integrated gasification combined cycle system ......2 pg6581 (b) 42.10 2682 32.1 145.6 544 3 pg6591...
TRANSCRIPT
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
INTEGRATED GASIFICATION COMBINED
CYCLE SYSTEM (IGCC) AND
COMBINED CYCLE TECHNOLOGY
G.S. BINDRA
GENERAL MANAGER – ENGG
BHEL-PEM, NOIDA
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
HISTORICAL DEVELOPMENT OF POWER PLANTS
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
SOURCE: INDIAN POWER DAYS – 2004 - SIEMENS
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
COMBINED CYCLE TECHNOLOGY
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
Gas Turbine
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
ENTROPY
• EFFICIENCY INCREASES BY 1 POINT FOR EVERY 600 C OF T3
• COMBINED CYCLE COMBINES BEST OF :– BRAYTON CYCLE VIZ: HIGH TEMP HEAT ADDITION (~14000 C)– RANKINE CYCLE VIZ: LOW TEMP HEAT REJECTION (~45 0C)
• EXPECTED COMBINED CYCLE EFFICIENCY = 50% TO 60%
1400 0 C
16000 C
TEMPERATURE
Steam Cycle
Gas Cycle
Q in
A
BC
D
E1
2
3
4
00 C
450 C
3000 C
6000C
13000 C
Q out
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
ADVANTAGES OF COMBINED CYCLE PLANTS
• HIGH EFFICIENCY
• LOW COOLING WATER REQUIREMENT
• FAST START
• LOW ENVIRONMENT POLLUTION
• LOW INSTALLATION COSTS
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
CONTEMPORARY CLASS GAS TURBINES
536.7530.734.72476168.00SGT5-2000ESIEMENS3
542.8418.233.82545126.10PG9171 (E)GE/ BHEL2
M701
GT 13 E2
V94.2
510562.936.92330179.90ALSTOM4
542.2
540.0
EXHAUST TEMP.
(C)
440.934.82472144.09MHI5
513.534.42500157.00BHEL1
EXHAUST FLOW
(KG/SEC)
EFFICIENCY%
HEAT RATE(KCAL/KWHR)
ISO RATING
(MW)
MODELS. NO.
SOURCE: GTW – 2007 PERFORMANCE SPECS
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
ADVANCE CLASS GAS TURBINES
M701G
M701F
GT 26
PG9371 (FB)
PG9351 (FA)
SGT5-4000F
--37.92272279.2GE/ BHEL3
600.6649.538.22220278.3MHI5
587.2
615.0
602.2
577.2
EXHAUST TEMP.
(C)
737.139.52175334.0MHI6
639.639.12196289.139ALSTOM4
640.936.92331255.6GE/ BHEL2
689.439.52177286.6SIEMENS1
EXHAUST FLOW
(KG/SEC)
EFFICIENCY%
HEAT RATE(KCAL/KWHR)
ISO RATING
(MW)
MODELS. NO.
SOURCE: GTW – 2007 PERFORMANCE SPECS
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
CONTEMPORARY CCPP (350 - 450 MW RANGE)
MPCP2 (M701)
KA13E2-2
SCC5-2000E 2X1
CC 2.94.2
S209E
CC 209EA
51.71663467.5BHEL3
53.01621.6507.4ALSTOM5
51.6
52.5
52.7
51.7
NET PLANTEFFICIENCY
%
1666426.6MHI6
1637505.0SIEMENS4
1633391.4GE2
1663384.0BHEL1
HEAT RATE(KCAL/KWHR)
NET PLANT OUTPUT
(MW)
MODELS.NO.
SOURCE: GTW – 2007 PERFORMANCE SPECS
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
ADVANCE CLASS CCPP (350 - 450 MW RANGE)
58.01482412.9S109FBGE3
MPCP1 (M701G)
MPCP1 (M701F)
KA26-1Single Shaft
SCC5-4000F Single Shaft
S109FA
CC 109FA
58.21476416.0SIEMENS4
59.01458416.4MHI6
59.3
58.3
56.7
55.4
NET PLANTEFFICIENCY
%
1450498.0MHI7
1474424.0ALSTOM5
1517390.8GE3
1553383.6BHEL1
HEAT RATE(KCAL/KWHR)
NET PLANT OUTPUT
(MW)
MODELS.NO.
