www.tecbeam.com.au 5.1. GENERAL NOTES Conventional framing practices can also apply to Tecbeam installations: however, to gain maximum benefit from using the Tecbeam system, builders are strongly advised to take advantage of its unique features by adopting the following guidelines. To meet the requirements of the Building Code of Australia (BCA), all works must comply with AS 1684.2-1999 and where applicable with TECBEAM Installation Guidelines. For details not covered in this manual, please refer to either: TECBEAM Australasia P/L, local TECBEAM fabricator or a registered structural engineer. 5.2. WEB HOLE ALIGNMENT - for installation of strongbacks (SB) and services To achieve alignment of web holes, for the installation of strongbacks and services, Tecbeam joists have been colour marked at one end, called the COMMON END. Refer to the Floor Framing Plan for set out reference lines (RL) Installation Manual: INSTALLATION GUIDELINES

Upload: dodat

Post on 28-Jul-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: INSTALLATION GUIDELINES - TECBUILD · 5.3.2 Installation (continued) • Install strongbacks with a minimum lap of one (1) bay • Laps in strongbacks maybe installed in a) the same

www.tecbeam.com.au

5.1. GENERAL NOTES• ConventionalframingpracticescanalsoapplytoTecbeaminstallations:however,togainmaximumbenefitfromusingtheTecbeam

system,buildersarestronglyadvisedtotakeadvantageofitsuniquefeaturesbyadoptingthefollowingguidelines.• TomeettherequirementsoftheBuildingCodeofAustralia(BCA),allworksmustcomplywithAS1684.2-1999andwhereapplicable

withTECBEAMInstallationGuidelines.• Fordetailsnotcoveredinthismanual,pleaserefertoeither:TECBEAMAustralasiaP/L,localTECBEAMfabricatororaregistered

structuralengineer.

5.2. WEB HOLE ALIGNMENT - forinstallationofstrongbacks(SB)andservices• Toachievealignmentofwebholes,fortheinstallationofstrongbacksandservices,Tecbeamjoistshavebeencolourmarkedatone

end,calledtheCOMMONEND.RefertotheFloorFramingPlanforsetoutreferencelines(RL)

Installation Manual:

INSTALLATION GUIDELINES

Page 2: INSTALLATION GUIDELINES - TECBUILD · 5.3.2 Installation (continued) • Install strongbacks with a minimum lap of one (1) bay • Laps in strongbacks maybe installed in a) the same

www.tecbeam.com.au

5.3. STRONGBACKS (SB)• Strongbackshavebeenprovento:

a)signifcantlyreducefloorvibration b)loadshareaconcentratedload c)aremoreeffectivethansolidblocking d)actasinternalsupportbeams

5.3.1General

• BeforeSecuringwedges,ensurestrongbacksarebelow15%MoistureContentsoastoavoidsqueakyfloors• MinumumMGP10grade• Ifhighercomfortlevelsfromfloorvibrationarerequired,useMGP12,F17,LVLorincreasethenumberofstrongbacks

RecommendedSizes

• T25series-140x45• T30series-190x45or200x45LVL• T35series-190x45or200x45LVL• Forhigherloading,steelsectionscanbeusedasstrongbackorinternalbeams;refertoTECBEAMAustralasiaorastructural

engineer Restrictions

• Formaximumefficiency,avoidcuttingholeswithadiametergreaterthanonthirdthedepthofthestrongback.• Forlongjoistspantables,planthelocationofservicesandpositionstrongbackstoavoidasmuchcuttingaspossible,sofloor

vibrationiskeptundercontrol.

5.3.2 Installation

• Strongbacksmustbesecuredtightwithapairofwedgesateachjoist;itisrecommendedwedgesaregluedandnailed.See5.3.4Wedges.

• Whereapointloadoccurs,locateastrongbackthroughthewebholeclosesttothepointloadandlongenoughtofixthroughatleasttwojoistseachsideofthejoistcarryingtheload.

