EF # CFM EXHAUST FAN - HVAC EQUIPMENT SUPPLY AIR RISE SUPPLY AIR DROP RECTANGULAR DUCT SIZE (FIRST FIGURE = WIDTH) 12x12 ACOUSTICAL LINING ROUND DUCT SIZE 12"Ø VOLUME DAMPER SMOKE/ FIRE DAMPER DUCT SMOKE DETECTOR SD FLEXIBLE CONNECTION ACCESS DOOR AD ATC CONTROL DAMPER 90° RADIUS ELBOW 90° ELBOW WITH TURNING VANES 45° RADIUS ELBOW SUPPLY DIFFUSER RETURN OR EXHAUST SLOT DIFFUSER DIFFUSER SIDE WALL DIFFUSER BRANCH DUCT TAKE-OFF WITH FLEXIBLE DUCT HVAC SYMBOLS - DUCTWORK VOLUME DAMPER BACKDRAFT DAMPER GRILLE, REGISTER, OR DIFFUSER FC FS VD ATC BDD FD AD FIRE DAMPER WITH ACCESS DOOR TRANSITION IN RISE RETURN, EXHAUST, OR OUTSIDE AIR DROP RETURN, EXHAUST, OR OUTSIDE AIR FLOOR OR ROOF PENETRATION RETURN, EXHAUST, OR OUTSIDE AIR RISE SUPPLY AIR FLOOR OR ROOF PENETRATION BREAK IN RECTANGULAR DUCT BREAK IN ROUND DUCT BRANCH DUCT WITH TOP TAKE-OFF AND VOLUME DAMPER VD PENNSYLVANIA UNIFORM CONSTRUCTION CODE INCLUDING: 2015 - INTERNATIONAL MECHANICAL CODE 2015 - INTERNATIONAL ENERGY CODE 2015 - NFPA 90A & 90B - HVAC SYSTEMS 1. THE HVAC DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED TO SHOW THE APPROXIMATE LOCATIONS OF EQUIPMENT, PIPING, DUCTWORK AND ASSOCIATED SYSTEMS. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND COORDINATE THE INSTALLATION OF HVAC SYSTEMS WITH ACTUAL CONDITIONS IN THE FIELD. A. PIPE AND DUCT ELEVATIONS ARE FOR REFERENCE ONLY. FIELD VERIFY ALL DIMENSIONS AND ELEVATIONS B. DUCT SIZES ARE MINIMUM CLEAR INSIDE DIMENSIONS. C. COORDINATE INSTALLATION OF MECHANICAL WORK WITH ALL OTHER TRADES D. MAINTAIN MANUFACTURERS RECOMMENDED SERVICE CLEARANCES 2. THE CONTRACTOR SHALL COORDINATE THE SHUTDOWN AND REMOVAL OF EXISTING SYSTEMS AND EQUIPMENT AND THE INSTALLATION OF NEW SYSTEMS AND EQUIPMENT WITH THE PROJECT CONSTRUCTION PHASING SCHEDULE. 3. PROVIDE ALL METHODS AND MATERIALS FOR SUPPORTING EQUIPMENT, PIPING, AND DUCTWORK. IN AREAS OF BAR JOIST CONSTRUCTION, SUPPORT LOADS FROM TOP CHORD OF BAR JOISTS AT PANEL POINTS. 4. UNLESS OTHERWISE INDICATED, THIS CONTRACTOR SHALL PERFORM ALL CUTTING AND PATCHING OF THE EXISTING FACILITY FOR HIS RESPECTIVE WORK. PATCHING SHALL MATCH EXISTING MATERIALS, FINISHES, AND METHODS OF CONSTRUCTION. A. COORDINATE CUTTING AND PATCHING OF THE EXISTING ROOF WITH THE GC. (NOTE: THE EXISTING ROOF WILL BE REPLACED BY THE GC. THE HC SHALL CUT THE EXISTING ROOF DECK AND PROVIDE STEEL FRAMING. THE GC SHALL FLASH/PATCH THE ROOF OPENING.) B. PROVIDE STEEL FRAMING ANGLES WHERE PENETRATING FLOOR AND ROOF DECKS; ANGLES SHALL BE MINIMUM 4” x 4” x 1/4” UNLESS NOTED OTHERWISE. C. WHERE CUTTING AND PATCHING IS INDICATED TO BE PERFORMED BY THE GENERAL CONTRACTOR, COORDINATE THE SIZE AND LOCATION OF OPENINGS. 5. IMMEDIATELY NOTIFY THE ARCHITECT AND OWNER IF ENVIRONMENTAL HAZARDS SUCH AS ASBESTOS IS ENCOUNTERED DURING CONSTRUCTION. THE CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO AVOID DISTURBING EXISTING HAZARDOUS MATERIALS. THE MECHANICAL CONTRACTOR SHALL NOT PERFORM ABATEMENT WORK AS PART OF THIS CONTRACT. 6. ALL MATERIAL EXPOSED WITHIN THE CEILING RETURN AIR PLENUMS SHALL BE NONCOMBUSTIBLE OR HAVE A MAXIMUM FLAME SPREAD RATING OF 25 AND A MAXIMUM SMOKE-DEVELOPED RATING OF 50. ALL DUCT TYPE, MASTICS, AND VIBRATION ISOLATION CONNECTIONS SHALL HAVE A MAXIMUM FLAME SPREAD RATING OF 25 AND SMOKE SPREAD RATING OF 50 OR LESS. DUCT COVERING AND LININGS SHALL NOT FLAME, GLOW, SMOLDER, OR SMOKE WHEN TESTED IN ACCORDANCE WITH ASTM C411 AND UL 181. FLEXIBLE DUCTWORK SHALL COMPLY WITH UL 181. 7. PROVIDE UL LISTED FIRE PROOFING SEALANTS AROUND ALL DUCT, PIPING, AND CONDUIT PENETRATIONS OF RATED FIRE RESISTANT WALLS. 8. MOUNT THERMOSTATS AND SIMILAR CONTROL DEVICES 48” AFF. 9. PERFORM START-UP EQUIPMENT IN STRICT ACCORDANCE WITH THE MANUFACTURERS' WRITTEN START-UP INSTRUCTIONS OR IN CONJUNCTION WITH FACTORY AUTHORIZED TECHNICIANS. ADJUST AUTOMATIC TEMPERATURE CONTROLS TO ACHIEVE SATISFACTORY OPERATION. 10. UNLESS OTHERWISE INDICATED, ALL DUCTWORK SHALL BE OF SHEET METAL CONSTRUCTION WITH SEALED JOINTS. ROUND FLEXIBLE DUCTWORK SHALL BE LIMITED TO 6'-0" PER BRANCH DUCT 11. DO NOT UTILIZE AIR HANDLING EQUIPMENT AND DUCTED SYSTEMS FOR TEMPORARY HEAT; OBTAIN WRITTEN APPROVAL FROM THE ENGINEER PRIOR TO PLACING EQUIPMENT INTO SUSTAINED OPERATION. CHANGE ALL AIR FILTERS 30 DAYS AFTER PROJECT COMPLETION. 12. PROVIDE IDENTIFICATION OF MECHANICAL SYSTEMS AND EQUIPMENT INCLUDING DUCTWORK AND PIPING. A. PROVIDE LOCATION / IDENTIFICATION MARKERS ON CEILING GRID OR ACCESS PANELS FOR CONTROL DAMPERS, FIRE DAMPERS, SMOKE DETECTORS, AND OTHER SERVICEABLE DEVICES. HVAC GENERAL NOTES EXISTING DUCT EXISTING DUCT TO BE REMOVED (DEMO) HVAC SYMBOLS - CONTROLS THERMOSTAT OR T CONTROL PANEL LAT LEAVING AIR TEMPERATURE LAT CAP LATENT CAPACITY LBS POUNDS LRA LOCKED ROTOR AMPS LWT LEAVING WATER TEMPERATURE MBH 1,000 BTU MC MECHANICAL CONTRACTOR MCA MINIMUM CIRCUIT AMPACITY M.O.D. MOTOR OPERATED DAMPER MOP MAXIMUM OVERCURRENT PROTECTION MFR MANUFACTURER MHP MAXIMUM HORSE POWER RNC ROOM NOISE CRITERIA NC NORMALLY CLOSED NO NORMALLY OPEN OA OUTSIDE AIR OC ON CENTER OD OUTSIDE DIAMETER OED OPEN ENDED DUCT PC PLUMBING CONTRACTOR PD PRESSURE DROP PIR PASSIVE INFRARED PRV PRESSURE RELIEF VALVE PSIG POUNDS PER SQUARE INCH GAUGE RA RETURN AIR RH RELATIVE HUMIDITY RLA RUN LOAD AMPS RPM REVOLUTIONS PER MINUTE SA SUPPLY AIR SS STAINLESS STEEL SST SATURATED SUCTION TEMPERATURE SEER SEASONAL ENERGY EFFICIENCY RATIO SEN CAP SENSIBLE CAPACITY SP STATIC PRESSURE T THERMOMETER TA TRANSFER AIR TEMP TEMPERATURE TOG TOP OF GRILLE TOL TOP OF LOUVER TOT. CAP TOTAL CAPACITY TSP TOTAL STATIC PRESSURE TSTAT THERMOSTAT TW TEPID WATER UC UNDERCUT DOOR UNO UNLESS NOTED OTHERWISE V VENT V/P/H VOLTS/PHASE/HERTZ VTR VENT THRU ROOF W WALL-MOUNTED WB WET BULB WPD WATER PRESSURE DROP WT WEIGHT HVAC ABBREVIATIONS AC AIR CONDITIONING AD ACCESS DOOR AFF ABOVE FINISHED FLOOR AFR ABOVE FINISHED ROOF AMB AMBIENT AP ACCESS PANEL APD AIR PRESSURE DROP ATC AUTOMATIC TEMPERATURE CONTROL AWT AVERAGE WATER TEMPERATURE BHP BREAK HORSE POWER BHP BOILER HORSE POWER BMS BUILDING MANAGEMENT SYSTEM BOD BOTTOM OF DUCT BOP BOTTOM OF PIPE BOS BOTTOM OF STRUCTURE BWE BAKED WHITE ENAMEL FA FREE AREA FM CUBIC FEET PER MINUTE FOB FLAT ON BOTTOM FOT FLAT ON TOP FV FACE VELOCITY COP COEFFICIENT OF PERFORMANCE CW COLD WATER DB DRY BULB EA EXHAUST AIR EAT ENTERING AIR TEMPERATURE EC ELECTRICAL CONTRACTOR EER ENERGY EFFICIENCY RATIO EF EXHAUST FAN EFF EFFICIENCY ESP EXTERNAL STATIC PRESSURE EWT ENTERING WATER TEMPERATURE EX EXISTING EXT EXTERIOR FLA FULL LOAD AMPS FL DR FLOOR DRAIN FT FEET FT HD FEET OF HEAD GA GAUGE HC HVAC CONTRACTOR HP HORSE POWER HTG HEATING HW HOT WATER HWR HOT WATER RETURN ID INSIDE DIAMETER OR IDENTIFIER IN INCHES INSUL INSULATION IN-WC INCHES OF WATER COLUMN IR INFRARED ISP INTERNAL STATIC PRESSURE IW INDIRECT WASTE KW KILOWATT DRAWING LIST CONNECT TO EXISTING EXISTING TO BE REMOVED PLAN NORTH SECTION ID A H1.1 SHEET NO. WHERE SECTION IS DIRECTIONAL VIEW OF SECTION 1 REVISION NUMBER ELEVATION 100.00' 1 KEYNOTE EQUIPMENT TAG SHOWING TYPE AND ID. SEE EQUIPMENT SCHEDULES FOR DETAILS EXISTING TO REMAIN REMOVE EXISTING PROVIDE NEW N TYPE ID REVISION CLOUD DETAIL ID 1 H1.1 SHEET NO. WHERE DETAIL IS 101 ROOM/SPACE NO. 11 H1.1 DIRECTION OF VIEW SHEET NO. WHERE EL. IS DRAWN ELEVATION ID COMMON SYMBOLS COMMON ABBREVIATIONS MECHANICAL M001 Cover Sheet M101 Floor Plan - Demolition M201 Floor Plan - Ductwork M301 Floor Plan - Piping M801 Schedules & Details ELECTRICAL E001 Cover Sheet E101 Floor Plan--Demolition E201 Floor Plan--Lighting E301 Floor Plan--Power E401 Floor Plan--Low-Voltage E701 Details E801 Schedules A/E ARCHITECT/ENGINEER AB CLG ABOVE CEILING ABV ABOVE AFF ABOVE FINISHED FLOOR AFI ARC-FAULT INTERRUPTER AFR ABOVE FINISHED ROOF ALT ALTERNATE ATS AUTOMATIC TRANSFER SWITCH BFC BELOW FINISHED CEILING C/G COUNTERTOP GFI CD CORD DROP CL CENTERLINE CLG CEILING CM CEILING MOUNTED COL COLUMN CT COUNTERTOP HEIGHT-44" AFF UNO OR CURRENT TRANSFORMER CR CORD REEL DBF DOWN BELOW FLOOR DET DETAIL DIA DIAMETER DIM DIMENSION DN DOWN DW DISHWASHER DWG DRAWING EC ELECTRICAL CONTRACTOR EL ELEVATION ELEV ELEVATOR EMER EMERGENCY EO EMERGENCY ONLY (NORMALLY OFF) EWC ELECTRIC WATER COOLER (PROVIDE GFI RECEPTACLE) EX EXISTING FA FIRE ALARM FBO FURNISHED BY OWNER FLR FLOOR FPC FIRE PROTECTION CONTRACTOR FSC FOOD SERVICE CONTRACTOR GC GENERAL CONTRACTOR GFI GROUND-FAULT INTERRUPTER GND GROUND HC HVAC CONTRACTOR HCP HANDICAPPED HGT HEIGHT HR HOUR IR INFRARED JB JUNCTION BOX KES KITCHEN EQUIPMENT SUPPLIER LV LOW-VOLTAGE MC MECHANICAL CONTRACTOR MCA MINIMUM CIRCUIT AMPACITY MOCP MAXIMUM OVERCURRENT PROTECTION MT MULTITECHNOLOGY MO MICROWAVE OVEN NA NOT APPLICABLE NE NORMAL/EMERGENCY (NORMALLY ON) NIC NOT IN CONTRACT NTS NOT TO SCALE OFCI OWNER FURNISHED- CONTRACTOR INSTALLED PC PLUMBING CONTRACTOR PIR PASSIVE INFRARED SE SERVICE ENTRANCE SECT SECTION SHT SHEET SIM SIMILAR SPD SURGE PROTECTION DEVICE SPEC SPECIFICATION SS SERVICE SINK STD STANDARD SUSP SUSPENDED TBR TO BE REMOVED TL TASK LIGHT TR TAMPER RESISTANT TSTAT THERMOSTAT UNO UNLESS NOTED OTHERWISE US ULTRASONIC W/ WITH W/O WITHOUT W WALL-MOUNTED WP WEATHERPROOF Exx ARCHITECTURAL EQUIPMENT NO. APPLICABLE CODES & STANDARDS TEMPERATURE SENSOR VAV - VARIABLE AIR VOLUME BOX date drawn designed checked comm. no. 02-04-2020 c Copyright 2016 Breslin Ridyard Fadero Architects FOR THE INTERIOR ALTERATIONS AND RE-ROOFING WILLOW GROVE, MONGOMERY COUNTY, PENNSYLVANIA h e E 1 W Broad St Suite 500 Bethlehem PA 18018 T 610-866-3820 F 610-866-3830 E [email protected] W www.lve.cc e n h E Mec L n gi l ai n ca and g hi e g n in er c lc e i r t C l a o a V ll n sl u a t ts y LVE - 19191 DCD DCD SMG M001 COVER SHEET