SOURCE: GTW – 2007 PERFORMANCE SPECS
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
ADVANCE CLASS CCPP (700 MW RANGE)
59.51445999.4MPCP2 (M701G)MHI7
MPCP2 (M701F)
2.KA26-1
S209FB
S209FA
CC209FA
SCC5-4000F 2X1
57.11507786.9GE3
59.01458857.7ALSTOM5
59.2
58.0
55.7
58.2
NET PLANT EFFICIENCY
%
1453835.6MHI6
1483825.4GE4
1543772.0BHEL2
1477832.0SIEMENS1
HEAT RATE(KCAL/KWHR)
NET PLANT OUTPUT
(MW)
MODELS.NO.
SOURCE: GTW – 2007 PERFORMANCE SPECS
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
GLOBAL TRENDS• HIGHER GT RATINGS
INCREASE IN TURBINE INLET TEMPERATURES
STEAM COOLED GAS TURBINE COMPONENTS
HIGH TEMP. TOLERANT COATINGS
DIRECTIONALY SOLIDIFIED CAST BLADES
• CLEAN LOW NOx (CLN) TECHNOLOGY
• ONCE THROUGH HRSGs
• STEAM TURBINES
ADVANCE STEAM PARAMETERS
DEAERATING CONDENSER
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
PLANT DESIGN TRENDS
• LARGE HIGH EFFICIENCY CCPPs
• SINGLE SHAFT MACHINES
• NO BYPASS STACK
• LOW MOUNTING ARRANGEMENTS
• FAST START-UP
• 3-D ENGINEERING
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
TRENDS IN CCPP EFFICIENCY
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
DETAILS OF 9H COMBINED CYCLE PLANT IN JAPAN
JULY 2008:COMMISSIONING DATE
YET TO START:OPERATION
3 X (1+1+1):ONFIGURATION
:
:
:
:
60%CCPP EFFICIENCY
TOSHIBASTEAM TURBINE
TWO FROM TOSHIBA/ IHI
ONE FROM HITACHI
HRSG
3 NOS. MS9001H (GE POWER SYSTEMS)
GAS TURBINE
SOURCE: DIESEL & GAS TURBINE WORLD MAY-2007
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
SIEMENS H CLASS CCPP
• JOINTLY DEVELOPED BY SIEMENS & E.On ENERGIE AG
• SITE - IRCHING, BAVARIA
• GT MODULE – SGT5-8000H
• HRSG – VERTICAL TUBE BENSON HRSG
• CCPP OUTPUT – 530 MW
• THERMAL EFFICIENCY – 60%
• PROTOTYPE – 2007
• FIRST COMMERCIAL OPERATION - 2011
SOURCE: MPS, NOV 2005
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
FUTURE TRENDS
• COMBUSTION TEMPERATURE = 17000C
• CC THERMAL EFFICIENCY (LHV) = 62-65%
APPROACH:
NEW MATERIALS
INNOVATIVE COOLING TECHNOLOGIES
AERODYNAMIC TECHNOLOGIES
LOW NOx COMBUSTION TECHNOLOGIES
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
FUTURE TRENDS (CONTD.)
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
INDIAN PERSPECTIVE
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
CCPP DEVELOPMENTS IN INDIA
• SIXTIES & SEVENTIES
OPEN CYCLE GAS TURBINE PLANTS PLANNED IN SIXTIES &
SEVENTIES
PLANTS PREDOMINANTLY LOCATED IN NORTH-EASTERN
REGION DUE TO CHEAP NATURAL GAS AVAILABILITY IN
ABUNDANCE
FIRST OPEN CYCLE PLANT INSTALLED BY ASSAM STATE
ELECTRICITY BOARD IN NAMRUP IN MID SIXTIES AS A BASE
LOAD STATION
MORE GAS TURBINE PLANTS INSTALLED AS PEAKING
STATIONS TO TAKE CARE OF ACUTE POWER SHORTAGE
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
CCPP DEVELOPMENTS IN INDIA (CONTD.)
