @ 200 including Food Prep Lab & Textiles & # RMS THUS 1

Clothing Lab TOTAL SF 2,200 2,291 91

12 Industrial/Technology Education AVG SIZE 2,400 1,700

Wood Shop 1,069

Shop Tool Storage 657 Wood ShopStorage + STORAGE @ 600 326

# RMS THUS 1

TOTAL SF 3,000 3,752 752

South East Junior High

1/10/2017

41

Page 44: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

Junior High SEJH SEJH

850 850

SPACE EVALUATION CRITERIA MODEL Compare

13 Administration

Reception 200 573

Secretary 100

General Office 300

Communications Center 50

Storage 150

F.P. Storage 80 72

Principal's Office 175 182

Assistant Principal's Office (2 @ 175) 350 123

Conference Room 250

Staff Toilet 120

Workroom 150 317

In-school suspension 450

Internal Circulation 270 100

TOTAL SF 2,645 1,267 (1,378)

14 Health Services

Waiting 140 143

Storage 100

Recovery 200

Office/Exam 120 133

Toilets 120 33

TOTAL SF 680 309 (371)

15 Guidance and Counseling

Offices (3 @ 120) 360 533

Reception / Secretary 140 137

Conference / Testing 180 144

Record Storage 80 141

Supply Storage 40 26

TOTAL SF 800 981 181

16 Teachers' Area # TEACHERS 29

Workstations @80 each (GENERAL) 2,320

Prep/Work (2 @ 250) 500 548

Lounge 400 321

Toilets 240 120

TOTAL SF 3,460 989 (2,471)

17 Food Service

Receiving 100 200

Storage 800 240

Kitchen / Prep 1,500 442

Serving 500 537

Dishwashing 240 214

Office 120 60

Locker 240 0

TOTAL SF 3,500 1,693 (1,807)

18 Lunch & Multi-purpose Room # SETTINGS

Student Dining 3,400 4,558

Teacher Dining 350

Lunchroom Storage 161

# STU / RM 283

SF / STU 12

# SETTINGS 3

TOTAL SF 3,750 4,719 969

19 Auditorium # SEATS 450SF / SEAT 16.0

Stage (cafeteriia at SEJH) 1,113 Storage

including 1800 SF stage + 400 SF storage TOTAL SF 7,200 1,113 (6,087)

20 Custodial, Receiving, & Storage TOTAL SF 500 701 201

21 Other Spaces (If any):

Exterior Storage 560

Interior General Storage 5,376

Juvenile Court 319

Community Health Clinic 706

TOTAL SF 0 6,961 6,961

FOOTNOTES:

(1) Toilets, elevators, stairs, mechanical/electrical space, and wall thickness are included in Unassigned Area.

(2) The square foot area shown as a model for Iowa City Schools should be considered as the idealized median of a range of size

which could be 5% smaller or larger. In other words, a standard 1,000 SF classroom should be considered to allow a reasonable

range of size from 950 SF to 1,050 SF. The size shown includes related storage.South East Junior High

1/10/2017

42

Page 45: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

2014 Capacity 505 705

Proposed Capacity & Template Size

2015-16 Enrollment

2016-17 Enrollment 551

Projected 2022 Enrollment 630

Deficiencies classrooms, practice gym, workroom, Kitchen, cafeteria

LRFMP budget $13,203,649

Recommended Additional Funds

Proposed Additions/ Changes

LRFMP Schedule 2020-2021

Recommended Schedule

Junior High NCJH

800

SPACE EVALUATION CRITERIA MODEL

Student and Teacher Population

STUDENT ENROLLMENT 800 551 (249.00)

Enrollment Range - 10% 720

Enrollment Range + 10% 880

Area in Square Feet:

TOTAL AREA TOTAL SF 124,107 82,735 (41,372)

SF / ENROLLMT 155.1 150.2 (4.98)

UNASSIGNABLE AREA TOTAL SF 37,232 24,609 (12,623)

(Toilets, Mechanical, Corridors, Walls, Etc.) % of TOTAL 30% 30% -0.26%

ASSIGNABLE AREA TOTAL SF 86,875 58,126 (28,749.00)

(Total of assignable spaces listed below) % of TOTAL 70% 70% 0.26%

Assignable Spaces:

1 Classrooms AVG SIZE "A" 850 786 Language Arts, Drama, Mathematics, Reading/ # RMS THUS 7 790

Writing, Social Studies, Foreign Language (all AVG SIZE "B" 800 792 are including storage) # RMS THUS 5 790

AVG SIZE "C" 750 786# RMS THUS 4 790

787897

1,0221,1111,172

898

TOTAL SF 12,950 10,621 (2,329)

TOTAL # RMS 16 12 (4)

2 Science Labs AVG SIZE 1,200 1,197+ STORAGE @ 300 1,173

1,076

415

# RMS THUS 6

TOTAL SF 9,000 3,861 (5,139)

TOTAL # RMS 6 3 (3)

3 Special Needs / Resource Rooms AVG SIZE "A" 400 786 ESL SWS # RMS THUS 4 589

628169510

Junior High Building Standards

Iowa City Community School District

North Central junior High & 800 Template

North Central Junior High

1/10/2017

43

Page 46: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

Spec Ed Support Staff AVG SIZE "B" 350# RMS THUS 4

AVG SIZE "C" 250# RMS THUS 1

TOTAL SF 3,250 2,682 (568)

TOTAL # RMS 9 5 (4)

4 Art Art Room 1,200 1,392 Teacher office 150 Storage 500

Kiln Room 150 38

TOTAL SF 2,000 1,430 (570)