Upload: others

Post on 24-Apr-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: INTERIOR ALTERATIONS AND RE-ROOFING

EF

#

CFM

EXHAUST FAN-

HVAC EQUIPMENT

SUPPLY AIR RISE

SUPPLY AIR DROP

RECTANGULAR DUCT SIZE(FIRST FIGURE = WIDTH)12x12

ACOUSTICAL LINING

ROUND DUCT SIZE12"Ø

VOLUME DAMPER

SMOKE/ FIRE DAMPER

DUCT SMOKE DETECTORSD

FLEXIBLE CONNECTION

ACCESS DOORAD

ATC CONTROL DAMPER

90° RADIUS ELBOW

90° ELBOW WITHTURNING VANES

45° RADIUS ELBOW

SUPPLY DIFFUSER

RETURN OR EXHAUST SLOT DIFFUSER

DIFFUSER SIDE WALL DIFFUSER

BRANCH DUCTTAKE-OFF WITH

FLEXIBLE DUCT

HVAC SYMBOLS - DUCTWORK

VOLUME DAMPER

BACKDRAFT DAMPER

GRILLE, REGISTER,OR DIFFUSER

FC

FS

VD

ATC

BDD

FD

AD FIRE DAMPERWITH ACCESS DOOR

TRANSITION IN RISE

RETURN, EXHAUST, OROUTSIDE AIR DROP

RETURN, EXHAUST, OROUTSIDE AIR FLOOR ORROOF PENETRATION

RETURN, EXHAUST, OROUTSIDE AIR RISE

SUPPLY AIR FLOOR ORROOF PENETRATION

BREAK IN RECTANGULARDUCT

BREAK IN ROUNDDUCT

BRANCH DUCT WITH TOPTAKE-OFF AND VOLUMEDAMPER

VD

PENNSYLVANIA UNIFORMCONSTRUCTION CODE INCLUDING:

2015 - INTERNATIONAL MECHANICAL CODE

2015 - INTERNATIONAL ENERGY CODE

2015 - NFPA 90A & 90B - HVAC SYSTEMS

1. THE HVAC DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED TO SHOW THE APPROXIMATE LOCATIONSOF EQUIPMENT, PIPING, DUCTWORK AND ASSOCIATED SYSTEMS. THE CONTRACTOR SHALL VERIFY ALLDIMENSIONS AND COORDINATE THE INSTALLATION OF HVAC SYSTEMS WITH ACTUAL CONDITIONS IN THEFIELD.

A. PIPE AND DUCT ELEVATIONS ARE FOR REFERENCE ONLY. FIELD VERIFY ALL DIMENSIONS ANDELEVATIONS

B. DUCT SIZES ARE MINIMUM CLEAR INSIDE DIMENSIONS.

C. COORDINATE INSTALLATION OF MECHANICAL WORK WITH ALL OTHER TRADES

D. MAINTAIN MANUFACTURERS RECOMMENDED SERVICE CLEARANCES

2. THE CONTRACTOR SHALL COORDINATE THE SHUTDOWN AND REMOVAL OF EXISTING SYSTEMS ANDEQUIPMENT AND THE INSTALLATION OF NEW SYSTEMS AND EQUIPMENT WITH THE PROJECTCONSTRUCTION PHASING SCHEDULE.

