interim submission 4
DESCRIPTION
Construction drawings & model 3TRANSCRIPT
2011 2nd year architectural technology
Interim Submission 4
Community hub project, ‘a meeting place’
Student no.: 210044594
Yusuf Sampson
Model 3, NB: 80% complete, waiting on supply of balsa wood.
NB: Submission will be touched up/completed for
08.08.2011.
• A summary of the design process with reference to all precedent study.
• Annotations, notes, anthropometrics, context and rendered drawings.
• Perspective drawings and 1:10 detail drawings of all major structural considerations.
• A formal compilation of all work for presentation.
Still to come: