Introducing experience from EUROCONTROL in TBS implementation
SDM Workshop on TBS, 24 Octobre 2017
Vincent TREVE (EUROCONTROL)ATM Airport Unit
![Page 2: Introducing experience from EUROCONTROL in TBS implementation · Hong Kong Tokyo Toronto China ICAO Opening the doors for EUROPEAN industry: ... Airbus in Tokyo. RECAT-EU RECAT-EU](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e7432a785846778ce626d21/html5/thumbnails/2.jpg)
Production of Time Based Specification
Time based Specification was prepared by EUROCONTROL under EC mandate
The Speciation is based on lower level “local” and “generic” requirements identified in SESAR P6.8.1
Focus group of experts (NATS, Austrocontrol, THALES) were consulted prior to drafting
Draft specification was produced ensuring full consistency with NATS products (inclusive but not limited)
ENPRM process took place between 15 April and 8 July 2016
84 comments (from 5 ANSPs and 1 regulator) were processed and clarified
Publication foreseen by end of 2017
![Page 3: Introducing experience from EUROCONTROL in TBS implementation · Hong Kong Tokyo Toronto China ICAO Opening the doors for EUROPEAN industry: ... Airbus in Tokyo. RECAT-EU RECAT-EU](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e7432a785846778ce626d21/html5/thumbnails/3.jpg)
Production of Time Based Generic Safety Case
Time Based Generic Safety Case was prepared by EUROCONTROL on the basis of the SESAR results
The Safety Case
Describes TBS Principle
Addresses wake turbulence risk
Justifies safe separation reductions from wake point of view
Is a key but not sufficient element for deployment
Wak
e st
reng
th
Wake age
Wind effect on wake decay always mitigates TBS reductions
![Page 4: Introducing experience from EUROCONTROL in TBS implementation · Hong Kong Tokyo Toronto China ICAO Opening the doors for EUROPEAN industry: ... Airbus in Tokyo. RECAT-EU RECAT-EU](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e7432a785846778ce626d21/html5/thumbnails/4.jpg)
Production of Time Based Generic Safety Case
Time Based Generic Safety Case was prepared by EUROCONTROL on the basis of the SESAR results
The Safety Case
Describes TBS Principle
Addresses wake turbulence risk
Justifies safe separation reductions from wake point of view
Is a key but not sufficient element for deployment
Safety Case for TBS principles in final review with EASA will be direct input for deployment
![Page 5: Introducing experience from EUROCONTROL in TBS implementation · Hong Kong Tokyo Toronto China ICAO Opening the doors for EUROPEAN industry: ... Airbus in Tokyo. RECAT-EU RECAT-EU](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e7432a785846778ce626d21/html5/thumbnails/5.jpg)
Information to Stakeholders and Regulation Authorities
Misunderstanding about Time Based Separation
Need for detailed and reliable prediction of expected benefit
Explanation of Wake Measurement and Wake Risk Assessment (TBS Generic Safety Case)
Explanation of the TBS Spec (TBS Guidance)
Creating the move – OPEN days SESAR context
Followed by new open days for promoting solution developed in SESAR and proposed by European industry
![Page 6: Introducing experience from EUROCONTROL in TBS implementation · Hong Kong Tokyo Toronto China ICAO Opening the doors for EUROPEAN industry: ... Airbus in Tokyo. RECAT-EU RECAT-EU](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e7432a785846778ce626d21/html5/thumbnails/6.jpg)
Information to Stakeholders and Regulation Authorities
Misunderstanding about Time Based Separation
Need for detailed and reliable prediction of expected benefit
Explanation of Wake Measurement and Wake Risk Assessment (TBS Generic Safety Case)
Explanation of the TBS Spec (TBS Guidance)
Creating the move – OPEN days SESAR context
Followed by new open days for promoting solution developed in SESAR and proposed by European industry
![Page 7: Introducing experience from EUROCONTROL in TBS implementation · Hong Kong Tokyo Toronto China ICAO Opening the doors for EUROPEAN industry: ... Airbus in Tokyo. RECAT-EU RECAT-EU](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e7432a785846778ce626d21/html5/thumbnails/7.jpg)