3. PROVIDE ALL METHODS AND MATERIALS FOR SUPPORTING EQUIPMENT, PIPING, AND DUCTWORK. INAREAS OF BAR JOIST CONSTRUCTION, SUPPORT LOADS FROM TOP CHORD OF BAR JOISTS AT PANELPOINTS.

4. UNLESS OTHERWISE INDICATED, THIS CONTRACTOR SHALL PERFORM ALL CUTTING AND PATCHING OFTHE EXISTING FACILITY FOR HIS RESPECTIVE WORK. PATCHING SHALL MATCH EXISTING MATERIALS,FINISHES, AND METHODS OF CONSTRUCTION.

A. COORDINATE CUTTING AND PATCHING OF THE EXISTING ROOF WITH THE GC. (NOTE: THE EXISTINGROOF WILL BE REPLACED BY THE GC. THE HC SHALL CUT THE EXISTING ROOF DECK AND PROVIDESTEEL FRAMING. THE GC SHALL FLASH/PATCH THE ROOF OPENING.)

B. PROVIDE STEEL FRAMING ANGLES WHERE PENETRATING FLOOR AND ROOF DECKS; ANGLES SHALL BEMINIMUM 4” x 4” x 1/4” UNLESS NOTED OTHERWISE.

C. WHERE CUTTING AND PATCHING IS INDICATED TO BE PERFORMED BY THE GENERAL CONTRACTOR,COORDINATE THE SIZE AND LOCATION OF OPENINGS.

5. IMMEDIATELY NOTIFY THE ARCHITECT AND OWNER IF ENVIRONMENTAL HAZARDS SUCH AS ASBESTOS ISENCOUNTERED DURING CONSTRUCTION. THE CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TOAVOID DISTURBING EXISTING HAZARDOUS MATERIALS. THE MECHANICAL CONTRACTOR SHALL NOTPERFORM ABATEMENT WORK AS PART OF THIS CONTRACT.

6. ALL MATERIAL EXPOSED WITHIN THE CEILING RETURN AIR PLENUMS SHALL BE NONCOMBUSTIBLE ORHAVE A MAXIMUM FLAME SPREAD RATING OF 25 AND A MAXIMUM SMOKE-DEVELOPED RATING OF 50. ALLDUCT TYPE, MASTICS, AND VIBRATION ISOLATION CONNECTIONS SHALL HAVE A MAXIMUM FLAMESPREAD RATING OF 25 AND SMOKE SPREAD RATING OF 50 OR LESS. DUCT COVERING AND LININGSSHALL NOT FLAME, GLOW, SMOLDER, OR SMOKE WHEN TESTED IN ACCORDANCE WITH ASTM C411 ANDUL 181. FLEXIBLE DUCTWORK SHALL COMPLY WITH UL 181.

7. PROVIDE UL LISTED FIRE PROOFING SEALANTS AROUND ALL DUCT, PIPING, AND CONDUITPENETRATIONS OF RATED FIRE RESISTANT WALLS.

8. MOUNT THERMOSTATS AND SIMILAR CONTROL DEVICES 48” AFF.

9. PERFORM START-UP EQUIPMENT IN STRICT ACCORDANCE WITH THE MANUFACTURERS' WRITTENSTART-UP INSTRUCTIONS OR IN CONJUNCTION WITH FACTORY AUTHORIZED TECHNICIANS. ADJUSTAUTOMATIC TEMPERATURE CONTROLS TO ACHIEVE SATISFACTORY OPERATION.

10.UNLESS OTHERWISE INDICATED, ALL DUCTWORK SHALL BE OF SHEET METAL CONSTRUCTION WITHSEALED JOINTS. ROUND FLEXIBLE DUCTWORK SHALL BE LIMITED TO 6'-0" PER BRANCH DUCT

11.DO NOT UTILIZE AIR HANDLING EQUIPMENT AND DUCTED SYSTEMS FOR TEMPORARY HEAT; OBTAINWRITTEN APPROVAL FROM THE ENGINEER PRIOR TO PLACING EQUIPMENT INTO SUSTAINED OPERATION.CHANGE ALL AIR FILTERS 30 DAYS AFTER PROJECT COMPLETION.

12.PROVIDE IDENTIFICATION OF MECHANICAL SYSTEMS AND EQUIPMENT INCLUDING DUCTWORK ANDPIPING.

A. PROVIDE LOCATION / IDENTIFICATION MARKERS ON CEILING GRID OR ACCESS PANELS FOR CONTROLDAMPERS, FIRE DAMPERS, SMOKE DETECTORS, AND OTHER SERVICEABLE DEVICES.

HVAC GENERAL NOTES

EXISTING DUCT

EXISTING DUCT TOBE REMOVED (DEMO)

HVAC SYMBOLS - CONTROLSTHERMOSTAT ORT

CONTROL PANEL

LAT LEAVING AIR TEMPERATURE

LAT CAP LATENT CAPACITY

LBS POUNDS

LRA LOCKED ROTOR AMPS

LWT LEAVING WATER TEMPERATURE

MBH 1,000 BTU

MC MECHANICAL CONTRACTOR

MCA MINIMUM CIRCUIT AMPACITY

M.O.D. MOTOR OPERATED DAMPER

MOP MAXIMUM OVERCURRENTPROTECTION

MFR MANUFACTURER

MHP MAXIMUM HORSE POWER

RNC ROOM NOISE CRITERIA

NC NORMALLY CLOSED

NO NORMALLY OPEN

OA OUTSIDE AIR

OC ON CENTER

OD OUTSIDE DIAMETER

OED OPEN ENDED DUCT

PC PLUMBING CONTRACTOR

PD PRESSURE DROP

PIR PASSIVE INFRARED

PRV PRESSURE RELIEF VALVE

PSIG POUNDS PER SQUARE INCH GAUGE

RA RETURN AIR

RH RELATIVE HUMIDITY

RLA RUN LOAD AMPS

RPM REVOLUTIONS PER MINUTE

SA SUPPLY AIR

SS STAINLESS STEEL

SST SATURATED SUCTION TEMPERATURE

SEER SEASONAL ENERGY EFFICIENCY RATIO

SEN CAP SENSIBLE CAPACITY

SP STATIC PRESSURE

T THERMOMETER

TA TRANSFER AIR

TEMP TEMPERATURE

TOG TOP OF GRILLE

TOL TOP OF LOUVER

TOT. CAP TOTAL CAPACITY

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TW TEPID WATER

UC UNDERCUT DOOR

UNO UNLESS NOTED OTHERWISE

V VENT

V/P/H VOLTS/PHASE/HERTZ

VTR VENT THRU ROOF

W WALL-MOUNTED

WB WET BULB

WPD WATER PRESSURE DROP

WT WEIGHT

HVAC ABBREVIATIONS

AC AIR CONDITIONING

AD ACCESS DOOR

AFF ABOVE FINISHED FLOOR

AFR ABOVE FINISHED ROOF

AMB AMBIENT

AP ACCESS PANEL

APD AIR PRESSURE DROP

ATC AUTOMATIC TEMPERATURE CONTROL

AWT AVERAGE WATER TEMPERATURE

BHP BREAK HORSE POWER

BHP BOILER HORSE POWER

BMS BUILDING MANAGEMENT SYSTEM

BOD BOTTOM OF DUCT

BOP BOTTOM OF PIPE

BOS BOTTOM OF STRUCTURE

BWE BAKED WHITE ENAMEL

FA FREE AREA

FM CUBIC FEET PER MINUTE

FOB FLAT ON BOTTOM

FOT FLAT ON TOP

FV FACE VELOCITY

COP COEFFICIENT OF PERFORMANCE

CW COLD WATER

DB DRY BULB

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EC ELECTRICAL CONTRACTOR

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EFF EFFICIENCY

ESP EXTERNAL STATIC PRESSURE

EWT ENTERING WATER TEMPERATURE

EX EXISTING

EXT EXTERIOR

FLA FULL LOAD AMPS

FL DR FLOOR DRAIN

FT FEET

FT HD FEET OF HEAD

GA GAUGE

HC HVAC CONTRACTOR

HP HORSE POWER

HTG HEATING

HW HOT WATER

HWR HOT WATER RETURN

ID INSIDE DIAMETEROR IDENTIFIER

IN INCHES

INSUL INSULATION

IN-WC INCHES OF WATER COLUMN

IR INFRARED

ISP INTERNAL STATIC PRESSURE

IW INDIRECT WASTE

KW KILOWATT

DRAWING LIST

CONNECT TO EXISTING

EXISTING TO BE REMOVED

PLAN NORTH

SECTION IDAH1.1 SHEET NO. WHERE SECTION IS

DIRECTIONAL VIEW OF SECTION

1 REVISION NUMBER

ELEVATION100.00'

