introduction - pyunghwa engineering consultantsintroduction pyunghwa engineering consultants(pec)...
TRANSCRIPT
2 | PYUNGHWA ENGINEERING CONSULTANTS
INTRODUCTION
PYUNGHWA ENGINEERING CONSULTANTS(PEC)
respects the nature.
Thus, members of cities designed by PEC are happy.
We dream the city where state-of-art technology and
IT technology coexists with nature and humanism.
For its realization, thousands of PEC engineers will do
their best even today.
PYUNGHWA ENGINEERING CONSULTANTS includes the philisophy in the city
P E C V I S I O N
Challenge Creative Change
StengthenOverseaBusiness
DevelopManagementt
System
BusinessDiversification
DevelopCore ability
2020 Award 500 million dollar, Global Top 80
Design Your Dreams...Creative Thinking, Creative Design, World class Company
CoreValues
BusinessStrategies
Goal
VisionStatement
www.pec.kr | 3
BUSINESS AREA
Super Long Span Bridges Cable-Stayed Bridges
Road Bridges Metros (Elevated & Underground)
Bridge & Structure
Flood Control Water Use
Environment Water Treatment
Water Sector
Urban Planning New City & Industrial Complex
Human Settlement
Site Civil Works Landscape Architecture
Power Plant Environmental Plant
Industrial Plant Renewable Energy
Plant Engineering
Road & HighwayTransportation & Planning
High Speed Railway MRT/LRT
Tunnel & Geotechnical Port & Marine InfrastructureSafety
Transportation
4 | PYUNGHWA ENGINEERING CONSULTANTS
Dandeung Bridge, Gunsan, KOREA
Bridge & Structure
• Suspension Bridge with single pylon• D-shaped concrete pylon• Main span length is 400m• Basic and Detailed Design
www.pec.kr | 5
• First Cable-Suspension Hybrid Bridge• Main span length is 1,408m• Hybrid girder (main span : Steel, side
span : Concrete)• Concrete Pylon (H=320m)• Construction Engineering Service
Black Sea
Europe
Asia
3rd Bosphorus Bridge, TURKEY
Bridge & Structure
6 | PYUNGHWA ENGINEERING CONSULTANTS
www.pec.kr | 7
•Length : The world's longest suspension bridge 2,023m (currently 1,991m Akashi Kaikyo Japan)
•Service: Feasibility Study & Basic Design (2016~2017)• Cost : 3.5 trillion won
1915 Canakkale Bridge, TURKEY
Bridge & Structure
•Project : Feasibility Study (2015~2017)•Client : MOTC, Oman• Total bridge extension 21.0km,• 1 pylon cable-stayed bridge (200 + 300 = 500m)
Masirah Causeway, Oman
Bridge & Structure
8 | PYUNGHWA ENGINEERING CONSULTANTS
www.pec.kr | 9
• Concrete Cable Stayed Bridge• Single-cell concrete box girder with internal
bracing•Single concrete Pylon : Symbolizing the
Floating Mosque• Main span length is 300m• Basic and Detailed Design & Construction
Engineering
Sungai Kebun Bridge, BRUNEI
Bridge & Structure
10 | PYUNGHWA ENGINEERING CONSULTANTS
•Cost : 236.4 billion won•Period : 84 months•Description of Project - L=5.52km(4 Lane) - Bridge : 2ea / 1,215m - Tunnel : 2ea / 3,252m
Miryang river bridge Sanoe 1nd Tunnel
Technical Proposal for Changnyeong~Miryang Expressway Construction Project (Lot No.6)
Road & Highway
www.pec.kr | 11
•Cost : 192.7 billion won•Period : 60 months•Description of Project - L=6.5km(4 Lane) - Bridge : 2ea / 492m - Intersection : 1ea
Ari Bridge Shinsi Interchange
Detailed Design for Saemangeum East-West 2nd Axis Road Construction Project (Lot No.1)
Road & Highway
12 | PYUNGHWA ENGINEERING CONSULTANTS
•Cost : 185.1 million won•Period : 13 months•Project Description - Yongho wharf : 3.8ha - Jaseongdae wharf : 158.8ha
Redevelopment activation plan of Yongho and Jaseongdae wharf, Busanport, Busan, KOREA
Port & Marine
• Gate Installation Construction for Flood Prevention• Sluice gate, Seawall, Bridge
www.pec.kr | 13
Asan-Bay Seawall & Drainage Sluice Gate Implementation Project, KOREA
Water Sector
•Area : 14,000ha•Period: : 2015• Proposed Feasibility Study for Kuwait new town
14 | PYUNGHWA ENGINEERING CONSULTANTS
Kuwait Nawaf Al Ahmad New Town Development, Kuwait
New City & Industrial Complex
www.pec.kr | 15
Lido Smart City Development, Indonesia
New City & Industrial Complex
•Area : 662ha •Period : 2017 - 2020•Client : MNC• New city developmentintroduced Smart City
•Batam Island : 50MWp•Rempang & Galang Island : 3MWp(each)
• Ground-mounted project • Ground-mounted project(2.0MW)
Batam & Annexed Island, INDONESIA
Photovoltaic Power Plant
16 | PYUNGHWA ENGINEERING CONSULTANTS
• Railway Depot(2.5MW)
• Floating Solar Plant(0.5MW) • Floating Solar Plant(1.0MW)
• Bike Road Project
www.pec.kr | 17
Photovoltaic Power Plant
18 | PYUNGHWA ENGINEERING CONSULTANTS
Photovoltaic Power Plant
www.pec.kr | 19
Photovoltaic Power Plant
Home Solar System
20 | PYUNGHWA ENGINEERING CONSULTANTS
•Quantity of Dried Coal : 135ton/hr•Quantity of Moisture Evaporation : 7.5ton/hr
Reheat Steam Coal Drying Plant of Youngheung Power Plant, Youngheung, KOREA
Power Plant
www.pec.kr | 21
•Project Type : Bio-SRF Fired Power Generation•Capacity : Steam 131ton/hr•Generation : 32.36MW (ICFB Boiler x 1unit)
Jeonju Power Biomass Power Plant Jeonju, KOREA
Power Plant
22 | PYUNGHWA ENGINEERING CONSULTANTS
Modular House
www.pec.kr | 23
24 | PYUNGHWA ENGINEERING CONSULTANTS
www.pec.kr | 25
1 | PYUNGHWA ENGINEERING CONSULTANTS
Head Office 6th Floor, T-Tower Bldg., 194, Munhwa-ro, Naju-si, Jeollanam-do, 58217, Korea [ Correspondence Address ] Pyunghwa Bldg., 454, Gwanak-daero, Dongan-gu, Anyang-si, Gyeonggi-do, 13949, KoreaAnnex 1 Doosan Venturedigm Bldg., 415, Heungan-daero Dongan-gu, Anyang-si, Gyeonggi-do, KoreaAnnex 2 Doosan Venturedigm 2 Bldg., 250 Hagui-ro, Dongan-gu, Anyang-si, Gyeonggi-do, Korea
Sunuk Kown (Vice President)Tel: +82 31 420 7221 Cell: +82 10 4782 4048E-mail: [email protected]
Global Business Div.Tel: +82 31 420 7991 thru 420 7998 Fax:+82 31 420 7999 E-mail: [email protected] Web site: www.pec.kr
PECincludes the philisophy
in the city