INTEGRATED POWER NETWORK OPERATORGIS TOOLS IN PRACTICE
MADRID, 27.11.2011r.
Cezary GąsiorowskiENERGA-Operator SA
POLAND
![Page 2: Integrated Power Network Operator GIS Tools in Practice](https://reader038.vdocuments.us/reader038/viewer/2022102816/559a51c01a28ab3c298b4822/html5/thumbnails/2.jpg)
Electricity market in Poland
![Page 3: Integrated Power Network Operator GIS Tools in Practice](https://reader038.vdocuments.us/reader038/viewer/2022102816/559a51c01a28ab3c298b4822/html5/thumbnails/3.jpg)
Energa Group – basic information
Areas of activity: production, distribution and supply of the electrical energy
Market: over 2.5 million household customers, more than 300 thousand business clients
Power installed: 1 260 MW from which 265 MW derives from renewable sources
Lenght of power lines – 188 000 km
DSO operated area: 75 000 km2 Employment: approx. 12 500 employees
Financial results:- Revenues 7 333 millions / USD 2 649 millions- EBITDA 1 068 millions / USD 386 millions- Gross profit 407 millions / USD 147 millions- Net debt 99 millions / USD 36 millions- Net debt/EBITDA 0.1
*data for the 2007
![Page 4: Integrated Power Network Operator GIS Tools in Practice](https://reader038.vdocuments.us/reader038/viewer/2022102816/559a51c01a28ab3c298b4822/html5/thumbnails/4.jpg)
SAG 2011 Award to ENERGA-Operator SA
![Page 5: Integrated Power Network Operator GIS Tools in Practice](https://reader038.vdocuments.us/reader038/viewer/2022102816/559a51c01a28ab3c298b4822/html5/thumbnails/5.jpg)
WHAT DOES GIS MEANS TO YOU ???
![Page 6: Integrated Power Network Operator GIS Tools in Practice](https://reader038.vdocuments.us/reader038/viewer/2022102816/559a51c01a28ab3c298b4822/html5/thumbnails/6.jpg)
GIS is a fast and cheap way to access information
Complete and certain information about power network assets
Low cost of work for mobile workers group
Various analisys in GIS environment
Replacing conventional documentation by computer systems
Projekt ZMS
Replacing conventional documentation by computer systems
Presentation of power grid componets with data from external systems in
GIS environment
GIS means data and access to it from any location
6
![Page 7: Integrated Power Network Operator GIS Tools in Practice](https://reader038.vdocuments.us/reader038/viewer/2022102816/559a51c01a28ab3c298b4822/html5/thumbnails/7.jpg)
SIPO
KOMIT
KOMIT-GEWO
AiES ZET
AiES OAS
AIES ZP
AiES USS
TiK-BK
WiR
PO
System Informacji Zarządczej
KOMIT -PIAS
KOMIT - RU TiK-KZ
SID is a modular system
Projekt ZMS
SID Serwer
Sieć Prace OdczytKlient
Baza obiektów sieci Baza eksploatacji sieci Baza Klientów Dystrybucji Baza Pomiarów i
Odczytów
Central Data Base
AiES ZET KOMIT - RU TiK-KZ
7
![Page 8: Integrated Power Network Operator GIS Tools in Practice](https://reader038.vdocuments.us/reader038/viewer/2022102816/559a51c01a28ab3c298b4822/html5/thumbnails/8.jpg)
Diagram of Computer systems in ENERGA
![Page 9: Integrated Power Network Operator GIS Tools in Practice](https://reader038.vdocuments.us/reader038/viewer/2022102816/559a51c01a28ab3c298b4822/html5/thumbnails/9.jpg)
We have divided users into the groups
Apx. 3.000 users use GIS tools
Diferent user types
GIS operators – apx. 10%
Viewers with simple sketching option – apx. 20%
Regular viewers – apx. 25%
Projekt ZMS
Regular viewers – apx. 25%
Users with access to data in non-map environment – apx. 20%
Non-GIS users – apx. 25%
GIS tools must be suitable for each group
9
![Page 10: Integrated Power Network Operator GIS Tools in Practice](https://reader038.vdocuments.us/reader038/viewer/2022102816/559a51c01a28ab3c298b4822/html5/thumbnails/10.jpg)
Former GIS solution in ENERGA ;-)
10
![Page 11: Integrated Power Network Operator GIS Tools in Practice](https://reader038.vdocuments.us/reader038/viewer/2022102816/559a51c01a28ab3c298b4822/html5/thumbnails/11.jpg)
Projekt ZMS