5 Music Instrumental 1,500 2,332

Vocal 1,200 1,390

Music Tech / Classroom 892

Practice Rooms Instruments 400 338

Practice Rooms Vocal

Office / Library 200 129 Storage 600 255

TOTAL SF 3,900 5,336 1,436

6 Physical Education Gymnasium w/ seating for 400 8,000 9,290 Auxillary Gymnasium 6,000 Office(s) 240 264 Storage 1,250 177 Storage Storage Lockers/Showers/Toilets 3,600 2,185

TOTAL SF 19,090 11,916 (7,174)

7 Multipurpose / Wrestling Room 2,400 2,137

Physical Educ. & Misc. TOTAL SF 2,400 2,137 (263)

8 Library / Media Center

Entrance / Circulation 200 4,080

Seating / Reading 2,750

Stack Area 300 123

Office 120 156

Classroom 900

Audio-visual equipment storage 400 174

Workroom 400 529

TOTAL SF 5,070 5,062 (8)

9 Computer / Resource Labs AVG SIZE 1,200 796 (proximity to Media Center) + STORAGE @ incl

# RMS THUS 1

TOTAL SF 1,200 796 (404)

10 Business Education AVG SIZE 1200 1197+ STORAGE @ incl # RMS THUS 1

TOTAL SF 1,200 1,197 (3)

11 Health / AVG SIZE 2,000 1,650Family and Consumer Science + STORAGE @ 200 including Food Prep Lab & Textiles & # RMS THUS 1

Clothing Lab TOTAL SF 2,200 1,650 (550)

12 Industrial/Technology Education AVG SIZE 2,400 1,287

Wood Shop 1,035

Shop Tool Storage 384 Wood ShopStorage + STORAGE @ 600 392

# RMS THUS 1

TOTAL SF 3,000 3,098 98

13 Administration

Reception 200 541

Secretary 100

General Office 300

Communications Center 50

Storage 150

F.P. Storage 80

Principal's Office 175 339North Central Junior High

1/10/2017

44

Page 47: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

Assistant Principal's Office (2 @ 175) 350 180

Conference Room 250 323

Staff Toilet 120 42

Workroom 150 207

In-school suspension 450 100

Internal Circulation 270 200

TOTAL SF 2,645 1,932 (713)

14 Health Services

Waiting 140 326

Storage 100

Recovery 200

Office/Exam 120

Toilets 120 42

TOTAL SF 680 368 (312)

15 Guidance and Counseling

Offices (3 @ 120) 360 283

Reception / Secretary 140 139

Conference / Testing 180 146

Record Storage 80

Supply Storage 40

TOTAL SF 800 568 (232)

16 Teachers' Area # TEACHERS 25

Workstations @80 each (GENERAL) 2,000

Prep/Work (2 @ 250) 500

Lounge 400 395

Toilets 240 168

TOTAL SF 3,140 563 (2,577)

17 Food Service

Receiving 100

Storage 800 45

Kitchen / Prep 1,500 876

Serving 500 143

Dishwashing 240

Office 120

Locker 240

TOTAL SF 3,500 1,064 (2,436)

18 Lunch & Multi-purpose Room # SETTINGS

Student Dining 3,200 3,504

Teacher Dining 350

Lunchroom Storage

# STU / RM 267

SF / STU 12

# SETTINGS 3

TOTAL SF 3,550 3,504 (46)

19 Auditorium # SEATS 425SF / SEAT 16.0 0

Stage (cafeteriia at SEJH) Storage

including 1800 SF stage + 400 SF storage TOTAL SF 6,800 0 (6,800)

20 Custodial, Receiving, & Storage TOTAL SF 500 293 (207)

21 Other Spaces (If any):

Exterior Storage 48

Interior General Storage

Juvenile Court

Community Health Clinic

TOTAL SF 0 48 48

FOOTNOTES:

(1) Toilets, elevators, stairs, mechanical/electrical space, and wall thickness are included in Unassigned Area.

(2) The square foot area shown as a model for Iowa City Schools should be considered as the idealized median of a range of size

which could be 5% smaller or larger. In other words, a standard 1,000 SF classroom should be considered to allow a reasonable

range of size from 950 SF to 1,050 SF. The size shown includes related storage.

North Central Junior High

1/10/2017

45

Page 48: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

2014 Capacity 806 836

Proposed Capacity & Template Size 850

2015-16 Enrollment

2016-17 Enrollment 652

Projected 2022 Enrollment 780

Deficiencies Admin, health, art, classrooms

LRFMP budget $15,715,683

Recommended Additional Funds

Proposed Additions/ Changes

LRFMP Schedule 2020-21

Recommended Schedule

Junior High NWJH

850

SPACE EVALUATION CRITERIA MODEL

Student and Teacher Population

STUDENT ENROLLMENT 850 652 (198)

Enrollment Range - 10% 765

Enrollment Range + 10% 935

STAFF POPULATION Total 70.0

Principals & Vice Principals 3.0

Teachers (average #) 55.0

Associates 9.0

Nurse 1.0

Office Staff 2.0

Area in Square Feet:

TOTAL AREA TOTAL SF 129,207 127,547 (1,660)

SF / ENROLLMT 152.0 195.6 43.62

UNASSIGNABLE AREA TOTAL SF 38,762 39,520 758

(Toilets, Mechanical, Corridors, Walls, Etc.) % of TOTAL 30% 31% 0.98%

ASSIGNABLE AREA TOTAL SF 90,445 88,027 (2,418)

(Total of assignable spaces listed below) % of TOTAL 70% 69% -0.98%

Assignable Spaces:

1 Classrooms AVG SIZE "A" 850 851 Language Arts, Drama, Mathematics, Reading/ # RMS THUS 8 836

Writing, Social Studies, Foreign Language (all AVG SIZE "B" 800 916 are including storage) # RMS THUS 6 949

AVG SIZE "C" 750 951# RMS THUS 5 970

980950949916836836709709832

TOTAL SF 15,350 13,190 (2,160)

TOTAL # RMS 19 15 (4)

2 Science Labs AVG SIZE 1,200 1,057+ STORAGE @ 300 1,077

1,0751,0771,088

811

# RMS THUS 6

TOTAL SF 9,000 6,185 (2,815)

TOTAL # RMS 6 5 (1)

Junior High Building Standards

Iowa City Community School District

Northwest junior High & 850 Template

Northwest Junior High

1/10/2017

46

Page 49: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

3 Special Needs / Resource Rooms AVG SIZE "A" 400 922 ESL SWS # RMS THUS 4 894

708708746561553731708832364487242

Spec Ed Support Staff AVG SIZE "B" 350 279# RMS THUS 4 215

AVG SIZE "C" 250 184# RMS THUS 2

TOTAL SF 3,500 9,134 5,634

TOTAL # RMS 10 16 6

4 Art Art Room 1,200 1,246 Teacher office 150 Storage 500

Kiln Room 150 107

TOTAL SF 2,000 1,353 (647)

5 Music Instrumental 1,500 1,498

Vocal 1,200 1,046

Music Tech / Classroom 1,121

Practice Rooms Instruments 400 216

Practice Rooms Vocal 149

Office / Library 200 109 Storage 600 539

TOTAL SF 3,900 4,678 778

6 Physical Education Gymnasium w/ seating for 400 8,000 6,748 Auxillary Gymnasium 6,000 6,144 Office(s) 240 506 Storage 1,250 894 Storage 577 Storage 1,002 Lockers/Showers/Toilets 3,600 3,626

TOTAL SF 19,090 19,497 407

7 Multipurpose / Wrestling Room 2,400 1,399

Physical Educ. & Misc. TOTAL SF 2,400 1,399 (1,001)

8 Library / Media Center

Entrance / Circulation 200 5,299

Seating / Reading 2,750

Stack Area 300 450

Office 120 217

Classroom 900 702

Audio-visual equipment storage 400 349

Workroom 400 331

TOTAL SF 5,070 7,348 2,278

9 Computer / Resource Labs AVG SIZE 1,200 708 (proximity to Media Center) + STORAGE @ incl

# RMS THUS 1

TOTAL SF 1,200 708 (492)

10 Business Education AVG SIZE 1200 918+ STORAGE @ incl # RMS THUS 1

TOTAL SF 1,200 918 (282)

11 Health / AVG SIZE 2,000 1,873Family and Consumer Science + STORAGE @ 200 353 including Food Prep Lab & Textiles & # RMS THUS 1

Clothing Lab TOTAL SF 2,200 2,226 26

12 Industrial/Technology Education AVG SIZE 2,400 978

Wood Shop 1,466

Shop Tool Storage 1,303 Wood ShopStorage + STORAGE @ 600 461

# RMS THUS 1

TOTAL SF 3,000 4,208 1,208

Northwest Junior High

1/10/2017

47

Page 50: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

13 Administration

Reception 200 414

Secretary 100 228

General Office 300

Communications Center 50

Storage 150

F.P. Storage 80 61

Principal's Office 175 105

Assistant Principal's Office (2 @ 175) 350 115

Conference Room 250 231

Staff Toilet 120

Workroom 150 354

In-school suspension 450

Internal Circulation 270 100

TOTAL SF 2,645 1,608 (1,037)

14 Health Services

Waiting 140 129

Storage 100 51

Recovery 200

Office/Exam 120 133

Toilets 120 88

TOTAL SF 680 401 (279)

15 Guidance and Counseling

Offices (3 @ 120) 360 209

Reception / Secretary 140 71

Conference / Testing 180 115

Record Storage 80 99

Supply Storage 40

TOTAL SF 800 494 (306)

16 Teachers' Area # TEACHERS 29

Workstations @80 each (GENERAL) 2,320 272

Prep/Work (2 @ 250) 500

Lounge 400

Toilets 240

TOTAL SF 3,460 272 (3,188)

17 Food Service

Receiving 100

Storage 800

Kitchen / Prep 1,500 2,756

Serving 500 2,264

Dishwashing 240 273

Office 120 64

Locker 240 124

TOTAL SF 3,500 5,481 1,981

18 Lunch & Multi-purpose Room # SETTINGS

Student Dining 3,400 3,479

Teacher Dining 350 1,127

Lunchroom Storage

# STU / RM 283

SF / STU 12

# SETTINGS 3

TOTAL SF 3,750 4,606 856

19 Auditorium # SEATS 450SF / SEAT 16.0 2507

Stage (cafeteriia at SEJH) 293 Storage 221

including 1800 SF stage + 400 SF storage TOTAL SF 7,200 3021 (4,179)

20 Custodial, Receiving, & Storage TOTAL SF 500 1,095 595

21 Other Spaces (If any):

Exterior Storage

Interior General Storage

Juvenile Court

Community Health Clinic 205

TOTAL SF 0 205 205

FOOTNOTES:

(1) Toilets, elevators, stairs, mechanical/electrical space, and wall thickness are included in Unassigned Area.

(2) The square foot area shown as a model for Iowa City Schools should be considered as the idealized median of a range of size

which could be 5% smaller or larger. In other words, a standard 1,000 SF classroom should be considered to allow a reasonable

range of size from 950 SF to 1,050 SF. The size shown includes related storage.

