Introduction
Felix Sefkow
HCAL main meeting February 14, 2006
![Page 2: Introduction Felix Sefkow HCAL main meeting February 14, 2006](https://reader035.vdocuments.us/reader035/viewer/2022081520/56649d005503460f949d2b9d/html5/thumbnails/2.jpg)
Felix Sefkow February 14, 2007 HCAL 2
Outline
• Analysis, publications
• movable stage, commissioning
• CERN schedule 2007
• R&D issues
• Reviews
![Page 3: Introduction Felix Sefkow HCAL main meeting February 14, 2006](https://reader035.vdocuments.us/reader035/viewer/2022081520/56649d005503460f949d2b9d/html5/thumbnails/3.jpg)
Felix Sefkow February 14, 2007 HCAL 3
Summary so far
• Proof-of principle prototype (technology & PFLOW approach)
• Technology– It works!– Successfully scaled up from
“minical” by 2 orders of magnitude
• PFLOW approach– It makes nice pictures– Analysis to come – millions of
events are there
HCAL3x3cm2 tiles
ECAL1cm2 pads
Imaging calorimetry
![Page 4: Introduction Felix Sefkow HCAL main meeting February 14, 2006](https://reader035.vdocuments.us/reader035/viewer/2022081520/56649d005503460f949d2b9d/html5/thumbnails/4.jpg)
Felix Sefkow February 14, 2007 HCAL 4
Detector studies to do now
• Calibration and calibration uncertainties– What limits the resolution?
• Dynamic range and non-linearity correction accuracy– Data and MC studies
• Stability, monitoring and corrections:– Cross-check methods and find most practical
• Effects of temperature and temperature gradients
• SiPM long-term studies– Is the response function stable?
• And: Learn from scintillator ECAL
Important
Help needed
![Page 5: Introduction Felix Sefkow HCAL main meeting February 14, 2006](https://reader035.vdocuments.us/reader035/viewer/2022081520/56649d005503460f949d2b9d/html5/thumbnails/5.jpg)
Felix Sefkow February 14, 2007 HCAL 5
Physics issues for the detector
• Physics (hadron shower) analysis will provide further input to the detector design
• Shower sub-structure resolution, two-particle separation – revisit granularity optimization
• Neutron sensitivity– Gaseous and scintillator
• Semi-digital approach
• Not yet possible: timing for PFA– Fast digitization (JINR electronics)– Next version of SiPM ASIC from LAL
![Page 6: Introduction Felix Sefkow HCAL main meeting February 14, 2006](https://reader035.vdocuments.us/reader035/viewer/2022081520/56649d005503460f949d2b9d/html5/thumbnails/6.jpg)
Felix Sefkow February 14, 2007 HCAL 6
Hadron analysis final goals
• Detector performance (resolutions): sure!
• Test / validation of simulation 1: algorithm-independent– Shower profiles– e/pi ratio– Neutron response– Correlations within shower, substructure– New observables
• Test / validation of PFA algorithm performance– Fragments faking neutrals double counting– Two-particle separation losse
![Page 7: Introduction Felix Sefkow HCAL main meeting February 14, 2006](https://reader035.vdocuments.us/reader035/viewer/2022081520/56649d005503460f949d2b9d/html5/thumbnails/7.jpg)
Felix Sefkow February 14, 2007 HCAL 7
Neutral shower separation
• Confusion in PFA: fakes and losses• Evaluate losses in test beam data using event overlay technique
– High granularity low occupancy
Simulation study by A.Raspereza – can be tested!
![Page 8: Introduction Felix Sefkow HCAL main meeting February 14, 2006](https://reader035.vdocuments.us/reader035/viewer/2022081520/56649d005503460f949d2b9d/html5/thumbnails/8.jpg)
Felix Sefkow February 14, 2007 HCAL 8
Susbtructure is there!
