integrating the losa relationships 3 rd icao-iata losa & tem conference captain chris...

12
“Integrating the LOSA Relationships ” 3 rd ICAO-IATA LOSA & TEM Conference Captain Chris Kriechbaum Captain Chris Wright Manager Procedure & Capability Development LOSA Manager Air New Zealand Air New Zealand

Upload: michael-murphy

Post on 27-Mar-2015

217 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Integrating the LOSA Relationships 3 rd ICAO-IATA LOSA & TEM Conference Captain Chris KriechbaumCaptain Chris Wright Manager Procedure & Capability DevelopmentLOSA

“Integrating the LOSA Relationships ” 3rd ICAO-IATA LOSA & TEM Conference

Captain Chris Kriechbaum Captain Chris WrightManager Procedure & Capability Development LOSA ManagerAir New Zealand Air New Zealand

Page 2: Integrating the LOSA Relationships 3 rd ICAO-IATA LOSA & TEM Conference Captain Chris KriechbaumCaptain Chris Wright Manager Procedure & Capability DevelopmentLOSA

2

WHAT IS THIS NEW ZEALAND PLACE?

> Geographically isolated

> S/W Pacific

> 4 Million people

> “Can do” attitude

> Long skinny country

> Aviation well utilised

Page 3: Integrating the LOSA Relationships 3 rd ICAO-IATA LOSA & TEM Conference Captain Chris KriechbaumCaptain Chris Wright Manager Procedure & Capability DevelopmentLOSA

3

BACKGROUND – AIR NZ (Mainline)

737-300X 18

Includes Freedom

A320x 11

IncludesFreedom

767-300X 9

747- 400X 8777-200

X 8On Order

Page 4: Integrating the LOSA Relationships 3 rd ICAO-IATA LOSA & TEM Conference Captain Chris KriechbaumCaptain Chris Wright Manager Procedure & Capability DevelopmentLOSA

4

BACKGROUND - REGIONALS

Mt Cook (Pt 121)

•Established in 1930’s

•11 ATR 72

•Culturally very different from mainline Air NZ

Eagle Airways (Pt 135)

•16 Beech 1900D

Air Nelson (Pt 121)

•17 SAAB 340A

•Q300 implementation programme – 17 ordered to replace SAABs

Other Factors

•Air NZ Mainline in expansion mode (B777 implementation) – high movement of pilots.

Page 5: Integrating the LOSA Relationships 3 rd ICAO-IATA LOSA & TEM Conference Captain Chris KriechbaumCaptain Chris Wright Manager Procedure & Capability DevelopmentLOSA

5

BACKGROUND

25 domestic destinations

22 direct international destinations

A small airline by world standards

No FOQA programme yet

Long involvement with UT

PAX ASKs RPKs Pax Rev

11.6m 31,984m 22,628m 2,755m

FY05

Page 6: Integrating the LOSA Relationships 3 rd ICAO-IATA LOSA & TEM Conference Captain Chris KriechbaumCaptain Chris Wright Manager Procedure & Capability DevelopmentLOSA

6

Air NZ’s LOSA PROGRAMME

> 1998 - 91 sectors

> 2001 – Joint audit with Ansett Australia, aborted

> 2003 – 200 sectors

–All fleets, except A320

> 2004 – First Regional LOSA @ Mt Cook – ATR 72 operator

> Total Union, company management & NZCAA support.

> A320 mini-LOSA in planning stage

Page 7: Integrating the LOSA Relationships 3 rd ICAO-IATA LOSA & TEM Conference Captain Chris KriechbaumCaptain Chris Wright Manager Procedure & Capability DevelopmentLOSA

7

BUSINESS RATIONALE FOR L.O.S.A.

> Under law – a shared responsibility with NZCAA for Safety

> It’s a pro-active approach to safety.

> It can be utilised as a risk measurement tool.

> LOSA provides facts not opinions - data driven approach.

> Verification of training and standards.

> Ability to compare internationally.

> Provide guidance on future improvements.

Page 8: Integrating the LOSA Relationships 3 rd ICAO-IATA LOSA & TEM Conference Captain Chris KriechbaumCaptain Chris Wright Manager Procedure & Capability DevelopmentLOSA

8

BUSINESS ADVANTAGES & ISSUES WITH LOSA

> Has drawn together the wider NZ industry

> Culture change within the airline and the industry

> A Change Management tool

– Risk - measurement and benchmarking

– New aircraft introduction monitoring

– Part of improving the Pilot/Management interface

> Wider acceptance of TEM principals as a result.

> Long term approach adopted, especially in terms of potential financial benefits.

> Financial scrutiny of value is intense.

Page 9: Integrating the LOSA Relationships 3 rd ICAO-IATA LOSA & TEM Conference Captain Chris KriechbaumCaptain Chris Wright Manager Procedure & Capability DevelopmentLOSA

9

LOSA EXPERIENCES

Generally similar to others

Long term strategy requires an investment in time and resource.

Flight Phase of Error Flight Phase of Error Detection Detection

0

10

20

30

40

50

60

Nu

mb

er o

f mo

nito

rin

g e

rro

rs

taxi

-ou

t

take

off

clim

b

cru

ise

cd tr

ans.

des

cen

t

ho

ldin

g

app

roac

h

lan

din

g

taxi

-in

Detection

Page 10: Integrating the LOSA Relationships 3 rd ICAO-IATA LOSA & TEM Conference Captain Chris KriechbaumCaptain Chris Wright Manager Procedure & Capability DevelopmentLOSA

10

THE FUTURE

Page 11: Integrating the LOSA Relationships 3 rd ICAO-IATA LOSA & TEM Conference Captain Chris KriechbaumCaptain Chris Wright Manager Procedure & Capability DevelopmentLOSA

11

THE FUTURE

•Integration of LOSA process into Safety Management System.•Integration with other Operational Integrity data •Major LOSA’s – every 3 - 4 years, using TLC•Mini LOSA’s on specific fleets / routes, ANZ run •Provide support to rest of ANZ Group and NZ industry •Full involvement of the National Regulator – NZCAA •Potentially a Regulatory Tool •Reduction in route Audit frequency/costs •Reduction in Route Checks – just Captains?

Page 12: Integrating the LOSA Relationships 3 rd ICAO-IATA LOSA & TEM Conference Captain Chris KriechbaumCaptain Chris Wright Manager Procedure & Capability DevelopmentLOSA

12

CONCLUSIONS

• LOSA process here to stay in Air N.Z. Group

• Will be fully integrated into our Safety Management System

• Continued willingness to share our information with the regulator.

• Still work to be done to achieve all the benefits

Contact Details:

[email protected]

[email protected]