Strongback

Web Stiffener

Support

POINT LOAD (>500kg)

Page 3: INSTALLATION GUIDELINES - TECBUILD · 5.3.2 Installation (continued) • Install strongbacks with a minimum lap of one (1) bay • Laps in strongbacks maybe installed in a) the same

www.tecbeam.com.au

5.3.2 Installation(continued)

• Installstrongbackswithaminimumlapofone(1)bay• Lapsinstrongbacksmaybeinstalledina)thesameholeorb)thenextadjacenthole• Min.strongbackslenths:2100mmfor450ctrsand2400mmfor600ctrs

5.3.3Specifications ForVibrationControl-Minimumrecommendations

• Installonerowofstrongbacksmidspanwherethejoistsarewithin0.75mto1.5mofthetabulatedspan

• Wherethejoistspanisover6morwithin0.75mofthetabulatedspan,installtworowsofstrongbacks,placedatapproximatelytheonethirdpointsofthejoistspan

• Forcontinuousspans-addaStrongbackintheshorterspanevenifitislessthanthespansindicatedabove.

with

in 0

.75

- 1.5

m o

f max

spa

nW

ithin 0

.75m

of m

ax s

pan

or

span

ove

r 6m

Page 4: INSTALLATION GUIDELINES - TECBUILD · 5.3.2 Installation (continued) • Install strongbacks with a minimum lap of one (1) bay • Laps in strongbacks maybe installed in a) the same

www.tecbeam.com.au

5.3.4 Wedges

• Wedgesareusedtosecurethestrongbacktoeachjoist.Looseorpoorlyfittedwedgesmayresultinthefloorsqueaking.• Itisrecommendedthatwedgesareinstalledinpairs,hammeredhardagainsttheopposingwedgethenglued&nailed.• MustbedrywithaMoistureContent<15%beforefixing.

5.4. BLOCKING & BRACING (in the floor plane)

• TECBEAMjoistsdonotrequireintermediateblockingwherethereiseitherfullfloorsheetingandceilinglining,orstrongbacks(Note:Strongbacksaremoreeffectivethansolidblocking).

• Installblockinginthefollowinglocations: a)atcantileversalongthesupportlineandinalternatebaysattheouterendifnotrimmeris indicated, b)alongallsupportlines-maximumspacing1.8m, c)incontinuousspans-alongintermediatesupports, d)underpartitionwallsrunningparalleltothejoists.

5.5. PLYWOOD LOAD SPREADERS (or RIMBOARDS)

• Wherejoistsareoffsetfromloadbearingstuds,PlywoodLoadSpreaders(orrimboards)canbeusedinsteadofextrastuds,wallplateblockingoradoubletopplate.

• Loadspreadersshouldmeminimum12mmF11constructionplywood,cuttotheexactjoistdepthandfittedtightbetweenthewallplateandflooring

• Installjoistswitha15mmsetbackfromtheoutsidefaceofthewallframe.Fixeachoffsetjoistwithaminimum8/40x2.8mmnails.

• LoadSpreadersshouldspanatleastthreestudsorminimum1350mm.• OffsetJoistscarryingloadsinadditiontonormalresidentialfloorloads,mayrequireextrafixings-refertostructuralengineer.• PlywoodLoadSpreadersalsoprovidein-floor-planebracing,eliminatingendblocking,orcrossstrapping.• Whenusedasendbracingonly,the15mmsetbackisnotrequired;fixwithaminimumoffournailsperjoist.

Timber Wedges glued and nailed or screw fixed, centred about the web.

(Alternative: wedges can be fixed on top of web)

Blocking in alternate bays

Rim Board nailed at ends of Tecbeam

Page 5: INSTALLATION GUIDELINES - TECBUILD · 5.3.2 Installation (continued) • Install strongbacks with a minimum lap of one (1) bay • Laps in strongbacks maybe installed in a) the same

www.tecbeam.com.au

5.5. BEARING SUPPORT• Recommendedminimumbearinglength:45mm

Alternately,Tecbeamjoistscanbestaggeredatinternalloadbearingwallsforfull90mmbearing