• NINETIES
COLLABORATIONS AGREEMENT OF BHEL FOR MANUFACTURE OF
LARGE SIZE GAS TURBINES WITH M/S. SIEMENS, GERMANY 1990
MAJOR NTPC PROJECTS COMMISSIONED IN NINETIES
KAWAS
DADRI
GANDHAR
KAYAMKULAM
FARIDABAD
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
BHEL RANGE OF GAS TURBINES
487.2122.528.5302126.30PG5371 (PA)1
544145.632.1268242.10PG6581 (B)2
574117.036.3237942.30PG6591 (C)3
605210.035.0246175.90PG6111 (FA)4
MODEL EXHAUST TEMP.
(C)
EXHAUST FLOW
(KG/SEC)
EFFICIENCY%
HEAT RATE(KCAL/KWHR)
ISO RATING
(MW)
S. NO.
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
BHEL RANGE OF GAS TURBINES
542.8418.233.82545126.10PG9171 (E)5
540.0513.534.42500157.00V94.26
602.2640.936.92331255.6PG9351 (FA)7
627636.837.92272279.2PG9371 (FB)8
MODEL EXHAUST TEMP.
(C)
EXHAUST FLOW
(KG/SEC)
EFFICIENCY%
HEAT RATE(KCAL/KWHR)
ISO RATING
(MW)
S. NO.
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
54.1159162.70CC106C6
49.81726130.70CC206B5
41.7206138.50CC 105P1
CC106B
CC305P
CC205P
MODEL
42.32034117.203
49.0
42.1
NET PLANTEFFICIENCY
%
175464.304
204477.802
HEAT RATE(KCAL/KWHR)
NET PLANT OUTPUT
(MW)
S.NO.
BHEL RANGE OF CCPP
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
52.01653577.00CC309E12
51.71663384.00CC209E11
54.41581126.20CC206C7
CC109E
CC206FA
CC106FA
MODEL
54.41583234.809
51.4
54.2
NET PLANTEFFICIENCY
%
1673109.7010
1588117.008
HEAT RATE(KCAL/KWHR)
NET PLANT OUTPUT
(MW)
S.NO.
BHEL RANGE OF CCPP
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
55.71543772.00CC209FA17
51.51671232.50CC1.94213
CC109FA
CC3.942
CC2.942
MODEL
51.71663701.0015
55.4
51.7
NET PLANTEFFICIENCY
%
1553383.6016
1663467.5014
HEAT RATE(KCAL/KWHR)
NET PLANT OUTPUT
(MW)
S.NO.
BHEL RANGE OF CCPP
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
PERFORMANCE OF 3x109FX
SR. NO.
