Intelligent management system of the
recreational tourist economic zone
on the Seliger Territory
2
Region's characteristics
3
Municipal territories of local Seliger's ecosystem
4
Lakes and rivers of Seliger's ecosystem
5
The forests of the Seliger have preserved their relative virgin calmness and stillness and have a lot of wild animals. There are such ungulate animals as elk, roe, wild boar. Fur game –bear, wolf, lynx, fox, raccoon, squirrel, marten, mountain hare, brown hare, polecat, ermine, weasel; beaver, mink and otter in rivers and springs.
Gathering of mushrooms and berries is one of the most popular and widespread recreational activities of the Russians.
The Seligers natural territory has preserved forests and swamps with a lot of berries (bilberries, wild strawberries, cowberries, great bilberries, cranberries and cloudberries) and mushrooms.
6
Investment objects of the project “Seliger”
7
Boiler-houses to build
Analytical management system
8
Analytical management system
Очистка угля Гидрогенизация Удалениеазота
УдалениеСО2
Удаление серы
Удалениепыли
УГОЛЬ
Измерительныеприборы
SO2
H2SNOx
CO
Мониторингвоздуха
рабочей зоныПерспективныетехнологии
Газификация
Измерительныеприборы
Измерительныеприборыконтроля
1
Базовыйсервер РИАС
1
1
1
CO2
Выбросы в газоходах
Пылемер
Газоанализаторы
ПЭЛ
Моделированиетрансграничных переносов
Мониторинг
Мониторинг состоянияатмосферного воздуха
территории
II
Расчетвыбросовпарниковых газов
Расчет полейтрансгранич
ныхпереносов
9
Ecological monitoringon the territory of the Seliger
Energy saving, environmental protectionactivity support for Tver region
10
International project «Seliger»
The project presupposes the construction of 31 recreational tourist complexes with 25 000 employees.
Structure:– 8 VIP complexes accommodating 250 people each;– 3 sanitary resort complexes accommodating 3000
people;– 20 recreational tourist complexes accommodating
20 000 people.
The first construction phase includes the construction of VIP complexes, the energy and infrastructure objects and also the road and transport development of the area.
International project «Seliger»
It is planned to build:
- 31 boiler-houses (about 300 MW);
- water-supply systems with the output of 13 000 m³ per day;
- 150 km of roads;
- power stations (over 100 MW).
The total area used for construction and recreation is 250 km².
The estimated amount of investments is about $250 mln. for infrastructure.
Total cost of the project is about $1.5 billion.
The predictable tourist flow is estimated more than million tourists per year.
11
1. Plan of building 8 biomass boiler-houses with total power about 150,000 Gcal/year.Cost is about $10 mln.Payback period is about 1.2 year.
2. Plan of building 10 gas boiler-houses with total power about 500,000 Gcal/year.Cost – $ 24 mln.Payback period is about 1 year.
3. Plan of building 13 clean coal boiler-houses with total power about 650,000 Gcal/year.Cost – $30 mln.Payback period is about 1.3 year.
4. Plan of reconstruction 8 boiler-houses from oil to gas with total power about 300,000 Gcal/year.Cost – $5 mln.Payback period is about 9 month.
Energetic business plans
The dynamics and structure of the predictable tourist flow
12
The estimated profitability of the project