bresd alterations and additions to gymnasium/kitchen ... · 3. interior hm frame and glazing stop...
TRANSCRIPT
BRESD Alterations and Additions to Gymnasium/Kitchen (Increment 1) and Gym Additions/Classroom/Fire Suppression (Increment 2)
Mold Rehabilitation Project –
BID PACKAGE BR2018.1-2.17 INTERIOR PAINT
Scope Clarification BR2018.1-2.17: Interior Paint
General Notes:
1. The following scope is offered as assistance to complete a thorough scope letter. Bids and budget
breakout shall include a scope letter prepared by the contractor
2. This work shall be completed per plans and specifications
3. Pre-bid RFI’s should be submitted if the plans are not thorough, lack dimensions, or if you have
questions pertaining to this bid
4. Review all pages of the plans
5. Budget breakout (itemized bid sheet) is required for all scopes
6. Bidders shall submit a schedule (number of days) required to complete the work contained in this
scope to assist with overall planning and scheduling
General Interior Painting Notes:
1. Paint to be Dunn Edward, Sherwin Williams, or equal per plan and spec.
2. Contractor to provide Caulking, Primer, Base and Finish coats.
3. Contractor shall protect all areas not scheduled for paint from spills, overspray, and any other
incident that would affect existing or future finishes.
4. Contractor shall provide (3) each 12” x 12” brush outs of colors for District verification and
approval before “any interior paint is applied”.
5. Contractor shall inspect all surfaces to be painted and bring any issues to District Project Manager
before commencement of painting. If no issues are recorded prior to commencement of painting,
District will assume building is 100% ready and contractor will assume any liability i.e. panel gaps not
correct, nailing depth too deep, gaps too large for caulking etc.
Interior Colors:
1. Interior Wall Color shall be equivalent color to: color to be determined by owner
2. Interior Ceilings including bathrooms shall be equivalent color to: color to be determined by owner
3. Interior HM Frame and Glazing Stop Color shall be equivalent color to: color to be determined by
owner
4. Interior Door Frames and Door Face shall be equivalent color to: color to be determined by owner
5. Caulking at HM Frames, Casework, Ceiling edges, etc. as needed – to match Interior Wall Color
Interior Paint Schedule
1. All interior rooms have painted ceilings.
2. Bathrooms have FRL/FRP on walls. Lids ONLY, get painted at all bathroom locations.
3. Kitchen and prep/storage rooms have FRL/FRP on walls. Lids ONLY, get painted in kitchen and
associated rooms.
4. All hard lids shall be painted.
5. Where FRL occurs, contractor shall bring finish paint down to minimum 7’ 6” AFF.
a. All gym walls get FRL to 8’.
6. Gym ceiling has extensive tectum panels. See attached pdf. Finish paint shall extend 6” minimum in
behind tectum panel at all sides/ all locations.
7. Gym walls get scattered tectum panels. All gym walls shall get finish paint.
This document shall be used only as a clarification of the intent of the DSA Approved Plans
and Project Manual. While this document is not meant to add to the design of the project, it
is formal and the contractor shall be responsible for its content.
DN
74'-0"
42'-0"
4'-0"
3'-0"
1'-0"
3'-0"
0'-2"
3'-0"3'-0"
15'-0"
12'-0"
19'-0"
19'-9"
3'-0"
1'-0"
3'-0"
0'-2"
3'-0" 3'-0"
15'-0"12'-0"
19'-9"
R6'-0"
R2'-0" R0'-9"
3'-0"
18'-7"18'-7"
18'-7"18'-7"
12'-0"
12'-0"
5'-5"5'-5"
14'-10"14'-10"
12'-6" 12'-4" 12'-4" 12'-0" 12'-6"
2" C
EN
TE
R L
INE
60'-0"
30'-0"10'-0"10'-0"
36'-0" 20'-0"20'-0"
NE
T L
EN
GT
H
2" C
EN
TE
R L
INE
NE
T H
EIG
HT
: 8'
HIG
H F
OR
BO
YS
7'4
" HIG
H F
OR
GIR
LS
SE
RV
ING
AR
EA
PO
ST
S A
RE
PL
AC
ED
36
'C
EN
TE
R T
O C
EN
TE
R
36
21
(4)3
6 2
1(4)
36
21
(4)3
6 2
1(4)
48 21(4)48 21(4)
P
42 24(4)42 24(4)
54
24
(4)
60
24
(4)
20x20
A.5 B.4
B.4
B.7 B.8
.1
.3
B.
B.
A.
A.
C.
.2
Z.
Z.
Y.
Y.
X.
X.
.4
(E) KITCHEN
2STORAGE
11
(E) STOR.
9
(E)COOLER/FREZER
8
(E) MECH
10
(E) CUST.
4
(E) GIRLS
6
(E) BOYS
5
MULTI-PURPOSE
7
LADDER
60" LANDING
60" LANDING
WH
IDFW/D
.G
.H
.I .J
30' - 0"
32
' - 0
"
32
' - 0
"
6' -
5"
12
CLR. @ LANDING2' - 0" MIN.
34C
CLASSROOM
34
TRUE NORTH
PLAN NORTH
KEY PLAN
CHECKED BY:
REVISIONS
DRAWN BY:
DATE:
PROJECT NUMBER
CLIENT
BC
DA
ARCHITECTURE
CIVIL
MECHANICAL & PLUMBING
TRINITY VALLEY CONSULTING ENGINEERS INC.67 WALNUT WAY/P.O. BOX 1567
WILLOW CREEK, CA 95573(530) 629-3000
FRONTIER CONSULTING ENGINEERSPO BOX 492174
REDDING, CA 96002(530) 232-2770
PACE ENGINEERING1730 SOUTH STREETREDDING, CA 96001
(530) 244-0202
ELECTRICAL
STRUCTURE
POINT 2 STRUCTURAL ENGINEERS INC.3701 BUSINESS DRIVE SUITE 100
SACRAMENTO, CA 95820(916) 452-8200
251
BU
RN
T R
AN
CH
SC
HO
OL
RD
., B
UR
NT
RA
NC
H,
CA
95
527
2520 Venture Oaks Way, Suite 440Sacramento, CA 95833
916-682-9494 P916-682-0990 F
PBK.COM
SACRAMENTO
FILE N0. 12-58
IDENTIFICATION STAMPVID. OF THE STATE ARCHITECT
APPL. 02-116159
ACS________FLS_______SS________
DATE____________________________
5/1
8/2
01
8 1
0:3
0:4
5 A
M
C:\U
se
rs\m
ho
ste
tle
r\D
ocum
en
t s\1
71
42.2
Burn
t R
anch E
lem
enta
ry S
chool C
entr
al IN
C 2
_A
17_m
ily.h
oste
t le
r.rv
t
A2.06-I2
ENLARGEDSTRIPPED DOWN
FLOOR PLAN
Checker
Author
APRIL 17, 2018
17142
BURNT RANCH JOINT SCHOOL DISTRICT
CONSTRUCTION DOCUMENTS
CO
NS
TR
UC
TI O
N D
OC
UM
EN
TS
No. Description Date
3/16" = 1'-0"1 FLOOR PLAN MULTIPURPOSE - BUILDING B
1/4" = 1'-0"2 FLOOR PLAN - BUILDING C
BU
RN
T R
AN
CH
EL
EM
EN
TA
RY
SC
HO
OL
AL
TE
RA
TIO
NS
& A
DD
ITIO
N T
O
MU
LT
I-P
UR
PO
SE
BU
ILD
ING
/ C
LA
SS
RO
OM
-IN
CR
EM
EN
T 2