5.7. WEB STIFFENERS (or WEB BLOCKS)

• arerequiredtotransfershearloadsintooroutofthesteelweb• areusedtobracethewebinhighloadcases• MinimumSize:70x35seasonedtimber,tightfittingbetweentimberflangesoneachsideofthewbeandnailedtogether• Minimumnailing: T25-65x2.7mm T30-65x2.7mm

5.7.1MinimumRequirements: Webstiffenersarerequiredat: a)theendsofalljoists b)supportlineforcantilevers c)supportingwalls,beamsorpostsincontinuousspans

Blocking as specified

45mm bearing

90mm LBW45mm

Blocking as specified

90mm bearing

90mm LBW

Flooring

Strongback

Web Stiffener each side of all joists and blocking every third bay

Page 6: INSTALLATION GUIDELINES - TECBUILD · 5.3.2 Installation (continued) • Install strongbacks with a minimum lap of one (1) bay • Laps in strongbacks maybe installed in a) the same

www.tecbeam.com.au

5.7.1MinimumRequirements(continued): d)underpointloadsexceeding500kg

e)perimeterwalls

• Underperimeterloadbearingwalls,asingleTECBEAMjoistfittedwithextrawebstiffenersreplacestwosolidtimberjoists

• Recommendedwebstiffenerspacing• MetalRooves -1350mmctrs• TileRooves -upto10mspan900mmctrs• HeavierLoads -600mmctrs

Note:Ifawebholeoccursoverthesupport,addapairofwebstiffenersasclosetothesupportaspossiblebutcoveringthesteelwebsufficientlytofixtheminimumnailingrequiredthroughtheweb.

Blocking at alternate bays

Web Stiffener (refer nailing require-ments)

Intermediate support

POINT LOAD (>500kg)

Strongback

Web Stiffener

Support

Page 7: INSTALLATION GUIDELINES - TECBUILD · 5.3.2 Installation (continued) • Install strongbacks with a minimum lap of one (1) bay • Laps in strongbacks maybe installed in a) the same

www.tecbeam.com.au

5.8. INTERNAL WALLS (Non-load bearing)

CrossingFloorJoists-Forasinglewallwithinthemiddlehalfofthejoistspanandalsowithin300mmofthetabulatedspan,oneofthefollowingmeasuresisrequired:

• addanextrajoistevery1800mmctrsor• reducejoistspacing,e.g.600mmto450mmctrs,450mmto350mmctrs,or• upgradetonextjoistsize

Note:foradditionalwallscrossingthejoists,checkwithTECBEAMAustralasiaorastructuralengineer

ParalleletoFloorJoists-Whereawallcoversover65%ofthejoistspan,checkthefollowing:

• Joists@600ctrs-ifthespaniswithin500mmofthetabulatedspan,addanextrajoistunderthewall• Joists@450ctrs-ifthespaniswithin900mmofthetabulatedspan,addanextrajoistunderthewall

Notes:1. Installastrongbackatmidspan2100mmlongtoevenoutdeflections2. Supportwallslocatedbetweenjoistswitheithershortstrongbacksorsolidblocking@1800mmctrs

5.9. TRIMMING, NOTCHING, or DOCKING• Trimming,notchingordockingispermissableonlyatendsupports• The“CommonEnd”hasapairofeither140mmor190mmwidewebstiffenersfittedwiththesteelwebsetback70mmor90mm

respectively.Thisfeatureallowsforhtetimberonlytrimming,notching,ordocking

5.9.1RestrictionsonNotching:

BottomFlangesTecbeamjoistbottomflangescanbenotchedupto15mmandnolongerthan100mm.Ifgreaternotchingisrequired,refertoTECBEAMAustralasia,orastructuralengineer.

TopFlangesCanbenotchedtothefulldepthoftheflangeandhalfthewidthofthestiffener.

100mm Max.

Web blocking in alternate bays

Trip-L-grip or skew nailing

15mm Max.

100mm Max.