• First steps into “deep analysis” by V.Morgunov
![Page 9: Introduction Felix Sefkow HCAL main meeting February 14, 2006](https://reader035.vdocuments.us/reader035/viewer/2022081520/56649d005503460f949d2b9d/html5/thumbnails/9.jpg)
Felix Sefkow February 14, 2007 HCAL 9
Analysis strategy
• Discussions with LHC calorimeter and test beam experts – P.Loch (Tucson), talk by P.Schacht (MPI) at FNAL:
• We are on the right track!
• Understanding of electromagnetic response crucial for hadron calorimetry– Em scale = response of ideal detector to em energy deposition– Simulation, link to production quality control data
• Hadronic response on em scale: this is the observable!– Expect 5% level agreement with simulation
• on average, not in tails and details– Data MC comparisons, input to weighting schemes – Interesting G4 tool: energy deposition by type (em, had, invis,
loss)
![Page 10: Introduction Felix Sefkow HCAL main meeting February 14, 2006](https://reader035.vdocuments.us/reader035/viewer/2022081520/56649d005503460f949d2b9d/html5/thumbnails/10.jpg)
Felix Sefkow February 14, 2007 HCAL 10
Towards LCWS’07
• Continue with strong focus on e.m response• Concentrate on temperature and time-stable data• Understand:
– Calibration– Noise– Linearity – Resolution – Longitudinal profile – Transverse profiles– Stability– Hadron response
Priority
Ambition
LCWS’07
![Page 11: Introduction Felix Sefkow HCAL main meeting February 14, 2006](https://reader035.vdocuments.us/reader035/viewer/2022081520/56649d005503460f949d2b9d/html5/thumbnails/11.jpg)
Felix Sefkow February 14, 2007 HCAL 11
HCAL publication plans
• 2007: – HCAL design and em performance: two papers (?)– Stability and monitoring: include in paper if ready,
• Otherwise first conference results
– HCAL Hadron response on e.m. scale : first conference results
• 2008: – HCAL Hadron response, performance, first MC comparisons:
paper
• ECAL+HCAL, PFLOW studies, G4 comprehensive analysis– CALICE wide
![Page 12: Introduction Felix Sefkow HCAL main meeting February 14, 2006](https://reader035.vdocuments.us/reader035/viewer/2022081520/56649d005503460f949d2b9d/html5/thumbnails/12.jpg)
Felix Sefkow February 14, 2007 HCAL 12
Movable stage status
• Two weeks ago
![Page 13: Introduction Felix Sefkow HCAL main meeting February 14, 2006](https://reader035.vdocuments.us/reader035/viewer/2022081520/56649d005503460f949d2b9d/html5/thumbnails/13.jpg)
Felix Sefkow February 14, 2007 HCAL 13
To be ready for shipment in June
![Page 14: Introduction Felix Sefkow HCAL main meeting February 14, 2006](https://reader035.vdocuments.us/reader035/viewer/2022081520/56649d005503460f949d2b9d/html5/thumbnails/14.jpg)
Felix Sefkow February 14, 2007 HCAL 14
Until then
• This week 7: lift stack support to stage • Week 8: prepare rack and install modules
starting from ECAL side• Week 9-10 cabling• Week 11 ECAL integration• Week 12-14 Electronics tests (noise and LED) • Week 14-15 Easter• Week 13-15 stage motion PLC programming• Week 16-19 stage motion computer programming • Week 22 LCWS
![Page 15: Introduction Felix Sefkow HCAL main meeting February 14, 2006](https://reader035.vdocuments.us/reader035/viewer/2022081520/56649d005503460f949d2b9d/html5/thumbnails/15.jpg)
Felix Sefkow February 14, 2007 HCAL 15
In parallel
• Module production (29-32 underway)• Module tests in electron beam• Module integration
• Modify remaining VFE HABs
• Prepare transport (options)
• Prepare transport fixation raverse for stage• Prepare separable rack ?
