Page 1: Inventory process @ suzuki pakistan

Inventory Process @ SUZUKI

Presented by:

Komal Shiekh Asra Qazi

Shazia Gul Reema Younus

M.Gohar Iqbal

Page 2: Inventory process @ suzuki pakistan

Introduction

Inventory Management

• Inventory management is an essential component of materials management and is embedded in the whole logistics process.

SUZUKI (Formerly PAK-SUZUKI)

• Pak Suzuki Motor Company Limited was formed as a joint venture between Pakistan Automobile Corporation and Suzuki Motor Corporation (SMC) - Japan. The Company was incorporated as a public limited company in August 1983 and started commercial operations in January 1984.

Page 3: Inventory process @ suzuki pakistan

Automation @ Suzuki

• ERP = Infor ERP LX

• Contact Person = Adbul Rasool Dayn (Material Handling Manager)

• Source of Information: Questionnaire

Page 4: Inventory process @ suzuki pakistan

Inventory Process

Start

DI

Challan

Verification

Enter Material

Access / Short supply

Return Access material

Receipt stock

Complain Back To Vendor

No entry

End

PIDReceived by MSD

Parts to PP

GIRN vendor

Page 5: Inventory process @ suzuki pakistan

Process of inventory MSD is integrated with production planning (PP) dept, SCM dept, and PI (QA) dept & controlling dept. 

Inventory Management process: It starts with DI (purchase Order) followed by challan in which gives the specifications & requirements.

Then the document verification started through barcode reading, all the payments etc checked then material allowed to enter in the premises of Suzuki.

Material Handling: For material handling, order for material given by SCM.

MSD only Receives, Stores, supply items to line for assembly etc.

When the material/parts received by Suzuki they send it to various dept for use such as:

Firstly parts received for in PID or QA (parts inspection dept or Quality Assurance).After the checking of the parts it sends to the MSD to further supply to production.Then GRIN (Goods Receive Inspection Note) generated to vendor.