KOMIT (based on ARC MAP)
11
![Page 12: Integrated Power Network Operator GIS Tools in Practice](https://reader038.vdocuments.us/reader038/viewer/2022102816/559a51c01a28ab3c298b4822/html5/thumbnails/12.jpg)
Projekt ZMS
GEWO (based on ARCGIS SERVER)
12
![Page 13: Integrated Power Network Operator GIS Tools in Practice](https://reader038.vdocuments.us/reader038/viewer/2022102816/559a51c01a28ab3c298b4822/html5/thumbnails/13.jpg)
Projekt ZMS
EWO – simple access to data in non-map environment
13
![Page 14: Integrated Power Network Operator GIS Tools in Practice](https://reader038.vdocuments.us/reader038/viewer/2022102816/559a51c01a28ab3c298b4822/html5/thumbnails/14.jpg)
Map layers used in ENERGA-Operator SA
![Page 15: Integrated Power Network Operator GIS Tools in Practice](https://reader038.vdocuments.us/reader038/viewer/2022102816/559a51c01a28ab3c298b4822/html5/thumbnails/15.jpg)
We are using various kinds of map layers
Maps from local government offices
Maps of cadastral data (buildings, parcels)
Base maps 1:500 (raster lub vector)
Projekt ZMS
Orthophoto maps
Topographical raster maps (various scales)
Topographical objects maps TBD (1:10 000) i BDO (1:250 000)
15
![Page 16: Integrated Power Network Operator GIS Tools in Practice](https://reader038.vdocuments.us/reader038/viewer/2022102816/559a51c01a28ab3c298b4822/html5/thumbnails/16.jpg)
We are using various kinds of map layers
Projekt ZMS
16
![Page 17: Integrated Power Network Operator GIS Tools in Practice](https://reader038.vdocuments.us/reader038/viewer/2022102816/559a51c01a28ab3c298b4822/html5/thumbnails/17.jpg)
We are using various kinds of map layers
Projekt ZMS
17
![Page 18: Integrated Power Network Operator GIS Tools in Practice](https://reader038.vdocuments.us/reader038/viewer/2022102816/559a51c01a28ab3c298b4822/html5/thumbnails/18.jpg)
We are using various kinds of map layers
Projekt ZMS
18
![Page 19: Integrated Power Network Operator GIS Tools in Practice](https://reader038.vdocuments.us/reader038/viewer/2022102816/559a51c01a28ab3c298b4822/html5/thumbnails/19.jpg)
Data acquisition
![Page 20: Integrated Power Network Operator GIS Tools in Practice](https://reader038.vdocuments.us/reader038/viewer/2022102816/559a51c01a28ab3c298b4822/html5/thumbnails/20.jpg)
SYSTEM IS ASRELIABLE AS
FAR ASIS DATA
Projekt ZMS
IS DATA RALIABLE ARE
20
![Page 21: Integrated Power Network Operator GIS Tools in Practice](https://reader038.vdocuments.us/reader038/viewer/2022102816/559a51c01a28ab3c298b4822/html5/thumbnails/21.jpg)
We undertake the bigest process of aquisition of spatial data in Poland
6 325 km HV lines
66 775 km MV lines
115 262 km LV lines
254 HV power stations
Projekt ZMS
150 000 000 attributes to acquire
46 355 MV/LV stations
1 069 369 cable cabinet
21
![Page 22: Integrated Power Network Operator GIS Tools in Practice](https://reader038.vdocuments.us/reader038/viewer/2022102816/559a51c01a28ab3c298b4822/html5/thumbnails/22.jpg)
Linking consumers to power grid objects is crutial for efficient functioning of SID
2,8 mil. power consumers
46 355 MV/LV power station
1 069 369 measurement points
Projekt ZMS
1 069 369 measurement points
22
![Page 23: Integrated Power Network Operator GIS Tools in Practice](https://reader038.vdocuments.us/reader038/viewer/2022102816/559a51c01a28ab3c298b4822/html5/thumbnails/23.jpg)
The data acquisition process costs 64% of the whole budget of the implementation of SID
Licencje
Interfejsy
Dokumentacja
Usługi WdroŜeniowe
Razem SID
Paszportyzacja
Razem T2
Budget
DATA aquisition 64%
Projekt ZMS
2010 2011 2012 Razem
Software 36%
23
![Page 24: Integrated Power Network Operator GIS Tools in Practice](https://reader038.vdocuments.us/reader038/viewer/2022102816/559a51c01a28ab3c298b4822/html5/thumbnails/24.jpg)
GIS TOOLS IN PRACTICE