![Page 8: Introducing experience from EUROCONTROL in TBS implementation · Hong Kong Tokyo Toronto China ICAO Opening the doors for EUROPEAN industry: ... Airbus in Tokyo. RECAT-EU RECAT-EU](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e7432a785846778ce626d21/html5/thumbnails/8.jpg)
![Page 9: Introducing experience from EUROCONTROL in TBS implementation · Hong Kong Tokyo Toronto China ICAO Opening the doors for EUROPEAN industry: ... Airbus in Tokyo. RECAT-EU RECAT-EU](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e7432a785846778ce626d21/html5/thumbnails/9.jpg)
Information to Stakeholders and Regulation Authorities
Misunderstanding about Time Based Separation
Need for detailed and reliable prediction of expected benefit
Explanation of Wake Measurement and Wake Risk Assessment (TBS Generic Safety Case)
Explanation of the TBS Spec (TBS Guidance)
Creating the move – OPEN days SESAR context
Followed by new open days for promoting solution developed in SESAR and proposed by European industry
![Page 10: Introducing experience from EUROCONTROL in TBS implementation · Hong Kong Tokyo Toronto China ICAO Opening the doors for EUROPEAN industry: ... Airbus in Tokyo. RECAT-EU RECAT-EU](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e7432a785846778ce626d21/html5/thumbnails/10.jpg)
LIDAR
Information to Stakeholders and Regulation Authorities
10
Misunderstanding about Time Based Separation
Need for detailed and reliable prediction of expected benefit
Explanation of Wake Measurement and Wake Risk Assessment (TBS Generic Safety Case)
Explanation of the TBS Spec (TBS Guidance)
Creating the move – OPEN days SESAR context
Followed by new open days for promoting solution developed in SESAR and proposed by European industry
![Page 11: Introducing experience from EUROCONTROL in TBS implementation · Hong Kong Tokyo Toronto China ICAO Opening the doors for EUROPEAN industry: ... Airbus in Tokyo. RECAT-EU RECAT-EU](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e7432a785846778ce626d21/html5/thumbnails/11.jpg)
Information to Stakeholders and Regulation Authorities
Misunderstanding about Time Based Separation
Need for detailed and reliable prediction of expected benefit
Explanation of Wake Measurement and Wake Risk Assessment (TBS Generic Safety Case)
Explanation of the TBS Spec (TBS Guidance)
Creating the move – OPEN days SESAR context
Followed by new open days for promoting solution developed in SESAR and proposed by European industry
![Page 12: Introducing experience from EUROCONTROL in TBS implementation · Hong Kong Tokyo Toronto China ICAO Opening the doors for EUROPEAN industry: ... Airbus in Tokyo. RECAT-EU RECAT-EU](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e7432a785846778ce626d21/html5/thumbnails/12.jpg)
Information to Stakeholders and Regulation Authorities
Misunderstanding about Time Based Separation
Need for detailed and reliable prediction of expected benefit
Explanation of Wake Measurement and Wake Risk Assessment (TBS Generic Safety Case)
Explanation of the TBS Spec (TBS Guidance)
Creating the move – OPEN days SESAR context
Followed by new open days for promoting solution developed in SESAR and proposed by European industry
![Page 13: Introducing experience from EUROCONTROL in TBS implementation · Hong Kong Tokyo Toronto China ICAO Opening the doors for EUROPEAN industry: ... Airbus in Tokyo. RECAT-EU RECAT-EU](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e7432a785846778ce626d21/html5/thumbnails/13.jpg)
Support to Local Deployment
TBS @ LOWW
Explanation of the Safety Case to Austrian regulation authorities Elaboration of intermediate deployment step (Procedural: RedSep) Support to MET office for definition of wind measurement requirements Support to Time Based calibration (local definition of aircraft speed profile and associated buffer ensuring
reliability of TBS computation)
RECAT @ CDG
Explanation of the Safety Case to French Authorities Demonstration session (RTS) to ATCO representatives and ATCO Team Leaders Information to Pilot and Flight Simulation sessions Post deployment risk monitoring
![Page 14: Introducing experience from EUROCONTROL in TBS implementation · Hong Kong Tokyo Toronto China ICAO Opening the doors for EUROPEAN industry: ... Airbus in Tokyo. RECAT-EU RECAT-EU](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e7432a785846778ce626d21/html5/thumbnails/14.jpg)
Support to Local Deployment
TBS @ LOWW
Explanation of the Safety Case to Austrian regulation authoritiesElaboration of intermediate deployment step (Procedural:) Support to MET office for definition of wind measurement requirementsSupport to Time Based calibration (local definition of aircraft speed profile and associated buffer ensuring reliability of TBS computation)
Post deployment risk monitoringEUROCONTROL automatic
wake data collection and analysis platform freely
available for supporting post deployment monitoring
![Page 15: Introducing experience from EUROCONTROL in TBS implementation · Hong Kong Tokyo Toronto China ICAO Opening the doors for EUROPEAN industry: ... Airbus in Tokyo. RECAT-EU RECAT-EU](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e7432a785846778ce626d21/html5/thumbnails/15.jpg)
Pre-deployment analysis
Refinement of the TBS concept as a function of local needs:
Copenhagen – TBS + PBN
Vienna – TBS in mix mode
Zurich – TBS for better Runway Occupancy Time management
CDG – Definition of step based TBS deployment roadmap
Organisation of Real Time Simulations for refining local requirements and making deployment decision
Important to define the content of ECTL support an to define transfer point between EUROCONTROL and industry
![Page 16: Introducing experience from EUROCONTROL in TBS implementation · Hong Kong Tokyo Toronto China ICAO Opening the doors for EUROPEAN industry: ... Airbus in Tokyo. RECAT-EU RECAT-EU](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e7432a785846778ce626d21/html5/thumbnails/16.jpg)
Building Consensus around European Standard and preparing ICAO ASBU
Non ECAC TBS concept presentation in:
Dubai Hong Kong Tokyo Toronto China ICAO
Opening the doors for EUROPEAN industry:
Leosphere / NATS in Hong Kong NLR in Dubai Airbus in Tokyo
![Page 17: Introducing experience from EUROCONTROL in TBS implementation · Hong Kong Tokyo Toronto China ICAO Opening the doors for EUROPEAN industry: ... Airbus in Tokyo. RECAT-EU RECAT-EU](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e7432a785846778ce626d21/html5/thumbnails/17.jpg)
RECAT-EU
RECAT-EU operates in
• Paris Charles de Gaulle (second larger airport in Europe) since March 2016 • 10% runway throughput
observed• 1 year monitoring didn’t show
increase of wake incidents
• Leipzig/Halle Airport(second-busiest freighter hub in Germany after Frankfurt Airport) since July 2017
17
![Page 18: Introducing experience from EUROCONTROL in TBS implementation · Hong Kong Tokyo Toronto China ICAO Opening the doors for EUROPEAN industry: ... Airbus in Tokyo. RECAT-EU RECAT-EU](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e7432a785846778ce626d21/html5/thumbnails/18.jpg)
Impact at CDG – New Separation Conformance
A332 A320
18
![Page 19: Introducing experience from EUROCONTROL in TBS implementation · Hong Kong Tokyo Toronto China ICAO Opening the doors for EUROPEAN industry: ... Airbus in Tokyo. RECAT-EU RECAT-EU](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e7432a785846778ce626d21/html5/thumbnails/19.jpg)
Impact at CDG – New Separation Conformance
A380 A320
19
![Page 20: Introducing experience from EUROCONTROL in TBS implementation · Hong Kong Tokyo Toronto China ICAO Opening the doors for EUROPEAN industry: ... Airbus in Tokyo. RECAT-EU RECAT-EU](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e7432a785846778ce626d21/html5/thumbnails/20.jpg)
RECAT-EU
RECAT-EU will be operated in
• London Heathrow (first larger airport in Europe) Spring 2018
• Vienna (250,000 movement / year) mid 2018
20
![Page 21: Introducing experience from EUROCONTROL in TBS implementation · Hong Kong Tokyo Toronto China ICAO Opening the doors for EUROPEAN industry: ... Airbus in Tokyo. RECAT-EU RECAT-EU](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e7432a785846778ce626d21/html5/thumbnails/21.jpg)
RECAT-EU
Preliminary analyses to deploy RECAT-EU in
• Manchester
• Gatwick
• Barcelona
• Las Palmas
• Madrid
• Copenhagen
21
![Page 22: Introducing experience from EUROCONTROL in TBS implementation · Hong Kong Tokyo Toronto China ICAO Opening the doors for EUROPEAN industry: ... Airbus in Tokyo. RECAT-EU RECAT-EU](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e7432a785846778ce626d21/html5/thumbnails/22.jpg)
RECAT-EU
Bi-lateral discussion and/or Cooperation to deploy RECAT-EUin
