In this chapter to its needs to finish four task. All the task use the define projection and project tool in
ARC toolbox which are in the ARC catalog as well as ARC map.
Task 1(project a shapefile from a geographic to projected coordinate system)
Objective: to project a shapefile from a geographic coordinate system to a custom projected coordinate
system.
Procedure:
The first stage is to define idll.shp by selecting a predefined geographic coordinate system and then
project the shape file onto the idoho tranverse Mercator coordinate system (IDTM). A custom
coordinate system,has the following parameter values. See figure 1.
Figure 1
-
7/29/2019 Introduction of Arc Toolbox
2/17
In the ARC catalog a connection is been made to the chapter 2 database. Base on figure 2. Idd.shp
should be highlighted in the catalog tree. If metadata be click, the FGDC summary information list the
coordinate system as geographic, see figure 3.
Figure 2
Figure 3
-
7/29/2019 Introduction of Arc Toolbox
3/17
In the spatial reference information tab,information shows the coordinate system is
GCS_Assumed_Geographic_1, an assumed coordinate. See figure 1.
To change the coordinate system the first steps is to define the coordinate system for idll.shp . the steps
is from figure 4 until figure 12.
Figure 4
Figure 5
-
7/29/2019 Introduction of Arc Toolbox
4/17
Figure 6
Figure 7
-
7/29/2019 Introduction of Arc Toolbox
5/17
Figure 8
Figure 9
-
7/29/2019 Introduction of Arc Toolbox
6/17
Figure 10
Figure 11
-
7/29/2019 Introduction of Arc Toolbox
7/17
Figure 12
The result is been shown as in figure 12. The coordinate system is change.
Here are the steps to make project idll.shp to the IDTM coordinate system. What to use are; project tool
in the data management tools/projection and transformation/features toolset. The steps as shown in
figure 14
Figure 13
-
7/29/2019 Introduction of Arc Toolbox
8/17
Task 2(import a coordinate system)
Objective: to complete the projection information on idll.shp and idtm.shp from task 1.
Procedure: the data that needed; stationsll.shp (contain snow course in IDAHO), a shape file measured
in longitude and latitude values and in decimal degrees.
Procedure: on the metadata tab,statioll.shp must be verify has an assumed geographic coordinate
system. A projection tool be use by double click it and select the input features class by select
stationll.shp then the button of coordinate system been clicked. Then spatial reference properties dialog
be import after that idll.shp be double click to add.
All the diagram show the steps to done the procedure.
-
7/29/2019 Introduction of Arc Toolbox
9/17
Figure 14
On the figure 14, it is the result for this task. Project tool been double click then stationsll.shp be
selected as input features class. Next stationsstm be specify for the output features class after that the
output coordinate system button be click. After that import the sptial refrence properties dialog the
select idm.shp to add it. Lastly the stationstm is now projected onto the same coordinate system as
idtm.shp.
Task 3(project a shape file by using a predefined coordinate system)
Objective: to create an event layer from now.txt and project the even layer to UTM coordinates system
and lastly save the output as shape file.
Procedure: in this task snow.txt be add to arc map. This is the data that want to create the layer. Then
tools menu be clicked and select add XY data. The input table must be snow.txt, longitude is in X field,
latitude is in Y field. After that the dialog will show that the spatial reference of the input coordinate is
an unknown coordinate system.
-
7/29/2019 Introduction of Arc Toolbox
10/17
Here are the steps to create the layer from figure 15 until figure 18
Figure 15
Figure 16
Figure 17
-
7/29/2019 Introduction of Arc Toolbox
11/17
-
7/29/2019 Introduction of Arc Toolbox
12/17
Here are the steps to change the coordinate system. Figure 19 until 21
Figure 19
Figure 20
Figure 21
-
7/29/2019 Introduction of Arc Toolbox
13/17
Figure 22
Figure 23
-
7/29/2019 Introduction of Arc Toolbox
14/17
Figure 24
Figure 25
-
7/29/2019 Introduction of Arc Toolbox
15/17
Task 4(convert from one coordinate system to another)
Objective: to convert coordinate system of IDTM to UTM coordinates system.
Procedure:
Figure 26
-
7/29/2019 Introduction of Arc Toolbox
16/17
Figure 27
In the figure 27 shows the result after change the coordinate system. Must remember it may look same
with the previous or the original image but the projection is different.
-
7/29/2019 Introduction of Arc Toolbox
17/17
Conclusion
After done the entire four task, it can be conclude that all task use the define projection and project
tools in arc toolbox. The define projection tool projects a geographic or projected coordinate system.
Arc toolbox have three option for defining coordinate system first, selecting a predefined coordinate
second importing coordinate system from an existing data set third creating a new coordinate system.
This task also use shape file. Arc toolbox has separate projection tools in the coverage
tools/management /projection toolset to work with coverage. Arc tool box also has a separate tool in
the data management tool/projection and transformation/raster toolset for projection raster.
Finally this chapter teaches us the coordinate system must be use and apply to all the spatial that we