![Page 25: Integrated Power Network Operator GIS Tools in Practice](https://reader038.vdocuments.us/reader038/viewer/2022102816/559a51c01a28ab3c298b4822/html5/thumbnails/25.jpg)
GIS means fast access to dataProjekt ZMS
25
![Page 26: Integrated Power Network Operator GIS Tools in Practice](https://reader038.vdocuments.us/reader038/viewer/2022102816/559a51c01a28ab3c298b4822/html5/thumbnails/26.jpg)
Every object contains detailed attributes and obiect diagrams Projekt ZMS
26
![Page 27: Integrated Power Network Operator GIS Tools in Practice](https://reader038.vdocuments.us/reader038/viewer/2022102816/559a51c01a28ab3c298b4822/html5/thumbnails/27.jpg)
GIS allows to execute technical analyses
Projekt ZMS
27
![Page 28: Integrated Power Network Operator GIS Tools in Practice](https://reader038.vdocuments.us/reader038/viewer/2022102816/559a51c01a28ab3c298b4822/html5/thumbnails/28.jpg)
Tracing of outages
Projekt ZMS
28
![Page 29: Integrated Power Network Operator GIS Tools in Practice](https://reader038.vdocuments.us/reader038/viewer/2022102816/559a51c01a28ab3c298b4822/html5/thumbnails/29.jpg)
Load of transformers
Monitoring the load of transformers on the basis of readout data
![Page 30: Integrated Power Network Operator GIS Tools in Practice](https://reader038.vdocuments.us/reader038/viewer/2022102816/559a51c01a28ab3c298b4822/html5/thumbnails/30.jpg)
GIS tools helps to reduce economic losses
![Page 31: Integrated Power Network Operator GIS Tools in Practice](https://reader038.vdocuments.us/reader038/viewer/2022102816/559a51c01a28ab3c298b4822/html5/thumbnails/31.jpg)
Designing the development of power gridProjekt ZMS
31
![Page 32: Integrated Power Network Operator GIS Tools in Practice](https://reader038.vdocuments.us/reader038/viewer/2022102816/559a51c01a28ab3c298b4822/html5/thumbnails/32.jpg)
We look for high development areas
Projekt ZMS
32
![Page 33: Integrated Power Network Operator GIS Tools in Practice](https://reader038.vdocuments.us/reader038/viewer/2022102816/559a51c01a28ab3c298b4822/html5/thumbnails/33.jpg)
Projekt ZMS
We support the maintenance of the power grid
33
![Page 34: Integrated Power Network Operator GIS Tools in Practice](https://reader038.vdocuments.us/reader038/viewer/2022102816/559a51c01a28ab3c298b4822/html5/thumbnails/34.jpg)
We execute spatial analises, we create new layers and we answer to the most compiled questions
WN SN
Rejon powierzchnia w m2 ha powierzchnia w m2 ha
Olsztyn 478124.87 47.812487 1265054.136 126.5054136
Iława 72154.88598 7.215488598 295702.1717 29.57021717
Ostróda 285953.2187 28.59532187 1565926.71 156.592671
Lidzbark 96122.10223 9.612210223 406520.6115 40.65206115
Kętrzyn 47103.0959 4.71030959 892167.0876 89.21670876
Szczytno 294667.6323 29.46676323 2220526.166 222.0526166
Suma 1274125.805 127.4125805 6645896.883 664.5896883
34
![Page 35: Integrated Power Network Operator GIS Tools in Practice](https://reader038.vdocuments.us/reader038/viewer/2022102816/559a51c01a28ab3c298b4822/html5/thumbnails/35.jpg)
We use GIS objects in car navigation systemProjekt ZMS
35
![Page 36: Integrated Power Network Operator GIS Tools in Practice](https://reader038.vdocuments.us/reader038/viewer/2022102816/559a51c01a28ab3c298b4822/html5/thumbnails/36.jpg)
GIS tools makes engineering work easier
Projekt ZMS
Complete and credible database about network assets and parcels
The technical records and the full information about customer available
on-demand
Many data from various systems stored and processed in one place
On-line data and documents for mobile workers
The complex set of data and the advanced analytic tools
36
The complex set of data and the advanced analytic tools
GIS cannot be „a computer island” in company, it must integrate with
other corporate systems
Implementing a GIS system can cause a lots of issue but it also brings
significant Return-On-Investment (ROI)
GIS-it-over to succeed!