PARAMETER UNIT VALUE
1 GT OUTPUT* MW 3x252.7
2 ST OUTPUT* MW 3x139.3
3 CCPP OUTPUT (3x109FX) MW 1176.0
4 CCPP HEAT RATE KCAL/KWH 1498
5 CCPP EFFICIENCY % 57.4
*AMB. TEMP. 32 DEG C, RH 60%, SEA LEVEL & CW TEMP. 33 DEG C
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
BHEL’s PREPOSITION OF 309FX CONFIGURATION
• CCPP WITH MULTIPLE GAS TURBINES AND SINGLESTEAM TURBINE HAS BETTER PERFORMANCE THANMULTIPLE CCPP MODULES
• SPACE REQUIREMENTS OF SINGLE MODULE CCPPARE MUCH LOWER THAN MULTI-MODULE CCPP
• 1x309FX CONFIGURATION FOR COMBINED CYCLE ISTECHNO-ECONOMICALLY BETTER OPTION COMPAREDTO 3x109FX CONFIGURATION
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
COMPARATIVE PERFORMANCE1x309FX vs 3x109FX
97.5
98
98.5
99
99.5
100
100.5
101
101.5
102
102.5
GT Output ST Output CCPPOutput
Heat Rate Efficiency
Series1Series23x109FX
1x309FX
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
ENERGY SECURITY : A CRITICAL ISSUE
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
Variation in fuel prices over the years
SOURCE: WORLD ENERGY COUNCIL 2007
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
ENERGY SECURITY OBJECTIVES
- AVAILABILITY OF PRIMARY ENERGY AT AFFORDABLE
PRICE
- REDUCING ENERGY REQUIREMENT
- INCREASE IN ENERGY USE EFFICIENCY
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
WORLD ENERGY SCENARIO
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
GAS RESERVES: WORLD & INDIA
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
TotalNorth
America
Total S.& Cent.America
TotalEurope &Eurasia
TotalMiddleEast
TotalAfrica
TotalAsia
Pacific
India
RES
ERV
E(T
RIL
ION
CU
BIC
ME
TER
S)
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
COAL RESERVES : WORLD & INDIA
0
50000
100000
150000
200000
250000
300000
350000
TotalNorth
America
Total S.& Cent.America
TotalEurope &Eurasia
TotalAfrica &MiddleEast
TotalAsia
Pacific
India
RESE
RVE
(MIL
LIO
N TO
E)
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
COAL RESERVES : WORLD & INDIA
0
50
100
150
200
250
300
Total NorthAmerica
Total S. &Cent.
America
TotalEurope &Eurasia
TotalAfrica &MiddleEast
Total AsiaPacific
India
R/P
RATI
O
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
KEY FUEL
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
KEY INFERENCES
• COAL IS THERE TO STAY
• ISSUES RELATED TO COAL FOR EFFICIENT ELECTRICITY GENERATION NEEDS TO BE ADDRESSED
•ISSUES RELATED TO COAL FOR POLLUTION FREE ELECTRICITY GENERATION NEEDS TO BE ADDRESSED
• EMPHASIS ON CLEAN COAL TECHNOLOGIES
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
IGCC : FUTURE OF POWER THROUGH COAL
• POWER GENERATION THROUGH INTEGRATED GASIFICATION COMBINED CYCLE
1. EFFICEINT
2. POLLUTION FREE
3. COST EFFECTIVE
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
INTEGRATED GASIFICATION COMBINED CYCLE
• IGCC COMPRISES TWO MAIN BLOCKS
1. GASIFICATION ISLAND
- GASIFICATION SYSTEM
- SYNGAS CLEAN UP SYSTEM
2. POWER ISLAND
- GAS TURBINE
- HRSG
- STEAM TURBINE
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
SCHEMATIC OF IGCC
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
CONTEMPORARY IGCC PLANTS
260
320
350
260
253
OUTPUT (MW)
1996GE7FATAMPA ELECTRIC, USA
1998SIEMENSV94.3AELCOGAS, SPAIN
1996GE9ESUV-VERSOVA, CZECH
1995GE7FAPSI WABASH, USA
1994SIEMENSV94.2NUON (DEMKOLEC), NETHERLANDS
YEARMAKEGT MODELPROJECT
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
CONTEMPORARY IGCC PLANTS
220
350
510
240
OUTPUT (MW)
2007*MHIM701DANAKOSO, JAPAN
2004GEM701FNIPPON PETROLIUM, JAPAN
1999SIEMENSV94.2KISAB ENERGY, ITALY
2000GE6FAVALERO, USA
YEARMAKEGT MODELPROJECT
* SCHEDULED
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
ELCOGAS 300 MW COAL BASED IGCC
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
NAKOSO 250 MW DEMO PLANT
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
SOURCE: NETL PRESENTATION
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
SOURCE: NETL PRESENTATION
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
SOURCE: NETL PRESENTATION
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
FUTURE IGCC
2011800UKProgressive Energy
Post-2012900UKPowerfuel
Post-2012450UKE.ON
2009250ChinaGreenGen
201050AustraliaZeroGen
EXPECTED YEAR OF START-UP
CAPACITYLOCATIONPROJECT
SOURCE: WORLD ENERGY COUNCIL
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
FUTURE IGCC
2011500USACarson Project
2012275USAFutureGen
2014400-450GermanyRWE
EXPECTED YEAR OF START-UP
CAPACITYLOCATIONPROJECT
SOURCE: WORLD ENERGY COUNCIL
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
FUTUREGEN PLANT
FutureGen is an initiative to build the world's first integrated sequestration and hydrogen production research power plant.