1 KEYNOTE

EQUIPMENT TAG SHOWINGTYPE AND ID. SEE EQUIPMENTSCHEDULES FOR DETAILS

EXISTING TO REMAIN

REMOVE EXISTING

PROVIDE NEW

N

TYPEID

REVISION CLOUD

DETAIL ID1H1.1 SHEET NO. WHERE DETAIL IS

101 ROOM/SPACE NO.

11 H1.1DIRECTION OF VIEW

SHEET NO. WHERE EL. IS DRAWNELEVATION ID

COMMON SYMBOLS

COMMON ABBREVIATIONS

MECHANICAL

M001 Cover SheetM101 Floor Plan - DemolitionM201 Floor Plan - DuctworkM301 Floor Plan - PipingM801 Schedules & Details

ELECTRICAL

E001 Cover SheetE101 Floor Plan--DemolitionE201 Floor Plan--LightingE301 Floor Plan--PowerE401 Floor Plan--Low-VoltageE701 DetailsE801 Schedules

A/E ARCHITECT/ENGINEER

AB CLG ABOVE CEILING

ABV ABOVE

AFF ABOVE FINISHED FLOOR

AFI ARC-FAULT INTERRUPTER

AFR ABOVE FINISHED ROOF

ALT ALTERNATE

ATS AUTOMATIC TRANSFER SWITCH

BFC BELOW FINISHED CEILING

C/G COUNTERTOP GFI

CD CORD DROP

CL CENTERLINE

CLG CEILING

CM CEILING MOUNTED

COL COLUMN

CT COUNTERTOP HEIGHT-44" AFF UNOOR CURRENT TRANSFORMER

CR CORD REEL

DBF DOWN BELOW FLOOR

DET DETAIL

DIA DIAMETER

DIM DIMENSION

DN DOWN

DW DISHWASHER

DWG DRAWING

EC ELECTRICAL CONTRACTOR

EL ELEVATION

ELEV ELEVATOR

EMER EMERGENCY

EO EMERGENCY ONLY (NORMALLY OFF)

EWC ELECTRIC WATER COOLER (PROVIDEGFI RECEPTACLE)

EX EXISTING

FA FIRE ALARM

FBO FURNISHED BY OWNER

FLR FLOOR

FPC FIRE PROTECTION CONTRACTOR

FSC FOOD SERVICE CONTRACTOR

GC GENERAL CONTRACTOR

GFI GROUND-FAULT INTERRUPTER

GND GROUND

HC HVAC CONTRACTOR

HCP HANDICAPPED

HGT HEIGHT

HR HOUR

IR INFRARED

JB JUNCTION BOX

KES KITCHEN EQUIPMENT SUPPLIER

LV LOW-VOLTAGE

MC MECHANICAL CONTRACTOR

MCA MINIMUM CIRCUIT AMPACITY

MOCP MAXIMUM OVERCURRENTPROTECTION

MT MULTITECHNOLOGY

MO MICROWAVE OVEN

NA NOT APPLICABLE

NE NORMAL/EMERGENCY(NORMALLY ON)

NIC NOT IN CONTRACT

NTS NOT TO SCALE

OFCI OWNER FURNISHED-CONTRACTOR INSTALLED

PC PLUMBING CONTRACTOR

PIR PASSIVE INFRARED

SE SERVICE ENTRANCE

SECT SECTION

SHT SHEET

SIM SIMILAR

SPD SURGE PROTECTION DEVICE

SPEC SPECIFICATION

SS SERVICE SINK

STD STANDARD

SUSP SUSPENDED

TBR TO BE REMOVED

TL TASK LIGHT

TR TAMPER RESISTANT

TSTAT THERMOSTAT

UNO UNLESS NOTED OTHERWISE

US ULTRASONIC

W/ WITH

W/O WITHOUT

W WALL-MOUNTED

WP WEATHERPROOF

Exx ARCHITECTURAL EQUIPMENT NO.

APPLICABLE CODES& STANDARDS

TEMPERATURE SENSOR

VAV- VARIABLE AIR VOLUME BOX

date

draw

nde

sign

edch

ecke

dco

mm

. no.

02-0

4-20

20

c Copyright 2016 Breslin Ridyard Fadero Architects

FOR

TH

EIN

TER

IOR

ALT

ERA

TIO

NS

AN

D R

E-R

OO

FIN

G

WIL

LOW

GR

OV

E, M

ON

GO

MER

Y C

OU

NTY

, PE

NN

SYLV

AN

IA

he

E1

W B

road

St S

uite

500

Bet

hleh

em P

A 18

018

T 61

0-86

6-38

20 F

610

-866

-383

0E

lve@

lve.

cc W

ww

w.lv

e.cc

en

hE

MecL

ngi

la

inca

and

ghi

eg

nin

erc

lce

irtCla

oaVll

ns

luat

tsy

LVE - 19191

DC

DD

CD

SMG

M001

CO

VER

SH

EET

Page 2: INTERIOR ALTERATIONS AND RE-ROOFING

200 sq ft

MECH.EQUIP.

STOR.

MECH.EQUIP.

AIRBRUSH

THEORY GCNA LAB

ST.

(149)

(144)

UP

UP

CORRIDOR A

CO

RR

IDO

R C

STOR.

(149A)

EX375

EX375

VD VD

14x8 14x8

16x1

0

16x1020x12

48x2

440

x24

20x1

0

VD

14x8

VD

EX375

EX375

40x2

4

24x2

0

36x16

20x1

0

EX490

EX490

VD VD

16x8 16x8

24x1

2

VD

EX100

16x10

20x10 24x12

EX60

8x4

24x1

2

10x4

VD

EX1000

40x1

836

x16

30x1

424

x14

16x8

VD

VD

EX285

EX285

20x8

16x8

30x14

24x10

EX-

EX-

EX-

EX-

T

T

T

T

T

24x20

RA DUCT BELOWSA DUCT

EXISTING VAV 14-1

EXISTING VAV 13-9

EXISTING VAV 13-8

EXISTING VAV 13-7

EXISTING VAV 14-3

EX850

EXISTING VAV 14-2

24x10

VD

T

1

1

1

1

2

30x1

6EXISTING AHU-15

EXISTING AHU-14

EXISTING AHU-13

2 (TYP.)2

2 (TYP.)

2

2

2

2

EXISTING RELIEFAIR HOOD

EX-

date

draw

nde

sign

edch

ecke

dco

mm

. no.

02-0

4-20

20

c Copyright 2016 Breslin Ridyard Fadero Architects

FOR

TH

EIN

TER

IOR

ALT

ERA

TIO

NS

AN

D R

E-R

OO

FIN

G

WIL

LOW

GR

OV

E, M

ON

GO

MER

Y C

OU

NTY

, PE

NN

SYLV

AN

IA

he

E1

W B

road

St S

uite

500

Bet

hleh

em P

A 18

018

T 61

0-86

6-38

20 F

610

-866

-383

0E

lve@

lve.

cc W

ww

w.lv

e.cc

en

hE

MecL

ngi

la

inca

and

ghi

eg

nin

erc

lce

irtCla

oaVll

ns

luat

tsy

LVE - 19191

AREA OF WORK

NOT TO SCALEKEY PLAN

N

FLOOR PLAN - DEMOLITIONN 2'

Scale: 1/4" = 1'-0"

8'4'1'0

1 RELOCATE EXISTING THERMOSTAT INCLUDING ALL ASSOCIATED WIRING, PATCH WALL TOMATCH EXISTING CONSTRUCTION AND FINISH. REFER TO DRAWING M201 FOR NEWTHERMOSTAT LOCATION. OBTAIN THE SERVICES OF BRADLEY SCIOCCHETTI TO PERFORMCONTROL WORK.

2 REMOVE EXISTING DUCTWORK AS SHOWN INCLUDING ALL ASSOCIATED GRILLES, DIFFUSERS,HANGERS, AND INSULATION.

KEYNOTES - DEMOLITION

1. OWNER RESERVES RIGHT TO CLAIM ANY AND ALL SALVAGEABLE MATERIALS AND EQUIPMENT. PRIOR TOCOMMENCING DEMOLITION WORK, IDENTIFY ITEMS OWNER CHOOSES TO CLAIM. REMOVE AND STORECLAIMED ITEMS. REMOVE AND DISPOSE OF ALL UNCLAIMED MATERIALS AND EQUIPMENT.

2. THE MECHANICAL CONTRACTOR SHALL NOT PERFORM HAZARDOUS MATERIAL ABATEMENT. IMMEDIATELYNOTIFY THE OWNER AND ARCHITECT IN THE EVENT HAZARDOUS MATERIALS ARE ENCOUNTERED PRIOROR DURING DEMOLITION. HAZARDOUS MATERIAL ABATEMENT INCLUDING THE REMOVAL OF ASBESTOS,LEAD, PCB'S, AND MOLD SHALL BE PERFORMED BY THE OWNER OR HIS SEPARATE CONTRACTOR.

3. COORDINATE THE REMOVAL OF HVAC SYSTEMS IN ACCORDANCE WITH THE PROJECT CONSTRUCTIONPHASING SCHEDULE. DO NOT REMOVE OR DE-ACTIVATE SYSTEMS NEEDED TO REMAIN IN OPERATIONTHROUGHOUT THE DESIGNATED CONSTRUCTION PHASES. WHERE PARTIAL REMOVAL OF ORCONNECTION TO ACTIVE SYSTEMS IS REQUIRED, COORDINATE PERIODS OF TEMPORARY SHUTDOWNWITH THE OWNER OR ARCHITECT.

