introduction part lab final project
DESCRIPTION
This is a first introduction part of CN Ananthaaram Vs Fiat India case 2009.TRANSCRIPT
![Page 1: Introduction Part LAB Final Project](https://reader036.vdocuments.us/reader036/viewer/2022083012/5695cffd1a28ab9b029070f8/html5/thumbnails/1.jpg)
• The situation is that your brand new car which you just got delivered by the company is defective
• If you have been given two choices • Take a replaced product • Wait for the same product to get repaired
• Which choice would you have chosen• This case talks about such a similar situation.• C.N.Anantharam vs M/S Fiat India Ltd.& Ors.Etc.Etc on 24 November, 2010
Ordered a Fiat Siena on 31st
Oct 2002
Got it delivered on 25th Nov
2002
Filed a complaint on
17th April 2003 before
Additional District
Consumer Disputes Redressal
Forum
Order was passed on 20th
Feb 2004 against the
respondents
Respondents filed a
complaint against
petitioner in 2004 before
Karnataka State CDRF
On 15th June 2006 state CDRF
modified the District Forum
Order
National CDRF disposed of the
State CDRF’s order about
EMIs
Common order on the matter on 17th April
2009