Project is intended to create the world's first zero-emissions fossil fuel plant. When operational, the prototype will be the cleanest fossil fuel fired power plant in the world.
The project will require 10 years to complete and will be led by the FutureGen Industrial Alliance, Inc., a non-profit industrial consortium representing the coal and power industries
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
FUTUREGEN PLANT – THE ALLIANCE
•American Electric Power
•Southern Company
•CONSOL Energy, Inc.
•Rio Tinto Energy America (RTEA)
•Peabody Energy
•E.ON U.S.
•PPL Corporation
•BHP Billiton
•Foundation Coal Corp.
•China Huaneng Group
•Anglo American
•Xstrata Coal
PROPOSED SITES :
• Mattoon, Illinois
• Tuscola, Illinois
• Heart of Brazos near Jewett, Texas
• Odessa, Texas.
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
A LOOK OF FUTURE IGCC
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
IGCC IN BHEL
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
• 6.2 MW IGCC PILOT PLANT AT ITS TRICHY COMPLEX.
• TECHNICAL FEASIBILITY OF UPGRADING THE 6.2 MW COMBINED CYCLE DEMONSTRATION PROJECT OF BHEL TO ~100 MW HAD BEEN ESTABLISHED
• PRELIMINARY ASSESSMENT MADE FOR 400 MW IGCC PLANT
• PLAN TO SET UP 125 MW IGCC DEMONSTRATION PLANT
IGCC POWER GENERATION -DEVELOPMENT IN BHEL
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
PFBG SCALE - UP
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
Clean
ACID FEED & MAKEUP
TO ETP
Gasifier
To HRSG
Gas
Gas Turbine
GT
LP HP From HRBBottom ash
Extract Air
To DA LP HP
Gland System Condenser
TO ASM
makeup blowdown
Air SB : Startup Burnar Comp : CompressorABC : Air Booster Compressor HRSG : Heat Recovery steam GeneratorSuC : Supplementary Compressor GSC : Gas Booster CompressorAPH : Air Pre Heater CC : Combustion ChamberFWH : Feed Water Heater HRB : Heat Recovery BolierASM : Air steam Mixture LPH : Low Pressure (steam) heaterFT : Flash Tank LP,HP : Low,High pressure respectively
cooling tower
C C
Clean
HeaterTO ETP
GSC
FROM ETP MAKEUP
ASM To LPH
FT
Gasifier
Purging
From LP
DA
APH
SuC
Ash disposal
Ash disposal
LDO
From ST
FWH
LPH
To stack H R S G
Cooling Tower
Fly Ash Removal and ash cooling system
SB
Turbine
Steam Turbine
Comp~
~
ABC SuC
GasAirSteamWaterAsh
PPP
P
Scrubbing system
CyclonesSyngas coolers
Coal125 MW IGCC SCHEME
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
To HRSG
HRSG
Fr-9Fa
261.5 MW
214.1 MW
CW inCW out
GHP IP LP
PIGCC = 475.6
QIN = 1071.7MW
EFFY = 44.39%
RHStack
SH
HRB2 WGCS2 GT GG2 C Y2
Ash Disposal System
Coa
l Sto
rage
& C
oal H
andl
ing
Plan
t
400 MW IGCC SCHEME
-
BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………
ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007
THANK YOUTHANK YOU
http://www.bhel.com