integrated gasification combined cycle system ......2 pg6581 (b) 42.10 2682 32.1 145.6 544 3 pg6591...

63
BRIGHTENING LIVES…..POWERING PROGRESS……… BRIGHTENING LIVES…..POWERING PROGRESS……… ENHANCING CAPACITY ENHANCING CAPACITY EMPOWERING NATION EMPOWERING NATION 11 11 TH TH DECEMBER 2007 DECEMBER 2007 INTEGRATED GASIFICATION COMBINED CYCLE SYSTEM (IGCC) AND COMBINED CYCLE TECHNOLOGY G.S. BINDRA GENERAL MANAGER – ENGG BHEL-PEM, NOIDA

Upload: others

Post on 02-Feb-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    INTEGRATED GASIFICATION COMBINED

    CYCLE SYSTEM (IGCC) AND

    COMBINED CYCLE TECHNOLOGY

    G.S. BINDRA

    GENERAL MANAGER – ENGG

    BHEL-PEM, NOIDA

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    HISTORICAL DEVELOPMENT OF POWER PLANTS

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    SOURCE: INDIAN POWER DAYS – 2004 - SIEMENS

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    COMBINED CYCLE TECHNOLOGY

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    Gas Turbine

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    ENTROPY

    • EFFICIENCY INCREASES BY 1 POINT FOR EVERY 600 C OF T3

    • COMBINED CYCLE COMBINES BEST OF :– BRAYTON CYCLE VIZ: HIGH TEMP HEAT ADDITION (~14000 C)– RANKINE CYCLE VIZ: LOW TEMP HEAT REJECTION (~45 0C)

    • EXPECTED COMBINED CYCLE EFFICIENCY = 50% TO 60%

    1400 0 C

    16000 C

    TEMPERATURE

    Steam Cycle

    Gas Cycle

    Q in

    A

    BC

    D

    E1

    2

    3

    4

    00 C

    450 C

    3000 C

    6000C

    13000 C

    Q out

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    ADVANTAGES OF COMBINED CYCLE PLANTS

    • HIGH EFFICIENCY

    • LOW COOLING WATER REQUIREMENT

    • FAST START

    • LOW ENVIRONMENT POLLUTION

    • LOW INSTALLATION COSTS

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    CONTEMPORARY CLASS GAS TURBINES

    536.7530.734.72476168.00SGT5-2000ESIEMENS3

    542.8418.233.82545126.10PG9171 (E)GE/ BHEL2

    M701

    GT 13 E2

    V94.2

    510562.936.92330179.90ALSTOM4

    542.2

    540.0

    EXHAUST TEMP.

    (C)

    440.934.82472144.09MHI5

    513.534.42500157.00BHEL1

    EXHAUST FLOW

    (KG/SEC)

    EFFICIENCY%

    HEAT RATE(KCAL/KWHR)

    ISO RATING

    (MW)

    MODELS. NO.

    SOURCE: GTW – 2007 PERFORMANCE SPECS

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    ADVANCE CLASS GAS TURBINES

    M701G

    M701F

    GT 26

    PG9371 (FB)

    PG9351 (FA)

    SGT5-4000F

    --37.92272279.2GE/ BHEL3

    600.6649.538.22220278.3MHI5

    587.2

    615.0

    602.2

    577.2

    EXHAUST TEMP.

    (C)

    737.139.52175334.0MHI6

    639.639.12196289.139ALSTOM4

    640.936.92331255.6GE/ BHEL2

    689.439.52177286.6SIEMENS1

    EXHAUST FLOW

    (KG/SEC)

    EFFICIENCY%

    HEAT RATE(KCAL/KWHR)

    ISO RATING

    (MW)

    MODELS. NO.

    SOURCE: GTW – 2007 PERFORMANCE SPECS

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    CONTEMPORARY CCPP (350 - 450 MW RANGE)

    MPCP2 (M701)

    KA13E2-2

    SCC5-2000E 2X1

    CC 2.94.2

    S209E

    CC 209EA

    51.71663467.5BHEL3

    53.01621.6507.4ALSTOM5

    51.6

    52.5

    52.7

    51.7

    NET PLANTEFFICIENCY

    %

    1666426.6MHI6

    1637505.0SIEMENS4

    1633391.4GE2

    1663384.0BHEL1

    HEAT RATE(KCAL/KWHR)

    NET PLANT OUTPUT

    (MW)

    MODELS.NO.