4. UNLESS OTHERWISE NOTED, ALL CUTTING AND PATCHING OF EXISTING FLOORS, CEILINGS, WALLS, ANDROOFS AS NEEDED TO PERFORM MECHANICAL DEMOLITION WORK, INCLUDING TEMPORARY REMOVALAND REINSTALLATION OF CEILINGS, SHALL BE PERFORMED BY THE MECHANICAL CONTRACTOR. PATCHWORK SHALL BE COMPATIBLE WITH EXISTING CONSTRUCTION MATERIALS, FINISHES, AND FIRERESISTANCE RATINGS.

5. PROVIDE TEMPORARY PROTECTION OF EXISTING FIRE PROTECTION DEVICES IN AREAS WHEREDEMOLITION WORK WILL BE PERFORMED. COORDINATE TEMPORARY PROTECTION AND SHUTDOWN OFFIRE ALARM SYSTEMS WITH THE OWNER.

6. IN LOCATIONS WHERE THE MECHANICAL CONTRACTOR IS THE SOLE CONTRACTOR PERFORMINGDEMOLITION WORK, INCLUDING CUTTING OF EXISTING FLOORS, WALLS, CEILINGS, AND ROOF FOR WORKRELATED TO THE INSTALLATION OF NEW HVAC WORK, PROVIDE TEMPORARY DUST CONTROL BARRIERSAND EXHAUST FANS TO MAINTAIN A NEGATIVE SPACE PRESSURE IN THE AREA OF WORK.

HVAC DEMOLITION NOTES

DC

DD

CD

SMG

M101

FLO

OR

PLA

N -

DEM

OLI

TIO

N

Page 3: INTERIOR ALTERATIONS AND RE-ROOFING

200 sq ft

MECH.EQUIP.

STOR.

MECH.EQUIP.

AIRBRUSH

SERVERROOM

THEORY GCNA LAB

ST.

(149)

PHOTOCOMPOSITION

(144)

UP

UP

CORRIDOR A

CO

RR

IDO

R C

STOR.

ROBOTICS ANDAUTOMATED

TECHNOLOGYA102

THEORYA101

MECHANICALA103

STORAGEA104

OFFICEA105

CORRIDORA106

(149A)

20x12

48x2

440

x24

40x2

4

24x2

0

36x16

20x1

0

16x10

20x10 24x12

EX60

8x4

40x1

836

x16

30x1

424

x14

16x8

VD

VD

EX285

EX285

30x14

T

24x20

RA DUCT BELOWSA DUCT

EXISTING VAV 14-1

EXISTING VAV 13-9

EXISTING VAV 13-8

EXISTING VAV 13-7

EXISTING VAV 14-3

EX850

EXISTING VAV 14-2

24x10

VD

T

30x1

6

EXISTING AHU-15

EXISTING AHU-14

EXISTING AHU-13

EXISTING RELIEFAIR HOOD

EX-

14x1

2

10"Ø

10"Ø

2275

3450

3450

14x1

2

12"Ø12"Ø

1100 6"Ø

10x10

175

6"Ø

8x8

6"Ø

1100

T

VAV-13-8

T

VAV-13-9

TVAV-14-1

4-

4-

10"Ø

10"Ø

2275

2275

2275

12x1

0

1

1 1

2 (TYP.)

3 EF1

51000

5100018x18 UP TO ROOF

18x12 18x12

5-

5-

5-

10x8 TA

4-

CUT AND PATCHEXISTING WALL

6"Ø

1100

4-

T

VAV-14-3

1

4

4

5

5

date

draw

nde

sign

edch

ecke

dco

mm

. no.

02-0

4-20

20

c Copyright 2016 Breslin Ridyard Fadero Architects

FOR

TH

EIN

TER

IOR

ALT

ERA

TIO

NS

AN

D R

E-R

OO

FIN

G

WIL

LOW

GR

OV

E, M

ON

GO

MER

Y C

OU

NTY

, PE

NN

SYLV

AN

IA

he

E1

W B

road

St S

uite

500

Bet

hleh

em P

A 18

018

T 61

0-86

6-38

20 F

610

-866

-383

0E

lve@

lve.

cc W

ww

w.lv

e.cc

en

hE

MecL

ngi

la

inca

and

ghi

eg

nin

erc

lce

irtCla

oaVll

ns

luat

tsy

LVE - 19191

AREA OF WORK

NOT TO SCALEKEY PLAN

N

FLOOR PLAN - NEW WORKN 2'

Scale: 1/4" = 1'-0"

8'4'1'0

1 MOUNT THERMOSTAT 48" AFF. CONCEAL CONTROL WIRING WITHIN WALL AND CEILINGCONSTRUCTION.

2 PROVIDE NEW GRILLE, REGISTER, OR DIFFUSER AS SHOWN. FIELD VERIFY ACTUAL GRILLEDIMENSIONS TO FIT EXISTING CEILING OPENING.

3 INSTALL NEW EXHAUST FAN ON ROOF IN THE LOCATION SHOWN.HC TO CUT ROOF OPENING AND PROVIDE STEEL FRAMING. GC TO FLASH ROOF CURB.

4 ATC CONTRACTOR TO PROGRAM NON-OVERLAPPING, NON-CONFLICTING TEMPERATURESETPOINTS.

5 PROVIDE TESTING & BALANCING REPORT INDICATING UNIT SUPPLY AIRFLOW RATES WITHALL ASSOCIATED VAV BOXES AT MAXIMUM OPEN SETTING. REPORT FAN WITH VFD SPEED,FLA, MAX FLA, AND DUCT STATIC SETPOINT. ADJUST MINIMUM OA DAMPER POSITION ATDIRECTION OF ENGINEER; COORDINATE DAMPER SETTING WITH ATC CONTRACTOR.

KEYNOTES - NEW WORK DC

DD

CD

SMG

M201

FLO

OR

PLA

N -

DU

CTW

OR

K

Page 4: INTERIOR ALTERATIONS AND RE-ROOFING

200 sq ft

MECH.EQUIP.

STOR.

MECH.EQUIP.

AIRBRUSH

SERVERROOM

THEORY GCNA LAB

ST.

(149)

PHOTOCOMPOSITION

(144)

UP

UP

CORRIDOR A

CO

RR

IDO

R C

STOR.

ROBOTICS ANDAUTOMATED

TECHNOLOGYA102

THEORYA101

MECHANICALA103

STORAGEA104

OFFICEA105

CORRIDORA106

(149A)

E11

E05

E17

E07

E07

E07

E01

CA CA

(E) 1"CA

CONNECT NEW 1"CA TO EXISTING CA MAIN INHALLWAY CEILING SPACE. VERIFY EXACT SIZEAND LOCATION OF CONNECTION POINT IN FIELD.

P.C. SHALL VERIFY FINAL CONNECTIONAND PRESSURE WITH EQUIPMENTMANUFACTURER'S REQUIREMENTS(TYPICAL FOR ALL)

PROVIDE 1/2"CA QUICK CONNECTOUTLET AT CEILING. REFER TOCOMPRESSED AIR DROP FORCEILING CONNECTIONS DETAIL ONTHIS DWG.

PROVIDE 1/2"CA DROP. REFER TOCOUNTERTOP COMPRESSED AIRDROP DETAIL ON THIS DWG.

3/4"CA

3/4"CA

3/4"CA

1"CA

CA

CA

CA

PROVIDE 1"CA DROP. REFERTO COMPRESSED AIR DROPFOR CEILING CONNECTIONSDETAIL ON THIS DWG.

1"CA

PROVIDE 1/2"CA QUICK CONNECTOUTLET AT CEILING. REFER TOCOMPRESSED AIR DROP FORCEILING CONNECTIONS DETAIL ONTHIS DWG.

1"CA

date

draw

nde

sign

edch

ecke

dco

mm

. no.

02-0

4-20

20

c Copyright 2016 Breslin Ridyard Fadero Architects

FOR

TH

EIN

TER

IOR

ALT

ERA

TIO

NS

AN

D R

E-R

OO

FIN

G

WIL

LOW

GR

OV

E, M

ON

GO

MER

Y C

OU

NTY

, PE

NN

SYLV

AN

IA

he

E1

W B

road

St S

uite

500

Bet

hleh

em P

A 18

018

T 61

0-86

6-38

20 F

610

-866

-383

0E

lve@

lve.

cc W

ww

w.lv

e.cc

en

hE

MecL

ngi

la

inca

and

ghi

eg

nin

erc

lce

irtCla

oaVll

ns

luat

tsy

LVE - 19191

AREA OF WORK

NOT TO SCALEKEY PLAN

N

FLOOR PLAN - COMPRESSED AIR PIPINGN 2'

Scale: 1/4" = 1'-0"

8'4'1'0

NR

ZN

RZ

JH

3"3"

12"

36" M

AXIM

UM

SPAC

ING

BALL VALVE(TYP)

PIPE SUPPORT (TYPICAL)

COMPRESSED AIR MAIN

1/2" COMPRESSED AIR DROP

FINISHED FLOOR

NO SCALECOUNTERTOP COMPRESSED AIR DROP

BLEEDER VALVE

SHARPE 606B AIR CONTROL UNIT (OR EQUIVALENT)

AIR HOSE COUPLER (MAKEFINAL CONNECTION TOEQUIPMENT AS APPLICABLE)

PRESSURE REGULATOR

COUNTERTOP, VERIFYINSTALLED HEIGHT WITHARCHITECT

CASEWORK/EQUIPMENTSURFACE

TERMINATE WITH OPEN END

SCHEDULE 40, STEEL PIPE: ASTM A53/A53M, TYPE E OR S, GRADE B, BLACKOR HOT-DIP ZINC COATED WITH ENDS THREADED ACCORDING TOASME B1.20.1.A. THREADED JOINTS: THREAD PIPE WITH TAPERED PIPE THREADS

ACCORDING TO ASME B1.20.1. CUT THREADS FULL AND CLEAN USINGSHARP DIES. REAM THREADED PIPE ENDS TO REMOVE BURRS ANDRESTORE FULL ID. JOIN PIPE FITTINGS AND VALVES AS FOLLOWS:

1. APPLY APPROPRIATE TAPE OR THREAD COMPOUND TO EXTERNAL PIPETHREADS UNLESS DRY SEAL THREADING IS SPECIFIED.

2. DAMAGED THREADS: DO NOT USE PIPE OR PIPE FITTINGS WITHTHREADS THAT ARE CORRODED OR DAMAGED. DO NOT USE PIPESECTIONS THAT HAVE CRACKED OR OPEN WELDS.