Northwest Junior High

1/10/2017

48

Page 51: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

Iowa City Community School DistrictElementary School Building Standards

Alexander Elementary School

2014 Capacity 500

Proposed Capacity & Template Size 575 - 3A

2015-16 Enrollment

2016-17 Enrollment 410

Projected 2022 Enrollment 485

Deficiencies Science Room Special Needs

LRFMP budget Completed

Recommended Additional Funds 1,494,000

Proposed Additions/ Changes 4 Classroom Addition

LRFMP Schedule Completed

Recommended Schedule 2022-23

ICCSD Alexander Alexander

EL 3A 3A

SPACE EVALUATION CRITERIA MODEL Compare

Student Population

STUDENT ENROLLMENT (Ideal, excluding Preschool) 575 410 (165)

Enrollment Range -10% 518 369

Enrollment Range +10% 633 451

Grades 1-6 450

Special Education / ELL 45 Kindergarten (All Day) 80

PRESCHOOL only (All day, every day) 20

Area in Square Feet:

TOTAL AREA TOTAL SF 64,757 65,759 1,002

SF / ENROLLMT 113 160

UNASSIGNABLE AREA TOTAL SF 19,427 20,942 1,515

(Toilets, Mechanical, Corridors, Walls, Etc.) % of TOTAL 30% 32% 1.85%

ASSIGNABLE AREA TOTAL SF 45,330 44,817 (513)

(Total of assignable spaces listed below) % of TOTAL 70% 68% -1.85%

Assignable Spaces:

1 Classroom Area - Preschool AVG SIZE 1,250 1,120

# STU / RM 20

SF / STU 63

# RMS THUS 1 1 0TOTAL SF 1,250 1,120 (130)

2 Classroom Area - Kindergarten AVG SIZE 1,200 1,050

# STU / RM 20 1,049

SF / STU 60 1,049

1,049

# RMS THUS 4 4 0

TOTAL SF 4,800 4,196 (604)

3 Classroom Area - Grades 1-6 AVG SIZE 950 830

including "extra" classrooms for enrollments inbetween # STU / RM 25 845

SF / STU 845

845

845

845

845

845

845

845

845

845

845

845

845

845

845

830

# RMS THUS 18 18 0

TOTAL SF 17,100 15,184 (1,916)

Alexander Elementary

1/8/2017

49

Page 52: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

ICCSD Alexander Alexander

EL 3A 3A

SPACE EVALUATION CRITERIA MODEL Compare

4 Special Needs AVG SIZE 500 845

Special Ed Support Staff # STU / RM 8 797

ESL SF / STU 67 845

845

Tutorial # RMS THUS 6 4 (2)

Gifted/Talented TOTAL SF 3,000 3,337 337

5 Art Room AVG SIZE 1,100 787

# STU / RM 25 142

SF / STU 44# RMS THUS 1 1 0

TOTAL SF 1,100 930 (170)]

6 Science Room AVG SIZE 1,100 0

# STU / RM 25

SF / STU 44# RMS THUS 1 0 (1)

TOTAL SF 1,100 0 (1,100)

7 Music AVG SIZE 1,550 741

Includes ensemble room, small practice # STU / RM 25 214

room and storage space. SF / STU 62 142# RMS THUS 1 1 0

TOTAL SF 1,550 1,097 (453)

8 Physical Education

Gymnasium (84' x 50' w/ BB floor 70' x 40') 4,200 7,716

Office(s) 150 102

Storage 550 208

Lockers/Showers/Toilets 0 103

# STU / RM 58 208

SF / STU 72TOTAL SF 4,900 8,336 3,436

9 Library / Media Center

Entrance-Circulation-Distribution 500

Seating 1,000 2,534

Office 150 112

Conference Room(s) 200

Audio-visual equipment storage 250

Materials storage and production 200 69

Computer Lab 500 696

Workroom 200

# STU / RM 50

SF / STU 60TOTAL SF 3,000 3,411 411

10 Administration & Support

Repcpt / Secretary / General Office 300 349

Principal's Office 175 168

Assistant Principals' Offices 175 123

Conference Room 300 176

Staff Toilet 60

Workroom 150

Scheduling 0

In-school Suspension 150

Storage

Internal Circulation 140 150TOTAL SF 1,450 966 (484)

11 Health Services TOTAL SF 600 292 (308)

12 Guidance and Counseling TOTAL SF 450 168 (282)

Alexander Elementary

1/8/2017

50

Page 53: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

ICCSD Alexander Alexander

EL 3A 3A

SPACE EVALUATION CRITERIA MODEL Compare

13 Student Support 328

Social Worker Speech Pathologist 333

Psychologist Therapist 206

Team Rooms 328

333

125

81

1 to 3 days per week

Shared rooms of 150 SF eachTOTAL SF 300 1,735 1,435

14 Teachers' Prep + Lounge + Toilets TOTAL SF 600 838 238

15 Volunteer / Community Workroom TOTAL SF 150 0 (150)

16 Food Service

Receiving / Storage 100 690

Kitchen / Serving 380

Dishwashing 160

Office / Locker 60TOTAL SF 700 690 (10)

17 Lunch & Multi-purpose Room

Student Lunch Room 2,300 2,196

Storage 92

Teacher Dining Room 480

# STU / RM 192

SF / STU 12

# SETTINGS 3TOTAL SF 2,780 2,288 (492)

18 Custodial, Receiving & Storage TOTAL SF 500 228 (272)

19 Other Spaces (If Any):

Commons

Commons

Commons

Custodian 111..87

BASP

TOTAL SF 0 0 0

NOTES:

#1 Toilets, elevators, stairs, mechanical/electrical space, and wall thickness are

included in Unassigned Area.