    SOURCE: GTW – 2007 PERFORMANCE SPECS

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    ADVANCE CLASS CCPP (350 - 450 MW RANGE)

    58.01482412.9S109FBGE3

    MPCP1 (M701G)

    MPCP1 (M701F)

    KA26-1Single Shaft

    SCC5-4000F Single Shaft

    S109FA

    CC 109FA

    58.21476416.0SIEMENS4

    59.01458416.4MHI6

    59.3

    58.3

    56.7

    55.4

    NET PLANTEFFICIENCY

    %

    1450498.0MHI7

    1474424.0ALSTOM5

    1517390.8GE3

    1553383.6BHEL1

    HEAT RATE(KCAL/KWHR)

    NET PLANT OUTPUT

    (MW)

    MODELS.NO.

    SOURCE: GTW – 2007 PERFORMANCE SPECS

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    ADVANCE CLASS CCPP (700 MW RANGE)

    59.51445999.4MPCP2 (M701G)MHI7

    MPCP2 (M701F)

    2.KA26-1

    S209FB

    S209FA

    CC209FA

    SCC5-4000F 2X1

    57.11507786.9GE3

    59.01458857.7ALSTOM5

    59.2

    58.0

    55.7

    58.2

    NET PLANT EFFICIENCY

    %

    1453835.6MHI6

    1483825.4GE4

    1543772.0BHEL2

    1477832.0SIEMENS1

    HEAT RATE(KCAL/KWHR)

    NET PLANT OUTPUT

    (MW)

    MODELS.NO.

    SOURCE: GTW – 2007 PERFORMANCE SPECS

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    GLOBAL TRENDS• HIGHER GT RATINGS

    INCREASE IN TURBINE INLET TEMPERATURES

    STEAM COOLED GAS TURBINE COMPONENTS

    HIGH TEMP. TOLERANT COATINGS

    DIRECTIONALY SOLIDIFIED CAST BLADES

    • CLEAN LOW NOx (CLN) TECHNOLOGY

    • ONCE THROUGH HRSGs

    • STEAM TURBINES

    ADVANCE STEAM PARAMETERS

    DEAERATING CONDENSER

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    PLANT DESIGN TRENDS

    • LARGE HIGH EFFICIENCY CCPPs

    • SINGLE SHAFT MACHINES

    • NO BYPASS STACK

    • LOW MOUNTING ARRANGEMENTS

    • FAST START-UP

    • 3-D ENGINEERING

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    TRENDS IN CCPP EFFICIENCY

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    DETAILS OF 9H COMBINED CYCLE PLANT IN JAPAN

    JULY 2008:COMMISSIONING DATE

    YET TO START:OPERATION

    3 X (1+1+1):ONFIGURATION

    :

    :

    :

    :

    60%CCPP EFFICIENCY

    TOSHIBASTEAM TURBINE

    TWO FROM TOSHIBA/ IHI

    ONE FROM HITACHI

    HRSG

    3 NOS. MS9001H (GE POWER SYSTEMS)

    GAS TURBINE

    SOURCE: DIESEL & GAS TURBINE WORLD MAY-2007

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    SIEMENS H CLASS CCPP

    • JOINTLY DEVELOPED BY SIEMENS & E.On ENERGIE AG

    • SITE - IRCHING, BAVARIA

    • GT MODULE – SGT5-8000H

    • HRSG – VERTICAL TUBE BENSON HRSG

    • CCPP OUTPUT – 530 MW

    • THERMAL EFFICIENCY – 60%

    • PROTOTYPE – 2007

    • FIRST COMMERCIAL OPERATION - 2011

    SOURCE: MPS, NOV 2005

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    FUTURE TRENDS

    • COMBUSTION TEMPERATURE = 17000C

    • CC THERMAL EFFICIENCY (LHV) = 62-65%

    APPROACH:

    NEW MATERIALS

    INNOVATIVE COOLING TECHNOLOGIES

    AERODYNAMIC TECHNOLOGIES

    LOW NOx COMBUSTION TECHNOLOGIES

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    FUTURE TRENDS (CONTD.)