INSTALL SHUTOFF VALVES AND UNIONS OR FLANGED JOINTS ATCOMPRESSED-AIR PIPING TO AIR COMPRESSORS. INSTALL SHUTOFF VALVEAT INLET TO EACH AUTOMATIC DRAIN VALVE, FILTER, LUBRICATOR, ANDPRESSURE REGULATOR. INSTALL CHECK VALVES TO MAINTAIN CORRECTDIRECTION OF COMPRESSED-AIR FLOW TO AND FROM COMPRESSED-AIRPIPING SPECIALTIES AND EQUIPMENT.PERFORM FIELD TESTS AND INSPECTIONS. REPAIR LEAKS AND RETESTUNTIL NO LEAKS EXIST. PREPARE TEST REPORT.

COMPRESSED AIR PIPING SPECIFICATION

PROVIDE UNI-STRUT FROMSTRUCTURE ABOVE WHEN DROPISN'T ALONG PERIMETER WALL

MECHANICAL FABRICATION 1 LEARNING SYSTEME01

E07E11

E05

E17

BASIC PNEUMATIC LEARNING SYSTEMELECTRIC RELAY CONTROL LEARNING SYSTEMELECTRICAL WIRING LEARNING SYSTEMPORTABLE PNEUMATIC TROUBLE SHOOTING LEARNING SYSTEM

EQUIPMENT SCHEDULEMIN. PIPING CONNECTIONS

CAITEM DESCRIPTIONTAG

CACA

CACACA

NO.

3"3"

27"

36" M

AXIM

UM

SPAC

ING

ENDTERMINATE WITH OPEN

BALL VALVE(TYP.)

PIPE SUPPORT (TYPICAL)

COMPRESSED AIR MAIN

1/2" COMPRESSED AIR DROP

FLOOR

NO SCALE

18"

COMPRESSED AIR DROP FOR CEILING CONNECTIONS

BLEEDER VALVE

REGULATOR

ESCUTCHEON

FINISHED CEILING

1/2" COMPRESSED AIR DROP

TERMINATE WITHQUICK CONNECT

COMPRESSED AIR MAINDOWNSTREAM OF WALLREGULATOR

M301

FLO

OR

PLA

N -

PIPI

NG

Page 5: INTERIOR ALTERATIONS AND RE-ROOFING

date

draw

nde

sign

edch

ecke

dco

mm

. no.

02-0

4-20

20

c Copyright 2016 Breslin Ridyard Fadero Architects

FOR

TH

EIN

TER

IOR

ALT

ERA

TIO

NS

AN

D R

E-R

OO

FIN

G

WIL

LOW

GR

OV

E, M

ON

GO

MER

Y C

OU

NTY

, PE

NN

SYLV

AN

IA

he

E1

W B

road

St S

uite

500

Bet

hleh

em P

A 18

018

T 61

0-86

6-38

20 F

610

-866

-383

0E

lve@

lve.

cc W

ww

w.lv

e.cc

en

hE

MecL

ngi

la

inca

and

ghi

eg

nin

erc

lce

irtCla

oaVll

ns

luat

tsy

LVE - 19191

GRILLE - REGISTER - DIFFUSER SCHEDULE

NOTES:

TAG MANUFACTURER MODEL PATTERN MAT FINISH NOTES

#

1 TITUS

2

3

4

1. PROVIDE 24x24 LAY-IN T-BAR PANEL

FACESIZE

5

CFM

TITUS

TITUS

TITUS

TITUS

THROW NCNECKSIZE

CFMRANGE

MCD-AA 16 X 6 3-4-8 246 0-125 ALUM BWEADJUST.

MCD-AA 112 X 12 7-10-14 2610 250-400 ALUM BWEADJUST.

MCD-AA 12 ADJUST. ALUM. BWE 112 X 12 10-14-20 27400-600

350FL 8 RETURN ALUM. BWE -10 X 10 - 10125-250

350FL - EXHAUST ALUM. BWE -22 X 22 - 20800-1600

FAN SCHEDULE EF

NOTES:

SF

TAG MANUFACTURER MODEL CFM ESP DRIVE SONES HP RPM

MOTOR

IN WG

EF-1

V/P/HzROOF

OPENING

INxIN

DAMPER NOTES

(WATTS)

WEIGHT

LBS

1. PROVIDE DISCONNECT SWITCH, BACK DRAFT DAMPER, & 14" H ROOF CURB.2. FAN MANUFACTURER TO PROVIDE 0-60 MINUTE PROGRAMMABLE TIMER, EC TO INSTALL.

# #

AREA SERVED FAN TYPE MODE OFOPERATION

1/2 129413.3BELT1.02000150 ACEBCOOK 115/1/60 19.5 X 19.5 - BACKDRAFT 70 1,2ROBOTICS ROOFTOP

INTERNAL

LVE NOTE

BB

EXHAUST FAN ROOF CURB DETAILNOT TO SCALE

REMOVABLE MOTOR DOME

GRAVITY BACKDRAFT DAMPER

WOOD BLOCKING BY HC

EXHAUST DUCT

12" HIGH ROOF CURB BY HC

NEOPRENE GASKET

BIRDSCREEN

VIBRATION ELIMINATOR

ROOF CURB FLASHING BY GC

ROOF MEMBRANE

ROOF INSULATIONROOF DECK

ROOF OPENING ANGLE FRAMING BY HC

ELECTRICAL CONDUIT BY EC

WOOD NAILER

ADJUSTABLE PITCH MOTOR SHEAVE(FOR BELT DRIVE)

MOTOR WITH FACTORYDISCONNECT SWITCH

INLET VENTURI

FAN WHEEL

DIFFUSER BRANCH DUCT DETAILNOT TO SCALE

MAIN DUCT

BRANCH DUCTTAKE-OFF

VOLUME DAMPER SUPPLY

AIRFLOW

RETURN /EXHAUSTAIRFLOW

CEILING T-BAR

CEILING TILE

DIFFUSER

PROVIDE DRAW BANDS WITHSILICONE SEALER AT BOTHENDS OF FLEXIBLE DUCT

FLEXIBLE DUCT SIZE AS SHOWN ONPLANS. PROVIDE REDUCER TO MATCHDIFFUSER OR GRILLE COLLAR SIZE. DONOT EXCEED 6'-0" OF FLEXIBLE DUCTPER BRANCH

90° RADIUS ELBOW WITHEXTERNAL INSULATION

TAPE ALL INSULATIONSEAMS

SUPPORT DIFFUSER AND BRANCHDUCT FROM STRUCTURE. DO NOTSUPPORT FROM CEILING

TRANSFER AIR DUCT DETAILNOT TO SCALE

PROVIDE 2x2x24 GA SHEETMETAL ANGLES FOR NON-RATEDWALLS. PROVIDE RETAININGANGLES PER FIRE DAMPER MFRFOR RATED WALLS

WALL

TURN ELBOWS HORIZONALWHERE AIR INLET/OUT PATH ISOBSTRUCTED

MAINTAIN 24" MINBETWEEN WALL

PENETRATION ANDINSIDE OF ELBOW

PROVIDE FIRE DAMPERWHERE REQUIREDREFER TO FIRE DAMPERDETAIL

INTERNALLY LINE DUCT WITH 1"THICK UL LISTED NON-FIBROUSLINER

NOTE:DUCT SIZES SHALL BE ASSHOWN ON PLANS. DUCT SIZESARE CLEAR INSIDE DIMENSIONS

L= 2 X W (MIN.)

L= 2 X W (MIN.)

W

L

DUCT HANGER DETAILSNOT TO SCALE

1" WIDEHANGERSTRAP

LOAD RATEDFASTENER(TYP)

ROUND DUCT SIZES12"Ø AND SMALLER

ROUND DUCT SIZES12"Ø - 24"Ø

THREADEDROD

2" WIDE BAND

1" WIDE HANGERSTRAP

RECTANGULAR DUCT SIZES24x24 AND SMALLER RECTANGULAR DUCT SIZES

24x24 AND LARGER

LOAD RATEDFASTENER(TYP)

STEELANGLE ORCHANNEL

ATTACH TOBUILDINGSTRUCTURE(TYP)

THREADEDROD

NOTES:1. COMPLY WITH SMACNA DUCT CONSTRUCTION STANDARDS FOR SIZES,

LOAD RATINGS, AND SPACING FOR HANGERS, FASTENERS, ANDBUILDING ATTACHMENTS

2. HANGER AND FASTENERS MATERIALS SHALL MATCH OR BECOMPATIBLE WITH DUCT MATERIALS

3. PRIME AND PAINT HANGERS EXPOSED WITHIN FINISHED SPACES

HC TO CUT ROOF OPENING

1.0 GENERAL REQUIREMENTS

A. SCOPE OF WORK

1. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, EQUIPMENT, TOOLS, AND LABOR TO COMPLETELY FURNISH, INSTALL, TEST, AND OPERATETHE MECHANICAL SYSTEMS DEPICTED ON THE DRAWINGS AND AS DESCRIBED HEREIN.

2. ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND SHALL BE OF THE TYPE, SIZE, CAPACITY, AND QUALITY AS INDICATED ON THE DRAWINGSAND AS SPECIFIED HEREIN. ALL LABOR SHALL BE PERFORMED BY SKILLED AND EXPERIENCED TRADESMAN, KNOWLEDGEABLE OF INDUSTRYSTANDARDS AND PRACTICES. THE ENGINEER SHALL BE THE SOLE JUDGE OF THE QUALITY OF CONSTRUCTION MATERIALS, EQUIPMENT, ANDWORKMANSHIP.

3. IN GENERAL, THE WORK SHALL INCLUDE FURNISHING AND INSTALLING THE FOLLOWING:

a. ROOF EXHAUST FAN AND ROOF CURBb. HANGERS AND SUPPORTSc. HVAC DUCT INSULLATIONd. COMPRESSED AIR PIPING

B. DRAWINGS

1. THE DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED TO SHOW THE APPROXIMATE LOCATION OF EQUIPMENT, PIPING, DUCTWORKAND ASSOCIATED SYSTEMS. THE DRAWINGS ARE INTENDED TO DEPICT COMPLETE AND FUNCTIONAL SYSTEMS BUT ARE NOT NECESSARILYINCLUSIVE OF EVERY MINUTE DETAIL INCLUDING BUT NOT LIMITED TO DUCT AND PIPING TRANSITIONS, ELBOWS, OFFSETS, NUTS AND BOLTS,AND MISCELLANEOUS MATERIALS THAT WILL BE REQUIRED AND SHALL BE INCLUDED BY THE CONTRACTOR AT NO EXTRA COST.

2. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS, SCALED OR NUMERIC, PRIOR TO THE INSTALLATION OF MECHANICAL SYSTEMS.

3. THE CONTRACTOR SHALL COORDINATE THE FINAL LOCATION AND INSTALLATION OF MECHANICAL SYSTEMS WITH ACTUAL CONDITIONS IN THE FIELDAND WITH THE WORK OF OTHER TRADES.

C. VISIT TO THE SITE

1. WHERE NEW WORK IS PROPOSED WITHIN OR ADJACENT TO EXISTING BUILDINGS, THE CONTRACTOR SHALL VISIT THE SITE PRIOR TOSUBMITTING HIS BID AND SHALL EXAMINE ALL CONDITIONS AFFECTING THE INSTALLATION OF THE PROPOSED WORK. THE CONTRACTOR SHALLINCLUDE IN HIS BID ALL LABOR AND MATERIALS REQUIRED TO COORDINATE THE INSTALLATION OF MECHANICAL SYSTEMS WITH EXISTING CONDITIONSAND THE WORK OF OTHER TRADES.

D. CODES, PERMITS, STANDARDS, AND REGULATIONS

1. THE CONTRACTOR SHALL INSTALL, TEST, AND OPERATE MECHANICAL SYSTEMS IN STRICT ACCORDANCE WITH ALL APPLICABLE LAWS, CODES,REGULATIONS, AND ORDINANCES OF THE MUNICIPAL, COUNTY, STATE, FEDERAL, PUBLIC UTILITIES, AND ALL OTHER AUTHORITIES HAVINGJURISDICTION.

2. THE CONTRACTOR SHALL PAY ALL PERMITS, INSPECTION FEES, AND ALL LOCAL, STATE, AND FEDERAL TAXES, AND UTILITY SERVICE CHARGES.

3. OSHA REGULATIONS: ALL WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH ALL APPLICABLE OSHA REGULATIONS. THECONSTRUCTION OF LADDERS, SERVICE PLATFORMS, AND WALKWAYS SHALL BE IN ACCORDANCE WITH OSHA STANDARDS.

4. ALL WORK SHALL BE PROVIDED IN ACCORDANCE WITH CURRENTLY RECOGNIZED INDUSTRY STANDARDS INCLUDING BUT NOT LIMITED TO: ARI,ASHRAE, ASME, ANSI, ASTM, SMACNA, NFPA, UL.

E. WARRANTY

1. THE CONTRACTOR SHALL PROVIDE A ONE (1) YEAR WARRANTY, FROM THE DATE OF FINAL COMPLETION AND ACCEPTANCE BY THE OWNER, FORTHE INSTALLATION OF HVAC SYSTEMS INCLUDING ALL EQUIPMENT, MATERIALS, WORKMANSHIP, AND LABOR.

2. THE CONTRACTOR SHALL RESPOND TO ALL SERVICE CALLS FROM THE OWNER THROUGHOUT THE WARRANTY PERIOD TO ADDRESSTEMPERATURE, DRAFT, NOISE, LEAKS, AND OPERATIONAL PROBLEMS ATTRIBUTABLE TO MALFUNCTIONING EQUIPMENT OR AUTOMATICCONTROLS.

F. SHOP DRAWINGS

1. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS (IN ELECTRONIC COPY) OF ALL EQUIPMENT AND MATERIALS TO BE FURNISHED ANDINSTALLED BY THIS CONTRACT.

2. PRIOR TO SUBMITTING COPIES TO THE ENGINEER, THE CONTRACTOR SHALL REVIEW ALL SUBMITTALS AND SHALL CLEARLY IDENTIFY ALLDEVIATIONS INCLUDING BUT NOT LIMITED TO CHANGES IN WEIGHTS, PHYSICAL DIMENSIONS, SERVICE CLEARANCES, CAPACITIES, EFFICIENCIES,ELECTRIC POWER AND CIRCUITING REQUIREMENTS, NATURAL GAS LOADS AND SERVICE PRESSURES, AND SIMILAR CHARACTERISTICS.

3. THE CONTRACTOR MAY PROPOSE PRODUCT OR EQUIPMENT SUBSTITUTIONS FOR PRODUCTS SIMILAR IN TYPE, CAPACITY, OR PERFORMANCETO THOSE SPECIFIED. THE ENGINEER SHALL BE THE SOLE JUDGE OF THE QUALITY AND ACCEPTABILITY OF PRODUCTS AND EQUIPMENTINTENDED FOR THIS PROJECT. THE ENGINEER RESERVES THE RIGHT TO REJECT OR CONDEMN ANY PRODUCTS, EQUIPMENT, AND MATERIALSTHAT ARE DETERMINED TO BE EQUIVALENT IN QUALITY OR PERFORMANCE TO THE SPECIFIED PRODUCT REGARDLESS OF EXTENT OF THEIRDELIVERY, INSTALLATION, OR COMPLETION. THE ENGINEER MAY REJECT SUBSTITUTIONS SHOULD INSUFFICIENT TIME BE AVAILABLE TOPROPERLY EVALUATE PROPOSED SUBSTITUTIONS.

4. THE ENGINEER MAY REJECT ANY AND ALL SHOP DRAWINGS THAT DO NOT COMPLY. THE CONTRACTOR SHALL RE-SUBMIT SHOP DRAWINGS ASOFTEN AS NECESSARY TO OBTAIN ACCEPTANCE WITHOUT ADDITIONAL COST OR DELAY.

G. STORAGE

1. THE CONTRACTOR SHALL COORDINATE THE STORAGE OF MATERIALS AND EQUIPMENT ON SITE WITH THE CONSTRUCTION MANAGER OROWNER AS APPLICABLE. THE CONTRACTOR SHALL PROTECT ALL MATERIALS, EQUIPMENT, AND PRODUCTS FROM DAMAGE DURINGCONSTRUCTION AND FROM DAMAGE RESULTING FROM THEFT, VANDALISM, AND WEATHER.

H. CLEAN-UP

1. UPON COMPLETION OF INSTALLATION OF MECHANICAL SYSTEMS THOROUGHLY CLEAN ALL MATERIALS AND EQUIPMENT. THOROUGHLY CLEANEXISTING SURFACES TO REMOVE DUST AND DEBRIS. REMOVE AND DISPOSE OF ALL CONSTRUCTION DEBRIS FROM THE SITE.

I. TESTS AND START-UP

1. PROVIDE TESTING AND START-UP IN ACCORDANCE WITH MECHANICAL EQUIPMENT MANUFACTURER'S REQUIREMENTS.

J. OPERATING AND MAINTENANCE INSTRUCTIONS

1. THE CONTRACTOR SHALL PROVIDE 3 BOUND VOLUMES OF OPERATING AND MAINTENANCE INSTRUCTIONS INCLUDING MANUFACTURERSCATALOGS, PRODUCT DESCRIPTIONS, WARRANTIES, AND PARTS LISTS FOR ALL EQUIPMENT PROVIDED UNDER THIS CONTRACT.

2. PROVIDE DEMONSTRATION AND TRAINING TO THE OWNER'S DESIGNATED SERVICE PERSONNEL ON THE BASIC OPERATION, CARE, ANDMAINTENANCE OF MECHANICAL EQUIPMENT AND AUTOMATIC TEMPERATURE CONTROLS.