#2 The general class size is optimized at 25 students for space planning purpose.

Actual class size could vary from 20 to 25 or more.

#3 The areas shown as models for Iowa Community Schools Schools should be

considered as the ideal. Concern for available budget, practicality, and common

sense lead to acceptance of existing spaces smaller than ideal, but all new

construction should strive to be at template standards.

#4 The size shown includes related storage.

Alexander Elementary

1/8/2017

51

Page 54: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

Iowa City Community School DistrictElementary School Building Standards

Hills Elementary School

2014 Capacity 189 356

Proposed Capacity & Template Size 290 - 1B

2015-16 Enrollment

2016-17 Enrollment 210

Projected Enrollment 116

Deficiencies 2 K Rooms, Art, Music, Science, Gym, Kitchen, Admin

LRFMP budget Completed

Recommended Additional Funds $3,194,000

Proposed Additions/ Changes 2 K Rooms, Art, Music, Science, Gym, Kitchen, Admin

LRFMP Schedule Completed

Recommended Schedule 2021-22

ICCSD Hills Hills

EL 1B 3A

SPACE EVALUATION CRITERIA MODEL Compare

Student Population

STUDENT ENROLLMENT (Ideal, excluding Preschool) 290 210 (80)

Enrollment Range -10% 261 189

Enrollment Range +10% 319 231

Grades 1-6 200

Special Education / ELL 30 Kindergarten (All Day) 40

PRESCHOOL only (All day, every day) 20

Area in Square Feet:

TOTAL AREA TOTAL SF 52,236 24,862 (27,374)

SF / ENROLLMT 127 118

UNASSIGNABLE AREA TOTAL SF 15,671 2,285 (13,385)

(Toilets, Mechanical, Corridors, Walls, Etc.) % of TOTAL 30% 9% -20.81%

ASSIGNABLE AREA TOTAL SF 36,565 22,577 (13,988)

(Total of assignable spaces listed below) % of TOTAL 70% 91% 20.81%

Assignable Spaces:

1 Classroom Area - Preschool AVG SIZE 1,250 1,181

# STU / RM 20

SF / STU 63

# RMS THUS 1 1 0TOTAL SF 1,250 1,181 (69)

2 Classroom Area - Kindergarten AVG SIZE 1,200 801

# STU / RM 20

SF / STU 60

# RMS THUS 2 1 (1)

TOTAL SF 3,600 801 (2,799)

3 Classroom Area - Grades 1-6 AVG SIZE 950 751

including "extra" classrooms for enrollments inbetween # STU / RM 25 978

SF / STU 978

951

951

951

951

978

978

38

# RMS THUS 8 9 1

TOTAL SF 11,400 8,466 (2,934)

Hills Elementary

1/8/2017

52

Page 55: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

ICCSD Hills Hills

EL 1B 3A

SPACE EVALUATION CRITERIA MODEL Compare

4 Special Needs AVG SIZE 500 780

Special Ed Support Staff # STU / RM 8 837

ESL SF / STU 67

Tutorial # RMS THUS 4 2 (2)

Gifted/Talented TOTAL SF 2,000 1,619 (381)

5 Art Room AVG SIZE 1,100 815

# STU / RM 25

SF / STU 44# RMS THUS 1 (1)

TOTAL SF 1,100 815 (285)]

6 Science Room AVG SIZE 1,100 0

# STU / RM 25

SF / STU 44# RMS THUS 1 1 0

TOTAL SF 1,100 0 (1,100)

7 Music AVG SIZE 1,550 0

Includes ensemble room, small practice # STU / RM 25

room and storage space. SF / STU 62# RMS THUS 1 1 0

TOTAL SF 1,550 0 (1,550)

8 Physical Education

Gymnasium (84' x 50' w/ BB floor 70' x 40') 4,200 2,501

Office(s) 150

Storage 550

Lockers/Showers/Toilets 0

# STU / RM 58

SF / STU 72TOTAL SF 4,900 2,501 (2,399)

9 Library / Media Center

Entrance-Circulation-Distribution 500

Seating 1,000 2,125

Office 150 89

Conference Room(s) 200

Audio-visual equipment storage 250

Materials storage and production 200

Computer Lab 459

Workroom 200

# STU / RM 50

SF / STU 50TOTAL SF 2,500 2,673 173

10 Administration & Support

Repcpt / Secretary / General Office 300 178

Principal's Office 175 136

Assistant Principals' Offices 0

Conference Room 300 136

Staff Toilet 60

Workroom 150

Scheduling 0

In-school Suspension 150

Storage 165

Internal Circulation 140 100TOTAL SF 1,275 716 (559)

Hills Elementary

1/8/2017

53

Page 56: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

ICCSD Hills Hills

EL 1B 3A

SPACE EVALUATION CRITERIA MODEL Compare

11 Health Services TOTAL SF 600 142 (458)

12 Guidance and Counseling TOTAL SF 300 86 (214)

13 Student Support 154

Social Worker Speech Pathologist 92

Psychologist Therapist

Team Rooms

1 to 3 days per week

Shared rooms of 150 SF eachTOTAL SF 300 245 (55)

14 Teachers' Prep + Lounge + Toilets TOTAL SF 400 397 (3)

15 Volunteer / Community Workroom TOTAL SF 150 0 (150)

16 Food Service

Receiving / Storage 100

Kitchen / Serving 380 128

Dishwashing 160

Office / Locker 60TOTAL SF 700 128 (572)

17 Lunch & Multi-purpose Room

Student Lunch Room 2,460 2,335

Storage 184

Teacher Dining Room 480

# STU / RM 205

SF / STU 12

# SETTINGS 2TOTAL SF 2,940 2,519 (421)

18 Custodial, Receiving & Storage TOTAL SF 500 286 (214)

19 Other Spaces (If Any):

2nd Gymnasium

Storqge

Custodian

Commons

Storage

TOTAL SF 0 0 0

NOTES:

#1 Toilets, elevators, stairs, mechanical/electrical space, and wall thickness are

included in Unassigned Area.