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    INDIAN PERSPECTIVE

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    CCPP DEVELOPMENTS IN INDIA

    • SIXTIES & SEVENTIES

    OPEN CYCLE GAS TURBINE PLANTS PLANNED IN SIXTIES &

    SEVENTIES

    PLANTS PREDOMINANTLY LOCATED IN NORTH-EASTERN

    REGION DUE TO CHEAP NATURAL GAS AVAILABILITY IN

    ABUNDANCE

    FIRST OPEN CYCLE PLANT INSTALLED BY ASSAM STATE

    ELECTRICITY BOARD IN NAMRUP IN MID SIXTIES AS A BASE

    LOAD STATION

    MORE GAS TURBINE PLANTS INSTALLED AS PEAKING

    STATIONS TO TAKE CARE OF ACUTE POWER SHORTAGE

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    CCPP DEVELOPMENTS IN INDIA (CONTD.)

    • NINETIES

    COLLABORATIONS AGREEMENT OF BHEL FOR MANUFACTURE OF

    LARGE SIZE GAS TURBINES WITH M/S. SIEMENS, GERMANY 1990

    MAJOR NTPC PROJECTS COMMISSIONED IN NINETIES

    KAWAS

    DADRI

    GANDHAR

    KAYAMKULAM

    FARIDABAD

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    BHEL RANGE OF GAS TURBINES

    487.2122.528.5302126.30PG5371 (PA)1

    544145.632.1268242.10PG6581 (B)2

    574117.036.3237942.30PG6591 (C)3

    605210.035.0246175.90PG6111 (FA)4

    MODEL EXHAUST TEMP.

    (C)

    EXHAUST FLOW

    (KG/SEC)

    EFFICIENCY%

    HEAT RATE(KCAL/KWHR)

    ISO RATING

    (MW)

    S. NO.

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    BHEL RANGE OF GAS TURBINES

    542.8418.233.82545126.10PG9171 (E)5

    540.0513.534.42500157.00V94.26

    602.2640.936.92331255.6PG9351 (FA)7

    627636.837.92272279.2PG9371 (FB)8

    MODEL EXHAUST TEMP.

    (C)

    EXHAUST FLOW

    (KG/SEC)

    EFFICIENCY%

    HEAT RATE(KCAL/KWHR)

    ISO RATING

    (MW)

    S. NO.

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    54.1159162.70CC106C6

    49.81726130.70CC206B5

    41.7206138.50CC 105P1

    CC106B

    CC305P

    CC205P

    MODEL

    42.32034117.203

    49.0

    42.1

    NET PLANTEFFICIENCY

    %

    175464.304

    204477.802

    HEAT RATE(KCAL/KWHR)

    NET PLANT OUTPUT

    (MW)

    S.NO.

    BHEL RANGE OF CCPP

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    52.01653577.00CC309E12

    51.71663384.00CC209E11

    54.41581126.20CC206C7

    CC109E

    CC206FA

    CC106FA

    MODEL

    54.41583234.809

    51.4

    54.2

    NET PLANTEFFICIENCY

    %

    1673109.7010

    1588117.008

    HEAT RATE(KCAL/KWHR)

    NET PLANT OUTPUT

    (MW)

    S.NO.

    BHEL RANGE OF CCPP

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    55.71543772.00CC209FA17

    51.51671232.50CC1.94213

    CC109FA

    CC3.942

    CC2.942

    MODEL

    51.71663701.0015

    55.4

    51.7

    NET PLANTEFFICIENCY

    %

    1553383.6016

    1663467.5014

    HEAT RATE(KCAL/KWHR)

    NET PLANT OUTPUT

    (MW)

    S.NO.

    BHEL RANGE OF CCPP

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    PERFORMANCE OF 3x109FX

    SR. NO.

    PARAMETER UNIT VALUE

    1 GT OUTPUT* MW 3x252.7

    2 ST OUTPUT* MW 3x139.3

    3 CCPP OUTPUT (3x109FX) MW 1176.0

    4 CCPP HEAT RATE KCAL/KWH 1498

    5 CCPP EFFICIENCY % 57.4

    *AMB. TEMP. 32 DEG C, RH 60%, SEA LEVEL & CW TEMP. 33 DEG C

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    BHEL’s PREPOSITION OF 309FX CONFIGURATION

    • CCPP WITH MULTIPLE GAS TURBINES AND SINGLESTEAM TURBINE HAS BETTER PERFORMANCE THANMULTIPLE CCPP MODULES

    • SPACE REQUIREMENTS OF SINGLE MODULE CCPPARE MUCH LOWER THAN MULTI-MODULE CCPP

    • 1x309FX CONFIGURATION FOR COMBINED CYCLE ISTECHNO-ECONOMICALLY BETTER OPTION COMPAREDTO 3x109FX CONFIGURATION

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    COMPARATIVE PERFORMANCE1x309FX vs 3x109FX

    97.5

    98

    98.5

    99

    99.5

    100

    100.5

    101

    101.5

    102

    102.5

    GT Output ST Output CCPPOutput

    Heat Rate Efficiency

    Series1Series23x109FX

    1x309FX

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    ENERGY SECURITY : A CRITICAL ISSUE

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    Variation in fuel prices over the years

    SOURCE: WORLD ENERGY COUNCIL 2007

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    ENERGY SECURITY OBJECTIVES

    - AVAILABILITY OF PRIMARY ENERGY AT AFFORDABLE

    PRICE

    - REDUCING ENERGY REQUIREMENT

    - INCREASE IN ENERGY USE EFFICIENCY

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    WORLD ENERGY SCENARIO

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    GAS RESERVES: WORLD & INDIA

    0.00

    10.00

    20.00

    30.00

    40.00

    50.00

    60.00

    70.00

    80.00

    TotalNorth

    America

    Total S.& Cent.America

    TotalEurope &Eurasia

    TotalMiddleEast

    TotalAfrica

    TotalAsia

    Pacific

    India

    RES

    ERV

    E(T

    RIL

    ION

    CU

    BIC

    ME

    TER

    S)

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    COAL RESERVES : WORLD & INDIA

    0

    50000

    100000

    150000

    200000

    250000

    300000

    350000

    TotalNorth

    America

    Total S.& Cent.America

    TotalEurope &Eurasia

    TotalAfrica &MiddleEast

    TotalAsia

    Pacific

    India

    RESE

    RVE

    (MIL

    LIO

    N TO

    E)

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    COAL RESERVES : WORLD & INDIA

    0

    50

    100

    150

    200

    250

    300

    Total NorthAmerica

    Total S. &Cent.

    America

    TotalEurope &Eurasia

    TotalAfrica &MiddleEast

    Total AsiaPacific

    India

    R/P

    RATI

    O

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    KEY FUEL

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    KEY INFERENCES

    • COAL IS THERE TO STAY

    • ISSUES RELATED TO COAL FOR EFFICIENT ELECTRICITY GENERATION NEEDS TO BE ADDRESSED

    •ISSUES RELATED TO COAL FOR POLLUTION FREE ELECTRICITY GENERATION NEEDS TO BE ADDRESSED

    • EMPHASIS ON CLEAN COAL TECHNOLOGIES

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    IGCC : FUTURE OF POWER THROUGH COAL

    • POWER GENERATION THROUGH INTEGRATED GASIFICATION COMBINED CYCLE

    1. EFFICEINT

    2. POLLUTION FREE

    3. COST EFFECTIVE

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    INTEGRATED GASIFICATION COMBINED CYCLE

    • IGCC COMPRISES TWO MAIN BLOCKS

    1. GASIFICATION ISLAND

    - GASIFICATION SYSTEM

    - SYNGAS CLEAN UP SYSTEM

    2. POWER ISLAND

    - GAS TURBINE

    - HRSG

    - STEAM TURBINE

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    SCHEMATIC OF IGCC

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    CONTEMPORARY IGCC PLANTS

    260

    320

    350

    260

    253

    OUTPUT (MW)

    1996GE7FATAMPA ELECTRIC, USA

    1998SIEMENSV94.3AELCOGAS, SPAIN

    1996GE9ESUV-VERSOVA, CZECH

    1995GE7FAPSI WABASH, USA

    1994SIEMENSV94.2NUON (DEMKOLEC), NETHERLANDS

    YEARMAKEGT MODELPROJECT

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    CONTEMPORARY IGCC PLANTS

    220

    350

    510

    240

    OUTPUT (MW)

    2007*MHIM701DANAKOSO, JAPAN

    2004GEM701FNIPPON PETROLIUM, JAPAN

    1999SIEMENSV94.2KISAB ENERGY, ITALY

    2000GE6FAVALERO, USA

    YEARMAKEGT MODELPROJECT

    * SCHEDULED

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    ELCOGAS 300 MW COAL BASED IGCC

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    NAKOSO 250 MW DEMO PLANT

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    SOURCE: NETL PRESENTATION

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    SOURCE: NETL PRESENTATION

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    SOURCE: NETL PRESENTATION

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    FUTURE IGCC

    2011800UKProgressive Energy

    Post-2012900UKPowerfuel

    Post-2012450UKE.ON

    2009250ChinaGreenGen

    201050AustraliaZeroGen

    EXPECTED YEAR OF START-UP

    CAPACITYLOCATIONPROJECT

    SOURCE: WORLD ENERGY COUNCIL

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    FUTURE IGCC

    2011500USACarson Project

    2012275USAFutureGen

    2014400-450GermanyRWE

    EXPECTED YEAR OF START-UP

    CAPACITYLOCATIONPROJECT

    SOURCE: WORLD ENERGY COUNCIL

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    FUTUREGEN PLANT

    FutureGen is an initiative to build the world's first integrated sequestration and hydrogen production research power plant.

    Project is intended to create the world's first zero-emissions fossil fuel plant. When operational, the prototype will be the cleanest fossil fuel fired power plant in the world.

    The project will require 10 years to complete and will be led by the FutureGen Industrial Alliance, Inc., a non-profit industrial consortium representing the coal and power industries

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    FUTUREGEN PLANT – THE ALLIANCE

    •American Electric Power

    •Southern Company

    •CONSOL Energy, Inc.

    •Rio Tinto Energy America (RTEA)

    •Peabody Energy

    •E.ON U.S.

    •PPL Corporation

    •BHP Billiton

    •Foundation Coal Corp.

    •China Huaneng Group

    •Anglo American

    •Xstrata Coal

    PROPOSED SITES :

    • Mattoon, Illinois

    • Tuscola, Illinois

    • Heart of Brazos near Jewett, Texas

    • Odessa, Texas.

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    A LOOK OF FUTURE IGCC

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    IGCC IN BHEL

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    • 6.2 MW IGCC PILOT PLANT AT ITS TRICHY COMPLEX.

    • TECHNICAL FEASIBILITY OF UPGRADING THE 6.2 MW COMBINED CYCLE DEMONSTRATION PROJECT OF BHEL TO ~100 MW HAD BEEN ESTABLISHED

    • PRELIMINARY ASSESSMENT MADE FOR 400 MW IGCC PLANT

    • PLAN TO SET UP 125 MW IGCC DEMONSTRATION PLANT

    IGCC POWER GENERATION -DEVELOPMENT IN BHEL

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    PFBG SCALE - UP

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    Clean

    ACID FEED & MAKEUP

    TO ETP

    Gasifier

    To HRSG

    Gas

    Gas Turbine

    GT

    LP HP From HRBBottom ash

    Extract Air

    To DA LP HP

    Gland System Condenser

    TO ASM

    makeup blowdown

    Air SB : Startup Burnar Comp : CompressorABC : Air Booster Compressor HRSG : Heat Recovery steam GeneratorSuC : Supplementary Compressor GSC : Gas Booster CompressorAPH : Air Pre Heater CC : Combustion ChamberFWH : Feed Water Heater HRB : Heat Recovery BolierASM : Air steam Mixture LPH : Low Pressure (steam) heaterFT : Flash Tank LP,HP : Low,High pressure respectively

    cooling tower

    C C

    Clean

    HeaterTO ETP

    GSC

    FROM ETP MAKEUP

    ASM To LPH

    FT

    Gasifier

    Purging

    From LP

    DA

    APH

    SuC

    Ash disposal

    Ash disposal

    LDO

    From ST

    FWH

    LPH

    To stack H R S G

    Cooling Tower

    Fly Ash Removal and ash cooling system

    SB

    Turbine

    Steam Turbine

    Comp~

    ~

    ABC SuC

    GasAirSteamWaterAsh

    PPP

    P

    Scrubbing system

    CyclonesSyngas coolers

    Coal125 MW IGCC SCHEME

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    To HRSG

    HRSG

    Fr-9Fa

    261.5 MW

    214.1 MW

    CW inCW out

    GHP IP LP

    PIGCC = 475.6

    QIN = 1071.7MW

    EFFY = 44.39%

    RHStack

    SH

    HRB2 WGCS2 GT GG2 C Y2

    Ash Disposal System

    Coa

    l Sto

    rage

    & C

    oal H

    andl

    ing

    Plan

    t

    400 MW IGCC SCHEME

  • BRIGHTENING LIVES…..POWERING PROGRESS………BRIGHTENING LIVES…..POWERING PROGRESS………

    ENHANCING CAPACITY ENHANCING CAPACITY –– EMPOWERING NATION EMPOWERING NATION 1111THTH DECEMBER 2007DECEMBER 2007

    THANK YOUTHANK YOU

    http://www.bhel.com