3. PROVIDE TRAINING ON BASIC HVAC EQUIPMENT AND SYSTEMS.

2.0 BASIC MATERIALS

A. FIRE RESISTANT CONSTRUCTION

1. PROVIDE UL LISTED FIRE PROOFING SEALANTS AROUND ALL DUCT, PIPING, AND CONDUIT PENETRATIONS OF RATED FIRE RESISTANT WALLSAND FLOORS.

B. METAL FABRICATIONS AND SUPPORTS

1. PROVIDE MISCELLANEOUS METALS AND MATERIALS FOR EQUIPMENT, PIPING, AND DUCT SUPPORTS AS PRODUCED BY B-LINE, UNI-STRUT, OREQUAL. MISCELLANEOUS STEEL PLATES, CHANNELS, ANGLES, TEES, RODS SHALL BE ASTM GRADE A36 STEEL. BOLTS SHALL BE ASTM GRADE A.

C. MECHANICAL IDENTIFICATION

1. PROVIDE PIPE AND EQUIPMENT IDENTIFICATION PRODUCTS AS PRODUCED BY SETON OR EQUAL AND APPLIED AS FOLLOWS:

a. PROVIDE PLASTIC LAMINATED SIGNS TO IDENTIFY EQUIPMENT TAG NUMBERS.

D. ELECTRICAL WORK

1. UNLESS OTHERWISE INDICATED, PROVIDE ALL ELECTRICAL WORK ASSOCIATED WITH MECHANICAL SYSTEM CONTROLS INCLUDING BUT NOT LIMITED TOWIRING AND CONNECTIONS TO: THERMOSTATS, MOTORIZED VALVES, AND MOTORIZED DAMPERS, AND CONTROL PANELS.

2. ALL ELECTRICAL WORK SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE NATIONAL ELECTRICAL CODE. ALL WIRING SHALL BE COPPERCONDUCTOR. ALL WIRING IN EXPOSED LOCATIONS SHALL BE INSTALLED IN CONDUIT. ALL LOW VOLTAGE WIRING SHALL BE UL LISTED FORPLENUM APPLICATIONS.

3.0 DUCTWORK

A. FABRICATION

1. FABRICATE DUCTWORK IN ACCORDANCE WITH SMACNA DUCT CONSTRUCTION STANDARDS FOR THE INTENDED APPLICATION AND STATICPRESSURE CLASS. COMPLY WITH SMACNA STANDARDS FOR THE CONSTRUCTION OF ALL FITTINGS, JOINTS, REINFORCING, AND SUPPORTS.SEAL ALL JOINTS IN ACCORDANCE WITH SMACNA STANDARDS AND APPLICABLE SECTIONS OF ASHRAE 90.1 OR THE INTERNATIONAL ENERGYCONSERVATION CODE.

a. FABRICATE HEATING AND AIR CONDITIONING DUCTWORK IN ACCORDAND WITH SMACNA “HVAC DUCT CONSTRUCTION STANDARD - METALAND FLEXIBLE”

3. PRESSURE CLASS:

a. SUPPLY, BETWEEN ROOFTOP UNIT AND OUTLET: +2.0”b. RETURN, UPSTREAM OF ROOFTOP UNITS: -2.0”c. GENERAL EXHAUST, UPSTREAM OF FANS: -2.0”

4. SEAL CLASS: A (ALL)

B. DUCT MATERIALS

1. SUPPLY AIR, RETURN AIR, OUTSIDE AIR, RELIEF AIR, AND NON-HAZARDOUS EXHAUST SYSTEM DUCTWORK SHALL BE FABRICATED FROMGALVANIZED SHEET STEEL COMPLYING WITH ASTM A653 WITH A G90 GALVANIZED COATING. DUCTWORK TO BE EXPOSED TO VIEW IN FINISHEDSPACES SHALL HAVE A MILL PHOSPHATIZED FINISH AND READY FOR PRIMER AND PAINT.

2. ROUND FLEXIBLE DUCT SHALL BE UL 181, CLASS 1, CONSTRUCTED WITH BLACK POLYMER FILM, HELICALLY WOUND SPRING-STEELREINFORCEMENT, 1” THICK GLASS FIBROUS INSULATION, POLYETHYLENE OR ALUMINIZED VAPOR BARRIER, AND RATED FOR 10 INCH WGPOSITIVE PRESSURE AND 1 INCH NEGATIVE PRESSURE.

C. DUCT ACCESSORIES

1. VOLUME DAMPERS: VOLUME DAMPERS SHALL BE OF STEEL CONSTRUCTION, RECTANGULAR MULTIPLE OPPOSED-BLADE OR ROUND SINGLEBLADE, WITH NON-FERROUS BEARINGS, AND EQUIPPED WITH EXTERNAL HANDLES WITH LOCKING QUADRANTS.

2. TURNING VANES SHALL BE SINGLE THICKNESS FOR DUCTS WIDTHS BETWEEN 12” AND 24” AND DOUBLE THICKNESS FOR DUCTS GREATER THAN24”.

3. DUCT ACCESS DOORS, DUCT SUPPORTS, AND MISCELLANEOUS MATERIALS SHALL BE IN ACCORDANCE WITH SMACNA STANDARDS. DUCTSEALANTS SHALL BE UL LISTED.

4.0 INSULATION

A. DUCT INSULATION: DUCT INSULATION SHALL BE MINERAL FIBER TYPE III WITH FSK JACKET AND COMPLYING WITH ASTM C533 AND C1290. INSULATION SHALL BE PRODUCED BY CERTAIN TEED, JOHNS MANVILLE, KNAUF, OR OWENS CORNING.

1. ALL SUPPLY AIR DUCTWORK CONCEALED ABOVE CEILINGS SHALL BE EXTERNALLY WRAPPED WITH 2" THICK FLEXIBLE DUCT INSULATION

6.0 HVAC EQUIPMENT

A. GENERAL

1. HVAC EQUIPMENT SHALL BE OF THE CAPACITY, PERFORMANCE, AND EFFICIENCY AS INDICATED ON THE DRAWINGS. UNITS SHALL BE UL LISTED,RATED IN ACCORDANCE WITH APPLICABLE INDUSTRY STANDARDS, AND SHALL BE COMPLETELY FACTORY ASSEMBLED AND WIRED. HVACEQUIPMENT SHALL MEET OR EXCEED ASHRAE STADNDARD 90.1

2. EQUIPMENT MANUFACTURERS SHALL PROVIDE ALL NECESSARY COMPONENTS AND ACCESSORIES FOR A COMPLETE INSTALLATION INCLUDINGBUT NOT LIMITED TO ROOF CURBS, VIBRATION ISOLATORS, AND SAFETY DISCONNECT SWITCHES.

7.0 AUTOMATIC TEMPERATURE CONTROLS

A. GENERAL

1. OBTAIN THE SERVICES OF BRADLEY SCIOCCETTI TO ALTER AND EXTEND THE EXISTING AUTOMATIC TEMPERATURE CONTROL SYSTEM AS INDICATEDON THE DRAWINGS.

2. INSTALL ALL WIRING IN ACCORDANCE WITH THE NATIONAL ELECTRIC CODE. ALL CONTROL WIRING SHALL BE PLENUM RATED AND UL LISTED.PROVIDE POWER WIRING TO LINE VOLTAGE DEVICES, CONTROL PANELS, AND LOW VOLTAGE CONTROL-CIRCUIT TRANSFORMERS. COORDINATETHE LOCATION AND SOURCE OF ATC POWER WITH THE PROJECT ELECTRICAL CONTRACTOR.

8.0 TEST, ADJUST, BALANCE

1. PRIOR TO STARTING EQUIPMENT, CHECK ALL MOTORS, ACTUATORS, CONTROLS, AND WIRING ARE PROPERLY INSTALLED. LEAK TEST ALLPIPING SYSTEMS PRIOR TO START-UP.

2. OBTAIN THE SERVICES OF A CERTIFIED TESTING AND BALANCING CONTRACTOR. TAB CONTRACTOR SHALL BE CERTIFIED BY NEEB OR AABC.

3. ADJUST AND BALANCE FANS AND DAMPERS TO ACHIEVE FLOW RATES AS INDICATED ON THE DRAWINGS.

4. ADJUST AUTOMATIC TEMPERATURE CONTROLS TO ACHIEVE SATISFACTORY TEMPERATURE CONTROL.

5. SUBMIT TESTING AND BALANCING REPORTS INDICATING THE NAME OF THE TAB CONTRACTOR, TYPES OF BALANCING EQUIPMENT UTILIZED,EQUIPMENT NAMEPLATE DATA, DESIGN VS. ACTUAL FLOW TABULATIONS, FAN AND PUMP OPERATING CHARACTERISTICS, AND MOTOR SPEED,VOLTAGE, AND AMPERAGE RECORDINGS.

6. IDENTIFY AND REPORT DEFICIENCIES SUCH AS: EXCESSIVE AIR LEAKAGE, INSUFFICIENT AIR FLOW, INSUFFICIENT PRESSURE, MOTOR OVERLOADCONDITIONS, NOISE, OR EXCESSIVE VIBRATION.

MECHANICAL SPECIFICATIONS

5.0 COMPRESSED AIR PIPING.

A. COMPRESSED AIR PIPING SHALL BE SCHEDULE 40 BLACK STEEL PIPE WITH THREADED FITTINGS.