• Tokyo
• Dubai (testing ongoing)
• Singapore
• Hong Kong
• Moscow
22
![Page 23: Introducing experience from EUROCONTROL in TBS implementation · Hong Kong Tokyo Toronto China ICAO Opening the doors for EUROPEAN industry: ... Airbus in Tokyo. RECAT-EU RECAT-EU](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e7432a785846778ce626d21/html5/thumbnails/23.jpg)
Time Based Separations (TBS)
Time based separation operates in
• London Heathrow (first larger airport in Europe) since March 2015 • 62% Reduction in ATFM delay• 2.9 additional movements per
hour in strong winds• 1.2 extra movements
per hour
23
![Page 24: Introducing experience from EUROCONTROL in TBS implementation · Hong Kong Tokyo Toronto China ICAO Opening the doors for EUROPEAN industry: ... Airbus in Tokyo. RECAT-EU RECAT-EU](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e7432a785846778ce626d21/html5/thumbnails/24.jpg)
Time Based Separations (TBS)
Support provided for Time based separation deployment to
• Vienna (250,000 movement / year)
• Zurich(270,000 movement / year)
• Copenhagen(265,000 movement / year)
16 European airports committed to deploy Time Based Separation as from 1 January 2024 )
24
![Page 25: Introducing experience from EUROCONTROL in TBS implementation · Hong Kong Tokyo Toronto China ICAO Opening the doors for EUROPEAN industry: ... Airbus in Tokyo. RECAT-EU RECAT-EU](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e7432a785846778ce626d21/html5/thumbnails/25.jpg)
Network Impact Assessment
All departures out of EGLL to 1 of the to 5 most connected airport ((LFPG, EIDW, EDDF, EDDM, EHAM), then continue but doesn’t go back to EGLL(top 10 windy days before and after TBS deployment)
![Page 26: Introducing experience from EUROCONTROL in TBS implementation · Hong Kong Tokyo Toronto China ICAO Opening the doors for EUROPEAN industry: ... Airbus in Tokyo. RECAT-EU RECAT-EU](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e7432a785846778ce626d21/html5/thumbnails/26.jpg)
Network Impact Assessment
All departures out of EGLL to 1 of the to 5 most connected airport ((LFPG, EIDW, EDDF, EDDM, EHAM), then continue but doesn’t go back to EGLL(top 10 windy days before and after TBS deployment)
![Page 27: Introducing experience from EUROCONTROL in TBS implementation · Hong Kong Tokyo Toronto China ICAO Opening the doors for EUROPEAN industry: ... Airbus in Tokyo. RECAT-EU RECAT-EU](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e7432a785846778ce626d21/html5/thumbnails/27.jpg)
Network Impact Assessment
All departures out of EGLL to 1 of the to 5 most connected airports (LFPG, EIDW, EDDF, EDDM, EHAM), then continue but doesn’t go back to EGLL(top 10 windy days before and after TBS deployment)
![Page 28: Introducing experience from EUROCONTROL in TBS implementation · Hong Kong Tokyo Toronto China ICAO Opening the doors for EUROPEAN industry: ... Airbus in Tokyo. RECAT-EU RECAT-EU](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e7432a785846778ce626d21/html5/thumbnails/28.jpg)
Conclusion
Runway throughput enhancement solutions are mature and ready for deployment
EUROCONTROL Techniques, Tools and Know-How are available for supporting European and Non-European airports to make decision to deploy these solutions
EUROCONTROL Wake Knowledge Hubhttps://recat-project.eu/
28
![Page 29: Introducing experience from EUROCONTROL in TBS implementation · Hong Kong Tokyo Toronto China ICAO Opening the doors for EUROPEAN industry: ... Airbus in Tokyo. RECAT-EU RECAT-EU](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e7432a785846778ce626d21/html5/thumbnails/29.jpg)
RECAT-EU
https://www.youtube.com/watch?v=UEWdexDlqfU https://www.youtube.com/watch?v=fJZf0LuwUJg
Time Based Separations and next steps (Pair Wise Separations / LORD)
https://www.youtube.com/watch?v=8TjNF7dhdP0 https://www.youtube.com/watch?v=ZUG5ywZvtnw&feature=youtu.be https://www.youtube.com/watch?v=mn_WPikR4lg
enter your presentation title 29
![Page 30: Introducing experience from EUROCONTROL in TBS implementation · Hong Kong Tokyo Toronto China ICAO Opening the doors for EUROPEAN industry: ... Airbus in Tokyo. RECAT-EU RECAT-EU](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e7432a785846778ce626d21/html5/thumbnails/30.jpg)
Question?