• Install cooling
• Paint the stage
![Page 16: Introduction Felix Sefkow HCAL main meeting February 14, 2006](https://reader035.vdocuments.us/reader035/viewer/2022081520/56649d005503460f949d2b9d/html5/thumbnails/16.jpg)
Felix Sefkow February 14, 2007 HCAL 16
Preferred test beam schedule
As communicated to CERN:
• May 28 - June 3: LCWS at DESY, CALICE set-up at display
• June 11-15: Installation at CERN• June 18-22: Re-commissioning
• June 25 – July 8: calibration with parasitic muons
• July 9-22: First main user period
• Aug 20-Sep 2: Second main user period
• If possible: Third main user period
• 2007: CALICE at FNAL
![Page 17: Introduction Felix Sefkow HCAL main meeting February 14, 2006](https://reader035.vdocuments.us/reader035/viewer/2022081520/56649d005503460f949d2b9d/html5/thumbnails/17.jpg)
Felix Sefkow February 14, 2007 HCAL 17
Test beam request
• Submitted to CERN on Jan 31st
• SPSC met last week: approved
• First schedule next week
• Unofficial: – Installation in June possible– 3rd period granted
![Page 18: Introduction Felix Sefkow HCAL main meeting February 14, 2006](https://reader035.vdocuments.us/reader035/viewer/2022081520/56649d005503460f949d2b9d/html5/thumbnails/18.jpg)
Felix Sefkow February 14, 2007 HCAL 18
R&D
• This year: EUDET module design choices• SiPM / MPPC candidates, coupling to scintillator• VFE ASIC design• Calibration concept
– Testbeam analysis– Hardware tests
• Readout chain– SiPM + SPIROC: test board– FE – ODR: DIF electronic proto
• Layer design– 15M$/mm
• Stack design, assembly procedures
![Page 19: Introduction Felix Sefkow HCAL main meeting February 14, 2006](https://reader035.vdocuments.us/reader035/viewer/2022081520/56649d005503460f949d2b9d/html5/thumbnails/19.jpg)
Felix Sefkow February 14, 2007 HCAL 19
Reviews
• 2nd half of April: CALICE technical review meeting – prepare CERN test beam program
• At LCWS’07 (May 30-June 3) ILC calorimetry will be reviewed– Reviewers: WWS R&D panel and external (non-ILC) calorimeter
experts
• Similar to DESY PRC case, we need to prepare – written report– Presentations– Funding information
![Page 20: Introduction Felix Sefkow HCAL main meeting February 14, 2006](https://reader035.vdocuments.us/reader035/viewer/2022081520/56649d005503460f949d2b9d/html5/thumbnails/20.jpg)
Felix Sefkow February 14, 2007 HCAL 20
Meeting dates
• May 10-12 CALICE collaboration meeting in Kobe
• October 8-10: EUDET Annual meeting at Paris
![Page 21: Introduction Felix Sefkow HCAL main meeting February 14, 2006](https://reader035.vdocuments.us/reader035/viewer/2022081520/56649d005503460f949d2b9d/html5/thumbnails/21.jpg)
Felix Sefkow February 14, 2007 HCAL 21
ILC testbeam worskhop at FNAL
Find slides at https://conferences.fnal.gov/idtb07/
• Good overview on facilities and plans from detector groups– Roadmap document in
summer– Trk & vtx getting more
active
• Warm welcome from FNAL management
• Significant participation of FNAL physicists
![Page 22: Introduction Felix Sefkow HCAL main meeting February 14, 2006](https://reader035.vdocuments.us/reader035/viewer/2022081520/56649d005503460f949d2b9d/html5/thumbnails/22.jpg)
Felix Sefkow February 14, 2007 HCAL 22
FNAL testbeam
• MTBF upgraded– Move target downstream– get higher rates at low E– Flexibility in spill structure – Hall (roof, floor) refurbishment– Control room and meeting
area – Cabling panels– Laser alignment system
(cool!)
• M-Center– Possibility to obtain tagged
neutral beams– Trigger and DAQ issues to be
worked through
Energy (GeV)
Present Hadron Rate MT6SC2 per 1E12
Protons
Estimated Rate in New Design
(dp/p 2%)
1 --- ~1500
2 --- ~50K
4 ~700 ~200K
8 ~5K ~1.5M
16 ~20K ~4M