introduction to lunar capability concept review · introduction to lunar capability concept review...
TRANSCRIPT
2
The New Fleet for Space Exploration
Ares VCargo Launch Vehicle
Ares ICrew Launch Vehicle
OrionCrew ExplorationVehicle
AltairLunar LanderEarth Departure Stage
3
CxP Integration Roadmap – Path Forward DATES FOR REFERENCEONLY
•Orion•Ares•Ground Ops•Mission Ops•EVA Systems
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
APMC10/11/07
SDR/PAR
ARES I-X4/2009 u/r
Project Formulation Pre-ProjectFormulation
CDRSynchronization
IC Implementation Phase
2009 PBS
2010 PBS
2011 PBS
2012 PBS
2013 PBS
2014 PBS
PMR ’08/PPBE ‘10
PA-14/2009
APMC u/r
Initi
al C
ap
ab
ility
Luna
r Ca
pa
bili
ty
PSDR/PBS6/16-17/08
PROGRAM
APPROVAL
EXECUTI
ON
RESOURCES
IDAC 3 IDAC-4A IDAC 5 IDAC 6 IDAC 7Design &Analysis
Constellation Program Planning &Control
Updated: Sept 23, 2008
External Version
PDR
PSRR / PPAR – Program System Requirements Review / Preliminary Program Approval ReviewPSDR / PAR – Program System Definition Review / Program Approval ReviewPDR / NAR – Preliminary Design Review / Non-advocate ReviewCDR / PRR - Critical Design Review / Production Readiness Review
•Lunar Surface Systems
You
are
here
.
PDRSynchronization
Pre-Project Formulation
LSCR – Lunar Surface Concept ReviewHLR / SRR – Human Lunar Return / System Readiness Reviewu/r – Under Review
Lunar Surface Systems Review6/2010
Program
Projects
Human LunarReturn•Ares V•Altair
MCR6/18-20
Q1 Q2
SRR/PrePAR
IC Formulation Phase
SIR
Project PDRs/NARs
Project CDRs/PRRsProject SDRs/PNARs
SIR
Fiscal Year 2008 Fiscal Year 2009 Fiscal Year 2010 Fiscal Year 2011 Fiscal Year 2012
VM-16/2009 u/r
VM-24/2010
Ares Test Flight
Virtual Mission
Pad Abort (PA)/Ascent Abort (AA)
PMR ’09/PPBE ‘11
PMR ’10/PPBE ‘12
PMR ’11/PPBE ‘13
Flight Tests& Simulations
Quarterly Program Management Review
Top Risk ReviewAgency Program Management Council
Lunar Projects SRR(U/R)
LCCR6/18-20
LunarCheckpoint
LC Formulation Phase
HLRSRR
Program
Core LunarInfrastructure
AA-17/2010
2009 PresidentBudget Submitto Congress
OMBPassback
2010 PresidentBudget Submitto Congress
OMBPassback
2011 PresidentBudget Submitto Congress
OMBPassback
2012 PresidentBudget Submitto Congress
OMBPassback
2013 PresidentBudget Submitto Congress
OMBPassback
PMR ’12/PPBE ‘14
CDR