#2 The general class size is optimized at 25 students for space planning purpose.

Actual class size could vary from 20 to 25 or more.

#3 The areas shown as models for Iowa Community Schools Schools should be

considered as the ideal. Concern for available budget, practicality, and common

sense lead to acceptance of existing spaces smaller than ideal, but all new

construction should strive to be at template standards.

#4 The size shown includes related storage.

Hills Elementary

1/8/2017

54

Page 57: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

Iowa City Community School DistrictElementary School Building Standards

Coralville Central Elementary School

2014 Capacity 362 362

Proposed Capacity & Template Size 420 - 2E

2015-16 Enrollment

2016-17 Enrollment 444

Projected 2022 Enrollment 357

Deficiencies Front Entrance Main Office 2-K, 1-PK Rooms

LRFMP budget Completed

Recommended Additional Funds $597,600

Proposed Additions/ Changes Entrance/Front Office Reconfigure K & PK

LRFMP Schedule Completed

Recommended Schedule 2022-23

ICCSD Coralville Coralville

EL 2E 3A

SPACE EVALUATION CRITERIA MODEL Compare

Student Population

STUDENT ENROLLMENT (Ideal, excluding Preschool) 420 444 24

Enrollment Range -10% 378 400

Enrollment Range +10% 462 488

Grades 1-6 350

Special Education / ELL Included above

Kindergarten (All Day) 70

PRESCHOOL only (All day, every day) 20

Area in Square Feet:

TOTAL AREA TOTAL SF 55,950 52,951 (2,999)

SF / ENROLLMT 133 119

UNASSIGNABLE AREA TOTAL SF 16,785 19,044 2,259

(Toilets, Mechanical, Corridors, Walls, Etc.) % of TOTAL 30% 36% 5.97%

ASSIGNABLE AREA TOTAL SF 39,165 33,907 (5,258)

(Total of assignable spaces listed below) % of TOTAL 70% 64% -5.97%

Assignable Spaces:

1 Classroom Area - Preschool AVG SIZE 1,250 756

# STU / RM 20

SF / STU 63

# RMS THUS 1 1 0TOTAL SF 1,250 756 (494)

2 Classroom Area - Kindergarten AVG SIZE 1,200 1,312

# STU / RM 18 816

SF / STU 69

# RMS THUS 4 2 (2)

TOTAL SF 4,800 2,128 (2,672)

3 Classroom Area - Grades 1-6 AVG SIZE 950 706

including "extra" classrooms for enrollments inbetween # STU / RM 25 707

SF / STU 709

754

750

773

777

764

747

38 709

955

905

714

1,010

707

706

864

668

695

# RMS THUS 14 19 5

TOTAL SF 13,300 14,621 1,321

Coralville Central Elementary

1/8/2017

55

Page 58: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

ICCSD Coralville Coralville

EL 2E 3A

SPACE EVALUATION CRITERIA MODEL Compare

4 Special Needs AVG SIZE 500 297

Special Ed Support Staff # STU / RM 10 300

ESL SF / STU 50 155

154

Tutorial # RMS THUS 4 2 (2)

Gifted/Talented TOTAL SF 2,000 908 (1,092)

5 Art Room AVG SIZE 1,100 673

# STU / RM 25 187

SF / STU 44# RMS THUS 1 (1)

TOTAL SF 1,100 861 (239)]

6 Science Room AVG SIZE 1,100 0

# STU / RM 25

SF / STU 44# RMS THUS 1 1 0

TOTAL SF 1,100 0 (1,100)

7 Music AVG SIZE 1,550 737

Includes ensemble room, small practice # STU / RM 25 228

room and storage space. SF / STU 62 136# RMS THUS 1 1 0

TOTAL SF 1,550 965 (585)

8 Physical Education

Gymnasium (84' x 50' w/ BB floor 70' x 40') 4,200 3,313

Office(s) 150

Storage 550 300

Lockers/Showers/Toilets 0

# STU / RM 58

SF / STU 72TOTAL SF 4,900 3,613 (1,287)

9 Library / Media Center

Entrance-Circulation-Distribution 500 2,679

Seating 1,000 75

Office 150

Conference Room(s) 200

Audio-visual equipment storage 250 194

Materials storage and production 200

Computer Lab 375

Workroom 200 311

# STU / RM 50

SF / STU 50TOTAL SF 2,500 3,635 1,135

10 Administration & Support

Repcpt / Secretary / General Office 300 385

Principal's Office 175 283

Assistant Principals' Offices 0

Conference Room 300

Staff Toilet 60 50

Workroom 150

Scheduling 0

In-school Suspension 150

Storage 115

Internal Circulation 140 100TOTAL SF 1,275 933 (342)

Coralville Central Elementary

1/8/2017

56

Page 59: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

ICCSD Coralville Coralville

EL 2E 3A

SPACE EVALUATION CRITERIA MODEL Compare

11 Health Services TOTAL SF 600 137 (463)

12 Guidance and Counseling TOTAL SF 300 149 (151)

13 Student Support 157

Social Worker Speech Pathologist 138

Psychologist Therapist 155

Team Rooms 122

89

62

1 to 3 days per week 81

Shared rooms of 150 SF eachTOTAL SF 300 804 504

14 Teachers' Prep + Lounge + Toilets TOTAL SF 400 767 367

15 Volunteer / Community Workroom TOTAL SF 150 0 (150)

16 Food Service

Receiving / Storage 100

Kitchen / Serving 380 255

Dishwashing 160 60

Office / Locker 60TOTAL SF 700 315 (385)

