Transcript
Page 1: Interim submission 4

2011 2nd year architectural technology

Interim Submission 4

Community hub project, ‘a meeting place’

Student no.: 210044594

Yusuf Sampson

Page 2: Interim submission 4
Page 3: Interim submission 4
Page 4: Interim submission 4
Page 5: Interim submission 4
Page 6: Interim submission 4
Page 7: Interim submission 4

Model 3, NB: 80% complete, waiting on supply of balsa wood.

Page 8: Interim submission 4
Page 9: Interim submission 4
Page 10: Interim submission 4
Page 11: Interim submission 4
Page 12: Interim submission 4

NB: Submission will be touched up/completed for

08.08.2011.

• A summary of the design process with reference to all precedent study.

• Annotations, notes, anthropometrics, context and rendered drawings.

• Perspective drawings and 1:10 detail drawings of all major structural considerations.

• A formal compilation of all work for presentation.

Still to come:


Top Related