70/95mm

140/190mm

Page 8: INSTALLATION GUIDELINES - TECBUILD · 5.3.2 Installation (continued) • Install strongbacks with a minimum lap of one (1) bay • Laps in strongbacks maybe installed in a) the same

www.tecbeam.com.au

5.10. CONNECTION AND FIXING DETAILS• Generally,standardtimberframingconnectorsandframingmethodsaresuitablewithTECBEAMjoists.• Forhigherloadcapacityapplications,heavydutyconnectorsmaybenecessary(refertoastructuralengineer)

5.10.1ConnectiontoTimberBeams

• Undernormalfloorloads,StandardJoisthangersareusedtoconnectTECBEAMjoiststotimberbeams.

• WhereTECBEAMjoistscarryhigherloadse.g.doublejoistatstairvoid,acombinationofajoisthangerononejoistandasteelanglebracketfixedwith2M12boltsontheotherjoistcanbeused.SeedetailbelowandrefertoTecbeamStandardDetails.

100x75x6 MS angles x 300 long (T30), 240 long (T25) z=016 (M12 thread) dynabolt anchors or angle60mm embedment at 180ctrs (T30), 130 ctrs (T25) ZM12 galvanised bolts at 60 centres or M12 all thread

Double Tecbeam floor joists carrying high loads e.g stair landing

Joist Hanger

Waler plate bolted to wall

Page 9: INSTALLATION GUIDELINES - TECBUILD · 5.3.2 Installation (continued) • Install strongbacks with a minimum lap of one (1) bay • Laps in strongbacks maybe installed in a) the same

www.tecbeam.com.au

5.10.2ConnectiontoSteelBeams

A.Notching-installagainstthebeamwebandbearingontheflange.

A.1.SteelbeamswithaheightsimilartoTecbeamjoists-minimisesanynotchingrequired• Notchthejoistinsidethesteelbeam(refernotchinglimitations)withthejoistsbearingonthebottomflangeofthesteelbeam• Installsolidtimberblockinginalternatebays• Fixblockingsecurelytothewebofthesteelbeambybolting,TekscrewsorRamsetpowerfasteners

A.2.LargerSteelbeams• Referdetailbelow• FixingssimilartoA.1.

or:

Bolt, Tek screw, or power fasten to web

Trip-L-grip or skew nailing

Block alternate bays

Bolt, Tek screw, or power fasten to web

Trip-L-grip or skew nailing

Block alternate bays

Bolt, Tek screw, or power fasten to web

Trip-L-grip or skew nailing

Block alternate bays

Bearing plate - bolt or power fasten to web

Page 10: INSTALLATION GUIDELINES - TECBUILD · 5.3.2 Installation (continued) • Install strongbacks with a minimum lap of one (1) bay • Laps in strongbacks maybe installed in a) the same

www.tecbeam.com.au

B.BeamCleats-usewhereitisnotpracticaltobearontheflange.

• Weldsteelcleats,orfixanglestothebeamwebandinstallboltsthroughthejoistwebstiffenerasshown.• Boltsindicatedarefornormalfloorloadsonly

Joist Bolts Minimum a b cT25 2M10 70 50 25T30,T35 2M12 85 80 30

C.Continoussolidtimberpacking

• Packthesteelbeamwithcontinuoussolidtimber• Boltpackingtosteelbeamwebtoengineer’sspecificationsandfixjoisthangers• Ensurethesteelbeamisbracedagainstrotationcausedbytheoffsetloading

‘I’Beam

or(PFC):

6mm Welded web cleat

Beam braced against rotation

Continuous timber packing Bolts to engineers design

Joist hanger

25mm Max. overhang

PFC

Continuous timber packing Bolts to engineers design

Joist hanger

Page 11: INSTALLATION GUIDELINES - TECBUILD · 5.3.2 Installation (continued) • Install strongbacks with a minimum lap of one (1) bay • Laps in strongbacks maybe installed in a) the same

www.tecbeam.com.au

5.11. EXTRA WEB HOLES• Ifextrawebholesarerequired,thefollowingareguidelinesforpermissableon-sitemodifications:

CONDITIONS:

1. ForuniformRESIDENTIALfloorloadsonly* - MaximumDeadLoad 0.7kPa(includinginternalpartitions) - MaximumLiveLoad 2.0kPa1. Noloadbearingwalls(LBWs)onthespan2. CuttingflangesisNOTallowed3. Flangesizeoverall90x45(forflanges70x45,therecangularholelengthisreduced,refertoTECBEAM

AustralasiaP/L,localTECBEAfabricatororastructuralengineer)4. Cutholesneatly,squareandrectangularholestohaveroundedcorners(Pre-drillminmum:10mmdia)

• Singlespan“L”istheTECBEAMtabulatedspanfor1.5&2.0kPaloading• Middlesegment“B”is0.5L• Endsegments“A”areequaltoor<0.5B• Iftheactualbeamlengthislessthan“B”,thereisnosegment“A”

*ForsetbackLBWs,continuousspans,andhigherfloorloading,refertoTECBEAMAustralasia,localTECBEAMfabricatororastructuralengineer.

Page 12: INSTALLATION GUIDELINES - TECBUILD · 5.3.2 Installation (continued) • Install strongbacks with a minimum lap of one (1) bay • Laps in strongbacks maybe installed in a) the same

www.tecbeam.com.au

5.11ExtraWebHoles(continued)

Page 13: INSTALLATION GUIDELINES - TECBUILD · 5.3.2 Installation (continued) • Install strongbacks with a minimum lap of one (1) bay • Laps in strongbacks maybe installed in a) the same

www.tecbeam.com.au

5.11ExtraWebHoles(continued)

Page 14: INSTALLATION GUIDELINES - TECBUILD · 5.3.2 Installation (continued) • Install strongbacks with a minimum lap of one (1) bay • Laps in strongbacks maybe installed in a) the same

LOGAN PROJECT SERVICES PTY LTD ABN 49 006 685 347

CERTIFICATIONOF‘TECBEAM’COMPOSITE‘I’BEAMSFORUSEASSTRUCTURALMEMBERSINBUILDINGS

Building Code of Australia ComplianceThe product ‘TECBEAM’, complies with the requirements of the Building Code of Australia, when designed and installed in accordance with the relevant Australian Standards, and also with the manufacturer’s current Design Guidelines, Installation Guidelines, Span Tables, and Section Properties (available from Tecbeam Australasia Pty Ltd or at www.tecbeam.com.au).

The Product‘TECBEAM’ is a structurally engineered composite ‘I’ beam, with seasoned timber flanges fastened to a continuous press-formed galvanized sheet steel web with stiffening ribs and holes; designed in Australia by Tecbeam Australasia Pty Ltd and manufactured under license.The published engineering properties:- first and second moment of area, flexural and shear stiffness, beam shear and bending capacity, have been determined from test results on full size samples and from the timber properties given in AS1720.1. The published values are based on the average of the tests, and are appropriate where several members share the loads as in floor and roof joists. Moment capacity has been determined using the first moment of area and the stress grade of the flange material. Where a single member is used to carry a significant load, a modification factor of 0.8, applied to the section properties, is recommended.

Floor Joist ApplicationsThe published span tables have been derived from: the relevant design criteria given in AS1684.1:1999 and AS1720.1:1997; and the design loadings specified in AS1170.1:2002.

The product is suitable for use as a structural building element in the following applications: • floor joists including; support of load bearing walls (non masonry), storage (up to 10kPa loading), concrete topped floors, car parking, sports floors, etc, • floor beams single, double or multiple TECBEAMS linked by one or more strong backs passing through the web holes and securely wedged in place, • moment connections to columns or walls to form sway bracing frames, • roof framing; rafters, purlins, hanging beams, ceiling joists, etc, • wall framing; studs, girts, etc, • other applications such as: A-frame and portal frame construction, portable buildings, temporary structures, formwork, etc can be designed using the beam section properties, or refer to Tecbeam Australasia Pty Ltd or a registered structural engineer.

B R Logan CPEng, BE(Civil), Dip CE, MIE Aust, NPER-3, RBP(Vic) EC-1176 August 2009