17 Lunch & Multi-purpose Room

Student Lunch Room 1,960 2,637

Storage 247

Teacher Dining Room 480

# STU / RM 140

SF / STU 14

# SETTINGS 3TOTAL SF 2,440 2,884 444

18 Custodial, Receiving & Storage TOTAL SF 500 431 (69)

19 Other Spaces (If Any):

Office 144

Office 146

Custodian

PTA 80

BASP 80

TOTAL SF 0 450 450

NOTES:

#1 Toilets, elevators, stairs, mechanical/electrical space, and wall thickness are

included in Unassigned Area.

#2 The general class size is optimized at 25 students for space planning purpose.

Actual class size could vary from 20 to 25 or more.

#3 The areas shown as models for Iowa Community Schools Schools should be

considered as the ideal. Concern for available budget, practicality, and common

sense lead to acceptance of existing spaces smaller than ideal, but all new

construction should strive to be at template standards.

#4 The size shown includes related storage.

Coralville Central Elementary

1/8/2017

57

Page 60: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

Iowa City Community School DistrictElementary School Building Standards

Van Allen Elementary School

2014 Capacity 464 2015-564

Proposed Capacity & Template Size 633 - 3B

2015-16 Enrollment

2016-17 Enrollment 504

Projected 2022 Enrollment 598 Move Computer Lab

DeficienciesScience Rm convert New Music Expand Art Expand Kitchen

LRFMP budget Completed

Recommended Additional Funds $1,307,250

Proposed Additions/ Changes

LRFMP Schedule Completed

Recommended Schedule 2022-23

ICCSD Van Allen Van Allen

EL 3B 3B

SPACE EVALUATION CRITERIA MODEL Compare

Student Population

STUDENT ENROLLMENT (Ideal, excluding Preschool) 633 504 (129)

Enrollment Range -10% 569 454

Enrollment Range +10% 696 554

Grades 1-6 500

Special Education / ELL 53 Kindergarten (All Day) 80

PRESCHOOL only (All day, every day) 20

Area in Square Feet:

TOTAL AREA TOTAL SF 67,800 65,779 1,022

SF / ENROLLMT 113 131

UNASSIGNABLE AREA TOTAL SF 20,340 22,277 2,850

(Toilets, Mechanical, Corridors, Walls, Etc.) % of TOTAL 30% 34% 3.87%

ASSIGNABLE AREA TOTAL SF 47,460 43,502 (1,828)

(Total of assignable spaces listed below) % of TOTAL 70% 66% -3.87%

Assignable Spaces:

1 Classroom Area - Preschool AVG SIZE 1,250 1,081

# STU / RM 20 1,083

SF / STU 63

# RMS THUS 1TOTAL SF 1,250 4,327 3,077

2 Classroom Area - Kindergarten AVG SIZE 1,200 1,085

# STU / RM 20 1,081

SF / STU 60 1,081

1,085

# RMS THUS 4 4 0

TOTAL SF 4,800 4,331 (469)

3 Classroom Area - Grades 1-6 AVG SIZE 950 864

including "extra" classrooms for enrollments inbetween # STU / RM 25 837

SF / STU 38 835

864

837

835

851

864

837

835

860

864

837

835

835

837

864

884

878

864

837

835

# RMS THUS 20 22 2

TOTAL SF 19,000 18,685 (315)

Van Allen Elementary

1/8/2017

58

Page 61: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

ICCSD Van Allen Van Allen

EL 3B 3B

SPACE EVALUATION CRITERIA MODEL Compare

4 Special Needs AVG SIZE 500 362

Special Ed Support Staff # STU / RM 8 382

ESL SF / STU 67 382

362

202

Tutorial # RMS THUS 7 5 (2)

Gifted/Talented TOTAL SF 3,500 1,689 (1,811)

5 Art Room AVG SIZE 1,100 1,198

# STU / RM 25

SF / STU 44# RMS THUS 1 (1)

TOTAL SF 1,100 1,198 98]

6 Science Room AVG SIZE 1,100 0

# STU / RM 25

SF / STU 44# RMS THUS 1 1 0

TOTAL SF 1,100 0 (1,100)

7 Music AVG SIZE 1,550 852

Includes ensemble room, small practice # STU / RM 25 365

room and storage space. SF / STU 62# RMS THUS 1 1 0

TOTAL SF 1,550 1,217 (333)

8 Physical Education

Gymnasium (84' x 50' w/ BB floor 70' x 40') 4,200 7,119

Office(s) 150 94

Storage 550 107

Lockers/Showers/Toilets 0 0

# STU / RM 58

SF / STU 72TOTAL SF 4,900 7,321 2,421

9 Library / Media Center

Entrance-Circulation-Distribution 500

Seating 1,000 2,314

Office 150 239

Conference Room(s) 200 166

Audio-visual equipment storage 250 175

Materials storage and production 200

Computer Lab 440

Workroom 200

# STU / RM 50

SF / STU 50TOTAL SF 2,500 3,334 834

10 Administration & Support

Repcpt / Secretary / General Office 300 273

Principal's Office 175 198

Assistant Principals' Offices 175 191

Conference Room 300 382

Staff Toilet 60 80

Workroom 150 508

Scheduling 0

In-school Suspension 150

Storage 506

Internal Circulation 140 120TOTAL SF 1,450 2,258 808

Van Allen Elementary

1/8/2017

59

Page 62: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

ICCSD Van Allen Van Allen

EL 3B 3B

SPACE EVALUATION CRITERIA MODEL Compare

11 Health Services TOTAL SF 600 317 (283)

12 Guidance and Counseling TOTAL SF 450 202 (248)

13 Student Support

Social Worker Speech Pathologist

Psychologist Therapist

Team Rooms

1 to 3 days per week

Shared rooms of 150 SF eachTOTAL SF 300 0 (300)

14 Teachers' Prep + Lounge + Toilets TOTAL SF 600 0 (600)

15 Volunteer / Community Workroom TOTAL SF 150 0 (150)

16 Food Service

Receiving / Storage 100 131

Kitchen / Serving 380 309

Dishwashing 160

Office / Locker 60TOTAL SF 700 439 (261)

17 Lunch & Multi-purpose Room

Student Lunch Room 2,530 2,159

Storage 100

Teacher Dining Room 480

# STU / RM 211

SF / STU 12

# SETTINGS 3TOTAL SF 3,010 2,259 (751)

18 Custodial, Receiving & Storage TOTAL SF 500 349 (151)

19 Other Spaces (If Any):

Commons 1,347

1,346

1,346

TOTAL SF 0 4,039 4,039

NOTES:

#1 Toilets, elevators, stairs, mechanical/electrical space, and wall thickness are

included in Unassigned Area.

#2 The general class size is optimized at 25 students for space planning purpose.

Actual class size could vary from 20 to 25 or more.

#3 The areas shown as models for Iowa Community Schools Schools should be

considered as the ideal. Concern for available budget, practicality, and common

sense lead to acceptance of existing spaces smaller than ideal, but all new

construction should strive to be at template standards.

#4 The size shown includes related storage.

Van Allen Elementary

1/8/2017

60

Page 63: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

Iowa City Community School District

inflation ad

justed costs

Iowa CI t y CommunI t y s Chool dI s t r IC tfaCIlItIes master plan

Elementary Schools Present Value Cost Inflation Adjusted Cost*Alexander Elementary School $14.1 M $14.1 MBorlaug Elementary School $1.2 M $1.7 MCoralville Central Elementary School $4.7 M $4.7 MGarner Elementary School $3.3 M $4.0 MGrant Elementary School $17.0 M $20.2 MHills Elementary School $780K $780KHoover Elementary School $1.5 M $1.5 MHoover (East) Elementary School $14.1 M $15.7 MHorn Elementary School $975K $1.3 MKirkwood Elementary School $8.2 M $10.9 MLemme Elementary School $6.1 M $8.3 MLincoln Elementary School $4.0 M $4.8 MLongfellow Elementary School $10.2 M $11.7 MLucas Elementary School $4.0 M $4.4 MMann Elementary School $9.9 M $11.7 MPenn Elementary School $9.9 M $9.9 MShimek Elementary School $4.0 M $4.9 MTwain Elementary School $6.1 M $6.1 MVan Allen Elementary School $1.6 M $1.6 MWeber Elementary School $4.7 M $5.2 MWickham Elementary School $1.2 M $1.5 MWood Elementary School $6.2 M $7.7 MJunior High SchoolsNorth Central Junior High School $10.4 M $13.2 MNorthwest Junior High School $12.4 M $15.7 MSouth East Junior High School $12.2 M $14.2 MHigh SchoolsCity High School $26.8 M $33.1 MLiberty High School $67.1 M $75.3 MTate High School $78K $108KTREC $3.1 M $4.2 MWest High School $21.7 M $25.5 MOne Vision Transitional Schoolhouse $7.3 M $6.3 MTOTAL $294.8 M $340.4 M

*Inflation adjustment calculated using 3.5% annual inflation.

61

Page 64: Iowa City Community School Districtfile/… · Timeline Revisions provides a summary of the projects completed to date and a list of those projects that ... Penn Elementary Spring

Iowa City Community School District

summ

ary of changesIowa CI t y CommunI t y s Chool dI s t r IC t

faCIlItIes master plan (Board approved 4/14/2015)

Elementary Schools Changes from Facilities Master Plan (Board Approved 12/10/13)

Alexander Elementary SchoolBorlaug Elementary School Added classroom addition to house 100 students.Coralville Central Elementary SchoolGarner Elementary School Added classroom addition to house 175 students.Grant Elementary School Increased planned capacity from 500 to 600 students.Hills Elementary SchoolHoover Elementary SchoolHoover (East) Elementary SchoolHorn Elementary SchoolKirkwood Elementary School Added classroom addition to house 150 students.Lemme Elementary School Increased classroom addition from 50 to 125 students.Lincoln Elementary School Removed 50 student classroom addition.Longfellow Elementary School Removed 150 student classroom addition.Lucas Elementary SchoolMann Elementary School Removed 180 student classroom addition.Penn Elementary SchoolShimek Elementary School Removed 100 student classroom addition.Twain Elementary SchoolVan Allen Elementary SchoolWeber Elementary School Increased classroom addition from 100 to 200

students.Wickham Elementary SchoolWood Elementary School Added classroom addtion to house 100 students.Junior High SchoolsNorth Central Junior High School Increased addition from 180 student capacity to 240

student capacity. Athletics master plan additions/renovations included.

Northwest Junior High School Increased addition from 30 student capacity to 60 student capacity. Athletics master plan additions/renovations included.

South East Junior High School Increased addtion from 60 student capacity to 90 student capacity. Athletics master plan additions/renovations included.

High SchoolsCity High School Added athletic master plan additions/renovations.Liberty High SchoolTate High SchoolTRECWest High School Added athletic master plan additions/renovations.

62